JPH10140618A - Operational valve system of power shovel - Google Patents
Operational valve system of power shovelInfo
- Publication number
- JPH10140618A JPH10140618A JP30459696A JP30459696A JPH10140618A JP H10140618 A JPH10140618 A JP H10140618A JP 30459696 A JP30459696 A JP 30459696A JP 30459696 A JP30459696 A JP 30459696A JP H10140618 A JPH10140618 A JP H10140618A
- Authority
- JP
- Japan
- Prior art keywords
- valve
- boom
- control valve
- tank
- arm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Operation Control Of Excavators (AREA)
- Component Parts Of Construction Machinery (AREA)
- Fluid-Pressure Circuits (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明はパワーショベルの操
作系バルブシステムに関し、さらに詳細には、パワーシ
ョベルのブームおよびアームの動作をコントロールする
ために、複数のコントロールバルブと複数のパイロット
バルブが備えられたパワーショベルの操作系バルブシス
テムに関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an excavator operating valve system, and more particularly, to a power shovel having a plurality of control valves and a plurality of pilot valves for controlling the operation of a boom and an arm of the shovel. And a valve system for an operation system of a power shovel.
【0002】[0002]
【従来の技術】従来、特に超小旋回機能を有するパワー
ショベルにあっては、上下方向に回動するブーム、アー
ムおよびバケット等から成る作業装置が、水平方向へオ
フセットされた状態で操作できるようになっている。例
えば、上下方向に回動するブームを、その上下方向の回
動軸が装着された装着部ごと水平方向へ回動移動させ
て、ブームを含む作業装置をオフセットする機能を備え
たものがある。この超小旋回型のパワーショベルによれ
ば、スペースがなく旋回範囲が規制される現場で有効に
利用できる。(なお、標準型のパワーショベルにあって
は、作業装置およびキャビンを含む上部機体全体を旋回
させる機構しかなく、旋回範囲が規制される現場では好
適に利用できない。)ところが、超小旋回型のパワーシ
ョベルの場合、ブーム等をオフセットすることから、ブ
ーム、アーム等(作業装置)の動作によっては、バケッ
ト(作業装置)がパワーショベル本体に干渉してしま
う。すなわち、旋回をしない状態での作業範囲を大きく
することはできるが、作業装置がキャビンを含むパワー
ショベル本体に干渉し易くなるという課題がある。2. Description of the Related Art Conventionally, particularly in a power shovel having an ultra-small turning function, a working device including a boom, an arm, a bucket, and the like, which rotates in a vertical direction, can be operated in a state of being offset in a horizontal direction. It has become. For example, there is an apparatus having a function of offsetting a working device including a boom by horizontally rotating a boom that rotates in a vertical direction together with a mounting portion on which the vertical rotation shaft is mounted. According to the ultra-small turning type power shovel, it can be effectively used in a site where there is no space and the turning range is restricted. (Note that a standard type power shovel has only a mechanism for turning the entire upper body including a working device and a cabin, and cannot be suitably used in a site where a turning range is restricted.) In the case of a power shovel, since a boom or the like is offset, the bucket (working device) interferes with the power shovel body depending on the operation of the boom, arm, or the like (working device). That is, although the working range in a state where the vehicle does not turn can be enlarged, there is a problem that the working device easily interferes with the power shovel body including the cabin.
【0003】これに対し、従来は、ブームのオフセット
位置、ブームの上下方向の回動位置、およびアームの上
下方向の回動位置が所定の領域から外れた際に、それを
センサで感知し、そのセンサから得た信号をコンピュー
タで解析して比例電磁弁を制御し、その比例電磁弁によ
ってパイロットバルブからコントロールバルブへの圧油
の供給を制御することで、作業装置を作動させる油圧動
力(油圧シリンダ装置等)を制御・停止させている。比
例電磁弁によれば、コンピュータからの制御信号によっ
て圧油の流量を好適に調整できるため、油圧動力を緩や
かに停止させることができ、作業装置の停止時の衝撃を
緩和できる。[0003] On the other hand, conventionally, when the offset position of the boom, the vertical rotation position of the boom, and the vertical rotation position of the arm deviate from a predetermined area, they are detected by a sensor. A computer analyzes the signal obtained from the sensor to control the proportional solenoid valve, and the proportional solenoid valve controls the supply of hydraulic oil from the pilot valve to the control valve, so that hydraulic power (oil pressure) Cylinder device, etc.). According to the proportional solenoid valve, the flow rate of the pressure oil can be suitably adjusted by the control signal from the computer, so that the hydraulic power can be gently stopped, and the shock at the time of stopping the working device can be reduced.
【0004】また、このコンピュータと比例電磁弁とを
備えるシステムによれば、パワーショベル本体、ブーム
およびアームの位置関係をコンピュータで演算して干渉
する位置関係にあるか否かを判断できる。さらに、作業
装置の作動領域を予め任意に設定することが可能である
ため、作業空間の制限が厳しい現場、例えば天井のある
作業空間で、その天井には干渉することが許されないよ
うな現場では、安全性を向上できる。なお、このコンピ
ュータと比例電磁弁とを備えるシステムは、元来、標準
的なパワーショベルのシステムに開発されたものであ
り、それを超小旋回型のパワーショベルに適用したもの
である。Further, according to the system including the computer and the proportional solenoid valve, the computer can calculate the positional relationship between the power shovel body, the boom, and the arm to determine whether or not the positional relationship causes interference. Further, since it is possible to arbitrarily set the operation area of the working device in advance, in a site where the working space is severely restricted, for example, in a working space with a ceiling, in a site where interference with the ceiling is not allowed. , Safety can be improved. The system including the computer and the proportional solenoid valve was originally developed as a standard power shovel system, and was applied to an ultra-small turning type power shovel.
【0005】[0005]
【発明が解決しようとする課題】しかしながら、従来の
システムでは、高価なコンピュータと比例電磁弁を用い
ているため、製造コストを低減できないという課題があ
る。超小旋回型のパワーショベルは小型であることが一
般的であり、コンピュータと比例電磁弁は大型の標準的
なパワーショベルと同等なものを要することになり、割
高である。また、従来のシステムでは、作業装置の作動
領域を予め自由に設定できる利点はあるが、実際にはパ
ワーショベル本体と作業装置の干渉さえ防止できればよ
いという現場が圧倒的である。従って、コンピュータと
比例電磁弁を用いたシステムは過剰機能となっているケ
ースが多く、実際には装置自体の干渉防止機能のみを備
えれば充分な場合が多い。However, since the conventional system uses an expensive computer and a proportional solenoid valve, there is a problem that the manufacturing cost cannot be reduced. Generally, a micro-swing type power shovel is small in size, and a computer and a proportional solenoid valve need to be equivalent to a large standard power shovel, which is expensive. Further, in the conventional system, there is an advantage that the operation area of the working device can be freely set in advance, but in reality, the site where the interference between the power shovel body and the working device only needs to be prevented is overwhelming. Therefore, a system using a computer and a proportional solenoid valve often has an excessive function, and in practice, it is often sufficient to provide only the interference prevention function of the device itself.
【0006】そこで、本発明の目的は、コンピュータと
比例電磁弁を用いることなく安価に、作業装置がパワー
ショベル本体に干渉することを防止できると共に、作業
装置の停止の際の衝撃を緩和できるパワーショベルの操
作系バルブシステムを提供することにある。SUMMARY OF THE INVENTION It is an object of the present invention to provide a power supply that can prevent the work equipment from interfering with the power shovel body at a low cost without using a computer and a proportional solenoid valve, and can reduce the shock when the work equipment is stopped. It is an object of the present invention to provide a valve system for an excavator.
