JPH10109209A - Processing method for main body frame of passenger conveyor and fitting auxiliary frame for fitting newly provided part - Google Patents

Processing method for main body frame of passenger conveyor and fitting auxiliary frame for fitting newly provided part

Info

Publication number
JPH10109209A
JPH10109209A JP26488396A JP26488396A JPH10109209A JP H10109209 A JPH10109209 A JP H10109209A JP 26488396 A JP26488396 A JP 26488396A JP 26488396 A JP26488396 A JP 26488396A JP H10109209 A JPH10109209 A JP H10109209A
Authority
JP
Japan
Prior art keywords
body frame
plate
base
upper beam
tem
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP26488396A
Other languages
Japanese (ja)
Other versions
JP4040710B2 (en
Inventor
Eikai Natsuyama
山 永 海 夏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Elevator and Building Systems Corp
Original Assignee
Toshiba Elevator Technos KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Elevator Technos KK filed Critical Toshiba Elevator Technos KK
Priority to JP26488396A priority Critical patent/JP4040710B2/en
Publication of JPH10109209A publication Critical patent/JPH10109209A/en
Application granted granted Critical
Publication of JP4040710B2 publication Critical patent/JP4040710B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To shorten time necessary for a making-off work, a boring work and a base fitting work. SOLUTION: A template 30 is used for the execution of work. The template 30 has a width about the same as the width of the upper beam 3 of a main body frame 2, and a prepared hole 31 smaller in a diameter than a bolthole is formed at a position corresponding to the bolthole formed in a newly provided member. The prepared template 30 is fixed at a fixed position on the upper beam 3. Next, the cutting edge of a drill having a diameter corresponding to the bolthole is abutted on the prepared hole 31, and then the upper beam 3 is drilled together with the template 30.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、いわゆるエスカレ
ータおよび動く歩道等の乗客コンベアにおける本体枠の
加工方法と、乗客コンベアの改修時に新設される部品を
取付けるための取付補助枠と、乗客コンベアの改修時に
新設される部品の取付方法とに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for processing a body frame of a passenger conveyor such as a so-called escalator and a moving walkway, an auxiliary mounting frame for mounting a newly-installed part when the passenger conveyor is modified, and a modification of the passenger conveyor. The present invention relates to a method of mounting a part which is sometimes newly provided.

【0002】[0002]

【従来の技術】乗客コンベアの構造概略を図18に示
す。図18に示すように乗客コンベアは建物の下階部か
ら上階部に向けて設置された本体枠2を有している。本
体枠2の上梁3には、ボルトまたは溶接によりベース1
が取り付けられており、このベース1には図18および
図19に示すように欄干4を支持するホネ5が取り付け
られている。
2. Description of the Related Art A schematic structure of a passenger conveyor is shown in FIG. As shown in FIG. 18, the passenger conveyor has a main body frame 2 installed from the lower floor to the upper floor of the building. The upper beam 3 of the main body frame 2 is bolted or welded to the base 1.
The base 1 is provided with a hook 5 for supporting the balustrade 4 as shown in FIGS. 18 and 19.

【0003】ところで改修等で欄干4を新しい形式のも
のと交換する場合には、新しい欄干4を支持する為の新
しい形式のホネ5およびベース1を新たに上梁3に取り
付ける必要がある。図20は、本体枠2から既設の欄干
4、ホネ5およびベース1を取り外した状態を示してお
り、既設のベース1がボルトで取り付けられていた場
合、上梁3にはボルト止め用の既設穴6がある。上梁3
に新しい形式のベース1を取り付ける場合、溶接かボル
ト締結のいずれかにより取り付けるが、作業現場が溶接
禁止となっている場合は、ベース1をボルトで取り付け
なければならない。ベース1をボルトにより取り付ける
ためには、上梁3にボルト止め用の穴が必要であるが、
既設穴6は既設のベース1用に穴開けされているためピ
ッチ、大きさ及び個数等が異なる場合が多く、既設穴6
を流用して新しい形式のベース1を取り付けることは通
常は不可能である。
When the balustrade 4 is replaced with a new balustrade for repair or the like, it is necessary to newly attach a new type of hook 5 and the base 1 for supporting the new balustrade 4 to the upper beam 3. FIG. 20 shows a state in which the existing balustrade 4, the hood 5 and the base 1 have been removed from the main body frame 2. When the existing base 1 was attached with bolts, the upper beam 3 is provided with an existing bolt. There is a hole 6. Upper beam 3
When a new type of base 1 is mounted on the base 1 by either welding or bolting, if the work site is prohibited from welding, the base 1 must be mounted by bolts. In order to attach the base 1 with bolts, the upper beam 3 needs a hole for bolting,
Since the existing holes 6 are drilled for the existing base 1, the pitch, the size, the number, and the like are often different.
It is usually impossible to divert a new type of base 1.

【0004】この為、このような場合には新設されるベ
ース1に対応して上梁3に新たな穴を穿けている。
For this reason, in such a case, a new hole is formed in the upper beam 3 corresponding to the newly provided base 1.

【0005】図21および図22は欄干4を変更する際
に上梁3にベース1取付用のボルト穴を加工する方法を
示したものである。この場合、まず本体枠2に作業基準
となるワーキングバー20およびセンターポール21が
取り付けられる。ワーキングバー20は本体枠2の長手
方向および高さの基準となり、センターポール21は、
本体枠2の幅方向の基準となるものである。
FIGS. 21 and 22 show a method of forming a bolt hole for attaching the base 1 to the upper beam 3 when changing the balustrade 4. In this case, first, the working bar 20 and the center pole 21 which are working standards are attached to the main body frame 2. The working bar 20 serves as a reference for the longitudinal direction and the height of the main body frame 2, and the center pole 21
This serves as a reference in the width direction of the main body frame 2.

【0006】次に図21および図22に示すようにセン
ターポール21に張られたピアノ線22に下げ振り23
を垂らし、そこから直尺24で幅方向の寸法を測り上梁
3にケガキが入れられる。次に幅方向のケガキと長手方
向のケガキとが交差する場所にポンチ25が刻印され、
電気ドリルにより穴が穿孔される。そしてこの穴を用い
て、ボルトによりベース1が取り付けられる。ベース1
には、ボルト径よりも大きい径の穴が穿孔され、ベース
1の取付作業を行なう場合には、まずボルトを仮締めし
て取付位置の微調整をすることにより位置決めが行わ
れ、その後ボルトを本締めしてベース1が固定される。
その後、ベース1上にホネ5および欄干4が順次取り付
けられる。
Next, as shown in FIGS. 21 and 22, the piano wire 22 stretched around the center pole 21 is swung 23
, From which the size in the width direction is measured with a straight scale 24, and the upper beam 3 is marked. Next, a punch 25 is stamped at a position where the widthwise marking and the longitudinal marking intersect,
A hole is drilled with an electric drill. The base 1 is attached by bolts using the holes. Base 1
In order to perform the work of mounting the base 1, first, the bolt is temporarily tightened to finely adjust the mounting position, and then the positioning is performed. The base 1 is fixed by fully tightening.
Thereafter, the hood 5 and the balustrade 4 are sequentially mounted on the base 1.

