JPH09296681A - Shield tunneling method - Google Patents

Shield tunneling method

Info

Publication number
JPH09296681A
JPH09296681A JP13595796A JP13595796A JPH09296681A JP H09296681 A JPH09296681 A JP H09296681A JP 13595796 A JP13595796 A JP 13595796A JP 13595796 A JP13595796 A JP 13595796A JP H09296681 A JPH09296681 A JP H09296681A
Authority
JP
Japan
Prior art keywords
shield
valley
tunnel
shield machine
steel wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP13595796A
Other languages
Japanese (ja)
Inventor
Kenichi Kaneko
研一 金子
Hirotoshi Ikeda
宏俊 池田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP13595796A priority Critical patent/JPH09296681A/en
Publication of JPH09296681A publication Critical patent/JPH09296681A/en
Pending legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

PROBLEM TO BE SOLVED: To reduce the construction cost and period when a railway or a water pipe is laid in a valley between mountains. SOLUTION: In a method to construct a shield tunnel in a valley between mountains, after a shield tunnel 3 has been constructed in a mountain by a shield machine 2, a tension steel wire arranged between an anchor body installed in the tunnel 3 and the shield machine 2 is stretched. the shield machine 2 is thrusted to the forward mountain by shielding jacks and the shield tunnel 3 is constructed in the space of the valley, while assembling segments 6 in the space of the rearward valley of the shield machine 2, in the state the shield machine is suspended from the anchor structure 4 fixed to the mountain through a hanging steel wire 41.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、山部と山部との間
の谷部にシ−ルドトンネルを構築する方法に関するもの
である。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a shield tunnel in a valley between peaks.

【0002】[0002]

【従来の技術】山有り谷有りの地形において、鉄道とか
水道を敷設する場合、山の部分はトンネルで、谷の部分
は鉄道橋や水道橋で連絡する方法がとられている。ま
た、山部も谷部トンネルで施工する場合は、図5に示す
ように山部a1、a2の間の谷部bを土cで埋めた後、
シ−ルドマシンdを掘進させてセグメントeを組み立て
る方法がとられている。
2. Description of the Related Art In a terrain with mountains and valleys, when laying a railway or water supply, a method is used in which a mountain portion is connected by a tunnel and a valley portion is connected by a railway bridge or a water bridge. Further, when the mountain portion is also constructed by the valley tunnel, after filling the valley portion b between the mountain portions a1 and a2 with the soil c as shown in FIG.
A method of assembling the segment e by excavating the shield machine d is adopted.

【0003】[0003]

【発明が解決しようとする課題】図5に示す谷部bを埋
める方法は、膨大な量の土を必要とするため、工費が高
くなると共に、自然体系を破壊することがある。
The method of filling the valley portion b shown in FIG. 5 requires an enormous amount of soil, which increases the construction cost and may destroy the natural system.

【0004】山部間を鉄道橋や水道橋で連絡する方法
は、図6に示すように、山部a1から山部a2までシ−
ルドマシンdを搬送する段取りが非常に大変である。特
に、クレ−ン等が入れない地形では大型の索道が必要と
なる。また、山部a2側からの発進に際して、反力構造
fを有するステ−ジgを構築する必要もある。従って、
連続して施工ができないため、工期が長くなると共に、
工費も高くなってしまう。
As shown in FIG. 6, the method of connecting the mountain portions by a railroad bridge or a water bridge is such that a mountain portion a1 to a mountain portion a2 is connected.
It is very difficult to set up to transport the rudder machine d. In particular, a large cableway is required in terrain where cranes and the like cannot enter. Further, when starting from the mountain portion a2 side, it is necessary to construct a stage g having a reaction force structure f. Therefore,
Since construction cannot be continued, the construction period becomes longer and
The construction cost will also increase.

【0005】[0005]

【発明の目的】本発明は、上記のような問題点を解決す
るためになされたもので、山部と山部の間の谷部に鉄道
や水道を敷設する場合において、工費の低減及び工期の
短縮化を図ることができるシ−ルド工法を提供すること
を目的とする。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and in the case of laying a railroad or a water supply in a valley portion between mountain portions, the construction cost can be reduced and the construction period can be reduced. It is an object of the present invention to provide a shield construction method capable of shortening the length.

