JPH09225120A - Grinding tower game machine management unit - Google Patents

Grinding tower game machine management unit

Info

Publication number
JPH09225120A
JPH09225120A JP3319796A JP3319796A JPH09225120A JP H09225120 A JPH09225120 A JP H09225120A JP 3319796 A JP3319796 A JP 3319796A JP 3319796 A JP3319796 A JP 3319796A JP H09225120 A JPH09225120 A JP H09225120A
Authority
JP
Japan
Prior art keywords
belt
ball
carrying
polishing
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP3319796A
Other languages
Japanese (ja)
Inventor
Koyu Kakizawa
孝勇 柿沢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Oizumi Corp
Original Assignee
Oizumi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Oizumi Corp filed Critical Oizumi Corp
Priority to JP3319796A priority Critical patent/JPH09225120A/en
Publication of JPH09225120A publication Critical patent/JPH09225120A/en
Pending legal-status Critical Current

Links

Landscapes

  • Pinball Game Machines (AREA)

Abstract

PROBLEM TO BE SOLVED: To improve carrying efficiency and to prevent the reduction of frictional resistance with pachinko balls by forming a ball carrying part by a carrying belt and a carrying guide plate, connecting a ball grinding part at the lower part and fitting a driving part for turning the carrying belt upwards and a belt cleaning part. SOLUTION: In this grinding tower 20 diposed inside a pachinko island, the ball carrying part 30 is erected upwards from the upper part of a base 21 and out balls sent to a ball sending port 20A are carried upwards and supplied from a ball exit 20B to an upper tank. The ball carrying part 30 is composed by forming a ball carrying space by an endless carrying belt spread between a lower pulley 33 and an upper pulley 34 and the carrying guide plate 32. A cushion material such as a sponge or the like is interposed between the carrying guide plate 32 and an exterior plate. The carrying belt is turned upwards by a carrying belt driving part 40 and the stains of the belt are cleaned by a carrying belt cleaning part 60. The belt cleaning part 60 is formed by a cleaning roller rotated in a direction opposite to the carrying belt.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は遊技機管理単位体中
に設けられた研磨塔の構成に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a structure of a polishing tower provided in a gaming machine management unit.

【0002】[0002]

【従来の技術】研磨塔100は、図11の側面図に示す
如く、ベース101上に、搬送ガイド板102と搬送ベ
ルト103により搬送空間を形成して、この搬送ベルト
103を矢印A→B方向に回動させることで玉送り口1
04から前記搬送空間に送られたパチンコ玉(アウト
玉)を、パチンコ玉と搬送ベルト103間に生じる摩擦
力を利用して上方(垂直)に送り、玉出口105から図
示しない上部タンクに供給するものであり、その正面に
は搬送空間内を保守管理する為蓋板106が設けられて
いる。
2. Description of the Related Art In a polishing tower 100, as shown in the side view of FIG. 11, a conveying space is formed on a base 101 by a conveying guide plate 102 and a conveying belt 103, and the conveying belt 103 is moved in the direction of arrow A → B. Ball feed port 1 by rotating to
The pachinko balls (out balls) sent from 04 to the transfer space are sent upward (vertically) using the frictional force generated between the pachinko balls and the transfer belt 103, and are supplied to the upper tank (not shown) from the ball outlet 105. A lid plate 106 is provided on the front surface for maintenance management of the inside of the transfer space.

【0003】上記搬送ベルト103の回転駆動機構は、
モータ107のプーリと従動プーリとその間に張架した
Vベルト108からなり、モータ107の回転をVベル
ト108を介して従動プーリに伝達し、この従動プーリ
の回転により前述の如く搬送ベルト103を矢印A→B
へ回動させている。
The rotation driving mechanism of the conveyor belt 103 is
The motor 107 includes a pulley, a driven pulley, and a V-belt 108 stretched between the pulleys. The rotation of the motor 107 is transmitted to the driven pulley via the V-belt 108, and the rotation of the driven pulley causes the conveyor belt 103 to move in the direction indicated by the arrow. A → B
It is rotating to.

【0004】[0004]

【発明が解決しようとする課題】斯かる研磨塔の構成に
おいては、玉送り口からのパチンコ玉は搬送ベルトと搬
送ガイド板に挾まれ、所謂搬送ベルトとパチンコ玉との
間に生じる摩擦力により上方(垂直)に搬送される為、
整列状態が乱れて蛇行搬送となり、それが搬送効率を低
下させる。
In the construction of such a polishing tower, the pachinko balls from the ball feeding port are sandwiched between the conveyor belt and the conveyor guide plate, and due to the so-called frictional force generated between the conveyor belt and the pachinko balls. Since it is transported upward (vertically),
The alignment state is disturbed and the transfer becomes meandering, which lowers the transfer efficiency.

【0005】その上、玉送り口から送られるパチンコ玉
は、各パチンコ台からパチンコ島中に搬入されたもの
や、玉計数器から客が投入したものであって(アウト
玉)、この玉の表面に付着した汚れは、上記研磨塔にお
ける搬送中では搬送ベルトに付着し、パチンコ玉との摩
擦抵抗を減少させるなど、これも又搬送効率を低下せる
原因となっている。
Moreover, the pachinko balls sent from the ball feeding port are those carried into the pachinko island from each pachinko machine, or those put in by a customer from a ball counter (out balls). The dirt adhering to the surface adheres to the conveyor belt during the transportation in the polishing tower and reduces the frictional resistance with the pachinko balls, which also causes a reduction in the transportation efficiency.

【0006】さらに遊技場とパチンコ島内の温度差に起
因して、パチンコ玉表面に結露水が付着し、島内の搬送
路に弊害を与える丈でなくパチンコ玉の発錆原因ともな
る。
Further, due to the temperature difference between the game hall and the pachinko island, dew condensation water adheres to the surface of the pachinko ball, which is not a height that adversely affects the transportation path on the island and causes rusting of the pachinko ball.

【0007】[0007]

【課題を解決するための手段】本発明は上記の如き研磨
塔が有する各課題を解決する為になされたものであっ
て、遊技機管理単位体内に設けられて、搬送ベルトを介
してパチンコ玉を上方に搬送研磨する研磨塔において、
前記研磨塔は前記搬送ベルトと搬送ガイド板とにより玉
搬送空間を形成した玉搬送部と、前記玉搬送部の下方の
搬送ガイド板を開口するとともにその開口に開閉自在に
取付けられた蓋体からなる玉研磨部と、前記搬送ベルト
を上方に回動させる搬送ベルト駆動部と、搬送面を清浄
する搬送ベルト清浄部とからなることを特徴とする遊技
機管理単位体内の研磨塔を提供するものである。
The present invention has been made to solve the problems of the polishing tower as described above, and is provided in a gaming machine management unit body, and pachinko balls are provided via a conveyor belt. In a polishing tower that conveys and polishes upwards,
The polishing tower has a ball transporting section in which a ball transporting space is formed by the transporting belt and a transporting guide plate, and a transporting guide plate below the ball transporting section, and a lid body that is openably and closably attached to the opening. A polishing tower in a gaming machine management unit body, comprising: a ball polishing unit, a transport belt driving unit that rotates the transport belt upward, and a transport belt cleaning unit that cleans a transport surface. Is.

【0008】[0008]

【発明の実施の形態】図1は本発明の研磨塔を内蔵した
遊技機管理単位体、所謂パチンコ島1の一部破断説明図
である。このパチンコ島1は、遊技機すなわちパチンコ
台10を複数並設して遊技機列を形成すると、二列の遊
技機列を背中合せに配置にし、その略中央に本願発明に
係る研磨塔を配備し、さらに島の端部に玉計数器18を
配設してなる。
DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 is a partially cutaway explanatory view of a so-called pachinko island 1, a gaming machine management unit incorporating a polishing tower of the present invention. In this pachinko island 1, when a plurality of gaming machines, that is, pachinko machines 10 are arranged side by side to form a gaming machine row, two rows of gaming machines are arranged back to back, and a polishing tower according to the present invention is arranged substantially in the center thereof. Further, a ball counter 18 is arranged at the end of the island.

【0009】斯かる構成のパチンコ島1内には複数の玉
貯留タンクすなわち上部タンク11、Jタンク12、F
タンク13、Rタンク14が配置され、各タンク11〜
14と各パチンコ台10とは補給トユ15、島中レール
16、アウトレール17、さらに後述の研磨塔20を介
して連結され、パチンコ玉を循環補給可能にしている。
A plurality of ball storage tanks, that is, an upper tank 11, a J tank 12, and a F tank are provided in the pachinko island 1 having such a structure.
A tank 13 and an R tank 14 are arranged, and each tank 11-
14 and each pachinko machine 10 are connected via a replenishment tow 15, an island rail 16, an outrail 17, and a polishing tower 20 described later, so that pachinko balls can be circulated and replenished.

【0010】上記構成のパチンコ島1内におけるパチン
コ玉の循環補給では1島当りの玉貯留タンクの玉保有量
が概ね定められている。まず島内における玉循環補給シ
ステムを説明する。遊技者(客)が玉計数機18にパチ
ンコ玉を投入するとその玉はJタンク12に流入する。
In the replenishment of pachinko balls in the pachinko island 1 having the above structure, the amount of balls held in the ball storage tank per island is generally determined. First, the ball circulation supply system on the island will be described. When a player (customer) inserts a pachinko ball into the ball counter 18, the ball flows into the J tank 12.

【0011】このとき上部タンク11,Fタンク13、
Rタンク14が満杯でなければ、玉は図示しない玉リフ
ターを介してアウトレール17に流される。又この玉と
ともにパチンコ台10に打込まれた玉も所謂アウト玉と
なって研磨塔20を介して上方に搬送され上部タンク1
1内へ供給される。
At this time, the upper tank 11, the F tank 13,
If the R tank 14 is not full, the balls are flown to the outrail 17 via a ball lifter (not shown). Also, the balls that have been driven into the pachinko machine 10 together with these balls become so-called out balls and are conveyed upward through the polishing tower 20 to the upper tank 1.
1 is supplied.

【0012】上部タンク11に供給された玉は、補給ト
ユ15を介して各パチンコ台10に補給される。そして
上部タンク11では玉が所定量以上貯留されるとオーバ
ーフローしてその玉は下の中タンクへ流入する。この中
タンクからRタンク14、Fタンク13の順に玉は貯留
されてゆく。この様にF,Rタンクが満杯になるとJタ
ンク12のリフターは停止しこのJタンク12内にも玉
が貯留される。
The balls supplied to the upper tank 11 are supplied to the respective pachinko machines 10 via the supply tows 15. When a predetermined amount or more of balls are stored in the upper tank 11, the balls overflow and flow into the lower middle tank. Balls are stored in this order from the middle tank to the R tank 14 and the F tank 13. Thus, when the F and R tanks are full, the lifter of the J tank 12 is stopped and balls are stored in the J tank 12.

【0013】上記パチンコ島1内に配備された研磨塔2
0は図2の側面図(イ),同正面図(ロ)に示す如く、
ベース21上から上方へ玉搬送部30を形成したもので
あって、前記の如くアウト玉は玉送り口20Aに送られ
玉搬送部30内を上方(垂直)に搬送されて玉出口20
Bに至り、前記の上部タンク内に供給される。
A polishing tower 2 provided in the pachinko island 1
0 is as shown in the side view (a) and the front view (b) of FIG.
The ball conveying unit 30 is formed from above the base 21 to the upper side. As described above, the out-balls are sent to the ball feeding port 20A and are conveyed upward (vertically) in the ball conveying unit 30 so that the ball outlet 20.
It reaches B and is supplied into the upper tank.

【0014】この玉搬送部30は、塔の上下に設けたベ
ルト下プーリ33とベルト上プーリ34間に、所謂エン
ドレス状態で張架された搬送ベルト31と塔の外装板3
6側に設けられた搬送ガイド板32とがなす玉搬送空間
35を主たる構成となす。そしてこの搬送ガイド板32
の背面側、すなわち外装板36との間にスポンジ等から
なるクッション材37を介設することで、搬送されたパ
チンコ玉70による押圧力の緩衝機能を確保している。
The ball transfer unit 30 is provided with a belt lower pulley 33 and a belt upper pulley 34 provided above and below the tower.
The ball transport space 35 formed by the transport guide plate 32 provided on the 6 side is the main configuration. And this transport guide plate 32
The cushioning member 37 made of sponge or the like is provided between the back side of the device, that is, the cushioning member 37 and the exterior plate 36, so that the cushioning function of the conveyed pachinko balls 70 is secured.

【0015】上記搬送ベルト31を上方へ回動させる機
構として、搬送ベルト駆動部40が設けられている。こ
の搬送ベルト駆動部40は駆動プーリ41と前記ベルト
下プーリ33と同軸支承された従動プーリ42との間に
Vベルト43を張架するとともに、モータ44の回転を
駆動プーリ41、Vベルト43、従動プーリ42を介し
てベルト下プーリ33に伝達する構成となっている。
A conveyor belt drive unit 40 is provided as a mechanism for rotating the conveyor belt 31 upward. The conveyor belt drive unit 40 stretches a V belt 43 between a drive pulley 41 and a driven pulley 42 coaxially supported by the belt lower pulley 33 and rotates the motor 44 by rotating the drive pulley 41, the V belt 43, It is configured to be transmitted to the belt lower pulley 33 via the driven pulley 42.

【0016】斯かる搬送ベルト31は、図3に示す如く
内部に補強用の細鋼線31aが埋め込まれているととも
に、搬送面31cとは反対側の裏面に蛇行防止溝31b
が長手方向に刻設されており、この溝31bによってベ
ルト下プーリ33とベルト上プーリ34間における搬送
ベルト31の蛇行を防止している。
As shown in FIG. 3, the conveyor belt 31 has a reinforcing thin steel wire 31a embedded therein, and a meandering prevention groove 31b on the back surface opposite to the conveyor surface 31c.
Are engraved in the longitudinal direction, and the groove 31b prevents the conveyor belt 31 from meandering between the belt lower pulley 33 and the belt upper pulley 34.

【0017】一方図4並びその要部拡大図である図5に
示す通り、搬送面31cには所定の間隔でかつ長手方向
に複数の縦溝31dが刻設されている。この縦溝31d
によって玉送り口20Aから送られた複数のパチンコ玉
70は、搬送ベルト31の搬送面31c上で横方向の移
動が制御され、すなわち縦溝31dに応じた整列状態で
搬送されることになり、その結果玉搬送空間35内での
パチンコ玉70自体の蛇行搬送はなくなりかつ又搬送時
における搬送ベルト31とパチンコ玉70間の摩擦力を
増加させることになって、搬送効率を向上させ得る。
On the other hand, as shown in FIG. 4 and FIG. 5, which is an enlarged view of the main part thereof, a plurality of vertical grooves 31d are formed in the conveying surface 31c at predetermined intervals in the longitudinal direction. This vertical groove 31d
The plurality of pachinko balls 70 sent from the ball feeding port 20A are controlled to move in the lateral direction on the conveying surface 31c of the conveying belt 31, that is, conveyed in an aligned state according to the vertical groove 31d, As a result, the meandering conveyance of the pachinko balls 70 themselves in the ball conveyance space 35 is eliminated, and the frictional force between the conveyance belt 31 and the pachinko balls 70 at the time of conveyance is increased, so that the conveyance efficiency can be improved.

【0018】図5に示したものはパチンコ玉70の略直
径に等しい間隔l内に複数の縦溝31dを設けた例であ
り、図6並びその要部拡大図である図7では、パチンコ
玉70の直径と略等しい間隔lで縦溝31dを設けた例
を示している。上記玉搬送部30の下側には、図2に示
す如く玉研磨部50が形成されている。
FIG. 5 shows an example in which a plurality of vertical grooves 31d are provided in a space 1 equal to the diameter of the pachinko ball 70, and in FIG. 6 and FIG. An example is shown in which vertical grooves 31d are provided at intervals l substantially equal to the diameter of 70. A ball polishing unit 50 is formed below the ball transport unit 30 as shown in FIG.

【0019】この玉研磨部50は玉搬送空間35を形成
する搬送ガイド板32の一部を切欠して開口を成し、こ
の開口を塞ぐ蓋板51にて形成される。蓋板51はマッ
ト52とロック53により開口に対し開閉自在に設けら
れており、玉搬送空間35内の保守点検の便宜が図られ
る。
The ball polishing section 50 is formed by a cover plate 51 that closes the opening by cutting out a part of the transfer guide plate 32 that forms the ball transfer space 35. The lid plate 51 is provided so as to be openable and closable with respect to the opening by a mat 52 and a lock 53, which facilitates maintenance and inspection of the ball transport space 35.

【0020】図8に示す通り、蓋体51の内面側にはマ
ジックテープ54を介して研磨部材55が取着されてい
る。図9は上記研磨部材55の断面図であって、図例の
如く研磨布55aとそれを裏打ちするラバー材55bに
よる積層構造となっている。
As shown in FIG. 8, a polishing member 55 is attached to the inner surface side of the lid 51 via a magic tape 54. FIG. 9 is a sectional view of the polishing member 55, which has a laminated structure of a polishing cloth 55a and a rubber material 55b lining it as shown in the figure.

【0021】研磨布55aとしては、静電糸が略50%
程度織込まれた吸水性ポリエステルのブラシ状のものか
らなる。しかもカットアンドループ織りにすることと前
記ラバー材55bによる裏打効果でブラシの抜け落ち防
止を図り、耐久性を向上させている。
As the polishing cloth 55a, approximately 50% of electrostatic yarn is used.
It consists of a brush of absorbent polyester woven to some extent. In addition, the cut-and-loop weave and the backing effect of the rubber material 55b prevent the brush from falling off and improve the durability.

【0022】以上の構成からなる研磨部材55は、玉搬
送空間35側に露出する為搬送されるパチンコ玉70は
その表面全体が当該研磨布55aに圧接し、その結果玉
表面の汚れは取り除かれ、又結露水があればこの研磨布
55aの吸収性により吸収され、さらに玉自体に帯電し
た静電気も取り除かれることになる。
Since the polishing member 55 having the above-described structure is exposed to the ball transport space 35 side, the entire surface of the pachinko ball 70 transported is pressed against the polishing cloth 55a, and as a result, dirt on the ball surface is removed. Also, if there is condensed water, it will be absorbed by the absorptivity of the polishing cloth 55a, and the static electricity charged on the ball itself will also be removed.

【0023】その上、この研磨部材55の背面に帯板状
のヒータ56を取り付けておくことで、前記結露水を吸
収した研磨布55a自体の乾燥促進を図ることができ
る。尚本研磨部材55は図8に示す如くマジックテープ
54にて蓋体51に取付けられているので取付取外しが
容易となり、研磨部材55の保守点検,取換作業の便宜
が図られる。
In addition, by attaching a band plate heater 56 to the back surface of the polishing member 55, it is possible to accelerate the drying of the polishing cloth 55a itself which has absorbed the condensed water. Since the polishing member 55 is attached to the lid body 51 with the magic tape 54 as shown in FIG. 8, the attachment / detachment is facilitated, and the maintenance / inspection and replacement work of the polishing member 55 are facilitated.

【0024】上述した研磨塔20では上記の構成の他
に、図2に示した搬送ベルト清浄部60が形成されてい
る。この清浄部60の構成は、図10に示す如くブラケ
ット61を介して取付けられた回転軸62に清浄ローラ
63が回転自在に軸承されている。そして清浄ローラ6
3自体はモータ44の回転と同期しかつ搬送ベルト31
とは逆方向に回転する。
In the polishing tower 20 described above, in addition to the above structure, the conveyor belt cleaning section 60 shown in FIG. 2 is formed. In the structure of the cleaning unit 60, as shown in FIG. 10, a cleaning roller 63 is rotatably supported on a rotating shaft 62 mounted via a bracket 61. And the cleaning roller 6
3 itself is synchronized with the rotation of the motor 44 and the conveyor belt 31
It rotates in the opposite direction to.

【0025】清浄ローラ63の表面は、例えばポリエス
テル糸が植付けられてブラシ状に形成され、このポリエ
ステル糸のブラシを搬送ベルト31の搬送面31cに圧
接させるとともに、前述の如く搬送ベルト31の回転と
逆方向に回転させるので清浄ローラ63の摩損も少くか
つ搬送面31cの汚れが効率良く取り除かれる。従って
パチンコ玉70の研磨搬送作業において長期に亘り清浄
な搬送面31cの維持が可能となる。
On the surface of the cleaning roller 63, for example, polyester yarn is planted to form a brush shape, and the brush of the polyester yarn is brought into pressure contact with the conveying surface 31c of the conveying belt 31, and the conveying belt 31 is rotated as described above. Since the cleaning roller 63 is rotated in the opposite direction, the wear of the cleaning roller 63 is small, and the dirt on the conveying surface 31c is efficiently removed. Therefore, it is possible to maintain a clean transfer surface 31c for a long period in the polishing and transfer operation of the pachinko balls 70.

【0026】[0026]

【発明の効果】本発明の研磨塔は、その搬送ベルトによ
りパチンコ玉の循環供給が円滑かつ効率化され、又玉研
磨部を構成する研磨部材は、耐久性の高いものであり、
これにパチンコ玉の結露水並びに静電気が吸収され、さ
らにヒータ加熱によって前記結露水による研磨部材の濡
れも解消される。
According to the polishing tower of the present invention, the circulation belt allows the pachinko balls to be circulated and supplied smoothly and efficiently, and the polishing member constituting the ball polishing section has high durability.
The condensed water and static electricity of the pachinko balls are absorbed by this, and the heating of the heater also eliminates the wetting of the polishing member by the condensed water.

【0027】その上搬送ベルトの搬送面も搬送ベルト洗
浄部材により常に清浄に維持されることになるので、長
期に亘る搬送運転も十分可能なものとなる。
In addition, since the transport surface of the transport belt is always kept clean by the transport belt cleaning member, the transport operation for a long period can be sufficiently performed.

【図面の簡単な説明】[Brief description of drawings]

【図1】パチンコ島の一部破断説明図である。FIG. 1 is a partially cutaway explanatory view of a pachinko island.

【図2】研磨塔を説明する図である。FIG. 2 is a diagram illustrating a polishing tower.

【図3】図2(A)のX−X矢視断面図である。FIG. 3 is a sectional view taken along line XX of FIG.

【図4】搬送ベルトの構成を説明する図である。FIG. 4 is a diagram illustrating a configuration of a conveyor belt.

【図5】図4の要部拡大図である。FIG. 5 is an enlarged view of a main part of FIG. 4;

【図6】他の搬送ベルトの構成を説明する図である。FIG. 6 is a diagram illustrating the configuration of another conveyor belt.

【図7】図6の要部拡大図である。FIG. 7 is an enlarged view of a main part of FIG. 6;

【図8】玉研磨部を有する蓋体の説明図である。FIG. 8 is an explanatory diagram of a lid having a ball polishing section.

【図9】研磨部材の断面図である。FIG. 9 is a cross-sectional view of a polishing member.

【図10】搬送ベルト清浄部の説明図である。FIG. 10 is an explanatory diagram of a conveyor belt cleaning unit.

【図11】従来の研磨塔を説明する図である。FIG. 11 is a diagram illustrating a conventional polishing tower.

【符号の説明】[Explanation of symbols]

1 パチンコ島 10 パチンコ台 20 研磨塔 30 玉搬送部 31 搬送ベルト 31d 縦溝 32 搬送ガイド板 35 玉搬送空間 40 搬送ベルト駆動部 50 玉研磨部 51 蓋板 55 研磨部材 56 ヒータ 60 搬送ベルト清浄部 63 清浄ローラ 1 Pachinko Island 10 Pachinko Stand 20 Polishing Tower 30 Ball Conveying Section 31 Conveying Belt 31d Vertical Groove 32 Conveying Guide Plate 35 Ball Conveying Space 40 Conveying Belt Driving Section 50 Ball Polishing Section 51 Cover Plate 55 Polishing Member 56 Heater 60 Conveying Belt Cleaning Section 63 Cleaning roller