【0007】[0007]
【課題を解決するための手段】本発明は、上記目的を達
成するために次の構成を備える。すなわち、本発明は、
パワーショベルのブームおよびアームの動作を制御する
ために、ブームのオフセット用の第1コントロールバル
ブおよび第1パイロットバルブと、ブームの回動用の第
2コントロールバルブおよび第2パイロットバルブと、
アームの回動用の第3コントロールバルブおよび第3パ
イロットバルブとが備えられたパワーショベルの操作系
バルブシステムにおいて、ブームがパワーショベルの基
体に対して所定の範囲外にオフセットされた際に信号を
発生するオフセットセンサと、ブームが上下方向に回動
して所定の範囲外に位置した際に信号を発生するブーム
位置センサと、アームが上下方向に回動して所定の範囲
外に位置した際に信号を発生するアーム位置センサと、
前記第1コントロールバルブと前記第1パイロットバル
ブの間に設けられ、ブームをオフセットさせる際には前
記両者を連通し、前記オフセットセンサからの信号を受
けた際には、第1パイロットバルブから第1コントロー
ルバルブへの圧油の供給を遮断すると共に、第1コント
ロールバルブへ供給されていた圧油をタンクへ逃がす第
1切換弁と、前記第2コントロールバルブと前記第2パ
イロットバルブの間に設けられ、ブームを回動させる際
には前記両者を連通し、前記ブームセンサからの信号を
受けた際には、第2パイロットバルブから第2コントロ
ールバルブへの圧油の供給を遮断すると共に、第2コン
トロールバルブへ供給されていた圧油をタンクへ逃がす
第2切換弁と、前記第3コントロールバルブと前記第3
パイロットバルブの間に設けられ、アームを回動させる
際には前記両者を連通し、前記アームセンサからの信号
を受けた際には、第3パイロットバルブから第3コント
ロールバルブへの圧油の供給を遮断すると共に、第3コ
ントロールバルブへ供給されていた圧油をタンクへ逃が
す第3切換弁と、前記第2切換弁とタンクの間に設けら
れ、タンクへ逃がす圧油の流れを規制するブーム用絞り
手段と、前記第3切換弁とタンクの間に設けられ、タン
クへ逃がす圧油の流れを規制するアーム用絞り手段とを
具備することを特徴とする。The present invention has the following arrangement to achieve the above object. That is, the present invention
A first control valve and a first pilot valve for offsetting the boom, a second control valve and a second pilot valve for rotating the boom, and
A control valve system for a power shovel including a third control valve and a third pilot valve for rotating an arm, wherein a signal is generated when the boom is offset from a predetermined range with respect to a body of the power shovel. An offset sensor, a boom position sensor that generates a signal when the boom rotates vertically and is out of a predetermined range, and a boom position sensor that generates a signal when the arm rotates vertically and is out of a predetermined range. An arm position sensor for generating a signal,
The first control valve and the first pilot valve are provided between the first control valve and the first pilot valve. When the boom is offset, the two are communicated with each other. A first switching valve for shutting off the supply of pressure oil to the control valve and releasing the pressure oil supplied to the first control valve to the tank, and is provided between the second control valve and the second pilot valve. When the boom is rotated, the two are communicated with each other. When a signal from the boom sensor is received, the supply of pressure oil from the second pilot valve to the second control valve is shut off, and the second A second switching valve for releasing the pressurized oil supplied to the control valve to the tank, the third control valve and the third control valve,
It is provided between the pilot valves and communicates the two when the arm is rotated, and supplies the pressure oil from the third pilot valve to the third control valve when receiving a signal from the arm sensor. And a boom provided between the second switching valve and the tank for restricting the flow of the pressure oil released to the tank. And a throttle means provided between the third switching valve and the tank for restricting the flow of pressure oil leaking to the tank.
【0008】また、前記ブーム用絞り手段がタンクへ逃
がす圧油の流量を制御するブーム用流量制御弁であり、
前記アーム用絞り手段がタンクへ逃がす圧油の流量を制
御するアーム用流量制御弁であることで、ブームまたは
アームの回動が停止される際の衝撃を確実且つ好適に緩
和することができる。A boom flow control valve for controlling a flow rate of the pressure oil released to the tank by the boom throttle means;
Since the arm throttle means is a flow control valve for the arm that controls the flow rate of the pressure oil released to the tank, the impact when the rotation of the boom or the arm is stopped can be reliably and suitably mitigated.
【0009】また、前記第1パイロットバルブと前記第
1コントロールバルブとを連通可能に設けられた第1パ
イパス通路と、前記第2パイロットバルブと前記第2コ
ントロールバルブとを連通可能に設けられた第2パイパ
ス通路と、前記第3パイロットバルブと前記第3コント
ロールバルブとを連通可能に設けられた第3パイパス通
路と、前記第1バイパス通路、前記第2バイパス通路お
よび前記第3バイパス通路を開閉するバイパス開閉弁と
を備えることで、電気系統の故障等によってロック状態
になった際に、そのバイパス開閉弁を開くことで、ロッ
ク状態を好適に解消できる。Also, a first bypass passage provided to allow communication between the first pilot valve and the first control valve, and a first bypass passage provided to allow communication between the second pilot valve and the second control valve. A second bypass passage, a third bypass passage provided to allow communication between the third pilot valve and the third control valve, and opening and closing the first bypass passage, the second bypass passage, and the third bypass passage. By providing the bypass on-off valve, when the lock state is established due to a failure of the electric system or the like, the lock state can be suitably canceled by opening the bypass on-off valve.
【0010】また、前記第1切換弁を有する第1ブロッ
ク、前記2切換弁および前記ブーム用絞り手段を有する
第2ブロック、前記切換弁および前記アーム用絞り手段
を有する第3ブロックが併設され、前記バイパス開閉弁
が、各前記ブロックに内蔵された前記第1バイパス通
路、前記第2バイパス通路および前記第3バイパス通路
を貫くように形成された挿通孔と、該挿通孔に挿通さ
れ、移動動作によって第1バイパス通路、第2バイパス
通路および第3バイパス通路を同時に開閉する弁体を備
えることで信頼性の高いバルブシステムをコンパクトに
形成できる。A first block having the first switching valve, a second block having the second switching valve and the boom throttle unit, and a third block having the switching valve and the arm throttle unit are provided side by side. The bypass opening / closing valve is inserted through the first bypass passage, the second bypass passage, and the third bypass passage incorporated in each of the blocks, and is inserted into the insertion hole, and the moving operation is performed. By providing a valve body that simultaneously opens and closes the first bypass passage, the second bypass passage, and the third bypass passage, a highly reliable valve system can be formed compactly.
【0011】また、前記ブーム用絞り手段および前記ア
ーム用絞り手段からタンクへ排出される排出油の通路と
して設けられたドレインラインと、該ドレインラインに
近接して配され、油圧ポンプから吐出されリリーフバル
ブ等を通過してタンクへ排出される排出油の通路として
設けられたタンクポートラインとを具備することで、タ
ンクポートラインを通過する排出油の熱によってドレイ
ンラインを加熱することができ、ブーム用絞り手段およ
びアーム用絞り手段の性能を向上できる。A drain line provided as a passage for draining oil discharged from the boom throttle means and the arm throttle means to the tank; and a drain line disposed close to the drain line, the relief line being discharged from a hydraulic pump. By providing a tank port line provided as a passage for discharged oil discharged to the tank through a valve or the like, the drain line can be heated by heat of the discharged oil passing through the tank port line, and the boom Of the diaphragm means for the arm and the diaphragm means for the arm can be improved.
【0012】[0012]
【発明の実施の形態】以下、本発明にかかる好適な実施
の形態を図1および図2と共に詳細に説明する。図1は
本発明にかかるパワーショベルの操作系バルブシステム
のバルブユニット10の回路図であり、パワーショベル
のブームおよびアーム等から成る作業装置が作動しない
状態を示している。A1、A2、A3は対応する各パイ
ロットバルブに接続され、B1、B2、B3は対応する
各コントロールバルブに接続される。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A preferred embodiment according to the present invention will be described below in detail with reference to FIGS. FIG. 1 is a circuit diagram of a valve unit 10 of an operation system valve system of a power shovel according to the present invention, and shows a state in which a working device including a boom, an arm, and the like of the power shovel does not operate. A1, A2, and A3 are connected to corresponding pilot valves, and B1, B2, and B3 are connected to corresponding control valves.
【0013】図2に示すように、12はパイロットバル
ブであり、ブームのオフセットを操作する第1パイロッ
トバルブ12a、ブームの回動(上下方向)を操作する
第2パイロットバルブ12b、アームの回動を操作する
第3パイロットバルブ12cを備える。各パイロットバ
ルブ12a、12b、12cは、対応するパイロットバ
ルブ側の連通路A1、A2、A3、バルブユニット1
0、およびコントロールバルブ側の連通路B1、B2、
B3を介してコントロールバルブ16a、16b、16
cに接続されており、パイロットバルブ12の操作部
(レバー等、図示せず)を操作することによって圧油を
コントロールバルブ16側へ発生する。18は油圧ポン
プであり、20はタンクである。コントロールバルブ1
6は、パイロットバルブ12によって制御され、スプー
ルが一方側へ移動した際には、油圧駆動装置22(ブー
ムオフセット用油圧シリンダ装置22a、ブーム回動用
油圧シリンダ装置22b、アーム回動用油圧シリンダ装
置22c)の一方への出力を発生させ、他方側へ移動し
た際には、油圧駆動装置22の他方への出力を発生させ
る。これにより、パワーショベルのブームおよびアーム
が制御されて作動する。そして、本発明にかかるバルブ
ユニット10は、パイロットバルブ12側からは連通路
A1、A2、A3によって、コントロールバルブ16側
からはB1、B2、B3によって接続されている。な
お、図2は配管を模式的に示してあり、例えば、連通路
A1、A2、A3はそれぞれ独立した管路(3本)であ
るが、一本の線で示してある。また、バルブユニット1
0は、パイロットバルブ12によってコントロールバル
ブ16の作動を制御するどちらか一方側に取り付ければ
よく、作動装置が干渉する可能性のない方向にかかるコ
ントロールバルブ16の作動を制御する側には取り付け
る必要がない。As shown in FIG. 2, reference numeral 12 denotes a pilot valve, a first pilot valve 12a for operating the boom offset, a second pilot valve 12b for operating the boom rotation (vertical direction), and an arm rotation. Is provided with a third pilot valve 12c for operating the second pilot valve. Each pilot valve 12a, 12b, 12c is connected to a corresponding pilot valve side communication passage A1, A2, A3, a valve unit 1
0, and the communication passages B1, B2 on the control valve side.