【006】[0086]

【課題を解決するための手段】上記課題を解決するため
の手段として、請求項1は、山部と山部との間の谷部に
シ−ルドトンネルを構築する方法において、シ−ルドマ
シンにより山部内にシ−ルドトンネルを構築した後、前
記シ−ルドトンネル内に設置したアンカ−体とシ−ルド
マシンとの間に配した引張り鋼線を緊張すると共に、シ
−ルドマシンを山部に設けたアンカ−構造物から吊り鋼
線で吊った状態で、シ−ルドマシン後方の谷部の空中に
セグメントを組み立てながら、シ−ルドジャッキにより
シ−ルドマシンを前方山部まで推進させ、谷部の空中に
シ−ルドトンネルを構築することを特徴とした、シ−ル
ド工法を提供する。
[Means for Solving the Problems] As a means for solving the above-mentioned problems, a first aspect of the present invention is a method for constructing a shield tunnel in a valley portion between a mountain portion and a shield machine. After constructing the shield tunnel in the mountain part, tension the tension steel wire arranged between the anchor body installed in the shield tunnel and the shield machine, and install the shield machine in the mountain part. While assembling the segment in the air in the valley behind the shield machine with the suspension steel wire suspended from the anchor structure, the shield jack propels the shield machine up to the front ridge and in the air in the valley. A shield construction method is provided, which is characterized by constructing a shield tunnel.

【0007】また、請求項2は、上記請求項1に記載の
シ−ルド工法において、前記谷部の空中に構築したシ−
ルドトンネルは、シ−ルドマシンの推進に伴って順次、
前記アンカ−構造物から吊り鋼線で吊ることを特徴とし
た、シ−ルド工法である。
According to a second aspect of the present invention, in the shield construction method according to the first aspect, a shield constructed in the air in the valley portion is used.
The rud tunnel, in sequence with the promotion of the shield machine,
The shield construction method is characterized in that the steel structure is hung from the anchor structure with a hanging steel wire.

【0008】さらに、請求項3は、上記請求項1又は2
に記載のシ−ルド工法において、前記谷部の空中に構築
したシ−ルドトンネルは、セグメント躯体内に軸方向に
配した定着鋼線を所定リングごとに緊張、定着して一体
化することを特徴とした、シ−ルド工法である。
Further, claim 3 is the above claim 1 or 2.
In the shield construction method described in (1), the shield tunnel constructed in the air of the valley portion is constructed by tensioning and fixing anchoring steel wires axially arranged in the segment body for each predetermined ring. It is a characteristic shield method.

【0009】[0009]

【発明の実施の形態】以下、図面を参照しながら、本発
明の一実施の形態について説明する。 <イ>山部の掘進 図1に示すように、本実施の形態では、山部1aとそれ
に対向する山部1b間の谷部1cにシ−ルドトンネルを
構築する場合について説明する。先ず、シ−ルドマシン
2により山部1a内にシ−ルドトンネル3を構築し、シ
−ルドマシン2のカッタ面が谷部1cに露出するか、又
はその手前で掘進を停止する。
Embodiments of the present invention will be described below with reference to the drawings. <A> Excavation of mountain portion As shown in FIG. 1, in the present embodiment, a case will be described in which a shield tunnel is constructed in a valley portion 1c between a mountain portion 1a and a mountain portion 1b facing it. First, the shield machine 3 constructs the shield tunnel 3 in the mountain portion 1a, and the cutter surface of the shield machine 2 is exposed in the valley portion 1c, or the excavation is stopped before this.