【0007】[0007]

【発明が解決しようとする課題】しかしながら、ケガキ
作業は、図面を見ながら、一箇所ごとに行われるため、
作業時間もかかり、作業者がケガキ位置を間違える場合
も多くある。また、穿孔作業は、穿孔したい穴の径が大
きい場合、ドリルの刃の径の小さいもので下穴を穿孔
し、さらにこの下穴より大きい径のドリルで段階的に穿
孔を繰り返すことにより所望の穴径を得るようにして行
われるため、多くの時間がかかっている。さらにベース
1の取付作業も仮締め後の位置の微調整に時間がかかっ
ている。
However, since the marking work is performed for each location while looking at the drawing,
It takes a lot of time, and the operator often mistakes the marking position. In addition, in the drilling operation, when the diameter of the hole to be drilled is large, a desired hole is formed by drilling a prepared hole with a small diameter of a drill blade, and by repeating drilling stepwise with a drill having a diameter larger than the prepared hole. It takes a lot of time because the hole diameter is obtained. Furthermore, it takes time to finely adjust the position of the base 1 after the temporary fastening in the mounting operation.

【0008】本発明は、このようなことを考慮しなされ
たものであり、ケガキ作業、穿孔作業、およびベースの
取付作業に必要な時間を短縮することができる、乗客コ
ンベアの本体枠の加工方法および新設部品用の取付補助
枠、さらに新設部品の取付方法を提供することを目的と
する。
SUMMARY OF THE INVENTION The present invention has been made in view of such circumstances, and a method of processing a main body frame of a passenger conveyor, which can reduce the time required for marking work, punching work, and base mounting work. It is another object of the present invention to provide a mounting auxiliary frame for a new component and a method for mounting a new component.

【0009】[0009]

【課題を解決するための手段】かかる目的を達成するた
め、第1の手段は、乗客コンベアの本体枠の加工方法に
おいて、本体枠上にテムプレートを設置し、このテムプ
レートに設けられた加工ガイドに従って本体枠を加工す
ることを特徴とするものである。
In order to achieve the above object, a first means is to provide a method for processing a main body frame of a passenger conveyor, wherein a tem plate is set on the main body frame and the processing provided on the tem plate is performed. The main body frame is processed according to the guide.

【0010】この第1の手段によれば、ケガキ間違い等
の作業ミスがなくなり、また、加工作業を効率良く行う
ことができるため、乗客コンベアの改修作業に必要とさ
れる時間を短縮することができる。
[0010] According to the first means, there is no work error such as a marking error, and the processing operation can be performed efficiently, so that the time required for the repair work of the passenger conveyor can be reduced. it can.

【0011】第2の手段は、前記テムプレートは、本体
枠を構成する梁と同一の幅を有していることを特徴とす
るものである。
The second means is that the tem plate has the same width as the beam forming the main body frame.

【0012】第3の手段は、前記加工ガイドは、前記本
体枠に穿孔される穴径より小さい穴径を有する下穴から
なり、前記本体枠を加工する場合、前記下穴にドリルの
刃先を当接させ、前記テムプレートごと本体枠を穿孔す
ることを特徴とするものである。
A third means is that the machining guide comprises a pilot hole having a hole diameter smaller than a hole diameter drilled in the main body frame. When the main body frame is processed, a cutting edge of a drill is inserted into the pilot hole. The body frame is perforated together with the Template.

【0013】第4の手段は、前記加工ガイドは、前記テ
ムプレートの端縁に形成された切欠きからなり、前記本
体枠を加工する場合、前記切欠きに沿って切欠き加工を
行うことを特徴とするものである。
A fourth means is that the processing guide comprises a notch formed at an edge of the tem plate, and when the main body frame is processed, a notch is formed along the notch. It is a feature.

【0014】第5の手段は、乗客コンベアの改修時に新
設される部品を取付けるための取付補助枠において、本
体枠に形成された既設穴に対応する位置に穴が形成され
た基板と、前記基板に設けられ、新設部品の穴位置に対
応する位置に穴が形成された取付部とを備えたことを特
徴とするものである。
Fifth means is a mounting auxiliary frame for mounting a part newly installed at the time of repairing a passenger conveyor, a board having a hole formed at a position corresponding to an existing hole formed in a main body frame; And a mounting portion having a hole formed at a position corresponding to the hole position of the new component.

【0015】第6の手段は、乗客コンベアの改修時に新
設される部品の取付方法において、新設部品に本体枠に
形成された既設穴に対応する位置に穴が形成された基板
を設け、この基板の穴と本体枠の既設穴とを用いて締結
を行うことを特徴とするものである。
According to a sixth aspect, in a method of mounting a part newly installed at the time of repair of a passenger conveyor, a board having a hole formed at a position corresponding to an existing hole formed in a main body frame is provided on the newly installed part. It is characterized in that the fastening is carried out by using the holes (1) and the existing holes of the body frame.

【0016】[0016]

【発明の実施の形態】以下、図面を参照して本発明の実
施の形態について説明する。第1の実施の形態 まず、第1の実施の形態について説明する。図1乃至図
10は本発明の第1の実施の形態を示す図である。
Embodiments of the present invention will be described below with reference to the drawings. First Embodiment First, a first embodiment will be described. 1 to 10 are views showing a first embodiment of the present invention.

【0017】まず、第1の実施の形態において使用され
るテムプレート30について説明する。図2に示すよう
に、テムプレート30は上梁3の上面3aと同一の幅W
を有する厚さ略1.6mm程度の鉄板からなる。テムプ
レート30の厚さは、コスト、重量、および必要とされ
る強度を考慮して決定されている。また、テムプレート
30の全長は、持ち運びの容易さを考慮して2m以下の
適当な長さに設定されている。
First, the Tem plate 30 used in the first embodiment will be described. As shown in FIG. 2, the Tem plate 30 has the same width W as the upper surface 3a of the upper beam 3.
And an iron plate having a thickness of about 1.6 mm. The thickness of the tem plate 30 is determined in consideration of cost, weight, and required strength. The total length of the Tem plate 30 is set to an appropriate length of 2 m or less in consideration of easy portability.

【0018】テムプレート30には、改修時に上梁3に
新たに取付けられる部材、例えば欄干4を受けるホネ5
に形成される取付用のボルト穴の位置に対応する位置に
加工ガイドとして下穴31が穿孔されている。この下穴
31の直径は、上梁3に開けようとしている取付用のボ
ルト穴より小さくなっている。
The tem plate 30 includes a member newly attached to the upper beam 3 at the time of repair, for example, a hook 5 for receiving a balustrade 4.
A pilot hole 31 is drilled as a processing guide at a position corresponding to the position of the mounting bolt hole formed in the hole. The diameter of the pilot hole 31 is smaller than the mounting bolt hole to be opened in the upper beam 3.

【0019】また、図1に示すように、テムプレート3
0には、その長手方向の端縁に合いマーク32a,32
bが描かれている。また、テムプレート30上に「右・
左」、「表・裏」、「上から2番目」等、本体枠2上へ
のテムプレート30の配置方法を示す文字33が記入さ
れている。
Also, as shown in FIG.
0, matching marks 32a, 32
b is drawn. In addition, “Right ・
Characters 33 indicating the method of arranging the Template 30 on the main body frame 2 such as “left”, “front / back”, and “second from the top” are entered.

