JPH10103699A - Heating system - Google Patents

Heating system

Info

Publication number
JPH10103699A
JPH10103699A JP8259022A JP25902296A JPH10103699A JP H10103699 A JPH10103699 A JP H10103699A JP 8259022 A JP8259022 A JP 8259022A JP 25902296 A JP25902296 A JP 25902296A JP H10103699 A JPH10103699 A JP H10103699A
Authority
JP
Japan
Prior art keywords
terminal
heaters
simultaneous
heater
simultaneous operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP8259022A
Other languages
Japanese (ja)
Inventor
Masao Yamaguchi
政夫 山口
Hideki Tadenuma
英樹 蓼沼
Hiroyuki Ieda
裕幸 家田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanyo Electric Co Ltd
Original Assignee
Sanyo Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanyo Electric Co Ltd filed Critical Sanyo Electric Co Ltd
Priority to JP8259022A priority Critical patent/JPH10103699A/en
Publication of JPH10103699A publication Critical patent/JPH10103699A/en
Pending legal-status Critical Current

Links

Landscapes

  • Domestic Hot-Water Supply Systems And Details Of Heating Systems (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

PROBLEM TO BE SOLVED: To prevent the total electric capacity at the time of ignition from exceeding an allowable value on the occasion of simultaneous operations of a large number of terminal heaters, by providing a centralized control unit which gives a command to make the terminal heaters operate simultaneously and by providing a control means which outputs an operation start command to each terminal heater on the basis of that command after a prescribed standby time passes. SOLUTION: A simultaneous operation switch 10 on an operating panel 9 of a centralized control unit 2 is pushed on the occasion when simultaneous operations of terminal heaters 1 are conducted in an operation of a heating system 1. Then a microcomputer 25 makes a control so that the terminal heaters 7 in the number of sixteen may start heating operations on the basis of a simultaneous operation program. Moreover, the microcomputer 25 waits for a prescribed standby time (e.g. 60 seconds) to pass, according to the simultaneous operation program, in order to avoid a state that the total electric capacity at the time of ignition exceeds an allowable value, and then it makes transfer to execution of the simultaneous operation program. In the case when the terminal heater 7 for the room No. 1 is judged to be in operation, an igniting operation therefor is already ended, and even when a heating operation for the room No.2 is conducted immediately, the total electric capacity does not exceed the allowable value.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、多数の燃料気化式
の端末暖房機(強制給排気型石油暖房機、石油ストーブ
等)を集中制御装置で管理する必要性の高い学校や病
院、ホテル等の施設に適用するに好適な暖房システムに
関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to schools, hospitals, hotels, etc., which need to manage a large number of fuel vaporization type terminal heaters (eg, forced supply / exhaust type oil heaters, oil heaters, etc.) by a centralized control device. The present invention relates to a heating system suitable for applying to a facility.

【0002】[0002]

【従来の技術】従来この種の暖房システムとしては、特
公平6−33899号公報、実公平7−5746号公
報、特公平7−62553号公報などに開示されている
ように、集中制御装置から端末暖房機へ出力された運転
開始信号を受けて、端末暖房機の気化器を電気ヒーター
(例えば、550W)で加熱した後、点火して暖房運転
を行うものが広く用いられていた。
2. Description of the Related Art Conventionally, as a heating system of this type, as disclosed in Japanese Patent Publication No. 6-33899, Japanese Utility Model Publication No. 7-5746, Japanese Patent Publication No. 7-62553, etc. In response to an operation start signal output to a terminal heater, a heater that heats a vaporizer of the terminal heater with an electric heater (for example, 550 W) and then ignites to perform a heating operation has been widely used.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、この暖
房システムでは、端末暖房機の一斉運転を行うべく集中
制御装置から各端末暖房機へ運転開始信号を出力する
と、すべての端末暖房機が同時に暖房運転を開始するた
め、特に端末暖房機の台数が多い場合には点火時の総電
気容量が許容値を超えてしまう恐れがあるという不都合
があった。
However, in this heating system, when the central control unit outputs an operation start signal to each terminal heater in order to perform simultaneous operation of the terminal heaters, all the terminal heaters simultaneously perform the heating operation. , There is a problem that the total electric capacity at the time of ignition may exceed an allowable value, particularly when the number of terminal heaters is large.