Control valves 16a, 16b, 16 via B3
The pressure oil is generated to the control valve 16 side by operating an operation unit (a lever or the like, not shown) of the pilot valve 12. Reference numeral 18 denotes a hydraulic pump, and reference numeral 20 denotes a tank. Control valve 1
6 is controlled by the pilot valve 12, and when the spool moves to one side, the hydraulic drive device 22 (the boom offset hydraulic cylinder device 22a, the boom rotation hydraulic cylinder device 22b, and the arm rotation hydraulic cylinder device 22c) To the other side, and when moving to the other side, the output of the hydraulic drive device 22 to the other side is generated. Thereby, the boom and the arm of the power shovel are controlled and operated. The valve unit 10 according to the present invention is connected from the pilot valve 12 side by communication paths A1, A2, A3, and from the control valve 16 side by B1, B2, B3. FIG. 2 schematically shows the pipes. For example, the communication paths A1, A2, and A3 are independent pipes (three), but are shown by one line. Also, the valve unit 1
0 may be attached to one side of the control valve 16 that controls the operation of the control valve 16 by the pilot valve 12, and must be attached to the side that controls the operation of the control valve 16 in a direction in which the actuator does not interfere. Absent.
【0014】24はオフセットセンサであり、ブームが
基体に対して所定の範囲外にオフセットされた際に信号
を発生する。なお、ブームのオフセット機構は、従来の
技術の欄で記載したようなブームの装着部ごと水平方向
へ回動移動させるものに限らす、ブームを基体側のブー
ムとアーム側のブームの2つに分けて、基体側のブーム
に対してアーム側のブームをオフセットさせるものなど
がある。従って、オフセットセンサ24の取り付け位置
は、基体とブームとの間、または基体側のブームとアー
ム側ブームとの間等になる。26はブーム位置センサで
あり、ブームが上下方向に回動して所定の範囲外に位置
した際に信号を発生する。また、28はアーム位置セン
サであり、アームが上下方向の回動して所定の範囲外に
位置した際に信号を発生する。これらのセンサは、例え
ば、リミットスイッチでよい。リミットスイットとして
は、例えば、アームおよびブームを作動可能の場合はO
N状態で、アームおよびブームが所定の領域外に位置し
た際にはOFF状態になるものでよい。Reference numeral 24 denotes an offset sensor, which generates a signal when the boom is offset from a predetermined range with respect to the base. Note that the boom offset mechanism is not limited to the one that horizontally rotates the mounting portion of the boom as described in the section of the related art, and the boom is divided into two parts, a base-side boom and an arm-side boom. In some cases, the boom on the arm side is offset from the boom on the base side. Accordingly, the mounting position of the offset sensor 24 is between the base and the boom, between the base-side boom and the arm-side boom, and the like. Reference numeral 26 denotes a boom position sensor, which generates a signal when the boom pivots up and down and is positioned outside a predetermined range. Reference numeral 28 denotes an arm position sensor, which generates a signal when the arm rotates vertically and is positioned outside a predetermined range. These sensors may be, for example, limit switches. As a limit switch, for example, if the arm and the boom can be operated,
In the N state, when the arm and the boom are positioned outside the predetermined area, the arm and the boom may be in the OFF state.
【0015】30は第1切換弁であり、連通路B1およ
びA1を介して第1コントロールバルブ16aと第1パ
イロットバルブ12aの間に設けられ、ブームをオフセ
ットさせる際には前記両者を連通する。また、第1切換
弁30は、オフセットセンサ24からの信号を受けた際
には、第1パイロットバルブ12aから第1コントロー
ルバルブ16aへの圧油の供給を遮断すると共に、第1
コントロールバルブ16aへ供給されていた圧油をタン
ク20へ逃がすように作動する。その動作は、例えば、
オフセットセンサ24の信号によってリレースイッチ等
を介して第1ソレノイド31の電源を切ることでなされ
る。図1では、第1ソレノイド31に通電されず、第1
パイロットバルブ12aから第1コントロールバルブ1
6aへの圧油の供給が断たれた状態を示してある。Reference numeral 30 denotes a first switching valve, which is provided between the first control valve 16a and the first pilot valve 12a via the communication paths B1 and A1, and communicates with each other when the boom is offset. When receiving a signal from the offset sensor 24, the first switching valve 30 shuts off the supply of pressure oil from the first pilot valve 12a to the first control valve 16a, and
It operates to release the pressure oil supplied to the control valve 16a to the tank 20. The operation is, for example,
This is performed by turning off the power of the first solenoid 31 via a relay switch or the like in accordance with a signal from the offset sensor 24. In FIG. 1, the first solenoid 31 is not energized,
From the pilot valve 12a to the first control valve 1
The state where the supply of the pressure oil to 6a is cut off is shown.
【0016】32は第2切換弁であり、連通路B2およ
びA2を介して第2コントロールバルブ16bと第2パ
イロットバルブ12bの間に設けられ、ブームを回動さ
せる際には前記両者を連通する。また、第2の切換弁3
2は、ブームセンサ26からの信号を受けた際には、第
2パイロットバルブ12bから第2コントロールバルブ
16bへの圧油の供給を遮断すると共に、第2コントロ
ールバルブ16bへ供給されていた圧油をタンク20へ
逃がすように作動する。その動作は、例えば、ブームセ
ンサ26の信号によってリレースイッチ等を介して第2
ソレノイド33の電源を切ることでなされる。図1で
は、第2ソレノイド33に通電されず、第2パイロット
バルブ12bから第2コントロールバルブ16bへの圧
油の供給が断たれた状態を示してある。A second switching valve 32 is provided between the second control valve 16b and the second pilot valve 12b via the communication passages B2 and A2, and communicates with each other when the boom is rotated. . Also, the second switching valve 3
2, upon receiving a signal from the boom sensor 26, shuts off the supply of the pressure oil from the second pilot valve 12b to the second control valve 16b, and also releases the pressure oil supplied to the second control valve 16b. Is operated to escape to the tank 20. The operation is performed, for example, by a signal from the boom sensor 26 via a relay switch or the like.
This is done by turning off the power of the solenoid 33. FIG. 1 shows a state in which the second solenoid 33 is not energized and the supply of pressure oil from the second pilot valve 12b to the second control valve 16b is cut off.
【0017】34は第3切換弁であり、連通路B3およ
びA3を介して第3コントロールバルブ16cと第3パ
イロットバルブ12cの間に設けられ、アームを回動さ
せる際には前記両者を連通する。また、第3切換弁34
は、アームセンサ28からの信号を受けた際には、第3
パイロットバルブ12cから第3コントロールバルブ1
6cへの圧油の供給を遮断すると共に、第3コントロー
ルバルブ16cへ供給されていた圧油をタンク20へ逃
がすように作動する。その動作は、例えば、アームセン
サ28の信号によってリレースイッチ等を介して第3ソ
レノイド35の電源を切ることでなされる。図1では、
第3ソレノイド35に通電されず、第3パイロットバル
ブ12cから第2コントロールバルブ16cへの圧油の
供給が断たれた状態を示してある。Reference numeral 34 denotes a third switching valve, which is provided between the third control valve 16c and the third pilot valve 12c via the communication paths B3 and A3, and connects the two when the arm is rotated. . Further, the third switching valve 34
When the signal from the arm sensor 28 is received, the third
From the pilot valve 12c to the third control valve 1
The supply of the pressure oil to the third control valve 16c is cut off while the supply of the pressure oil to the third control valve 16c is released to the tank 20. The operation is performed by, for example, turning off the power of the third solenoid 35 via a relay switch or the like according to a signal from the arm sensor 28. In FIG.
The state where the third solenoid 35 is not energized and the supply of the pressure oil from the third pilot valve 12c to the second control valve 16c is cut off is shown.
【0018】36はブーム用流量制御弁であり、タンク
へ逃がす圧油の流れを規制するブーム用絞り手段の一例
である。このブーム用流量制御弁36は、第2切換弁3
2とタンク20の間に設けられ、第2コントロールバル
ブ16bへ供給されていた圧油をタンク20へ逃がす際
に、その圧油の流量を制御してショックを緩和するショ
ックレスバルブとして作用する。なお、圧油は、ブーム
用流量制御弁36からタンク20へドレインライン19
を介して逃がされる。38はアーム用流量制御弁であ
り、タンクへ逃がす圧油の流れを規制するアーム用絞り
手段の一例である。このアーム用流量制御弁38は、第
3切換弁34とタンク20の間に設けられ、第3コント
ロールバルブ16cへ供給されていた圧油をタンク20
へ逃がす際に、その圧油の流量を制御してショックを緩
和するショックレスバルブとして作用する。なお、圧油
は、アーム用流量制御弁38からタンク20へドレイン
ライン19を介して逃がされる。Reference numeral 36 denotes a boom flow control valve, which is an example of a boom throttle means for restricting the flow of pressure oil released to the tank. The boom flow control valve 36 includes a second switching valve 3.
When the pressure oil supplied to the second control valve 16b is released to the tank 20, the pressure oil supplied to the second control valve 16b functions as a shockless valve that controls the flow rate of the pressure oil to reduce the shock. The pressure oil is supplied from the boom flow control valve 36 to the tank 20 to the drain line 19.
Escaped through. Numeral 38 is a flow control valve for the arm, which is an example of a throttle means for the arm for restricting the flow of the pressure oil released to the tank. The arm flow control valve 38 is provided between the third switching valve 34 and the tank 20 to reduce the pressure oil supplied to the third control valve 16c to the tank 20.
When escaping, it acts as a shockless valve that controls the flow rate of the pressure oil to reduce the shock. The pressurized oil is released from the arm flow control valve 38 to the tank 20 via the drain line 19.