【0010】<ロ>谷部の推進準備 シ−ルドマシン2のカッタ面が谷部1cに露出したら、
スキンプレ−ト外面の頂部等に係留突起21を取り付け
る。山部1aの頂上等には、アンカリッジ等の吊り用ア
ンカ−構造物4を建設する。そして、係留突起21と吊
り用アンカ−構造物4間に吊り鋼線41を張設し、シ−
ルドマシン2が垂れ下がらないように吊る。吊り鋼線4
1は、吊り用アンカ−構造物4に設置されたジャッキに
より、引張り、送り出しが可能となっている。
<B> Preparation for Promotion of Valley Part When the cutter surface of the shield machine 2 is exposed in the valley part 1c,
The mooring projection 21 is attached to the top of the outer surface of the skin plate. An anchor structure 4 for suspension such as anchor ridges is constructed on the top of the mountain portion 1a. Then, a suspension steel wire 41 is stretched between the mooring protrusion 21 and the suspension anchor structure 4, and
Hang so that Rud Machine 2 does not hang down. Hanging steel wire 4
A jack 1 installed on the hanging anchor structure 4 enables pulling and feeding.

【0011】また、図2に示すように、既設のシ−ルド
トンネル3内に引張り用アンカ−体5を固定し、それに
は引張り用ジャッキ51aを所定数取り付ける。一方、
シ−ルドマシン2側にも引張り用ジャッキ51bを対応
する数だけ取り付け、両ジャッキ51a、51b間に引
張り鋼線51を配する。なお、引張り用ジャッキはアン
カ−体側かシ−ルドマシン側のどちらか一方でも良い。
Further, as shown in FIG. 2, a tension anchor body 5 is fixed in an existing shield tunnel 3 and a predetermined number of tension jacks 51a are attached thereto. on the other hand,
A corresponding number of pulling jacks 51b are attached to the shield machine 2 side, and a pulling steel wire 51 is arranged between the jacks 51a and 51b. The pulling jack may be on either the anchor body side or the shield machine side.

【0012】<ハ>谷部の推進 吊り鋼線41及び引張り鋼線52に所定の緊張力を付与
した状態で、シ−ルドマシン2の後方の谷部1cの空中
に、セグメント6をボルト締結等で組み立てながら、シ
−ルドジャッキ53によりセグメント6に反力を取っ
て、シ−ルドマシン2を前方山部1bまで推進させる。
このとき、吊り鋼線41は所定の緊張力を維持しなが
ら、シ−ルドマシン2の推進に追従して徐々に送り出
し、また、引張り鋼線52も所定の緊張力を維持しなが
ら徐々に送り出すようにする。
<C> Propulsion of valley portion With the predetermined tension applied to the suspension steel wire 41 and the tension steel wire 52, the segment 6 is bolted in the air in the valley portion 1c behind the shield machine 2. While assembling at 1, the reaction force is applied to the segment 6 by the shield jack 53 to propel the shield machine 2 to the front mountain portion 1b.
At this time, the suspended steel wire 41 is gradually fed while following the propulsion of the shield machine 2 while maintaining a predetermined tension force, and the tensile steel wire 52 is also gradually fed while maintaining a predetermined tension force. To

【0013】上記のように谷部1cの空中に構築したシ
−ルドトンネル31は、図2に示すように、セグメント
6の躯体内に軸方向に配した複数の定着鋼線7を、シ−
ルドマシン2に設置した定着用ジャッキ54で緊張し
て、所定リングごとに定着具71により定着することに
よって一体化を図る。定着鋼線7は、図3に示すよう
に、セグメント6の躯体に軸方向に開設した引張り鋼線
挿通孔61内に配置されており、所定リングごとのセグ
メント6の端面には、定着具71を収納する定着具取付
穴62が開設されている。なお、定着具71の取り付け
位置はずらすようにする。
As shown in FIG. 2, the shield tunnel 31 constructed in the air in the valley portion 1c as described above has a plurality of anchoring steel wires 7 axially arranged in the body of the segment 6 as shown in FIG.
The fixing jacks 54 installed in the rud machine 2 are tensioned, and fixing is performed by the fixing tool 71 for each predetermined ring to achieve integration. As shown in FIG. 3, the fixing steel wire 7 is arranged in a pulling steel wire insertion hole 61 opened in the frame of the segment 6 in the axial direction. A fixing tool mounting hole 62 for accommodating is installed. In addition, the attachment position of the fixing tool 71 is displaced.