【0004】本発明は、上記事情に鑑み、端末暖房機の
台数が多くても、端末暖房機の一斉運転に際して点火時
の総電気容量が許容値を超える事態を防止しうる暖房シ
ステムを提供することを目的とする。
In view of the above circumstances, the present invention provides a heating system capable of preventing a situation where the total electric capacity at the time of ignition exceeds an allowable value during simultaneous operation of terminal heaters even when the number of terminal heaters is large. The purpose is to:

【0005】[0005]

【課題を解決するための手段】すなわち本発明は、集中
制御装置に複数台の燃料気化式の端末暖房機をそれぞれ
端末接続器を介して接続した暖房システムにおいて、前
記端末暖房機の一斉運転を指令する一斉運転スイッチを
前記集中制御装置に設け、この一斉運転スイッチからの
指令に基づいて、前記各端末暖房機に所定の待機時間を
置いて順に運転開始指令を出力する運転制御手段を設け
て構成される。
That is, the present invention relates to a heating system in which a plurality of fuel vaporization type terminal heaters are connected to a centralized control device via terminal connectors, respectively. A simultaneous operation switch for instructing is provided in the centralized control device, and operation control means for sequentially outputting an operation start instruction with a predetermined standby time at each terminal heater based on the instruction from the simultaneous operation switch is provided. Be composed.

【0006】また本発明は、集中制御装置に複数台の燃
料気化式の端末暖房機をそれぞれ端末接続器を介して接
続した暖房システムにおいて、前記端末暖房機の一斉運
転を指令する一斉運転スイッチを前記集中制御装置に設
け、この一斉運転スイッチからの指令に基づいて、前記
各端末暖房機に所定の待機時間を置いて順に運転開始指
令を出力する運転制御手段を設け、さらに、前記待機時
間を変更する待機時間変更手段を設けて構成される。
Further, the present invention provides a heating system in which a plurality of fuel vaporization type terminal heaters are connected to a centralized control device via terminal connectors, respectively. Provided in the centralized control device, based on a command from the simultaneous operation switch, provided with operation control means for sequentially outputting an operation start command with a predetermined standby time in each of the terminal heaters, further comprising the standby time A standby time changing means for changing the time is provided.

【0007】[0007]

【発明の実施の形態】以下、本発明の実施形態を図面に
基づいて説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0008】図1は本発明による暖房システムの一実施
形態を示す配線系統図、図2は集中制御装置の操作盤の
一例を示す正面図、図3は端末暖房機の操作パネルの一
例を示す正面図、図4は図1に示す暖房システムの制御
ブロック図、図5は一斉運転プログラムの一例を示すフ
ローチャート、図6は待機時間設定サブプログラムの一
例を示すフローチャートである。
FIG. 1 is a wiring diagram showing an embodiment of a heating system according to the present invention, FIG. 2 is a front view showing an example of an operation panel of a central control device, and FIG. 3 is an example of an operation panel of a terminal heater. 4 is a control block diagram of the heating system shown in FIG. 1, FIG. 5 is a flowchart showing an example of the simultaneous operation program, and FIG. 6 is a flowchart showing an example of the standby time setting subprogram.

【0009】本発明による暖房システム1は、図1に示
すように、集中制御装置2を有しており、集中制御装置
2には信号幹線3が接続されている。信号幹線3には1
6本の信号分岐線5が結線されており、各信号分岐線5
にはそれぞれ端末接続器6を介して端末暖房機7が接続
されている。これら端末暖房機7は、1号室から16号
室までの16の部屋に1台ずつ設置されている。
As shown in FIG. 1, a heating system 1 according to the present invention has a centralized control device 2 to which a signal trunk 3 is connected. 1 for signal trunk 3
Six signal branch lines 5 are connected, and each signal branch line 5
Are connected to terminal heaters 7 via terminal connectors 6, respectively. These terminal heaters 7 are installed one by one in 16 rooms from room 1 to room 16.

【0010】また、集中制御装置2は、図2に示すよう
に、操作盤9を有しており、操作盤9上には一斉運転ス
イッチ10、一斉停止スイッチ11、メモリー運転スイ
ッチ12、部屋選択スイッチ13、昇温スイッチ15、
降温スイッチ16、部屋番号表示部17、温度表示部1
9、現在温度ランプ14、設定温度ランプ18および1
6個の個別運転スイッチ20が設けられていると共に、
各個別運転スイッチ20に対応して本体切ランプ21、
運転命令ランプ22およびプログラム運転ランプ23が
それぞれ設けられている。
The centralized control device 2 has an operation panel 9 as shown in FIG. 2. On the operation panel 9, a simultaneous operation switch 10, a simultaneous stop switch 11, a memory operation switch 12, and a room selection switch Switch 13, temperature raising switch 15,
Temperature switch 16, room number display 17, temperature display 1
9, current temperature lamp 14, set temperature lamps 18 and 1
While six individual operation switches 20 are provided,
A lamp 21 for turning off the main body corresponding to each individual operation switch 20,
An operation instruction lamp 22 and a program operation lamp 23 are provided.