【0020】次に、このテムプレート30を使用して乗
客コンベアを改修する方法について本体枠2の加工方法
を中心として図1により説明する。なお、以下の説明に
おいて、テムプレート30a〜30dの基本的な構成は
上述したテムプレート30と同一であり、下穴31が形
成される部位、合いマーク32a,32bの有無および
形状、文字33による記載事項等が、テムプレート30
a〜30dの取付けられる位置に対応して変更されてい
るのみである。
Next, a method for repairing a passenger conveyor using the Template 30 will be described with reference to FIG. In the following description, the basic configuration of the Tem plates 30a to 30d is the same as that of the Tem plate 30 described above, and includes a portion where the pilot hole 31 is formed, the presence and absence and shape of the matching marks 32a and 32b, and a character 33. If the items described are in the Template 30
They are only changed corresponding to the positions where a to 30d are attached.

【0021】まず、既設の欄干、ホネ、ベースを取外し
た上梁3の上面3aに対するテムプレート30a〜30
dの固定作業が行われる。この固定作業を行うにあたっ
て、上面3aの所定位置に正しく対応するテムプレート
30a〜30dが配置されるように、作業者は各テムプ
レート30a〜30dに記載された文字33を確認する
ことになっている。
First, the tem plates 30a to 30a to the upper surface 3a of the upper beam 3 from which the existing balustrade, hood, and base are removed.
The fixing operation of d is performed. In performing this fixing work, the operator checks the characters 33 written on each of the Tem plates 30a to 30d so that the Tem plates 30a to 30d corresponding to the predetermined positions on the upper surface 3a are correctly arranged. I have.

【0022】テムプレート30a〜30dの固定作業を
行うにあたって、まず、上梁3の折点3cの近くにテム
プレート30aが載置される。この場合、上梁3の上面
3aが折点3c近傍において若干のRを持っているため
(曲面となっているため)、テムプレート30aの折点
3c側の長手方向の端縁は、折点3cからxだけ離間す
るように設置される。通常、上梁3の上面3aには、折
点3cから10mm離れた位置にポンチマークが刻印さ
れているため、このポンチマークにテムプレート30a
の長手方向の端縁を一致させることにより、上梁3に対
するテムプレート30aの長手方向の位置決めが行われ
る。さらに、テムプレート30aの幅方向の両端縁を上
面3aの幅方向の両端縁と一致させることにより、上梁
3に対するテムプレート30aの幅方向の位置決めが行
われる。このように位置決めされたテムプレート30a
は、図1に示すように、シャコ万力26により上梁3に
対して固定される。
In fixing the Tem plates 30a to 30d, first, the Tem plate 30a is placed near the folding point 3c of the upper beam 3. In this case, since the upper surface 3a of the upper beam 3 has a slight radius near the folding point 3c (because it is a curved surface), the longitudinal edge of the Tem plate 30a on the folding point 3c side is bent at the folding point. It is installed so as to be separated by x from 3c. Usually, a punch mark is engraved on the upper surface 3a of the upper beam 3 at a position 10 mm away from the folding point 3c.
The longitudinal edges of the Tem plate 30a are positioned with respect to the upper beam 3 by matching the longitudinal edges of the Tem plate 30a. Further, by aligning both ends in the width direction of the Tem plate 30a with both ends in the width direction of the upper surface 3a, the Tem plate 30a is positioned relative to the upper beam 3 in the width direction. The thus positioned Template 30a
Is fixed to the upper beam 3 by a giant vice 26 as shown in FIG.

【0023】テムプレート30aの位置決めが終了する
と、これに隣接するテムプレート30bの位置決めが行
われる。テムプレート30の長手方向に関する位置決め
は、テムプレート30aおよびテムプレート30bの長
手方向の端縁同士を密接させることにより行われる。な
お、この場合、テムプレート30aおよび30bの長手
方向の端縁に描かれた合いマーク32aが合致している
ことを確認することにより、テムプレート30bが正し
く位置決めされたことを確認することができる。また、
テムプレート30bの幅方向に関するテムプレート30
bの位置決めは、テムプレート30aにおいて行われれ
たのと同様に、テムプレート30bの幅方向の両端縁を
上梁3の上面3aの幅方向の両端縁と一致させればよ
い。このように位置決めされたテムプレート30bは、
図1に示すように、テムプレート30aと同様にして、
シャコ万力26により上梁3に対して固定される。
When the positioning of the Tem plate 30a is completed, the positioning of the Tem plate 30b adjacent thereto is performed. The positioning of the tem plate 30 in the longitudinal direction is performed by bringing the longitudinal edges of the tem plate 30a and the tem plate 30b into close contact with each other. In this case, by confirming that the matching marks 32a drawn on the longitudinal edges of the Tem plates 30a and 30b match, it can be confirmed that the Tem plate 30b has been correctly positioned. . Also,
Tem plate 30 in the width direction of tem plate 30b
The positioning of b is performed in the same manner as that performed on the Tem plate 30a, so that both ends in the width direction of the Tem plate 30b may be aligned with both ends in the width direction of the upper surface 3a of the upper beam 3. The Tem plate 30b thus positioned is
As shown in FIG. 1, similar to the Tem plate 30a,
It is fixed to the upper beam 3 by a giant vice 26.

【0024】さらに、テムプレート30aと同様にして
テムプレート30dが、テムプレート30bと同様にし
てテムプレート30cが上梁3の上面3aに載置される
とともに所定位置に位置決めされ、シャコ万力26によ
り上梁3に対して固定される。
Further, the tem plate 30d is mounted on the upper surface 3a of the upper beam 3 and the tem plate 30c is positioned at a predetermined position in the same manner as the tem plate 30b. Is fixed to the upper beam 3.

【0025】テムプレート30a〜30dの取付作業が
終了すると、図2に示すように、各テムプレート30a
〜30dに形成された下穴31にドリル27の刃先が当
てられ、テムプレート30a〜30dと上梁3の上面3
aが一度に穿孔される。この場合、下穴31の直径は、
上面3aに開けようとしている取付用のボルト穴、すな
わちドリル27の刃の直径より小さくなっているため、
ドリル27の刃先をこの下穴31に当接させた場合、下
穴31の中心とドリル27の中心とが精度よく一致し、
上面3aの正確な位置に穿孔を行うことができる。穿孔
作業が終了すると、テムプレート30a〜30dは上梁
3aから取外され廃棄される。なお、テムプレート30
a〜30dを再利用することは不可能ではないが、回収
費用等を考慮して作業現場での使い切りとしている。
When the mounting operation of the Tem plates 30a to 30d is completed, as shown in FIG.
The tip of the drill 27 is applied to the prepared hole 31 formed in the upper beam 3 to the upper plate 3 of the upper beam 3.
a is pierced at one time. In this case, the diameter of the pilot hole 31 is
Since it is smaller than the diameter of the mounting bolt hole to be opened in the upper surface 3a, that is, the diameter of the blade of the drill 27,
When the cutting edge of the drill 27 is brought into contact with the prepared hole 31, the center of the prepared hole 31 and the center of the drill 27 are accurately matched,
Drilling can be performed at an accurate position on the upper surface 3a. When the drilling operation is completed, the tem plates 30a to 30d are removed from the upper beam 3a and discarded. The Tem plate 30
Although it is not impossible to reuse a to 30d, they are used up at the work site in consideration of collection costs and the like.

