JPH0970657A - Two mold alternate use casting apparatus - Google Patents

Two mold alternate use casting apparatus

Info

Publication number
JPH0970657A
JPH0970657A JP25201495A JP25201495A JPH0970657A JP H0970657 A JPH0970657 A JP H0970657A JP 25201495 A JP25201495 A JP 25201495A JP 25201495 A JP25201495 A JP 25201495A JP H0970657 A JPH0970657 A JP H0970657A
Authority
JP
Japan
Prior art keywords
molten metal
casting machine
mold
space
molds
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP25201495A
Other languages
Japanese (ja)
Inventor
Yoshihiro Sugitani
順弘 杉谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sugitani Kinzoku Kogyo KK
Original Assignee
Sugitani Kinzoku Kogyo KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sugitani Kinzoku Kogyo KK filed Critical Sugitani Kinzoku Kogyo KK
Priority to JP25201495A priority Critical patent/JPH0970657A/en
Publication of JPH0970657A publication Critical patent/JPH0970657A/en
Pending legal-status Critical Current

Links

Landscapes

  • Casting Support Devices, Ladles, And Melt Control Thereby (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a two mold alternate use casting apparatus which can improve the working efficiency of a casting machine and the producing efficiency of a cast product. SOLUTION: The two metallic molds A, B constituted so as to receive molten metal from a casting machine 1 are alternately set to a molten metal pouring space 3 of the casting machine 1 in a shifting unit. After pouring the molten metal into the metallic mold A from the casting machine 1 in the molten metal pouring space 3, the molten metal is poured into the metallic mold B in the molten metal pouring space 3 by utilizing the solidification waiting time on the metallic mold A, and the pouring of the molten metal can efficiently be performed without any waiting time in the casting machine 1.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術の分野】本発明は、二つの金型を交
互に使用して鋳造する鋳造装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a casting apparatus for casting by alternately using two molds.

【0002】[0002]

【従来の技術】従来の鋳造機においては、溶湯注湯スペ
ースで一つの金型に溶湯を注湯した後、その場で金型の
中の溶湯が凝固するのを待ち、その凝固が完了してから
金型を鋳造機から取り出し、その後その金型を溶湯注湯
スペースに装填し、次の溶湯注湯に備えてその金型の清
掃、中子のセットを行った後、型締めし、溶湯注湯を行
う。
2. Description of the Related Art In a conventional casting machine, after pouring molten metal into one die in a molten metal pouring space, waiting for the molten metal in the die to solidify on the spot, the solidification is completed. After that, remove the mold from the casting machine, then load the mold into the molten metal pouring space, clean the mold in preparation for the next molten metal pouring, set the core, then clamp the mold, Perform molten metal pouring.

【0003】[0003]

【発明が解決しようとする課題】従って、金型への溶湯
の注湯が完了してから次回の金型への溶湯の注湯が始ま
るまで、鋳造機は手待ちの状態になり、鋳造機の稼動効
率が低く、その結果鋳造品の生産効率も低いという問題
がある。
Therefore, the casting machine waits until the next time the molten metal is poured into the mold until the molten metal is poured into the mold. However, there is a problem in that the operating efficiency is low, and as a result, the production efficiency of cast products is low.

【0004】本発明の目的は、鋳造機の稼動効率を向上
させ、鋳造品の生産効率を向上させ得る2型交互鋳造装
置を提供することにある。
An object of the present invention is to provide a type 2 alternating casting apparatus capable of improving the operating efficiency of a casting machine and improving the production efficiency of cast products.

【0005】[0005]

【課題を解決するための手段】前述の目的を達成するた
めに、請求項1の2型交互鋳造装置は、鋳造機と、前記
鋳造機から溶湯を受容するように構成された二つの金型
を前記鋳造機の溶湯注湯スペースに交互に配置すべく前
記鋳造機に設けられた配置手段とを備えることをと特徴
とする。
In order to achieve the above-mentioned object, a type 2 alternating casting apparatus according to claim 1 comprises a casting machine and two molds configured to receive molten metal from the casting machine. Is arranged in the molten metal pouring space of the casting machine alternately, and a disposing means provided in the casting machine.

