JPH0991337A - Construction cost estimation system - Google Patents

Construction cost estimation system

Info

Publication number
JPH0991337A
JPH0991337A JP28430895A JP28430895A JPH0991337A JP H0991337 A JPH0991337 A JP H0991337A JP 28430895 A JP28430895 A JP 28430895A JP 28430895 A JP28430895 A JP 28430895A JP H0991337 A JPH0991337 A JP H0991337A
Authority
JP
Japan
Prior art keywords
construction cost
information
design
unit price
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP28430895A
Other languages
Japanese (ja)
Inventor
Hide Arayama
秀 荒山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP28430895A priority Critical patent/JPH0991337A/en
Publication of JPH0991337A publication Critical patent/JPH0991337A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PROBLEM TO BE SOLVED: To easily modify an estimate on the basis of altered information even when a design, the unit price of a member, and the construction cost are changed. SOLUTION: A hard disk 2a on which design information designed by CAD is stored, a hard disk 2b on which member unit price information is stored, and a hard disk 2c on which construction cost information is stored are connected to a computer 3 to which a CRT 4 and a printer 5c are connected; and the computer 3 estimates the construction cost according to the design information, member unit price information, and construction cost information, and the estimated construction cost is displayed on the CRT 4 and printed on the printer 5.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】TECHNICAL FIELD OF THE INVENTION

【0002】本発明は、設計情報、部材単価情報及び施
工費用情報とから工事費用見積を算出する工事費用見積
システムに関する。
The present invention relates to a construction cost estimate system for calculating a construction cost estimate from design information, member unit price information and construction cost information.

【0003】[0003]

【従来の技術】[Prior art]

【0004】従来、住宅建築、造園工事等の工事費用の
見積は、以下のように行われていた。
[0004] Conventionally, the estimation of the construction cost for housing construction, landscaping construction, etc. has been performed as follows.

【0005】まず、設計図から、使用される部材の種類
及び大きさを見積担当者が読み取り、それぞれの部材ご
とに部材の単価表から使用される部材の費用を計算し、
これらを積算して総部材費用を算出する。
First, an estimater reads the type and size of the member to be used from the design drawing, calculates the cost of the member to be used from the unit price table of the member for each member,
These are added up to calculate the total cost of materials.

【0006】次に、上記図面から施工費用を計算し、該
施工費用に上記総部材費用を加算して工事費用の見穫を
行う。
Next, the construction cost is calculated from the above drawings, and the construction cost is added to the construction cost to collect the construction cost.

【0007】また、上記部材の大きさを計算する装置と
して、デジタイザーと呼ばれるものがある。このデジタ
イザーは、設計図に描かれた部材の輪郭を座標位置に見
立て、これを専用のポインティングデバイスと呼ばれる
読み取り装置で読み取って、部材の面積を計算するもの
である。
Further, as a device for calculating the size of the above member, there is one called a digitizer. In this digitizer, the contour of a member drawn on a design drawing is regarded as a coordinate position, and this is read by a reading device called a dedicated pointing device to calculate the area of the member.

【0008】[0008]

【発明が解決しようとする課題】[Problems to be Solved by the Invention]

【0009】しかしながら、例えば、住宅に使用される
部品は数千点にも及ぶため、上記見積作業は大変煩雑で
あって、その上、設計変更、部材の単価変更、及び施工
費用変更があった場合は、これらの変更の度に再度見積
作業を行わなければならないという問題点があった。
However, for example, since the number of parts used in a house is several thousand, the above estimation work is very complicated, and in addition, there are design changes, unit price changes of members, and construction cost changes. In this case, there was a problem that the estimation work had to be performed again each time these changes were made.