【0026】次いで、このようにして穿孔された上梁3
の上面3aの上に、新設される部材、例えばベース1が
載置される。上梁3とベース1とは、上面3aに穿孔さ
れた穴と予めベース1に形成されている取付用のボルト
穴とにボルトを挿入し、ネジ締結を行うことにより互い
に固着される。次いで、骨および欄干等の部材が取付け
られ、乗客コンベアの改修作業が終了する。なお、図1
においては省略されているが、反対側の上梁3について
も同様の作業が行われる。
Next, the upper beam 3 thus drilled is
A member to be newly provided, for example, the base 1 is placed on the upper surface 3a of the base. The upper beam 3 and the base 1 are fixed to each other by inserting bolts into holes drilled in the upper surface 3a and mounting bolt holes formed in the base 1 in advance, and performing screw fastening. Next, members such as bones and balustrades are attached, and the work of repairing the passenger conveyor is completed. FIG.
, The same operation is performed on the upper beam 3 on the opposite side.

【0027】以上説明したように、本実施形態によれ
ば、所定のピッチで精度よく穿孔された下穴31が形成
されたテムプレート30を、上梁3の上面3a上に載置
して位置決めを行った後上梁3に固定し、テムプレート
30ごと上面3aを穿孔することにより、新設部材取付
け用のボルト穴を、精度良くかつ容易に形成することが
できる。このため乗客コンベアの改修作業に必要な時間
を低減することができる。
As described above, according to the present embodiment, the tem plate 30 having the pilot holes 31 formed with high precision at a predetermined pitch is placed on the upper surface 3a of the upper beam 3 and positioned. Then, by fixing to the upper beam 3 and drilling the upper surface 3a together with the Tem plate 30, a bolt hole for attaching a new member can be formed accurately and easily. Therefore, the time required for the repair work of the passenger conveyor can be reduced.

【0028】なお、以上説明した本実施の形態において
は、上梁3へのテムプレート30固定は、シャコ万力2
6により行っているが、これに限定されるものではな
く、接着剤等の他の固定手段により行ってもよい。
In the present embodiment described above, the fixing of the tem plate 30 to the upper beam 3 is performed by
6, but the present invention is not limited to this, and other fixing means such as an adhesive may be used.

【0029】また、上述した本実施形態においては、テ
ムプレート30は矩形の板により形成されているが、テ
ムプレートの形態を、以下に示す変形例の如く改変する
ことも可能である。
Further, in the above-described embodiment, the Tem plate 30 is formed of a rectangular plate, but the form of the Tem plate can be modified as in the following modified examples.

【0030】第1の変形例 まず、図3により第1の変形例について説明する。第1
の変形例においては、一対のテムプレート30同士を互
いに連結する連結部材34が設けられている。これら連
結部材34は、テムプレート30と略同一の鋼板材料か
らなり、両端がテムプレート30の上面(上梁3の上面
3と接触する面と反対側の面)に固着されている。
First Modification First, a first modification will be described with reference to FIG. First
In the modification, a connecting member 34 for connecting the pair of Tem plates 30 to each other is provided. These connecting members 34 are made of substantially the same steel plate material as the Tem plate 30, and both ends are fixed to the upper surface of the Tem plate 30 (the surface opposite to the surface in contact with the upper surface 3 of the upper beam 3).

【0031】この第1の変形例は、トラス幅(左右の上
梁間の間隔)が予め正確に分かっている場合に有用であ
り、テムプレート30を左右の上梁3に対して同時に取
付けることができるため、乗客コンベアの改修作業をよ
り迅速に行うことができる。
The first modified example is useful when the truss width (the distance between the upper and lower beams) is accurately known in advance, and the tem plate 30 can be attached to the left and right upper beams 3 at the same time. Therefore, the repair work of the passenger conveyor can be performed more quickly.

【0032】第2の変形例 次に、図4(a)(b)により第2の変形例について説
明する。図4(a)(b)に示す第2の変形例において
は、3枚のテムプレート30がヒンジ機構(ちょうつが
い)35により互いに連結されている。
Second Modification Next, a second modification will be described with reference to FIGS. In the second modified example shown in FIGS. 4A and 4B, three Templates 30 are connected to each other by a hinge mechanism (hinge) 35.

【0033】この第2の変形例によれば、テムプレート
30は、ヒンジ機構35により互いに連結されているた
め、図4(a)に示すように、コンパクトに折り畳むこ
とができ、作業現場への搬送が容易である。
According to the second modification, since the tem plates 30 are connected to each other by the hinge mechanism 35, they can be folded compactly as shown in FIG. Easy transport.

【0034】なお、互いに連結されるテムプレート30
の数は3枚に限定されるものではなく、3枚より多くし
ても少なくしてもよい。
The Tem plate 30 connected to each other is
Is not limited to three, and may be more or less than three.

【0035】第3の変形例 次に、図5により第3の変形例について説明する。図5
に示す第3の変形例においては、各テムプレート30
a,30b,30cの互いに隣接する長手方向端縁に、
互いに嵌合可能な凹凸が形成されている。テムプレート
30a,30b間に形成された凹凸の形状と、テムプレ
ート30b,30c間に形成された凹凸の形状とは、互
いに異なっている。このため第3の変形例によれば、上
梁3に対してより正確にテムプレートを配置することが
できる。
Third Modification Next, a third modification will be described with reference to FIG. FIG.
In the third modification shown in FIG.
a, 30b, 30c at adjacent longitudinal edges,
Irregularities that can be fitted to each other are formed. The shape of the unevenness formed between the tem plates 30a and 30b and the shape of the unevenness formed between the tem plates 30b and 30c are different from each other. For this reason, according to the third modified example, the Tem plate can be more accurately arranged on the upper beam 3.

【0036】第4の変形例 次に、図6により第4の変形例について説明する。図6
に示す第4の変形例においては、テムプレート30は、
L字型に折れ曲がった形状を有しており、上梁3の上面
3aを覆う部分36と、上梁3の側面3bを覆う部分3
7とからなる。
Fourth Modification Next, a fourth modification will be described with reference to FIG. FIG.
In a fourth modification shown in FIG.
It has an L-shaped bent shape, a portion 36 covering the upper surface 3a of the upper beam 3, and a portion 3 covering the side surface 3b of the upper beam 3.
7

【0037】この第4の変形例によれば、上梁3の上面
3aおよび側面3bを共に穿孔する必要がある場合、よ
り迅速に作業を行うことができる。さらにこの場合、上
梁3の上面3a用の部分36と上梁3の側面3b用の部
分37とがを一体となっているため、部分36と部分3
7とが別体となっている場合に比べて、下孔31間の位
置関係、とりわけ部分36に形成された下孔31と部分
37に形成された下孔31との位置関係が正確になる。
このためより正確に穿孔を行うことができる。
According to the fourth modified example, when it is necessary to pierce both the upper surface 3a and the side surface 3b of the upper beam 3, the work can be performed more quickly. Furthermore, in this case, since the portion 36 for the upper surface 3a of the upper beam 3 and the portion 37 for the side surface 3b of the upper beam 3 are integrated, the portion 36 and the portion 3
The positional relationship between the pilot holes 31, especially the positional relationship between the pilot hole 31 formed in the portion 36 and the pilot hole 31 formed in the portion 37, is more accurate than when the 7 is a separate body. .
For this reason, perforation can be performed more accurately.