【0006】前述の目的を達成するために、請求項2の
2型交互鋳造装置は、請求項1の2型交互鋳造装置にお
いて、前記配置手段は、前記金型の一方を前記溶湯注湯
スペースと凝固待ちスペースとの間で移動すると共に、
前記金型の他方を前記溶湯注湯スペースと凝固待ちスペ
ースとの間で移動する移動手段とからなることを特徴と
する。
In order to achieve the above-mentioned object, the type 2 alternating casting apparatus according to claim 2 is the type 2 alternating casting apparatus according to claim 1, wherein the arranging means includes one of the molds for the molten metal pouring space. And the waiting space for solidification,
It is characterized in that the other of the molds comprises a moving means for moving between the molten metal pouring space and the solidification waiting space.

【0007】前述の目的を達成するために、請求項3の
2型交互鋳造装置は、請求項2の2型交互鋳造装置にお
いて、前配置手段は、前記金型の一方を前記溶湯注湯ス
ペースに移動したときに、前記金型の他方を前記他の凝
固待ちスペースに移動すると共に、前記移動手段が前記
金型の一方を前記凝固待ちスペースに移動したときに、
前記金型の他方を前記溶湯注湯スペースに移動するよう
に、前記移動手段を制御する制御手段を備えることを特
徴とする。
In order to achieve the above-mentioned object, the type 2 alternating casting apparatus according to claim 3 is the type 2 alternating casting apparatus according to claim 2, wherein the pre-arrangement means has one of the molds for the molten metal pouring space. When moving to the other of the mold to the other solidification waiting space, when the moving means moves one of the mold to the solidification waiting space,
Control means for controlling the moving means is provided so as to move the other of the molds to the molten metal pouring space.

【0008】請求項1 から3の2型交互鋳造装置によ
れば、鋳造機に設けられた配置手段が、鋳造機から溶湯
を受容するように構成された二つの金型を鋳造機の溶湯
注湯スペースに交互に配置するので、鋳造機が溶湯注湯
スペースで金型の一方に注湯した後、金型の一方内の溶
湯が凝固する時間を利用して溶湯注湯スペース上の金型
の他方に溶湯を注湯でき、鋳造機が手待ちとならずに効
率よく注湯を実施できる。その結果、鋳造機の稼動効率
を向上させ、鋳造品の生産効率を向上させ得る。
According to the two-type alternating casting apparatus of the first to third aspects, the arranging means provided in the casting machine inserts two molds configured to receive the molten metal from the casting machine into the casting machine. The molds are placed on the molten metal pouring space after the casting machine pours the molten metal into one of the molds in the molten metal pouring space. On the other hand, the molten metal can be poured, and the casting machine can be efficiently poured without waiting. As a result, the operating efficiency of the casting machine can be improved, and the production efficiency of cast products can be improved.

【0009】[0009]

【発明の実施の形態】以下、本発明を図1(a)(b)
に示す好ましい実施の形態を参照しながら詳述する。図
1は、本発明の2型交互鋳造装置の実施の形態の概略平
面図である。
BEST MODE FOR CARRYING OUT THE INVENTION The present invention will now be described with reference to FIGS.
It will be described in detail with reference to the preferred embodiment shown in FIG. FIG. 1 is a schematic plan view of an embodiment of a type 2 alternating casting apparatus of the present invention.

【0010】参照番号1で示される鋳造機の正面に作業
者2が立っている。鋳造機1には、溶湯口付近に溶湯注
湯スペース3が設けられている。鋳造機1の両側には、
凝固待ちスペース4、5が設けられている。
A worker 2 stands in front of the casting machine indicated by reference numeral 1. The casting machine 1 is provided with a molten metal pouring space 3 near the molten metal port. On both sides of the casting machine 1,
Spaces 4 and 5 waiting for solidification are provided.

【0011】以下、本2型交互鋳造装置の作動を図1
(a)(b)を参照しながら説明する。
The operation of this type 2 alternating casting apparatus will be described below with reference to FIG.
A description will be given with reference to (a) and (b).

【0012】図1(a)において、まず、鋳造機1の溶
湯注湯スペース3には金型Aが装填されており、鋳造機
1が金型Aに溶湯を注湯している。凝固待ちスペース4
には、金型Bが配置されており、金型B内では溶湯が凝
固しつつある。
In FIG. 1A, first, a mold A is loaded in the molten metal pouring space 3 of the casting machine 1, and the casting machine 1 pours the molten metal into the mold A. Space for waiting for solidification 4
A mold B is placed in the mold, and the molten metal is solidifying inside the mold B.

