JPH09209569A - Work control system - Google Patents

Work control system

Info

Publication number
JPH09209569A
JPH09209569A JP1767296A JP1767296A JPH09209569A JP H09209569 A JPH09209569 A JP H09209569A JP 1767296 A JP1767296 A JP 1767296A JP 1767296 A JP1767296 A JP 1767296A JP H09209569 A JPH09209569 A JP H09209569A
Authority
JP
Japan
Prior art keywords
work
information
priority
input
adjustment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP1767296A
Other languages
Japanese (ja)
Inventor
Takeshi Tanetani
剛 種谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujitsu Ltd
Original Assignee
Fujitsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujitsu Ltd filed Critical Fujitsu Ltd
Priority to JP1767296A priority Critical patent/JPH09209569A/en
Publication of JPH09209569A publication Critical patent/JPH09209569A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To shorten the control time by storing the master information such as the work places and types and the order of priority in the computer of a management center, and controlling and displaying schedules based on the input information from terminals. SOLUTION: When multiple work is conducted at multiple places for the road work requiring lane control and traffic control, the master information such as work places, types of work, and work conditions is inputted to the server (computer) 1 of a management center, and the order of priority is stored. Input terminals 2 such as keyboards at the work places A, B, C are connected to the server 1 via communication circuits, and exceptional information and emergency information can be inputted. The computer of the server 1 controls schedules based on these information and displays the corrected schedules on output devices such as printers, CRTs, and liquid crystal displays at the work places A, B, C. The schedule control work can be simplified.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】この発明は、作業調整システ
ムに関し、特に、道路設備や鉄道設備などの規制を伴う
複数の作業のスケジュール調整を行う作業調整システム
に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a work adjusting system, and more particularly to a work adjusting system for adjusting a schedule of a plurality of works accompanied by regulation of road facilities, railway facilities and the like.

【0002】[0002]

【従来の技術及び発明が解決しようとする課題】従来、
道路工事や道路・鉄道の補修工事などの作業を行う場
合、安全性確保等のため、車線規制や通行止めが実施さ
れることが多い。また、複数の作業を同一場所で同時に
行った方が都合の良い場合もあるが、作業内容によって
は同一時間帯には行えない作業もある。たとえば、片側
二車線道路の同一場所において、一つの作業が片側の車
線を規制する必要があり、他の作業がもう一方の側の車
線を規制することが必要である場合には、通行が不可能
となるため、同一時間帯には行うことができない。
2. Description of the Related Art
When performing work such as road construction and road / rail repair work, lane restrictions and road closures are often implemented to ensure safety. In some cases, it may be more convenient to perform a plurality of tasks at the same place at the same time, but some tasks cannot be performed in the same time zone. For example, in the same location on a two-lane road on one side, if one work needs to control one lane and another work needs to control the other lane, traffic is impaired. Since it is possible, it cannot be done in the same time zone.

【0003】また、気象条件や特別行事などの例外事象
のため作業ができない場合もあり、ある作業を先に行わ
なければ他の作業ができない場合もある。従来、このよ
うな工事や設備点検などのスケジュール管理は、通常1
ヶ月単位で作業スケジュール表を作成し各作業の希望日
時を表に記入し、競合する作業の有無、作業の優先順
位、例外事象の有無等を比較検討しながら作業の調整を
行っていた。
Further, there are cases where work cannot be performed due to exceptional events such as weather conditions and special events, and there are cases where other work cannot be performed unless a certain work is performed first. Conventionally, schedule management such as construction and equipment inspection is usually done by 1
The work schedule was created on a monthly basis, the desired dates and times for each work were entered in the table, and the work was adjusted while comparing and examining the presence or absence of competing work, the priority of work, and the presence or absence of exceptional events.

【0004】図11に、従来の作業スケジュールの調整
フローの概略図を示す。まず、各業者が1ヶ月間に取扱
う作業を一覧表にして、作業調整を行う管理者に提出す
る(ステップS101)。次に、管理者が日時・場所ご
とに提出された作業を区分けする(ステップS10
2)。
FIG. 11 shows a schematic view of a conventional work schedule adjustment flow. First, a list of operations that each company handles for one month is made into a list and submitted to the manager who adjusts the operations (step S101). Next, the administrator classifies the submitted work according to date and time and place (step S10).
2).