【0010】また、上記デジタイザーを使用すれば、見
積担当者が直接図面を読み取る面積計算に比べて面積計
算にかかる時間を短縮することができるが、設計図が紙
でできているため、湿気により設計図に伸びが生じ、正
確な面積計算が出来ない場合があり、さらに、設計図に
問題がなくとも、ポインティングデバイスで部材の輪郭
を複数箇所入力する作業にはミスが生じやすく、これに
より正確な計算が出来ない場合があった。
Further, when the digitizer is used, the time required for the area calculation can be shortened as compared with the area calculation in which the person in charge of the estimation directly reads the drawing. Accurate area calculation may not be possible due to elongation of the design drawing.Furthermore, even if there are no problems with the design drawing, it is easy to make an error in inputting the contours of the member at multiple points with the pointing device, which results in accurate There was a case where it was not possible to calculate.

【0011】上記見積作業では、見積担当者の経験に基
づいて、部材の単価、施工費の実費等に利益を上乗して
見積作業を行うが、使用される部材の歩留まりの低下、
気象条件の悪化による施工費用の増加等、工事が始まっ
てからの工事費用の変化に対応して、所望の利益を確保
しながら見積の変更を行うことは熟練した見積担当者で
あっても困難であり、経験則に基づいて、あいまいなま
ま見積作業を行っていたため、正確な利益率が分から
ず、経営分析等もできないという問題点があった。
In the above estimation work, the estimation work is performed by adding the profit to the unit price of the member, the actual cost of construction, etc. based on the experience of the person in charge of estimation, but the yield of the used member is reduced,
It is difficult for even a skilled estimator to change the estimate while securing the desired profit in response to changes in the construction cost since the start of construction, such as an increase in construction cost due to deterioration of weather conditions. However, since the estimation work was performed unclearly based on the empirical rule, there was a problem that the accurate profit ratio was not known and the business analysis could not be performed.

【0012】そこで本発明は、上記問題点に鑑みてなさ
れたものであって、設計情報、部材単価情報及び施工費
用情報から正確な工事費用見積を容易に算出することを
目的としている。
Therefore, the present invention has been made in view of the above problems, and an object thereof is to easily calculate an accurate construction cost estimate from design information, member unit price information, and construction cost information.

【0013】[0013]

【課題を解決するための手段】[Means for Solving the Problems]

【0014】上記目的を達成するために、本発明におい
ては、CADで設計された設計情報が記憶される設計情
報記憶手段と、部材単価情報記憶手段と、施工費用情報
記憶手段と、を画像表示手段と印刷手段とが接続された
計算手段に接続し、上記計算手段で設計情報、部材単価
情報及び施工費用情報から工事費用見積を算出し、上記
工事費用見積を画像表示手段に表示するとともに、上記
印刷手段で印刷することを特徴としている。
In order to achieve the above object, in the present invention, a design information storage means for storing design information designed by CAD, a member unit price information storage means, and a construction cost information storage means are displayed as images. Connected to the calculation means to which the means and the printing means are connected, calculate the construction cost estimate from the design information, material unit price information and construction cost information by the calculation means, and display the construction cost estimate on the image display means, The printing is performed by the printing means.

【0015】[0015]

【作用】[Action]

【0016】上記構成の工事費用見積システムでは、設
計情報記憶手段にはCADで設計された設計情報が、部
材単価情報記憶手段には部材単価の情報が、施工費用情
報記憶手段には、施工費用の情報が記憶される。
In the construction cost estimation system having the above-mentioned configuration, the design information storage means contains the design information designed by CAD, the member unit price information storage means contains the information of the member unit price, and the construction cost information storage means contains the construction cost. Information is stored.

【0017】各部材ごとの設計情報および部材単価情報
を計算手段に入力し、該計算手段で各部材の費用を算出
するとともに、全ての部材を加算した総部材費用を算出
する。
The design information and the unit price information of each member are input to the calculating means, and the calculating means calculates the cost of each member, and also calculates the total member cost obtained by adding all the members.