【0019】41は第1バイパス通路であり、第1切換
弁30を介して第1パイロットバルブ12aと第1コン
トロールバルブ16aとを連通可能に設けられている。
42は第2バイパス通路であり、第2切換弁32を介し
て第2パイロットバルブ12bと第2コントロールバル
ブ16bとを連通可能に設けられている。43は第3バ
イパス通路であり、第3切換弁34を介して第3パイロ
ットバルブ12cと第3コントロールバルブ16cとを
連通可能に設けられている。そして、45はバイパス開
閉弁であり、第1バイパス通路41、第2バイパス通路
42および第3バイパス通路43を同時に開閉する。こ
のバイパス開閉弁45は、レバー46によって開閉され
る。但し、レバー46に限らず、ソレノイドを用いても
よい。図1では、バイパス開閉弁45が、パワーショベ
ルが通常に作動する状態、すなわち各バイパス通路4
1、42、43が閉じた状態を示してある。Reference numeral 41 denotes a first bypass passage, which is provided so as to allow communication between the first pilot valve 12a and the first control valve 16a via the first switching valve 30.
Reference numeral 42 denotes a second bypass passage, which is provided to allow communication between the second pilot valve 12b and the second control valve 16b via the second switching valve 32. Reference numeral 43 denotes a third bypass passage, which is provided so that the third pilot valve 12c and the third control valve 16c can be communicated via the third switching valve 34. A bypass opening / closing valve 45 opens and closes the first bypass passage 41, the second bypass passage 42, and the third bypass passage 43 at the same time. The bypass on-off valve 45 is opened and closed by a lever 46. However, not limited to the lever 46, a solenoid may be used. In FIG. 1, the bypass on-off valve 45 is in a state where the power shovel operates normally, that is, each bypass passage 4
1, 42 and 43 show the closed state.
【0020】以上の構成によるパワーショベルの操作系
バルブシステムによれば、ブームやアームが所定領域外
に位置して第1〜3ソレノイド31、33、35のいず
れか一つまたは複数が作動して作業装置の動作が停止し
た際、ブームやアームを反対方向へ移動させ、所定の領
域内へ位置させることにより、通常の作動状態に戻すこ
とができる。すなわち、ブームやアームが所定領域外
(一方側)へ移動した際は、コントロールバルブ16の
スプールの一方向への作動は停止されるが、他方向への
作動は可能であり、コントロールバルブ16のスプール
の他方側への作動によってブームやアームを油圧動力を
介して反対方向へ移動することで、ブームやアームを通
常の作動状態へ戻すことができる。また、電気系統の故
障等によって各ソレノイド31、33、35の電源が切
れ、各パイロットバルブ12a、12b、12cと各コ
ントロールバルブ16a、16b、16cとが連通しな
くなった場合は、レバー46を操作することによってバ
イパス開閉弁45を開く。これにより、各バイパス通路
41、42、43が、各切換弁30、32、34を介し
て、各パイロットバルブ12a、12b、12cと各コ
ントロールバルブ16a、16b、16cとを連通でき
る。各切換弁30、32、34を介してバイパスする具
体的な実施例については後述するが、このようにバイパ
スさせた場合、ブームおよびアームは、パワーショベル
本体に干渉する位置を含めて全範囲で駆動できるように
なり、電気系統の故障等が発生しても暫定的に作業装置
を稼働させることができる。According to the operation system valve system of the power shovel having the above-described configuration, the boom or the arm is positioned outside the predetermined region, and one or more of the first to third solenoids 31, 33, and 35 operate. When the operation of the working device is stopped, the normal operation state can be returned by moving the boom or the arm in the opposite direction and positioning it in a predetermined area. That is, when the boom or the arm moves out of the predetermined area (one side), the operation of the control valve 16 in one direction is stopped, but the operation in the other direction is possible. By moving the boom or arm in the opposite direction via hydraulic power by operation of the other side of the spool, the boom or arm can be returned to a normal operating state. When the power to each of the solenoids 31, 33, and 35 is cut off due to a failure in the electric system and the like, and the pilot valves 12a, 12b, and 12c and the control valves 16a, 16b, and 16c are disconnected, the lever 46 is operated. By doing so, the bypass on-off valve 45 is opened. Thereby, each bypass passage 41, 42, 43 can communicate each pilot valve 12a, 12b, 12c and each control valve 16a, 16b, 16c via each switching valve 30, 32, 34. A specific example of bypassing via each of the switching valves 30, 32, 34 will be described later. However, when such bypassing is performed, the boom and the arm can be moved over the entire range including the position that interferes with the power shovel body. It becomes possible to drive, and even if a failure of the electric system or the like occurs, the working device can be temporarily operated.
【0021】[0021]
【実施例】次に、本発明にかかる好適な実施例を添付図
面と共に詳細に説明する。図3は本発明によるパワーシ
ョベルの操作系バルブシステムのバルブユニット10の
一実施例を示す断面図である。図4はソレノイドがOF
Fになった状態を示す断面図である。図5はバイパス開
閉弁を説明する説明図である。バルブユニット10は、
第1〜3切換弁30、32、34、流量制御弁36、3
8、およびバイパス開閉弁45を一体的に組み込んだ状
態に設けてある。第1〜3切換弁30、32、34は同
一の構造のものを利用できるのため、ここでは第2切換
弁32のみを説明する。また、ブーム用流量制御弁36
と、アーム用流量制御弁38は同一の構造のものを利用
できるのため、ここではブーム用流量制御弁36のみを
説明する。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Preferred embodiments according to the present invention will be described in detail with reference to the accompanying drawings. FIG. 3 is a sectional view showing one embodiment of the valve unit 10 of the operation system valve system of the power shovel according to the present invention. Fig. 4 shows that the solenoid is OF
It is sectional drawing which shows the state which became F. FIG. 5 is an explanatory diagram illustrating the bypass on-off valve. The valve unit 10
First to third switching valves 30, 32, 34, flow control valves 36, 3
8 and the bypass opening / closing valve 45 are integrally incorporated. Since the first to third switching valves 30, 32, and 34 can have the same structure, only the second switching valve 32 will be described here. Also, the boom flow control valve 36
Since the same structure can be used as the arm flow control valve 38, only the boom flow control valve 36 will be described here.
【0022】第2切換弁32は、スプール式のON・O
FFバルブである。50は入力ポートであり、第2パイ
ロットバルブ12b(以下、単に「パイロットバルブ1
2」と記す)に接続され、パイロットバルブ12から出
力された圧油を連通路A2を介して油室である挿通孔5
8へ導入するポートである。51は入力接続ネジ部であ
り、配管等の接続用部材(図3ではフィルタを備える継
手を示してある)が接続されるように設けられており、
入力ポート50に連通している。なお、49はプラグで
あり、製造時に形成された孔(圧油の通路とならない)
を閉塞している。52は出力ポートであり、第2コント
ロールバルブ16b(以下、単に「コントロールバルブ
16」と記す)に接続され、パイロットバルブ12から
出力された圧油を連通路B2を介してコントロールバル
ブ16側へ出力するポートである。53は出力接続ネジ
部であり、出力ポート52に連通している。54はタン
クポートであり、後述するブーム用流量制御弁36を介
してドレインライン19からタンク20に連通してい
る。なお、第1切換弁30の場合、本実施例ではタンク
ポート54は流量制御弁を介せず直接タンクへ接続され
る。これは、ブームのオフセットは通常低速度で行われ
るように設定され、停止の際の衝撃が小さいためであ
る。但し、使用条件によっては流量制御弁を介在させて
もよいのは勿論である。The second switching valve 32 is a spool type ON / O
FF valve. Reference numeral 50 denotes an input port, and the second pilot valve 12b (hereinafter simply referred to as "pilot valve 1").
2 "), and pressurized oil output from the pilot valve 12 is passed through the communication passage A2 to form an insertion hole 5 serving as an oil chamber.
8 is a port to be introduced. Reference numeral 51 denotes an input connection screw portion, which is provided so as to be connected to a connection member such as a pipe (a joint provided with a filter is shown in FIG. 3).
It communicates with the input port 50. Reference numeral 49 denotes a plug, which is a hole formed at the time of manufacture (not a passage for pressure oil).
Is closed. An output port 52 is connected to a second control valve 16b (hereinafter simply referred to as "control valve 16"), and outputs the pressure oil output from the pilot valve 12 to the control valve 16 via the communication passage B2. Port. Reference numeral 53 denotes an output connection screw portion, which communicates with the output port 52. A tank port 54 communicates with the tank 20 from the drain line 19 via a boom flow control valve 36 described later. In the case of the first switching valve 30, in this embodiment, the tank port 54 is directly connected to the tank without passing through the flow control valve. This is because the boom offset is normally set to be performed at a low speed, and the impact at the time of stopping is small. However, it goes without saying that a flow control valve may be interposed depending on the use conditions.