【0011】一方、各端末暖房機7は、図3に示すよう
に、操作パネル30を有しており、操作パネル30上に
は現在温度表示部31、設定温度表示部32、昇温スイ
ッチ33および降温スイッチ34が設けられている。ま
た、図1に示すように、各端末暖房機7の背面にはそれ
ぞれ温度センサー8が取り付けられており、端末暖房機
7が設置された部屋の室温をこの温度センサー8で検知
することができる。
On the other hand, as shown in FIG. 3, each terminal heater 7 has an operation panel 30, on which a current temperature display section 31, a set temperature display section 32, and a temperature raising switch 33 are provided. And a temperature lowering switch 34. Also, as shown in FIG. 1, a temperature sensor 8 is attached to the back of each terminal heater 7, and the temperature sensor 8 can detect the room temperature of the room where the terminal heater 7 is installed. .

【0012】また、集中制御装置2は、図4に示すよう
に、マイコン25を具備しており、マイコン25には、
前述した一斉運転スイッチ10、一斉停止スイッチ1
1、メモリー運転スイッチ12、部屋選択スイッチ1
3、昇温スイッチ15、降温スイッチ16、各個別運転
スイッチ20、部屋番号表示部17、温度表示部19、
現在温度ランプ14、設定温度ランプ18、本体切ラン
プ21、運転命令ランプ22およびプログラム運転ラン
プ23が接続されている。
The centralized control device 2 includes a microcomputer 25 as shown in FIG.
Simultaneous operation switch 10 and simultaneous stop switch 1 described above
1, memory operation switch 12, room selection switch 1
3, temperature raising switch 15, temperature lowering switch 16, each individual operation switch 20, room number display section 17, temperature display section 19,
A current temperature lamp 14, a set temperature lamp 18, a main body cutoff lamp 21, an operation instruction lamp 22, and a program operation lamp 23 are connected.

【0013】さらに、各端末暖房機7はマイコン35を
具備しており、マイコン35には、前述した温度センサ
ー8、昇温スイッチ33、降温スイッチ34、現在温度
表示部31および設定温度表示部32が接続されてい
る。
Further, each terminal heater 7 has a microcomputer 35. The microcomputer 35 includes a temperature sensor 8, a temperature raising switch 33, a temperature lowering switch 34, a current temperature display 31 and a set temperature display 32. Is connected.

【0014】本発明による暖房システム1は以上のよう
な構成を有するので、この暖房システム1を稼働する際
には、端末暖房機7の運転形態(一斉運転、個別運転、
メモリー運転)に応じて次のような操作を行う。
Since the heating system 1 according to the present invention has the above configuration, when the heating system 1 is operated, the operation mode of the terminal heater 7 (simultaneous operation, individual operation,
Perform the following operations according to the memory operation).

【0015】まず、端末暖房機7の一斉運転を行う際に
は、集中制御装置2の操作盤9上の一斉運転スイッチ1
0を押す。するとマイコン25は、図5に示す一斉運転
プログラムPRG1に基づいて、16台の端末暖房機7
が暖房運転を開始するように制御する。
First, when performing the simultaneous operation of the terminal heater 7, the simultaneous operation switch 1 on the operation panel 9 of the central control device 2 is operated.
Press 0. Then, the microcomputer 25, based on the simultaneous operation program PRG1 shown in FIG.
Controls to start the heating operation.

【0016】すなわち、まず一斉運転プログラムPRG
1のステップS1で、1号室の端末暖房機7が運転中で
あるか否かを判定し、1号室の端末暖房機7が運転中で
ないと判定した場合には、一斉運転プログラムPRG1
のステップS2に入り、信号幹線3、信号分岐線5およ
び端末接続器6を介して1号室の端末暖房機7に運転開
始指令を出力する。これを受けて、1号室の端末暖房機
7のマイコン35は、その端末暖房機7の電気ヒーター
(図示せず)に通電して気化器を加熱した後、点火して
暖房運転を行うように制御する。
That is, first, the simultaneous operation program PRG
In step S1 of 1, it is determined whether or not the terminal heater 7 of the first room is in operation. If it is determined that the terminal heater 7 of the first room is not in operation, the simultaneous operation program PRG1 is performed.
And outputs an operation start command to the terminal heater 7 in the first room via the signal trunk line 3, the signal branch line 5, and the terminal connector 6. In response to this, the microcomputer 35 of the terminal heater 7 in the first room energizes an electric heater (not shown) of the terminal heater 7 to heat the vaporizer and then ignites to perform the heating operation. Control.