【0013】金型Aへの溶湯の注湯が完了した後金型A
の凝固待ち時間中に、図示しない移動ユニットにより金
型Aを凝固待ちスペース5に移動すると共に、図示しな
い移動ユニットにより溶湯の凝固が完了した金型Bを溶
湯注湯スペース3に移動する(図1(b))。
After pouring of the molten metal into the mold A is completed, the mold A is
During the solidification waiting time, the mold A is moved to the solidification waiting space 5 by the moving unit (not shown), and the mold B where the solidification of the molten metal is completed is moved to the molten metal pouring space 3 by the moving unit (not shown) (Fig. 1 (b)).

【0014】次に、金型Bを開き、作業者2の手により
金型Bから鋳造製品を取り出してから次の溶湯注湯に備
えて金型Bの清掃、中子セットを行った後、型締めし溶
湯の注湯を行う。
Next, the mold B is opened, the cast product is taken out from the mold B by the hand of the operator 2, the mold B is cleaned and the core is set in preparation for the next molten metal pouring. The mold is clamped and the molten metal is poured.

【0015】金型Bへの溶湯注湯後、金型Bの凝固待ち
時間中に、図示しない移動ユニットにより金型Bを凝固
待ちスペース4に移動する。同時に、前述と同様に凝固
待ちスペースから金型Aを溶湯注湯スペース3に移動す
る(図1(a))。
After the molten metal is poured into the mold B, the mold B is moved to the solidification waiting space 4 by a moving unit (not shown) during the solidification waiting time of the mold B. At the same time, the mold A is moved from the waiting space for solidification to the molten metal pouring space 3 as described above (FIG. 1 (a)).

【0016】以上の工程を繰り返す。The above steps are repeated.

【0017】本実施の形態によれば、移動ユニットが、
鋳造機1から溶湯を受容するように構成された二つの金
型A、Bを鋳造機1の溶湯注湯スペース3に交互に配置
するので、鋳造機1が溶湯注湯スペース3で金型Aに注
湯した後、金型Aの凝固待ち時間を利用して、溶湯注湯
スペース3で金型Bに溶湯を注湯でき、鋳造機1が手待
ちとならずに効率よく注湯を実施できる。その結果、鋳
造機1の稼動効率を向上させ、鋳造製品の生産効率を向
上させ得る。
According to this embodiment, the mobile unit is
Since the two molds A and B configured to receive the molten metal from the casting machine 1 are alternately arranged in the molten metal pouring space 3 of the casting machine 1, the casting machine 1 uses the mold A in the molten metal pouring space 3. After pouring the molten metal into the mold A, the molten metal can be poured into the mold B in the molten metal pouring space 3 by using the waiting time for the solidification of the mold A, and the casting machine 1 can efficiently perform the pouring without waiting. it can. As a result, the operating efficiency of the casting machine 1 can be improved and the production efficiency of cast products can be improved.

【0018】[0018]

【発明の効果】以上、詳細に説明したように、 請求項
1 から3の2型交互鋳造装置によれば、鋳造機に設け
られた配置手段が、鋳造機から溶湯を受容するように構
成された二つの金型を鋳造機の溶湯注湯スペースに交互
に配置するので、鋳造機が溶湯注湯スペースで金型の一
方に注湯した後、金型の一方内の溶湯が凝固する時間を
利用して溶湯注湯スペース上の金型他方に溶湯を注湯で
き、鋳造機が手待ちとならずに効率よく注湯を実施でき
る。その結果、鋳造機の稼動効率を向上させ、鋳造品の
生産効率を向上させ得る。
As described above in detail, according to the two-type alternating casting apparatus of claims 1 to 3, the arranging means provided in the casting machine is configured to receive the molten metal from the casting machine. Since the two molds are placed alternately in the molten metal pouring space of the casting machine, it takes time for the molten metal in one of the molds to solidify after the casting machine pours one of the molds in the molten metal pouring space. The molten metal can be poured into the other mold on the molten metal pouring space, and the casting machine can be efficiently poured without waiting. As a result, the operating efficiency of the casting machine can be improved, and the production efficiency of cast products can be improved.

【図面の簡単な説明】[Brief description of drawings]

【図1】図1は、本発明の2型交互鋳造装置の実施の形
態の概略平面図である。
FIG. 1 is a schematic plan view of an embodiment of a type 2 alternating casting apparatus of the present invention.