【0018】また、施工費用情報を設計情報に入力し、
該施工費用情報と上記設計情報とから施工費用を算出す
る。さらに、該施工費用と上記総部材費用を加算して工
事費用を算出し、画像表示手段に表示するとともに、印
刷手段で印刷する。
In addition, by inputting construction cost information into the design information,
A construction cost is calculated from the construction cost information and the design information. Further, the construction cost is calculated by adding the construction cost and the total member cost, and the construction cost is displayed on the image display means and printed by the printing means.

【0019】[0019]

【発明に係る実施の形態】DETAILED DESCRIPTION OF THE INVENTION

【0020】以下、添付図面を参照して本発明に係る工
事費用見積システムについて説明する。
The construction cost estimation system according to the present invention will be described below with reference to the accompanying drawings.

【0021】図1は、工事費用見積システムの構成を示
している。このシステムほ、CADで設計された設計情
報を記憶するハードディスク2aと、住宅建設に必要な
部品単価及び材料価格等の価格情報が記憶されたハード
ディスク2bと、人件費及び施工日数等の施工費用情報
が記憶されたハードディスク2cと、をコンピュータ3
に接続している。また、上記コンピュータ3にはCRT
4及びプリンタ5が接続している。
FIG. 1 shows the construction of a construction cost estimation system. This system, a hard disk 2a that stores design information designed by CAD, a hard disk 2b that stores price information such as the unit price and material price required for housing construction, and construction cost information such as personnel costs and construction days A hard disk 2c storing the
Connected to Further, the computer 3 has a CRT.
4 and the printer 5 are connected.

【0022】上記構成からなる工事費用見積システムで
見積を行うには、コンピュータ3を操作してCRT4の
画面上にCADで設計された設計情報を表示させ、この
設計情報から住宅を部品または材料別に分割する。この
設計情報には、住宅全体の設計図面や、部品、材料ごと
の設計図面、および設計によって算出された長さ、幅及
び厚み等の形状寸法データが含まれており、さらには、
部品、材料別の許容荷重等の特性データも含まれてい
る。
In order to make an estimate with the construction cost estimate system having the above-mentioned structure, the computer 3 is operated to display the design information designed by CAD on the screen of the CRT 4, and the house is classified by parts or materials from this design information. To divide. This design information includes design drawings for the entire house, design drawings for each part and material, and shape dimension data such as length, width, and thickness calculated by the design.
Characteristic data such as allowable load for each part and material is also included.

【0023】次に、コンピュータ3は、上記部品及び材
料の形状寸法データと、ハードディスク2bから読み込
んだ部品単価及び材料価格とを演算処理することによっ
て、必要な上記部品及び材料価格を算出する。この作業
を住宅を構成する全ての部品または材料について行い、
これらを積算して総部材費用を算出する。
Next, the computer 3 calculates the necessary parts and material prices by arithmetically processing the shape and size data of the parts and materials and the unit price and material price read from the hard disk 2b. Do this work for all parts or materials that make up the house,
These are added up to calculate the total cost of materials.

【0024】また、コンピュータ3は、上記ハードディ
スク2cから読み込んだ施工費用情報と上記設計情報と
から施工費用を算出し、さらに、この施工費用に上記総
部材費用を加算後利益を加算することにより工事見積金
額を算出する。
The computer 3 calculates the construction cost from the construction cost information read from the hard disk 2c and the design information, and further adds the profit after adding the total member cost to the construction cost to perform the construction. Calculate the estimated amount.

【0025】次に、本システムを利用してすでに工事見
積金額を算出した後、設計変更などにより再度見積をす
る場合について説明する。
Next, a case will be described in which the estimated work amount is already calculated using this system, and then the estimate is made again due to a design change or the like.