【0017】さらにマイコン25は、点火時の総電気容
量が許容値を超える事態を避けるため、一斉運転プログ
ラムPRG1のステップS3で、所定の待機時間(例え
ば、60秒)が経過するのを待ってから、一斉運転プロ
グラムPRG1のステップS4に移行する。なお、上述
した一斉運転プログラムPRG1のステップS1での判
定の結果、1号室の端末暖房機7が運転中であると判定
した場合には、その端末暖房機7の点火作業がすでに終
了しており、直ちに次の2号室の端末暖房機7の暖房運
転を行っても点火時の総電気容量が許容値を超えること
はないので、一斉運転プログラムPRG1のステップS
2、S3をスキップしてステップS4に移行する。
Further, the microcomputer 25 waits for a predetermined standby time (for example, 60 seconds) to elapse in step S3 of the simultaneous operation program PRG1 in order to avoid a situation where the total electric capacity at the time of ignition exceeds an allowable value. From step S4 of the simultaneous operation program PRG1. In addition, as a result of the determination in step S1 of the above-mentioned simultaneous operation program PRG1, when it is determined that the terminal heater 7 of the first room is in operation, the ignition work of the terminal heater 7 has already been completed. Since the total electric capacity at the time of ignition does not exceed the allowable value even if the heating operation of the terminal heater 7 in the next room 2 is immediately performed, step S of the simultaneous operation program PRG1 is performed.
2. Skip S3 and proceed to step S4.

【0018】そして、一斉運転プログラムPRG1のス
テップS4で、2号室の端末暖房機7が運転中であるか
否かを判定し、2号室の端末暖房機7が運転中でないと
判定した場合には、一斉運転プログラムPRG1のステ
ップS5に入り、信号幹線3、信号分岐線5および端末
接続器6を介して2号室の端末暖房機7に運転開始指令
を出力する。これを受けて、2号室の端末暖房機7のマ
イコン35は、その端末暖房機7の電気ヒーター(図示
せず)に通電して気化器を加熱した後、点火して暖房運
転を行うように制御する。
Then, in step S4 of the simultaneous operation program PRG1, it is determined whether or not the terminal heater 7 in the second room is in operation. If it is determined that the terminal heater 7 in the second room is not in operation, In step S5 of the simultaneous operation program PRG1, the operation start command is output to the terminal heater 7 in the second room via the signal trunk 3, the signal branch 5 and the terminal connector 6. In response to this, the microcomputer 35 of the terminal heater 7 in the second room heats the vaporizer by energizing the electric heater (not shown) of the terminal heater 7 and then performs the heating operation by igniting. Control.

【0019】さらにマイコン25は、点火時の総電気容
量が許容値を超える事態を避けるため、一斉運転プログ
ラムPRG1のステップS6で、所定の待機時間(例え
ば、60秒)が経過するのを待ってから、次の3号室の
端末暖房機7の暖房運転に移行する。なお、上述した一
斉運転プログラムPRG1のステップS4での判定の結
果、2号室の端末暖房機7が運転中であると判定した場
合には、その端末暖房機7の点火作業がすでに終了して
おり、直ちに次の3号室の端末暖房機7の暖房運転を行
っても点火時の総電気容量が許容値を超えることはない
ので、一斉運転プログラムPRG1のステップS5、S
6をスキップして3号室の端末暖房機7の暖房運転に移
行する。
Further, the microcomputer 25 waits for a predetermined standby time (for example, 60 seconds) to elapse in step S6 of the simultaneous operation program PRG1 in order to avoid a situation where the total electric capacity at the time of ignition exceeds an allowable value. Then, the operation shifts to the heating operation of the terminal heater 7 in the next room No. 3. In addition, as a result of the determination in step S4 of the above-mentioned simultaneous operation program PRG1, when it is determined that the terminal heater 7 of the second room is in operation, the ignition work of the terminal heater 7 has already been completed. Since the total electric capacity at the time of ignition does not exceed the allowable value even if the heating operation of the terminal heater 7 in the next room 3 is immediately performed, steps S5 and S5 of the simultaneous operation program PRG1 are performed.
6 is skipped and the operation moves to the heating operation of the terminal heater 7 in the third room.

【0020】以下同様にして、最後の16号室の端末暖
房機7の暖房運転が開始されたところで、一斉運転プロ
グラムPRG1に基づく端末暖房機7の一斉運転が終了
する。
Similarly, when the heating operation of the terminal heater 7 in the last room 16 starts, the simultaneous operation of the terminal heaters 7 based on the simultaneous operation program PRG1 ends.