【0005】区分けされた作業について、その作業の重
要度、かかる時間、他作業との同時可能性等の特性を判
断する(ステップS103)。気象条件、重要車両の通
行などの例外事象により作業を中止する必要があるかど
うかを判断する(ステップS104)。上記区分け、判
断の結果より、作業の優先順位付けを行い、再調整の必
要な作業を抽出する(ステップS105)。この再調整
の必要な作業とは、スケジュール管理からはずされた作
業であり、再度スケジュールを決定する必要がある。
With respect to the divided work, the characteristics such as the importance of the work, the time taken, the possibility of simultaneous work with other work, etc. are judged (step S103). It is determined whether or not the work needs to be stopped due to an exceptional event such as weather conditions or traffic of an important vehicle (step S104). Based on the results of the above classification and judgment, the work is prioritized and the work that needs readjustment is extracted (step S105). The work that needs re-adjustment is a work that has been removed from schedule management, and it is necessary to determine the schedule again.

【0006】ステップS106において、再調整の必要
な作業がない場合はスケジュール調整は終了するが、そ
うでない場合は、担当業者に再調整の必要な作業を電話
あるいはFAXで連絡し、再度一覧表の提出を求める
(ステップS107)。従来は、以上のような手順を、
再調整の必要な作業がなくなるまで繰り返し行ってい
た。
In step S106, if there is no work requiring re-adjustment, the schedule adjustment ends, but if not, the person in charge is notified of the work requiring re-adjustment by telephone or FAX, and the list is re-displayed. Request for submission (step S107). Conventionally, the above procedure
It was repeated until there was no work to readjust.

【0007】しかし、工事や点検は異なる種類の多数の
業者によって行われ、前記ステップS101で提出され
る一覧表には、各業者ごとに、自己が担当する作業のみ
が記入され、他の業者の作業状況は全く関知されていな
いのが現状である。ステップS102以降の区分け、判
断等は、熟練した管理担当者が行うが、月単位の実際の
作業は数百に及ぶ場合もあり、この判断等には膨大な時
間がかかっていた。
However, the construction and inspection are carried out by a large number of different types of contractors, and in the list submitted in step S101, only the work for which they are in charge is entered for each contractor, and other contractors are in charge. The current situation is that the working situation is not known at all. Skilled managers perform the classification and judgment after step S102, but the actual work on a monthly basis may amount to several hundreds, and this judgment takes a huge amount of time.

【0008】さらに、一覧表の作成、郵送、電話連絡、
一覧表の再記入などの作業も人手によって行われるた
め、スケジュール調整を完了するためには、通常数日を
要していた。たとえば作業を請け負う業者が10あり、
1ヶ月の間にそれぞれ100の作業がある場合は、業者
が一覧表を提出して管理担当者の手元に収集されるのに
2日、作業の区分けに5日、作業の特性及び例外事象の
判断に3日、作業の優先順位付け及び調整の必要な作業
の抽出と一覧表再提出の連絡に2日、合計12日程度の
日数を必要としていた。
Further, preparation of a list, mailing, telephone contact,
Since work such as re-filling the list is also done manually, it usually took several days to complete the schedule adjustment. For example, there are 10 contractors outsourced work,
If there are 100 jobs each in a month, it takes 2 days for the contractor to submit the list and collect it in the hands of the management person, 5 days for the work classification, and the work characteristics and exceptional events. It took 3 days for the judgment, 2 days for the prioritization of the work, 2 days for the extraction of the work requiring adjustment, and 2 days for the notification of the re-submission of the list, a total of about 12 days.

【0009】特に、作業の区分け及び作業の特性等の判
断には熟練を必要とし、調整する作業が数十にも及ぶ場
合、調整作業は複雑であり、区分け及び判断を行う者の
負担がかなり大きかった。また、作業調整を熟練者が行
ったとしても、確定された作業スケジュールは必ずしも
作業効率の良いスケジュールとは言えない場合もあっ
た。また、これらの数十種類にわたる作業の中には、作
業を行う優先順位が決められるものもあり、また同時に
進行可能な作業も予めわかっている場合が多い。
[0009] In particular, when it is necessary to have skill in judging work classification and work characteristics, and when there are dozens of adjustment works, the adjustment work is complicated and the burden on the person making the classification and judgment is considerable. It was great. In addition, even if a skilled worker performs work adjustment, the confirmed work schedule may not always be a work-efficient schedule. Further, among these dozens of types of work, there are some in which the priority order of work is decided, and in many cases work that can proceed at the same time is known in advance.