【0014】また、谷部1cの空中に構築したシ−ルド
トンネル31は、図1に示すように、シ−ルドマシン2
の推進に伴って順次、吊り用アンカ−構造物4から吊り
鋼線41で吊るようにする。このためには、図4に示す
ように、セグメントリング頂部に位置するセグメント6
に、吊り鋼線41の張設角度に応じた吊り鋼線挿通孔6
3を開設しておく。また、そのセグメント6の内周面側
には定着用突起64を設け、その定着面65は吊り鋼線
挿通孔63と直角になるよう形成する。
Further, the shield tunnel 31 constructed in the air in the valley 1c is, as shown in FIG.
The suspension steel structure 41 suspends the suspension anchor structure 4 from the suspension anchor structure 4 sequentially. For this purpose, as shown in FIG. 4, the segment 6 located at the top of the segment ring is
The hanging steel wire insertion hole 6 according to the tension angle of the hanging steel wire 41
Open 3. Further, a fixing projection 64 is provided on the inner peripheral surface side of the segment 6, and the fixing surface 65 is formed so as to be perpendicular to the hanging steel wire insertion hole 63.

【0015】以上のようにして、対向する山部1bまで
空中にシ−ルドトンネル31を構築したら、シ−ルドマ
シン2の係留突起21を取り外し、後方のセグメント6
に反力を取って通常の掘進を行う。シ−ルドマシン2が
ある程度まで山部1b内に推進したら、引張り鋼線5
2、引張り用ジャッキ51a、51b、引張り用アンカ
−体5、定着用ジャッキ54を撤去する。
After the shield tunnel 31 is constructed in the air up to the facing mountain portion 1b as described above, the mooring protrusion 21 of the shield machine 2 is removed, and the rear segment 6 is formed.
Take a reaction force and perform a normal dig. Once the shield machine 2 has been pushed into the ridge 1b to some extent, the tensile steel wire 5
2. Pulling jacks 51a and 51b, pulling anchor body 5, and fixing jack 54 are removed.

【0016】[0016]

【発明の効果】以上のように本発明は、シ−ルドマシン
を用いて、山部から連続して谷部の空中にシ−ルドトン
ネルを構築することができる。従って、従来のように谷
部を埋めたり、シ−ルドマシンを運搬する必要がないた
め、工期の短縮及び工費の低減を図ることができる。
As described above, according to the present invention, a shield machine can be used to construct a shield tunnel in the air in the valley portion continuously from the mountain portion. Therefore, it is not necessary to fill the troughs or carry the shield machine as in the conventional case, so that the construction period and the construction cost can be shortened.

【図面の簡単な説明】[Brief description of drawings]

【図1】 本発明の施工方法の説明図FIG. 1 is an illustration of a construction method of the present invention.

【図2】 シ−ルドマシン及びシ−ルドトンネルの構造
の説明図
FIG. 2 is an explanatory view of a structure of a shield machine and a shield tunnel.

【図3】 セグメントの説明図[Figure 3] Explanatory diagram of segment

【図4】 セグメントの説明図FIG. 4 Explanatory diagram of segment

【図5】 従来技術の説明図FIG. 5 is an explanatory view of a conventional technique.

【図6】 従来技術の説明図FIG. 6 is an explanatory diagram of a conventional technique.