【0021】このように、一斉運転スイッチ10が押さ
れると、マイコン25は、16台の端末暖房機7に所定
の待機時間(例えば、60秒)を置いて順に運転開始指
令を出力し、これを受けて各端末暖房機7は所定の待機
時間ごとに順次その暖房運転を開始するので、点火時の
総電気容量が許容値を超えてしまう事態を未然に防止す
ることが可能となる。
As described above, when the simultaneous operation switch 10 is pressed, the microcomputer 25 outputs an operation start command to the sixteen terminal heaters 7 after a predetermined standby time (for example, 60 seconds). In response to this, each terminal heater 7 sequentially starts its heating operation at every predetermined standby time, so that it is possible to prevent a situation where the total electric capacity at the time of ignition exceeds an allowable value.

【0022】また、端末暖房機7の個別運転を行う際に
は、集中制御装置2の操作盤9上の個別運転スイッチ2
0を押す。するとマイコン25は、個別運転スイッチ2
0が押された端末暖房機7に対して信号幹線3、信号分
岐線5および端末接続器6を介して運転開始を指令し、
これを受けて当該端末暖房機7のマイコン35は所定の
暖房運転が行われるように制御する。その結果、何台か
の端末暖房機7が暖房運転を行う。
When the individual operation of the terminal heater 7 is performed, the individual operation switch 2 on the operation panel 9 of the centralized controller 2 is operated.
Press 0. Then, the microcomputer 25 sets the individual operation switch 2
0 is commanded to the terminal heater 7 to which the operation is started via the signal trunk line 3, the signal branch line 5, and the terminal connector 6,
In response to this, the microcomputer 35 of the terminal heater 7 controls so that a predetermined heating operation is performed. As a result, some terminal heaters 7 perform the heating operation.

【0023】さらに、端末暖房機7のメモリー運転を行
う際には、集中制御装置2の操作盤9上のメモリー運転
スイッチ12を押す。するとマイコン25は、メモリー
運転を指示されている端末暖房機7に対して信号幹線
3、信号分岐線5および端末接続器6を介して運転開始
を指令し、これを受けて当該端末暖房機7のマイコン3
5は所定の暖房運転が行われるように制御する。その結
果、何台かの端末暖房機7が暖房運転を行う。
Further, when performing the memory operation of the terminal heater 7, the memory operation switch 12 on the operation panel 9 of the central control device 2 is pressed. Then, the microcomputer 25 instructs the terminal heater 7 instructed to perform the memory operation to start the operation via the signal trunk line 3, the signal branch line 5, and the terminal connector 6, and receives the instruction to start the operation. Microcomputer 3
5 controls so that a predetermined heating operation is performed. As a result, some terminal heaters 7 perform the heating operation.

【0024】このように、暖房システム1は端末暖房機
7の運転形態に応じて稼働することができるが、各端末
暖房機7の操作パネル30上の現在温度表示部31およ
び設定温度表示部32にはそれぞれ、その端末暖房機7
が設置された部屋の現在温度および設定温度が2桁の7
セグメントで表示されているので、その端末暖房機7の
設定温度を変更したい場合には、昇温スイッチ33また
は降温スイッチ34を押して設定温度を所望の温度に変
更することができる。
As described above, the heating system 1 can be operated according to the operation mode of the terminal heaters 7, but the current temperature display section 31 and the set temperature display section 32 on the operation panel 30 of each terminal heater 7. Each has its terminal heater 7
The current temperature and the set temperature of the room where the
When the set temperature of the terminal heater 7 is to be changed, the set temperature can be changed to a desired temperature by pressing the temperature raising switch 33 or the temperature lowering switch 34 because the temperature is displayed in segments.