【0038】第5の変形例 次に、図7により第5の変形例について説明する。図7
に示す第5の変形例においては、テムプレート30の幅
方向の端縁に加工ガイドとして切欠き38が形成されて
いる。
Fifth Modification Next, a fifth modification will be described with reference to FIG. FIG.
In the fifth modified example shown in FIG. 7, a notch 38 is formed as a processing guide at the edge of the Tem plate 30 in the width direction.

【0039】この第5の変形例によれば、上梁3の穿孔
と同時に上梁3の切欠き加工を行いたい場合、切欠き3
8に沿って切欠き加工を行うことができる。また、この
場合、加工されたボルト穴と切欠きとの位置関係を正確
にすることができる。
According to the fifth modification, when it is desired to perform the notch processing of the upper beam 3 at the same time as the perforation of the upper beam 3, the notch 3
Notch processing can be performed along 8. In this case, the positional relationship between the processed bolt hole and the notch can be made accurate.

【0040】第6の変形例 次に、図8(a)(b)により第6の変形例について説
明する。図8(a)(b)に示す第6の変形例において
は、テムプレート30はコの字型に形成されており、上
梁3の上面3aを覆う上部39と、上部39と平行に設
けられた底部40と、上部39と底部40とを連結する
側部41とを有している。底部40にはテムプレート3
0の長手方向に沿って等間隔に複数のボルト穴が形成さ
れており、これらボルト穴にはそれぞれボルト42が取
付けられている。
Sixth Modification Next, a sixth modification will be described with reference to FIGS. In the sixth modification shown in FIGS. 8A and 8B, the Tem plate 30 is formed in a U-shape, and is provided in parallel with the upper portion 39 and the upper portion 39 covering the upper surface 3 a of the upper beam 3. It has a bottom portion 40 and a side portion 41 connecting the upper portion 39 and the bottom portion 40. Template 3 on bottom 40
A plurality of bolt holes are formed at equal intervals along the lengthwise direction of 0, and a bolt 42 is attached to each of the bolt holes.

【0041】この第6の変形例によるテムプレート30
を使用する場合、上梁3の上面3aの自由端側からテム
プレート30を差し込み、側部41を上梁3の上面3a
の自由端に当接させる。するとテムプレート30の上部
39の自由端は、上面3aの幅方向の側縁と一致するよ
うになる。この状態で、ボルト42を締付けることによ
りテムプレート30を上梁3に固定することができる。
The Tem plate 30 according to the sixth modification example
Is used, the tem plate 30 is inserted from the free end side of the upper surface 3a of the upper beam 3, and the side portion 41 is attached to the upper surface 3a of the upper beam 3.
To the free end of the Then, the free end of the upper portion 39 of the Tem plate 30 comes to coincide with the side edge of the upper surface 3a in the width direction. In this state, the tem plate 30 can be fixed to the upper beam 3 by tightening the bolt 42.

【0042】この第6の変形例によれば、テムプレート
30に固定用のボルト42が設けられているため、前述
したシャコ万力26等の固定手段を別途準備する必要が
ない。このため、テムプレート30を容易に上梁3に固
定することができる。
According to the sixth modification, since the fixing bolt 42 is provided on the Tem plate 30, it is not necessary to separately prepare a fixing means such as the giant vise 26 described above. Therefore, the tem plate 30 can be easily fixed to the upper beam 3.

【0043】第7の変形例 次に、図9により第7の変形例について説明する。図9
に示す第7の変形例においては、テムプレート30の幅
は、下穴31が形成されている部位の近傍のみで上梁3
の上面3aの幅Wと同一となっており、残余の部分は切
欠かれている。
Seventh Modification Next, a seventh modification will be described with reference to FIG. FIG.
In the seventh modification shown in FIG. 7, the width of the tem plate 30 is limited only in the vicinity of the portion where the pilot hole 31 is formed.
Is the same as the width W of the upper surface 3a, and the remaining portion is notched.

【0044】この第7の変形例によれば、テムプレート
30の位置決めと穿孔作業に必要のない部分が切欠かれ
ているため、テムプレート30全体を軽量化することが
できる。このためテムプレート30の作業現場への搬入
を容易に行うことができる。
According to the seventh modification, the portion not necessary for the positioning and the perforation work of the Tem plate 30 is cut off, so that the entire Tem plate 30 can be reduced in weight. For this reason, it is possible to easily carry the Tem plate 30 into the work site.

【0045】また、以上説明した第1乃至第7の変形例
の他に、図10に示すように、テムプレート30を巻き
取り可能な素材により形成してもよい。このようにすれ
ば、テムプレート30の作業現場への搬入をより容易に
行うことができる。この場合、テムプレート30は、例
えば、強度と寸法精度を両立させることができる材料、
例えば、ステンレス帯等により形成してもよい。また、
テープのように上梁3の上面3aに張付け可能なものに
よりテムプレート30を形成してもよい。
In addition to the first to seventh modifications described above, as shown in FIG. 10, the Tem plate 30 may be formed of a rollable material. This makes it easier to carry the tem plate 30 into the work site. In this case, the Tem plate 30 is made of, for example, a material capable of achieving both strength and dimensional accuracy.
For example, it may be formed of a stainless steel band or the like. Also,
The tem plate 30 may be formed of a material such as a tape that can be attached to the upper surface 3a of the upper beam 3.

【0046】第2の実施の形態 次に、第2の実施の形態について説明する。図11乃至
図16は本発明の第2の実施の形態を示す図である。
Second Embodiment Next, a second embodiment will be described. FIGS. 11 to 16 are views showing a second embodiment of the present invention.

【0047】まず、第2の実施の形態において使用され
るベース(取付補助枠)50について説明する。図11
および図12に示すように、ベース50はプレート(基
板)51と、このプレート51の上面に溶接により固着
されたコの字型断面を有するベース部分(取付部)52
および/または板状のベース部分(取付部)53と、を
有している。
First, a base (mounting assistance frame) 50 used in the second embodiment will be described. FIG.
As shown in FIG. 12 and FIG. 12, a base 50 includes a plate (substrate) 51 and a base portion (mounting portion) 52 having a U-shaped cross section fixed to the upper surface of the plate 51 by welding.
And / or a plate-like base portion (attachment portion) 53.

【0048】このうち、プレート51は上梁3の上面3
aと同一の幅を有する鉄板からなる。プレート51に
は、上面3aに既設されていた穴(例えば既設のベース
を取り付けるためのボルト穴)に対応する位置にそれぞ
れボルト穴54が形成されている。このボルト穴54は
装着されるボルトの径より若干大きくなっている。
The plate 51 is formed on the upper surface 3 of the upper beam 3.
It consists of an iron plate having the same width as a. Bolt holes 54 are formed in the plate 51 at positions corresponding to the holes (for example, bolt holes for attaching an existing base) which are already provided on the upper surface 3a. This bolt hole 54 is slightly larger than the diameter of the bolt to be mounted.

【0049】また、ベース部分52、53には、改修時
に新たに取付けられる部材、例えば欄干を受けるホネに
形成された取付用のボルト穴の位置に対応する位置に、
所定のピッチで取付用のボルト穴55が形成されてい
る。
The base portions 52 and 53 are provided with members to be newly attached at the time of renovation, for example, at positions corresponding to the positions of bolt holes for attachment formed in a hook for receiving a balustrade.
Bolt holes 55 for attachment are formed at a predetermined pitch.