【0026】設計変更があった場合、コンピュータ3
は、ハードディスク2aにすでに記憶された設計情報の
書き換えを行い、この書換後の情報に基づいて再び上記
と同様の演算処理をおこなって部品及び材料価格を算出
する。その後の処理は、上記総部材材料の積算算出以降
と同様の手順をすすむこととなる。
When there is a design change, the computer 3
Rewrites the design information already stored in the hard disk 2a, and based on the rewritten information, again performs the same arithmetic processing as above to calculate the component and material prices. For the subsequent processing, the same procedure as that after the above-mentioned integrated calculation of the total member materials is performed.

【0027】なお、本システムでは、施工場所などの環
境条件を入力すると、ハードディスク2aの特性データ
に基づいて許容範囲内の適切な部品及び材料が選択さ
れ、この選択された部品及び材料を使用して見積金額が
算出されるようにも構成されている。
In this system, when environmental conditions such as the construction site are input, appropriate parts and materials within the allowable range are selected based on the characteristic data of the hard disk 2a, and the selected parts and materials are used. It is also configured so that the estimated amount is calculated by

【0028】本システムによれば,部品及び材料点数が
多数に及ぶような見積をすでに算出し終えた後であって
も、設計上の変更をCADにより設計変更をおこなうだ
けで、設計情報と価格情報とがリンクされているので、
コンピュータ3により自動的に見積金額の変更が行われ
る。
According to the present system, even after the estimation of the number of parts and the number of materials has already been calculated, the design information and the price can be changed by simply changing the design by CAD. Since the information is linked to
The computer 3 automatically changes the estimated amount.

【0029】[0029]

【発明の効果】【The invention's effect】

【0030】以上の説明で明らかなように、本発明に係
る工事費用見積システムでは、設計情報記憶手段に記憶
された、CADで設計された設計情報と、部材単価情報
記憶手段に記憶された部材単価の情報から部材の費用を
算出し、上記設計情報と施工費用情報記憶手段に記憶さ
れた施工費用の情報とから施工費用を算出し、この施工
費用を上記部材の費用に加算して工事費用の見積を行う
ことができる。
As is clear from the above description, in the construction cost estimation system according to the present invention, the CAD design information stored in the design information storage means and the member stored in the member unit price information storage means. The cost of the material is calculated from the unit price information, and the construction cost is calculated from the design information and the construction cost information stored in the construction cost information storage means, and the construction cost is added to the cost of the material described above. Can be quoted.

【0031】このように、見積を行う担当者は、CAD
で設計された設計情報を直接的に見積を算出する情報と
して使用することができるので工事費用の見積が正確に
かつ容易に行うことができる。
As described above, the person in charge of estimating the CAD
Since the design information designed in 1 above can be directly used as the information for calculating the estimate, the construction cost can be estimated accurately and easily.

【0032】また、設計変更、部材の単価変更、及び施
工費用変更があった場合においても、変更された情報に
基づいて容易に見積の変更が行うことができる。
Further, even when the design is changed, the unit price of the member is changed, and the construction cost is changed, the estimate can be easily changed based on the changed information.

【図面の簡単な説明】[Brief description of drawings]

【図1】 本発明に係る工事費用見積システムの構成を
示す図である。
FIG. 1 is a diagram showing a configuration of a construction cost estimation system according to the present invention.

【符号の説明】[Explanation of symbols]

2a,2b,2c…ハードディスク、3…コンピュー
タ、4…CRT、5…プリンタ
2a, 2b, 2c ... hard disk, 3 ... computer, 4 ... CRT, 5 ... printer

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 CADで設計された設計情報が記憶され
る設計情報記憶手段と、部材単価情報記憶手段と、施工
費用情報記憶手段と、を画像表示手段と印刷手段とが接
続された計算手段に接続し、上記計算手段で設計情報、
部材単価情報及び施工費用情報から工事費用見積を算出
し、上記工事費用見積を画像表示手段に表示するととも
に、上記印刷手段で印刷することを特徴とする工事費用
見積システム。
1. A calculation means in which a design information storage means for storing design information designed by CAD, a member unit price information storage means, a construction cost information storage means, an image display means and a printing means are connected. Connect to, design information with the above calculation means,
A construction cost estimation system characterized in that a construction cost estimate is calculated from material unit price information and construction cost information, and the construction cost estimate is displayed on an image display means and printed by the printing means.
JP28430895A 1995-09-26 1995-09-26 Construction cost estimation system Pending JPH0991337A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP28430895A JPH0991337A (en) 1995-09-26 1995-09-26 Construction cost estimation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP28430895A JPH0991337A (en) 1995-09-26 1995-09-26 Construction cost estimation system