【符号の説明】[Explanation of symbols]

1 鋳造機 2 作業者 3 溶湯注湯スペース 4、5 凝固待ちスペース 1 Casting machine 2 Worker 3 Molten metal pouring space 4, 5 Solidification waiting space

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 鋳造機と、前記鋳造機から溶湯を受容す
るように構成された二つの金型を前記鋳造機の溶湯注湯
スペースに交互に配置すべく前記鋳造機に設けられた配
置手段とを備えることをと特徴とする2型交互鋳造装
置。
1. Arrangement means provided in the casting machine for alternately arranging the casting machine and two molds configured to receive the molten metal from the casting machine in a molten metal pouring space of the casting machine. And a type 2 alternating casting apparatus.
【請求項2】 前記配置手段は、前記金型の一方を前記
溶湯注湯スペースと凝固待ちスペースとの間で移動する
と共に、前記金型の他方を前記溶湯注湯スペースと他の
凝固待ちスペースとの間で移動する移動手段とからなる
ことを特徴とする請求項1記載の2型交互鋳造装置。
2. The arranging means moves one of the molds between the molten metal pouring space and the solidification waiting space, and the other of the molds is the molten metal pouring space and another solidification waiting space. 2. The two-type alternating casting apparatus according to claim 1, further comprising a moving means that moves between the two-type alternating casting apparatus.
【請求項3】 前配置手段は、前記金型の一方を前記溶
湯注湯スペースに移動したときに、前記金型の他方を前
記他の凝固待ちスペースに移動すると共に、前記移動手
段が前記金型の一方を前記凝固待ちスペースに移動した
ときに、前記金型の他方を前記溶湯注湯スペースに移動
するように、前記移動手段を制御する制御手段を備える
ことを特徴とする請求項2記載の2型交互鋳造装置。
3. The pre-positioning means moves one of the molds to the molten metal pouring space and moves the other of the molds to the other solidification waiting space, and the moving means moves the mold to the metal mold. The control means for controlling the moving means is provided so that, when one of the molds is moved to the solidification waiting space, the other of the molds is moved to the molten metal pouring space. 2 type alternating casting equipment.
JP25201495A 1995-09-06 1995-09-06 Two mold alternate use casting apparatus Pending JPH0970657A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP25201495A JPH0970657A (en) 1995-09-06 1995-09-06 Two mold alternate use casting apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP25201495A JPH0970657A (en) 1995-09-06 1995-09-06 Two mold alternate use casting apparatus

Publications (1)

Publication Number Publication Date
JPH0970657A true JPH0970657A (en) 1997-03-18

Family

ID=17231382

Family Applications (1)

Application Number Title Priority Date Filing Date
JP25201495A Pending JPH0970657A (en) 1995-09-06 1995-09-06 Two mold alternate use casting apparatus

Country Status (1)

Country Link
JP (1) JPH0970657A (en)

Similar Documents

Publication Publication Date Title
JP2003305556A (en) Direct pressure molten metal squeeze casting apparatus
CN212070333U (en) Composite continuous casting machine
JPH0970657A (en) Two mold alternate use casting apparatus
JP3680979B2 (en) Casting method using sand mold for casting
CN107159860B (en) Continuous casting machine
CN102266937A (en) Processing device and method of cast residual steel of continuous casting intermediate ladle
CN108788062A (en) A kind of full-automatic die casting equipment and technique
US4086951A (en) Apparatus for changing width of a cast piece in a continuous casting operation
EP1797979B1 (en) Casting production apparatus and method
JP2012240050A5 (en)
JP2005131682A (en) Metallic mold for casting and metallic mold casting method
GB1285929A (en) Improvements in or relating to a casting apparatus and method
JP2002079353A (en) Molding line and casting line
JPH02268959A (en) Low-pressure casting device having moving holding furnace
JP3075893B2 (en) Trimming press control device
JP2003039152A (en) Die-casting device and replacing method for mold of the die-casting device
JP2003039149A (en) Die-casting device and replacing method for mold of the die-casting device
JPH10225749A (en) Method for molding, core-inserting and carrying out mold
JPH0138583B2 (en)
CN113523208A (en) Composite continuous casting machine and production method thereof
JPH0195859A (en) Core for pressure casting
JPH02127964A (en) Casting line
JPS6145975Y2 (en)
RU2020037C1 (en) Method and device for periodic casting of metals
Mostert et al. The effect of straightening and bulging on intercolumnar cracking of slabs