【0010】そこで、この発明は以上のような事情を考
慮してなされたものであり、提出された作業依頼の一覧
表から重複作業を回避し、作業調整を行う時間を短縮化
するとともに、効率的な作業スケジュールの作成を可能
とする作業調整システムを提供するものである。
Therefore, the present invention has been made in consideration of the above circumstances, and avoids redundant work from the list of submitted work requests, shortens the time for work adjustment, and improves efficiency. The present invention provides a work adjustment system that enables the creation of an effective work schedule.

【0011】[0011]

【課題を解決するための手段】この発明は、作業情報を
入力する入力手段と、複数の作業の優先順位を記憶した
第1の記憶手段と、同時作業可能性の情報を含む作業条
件を記憶した第2の記憶手段と、前記作業情報から時間
的かつ位置的に重複する複数の作業を抽出する重複作業
抽出手段と、前記作業条件と優先順位に従って、前記重
複作業抽出手段によって抽出された作業の重複を回避す
る重複回避手段とを備え、前記作業条件を参照すること
により同時作業可能性のない作業が重複していると判定
された場合に、前記重複回避手段が優先順位の高い作業
を選択することを特徴とする作業調整システムを提供す
るものである。
According to the present invention, an input means for inputting work information, a first storage means for storing a priority order of a plurality of works, and a work condition including information on the possibility of simultaneous work are stored. Second storage means, duplicated work extraction means for extracting a plurality of temporally and positionally duplicated works from the work information, and work extracted by the duplicated work extraction means according to the work condition and the priority order. And a duplication avoiding means for avoiding duplication, the duplication avoiding means determines the work having a high priority when it is determined that there is a duplication of work that cannot be performed simultaneously by referring to the work conditions. The present invention provides a work adjustment system characterized by selection.

【0012】また、作業の実施に影響を及ぼす例外事象
と例外事象の優先順位を入力する第2の入力手段と、出
力手段とをさらに備え、前記重複作業抽出手段が、前記
作業情報から前記例外事象と時間的かつ位置的に重複す
る作業を抽出し、抽出された作業が前記例外事象よりも
低い優先順位の場合には前記重複回避手段はこの抽出さ
れた作業を確定せず、再入力を促すために前記出力手段
がこの抽出された作業を出力するようにしてもよい。
The present invention further comprises a second input means for inputting an exceptional event affecting the performance of the work and the priority of the exceptional event, and an output means, wherein the duplicate work extracting means uses the exception information from the work information. The work that overlaps with the event temporally and positionally is extracted, and when the extracted work has a lower priority than the exception event, the duplication avoiding means does not confirm the extracted work and re-enters it. The output means may output the extracted work for prompting.

【0013】ここで、作業情報を入力する入力手段、例
外情報を入力する第2の入力手段は、キーボードあるい
はマウスなどのポインティングデバイスを用いることが
できる。第1の記憶手段及び第2の記憶手段は、RAM
等の書き換え可能な記憶素子あるいは媒体を用いること
が好ましい。
A pointing device such as a keyboard or a mouse can be used as the input means for inputting the work information and the second input means for inputting the exception information. The first storage means and the second storage means are RAMs.
It is preferable to use a rewritable storage element or medium such as

【0014】入力手段によって入力される作業情報と
は、調整対象となる作業に関する情報であり、作業名、
作業日時、作業場所などが含まれる。第1の記憶手段に
記憶される優先順位は、通常、数字で表わされる。たと
えば、最も優先順位の高いものについては‘1’という
数字が付与され、以下優先順位が低くなるにつれて大き
な整数が付与される。
The work information input by the input means is information about the work to be adjusted, and the work name,
The work date, work place, etc. are included. The priority order stored in the first storage means is generally represented by a numeral. For example, a number "1" is given to the highest priority, and a larger integer is given as the priority becomes lower.