【0025】また、こうした各端末暖房機7の現在温度
および設定温度の確認ならびに設定温度の変更は、集中
制御装置2側で実施することも可能である。それには、
集中制御装置2の操作盤9上の部屋選択スイッチ13を
押して所望の端末暖房機7を選択する。ここで、部屋選
択スイッチ13を押すと、押圧操作ごとに順次、表示内
容が変化する。すなわち、部屋番号表示部17に「1」
「2」「3」…と端末暖房機7の対応番号が2桁の7セ
グメントで表示されるので、部屋番号表示部17の表示
を見ながら端末暖房機7を容易に選択することができ
る。さらに、こうして選択された端末暖房機7の室温
(現在温度)が温度表示部19に表示されると共に、現
在温度ランプ14が点灯する。これが現在温度表示モー
ドである。ここで、その端末暖房機7の設定温度を変更
したい場合には、昇温スイッチ15または降温スイッチ
16を押す。すると、現在温度ランプ14が消灯すると
同時に設定温度ランプ18が点灯して温度設定モードに
移行するので、設定温度を上げるには昇温スイッチ15
を押し、逆に設定温度を下げるには降温スイッチ16を
押して、設定温度を所望の温度に変更することができ
る。よって、端末暖房機7の周囲環境の状況を集中制御
装置2側で把握することが可能となり、端末暖房機7が
設置された部屋にいちいち出向く必要がないので、特に
端末暖房機7の台数が多い場合には管理上の利便性に優
れる。
The confirmation of the current temperature and the set temperature of each terminal heater 7 and the change of the set temperature can also be carried out on the central control device 2 side. To do that,
The user selects the desired terminal heater 7 by pressing the room selection switch 13 on the operation panel 9 of the central control device 2. Here, when the room selection switch 13 is pressed, the display content changes sequentially for each pressing operation. That is, “1” is displayed in the room number display section 17.
Since “2”, “3”,... And the corresponding numbers of the terminal heaters 7 are displayed in seven 2-digit segments, the terminal heaters 7 can be easily selected while looking at the display on the room number display section 17. Further, the room temperature (current temperature) of the terminal heater 7 thus selected is displayed on the temperature display section 19, and the current temperature lamp 14 is turned on. This is the current temperature display mode. Here, when it is desired to change the set temperature of the terminal heater 7, the temperature raising switch 15 or the temperature lowering switch 16 is pressed. Then, at the same time when the current temperature lamp 14 is turned off, the set temperature lamp 18 is turned on and the mode shifts to the temperature setting mode.
To lower the set temperature, press the temperature lowering switch 16 to change the set temperature to a desired temperature. Therefore, the state of the surrounding environment of the terminal heater 7 can be grasped on the central control device 2 side, and it is not necessary to go to the room where the terminal heater 7 is installed. When there are many, it is excellent in management convenience.

【0026】また、端末暖房機7の運転を停止する際に
は、集中制御装置2の操作盤9上の一斉停止スイッチ1
1を押す。すると、マイコン25は信号幹線3、信号分
岐線5および端末接続器6を介して運転中の端末暖房機
7に運転停止を指令し、これを受けて各端末暖房機7の
マイコン35は所定の暖房運転を停止するように制御す
る。その結果、すべての端末暖房機7が運転停止状態と
なる。
When the operation of the terminal heater 7 is stopped, the simultaneous stop switch 1 on the operation panel 9 of the central control device 2 is used.
Press 1. Then, the microcomputer 25 instructs the operating terminal heaters 7 to stop operating via the signal trunk line 3, the signal branch line 5, and the terminal connector 6, and in response to this, the microcomputer 35 of each terminal heater 7 issues a predetermined command. Control to stop the heating operation. As a result, all the terminal heaters 7 are in an operation stop state.

【0027】なお、運転中の端末暖房機7に対応した個
別運転スイッチ20を押すことにより、端末暖房機7ご
とにその運転を停止することも勿論可能である。
It is of course possible to stop the operation of each terminal heater 7 by pressing the individual operation switch 20 corresponding to the terminal heater 7 in operation.

【0028】なお、上述の実施形態においては、16台
の端末暖房機7の点火時の総電気容量が許容値を超えな
いように各端末暖房機7に所定の待機時間を置いて順に
運転開始指令を出力する暖房システム1について説明し
たが、端末暖房機7の台数が少ない場合や電気容量の許
容値が大きい場合には、この待機時間を長く設定する必
要がない。そこで、待機時間変更手段としてディップス
イッチ(図示せず)を集中制御装置2に設けておき、こ
れを操作することにより、待機時間を適宜変更できるよ
うにすることも可能である。この場合、上述した端末暖
房機7の一斉運転に先立ち、マイコン25は、図6に示
す待機時間設定サブプログラムPRG2に基づいて待機
時間を設定する。すなわち、マイコン25は、待機時間
設定サブプログラムPRG2のステップS1で、ディッ
プスイッチがONかOFFかを判定し、ディップスイッ
チがOFFであると判定した場合には、待機時間設定サ
ブプログラムPRG2のステップS2に入り、待機時間
を1秒に設定し、ディップスイッチがONであると判定
した場合には、待機時間設定サブプログラムPRG2の
ステップS3に入り、待機時間を60秒に設定する。
In the above-described embodiment, the operation is sequentially started after a predetermined standby time is set for each terminal heater 7 so that the total electric capacity of the 16 terminal heaters 7 at the time of ignition does not exceed an allowable value. The heating system 1 that outputs a command has been described. However, when the number of terminal heaters 7 is small or when the allowable value of the electric capacity is large, it is not necessary to set the standby time long. Therefore, it is possible to provide a DIP switch (not shown) as the standby time changing means in the central control device 2 and operate the switch to appropriately change the standby time. In this case, prior to the simultaneous operation of the terminal heater 7 described above, the microcomputer 25 sets the standby time based on the standby time setting subprogram PRG2 shown in FIG. That is, in step S1 of the standby time setting subprogram PRG2, the microcomputer 25 determines whether the DIP switch is ON or OFF. When it is determined that the DIP switch is OFF, the microcomputer 25 determines in step S2 of the standby time setting subprogram PRG2. Then, the standby time is set to 1 second, and if it is determined that the dip switch is ON, the process proceeds to step S3 of the standby time setting subprogram PRG2, and the standby time is set to 60 seconds.