【0023】56はスプールであり、2つのくびれ部5
6a、56bが形成されており、挿通孔58内で軸線方
向に摺動可能に配されている。また、スプール56は、
常にスプリング60によって図面上右側へ付勢されてい
る。なお、挿通孔58は、その左端部形成された孔62
を介してドレインライン19から低圧源であるタンク2
0に連通されている。また、スプール56の軸芯に沿っ
て形成された貫通孔56cによって、挿通孔58の両端
は連通されており、スプール56の軸線方向の往復動
は、挿通孔58の両端に満たされる油によって規制を受
けない。第2ソレノイド33は、駆動軸部33aが、挿
通孔58の右内端面からスプリング60に対抗して挿通
孔58内へ進退可能に臨んで配されている。第2ソレノ
イド33に通電されているときには駆動軸部33aが突
出している。駆動軸部33aが突出している際には、図
3に示すように、スプール56を押圧し、そのスプール
56をスプリング60の付勢力に抗して左側に移動した
状態にしている。この際には、入力ポート50が、スプ
ール56の第1のくびれ部56aを介して出力ポート5
2に連通しており、パイロットバルブ12の圧油がコン
トロールバルブ16側へ供給できる状態となっている。Numeral 56 denotes a spool, and two constricted portions 5
6a and 56b are formed, and are slidably disposed in the insertion hole 58 in the axial direction. Also, the spool 56
It is always urged by the spring 60 to the right in the drawing. The insertion hole 58 is formed with a hole 62 formed at the left end.
From the drain line 19 through the tank 2 which is a low pressure source
It is connected to 0. Further, both ends of the insertion hole 58 are communicated with each other by a through hole 56 c formed along the axis of the spool 56, and the reciprocation of the spool 56 in the axial direction is restricted by oil filled at both ends of the insertion hole 58. Not receive. The second solenoid 33 is arranged such that the drive shaft portion 33a faces the spring 60 from the right inner end face of the insertion hole 58 so as to be able to advance and retreat into the insertion hole 58. When the second solenoid 33 is energized, the drive shaft portion 33a protrudes. When the drive shaft portion 33a protrudes, as shown in FIG. 3, the spool 56 is pressed, and the spool 56 is moved to the left against the urging force of the spring 60. At this time, the input port 50 is connected to the output port 5 via the first constricted portion 56a of the spool 56.
2 so that the pressure oil of the pilot valve 12 can be supplied to the control valve 16 side.
【0024】次に、ブームが上下方向に回動して所定の
範囲外に位置し、ブーム位置センサ26が信号を発生し
た際は、その信号によってリレースイッチ等を介して第
2ソレノイド33への通電が断たれる。第2ソレノイド
33がOFF状態になるため、図4に示すように、スプ
ール56がスプリング60の付勢力によって右側へ移動
すると共に、駆動軸部33aが第2ソレノイド33の本
体内へ引き込む。これによって、入力ポート50と出力
ポート52との連通は遮断され、パイロットバルブ12
からコントロールバルブ16への圧油の供給が遮断され
る。同時に第2のくびれ部56bによって出力ポート5
2とタンクポート54とが連通して、コントロールバル
ブ16へ供給されていた圧油は、ドレインライン19を
介してタンク20へ逃がされる。第2切換弁32のタン
クポート54とタンク20との間にはブーム用流量制御
弁36が設けられており、タンク20へ逃がす圧油の流
量を制御し、そのショックを緩和する。作動装置が停止
する際の予期しない衝撃的な振動等を回避できる。Next, when the boom is rotated vertically and positioned outside a predetermined range and the boom position sensor 26 generates a signal, the signal is transmitted to the second solenoid 33 via a relay switch or the like in accordance with the signal. Power is turned off. Since the second solenoid 33 is turned off, the spool 56 moves rightward by the urging force of the spring 60, and the drive shaft 33a is drawn into the main body of the second solenoid 33, as shown in FIG. As a result, communication between the input port 50 and the output port 52 is cut off, and the pilot valve 12
The supply of the pressure oil from the control valve 16 to the control valve 16 is shut off. At the same time, the output port 5 is controlled by the second constricted portion 56b.
2 communicates with the tank port 54, and the pressure oil supplied to the control valve 16 is released to the tank 20 via the drain line 19. A boom flow control valve 36 is provided between the tank port 54 of the second switching valve 32 and the tank 20 to control the flow rate of the pressure oil released to the tank 20 to reduce the shock. Unexpected shocking vibration and the like when the operating device stops can be avoided.
【0025】次に、ブーム用流量制御弁36の一実施例
について、その詳細を図3に基づいて説明する。ブーム
用流量制御弁36は、一般的なショックレスバルブの構
成を備えており、基本的には、油室64に導入ポート6
6と排出ポート68が開口し、油室64の中には導入ポ
ート側の油室64aと排出ポート側の油室64bとを連
通する固定絞り72および連通孔73、74を有するス
プール70が往復動可能に挿入され、そのスプール70
の両側には油室64の内壁との間にスプリング75、7
6が弾装された構成を備えている。導入ポート66は、
パワーショベルの通常の作動時、油室64と前記第2切
換弁32のタンクポート54とを連通孔88bおよび流
路78を介して連通している。また、排出ポート68は
油室64とタンク20とをドレインライン19を介して
連通している。スプール70には、軸芯に沿って貫通孔
71が形成されており、その貫通孔71の中途部にオリ
フィス(固定絞り72)が設けられている。73は導入
ポート側の連通孔であり、導入ポート側の油室64aに
連通するように形成されている。また、74は排出ポー
ト側の連通孔であり、排出ポート68側の油室64bに
連通するように形成されている。Next, an embodiment of the boom flow control valve 36 will be described in detail with reference to FIG. The boom flow control valve 36 has a general shockless valve configuration.
6, a discharge port 68 is opened, and a spool 70 having a fixed throttle 72 and communication holes 73 and 74 for communicating between an oil chamber 64a on the introduction port side and an oil chamber 64b on the discharge port side reciprocates in the oil chamber 64. Movably inserted into its spool 70
Of springs 75, 7 between the oil chamber 64 and the inner wall of the oil chamber 64.
6 has a configuration in which it is loaded. The introduction port 66
During normal operation of the power shovel, the oil chamber 64 communicates with the tank port 54 of the second switching valve 32 via the communication hole 88b and the flow path 78. The discharge port 68 connects the oil chamber 64 and the tank 20 via the drain line 19. A through hole 71 is formed in the spool 70 along the axis, and an orifice (fixed throttle 72) is provided in the middle of the through hole 71. Reference numeral 73 denotes a communication hole on the introduction port side, which is formed so as to communicate with the oil chamber 64a on the introduction port side. A communication hole 74 on the discharge port side is formed so as to communicate with the oil chamber 64b on the discharge port 68 side.
【0026】このような構成からなるショックレスバル
ブ(ブーム用流量制御弁36)の作用について以下に説
明する。先ず、図4のように第2切換弁32がOFFに
状態になり、前記出力ポート52とタンクポート54と
が連通して、コントロールバルブ16へ供給されていた
圧油は、ブーム用流量制御弁36の導入ポート66へ供
給される。その圧油は、導入ポート66から、導入ポー
ト側の連通孔73、導入ポート側の油室64a、固定絞
り72、排出ポート側の油室64b、排出ポート側の連
通孔74、排出ポート68を通過し、ドレインライン1
9を通って低圧側のタンク20へ排出される。圧油が導
入された初期段階において、固定絞り72には、導入ポ
ート66側から排出ポート68側への油の流れが発生す
るため、差圧が発生し、スプール70は排出ポート側の
スプリング76の付勢力に抗して排出ポート68側へ移
動する。流量が多くなると差圧が大きくなり、スプール
70がさらに排出ポート68側へ移動し、排出ポート6
8側の連通孔74が塞がれ、油の流れが減少する。これ
により、固定絞り72に発生していた差圧が小さくな
り、排出ポート68側のスプリング76の付勢力によっ
てスプール70が導入ポート66側へ移動し、再び油の
流れが多くなる。以上のような動作が短時間のうちに繰
り返され、上記差圧と排出ポート68側のスプリングの
付勢力が釣り合うような一定流量となる。そして、その
後導入ポート66に導入される圧油の圧力が減少して
も、固定絞り72の前後の差圧が減少してスプール70
が導入ポート側の油室64a側へ戻され、排出ポート側
の連通孔74の排出ポート68に開口する面積が拡大す
るため、排出される油の流量は略一定に保たれる。この
ようにブーム用流量制御弁36によれば、コントロール
バルブ16側に供給されていた油を、流量が略一定でゆ
っくりと最終的にタンク20へ流すことができる。The operation of the shockless valve (boom flow control valve 36) having such a configuration will be described below. First, as shown in FIG. 4, the second switching valve 32 is turned off, the output port 52 communicates with the tank port 54, and the pressure oil supplied to the control valve 16 is supplied to the boom flow control valve. It is supplied to 36 introduction ports 66. The pressure oil flows from the introduction port 66 through the communication port 73 on the introduction port side, the oil chamber 64a on the introduction port side, the fixed throttle 72, the oil chamber 64b on the discharge port side, the communication hole 74 on the discharge port side, and the discharge port 68. Pass through, drain line 1
9 and is discharged to the tank 20 on the low pressure side. In the initial stage when the pressure oil is introduced, a flow of oil flows from the introduction port 66 side to the discharge port 68 side in the fixed throttle 72, so that a differential pressure is generated, and the spool 70 is displaced by the spring 76 on the discharge port side. Move to the discharge port 68 side against the urging force of. As the flow rate increases, the differential pressure increases, and the spool 70 moves further to the discharge port 68 side, and the discharge port 6
The communication hole 74 on the eighth side is closed, and the flow of oil decreases. As a result, the differential pressure generated in the fixed throttle 72 decreases, and the spool 70 moves toward the introduction port 66 by the urging force of the spring 76 on the discharge port 68 side, and the flow of oil increases again. The above operation is repeated within a short time, and the flow rate becomes constant such that the above-mentioned differential pressure and the urging force of the spring on the discharge port 68 side are balanced. Then, even if the pressure of the pressure oil introduced into the introduction port 66 decreases thereafter, the differential pressure across the fixed throttle 72 decreases, and the spool 70
Is returned to the oil chamber 64a on the introduction port side, and the area of the communication hole 74 on the discharge port side that opens to the discharge port 68 is increased, so that the flow rate of the discharged oil is kept substantially constant. As described above, according to the boom flow control valve 36, the oil supplied to the control valve 16 can be slowly and finally flown to the tank 20 at a substantially constant flow rate.
【0027】このように流量が制御されることで、第2
切換弁32によって、パイロットバルブ12からコント
ロールバルブ16への圧油の供給が急激に遮断された際
にも、ブームはゆっくりと作動して停止できる。すなわ
ち、その停止のショックを緩和できる。この効果は、ア
ームの動作についてアーム用流量制御弁38によって同
様に得られる。従って、作動装置が停止する際の予期し
ない衝撃的な振動を回避でき、安全性を向上できるので
ある。By controlling the flow rate in this way, the second
Even when the supply of pressure oil from the pilot valve 12 to the control valve 16 is suddenly cut off by the switching valve 32, the boom can be slowly operated and stopped. That is, the shock of the stop can be reduced. This effect is similarly obtained by the arm flow control valve 38 for the operation of the arm. Therefore, unexpected shock vibration when the operating device stops can be avoided, and safety can be improved.
【0028】なお、大型のパワーショベルの場合、コン
トロールバルブ16を作動させる油量が増大するため、
所定の速度の制御を行うには流量制御弁36、38で油
を逃がす量も増大させることを要する。このように機械
の大小によるコントロールバルブ16側から流量制御弁
36、38を通過してタンク20へ流れる油量の大小に
対応するには、固定絞り72のオリフィスの径を変えれ
ばよい。すなわち、大型のパワーショベルの場合は、固
定絞り72のオリフィスの径を大きくすればよい。従っ
て、他の部品は共用化が可能であり、製造コストを低減
できる。In the case of a large power shovel, the amount of oil for operating the control valve 16 increases.
In order to control the predetermined speed, it is necessary to increase the amount of oil released by the flow control valves 36 and 38. In order to cope with the magnitude of the amount of oil flowing from the control valve 16 side to the tank 20 through the flow control valves 36 and 38 depending on the size of the machine, the diameter of the orifice of the fixed throttle 72 may be changed. That is, in the case of a large-sized power shovel, the diameter of the orifice of the fixed throttle 72 may be increased. Therefore, other parts can be shared, and the manufacturing cost can be reduced.
【0029】次に、図5に基づいて、第1〜3切換弁3
0、32、34、ブーム用流量制御弁36およびアーム
用流量制御弁38を一体的に組み込んでバルブユニット
10を形成した実施例について説明する。図5の実施例
では、第1切換弁30を有する第1ブロック81、第2
切換弁32およびブーム用流量制御弁36を有する第2
ブロック82、第3切換弁34およびアーム用流量制御
弁38を有する第3ブロック83を併設して一体化して
ある。Next, based on FIG.
An embodiment in which the valve unit 10 is formed by integrally incorporating 0, 32, 34, the boom flow control valve 36, and the arm flow control valve 38 will be described. In the embodiment of FIG. 5, the first block 81 having the first switching valve 30 and the second block 81
A second valve having a switching valve 32 and a boom flow control valve 36;
The block 82, the third switching valve 34, and the third block 83 having the arm flow control valve 38 are provided side by side and integrated.
【0030】また、バイパス開閉弁45が、各ブロック
81、82、83を貫くように形成された挿通孔84
と、その挿通孔84に挿通され、回動することによって
第1〜3バイパス通路41、42、43を開閉する冗長
スプール86によって構成されている。冗長スプール8
6は、第1〜3バイパス通路41、42、43に対応し
て、通路の両端の開口が90°位置に設けられた連通孔
88a、88b、88cを備えている。従って、このバ
イパス開閉弁45は、弁体86を手動(レバー46、図
1参照)或いはソレノイド等の動力によって回動するこ
とで開閉する回動式の開閉弁になっている。なお、この
バイパス開閉弁45は、3つの外周溝部を備えれば、弁
体を手動或いはソレノイド等の動力によって往復動する
ことで開閉するスプール式の開閉弁とすることも可能で
ある。さらに、以上の二つの開閉機構を備えることで、
例えば、一方を動力によって作動させ、他方を手動で作
動させるように設けて信頼性の向上を図ることもでき
る。なお、図5にはバイパス開閉弁45が閉じた状態を
示してある。A bypass opening / closing valve 45 has an insertion hole 84 formed through each of the blocks 81, 82, 83.
And a redundant spool 86 that is inserted through the insertion hole 84 and rotates to open and close the first to third bypass passages 41, 42, and 43. Redundant spool 8
6 has communication holes 88a, 88b, 88c corresponding to the first to third bypass passages 41, 42, 43 in which openings at both ends of the passages are provided at 90 ° positions. Therefore, the bypass on-off valve 45 is a rotary on-off valve that opens and closes by rotating the valve body 86 manually (the lever 46, see FIG. 1) or by the power of a solenoid or the like. If the bypass opening / closing valve 45 is provided with three outer peripheral grooves, it may be a spool-type opening / closing valve that opens and closes by reciprocating the valve body manually or by the power of a solenoid or the like. Furthermore, by having the above two opening and closing mechanisms,
For example, it is possible to improve reliability by providing one to operate by power and the other to operate manually. FIG. 5 shows a state in which the bypass on-off valve 45 is closed.
【0031】次に、バイパス開閉弁45の作用につい
て、以上の説明と同様に第2切換弁32について説明す
る。冗長スプール86のレバー46を操作して図3のよ
うにセットした場合、第2ソレノイド33がONの状態
では、図3に明かにパイロットバルブ12の圧油は、連
通路A2、入力ポート50、第2切換弁32内(挿通孔
58内)、出力ポート52、および連通路B2を通過し
てコントロールバルブ16に供給される。この状態を、
X連通状態ということにする。冗長スプール86は上記
のままでブームセンサ26が作動した場合、すなわち、
第2ソレノイド33がOFFの状態では、図4のよう
に、コントロールバルブ16に供給されていた圧油が、
連通路B2、出力ポート52、第2切換弁32内(挿通
孔58内)、タンクポート54、連通孔88b、流路7
8、ブーム用流量制御弁36、ドレインライン19を通
過してタンク20に供給される。この状態を、Y連通状
態ということにする。Y連通状態になることで、回動し
ていたブームはゆっくりと停止できる。Next, the operation of the bypass on-off valve 45 will be described for the second switching valve 32 in the same manner as described above. When the lever 46 of the redundant spool 86 is operated and set as shown in FIG. 3, when the second solenoid 33 is in the ON state, the pressure oil of the pilot valve 12 apparently passes through the communication passage A2, the input port 50, The air is supplied to the control valve 16 through the second switching valve 32 (in the insertion hole 58), the output port 52, and the communication path B2. This state,
Let it be X communication state. When the boom sensor 26 operates while the redundant spool 86 remains as described above,
When the second solenoid 33 is in the OFF state, the pressure oil supplied to the control valve 16 is
Communication path B2, output port 52, inside second switching valve 32 (in insertion hole 58), tank port 54, communication hole 88b, flow path 7
8. It is supplied to the tank 20 through the boom flow control valve 36 and the drain line 19. This state is called a Y communication state. By entering the Y communication state, the rotating boom can be stopped slowly.
【0032】また、電気回路のトラブルで、コントロー
ルバルブ16の両側に対応して設けられた一対のバルブ
ユニット10、10の両側の第2ソレノイド33への通
電が切れて第2ソレノイド33がOFF状態になった場
合、両者のスプール56が移動してY連通状態になるた
め、パイロットバルブ12からコントロールバルブ16
の両側へ圧油を供給しない状態となる。従って、この状
態では作動装置(ここではブーム)が作動できない。こ
の際に、バイパス開閉弁45の冗長スプール86を、レ
バー46を操作して図7に示したように回動すること
で、図7に明かにパイロットバルブ12の圧油を、連通
路A2、第2バイパス通路42、連通路88b、タンク
ポート54、第2切換弁32内(挿通孔58内)、出力
ポート52、および連通路B2を通過してコントロール
バルブ16に供給する状態(この状態を、Z連通状態と
いうことにする)にできる。なお、このとき、タンクポ
ート54からブーム用流量制御弁36への連通は遮断さ
れる。これにより、作動装置(ここではブーム)を作動
させることが可能になる。さらに、第2切換弁32のス
プール56が、過渡状態にあって何等かの状態でステッ
クを起こして止まった場合についても、上記と同様に冗
長スプール86を操作することで、作動装置(ここでは
ブーム)を作動させることが可能になる。但し、以上の
ような状態になるためには、スプール56がどの位置で
止まっても、前記X連通状態または前記Z連通状態とな
るように、第2切換弁32を所定の構造に設けてあるこ
とを要するのは勿論である。Also, due to a trouble in the electric circuit, the power to the second solenoids 33 on both sides of the pair of valve units 10 and 10 provided on both sides of the control valve 16 is cut off, and the second solenoid 33 is turned off. , The two spools 56 move to the Y-communication state.