【0015】第2の記憶手段に記憶される作業条件は、
たとえばある作業について他の作業との同時進行が可能
か否か、ある作業を行う場合に特別の規制を伴うか否
か、ある作業は所定の条件を満たした後にしか実施でき
ないといったその作業固有の特性や実施条件等を意味す
る。上記の優先順位及び作業条件は、実際に調整が行な
われる以前にRAM等に記憶させておくことが好まし
い。
The working conditions stored in the second storage means are:
For example, whether a certain work can be carried out simultaneously with other work, whether a certain work is accompanied by special restrictions, and a certain work can be carried out only after satisfying predetermined conditions. Means characteristics and implementation conditions. It is preferable to store the above-mentioned priority order and working conditions in the RAM or the like before the actual adjustment.

【0016】重複作業抽出手段、重複回避手段は、通常
CPUを中心とし、ROM、RAM、タイマー、I/O
インタフェース等からなるいわゆるマイクロコンピュー
タから構成される。さらに、これらの各手段の機能を実
現するために、作業調整を実行するプログラムがROM
又はRAM上に備えられる。出力手段は、たとえば、プ
リンタなどの印字装置、あるいはCRT、液晶ディスプ
レイなどの表示装置を意味する。
The duplication work extraction means and the duplication avoidance means are usually composed mainly of a CPU, ROM, RAM, timer and I / O.
It is composed of a so-called microcomputer including an interface and the like. Further, in order to realize the function of each of these means, a program for executing work adjustment is stored in the ROM.
Alternatively, it is provided on the RAM. The output means means, for example, a printing device such as a printer or a display device such as a CRT or a liquid crystal display.

【0017】また、作業情報を入力する入力手段を含む
入力装置を、他の手段を含む装置とは別に設けて、遠隔
地に配置する構成を取ることもできる。この場合には、
通信手段を前記入力装置及び他の手段を含む装置の両者
に設けるようにし、この両者を通信回線で接続すればよ
い。ここで、上記の入力装置は、キーボードを備えるこ
とが好ましい。このとき利用する通信回線は専用回線、
ISDN回線あるいはアナログ電話回線等を用いること
ができる。
It is also possible to provide an input device including an input means for inputting work information separately from a device including other means and dispose the input device at a remote place. In this case,
The communication means may be provided in both the input device and the device including other means, and both may be connected by a communication line. Here, it is preferable that the input device includes a keyboard. The communication line used at this time is a dedicated line,
An ISDN line or an analog telephone line can be used.

【0018】[0018]

【発明の実施の形態】以下、図面に示す実施の形態に基
づいてこの発明を詳述する。なお、これによってこの発
明が限定されるものではない。図1は、この発明の作業
調整システムの一実施例における構成図を示す。このシ
ステムは、作業調整が行われる管理センターに置かれる
サーバ1と、作業内容及び日時を入力する複数台の入力
端末2とから構成される。
BEST MODE FOR CARRYING OUT THE INVENTION The present invention will be described in detail below based on the embodiments shown in the drawings. Note that the present invention is not limited to this. FIG. 1 is a block diagram showing an embodiment of the work adjusting system of the present invention. This system is composed of a server 1 placed in a management center where work adjustment is performed, and a plurality of input terminals 2 for inputting work content and date and time.

【0019】ここで、サーバ1は、ワークステーション
又はパソコン等のコンピュータであり、キーボード、デ
ィスプレイ、記憶装置、通信装置などから構成される。
入力端末2も同様にワークステーション等で構成され
る。入力端末2は、作業を実際に行う業者ごとにその業
者の事業所内に配置され、管理センターとは通常離れて
いるため、サーバ1と入力端末2は通信回線で結ばれ
る。この作業調整システムの規模にもよるが、この通信
回線には専用回線、ISDN回線、アナログ電話回線な
どが用いられる。
Here, the server 1 is a computer such as a workstation or a personal computer, and comprises a keyboard, a display, a storage device, a communication device and the like.
The input terminal 2 is also composed of a workstation or the like. The input terminal 2 is arranged in the business office of each trader who actually performs the work and is usually away from the management center, so that the server 1 and the input terminal 2 are connected by a communication line. Depending on the scale of this work adjustment system, a dedicated line, ISDN line, analog telephone line, or the like is used for this communication line.