【0029】また、上述の実施形態においては、16台
の端末暖房機7を備えた暖房システム1について説明し
たが、端末暖房機7の台数は16台に限られないことは
言及するまでもない。
Further, in the above-described embodiment, the heating system 1 including the 16 terminal heaters 7 has been described, but it is needless to mention that the number of terminal heaters 7 is not limited to 16. .

【0030】[0030]

【発明の効果】以上説明したように本発明によれば、集
中制御装置に複数台の燃料気化式の端末暖房機をそれぞ
れ端末接続器を介して接続した暖房システムにおいて、
前記端末暖房機の一斉運転を指令する一斉運転スイッチ
を前記集中制御装置に設け、この一斉運転スイッチから
の指令に基づいて、前記各端末暖房機に所定の待機時間
を置いて順に運転開始指令を出力するマイコン等の運転
制御手段を設けて構成したので、端末暖房機の一斉運転
に際して、各端末暖房機は所定の待機時間ごとに順次そ
の暖房運転を開始することから、端末暖房機の台数が多
くても点火時の総電気容量が許容値を超える事態を防止
することが可能となる。
As described above, according to the present invention, in a heating system in which a plurality of fuel vaporization type terminal heaters are connected to a central control device via terminal connectors, respectively.
A simultaneous operation switch for instructing the simultaneous operation of the terminal heaters is provided in the centralized control device, and based on an instruction from the simultaneous operation switch, an operation start instruction is sequentially issued after a predetermined standby time for each terminal heater. Since the operation control means such as a microcomputer for outputting is provided, the terminal heaters start the heating operation sequentially at a predetermined standby time during the simultaneous operation of the terminal heaters. At most, it is possible to prevent a situation where the total electric capacity at the time of ignition exceeds an allowable value.

【0031】また本発明によれば、集中制御装置に複数
台の燃料気化式の端末暖房機をそれぞれ端末接続器を介
して接続した暖房システムにおいて、前記端末暖房機の
一斉運転を指令する一斉運転スイッチを前記集中制御装
置に設け、この一斉運転スイッチからの指令に基づい
て、前記各端末暖房機に所定の待機時間を置いて順に運
転開始指令を出力するマイコン等の運転制御手段を設
け、さらに、前記待機時間を変更するディップスイッチ
等の待機時間変更手段を設けて構成したので、端末暖房
機の一斉運転に際して、各端末暖房機は所定の待機時間
ごとに順次その暖房運転を開始することから、端末暖房
機の台数が多くても点火時の総電気容量が許容値を超え
る事態を防止することが可能となるとともに、待機時間
変更手段を操作することにより、待機時間を簡易に変更
できることから、端末暖房機7の台数の多少や電気容量
の許容値の大小などに応じて所望の運転形態を採用する
ことが可能となり、暖房システムの汎用性が拡大する。
Further, according to the present invention, in a heating system in which a plurality of fuel vaporization type terminal heaters are connected to a centralized control device via respective terminal connectors, simultaneous operation for commanding simultaneous operation of the terminal heaters is provided. A switch provided in the centralized control device, based on a command from the simultaneous operation switch, provided with operation control means such as a microcomputer for sequentially outputting an operation start command at a predetermined standby time to each of the terminal heaters, Since the standby time changing means such as a dip switch for changing the standby time is provided, when the terminal heaters are simultaneously operated, each terminal heater sequentially starts its heating operation every predetermined standby time. Even if the number of terminal heaters is large, it is possible to prevent the total electric capacity at the time of ignition from exceeding an allowable value, and to operate the standby time changing means. As a result, the standby time can be easily changed, so that a desired operation mode can be adopted according to the number of terminal heaters 7 and the allowable value of the electric capacity, and the versatility of the heating system is expanded. I do.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明による暖房システムの一実施形態を示す
配線系統図である。
FIG. 1 is a wiring system diagram showing one embodiment of a heating system according to the present invention.

【図2】集中制御装置の操作盤の一例を示す正面図であ
る。
FIG. 2 is a front view showing an example of an operation panel of the centralized control device.

【図3】端末暖房機の操作パネルの一例を示す正面図で
ある。
FIG. 3 is a front view showing an example of an operation panel of the terminal heater.