【0050】ベース50の全長は、持ち運びの容易さを
考慮して1m以下となっている。また、ベース50のプ
レート51には、第1の実施の形態で説明したのと同様
に、その長手方向の端縁に合いマーク55a,55bが
描かれている。また、ベース50の上に「右・左」、
「上から2番目」等、上梁3へのベース50の配置方法
を示す文字56が記入されている(図11参照)。
The total length of the base 50 is 1 m or less in consideration of portability. Further, on the plate 51 of the base 50, as described in the first embodiment, matching marks 55a and 55b are drawn on the edges in the longitudinal direction. "Right / Left" on the base 50,
Characters 56 indicating the method of arranging the base 50 on the upper beam 3, such as "second from the top", are entered (see FIG. 11).

【0051】次に、このベース50を使用して上梁3を
改修する方法について図11により説明する。
Next, a method of repairing the upper beam 3 using the base 50 will be described with reference to FIG.

【0052】まず、既設の欄干、ホネ、ベースを取外し
た上梁3の上面3aに対するベース50が載置される。
この載置作業は、第1の実施の形態におけるテムプレー
ト30の載置作業と同様にして行われ、上梁3に対する
ベース50の位置ぎめ方法も、第1の実施の形態におけ
る上梁3に対するテムプレート30の位置決め方法と同
一である。
First, the base 50 is placed on the upper surface 3a of the upper beam 3 from which the existing balustrade, the hood, and the base have been removed.
This placing operation is performed in the same manner as the placing operation of the Tem plate 30 in the first embodiment. The method of positioning the base 50 with respect to the upper beam 3 according to the first embodiment is also performed. This is the same as the method for positioning the system plate 30.

【0053】上梁3の上面3aにベース50が載置され
ると、プレート51の各ボルト穴54にボルトが挿入さ
れ、ボルト締結が行われる。この場合、ボルト穴54は
装着されるボルトの径より若干大きくなっているため、
上面3aに形成された既設のボルト穴とプレート51の
ボルト穴54との間に多少の位置ずれがあっても、ボル
ト穴54へのボルトの挿入作業を容易に行うことができ
る。
When the base 50 is placed on the upper surface 3a of the upper beam 3, bolts are inserted into the bolt holes 54 of the plate 51, and the bolts are fastened. In this case, since the bolt hole 54 is slightly larger than the diameter of the bolt to be mounted,
Even if there is some displacement between the existing bolt hole formed on the upper surface 3a and the bolt hole 54 of the plate 51, the work of inserting the bolt into the bolt hole 54 can be easily performed.

【0054】次いで、各ベース部分52、53のボルト
穴55にホネが取付けられ、さらに欄干が取付けられ、
乗客コンベアの改修作業が終了する。なお、図11にお
いては省略されているが、反対側の上梁3についても同
様の作業が行われる。
Next, a hook is attached to the bolt hole 55 of each of the base portions 52 and 53, and a balustrade is further attached.
The renovation work of the passenger conveyor is completed. Although not shown in FIG. 11, the same operation is performed for the upper beam 3 on the opposite side.

【0055】以上説明したように、本実施形態によれ
ば、上梁3に形成された既設のボルト穴を利用して改修
時に上梁3に新たに取付けられるベースを取付けること
ができるため、上梁3に対する穿孔作業が不要となる。
このため、迅速に乗客コンベアの改修作業を行うことが
できる。
As described above, according to the present embodiment, a base that can be newly attached to the upper beam 3 at the time of repair can be attached using the existing bolt holes formed in the upper beam 3. The perforation work for the beam 3 becomes unnecessary.
Therefore, the repair work of the passenger conveyor can be quickly performed.

【0056】なお、第2の実施の形態においては、第1
の実施の形態の場合と異なり、互いに隣接するベース5
0のプレート51の長手方向端縁同士を当接させる必要
はなく、図13に示すように互いに隣接するプレート5
1の長手方向端縁が距離dをおいて離間するように、ベ
ース50を上梁3の上面3a上に配置してもよい。この
場合、ベース50の上梁3の上面3aに対する長手方向
の位置決めは、例えば、上面3aに形成された既設のボ
ルト穴とプレート51に形成されたボルト穴54とを一
致させることにより行ってもよい。
In the second embodiment, the first
Unlike the embodiment, the bases 5 adjacent to each other
It is not necessary to make the longitudinal edges of the plates 51 abut against each other, as shown in FIG.
The base 50 may be arranged on the upper surface 3a of the upper beam 3 so that one longitudinal edge is separated by a distance d. In this case, the positioning of the upper beam 3 of the base 50 in the longitudinal direction with respect to the upper surface 3a may be performed by, for example, aligning an existing bolt hole formed in the upper surface 3a with a bolt hole 54 formed in the plate 51. Good.

【0057】また、1枚のプレート51に対して、複数
のベース部分52および/またはベース部分53を設け
る必要は必ずしもしなく、図14に示すように、1枚の
プレート51に1つのベース部分52または53を設け
ることによりベース50を作成してもよい。
Further, it is not always necessary to provide a plurality of base portions 52 and / or base portions 53 for one plate 51. As shown in FIG. The base 50 may be created by providing 52 or 53.

【0058】また、プレート51に、第1に実施の形態
のテムプレート30に形成した下穴31と同様な下穴を
形成して、プレート51にテムプレート機能を持たせて
もよい。そして第1に実施の形態と同様にして、プレー
ト51と上梁3の上面3aとを同時に穿孔してボルト穴
を形成し、このボルト穴にボルトを装着してもよい。こ
のようにすれば、例えば、上梁3の上面3aに形成され
た既設のボルト穴を利用するのみではプレート51と上
梁3との締結点数が不足し、上梁3に対するベース50
の取付強度が不足する場合に対応することが容易とな
る。
Further, a pilot hole similar to the pilot hole 31 formed in the Tem plate 30 of the first embodiment may be formed in the plate 51 so that the plate 51 has a Tem plate function. Then, similarly to the first embodiment, the plate 51 and the upper surface 3a of the upper beam 3 may be simultaneously drilled to form a bolt hole, and a bolt may be mounted in this bolt hole. In this way, for example, if only the existing bolt holes formed on the upper surface 3a of the upper beam 3 are used, the number of fastening points between the plate 51 and the upper beam 3 is insufficient, and the base 50 for the upper beam 3 is not provided.
It becomes easy to cope with the case where the mounting strength of the deficiency is insufficient.

【0059】なお、ベース50の形態を、以下に示す変
形例の如く改変することも可能である。
The form of the base 50 can be modified as in the following modified examples.

【0060】第1の変形例 まず、図15により第1の変形例について説明する。図
15に示す第1の変形例においては、ベース50のプレ
ート51の幅は、長手方向の両端近傍のみで上梁3の上
面3aの幅Wと同一となっており、残余の部分はボルト
穴54を形成するために必要最小限の幅となっている。
この場合、上梁3の上面3aへのベース50の位置決め
は、プレート51の長手方向の両端近傍部分の端縁を用
いて行われる。
First Modification First, a first modification will be described with reference to FIG. In the first modification shown in FIG. 15, the width of the plate 51 of the base 50 is the same as the width W of the upper surface 3a of the upper beam 3 only in the vicinity of both ends in the longitudinal direction, and the remaining portion is a bolt hole. The width is the minimum necessary for forming the wiring 54.
In this case, the positioning of the base 50 on the upper surface 3a of the upper beam 3 is performed using the edges near the both ends in the longitudinal direction of the plate 51.