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 山部と山部との間の谷部にシ−ルドトン
ネルを構築する方法において、 シ−ルドマシンにより山部内にシ−ルドトンネルを構築
した後、 前記シ−ルドトンネル内に設置したアンカ−体とシ−ル
ドマシンとの間に配した引張り鋼線を緊張すると共に、
シ−ルドマシンを山部に設けたアンカ−構造物から吊り
鋼線で吊った状態で、 シ−ルドマシン後方の谷部の空中にセグメントを組み立
てながら、シ−ルドジャッキによりシ−ルドマシンを前
方山部まで推進させ、 谷部の空中にシ−ルドトンネルを構築することを特徴と
した、 シ−ルド工法。
1. A method of constructing a shield tunnel in a valley between a mountain portion and a mountain portion, wherein a shield tunnel is constructed in the mountain portion by a shield machine and then in the shield tunnel. While tensioning the tensile steel wire placed between the installed anchor body and the shield machine,
While assembling the segment in the air in the valley behind the shield machine while suspending the shield machine from the anchor structure provided in the slope, the shield jack is used to move the shield machine to the front slope. A shield construction method characterized by propelling a shield tunnel in the air in the valley.
【請求項2】 請求項1に記載のシ−ルド工法におい
て、前記谷部の空中に構築したシ−ルドトンネルは、シ
−ルドマシンの推進に伴って順次、前記アンカ−構造物
から吊り鋼線で吊ることを特徴とした、シ−ルド工法。
2. The shield construction method according to claim 1, wherein the shield tunnel constructed in the air in the valley portion is sequentially hung from the anchor structure with the steel wire suspended from the anchor structure. The shield construction method, which is characterized by being hung in.
【請求項3】 請求項1又は2に記載のシ−ルド工法に
おいて、前記谷部の空中に構築したシ−ルドトンネル
は、セグメント躯体内に軸方向に配した定着鋼線を所定
リングごとに緊張、定着して一体化することを特徴とし
た、シ−ルド工法。
3. The shield tunnel construction method according to claim 1 or 2, wherein the shield tunnel constructed in the air of the valley portion has anchoring steel wires axially arranged in the segment body for each predetermined ring. A shield construction method that is characterized by tension, fixation and integration.
JP13595796A 1996-05-02 1996-05-02 Shield tunneling method Pending JPH09296681A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13595796A JPH09296681A (en) 1996-05-02 1996-05-02 Shield tunneling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13595796A JPH09296681A (en) 1996-05-02 1996-05-02 Shield tunneling method

Publications (1)

Publication Number Publication Date
JPH09296681A true JPH09296681A (en) 1997-11-18

Family

ID=15163803

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13595796A Pending JPH09296681A (en) 1996-05-02 1996-05-02 Shield tunneling method

Country Status (1)

Country Link
JP (1) JPH09296681A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790964A (en) * 2015-04-29 2015-07-22 中铁十八局集团轨道交通工程有限公司 Construction method for shield tunneling machine moving-out on condition of tunnel portal deviation
CN105736880A (en) * 2016-04-29 2016-07-06 中铁工程装备集团有限公司 Novel multi-channel central rotary connector of shield tunneling machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104790964A (en) * 2015-04-29 2015-07-22 中铁十八局集团轨道交通工程有限公司 Construction method for shield tunneling machine moving-out on condition of tunnel portal deviation
CN105736880A (en) * 2016-04-29 2016-07-06 中铁工程装备集团有限公司 Novel multi-channel central rotary connector of shield tunneling machine

Similar Documents

Publication Publication Date Title
CN112176872B (en) Method for erecting main cable of anchor suspension bridge of two-bank tunnel
JPH09296681A (en) Shield tunneling method
JP2742026B2 (en) Underground tunnel joining method and segment
JPH112095A (en) Method for tunnel constructing work
SU926318A1 (en) Yieldable suspended roof support
JP3484328B2 (en) Pilot tube for small diameter propulsion and automatic feeding device
JP3039351U (en) Underwater cable
JPS6330097Y2 (en)
JPH07127389A (en) Shield tunnel
JPH0143193B2 (en)
JPS61146917A (en) Method of removing anchor tensile material
JP2961685B2 (en) Branch shield excavation method
JPH0132332B2 (en)
JP3575755B2 (en) Element towing construction method
JP3519287B2 (en) Self-propelled new pipe propulsion device and underground pipe replacement method
JP2002138791A (en) Jacking method to portal, and entrance packing supporting structure
JPS649414B2 (en)
JPH0216291A (en) Constructing of shield tunnel requiring no shaft
JPH099444A (en) Method and apparatus for laying cable in duct
JPS5845448Y2 (en) Cable towing aid
US4056945A (en) Process and device for laying submarine pipelines
JPH01190209A (en) Laying method for submarine cable on land
JPS62189904A (en) Installation of underwater cable
JPS5885785A (en) Method of drawing floating structure into canal
JPS61164410A (en) Sinking of water bottom cable