And no pressure oil is supplied to both sides. Therefore, in this state, the actuator (here, the boom) cannot operate. At this time, by operating the lever 46 to rotate the redundant spool 86 of the bypass on-off valve 45 as shown in FIG. 7, the pressure oil of the pilot valve 12 is clearly shown in FIG. A state in which the control valve 16 is supplied to the control valve 16 through the second bypass passage 42, the communication passage 88b, the tank port 54, the inside of the second switching valve 32 (the inside of the insertion hole 58), the output port 52, and the communication passage B2. , Z communication state). At this time, communication from the tank port 54 to the boom flow control valve 36 is cut off. Thereby, it becomes possible to operate the actuator (here, the boom). Further, in the case where the spool 56 of the second switching valve 32 is in a transient state and sticks in some state and stops, by operating the redundant spool 86 in the same manner as described above, the operating device (here, Boom) can be activated. However, in order to achieve the above-described state, the second switching valve 32 is provided in a predetermined structure so that the X-communication state or the Z-communication state is established regardless of the position where the spool 56 stops. Needless to say, it is necessary.
【0033】次に、図1、3、4、6、7に示すように
ドレインライン19の直下に設けられたタンクポートラ
イン80について説明する。前述したようにブーム用流
量制御弁36およびアーム用流量制御弁38は、ドレイ
ンライン19に連通しており、そのドレインライン19
を通って排出油がタンク20へ戻されるように構成され
ている。これに対して、タンクポートライン80は、ド
レインライン19に近接して配されており、油圧ポンプ
から吐出されリリーフバルブ等を通過してタンク20へ
排出される排出油の通路として設けられている。このよ
うにタンクポートライン80を配することで、タンクポ
ートライン80中の排出油の熱を、ドレインライン19
中の排出油へ伝達できる。排出油は油圧ポンプから吐出
されたものであり、加熱されている。従って、低油温時
においてドレインライン19内の排出油の温度上昇を早
め、ブーム用流量制御弁36およびアーム用流量制御弁
38の性能を向上させることができる。なお、リリーフ
バルブ92(図2参照)は、例えば、油圧ポンプ18と
パイロットバルブ12との間に、パイロットバルブ12
へ供給する圧油の圧力を略一定に保つために配設される
ものがある。Next, the tank port line 80 provided immediately below the drain line 19 as shown in FIGS. As described above, the boom flow control valve 36 and the arm flow control valve 38 communicate with the drain line 19, and the drain line 19
The exhaust oil is returned to the tank 20 through the tank. On the other hand, the tank port line 80 is arranged close to the drain line 19 and is provided as a passage for the discharged oil discharged from the hydraulic pump, discharged through the relief valve or the like, and discharged to the tank 20. . By arranging the tank port line 80 in this manner, the heat of the discharged oil in the tank port line 80 is transferred to the drain line 19.
It can be transmitted to the discharged oil inside. The discharged oil is discharged from the hydraulic pump and is heated. Therefore, the temperature of the discharged oil in the drain line 19 can be increased at a low oil temperature, and the performance of the boom flow control valve 36 and the arm flow control valve 38 can be improved. The relief valve 92 (see FIG. 2) is provided between the hydraulic pump 18 and the pilot valve 12, for example.
Some are provided to keep the pressure of the pressurized oil supplied to the compressor substantially constant.
【0034】以上に説明したように本発明によれば、コ
ンピュータ(精密電子部品)を要しないため、故障しに
くく、扱い易い。また、コンピュータを搭載する場合に
比べ簡単な搭載構造でよいため製造コストを低減でき
る。以上の実施例では、ブームのオフセットは低速度で
行うことを前提に、第1切換弁30には、ショックレス
バルブを設けなかったが、ショックを緩和できる効果を
必要とする使用条件の場合には、第2切換弁および第3
切換弁と同様にショックレスバルブを設けてもよいのは
勿論である。また、以上の実施例では、絞り手段として
ブーム用流量制御弁36およびアーム用流量制御弁38
のように低温時にも作動可能な温度保証型のショックレ
スバルブを用いたが、本発明はこれに限らず、例えば、
図7に示すような単なる絞り90によっても、温度保証
はできないが同等の効果を得ることができる。以上、本
発明につき好適な実施例を挙げて種々説明してきたが、
本発明はこの実施例に限定されるものではなく、発明の
精神を逸脱しない範囲内で多くの改変を施し得るのは勿
論のことである。As described above, according to the present invention, a computer (precision electronic parts) is not required, so that it is hard to break down and easy to handle. Further, since a simple mounting structure is sufficient as compared with a case where a computer is mounted, manufacturing costs can be reduced. In the above embodiment, the boom offset is performed at a low speed, and the first switching valve 30 is not provided with the shockless valve. Are the second switching valve and the third
Needless to say, a shockless valve may be provided similarly to the switching valve. Also, in the above embodiment, the boom flow control valve 36 and the arm flow control valve 38
Although a temperature-guaranteed shockless valve that can be operated even at low temperatures was used, the present invention is not limited to this.
Although the temperature cannot be guaranteed by a simple stop 90 as shown in FIG. 7, the same effect can be obtained. As described above, the present invention has been described in various ways with preferred embodiments.
The present invention is not limited to this embodiment, and it goes without saying that many modifications can be made without departing from the spirit of the invention.
【0035】[0035]
【発明の効果】本発明によれば、切換弁(ON・OFF
弁)と、絞り手段(流量制御弁等)を組み合わせて用い
ることで、コンピュータと比例電磁弁を用いることな
く、作業装置がパワーショベル本体に干渉することを防
止できると共に、ブームおよびアームを含む作業装置の
停止の際の衝撃を緩和できるパワーショベルの操作系バ
ルブシステムを設けることができる。従って、好適な干
渉防止機能と、好適な停止の際の衝撃緩和機能を備える
パワーショベルの製造コストを大幅に低減できるという
著効を奏する。According to the present invention, the switching valve (ON / OFF)
By using a combination of a valve and a throttle means (flow control valve, etc.), it is possible to prevent the working device from interfering with the power shovel body without using a computer and a proportional solenoid valve, and to perform work including a boom and an arm. An operation valve system for a power shovel that can reduce an impact when the device is stopped can be provided. Therefore, a significant effect is achieved in that the manufacturing cost of a power shovel having a suitable interference prevention function and a suitable shock absorbing function at the time of stopping can be significantly reduced.
【図1】本発明にかかるパワーショベルの操作系バルブ
システムの一実施例を示す回路図である。FIG. 1 is a circuit diagram showing one embodiment of an operation system valve system of a power shovel according to the present invention.
【図2】本発明にかかるバルブユニットの装着部位を説
明する回路図である。FIG. 2 is a circuit diagram illustrating a mounting portion of a valve unit according to the present invention.
【図3】本発明にかかるバルブユニットの一実施例を示
す断面図である。FIG. 3 is a sectional view showing one embodiment of the valve unit according to the present invention.
【図4】図3の実施例の作動状態を示す断面図である。FIG. 4 is a sectional view showing an operation state of the embodiment of FIG. 3;
【図5】本発明にかかるバイパス開閉弁を説明する説明
図である。FIG. 5 is an explanatory diagram illustrating a bypass on-off valve according to the present invention.
【図6】図3の実施例の使用状態を示す断面図である。FIG. 6 is a sectional view showing a use state of the embodiment of FIG. 3;
【図7】本発明にかかる流量制御弁の他の実施例を示す
断面図である。FIG. 7 is a sectional view showing another embodiment of the flow control valve according to the present invention.