【0061】この第7の変形例によれば、プレート51
のうち機能上必要のない部分が取り除かれているため、
ベース50全体を軽量化することができる。このためベ
ース50の作業現場への搬入を容易に行うことができ
る。
According to the seventh modification, the plate 51
Because unnecessary parts of the function have been removed,
The entire base 50 can be reduced in weight. Therefore, it is possible to easily carry the base 50 into the work site.

【0062】第2の変形例 次に、図16により第2の変形例について説明する。図
16に示す第2の変形例においては、ベース50は一枚
の鉄板を折曲げることにより形成されている。
Second Modification Next, a second modification will be described with reference to FIG. In the second modification shown in FIG. 16, the base 50 is formed by bending a single iron plate.

【0063】この第2の変形例は、ベース部分52、5
3をプレート51の幅からはみ出し設ける必要がない場
合に有用であり、プレート51とベース部分52、53
とを予め別個に形成して結合してベース50を作成する
場合に比べて、低コストかつ容易にベース50を作成す
ることができる。
This second modified example is based on the base portions 52, 5
This is useful when it is not necessary to provide the projection 3 out of the width of the plate 51, and the plate 51 and the base portions 52, 53
And the base 50 can be easily and inexpensively formed at a lower cost than when the base 50 is formed by separately forming the base 50 and combining them.

【0064】さらに第3の変形例として、プレート51
の長手方向端部に、第1の実施の形態の第3の変形例
(図5参照)に示すテムプレート30に形成されたよう
な凹凸を形成して、凹凸を嵌合することにより互いに隣
接するベース50間の位置決めを行うことができるよう
に構成してもよい。
As a third modification, the plate 51
Are formed adjacent to each other by forming irregularities such as those formed on the Tem plate 30 shown in the third modified example of the first embodiment (see FIG. 5) at the longitudinal end portions thereof. The configuration may be such that positioning between the bases 50 can be performed.

【0065】第3の実施の形態 次に、第3の実施の形態について図17により説明す
る。この第3の実施の形態においては、第2の実施の形
態において用いられたベース50のプレート(基板)5
1にホネ部分(新設部品)61を直接(ベース部分5
2、53を使用せずに)固着したホネ構造体60が使用
される。
Third Embodiment Next, a third embodiment will be described with reference to FIG. In the third embodiment, the plate (substrate) 5 of the base 50 used in the second embodiment is used.
1 is directly attached to the base part (new part) 61 (base part 5).
A bonded fone structure 60 (without using 2, 53) is used.

【0066】ホネ構造体60のプレート51には、第2
の実施の形態のプレート51と同様に、上梁3の上面3
aに既設されていたボルト穴に対応する位置にそれぞれ
ボルト穴54が形成されている。
The plate 51 of the phone structure 60 has the second
Like the plate 51 of the embodiment, the upper surface 3 of the upper beam 3
A bolt hole 54 is formed at a position corresponding to the bolt hole already provided in FIG.

【0067】次に、このホネ構造体60を使用して上梁
3を改修する方法について説明する。
Next, a method of repairing the upper beam 3 by using the bone structure 60 will be described.

【0068】まず、既設の欄干、ホネ、ベースを取外し
た上梁3の上面3aに対するホネ構造体60のプレート
51が所定位置に載置される。次いで、プレート51の
各ボルト穴54にボルトが挿入され、ボルト締結が行わ
れ、これにより上梁3にホネ構造体60が固着される。
次いで、ホネ構造体60のホネ部分61に欄干等の部材
が取付けられ、乗客コンベアの改修作業が終了する。
First, the plate 51 of the phone structure 60 is placed at a predetermined position on the upper surface 3a of the upper beam 3 from which the existing balustrade, hook and base have been removed. Next, bolts are inserted into the bolt holes 54 of the plate 51, and bolt fastening is performed, whereby the phone structure 60 is fixed to the upper beam 3.
Next, a member such as a balustrade is attached to the horn portion 61 of the horn structure 60, and the repair work of the passenger conveyor is completed.

【0069】この第3の実施の形態によれば、ベースと
ホネとの結合工程を省略することができるため、より迅
速に乗客コンベアの改修作業を行うことができる。
According to the third embodiment, since the step of connecting the base and the horn can be omitted, the repair work of the passenger conveyor can be performed more quickly.

【0070】[0070]

【発明の効果】以上説明したように、本発明によれば、
ケガキ作業、穴開け作業、およびベースの取付作業に必
要な時間を短縮することができ、乗客コンベアの改修作
業の効率を大幅に向上させることができる。
As described above, according to the present invention,
The time required for marking work, punching work, and base mounting work can be reduced, and the efficiency of passenger conveyor repair work can be greatly improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の第1の実施の形態を示す図であって、
本体枠の上梁へのテムプレートの固定方法を示す斜視
図。
FIG. 1 is a diagram showing a first embodiment of the present invention,
FIG. 9 is a perspective view showing a method of fixing the Tem plate to the upper beam of the main body frame.

【図2】本発明の第1の実施の形態を示す図であって、
テムプレートの構成および上梁の穿孔方法を示す斜視
図。
FIG. 2 is a diagram showing a first embodiment of the present invention,
The perspective view which shows the structure of a tem plate, and the method of perforating an upper beam.

【図3】テムプレートの第1の変形例を示す図。FIG. 3 is a view showing a first modification of the tem plate.

【図4】テムプレートの第2の変形例を示す図。FIG. 4 is a diagram showing a second modification of the tem plate.

【図5】テムプレートの第3の変形例を示す図。FIG. 5 is a view showing a third modification of the tem plate.

【図6】テムプレートの第4の変形例を示す図。FIG. 6 is a view showing a fourth modification of the tem plate.

【図7】テムプレートの第5の変形例を示す図。FIG. 7 is a view showing a fifth modification of the tem plate.

【図8】テムプレートの第6の変形例を示す図。FIG. 8 is a view showing a sixth modification of the tem plate.

【図9】テムプレートの第7の変形例を示す図。FIG. 9 is a view showing a seventh modification of the tem plate.

【図10】テムプレートの第8の変形例を示す図。FIG. 10 is a diagram showing an eighth modification of the tem plate.

【図11】本発明の第2の実施の形態を示す図であっ
て、本体枠の上梁へのベースの配置方法を示す図。
FIG. 11 is a view showing the second embodiment of the present invention, and is a view showing a method of arranging the base on the upper beam of the main body frame.

【図12】第1の実施の形態におけるベースの構成を示
す図。
FIG. 12 is a diagram showing a configuration of a base according to the first embodiment.

【図13】ベースの他の配置方法を示す図。FIG. 13 is a view showing another arrangement method of the base.

【図14】ベースの他の形態を示す図。FIG. 14 is a view showing another form of the base.

【図15】ベースの第1の変形例を示す図。FIG. 15 is a diagram showing a first modification of the base.

【図16】ベースの第2の変形例を示す図。FIG. 16 is a view showing a second modification of the base.

【図17】本発明の第3の実施の形態を示す図であっ
て、本体枠の上梁へのホネ構造体の取付方法を示す図。
FIG. 17 is a view showing the third embodiment of the present invention, and is a view showing a method of attaching the phone structure to the upper beam of the main body frame.