【0020】各業者はある月に行う作業についての依頼
情報をその前月の所定の日までに各自の入力端末2を用
いて入力する。たとえば、図2に示すような作業依頼情
報が入力される。ここで、入力される主な依頼情報は、
その業者が行う作業内容、作業場所、作業日、開始時
刻、終了時刻などである。通常、各業者は、これらの作
業依頼情報を他の業者の作業内容等を考慮することなく
入力する。また、図2において、道路交通情報板の点検
作業を行う際には、車線規制が必要ということを示して
おり、その作業に必要な特性値(車線規制、優先順位な
ど)も入力される。
Each trader inputs request information about work to be performed in a certain month using his / her own input terminal 2 by a predetermined day of the previous month. For example, work request information as shown in FIG. 2 is input. The main request information entered here is
The work contents, work place, work date, start time, end time, and the like performed by the trader. Usually, each trader inputs these work request information without considering the work contents of other traders. Further, in FIG. 2, it is shown that lane regulation is necessary when performing the inspection work of the road traffic information board, and the characteristic values (lane regulation, priority order, etc.) necessary for the work are also input.

【0021】このような作業依頼情報が入力端末2から
入力されると、入力端末2は業者の識別情報を付加し
て、転送データを作成する。そして転送データは通信回
線を介して入力端末2からサーバ1へ送信され、サーバ
1内の記憶装置内に格納される。サーバ1では、このよ
うな作業依頼情報のほか、作業調整に必要なマスタ情報
が記憶される。マスタ情報としては、「道路の位置情
報」、対象とする「作業の種類」、「作業条件」、作業
の「優先順位」、「例外事象」、「同時作業可能性」な
どがある。
When such work request information is input from the input terminal 2, the input terminal 2 adds the identification information of the trader and creates transfer data. Then, the transfer data is transmitted from the input terminal 2 to the server 1 via the communication line and stored in the storage device in the server 1. In addition to such work request information, the server 1 stores master information necessary for work adjustment. The master information includes “road position information”, “work type” to be targeted, “work condition”, “priority order” of work, “exceptional event”, “possibility of simultaneous work”, and the like.

【0022】ここで、「道路の位置情報」とは、県道、
市道等の区別、道路番号・名称や道路の主要ポイント間
の距離などである。この「道路の位置情報」は、入力さ
れた依頼情報の作業場所が同一場所であるかどうか、又
は複数の作業の場所がどのくらい離れているかなどの判
断を行う際に用いられる。
Here, "road position information" means a prefectural road,
It is the distinction of city roads, road numbers and names, and the distance between major points on the road. The “road position information” is used when determining whether the work places of the input request information are the same place, or how far the places of a plurality of works are.

【0023】「作業の種類」とは、業者の行う工事名を
意味し、たとえば、「若返り工事」、「緊急補修工
事」、「定期補修工事」、「新設工事」、「設備点検」
などがある。 また、前記作業の種類(工事名)には、
それぞれ優先順位と同時作業可能性についての情報が付
与されてサーバ1に記憶されることが好ましい。この工
事名、優先順位、同時作業可能性についての情報をまと
めて記憶したものを「作業マスタ」と呼び、その一実施
例を図3に示す。同じ優先順位の作業が同じ場所で重複
した場合には、管理センターの調整担当者が採用すべき
作業を判断するものとする。
"Type of work" means the name of work carried out by a contractor, for example, "rejuvenation work", "emergency repair work", "regular repair work", "new installation work", "equipment inspection".
and so on. In addition, the type of work (construction name),
It is preferable that the priority and the information about the possibility of simultaneous work are given to each and stored in the server 1. This work name, priority, and information about the possibility of simultaneous work are collectively stored and called a "work master", and one example thereof is shown in FIG. If work of the same priority is duplicated in the same place, the coordinator of the management center shall decide the work to be adopted.

【0024】前記マスタ情報のうち「作業条件」とは、
作業のスケジュール調整を行う上で考慮されるべき条件
を意味する。たとえば「作業Aと作業Bとは同一場所で
同時にはできない」、「作業Aは車線規制を必要とす
る」、「作業Cは天候が雨のときは行えない」、「同一
道路の異なる車線で車線規制を伴う2以上の作業は、前
後2km内では同一時間帯には行えない」、「作業Bと作
業Dを同一場所で行う場合は、必ず作業Dを優先させ
る」、「作業Cは何時以降でなければできない」という
作業条件が、予めサーバ1の中に記憶される。これらの
「作業条件」は、管理センターの管理担当者が経験的に
必要と認めた条件や、あるいは個別作業ごとに満たすべ
き条件であって、作業調整前に管理センターにて入力さ
れる。
The "working condition" of the master information is
It means the conditions to be considered when adjusting the work schedule. For example, "work A and work B cannot be performed at the same place at the same time", "work A requires lane regulation", "work C cannot be performed when the weather is rainy", "in different lanes on the same road" 2 or more work with lane regulation cannot be done within the same time zone within 2km before and after. "," When work B and work D are performed at the same place, work D must be prioritized. " The work condition “cannot be done afterwards” is stored in the server 1 in advance. These “work conditions” are conditions that the manager in charge of the management center has empirically found necessary or conditions to be satisfied for each individual work, and are input at the management center before work adjustment.

【0025】前記マスタ情報のうち「例外事象」とは、
作業そのものではないが、作業の調整に重要な影響を及
ぼす要因であり、作業調整段階で考慮されなければなら
ない事象である。この例外事象の具体例を、図4に示
す。たとえば、VIPなどの重要車両が通行するという
事象が発生した場合には、所定の時間帯は工事が中断さ
れる。また、マラソン、パレードなどの特別行事の開
催、特別な警察要望事項の存在、気象予報の悪化、作業
人員の超過なども例外事象の1つとなりうる。これらの
「例外事象」としては、優先順位のほか、図5に示すよ
うな日時、場所、作業内容が管理センター側で予め入力
され、サーバ1の中に「例外事象マスタ」として記憶さ
れる。
The "exception event" in the master information is
Although it is not the work itself, it is a factor that has an important influence on the work adjustment and is an event that must be taken into consideration at the work adjustment stage. A specific example of this exceptional event is shown in FIG. For example, when an event such as a VIP traffic of an important vehicle occurs, the construction is suspended for a predetermined time period. Also, special events such as marathons and parades, the existence of special police requests, deterioration of weather forecasts, and excess workforce can be one of the exceptions. As these “exception events”, in addition to the priority order, the date and time, the place, and the work content as shown in FIG. 5 are input in advance by the management center side and stored in the server 1 as the “exception event master”.

【0026】同じ優先順位の作業と例外事象とが同一場
所、同一時間帯で重複した場合は、例外事象が優先さ
れ、重複した作業は再調整するべく、一旦スケジュール
からはずされる。また、同じ優先順位の2以上の作業が
同一場所、同一時間帯で重複した場合は、調整担当者に
よって採用された作業以外の作業も、一旦スケジュール
からはずされる。スケジュールからはずされた作業は、
サーバ1内に再調整リストとして記憶され、それぞれ担
当する業者の入力端末2へ再調整作業として通信回線を
介して通知するようにしてもよい。
When the work having the same priority and the exceptional event are duplicated at the same place and at the same time zone, the exceptional event is prioritized and the duplicated work is once removed from the schedule in order to readjust it. Further, when two or more works having the same priority order are duplicated at the same place and at the same time zone, the works other than the work adopted by the coordinator are once removed from the schedule. The work that was missed from the schedule
It may be stored as a readjustment list in the server 1 and notified to the input terminals 2 of the respective companies in charge as readjustment work via a communication line.

【0027】図6に、同時作業が不可能な具体例を示
す。同図の斜線部分は、車線規制区間を含む工事区間を
示している。道路交通情報板と道路照明灯の位置(A地
点、B地点)は、同じ道路上で車線が異なるが、両工事
区間の距離は1km以内と接近している。また、工事の時
間帯も一部重複しているため、同時に行なうとすると、
規制車線が交互となり、通行に危険を伴い、ひどい交通
渋滞を招くおそれがある。
FIG. 6 shows a specific example in which simultaneous work is impossible. The shaded area in the figure indicates the construction section including the lane regulation section. Although the lanes of the road traffic information board and the road illumination lights (points A and B) are different on the same road, the distance between both construction sections is within 1 km. Also, because the construction time zones overlap partially, if you do it at the same time,
Altered lanes may be dangerous and may lead to severe traffic congestion.

【0028】図7に、作業が不可能となる具体例を示
す。この具体例は、国際会議開催という例外事象が発生
した場合を示している。この場合、所定の期間内は国際
会議が開催されて重要車両が所定の場所を通行するた
め、道路交通情報板の点検作業はスケジュールからはず
される。
FIG. 7 shows a concrete example in which the work is impossible. This concrete example shows a case where an exceptional event of holding an international conference occurs. In this case, since an international conference is held within a predetermined period and important vehicles pass through a predetermined place, the inspection work of the road traffic information board is missed from the schedule.

【0029】次に、サーバ1内で行なわれる作業調整の
フローについて説明する。作業調整は、入力された各業
者の依頼情報から重複する作業を抽出し、重複作業の同
時可能性の判断、作業の優先順位の判断、例外事象の有
無の判断という一連の処理を繰り返すことによって行な
われる。この判断処理を行う場合に、前記したサーバ1
内に予め記憶される作業マスタ、例外事象マスタ、及び
作業条件が参照される。このような作業調整処理を行う
ことで、従来、数日を必要としていた区分け、判断処理
が数時間で可能となり、作業調整全体の処理の短時間化
が図れる。
Next, the flow of work adjustment performed in the server 1 will be described. The work adjustment is performed by extracting a duplicate work from the input request information of each supplier and repeating a series of processes of determining the possibility of duplicate work, determining the priority of the work, and determining whether there is an exceptional event. Done. When performing this determination processing, the server 1 described above
The work master, the exception event master, and the work condition stored in advance are referred to. By performing such work adjustment processing, it is possible to perform classification and determination processing in a few hours, which conventionally required several days, and shorten the overall processing of work adjustment.

【0030】図8に、この発明の作業調整のフローチャ
ートを示す。ステップS1において、入力端末2から各
業者が作業内容を入力する。ステップS2において、作
業内容の入力は、その業者のある1ヶ月単位のすべての
作業が終了するまで行う。この時点で、入力された作業
内容のデータは、通信回線を介してすべてサーバ1内の
記憶装置内へ転送される。以上は入力端末2側での処理
である。
FIG. 8 shows a flow chart of the work adjustment of the present invention. In step S1, each trader inputs work contents from the input terminal 2. In step S2, the work contents are input until all the works in one month unit by the trader are completed. At this point, all the input work content data is transferred to the storage device in the server 1 via the communication line. The above is the processing on the input terminal 2 side.

【0031】ステップS3において、作業内容のデータ
が転送された後、サーバ1では、処理すべき日付を
‘1’に設定する。サーバ1に転送されてきた作業内容
のデータの中には、作業場所、作業日、開始時刻及び終
了時刻が含まれる。ステップS4において、同一日付を
持つすべての作業内容のデータを検索することによって
同一場所及び同一時間帯で重複する作業が存在するかど
うか判断する。
In step S3, after the work content data has been transferred, the server 1 sets the date to be processed to "1". The work content data transferred to the server 1 includes a work place, a work day, a start time and an end time. In step S4, it is determined whether or not there is overlapping work at the same place and at the same time zone by searching for data of all work contents having the same date.

【0032】たとえば、図6に示した具体例において
は、2つの作業とも12月05日で同一日付であり、作
業時間帯も一部分重複している。さらに、サーバ1に記
憶された位置情報より、△△線のA地点と△△線のB地
点は工事区間が1km以内となりうる区間であることがわ
かり、2つの作業は同一場所での作業であるとみなすこ
とができる。したがって、この場合、同一場所かつ同一
時間帯での重複作業が存在すると判断される。
For example, in the specific example shown in FIG. 6, the two works have the same date of December 05, and the work time zones partially overlap. Further, from the position information stored in the server 1, it can be seen that the point A on the △△ line and the point B on the △△ line are the sections where the construction section can be within 1 km. Can be considered to be. Therefore, in this case, it is determined that there is duplicate work at the same place and at the same time zone.

【0033】ステップS4において、重複作業が存在し
ない場合は、ステップS13へ進み、日付に1を加算
し、さらに次の日の作業調整へ入るためステップS4へ
戻る。
In step S4, if there is no overlapping work, the process proceeds to step S13, 1 is added to the date, and the process returns to step S4 to enter the work adjustment of the next day.