【図4】図1に示す暖房システムの制御ブロック図であ
る。
FIG. 4 is a control block diagram of the heating system shown in FIG.

【図5】一斉運転プログラムの一例を示すフローチャー
トである。
FIG. 5 is a flowchart illustrating an example of a simultaneous operation program.

【図6】待機時間設定サブプログラムの一例を示すフロ
ーチャートである。
FIG. 6 is a flowchart illustrating an example of a standby time setting subprogram.

【符号の説明】 1……暖房システム 2……集中制御装置 6……端末接続器 7……端末暖房機 10……一斉運転スイッチ 25……運転制御手段(マイコン)[Description of Signs] 1 ... Heating system 2 ... Central control device 6 ... Terminal connector 7 ... Terminal heater 10 ... Simultaneous operation switch 25 ... Operation control means (microcomputer)

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 集中制御装置に複数台の燃料気化式の端
末暖房機をそれぞれ端末接続器を介して接続した暖房シ
ステムにおいて、 前記端末暖房機の一斉運転を指令する一斉運転スイッチ
を前記集中制御装置に設け、 この一斉運転スイッチからの指令に基づいて、前記各端
末暖房機に所定の待機時間を置いて順に運転開始指令を
出力する運転制御手段を設けたことを特徴とする暖房シ
ステム。
1. A heating system in which a plurality of fuel vaporization type terminal heaters are connected to a centralized control device via respective terminal connectors, wherein a simultaneous operation switch for commanding simultaneous operation of the terminal heaters is controlled by the centralized control. A heating system, provided in the device, and an operation control means for sequentially outputting an operation start command to each of the terminal heaters at a predetermined standby time based on a command from the simultaneous operation switch.
【請求項2】 集中制御装置に複数台の燃料気化式の端
末暖房機をそれぞれ端末接続器を介して接続した暖房シ
ステムにおいて、 前記端末暖房機の一斉運転を指令する一斉運転スイッチ
を前記集中制御装置に設け、 この一斉運転スイッチからの指令に基づいて、前記各端
末暖房機に所定の待機時間を置いて順に運転開始指令を
出力する運転制御手段を設け、さらに、前記待機時間を
変更する待機時間変更手段を設けたことを特徴とする暖
房システム。
2. A heating system in which a plurality of fuel vaporization type terminal heaters are connected to a centralized control device via respective terminal connectors, wherein a simultaneous operation switch for commanding simultaneous operation of the terminal heaters is controlled by the centralized control. Provided in the device, based on a command from the simultaneous operation switch, provided with operation control means for sequentially outputting an operation start command at a predetermined standby time to each of the terminal heaters, and further comprising a standby for changing the standby time. A heating system provided with time changing means.
JP8259022A 1996-09-30 1996-09-30 Heating system Pending JPH10103699A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8259022A JPH10103699A (en) 1996-09-30 1996-09-30 Heating system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8259022A JPH10103699A (en) 1996-09-30 1996-09-30 Heating system

Publications (1)

Publication Number Publication Date
JPH10103699A true JPH10103699A (en) 1998-04-21

Family

ID=17328269

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8259022A Pending JPH10103699A (en) 1996-09-30 1996-09-30 Heating system

Country Status (1)

Country Link
JP (1) JPH10103699A (en)

Similar Documents

Publication Publication Date Title
JPH10103699A (en) Heating system
JP3594422B2 (en) Heating system
JPH10122585A (en) Heating system
JPH10103698A (en) Heating system
JP2001165493A (en) Heating system
JP5811697B2 (en) Control device for heating system
JP2006308205A (en) Electric floor heating system
JP3498967B2 (en) Lighting control system
JPS59231351A (en) Hot water supplier provided with a plurality of remote controllers
JP3273858B2 (en) Remote control device
JP2607659Y2 (en) Lighting load control device
JPH09282011A (en) Controller
JPH08297504A (en) Controller unit
JPS63150550A (en) Air conditioner
JPH0424460A (en) Centralized controlling method for air conditioner
KR970002001B1 (en) Method for establishing address of airconditioner
JPH0718543B2 (en) Control equipment for heating equipment
JPS5924901Y2 (en) Central control device for central heating system
JP2002122332A (en) System for bathroom heating
JP2768604B2 (en) Control device for gas combustion equipment
JPH0375437A (en) Air conditioner with lighting control function
JPS63315857A (en) Operation controlling method for hot air heater
JPH11173570A (en) Hot water heating device
JP4616709B2 (en) Telecontroller connection unit
KR20060000628A (en) Method and apparatus for controlling a boiler by multiple remote controllers

Legal Events

Date Code Title Description
RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20040120

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040422

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040512

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20040922