【図18】乗客コンベアの構造のうち、本発明の実施に
係る部分を示す側面図。
FIG. 18 is a side view showing a portion of the structure of the passenger conveyor according to an embodiment of the present invention.

【図19】本体枠の上梁へのホネの取付方法を示す図。FIG. 19 is a diagram showing a method of attaching a hook to the upper beam of the main body frame.

【図20】ベース、ホネ、欄干等を取り除いた本体枠の
上梁を示す斜視図。
FIG. 20 is a perspective view showing an upper beam of a main body frame from which a base, a hood, a balustrade, and the like are removed.

【図21】乗客コンベア改修時における従来の本体枠の
加工方法を示す斜視図。
FIG. 21 is a perspective view showing a conventional method of processing a main body frame during repair of a passenger conveyor.

【図22】乗客コンベア改修時における従来の本体枠の
加工方法を示す斜視図。
FIG. 22 is a perspective view showing a conventional method of processing a main body frame during repair of a passenger conveyor.

【符号の説明】[Explanation of symbols]

2 本体枠 30 テムプレート 31 下穴(加工ガイド) 38 切欠き(加工ガイド) 50 ベース(取付補助枠) 51 ベース(基板) 52、53 ベース部分(取付部) 2 Body frame 30 Tem plate 31 Prepared hole (Processing guide) 38 Notch (Processing guide) 50 Base (Mounting auxiliary frame) 51 Base (Substrate) 52, 53 Base part (Mounting part)

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】本体枠上にテムプレートを設置し、このテ
ムプレートに設けられた加工ガイドに従って本体枠を加
工することを特徴とする乗客コンベアの本体枠の加工方
法。
1. A method for processing a body frame of a passenger conveyor, comprising: installing a Tem plate on a body frame; and processing the body frame according to a processing guide provided on the Tem plate.
【請求項2】前記テムプレートは、本体枠を構成する梁
と同一の幅を有していることを特徴とする請求項1記載
の加工方法。
2. The processing method according to claim 1, wherein the tem plate has the same width as a beam forming the main body frame.
【請求項3】前記加工ガイドは、前記本体枠に穿孔され
る穴径より小さい穴径を有する下穴からなり、前記本体
枠を加工する場合、前記下穴にドリルの刃先を当接さ
せ、前記テムプレートごと本体枠を穿孔することを特徴
とする請求項1または2記載の本体枠の加工方法。
3. The processing guide comprises a pilot hole having a hole diameter smaller than a hole diameter drilled in the main body frame. When processing the main body frame, a cutting edge of a drill is brought into contact with the pilot hole, 3. The method for processing a body frame according to claim 1, wherein the body frame is bored together with the tem plate.
【請求項4】前記加工ガイドは、前記テムプレートの端
縁に形成された切欠きからなり、前記本体枠を加工する
場合、前記切欠きに沿って切欠き加工を行うことを特徴
とする請求項1または2記載の本体枠の加工方法。
4. The processing guide comprises a notch formed at an edge of the Template, and when processing the main body frame, a notch is formed along the notch. Item 3. The method for processing a body frame according to Item 1 or 2.
【請求項5】乗客コンベアの改修時に新設される部品を
取付けるための取付補助枠において、 本体枠に形成された既設穴に対応する位置に穴が形成さ
れた基板と、 前記基板に設けられ、新設部品の穴位置に対応する位置
に穴が形成された取付部と、を備えたことを特徴とする
取付補助枠。
5. A mounting auxiliary frame for mounting a part newly installed at the time of repairing a passenger conveyor, a board having a hole formed at a position corresponding to an existing hole formed in a main body frame; A mounting portion having a hole formed at a position corresponding to the hole position of the newly installed part.
【請求項6】乗客コンベアの改修時に新設される部品の
取付方法において、 新設部品に本体枠に形成された既設穴に対応する位置に
穴が形成された基板を設け、この基板の穴と本体枠の既
設穴とを用いて締結を行うことを特徴とする取付方法。
6. A method of mounting a part newly installed at the time of repairing a passenger conveyor, wherein a board having a hole formed at a position corresponding to an existing hole formed in a body frame is provided on the new part, and the hole of the board and the body are provided. An attachment method, wherein fastening is performed using an existing hole of a frame.
JP26488396A 1996-10-04 1996-10-04 Processing method for passenger conveyor body frame Expired - Fee Related JP4040710B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP26488396A JP4040710B2 (en) 1996-10-04 1996-10-04 Processing method for passenger conveyor body frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP26488396A JP4040710B2 (en) 1996-10-04 1996-10-04 Processing method for passenger conveyor body frame

Publications (2)

Publication Number Publication Date
JPH10109209A true JPH10109209A (en) 1998-04-28
JP4040710B2 JP4040710B2 (en) 2008-01-30

Family

ID=17409557

Family Applications (1)

Application Number Title Priority Date Filing Date
JP26488396A Expired - Fee Related JP4040710B2 (en) 1996-10-04 1996-10-04 Processing method for passenger conveyor body frame

Country Status (1)

Country Link
JP (1) JP4040710B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008019047A (en) * 2006-07-12 2008-01-31 Mitsubishi Electric Corp Device and method for mounting fall prevention curtain for elevator

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008019047A (en) * 2006-07-12 2008-01-31 Mitsubishi Electric Corp Device and method for mounting fall prevention curtain for elevator

Also Published As

Publication number Publication date
JP4040710B2 (en) 2008-01-30

Similar Documents

Publication Publication Date Title
EP0597835B1 (en) Method for production of trussed rafters with nail plate joints
JPH10109209A (en) Processing method for main body frame of passenger conveyor and fitting auxiliary frame for fitting newly provided part
US20050217185A1 (en) Building framework, method for making the same and components used in the framework
CN209831907U (en) Perforating device is used in furniture design decoration
US20080307666A1 (en) Measuring Band
US5419057A (en) Floor joist square
JP3241691B2 (en) Rafter or corner block aligning device, rafter or corner block alignment instrument, and rafter or corner block alignment method
JPS61279406A (en) Universal drilling jig
CN218285227U (en) Positioning tool
US20060096230A1 (en) Truss and method for making same
JPH07215626A (en) Form plate for elevator
CN219336627U (en) Welding auxiliary device for I-steel and punching connecting plate
CN217452264U (en) Finished product mounting hole jig
KR940006283B1 (en) Package of escalator
JPH0111369Y2 (en)
JPH01183400A (en) Fine puncher
KR200489385Y1 (en) Jig for fixing panel tie bar clip
JPH04254660A (en) Plywood for concrete form and form assembling method
JPH0641047B2 (en) Origin position correction method for shape steel punching machine
JP2000118910A (en) Positioning jig
JPH0342697Y2 (en)
JP2000176865A (en) Marking-off jig
JPS61195407A (en) Processing method for numerical control data
JPH09225717A (en) Simply moving type drilling device
JPH11207663A (en) Template for marking off location of foundation bolt hole and marking off method using the same

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20051212

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20051220

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060215

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20060509

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060710

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20060821

A911 Transfer of reconsideration by examiner before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20060915

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070814

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20071004

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20071030

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20071108

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101116

Year of fee payment: 3

R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101116

Year of fee payment: 3

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111116

Year of fee payment: 4

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121116

Year of fee payment: 5

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121116

Year of fee payment: 5

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131116

Year of fee payment: 6

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees