JPH09215141A - Method for winding electric wire for prefabricated trolley wire on drum and prefabricated stringing method - Google Patents

Method for winding electric wire for prefabricated trolley wire on drum and prefabricated stringing method

Info

Publication number
JPH09215141A
JPH09215141A JP33613896A JP33613896A JPH09215141A JP H09215141 A JPH09215141 A JP H09215141A JP 33613896 A JP33613896 A JP 33613896A JP 33613896 A JP33613896 A JP 33613896A JP H09215141 A JPH09215141 A JP H09215141A
Authority
JP
Japan
Prior art keywords
electric wire
wire
drum
drums
prefabricated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP33613896A
Other languages
Japanese (ja)
Other versions
JP2863146B2 (en
Inventor
Masami Obara
正美 小原
Toru Kojima
徹 小島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Furukawa Electric Co Ltd
Original Assignee
Furukawa Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Furukawa Electric Co Ltd filed Critical Furukawa Electric Co Ltd
Priority to JP33613896A priority Critical patent/JP2863146B2/en
Publication of JPH09215141A publication Critical patent/JPH09215141A/en
Application granted granted Critical
Publication of JP2863146B2 publication Critical patent/JP2863146B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Insulated Conductors (AREA)
  • Electric Cable Installation (AREA)

Abstract

PROBLEM TO BE SOLVED: To improve the efficiency of the manufacture by making it possible to manufacture a wire for a plurality of strain spans continuously without cutting it for each strain span and to reduce a transportation cost by lessening the number of drums using coupled drums, in manufacturing an electric wire for a prefabricated trolley wire. SOLUTION: Precise measured marks 7A, 7B, 7C are stamped at near both ends and the midpoint on a continuous electric wire 6 to be stringed in a plurality of strain spans. Coupled drums are used; a plurality of drums 1A, 1B are coupled in such a manner that they can be detached and an extra-length storing part 16 is provided at the coupled part. The electric wire 6 above is wound onto the coupled drums so that an electric wire for a strain span corresponds to a drum and the wire around the precise measured mark 7B at the midpoint is stored with an extra slacking length in the extra-length storing part 16.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、プレハブ架線用電線の
ドラム巻き方法及びプレハブ架線工法に関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of winding an electric wire for a prefabricated overhead wire and a prefabricated overhead wire construction method.

【0002】[0002]

【従来の技術】従来、架空送電線のプレハブ架線工法は
次のように行われていた。すなわち、工場で精密計尺マ
ークをつけた電線をドラムに巻いて工事現場に搬入し、
この電線をドラムから引き出して延線車を通して延線す
る。その際、精密計尺マークが延線車を通過したところ
で延線を一時中断し、精密計尺マークを基準として所要
の長さを補正計尺して電線を切断し、切断端に引留クラ
ンプを圧縮固定する作業を行う。引留クランプ取付け
後、延線を再開し、延線終了後、引留クランプを耐張鉄
塔に碍子連を介して取り付ける。
2. Description of the Related Art Conventionally, a prefabricated overhead wire construction method for overhead power lines has been performed as follows. That is, at the factory, wind the electric wire with the precision scale mark around the drum and carry it to the construction site,
This wire is pulled out from the drum and passed through the wire-drawing car. At that time, the wire extension is temporarily stopped when the precision measuring mark passes through the wire drawing car, the required length is corrected and measured with the precision measuring mark as a reference, the wire is cut, and the pulling clamp is attached to the cutting end. Work to compress and fix. After the drawing clamp is attached, the wire drawing is restarted, and after the drawing is completed, the drawing clamp is attached to the tension tower through the insulator string.

【0003】しかしこの工法は、延線車の出口側すなわ
ち延線張力がかかっているところで、電線の切断、引留
クランプの取付け作業を行うので、作業が面倒であっ
た。そこで最近、電線端部に圧縮固定した引留クランプ
が通過できる延線車が開発され、架線工事前に電線の両
端に引留クランプを圧縮固定してから延線を行う、いわ
ゆる完全プレハブ架線工法が検討されている。
However, this construction method is troublesome because the electric wire is cut and the pulling clamp is attached at the exit side of the wire drawing vehicle, that is, where the tension is applied. Therefore, recently, an extension car has been developed that allows a compression clamp fixed to the end of the wire to pass through.A so-called completely prefabricated overhead wire construction method, in which the tension clamps are compressed and fixed to both ends of the wire before the overhead wire construction, is considered. Has been done.

【0004】現在検討されている完全プレハブ架線工法
は、延線前の準備段階で1耐張区間の電線の両端に引留
クランプを取り付けるため、次のような方法を採用して
いる。すなわち、工場では図5に示すようなドラムに精
密計尺マークをつけた電線を巻いて出荷する。このドラ
ム1は胴2の両端の鍔3、4の間の、一方の鍔3の近く
に仕切り鍔5を設けたもので、一方の鍔3と仕切り鍔5
の間に電線6の巻き始め端側を所要長巻いてから、仕切
り鍔5と他方の鍔4の間にそれに続く電線6を巻くよう
にしたものである。
The completely prefabricated overhead wire construction method currently under study employs the following method in order to attach the retention clamps to both ends of the electric wire of one tension section at the preparatory stage before drawing the wire. That is, at the factory, an electric wire with a precision scale mark is wound on a drum as shown in FIG. 5 and shipped. This drum 1 is provided with a partition flange 5 between the flanges 3 and 4 at both ends of the body 2 and near the one flange 3, and the one flange 3 and the partition flange 5 are provided.
The winding start end side of the electric wire 6 is wound for a required length between the two, and the subsequent electric wire 6 is wound between the partition flange 5 and the other flange 4.

【0005】工事現場では、図5の状態で搬入されたド
ラムから、電線6の巻き始め端側を精密計尺マーク7A
が出るまで巻きほぐし、その精密計尺マーク7Aを基準
として補正計尺し、電線切断、引留クランプ圧縮を行う
と共に、電線6の巻き終り端側も精密計尺マーク7Bが
出るまで巻きほぐし、同様に電線切断、引留クランプ圧
縮を行う。その後、巻き終り端側から電線6を引き出し
て、引留クランプ通過型の延線車を通して延線作業を行
う。これにより延線車の出口側での作業が一切必要なく
なり、安全で効率のよい延線作業が行える。
At the construction site, the winding start end side of the electric wire 6 from the drum loaded in the state shown in FIG.
Unwind until the precision measuring mark 7A appears, correct the measuring scale based on the precision measuring mark 7A, cut the wire, compress the strain clamp, and unwind until the precision measuring mark 7B appears on the winding end side of the wire 6 as well. The wire is cut and the strain clamp is compressed. After that, the electric wire 6 is pulled out from the winding end end side, and a wire drawing operation is performed through a wire drawing wheel of a pulling clamp passing type. As a result, no work is required on the exit side of the wire drawing vehicle, and safe and efficient wire drawing work can be performed.

【0006】[0006]

【発明が解決しようとする課題】架空送電線用の電線は
通常1000m〜2000mが1ドラム単位となってい
るが、上述の完全プレハブ架線工法では1耐張区間が1
ドラムとなり、1耐張区間が300〜600mの場合は
短い電線を多数回に分けて製造しなければならないた
め、製造上効率がわるく、またドラム数も2〜3倍に増
えるため、ドラムコスト、運搬コストも大幅にアップす
るという問題がある。
The electric wire for an overhead power transmission line normally has a unit of 1000 m to 2000 m per drum, but in the above-mentioned complete prefabricated overhead wire construction method, one tension section is one.
If it is a drum and one tension section is 300 to 600 m, it is necessary to manufacture short electric wires in a large number of times, which is inefficient in manufacturing, and the number of drums is increased by 2 to 3 times. There is a problem that the transportation cost will also increase significantly.

【0007】[0007]

【課題を解決するための手段】今、図1に示すようにA
区間が1耐張区間であり、これにB区間の1耐張区間が
続いているものとすると、A区間用の電線とB区間用の
電線を別々に製造するより、A+Bの長さの電線6を一
連続で製造した方が効率がよい。そこで本発明は、複数
の耐張区間に架線される一連続の電線の両端付近および
中間に引留クランプ取付け位置決定の基準となる精密計
尺マークをつけ、この電線を、複数のドラムが分離可能
に連結されて連結部に余長収納部が設けられた連結ドラ
ムに、1つの耐張区間が1つのドラムに対応するように
巻き、かつ中間の精密計尺マーク付近の電線を前記連結
ドラムの余長収納部に余長を持たせて収納することを特
徴とすることを特徴とするものである。
[Means for Solving the Problems] As shown in FIG.
Assuming that the section is 1 tension section, and that 1 section of B section follows, the wire of length A + B is obtained rather than manufacturing the wire for section A and the wire for section B separately. It is more efficient to manufacture 6 continuously. Therefore, in the present invention, a precision measuring mark, which serves as a reference for determining the position of the retracting clamp, is attached near both ends and in the middle of a continuous electric wire that is extended in a plurality of tension-resistant sections, and the electric wires can be separated by a plurality of drums. Is wound around a connecting drum having an extra length storage portion connected to the connecting drum so that one tension section corresponds to one drum, and an electric wire near an intermediate precision measuring mark is connected to the connecting drum. It is characterized in that the extra length storage portion is stored with an extra length.

【0008】[0008]

【作用】連結ドラムに巻かれた電線は1連続ではある
が、1つの耐張区間毎に別なドラムに巻かれており、先
の耐張区間の巻き終り端が次の耐張区間の巻き始め端と
なっている。耐張区間と耐張区間の境界付近には例えば
図1に示すように中間の精密計尺マークが付けられてい
る。架線工事の際には連結ドラムを分離し、余長収納部
に収納された電線を引き出し、中間の精密計尺マークを
基準に補正計尺を行い、電線を切断する。これにより電
線を各耐張区間毎に切り分けできるから、各電線の両端
に引留クランプを圧縮する。このようにして各耐張区間
毎の引留クランプ付き電線を準備した後、プレハブ架線
を行う。
The electric wire wound on the connecting drum is continuous, but is wound on another drum for each tension section, and the winding end of the previous tension section is wound on the next tension section. It is the beginning. In the vicinity of the boundary between the tension sections, for example, an intermediate precision scale mark is attached as shown in FIG. At the time of overhead line construction, the connecting drum is separated, the electric wire stored in the extra length storage section is pulled out, the correct measuring scale is taken based on the intermediate precision measuring mark, and the electric wire is cut. As a result, the electric wire can be cut into each tension-resistant section, so that the tension clamps are compressed at both ends of each electric wire. After preparing the electric wire with the pulling clamp for each tension-resistant section in this way, prefabricated overhead wire is performed.

【0009】[0009]

【実施例】以下、本発明の実施例を図面を参照して詳細
に説明する。図2は本発明の一実施例に係るプレハブ架
線用電線のドラム巻き方法を示す断面図、図3はそれに
用いた連結ドラムの分解斜視図である。この連結ドラム
9は分離、結合可能な二つのドラム1A、1Bから構成
されている。各ドラム1A、1Bは、鍔3、4に電線引
き出し用の切込み10、11を形成すると共に、一方の
鍔3の外側に内筒部12と外筒部13を突出させ、外筒
部13に多数のボルト穴14を形成した構造となってい
る。
Embodiments of the present invention will be described below in detail with reference to the drawings. FIG. 2 is a cross-sectional view showing a method of winding a prefabricated overhead wire for a drum according to an embodiment of the present invention, and FIG. 3 is an exploded perspective view of a connecting drum used therein. The connecting drum 9 is composed of two drums 1A and 1B which can be separated and combined. Each of the drums 1A and 1B has notches 10 and 11 for pulling out electric wires formed in the flanges 3 and 4, and an inner cylinder portion 12 and an outer cylinder portion 13 are projected outside the one flange 3 so that the outer cylinder portion 13 has It has a structure in which a large number of bolt holes 14 are formed.

【0010】外筒部13の内径は他方の鍔4の外径より
僅かに大きくなっており、二つのドラム1A、1Bを同
一軸線上に並べて突き合わせると、図2に示すようにド
ラム1Aの鍔4がドラム1Bの外筒部13内に入る。こ
の状態で外周からボルト15をねじ込むことにより二つ
のドラム1Aと1Bを連結できる。連結した状態では第
一のドラム1Aの鍔4と第二のドラム1Bの鍔3の間に
電線の余長収納部16ができる。
The inner diameter of the outer cylindrical portion 13 is slightly larger than the outer diameter of the other collar 4, and when the two drums 1A and 1B are aligned and abutted on the same axis, as shown in FIG. The collar 4 enters the outer cylindrical portion 13 of the drum 1B. In this state, the two drums 1A and 1B can be connected by screwing the bolt 15 from the outer circumference. In the connected state, an extra length storage portion 16 for the electric wire is formed between the collar 4 of the first drum 1A and the collar 3 of the second drum 1B.

【0011】以下、この連結ドラム9を用いた本発明の
プレハブ架線用電線のドラム巻き方法とプレハブ架線方
法を説明する。電線製造時には、まず巻取り装置に第一
のドラム1Aをセットし、図1のA区間用の電線の製
造、巻取りを行う。このとき電線6の巻き始め端側は図
2に示すように引留クランプの圧縮に必要な長さだけ鍔
3の外側に引き出し、鍔3に固定しておく。電線6の巻
き始め端付近には精密計尺マーク7Aが付けられてい
る。
The method of winding the electric wire for prefabricated overhead wire of the present invention using the connecting drum 9 and the prefabricated overhead wire method will be described below. When manufacturing the electric wire, first, the first drum 1A is set in the winding device, and the electric wire for the section A in FIG. 1 is manufactured and wound. At this time, as shown in FIG. 2, the winding start end side of the electric wire 6 is pulled out to the outside of the collar 3 by a length required for compression of the tension clamp and is fixed to the collar 3. A precision scale mark 7A is attached near the winding start end of the electric wire 6.

【0012】A区間用の電線6の製造が終了し、中間の
精密計尺マーク7Bがきたら、巻取りを中止し、工事現
場での補正計尺、電線切断、引留クランプ圧縮に必要な
長さだけ電線6を鍔4の外側に引き出す。電線6が鍔4
の切込み11(図3参照)を通過する部分では、電線6
を鍔4に固定し、外側の弛みがドラム1A内に伝わらな
いようにする。
When the production of the electric wire 6 for the section A is completed and the intermediate precision measuring mark 7B comes, the winding is stopped and the length required for the correction measuring at the construction site, the cutting of the electric wire, and the retracting clamp compression. Only pull the wire 6 out of the collar 4. Electric wire 6 is a collar 4
At the portion that passes through the notch 11 (see FIG. 3) of the electric wire 6
Is fixed to the collar 4 so that the slack on the outside is not transmitted to the inside of the drum 1A.

【0013】次に同じ巻取り装置に第二のドラム1Bを
セットし、電線6の巻き始め部分(中間部)を鍔3の外
面に固定し、切込み10から電線6をドラム1B内に引
き込む。その後、二つのドラム1A、1Bを同一軸線上
で突き合わせ、ボルト15により連結する。このとき電
線6の中間余長部分を二つのドラム1Aと1Bの間の余
長収納部16内に収納する。余長収納部16内の電線6
はゆるく収納されているだけなので、輸送中に振動等に
よって傷がつかないように、余長収納部16内には緩衝
材などを入れておくことが好ましい。
Next, the second drum 1B is set in the same winding device, the winding start portion (intermediate portion) of the electric wire 6 is fixed to the outer surface of the collar 3, and the electric wire 6 is drawn into the drum 1B from the notch 10. After that, the two drums 1A and 1B are butted against each other on the same axis and connected by the bolt 15. At this time, the intermediate extra length portion of the electric wire 6 is stored in the extra length storage portion 16 between the two drums 1A and 1B. Electric wire 6 in the extra length storage 16
Since it is only stored loosely, it is preferable to put a cushioning material or the like in the extra length storage portion 16 so as not to be damaged by vibration or the like during transportation.

【0014】第一と第二のドラム1A、1Bを連結した
後は、B区間用の電線6を製造し、第二のドラム1Bに
巻き取る。その後、巻き終り端をそのドラムの鍔4の内
面に固定して、ドラム巻き終了となる。電線6の巻き終
り端付近にも精密計尺マーク7Cが付けられている。
After connecting the first and second drums 1A and 1B, the electric wire 6 for the section B is manufactured and wound on the second drum 1B. After that, the winding end is fixed to the inner surface of the collar 4 of the drum, and the drum winding is completed. A precision scale mark 7C is also attached near the winding end of the electric wire 6.

【0015】このあと図2の状態のまま梱包し、工事現
場に運搬し、現場では次のような順序で架線工事を行
う。まず梱包を解き、二つのドラム1A、1Bを連結し
ているボルト15を外し、二つのドラム1A、1Bを分
離する。これにより電線1の中間余長部分が出てくるか
ら、中間の精密計尺マーク7Bを基準として補正計尺
し、電線6を切断する。これにより二つのドラム1A、
1Bは完全に分離するので、その後、各ドラム1A、1
Bに巻かれている電線6の両端にそれぞれ引留クランプ
を圧縮固定する。これでプレハブ架線の準備が完了する
から、その後は、第一のドラム1A、第二のドラム1B
の順で架線作業を行う。
After that, it is packed in the state shown in FIG. 2 and transported to the construction site, where the overhead line work is performed in the following order. First, the package is unpacked, the bolt 15 connecting the two drums 1A and 1B is removed, and the two drums 1A and 1B are separated. As a result, the intermediate surplus length portion of the electric wire 1 comes out, so that the electric wire 6 is cut by performing the correction measurement with the intermediate precision measurement mark 7B as a reference. This allows two drums 1A,
1B completely separates, so each drum 1A, 1
Strain clamps are compressed and fixed to both ends of the electric wire 6 wound around B. This completes the preparation of the prefabricated overhead wire, after which the first drum 1A and the second drum 1B
Perform the overhead line work in this order.

【0016】なお上記実施例では、二つのドラムを連結
するのに外筒部の外側から鍔の径方向にボルトをねじ込
む構造としたが、ドラムの連結構造はこれに限られるも
のではなく、例えば図4に示すように鍔3、4の外周付
近に内凹外凸部17を形成し、そこに軸線方向にボルト
15を挿通してナット18で締め付ける構造にすること
もできる。また上記実施例では二つのドラムを連結した
場合を説明したが、三つ以上のドラムを連結することも
可能であり、その場合も上記実施例と同様の手順に従え
ばよい。
In the above-mentioned embodiment, the bolts are screwed in from the outside of the outer cylindrical portion in the radial direction of the flange to connect the two drums, but the connecting structure of the drums is not limited to this. As shown in FIG. 4, an inner concave and outer convex portion 17 may be formed near the outer circumferences of the collars 3 and 4, and a bolt 15 may be inserted through the convex portion 17 in the axial direction and tightened with a nut 18. Further, in the above embodiment, the case where two drums are connected has been described, but it is also possible to connect three or more drums, and in that case, the same procedure as in the above embodiment may be followed.

【0017】[0017]

【発明の効果】以上説明したように本発明によれば、完
全プレハブ架線用の電線を製造する際に、電線を1耐張
区間毎に切り分けずに複数の耐張区間分を1連続で製造
できるので、製造効率が大幅に向上する。また複数のド
ラムを連結した連結ドラムを使用するので、全体がコン
パクトになり、ドラム数が少なくなり、輸送コストも低
減できる。
As described above, according to the present invention, when manufacturing an electric wire for a completely prefabricated overhead wire, a plurality of tensile strength sections are continuously manufactured without dividing the electric wire for each tensile strength section. Therefore, the manufacturing efficiency is significantly improved. In addition, since a connected drum in which a plurality of drums are connected is used, the overall size is reduced, the number of drums is reduced, and the transportation cost can be reduced.

【図面の簡単な説明】[Brief description of drawings]

【図1】 二つの耐張区間を連続する電線の展開説明
図。
FIG. 1 is an explanatory view showing the development of an electric wire that connects two tension sections.

【図2】 本発明の一実施例に係るプレハブ架線用電線
のドラム巻き方法を示す断面図。
FIG. 2 is a sectional view showing a method for winding a prefabricated overhead wire according to an embodiment of the present invention on a drum.

【図3】 図2のドラム巻き方法に使用した連結ドラム
の分解斜視図。
FIG. 3 is an exploded perspective view of a connection drum used in the drum winding method of FIG.

【図4】 本発明に使用する連結ドラムの他の例を示す
断面図。
FIG. 4 is a cross-sectional view showing another example of the connecting drum used in the present invention.

【図5】 従来のプレハブ架線用電線のドラム巻き方法
を示す断面図。
FIG. 5 is a cross-sectional view showing a conventional method for winding a wire for a prefabricated overhead wire on a drum.

【符号の説明】[Explanation of symbols]

1A、1B:ドラム 2:胴 3、4:鍔 6:電線 7A、7B、7C:精密計尺マーク 9:連結ドラム 10、11:切込み 12:内筒部 13:外筒部 14:ボルト穴 15:ボルト 16:余長収納部 1A, 1B: Drum 2: Body 3, 4: Collar 6: Electric wire 7A, 7B, 7C: Precision scale mark 9: Connection drum 10, 11: Notch 12: Inner cylinder part 13: Outer cylinder part 14: Bolt hole 15 : Bolt 16: Extra length storage

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】複数の耐張区間に架線される一連続の電線
の両端付近および中間に引留クランプ取付け位置決定の
基準となる精密計尺マークをつけ、この電線を、複数の
ドラムが分離可能に連結されて連結部に余長収納部が設
けられた連結ドラムに、1つの耐張区間が1つのドラム
に対応するように巻き、かつ中間の精密計尺マーク付近
の電線を前記連結ドラムの余長収納部に余長を持たせて
収納することを特徴とするプレハブ架線用電線のドラム
巻き方法。
1. A plurality of drums can be separated from each other by attaching a precision measuring mark, which serves as a reference for determining the position of a tension clamp, to the vicinity of both ends and the middle of a continuous electric wire that is extended over a plurality of tension sections. Is wound around a connecting drum having an extra length storage portion connected to the connecting drum so that one tension section corresponds to one drum, and an electric wire near an intermediate precision measuring mark is connected to the connecting drum. A method of winding an electric wire for a prefabricated overhead wire, which is characterized in that an extra length is stored in an extra length storage portion.
【請求項2】請求項1記載の方法で電線が巻かれた連結
ドラムを架線工事現場に運搬し、架線工事現場で前記連
結ドラムおよび電線を各耐張区間毎に分離してプレハブ
架線を行うことを特徴とするプレハブ架線工法。
2. A prefabricated overhead wire is carried by transporting a connecting drum wound with an electric wire by the method according to claim 1 to an overhead wire construction site and separating the connecting drum and the electric wire for each tension section at the overhead wire construction site. A prefabricated overhead wire construction method characterized in that
JP33613896A 1996-12-16 1996-12-16 Drum winding method of complete prefabricated wire and electric wire for complete prefabricated wire Expired - Fee Related JP2863146B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP33613896A JP2863146B2 (en) 1996-12-16 1996-12-16 Drum winding method of complete prefabricated wire and electric wire for complete prefabricated wire

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP33613896A JP2863146B2 (en) 1996-12-16 1996-12-16 Drum winding method of complete prefabricated wire and electric wire for complete prefabricated wire

Publications (2)

Publication Number Publication Date
JPH09215141A true JPH09215141A (en) 1997-08-15
JP2863146B2 JP2863146B2 (en) 1999-03-03

Family

ID=18296093

Family Applications (1)

Application Number Title Priority Date Filing Date
JP33613896A Expired - Fee Related JP2863146B2 (en) 1996-12-16 1996-12-16 Drum winding method of complete prefabricated wire and electric wire for complete prefabricated wire

Country Status (1)

Country Link
JP (1) JP2863146B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104064994A (en) * 2014-07-02 2014-09-24 国家电网公司 Pre-twisted wire braider

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104064994A (en) * 2014-07-02 2014-09-24 国家电网公司 Pre-twisted wire braider

Also Published As

Publication number Publication date
JP2863146B2 (en) 1999-03-03

Similar Documents

Publication Publication Date Title
US3855777A (en) Reel of alternately rotated parallel-wire strand and method of making
JPS5824109A (en) Optical fiber
JPH09215141A (en) Method for winding electric wire for prefabricated trolley wire on drum and prefabricated stringing method
JPH0624312U (en) Prefabricated overhead wire for drum winding
JPH08327831A (en) Optical fiber winding bobbin, optical fiber winding method and optical fiber winding package
JP2007308280A (en) Cable drum, cable winding method, and cable laying method
JP3175384B2 (en) Drum winding wire for prefabricated overhead wire
JP3296595B2 (en) Manufacturing method of optical fiber composite overhead ground wire
JP2000214362A (en) Fastening method of optical cable around overhead wire
JPH09328257A (en) Drum for power transmission line
JP2819394B2 (en) Complete prefabricated overhead wire construction method
CN218412998U (en) Manufacturing equipment for cable production line for manufacturing acoustic sensitive optical cable
JP2819385B2 (en) Split wire and prefabricated wire series for complete prefabricated overhead wire method
JPS6059565B2 (en) Optical submarine cable connection structure
JP3130441B2 (en) Compression type clamping clamp
JP3661356B2 (en) Optical composite overhead wire and manufacturing method thereof
JPH0524098Y2 (en)
JPS61184503A (en) Method of stringing light composite overhead earth wire
JP2562532B2 (en) Optical composite overhead wire formation method
JP3274804B2 (en) Wheel passing type anchorage device
JPH0112501Y2 (en)
JPH01107605A (en) Stringing of relaxation restrain type cable
JP3000969B2 (en) Construction method of pipe
JPH08152535A (en) Juncture of optical cable
JPH09208131A (en) Drum for power transmission line

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20071211

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081211

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081211

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091211

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101211

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101211

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111211

Year of fee payment: 13

LAPS Cancellation because of no payment of annual fees