Publications (1)

Publication Number Publication Date
JPH0991337A true JPH0991337A (en) 1997-04-04

Family

ID=17676863

Family Applications (1)

Application Number Title Priority Date Filing Date
JP28430895A Pending JPH0991337A (en) 1995-09-26 1995-09-26 Construction cost estimation system

Country Status (1)

Country Link
JP (1) JPH0991337A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998033134A1 (en) * 1997-01-24 1998-07-30 Johannes Antonius Kuypers A hierarchical relational definition system and a method of defining an object
JPH1139390A (en) * 1997-07-23 1999-02-12 Minoru Yoneda Method for managing building cost
JP2002297370A (en) * 2001-03-30 2002-10-11 Daiwa House Ind Co Ltd System, device and method for information communication, program and data recording medium
JP2013088895A (en) * 2011-10-14 2013-05-13 Haruta Kensetsu:Kk Construction assisting device and construction assisting method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998033134A1 (en) * 1997-01-24 1998-07-30 Johannes Antonius Kuypers A hierarchical relational definition system and a method of defining an object
JPH1139390A (en) * 1997-07-23 1999-02-12 Minoru Yoneda Method for managing building cost
JP2002297370A (en) * 2001-03-30 2002-10-11 Daiwa House Ind Co Ltd System, device and method for information communication, program and data recording medium
JP2013088895A (en) * 2011-10-14 2013-05-13 Haruta Kensetsu:Kk Construction assisting device and construction assisting method

Similar Documents

Publication Publication Date Title
US6343285B1 (en) Estimation and designing supporting apparatus
M’Pherson et al. Accounting, empirical measurement and intellectual capital
US7768534B2 (en) Method of and system for determining inaccuracy information in an augmented reality system
US8694890B2 (en) Use of color in a site analysis report
JP5046520B2 (en) Business day comparison report output method and system
CN109376150A (en) Methods of product development, device, computer equipment and storage medium
JPH0991337A (en) Construction cost estimation system
KR100886418B1 (en) Procuring management system and its managing method of cost accounting distributing board using cad system with material counting and its cost accounting
JP3841721B2 (en) Building estimation system, building estimation program, and computer-readable recording medium recording the program
JP2000309253A (en) Method of quoting vehicle repair charge
Hansbo A Crank–Nicolson type space–time finite element method for computing on moving meshes
JP2006350744A (en) Damaged vehicle image preparation system and vehicle repair cost estimation system configured by using the same
JP3023096B1 (en) Accident car repair estimation device
JP3670893B2 (en) Vehicle repair cost estimation system, estimation method, and computer-readable medium recording program
JP5717122B2 (en) Interior material purchase cost estimation system and interior material purchase cost estimation program
CN100383502C (en) Historical trend analysis method for infrared sequence image
JP7244707B1 (en) Information processing system, computer program, and information processing method
Locher et al. Home range creation and analysis using Geospatial Modeling Environment and ArcGIS software
JPH09245082A (en) Method and device for integrating painting area in estimation of painting construction
JPH0773240A (en) Direct construction cost calculator
JP3927106B2 (en) Integration processing system, integration processing device, and program
JP2016151890A (en) Program, estimation method, and estimation apparatus
JP2002056122A (en) Sheet and system for estimate
JPH11288437A (en) Landscape gardening estimation system
JPH06103274A (en) Cost estimating system