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 遊技機管理単位体内に設けられて、搬送
ベルトを介してパチンコ玉を上方に搬送研磨する研磨塔
において、 前記研磨塔は前記搬送ベルトと搬送ガイド板とにより玉
搬送空間を形成した玉搬送部と、 前記玉搬送部の下方の搬送ガイド板を開口するとともに
その開口に開閉自在に取付けられた蓋体からなる玉研磨
部と、 前記搬送ベルトを上方に回動させる搬送ベルト駆動部
と、 前記搬送ベルトの搬送面に清浄ローラを当接させて該搬
送面を清浄する搬送ベルト清浄部とからなることを特徴
とする遊技機管理単位体内の研磨塔。
1. A polishing tower provided inside a gaming machine management unit for carrying and polishing pachinko balls upward via a carrying belt, wherein the grinding tower forms a ball carrying space by the carrying belt and a carrying guide plate. A ball transport unit, a ball polishing unit including a lid body that opens a transport guide plate below the ball transport unit and is openably and closably attached to the opening, and a transport belt drive that rotates the transport belt upward. A polishing tower in the gaming machine management unit body, comprising: a cleaning belt and a cleaning belt for cleaning the transportation surface by bringing a cleaning roller into contact with the transportation surface of the transportation belt.
【請求項2】 請求項1記載の研磨塔において、 前記玉搬送部を形成する搬送ベルトは、その搬送面長手
方向に複数の縦溝が刻設されたことを特徴とする遊技機
管理単位体内の研磨塔。
2. The polishing tower according to claim 1, wherein the conveyor belt forming the ball conveyor has a plurality of vertical grooves formed in the longitudinal direction of the conveyor surface. Polishing tower.
【請求項3】 請求項1記載の研磨塔において、 前記玉研磨部を形成する蓋板の内面側には、吸水性を有
する研磨部材が着脱自在に取付けられていることを特徴
とする遊技機管理単位体内の研磨塔。
3. The polishing tower according to claim 1, wherein a polishing member having a water absorbing property is detachably attached to an inner surface side of the lid plate forming the ball polishing portion. Polishing tower in the management unit.
【請求項4】 請求項3記載の研磨塔において、 前記研磨部材の背面にはヒータが設けられていることを
特徴とする遊技機管理単位体内の研磨塔。
4. The polishing tower according to claim 3, wherein a heater is provided on a back surface of the polishing member, the polishing tower in the gaming machine management unit body.
【請求項5】 請求項1記載の研磨塔において、 前記搬送ベルト清浄部の清浄ローラは、前記搬送ベルト
の回動に同期して回転することを特徴とする遊技機管理
単位体内の研磨塔。
5. The polishing tower according to claim 1, wherein the cleaning roller of the conveyor belt cleaning unit rotates in synchronization with the rotation of the conveyor belt.
JP3319796A 1996-02-21 1996-02-21 Grinding tower game machine management unit Pending JPH09225120A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3319796A JPH09225120A (en) 1996-02-21 1996-02-21 Grinding tower game machine management unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3319796A JPH09225120A (en) 1996-02-21 1996-02-21 Grinding tower game machine management unit

Publications (1)

Publication Number Publication Date
JPH09225120A true JPH09225120A (en) 1997-09-02

Family

ID=12379764

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3319796A Pending JPH09225120A (en) 1996-02-21 1996-02-21 Grinding tower game machine management unit

Country Status (1)

Country Link
JP (1) JPH09225120A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001340620A (en) * 2000-06-02 2001-12-11 Takeya Co Ltd Game ball hoisting apparatus
JP2010057636A (en) * 2008-09-02 2010-03-18 Mars Engineering Corp Pachinko ball pumping device, ball passage, machine between game machines and game machine counter

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001340620A (en) * 2000-06-02 2001-12-11 Takeya Co Ltd Game ball hoisting apparatus
JP2010057636A (en) * 2008-09-02 2010-03-18 Mars Engineering Corp Pachinko ball pumping device, ball passage, machine between game machines and game machine counter

Similar Documents

Publication Publication Date Title
JP4418816B2 (en) Medal cleaning device
JPH09225120A (en) Grinding tower game machine management unit
JP5395408B2 (en) Lift polishing machine
JP2008148906A (en) Token circulation system of game parlor
JP5243927B2 (en) Abrasive cloth mounting structure
US2632197A (en) Mirror cleaning machine
JP4986572B2 (en) Slot island
JP3437788B2 (en) Medal supply device
WO1999016026A1 (en) Washing apparatus for gaming chips
JPH02119885A (en) Lift feed device for pachinko (japanese pinball) machine ball
JP5212983B2 (en) Lift polishing machine
JPH04126589U (en) Pachinko ball lifting device
JP3617068B2 (en) Game ball lifting machine
JP7103658B2 (en) Maintenance equipment
JP4144039B2 (en) Automatic belt winding mechanism for ball polishing
JPH0924156A (en) Cleaning equipment for game media
KR100211220B1 (en) The conveyor in the apparatus for selecting fruits
JP3835418B2 (en) Polishing and lifting equipment
JPH10179810A (en) Ball washing device
JPH11104341A (en) Lifting, feeding, and polishing device for pachinko ball
JP2007007385A (en) Game medium polishing apparatus
JP2775173B2 (en) Medal polishing transfer device
JP3617067B2 (en) Game ball ball polishing equipment
JP5520402B2 (en) Lift polishing machine
JP4469574B2 (en) Pachinko ball supply mechanism in Yugi Island

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070524

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070605

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070802

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080415

A521 Written amendment

Effective date: 20080613

Free format text: JAPANESE INTERMEDIATE CODE: A523

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080715

A02 Decision of refusal

Effective date: 20081111

Free format text: JAPANESE INTERMEDIATE CODE: A02