10 バルブユニット 24 オフセットセンサ 26 ブーム位置センサ 28 アーム位置センサ 30 第1切換弁 32 第2切換弁 34 第3切換弁 36 ブーム用流量制御弁 38 アーム用流量制御弁 41 第1バイパス通路 42 第2バイパス通路 43 第3バイパス通路 45 バイパス開閉弁 Reference Signs List 10 Valve unit 24 Offset sensor 26 Boom position sensor 28 Arm position sensor 30 First switching valve 32 Second switching valve 34 Third switching valve 36 Boom flow control valve 38 Arm flow control valve 41 First bypass passage 42 Second bypass Passage 43 Third bypass passage 45 Bypass on-off valve
Claims (5)
動作を制御するために、ブームのオフセット用の第1コ
ントロールバルブおよび第1パイロットバルブと、ブー
ムの回動用の第2コントロールバルブおよび第2パイロ
ットバルブと、アームの回動用の第3コントロールバル
ブおよび第3パイロットバルブとが備えられたパワーシ
ョベルの操作系バルブシステムにおいて、 ブームがパワーショベルの基体に対して所定の範囲外に
オフセットされた際に信号を発生するオフセットセンサ
と、 ブームが上下方向に回動して所定の範囲外に位置した際
に信号を発生するブーム位置センサと、 アームが上下方向に回動して所定の範囲外に位置した際
に信号を発生するアーム位置センサと、 前記第1コントロールバルブと前記第1パイロットバル
ブの間に設けられ、ブームをオフセットさせる際には前
記両者を連通し、前記オフセットセンサからの信号を受
けた際には、第1パイロットバルブから第1コントロー
ルバルブへの圧油の供給を遮断すると共に、第1コント
ロールバルブへ供給されていた圧油をタンクへ逃がす第
1切換弁と、 前記第2コントロールバルブと前記第2パイロットバル
ブの間に設けられ、ブームを回動させる際には前記両者
を連通し、前記ブームセンサからの信号を受けた際に
は、第2パイロットバルブから第2コントロールバルブ
への圧油の供給を遮断すると共に、第2コントロールバ
ルブへ供給されていた圧油をタンクへ逃がす第2切換弁
と、 前記第3コントロールバルブと前記第3パイロットバル
ブの間に設けられ、アームを回動させる際には前記両者
を連通し、前記アームセンサからの信号を受けた際に
は、第3パイロットバルブから第3コントロールバルブ
への圧油の供給を遮断すると共に、第3コントロールバ
ルブへ供給されていた圧油をタンクへ逃がす第3切換弁
と、 前記第2切換弁とタンクの間に設けられ、タンクへ逃が
す圧油の流れを規制するブーム用絞り手段と、 前記第3切換弁とタンクの間に設けられ、タンクへ逃が
す圧油の流れを規制するアーム用絞り手段とを具備する
ことを特徴とするパワーショベルの操作系バルブシステ
ム。1. A first control valve and a first pilot valve for offsetting a boom, a second control valve and a second pilot valve for rotating a boom, and a control valve for controlling operation of a boom and an arm of a power shovel. A control system valve system for a power shovel including a third control valve and a third pilot valve for rotating an arm, wherein a signal is output when the boom is offset from a predetermined range with respect to the base of the power shovel. An offset sensor that is generated, a boom position sensor that generates a signal when the boom rotates vertically and is out of a predetermined range, and a boom position sensor that generates a signal when the arm is rotated vertically and is out of a predetermined range An arm position sensor for generating a signal to the first control valve and the first pilot valve; And when the boom is offset, the two are communicated with each other, and when receiving a signal from the offset sensor, the supply of pressure oil from the first pilot valve to the first control valve is shut off. A first switching valve for releasing pressurized oil supplied to the first control valve to the tank; and a second switching valve provided between the second control valve and the second pilot valve. When the signal from the boom sensor is received, the supply of the pressure oil from the second pilot valve to the second control valve is shut off, and the pressure oil supplied to the second control valve is supplied to the tank. A second switching valve which is provided between the third control valve and the third pilot valve. When receiving a signal from the arm sensor, the supply of pressure oil from the third pilot valve to the third control valve is shut off, and the pressure oil supplied to the third control valve is released to the tank. A third switching valve; a boom throttling means provided between the second switching valve and the tank to regulate the flow of pressure oil escaping to the tank; a boom throttle means provided between the third switching valve and the tank; An operating valve system for a power shovel, comprising: a throttle means for an arm for regulating a flow of pressure oil to be released.
圧油の流量を制御するブーム用流量制御弁であり、前記
アーム用絞り手段がタンクへ逃がす圧油の流量を制御す
るアーム用流量制御弁であることを特徴とする請求項1
記載のパワーショベルの操作系バルブシステム。2. A boom flow control valve for controlling the flow rate of pressure oil released by the boom throttle means to the tank, and the arm flow control valve for controlling the flow rate of pressure oil released by the arm throttle means to the tank. 2. The method according to claim 1, wherein
An operating valve system for the power shovel as described.
ントロールバルブとを連通可能に設けられた第1パイパ
ス通路と、 前記第2パイロットバルブと前記第2コントロールバル
ブとを連通可能に設けられた第2パイパス通路と、 前記第3パイロットバルブと前記第3コントロールバル
ブとを連通可能に設けられた第3パイパス通路と、 前記第1バイパス通路、前記第2バイパス通路および前
記第3バイパス通路を開閉するバイパス開閉弁とを備え
ることを特徴とする請求項1または2記載のパワーショ
ベルの操作系バルブシステム。3. A first bypass passage provided to allow communication between the first pilot valve and the first control valve, and a first bypass passage provided to allow communication between the second pilot valve and the second control valve. A second bypass passage; a third bypass passage provided to allow communication between the third pilot valve and the third control valve; and opening and closing the first bypass passage, the second bypass passage, and the third bypass passage. 3. The valve system according to claim 1, further comprising a bypass valve.
前記2切換弁および前記ブーム用絞り手段を有する第2
ブロック、前記切換弁および前記アーム用絞り手段を有
する第3ブロックが併設され、前記バイパス開閉弁が、
各前記ブロックに内蔵された前記第1バイパス通路、前
記第2バイパス通路および前記第3バイパス通路を貫く
ように形成された挿通孔と、該挿通孔に挿通され、移動
動作によって第1バイパス通路、第2バイパス通路およ
び第3バイパス通路を同時に開閉する弁体を備えること
を特徴とする請求項3記載のパワーショベルの操作系バ
ルブシステム。4. A first block having the first switching valve,
A second valve having the two-way switching valve and the boom throttle means;
A third block having a block, the switching valve, and the throttle means for the arm is provided side by side,
An insertion hole formed to penetrate the first bypass passage, the second bypass passage, and the third bypass passage incorporated in each of the blocks; and a first bypass passage inserted through the insertion hole and moved by a moving operation. 4. The valve system according to claim 3, further comprising a valve body for simultaneously opening and closing the second bypass passage and the third bypass passage.
用絞り手段からタンクへ排出される排出油の通路として
設けられたドレインラインと、 該ドレインラインに近接して配され、油圧ポンプから吐
出されリリーフバルブ等を通過してタンクへ排出される
排出油の通路として設けられたタンクポートラインとを
具備することを特徴とする請求項1、2、3または4記
載のパワーショベルの操作系バルブシステム。5. A drain line provided as a passage for draining oil discharged from the boom throttle means and the arm throttle means to the tank, and a relief line disposed close to the drain line and discharged from a hydraulic pump. 5. The valve system for an operation system of a power shovel according to claim 1, further comprising a tank port line provided as a passage for discharged oil discharged to a tank through a valve or the like.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP30459696A JP3203194B2 (en) | 1996-11-15 | 1996-11-15 | Excavator operating valve system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP30459696A JP3203194B2 (en) | 1996-11-15 | 1996-11-15 | Excavator operating valve system |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH10140618A true JPH10140618A (en) | 1998-05-26 |
JP3203194B2 JP3203194B2 (en) | 2001-08-27 |
Family
ID=17934914
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP30459696A Expired - Fee Related JP3203194B2 (en) | 1996-11-15 | 1996-11-15 | Excavator operating valve system |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3203194B2 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013073112A1 (en) * | 2011-11-16 | 2013-05-23 | 川崎重工業株式会社 | Cushion valve device and multi-cushion valve unit provided with same |
US11391308B2 (en) | 2018-04-11 | 2022-07-19 | Komatsu Ltd. | Work vehicle |
-
1996
- 1996-11-15 JP JP30459696A patent/JP3203194B2/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013073112A1 (en) * | 2011-11-16 | 2013-05-23 | 川崎重工業株式会社 | Cushion valve device and multi-cushion valve unit provided with same |
JP2013104518A (en) * | 2011-11-16 | 2013-05-30 | Kawasaki Heavy Ind Ltd | Cushion valve device and multi-cushion valve unit with same |
US11391308B2 (en) | 2018-04-11 | 2022-07-19 | Komatsu Ltd. | Work vehicle |
Also Published As
Publication number | Publication date |
---|---|
JP3203194B2 (en) | 2001-08-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3685923B2 (en) | Pipe break control valve device | |
JPH07127607A (en) | Hydraulic device of work machine | |
US20060265915A1 (en) | Working machine | |
JP2744004B2 (en) | Hydraulic pressure control device | |
JPH0333928B2 (en) | ||
CN105909588A (en) | Unloading valve and hydraulic drive system for hydraulic excavator | |
JPH10238506A (en) | Hydraulic drive device and directional control valve device for hydraulic machine | |
KR970017750A (en) | Fluid pressure drive device of circuit breaker and circuit breaker using same | |
JP3203194B2 (en) | Excavator operating valve system | |
JP3136118B2 (en) | Hydraulic operation valve system and power shovel | |
WO1991015636A1 (en) | Hydraulic drive system in civil engineering-construction machine | |
JP2002106507A (en) | Flow control device of hydraulic actuator | |
JPH09317706A (en) | Fall prevention valve device with regenerative function | |
JP2004132411A (en) | Hydraulic control device | |
US5615991A (en) | Variable priority device for heavy construction equipment | |
JPH0752402Y2 (en) | Fluid control valve | |
JPH0544517A (en) | Working machine stop device | |
JP2960743B2 (en) | Hydraulic drive | |
KR20050105971A (en) | Hydraulic device | |
JP3712688B2 (en) | Hydraulic control device mounting structure | |
JPS647241B2 (en) | ||
WO2023017719A1 (en) | Fluid pressure control device | |
WO2023176685A1 (en) | Fluid pressure control device | |
KR100221597B1 (en) | Isolation apparatus for flow conflux | |
JP2001065506A (en) | Construction equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313532 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100622 Year of fee payment: 9 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 11 Free format text: PAYMENT UNTIL: 20120622 |
|
LAPS | Cancellation because of no payment of annual fees |