【0034】ステップS5において、重複作業が存在す
る場合に、その作業が同時に可能かどうかを判断する。
ここでは、前記した作業条件が参照される。たとえば、
図6の具体例の場合は、「同一道路の異なる車線で車線
規制を伴う2以上の作業は、前後2km内では同一時間帯
には行えない」という作業条件を満足する。したがっ
て、図6の具体例では、依頼された2つの作業は同時に
は行えないと判断され、ステップS6へ進む。なお、重
複作業が可能である場合は、ステップS8へ進む。
In step S5, when there is an overlapping work, it is determined whether the works can be performed at the same time.
Here, the work conditions described above are referred to. For example,
In the case of the specific example of FIG. 6, the work condition that “two or more works involving lane regulation in different lanes on the same road cannot be performed within the same time zone within 2 km before and after” is satisfied. Therefore, in the specific example of FIG. 6, it is determined that the two requested works cannot be performed at the same time, and the process proceeds to step S6. If the duplicate work is possible, the process proceeds to step S8.

【0035】ステップS6では、重複した作業のうちど
ちらを優先して行うべきかを判断する。ここでは、前記
した作業マスタに予め記憶されている優先順位の情報が
利用される。たとえば、図6の具体例の場合は重複する
作業は「点検作業」と「補修作業」であるが、図3に示
した作業マスタによると、定期補修工事(補修作業)の
順位が3で、設備点検(点検作業)の順位が5である。
したがって、「補修作業」の方が「点検作業」よりも優
先順位が高いので、「補修作業」が選択される。また、
選択された作業以外の作業はスケジュールからはずさ
れ、ステップS7において、再調整リストにプールされ
る。
In step S6, it is determined which of the duplicated works should be prioritized. Here, the priority information stored in advance in the work master is used. For example, in the specific example of FIG. 6, the overlapping work is “inspection work” and “repair work”, but according to the work master shown in FIG. 3, the order of the regular repair work (repair work) is 3, The order of equipment inspection (inspection work) is 5.
Therefore, since "repair work" has a higher priority than "inspection work", "repair work" is selected. Also,
The work other than the selected work is descheduled and pooled in the readjustment list in step S7.

【0036】図9に、作業調整の具体例を示す。図9
は、同一場所、同一時間帯に2つの作業が競合した場合
の具体例であり、優先順位の高い「定期補修工事」が採
用され、「新設工事」は再調整リストにプールされる。
FIG. 9 shows a concrete example of work adjustment. FIG.
Is a specific example in the case where two works compete at the same place and at the same time zone. “Regular repair work” with high priority is adopted, and “new work” is pooled in the readjustment list.

【0037】次に、ステップS8において、同一場所及
び同一時間帯で例外事象が存在するか否か判断する。こ
こでは、前記した例外事象マスタが参照される。例外事
象マスタに該当する例外事象が存在する場合には、ステ
ップS9において、この例外事象とステップS6で選択
された作業との優先順位が比較判断される。そして優先
順位の高い方が選択されるが、ステップS6で選択され
た作業がはずされた場合にはその作業が再調整リストに
プールされる(ステップS10)。図6の具体例では、
例外事象が存在しないので、ステップS12へ進む。
Next, in step S8, it is determined whether or not an exceptional event exists at the same place and at the same time zone. Here, the exception event master described above is referenced. If there is an exception event corresponding to the exception event master, the priority order of this exception event and the work selected in step S6 is compared and determined in step S9. Then, the higher priority is selected, but when the work selected in step S6 is removed, the work is pooled in the readjustment list (step S10). In the concrete example of FIG.
Since there is no exceptional event, the process proceeds to step S12.

【0038】図10は、同一場所、同一時間帯に、作業
と例外事象が競合した場合の具体例であり、両者は同じ
優先順位を持つので、「重要車通行」という例外事象が
優先され、「若返り工事」は再調整リストにプールされ
る。
FIG. 10 is a concrete example of the case where the work and the exceptional event compete at the same place and at the same time zone. Since both have the same priority, the exceptional event "important vehicle traffic" is prioritized, “Rejuvenation work” will be pooled in the readjustment list.

【0039】ステップS11において、現在注目してい
る日付が月末かどうか判定し、月末である場合にはステ
ップS12へ進み、月末でない場合にはステップS13
へ進む。ステップS12においては、ステップS7及び
ステップS10で再調整リストにプールされた作業をサ
ーバ1の表示画面上に表示し、再入力が必要である旨を
指示する。このとき、再入力可能な時間帯を表示するよ
うにしてもよい。
In step S11, it is determined whether or not the date of interest is the end of the month. If it is the end of the month, the process proceeds to step S12, and if it is not the end of the month, step S13.
Proceed to. In step S12, the work pooled in the readjustment list in step S7 and step S10 is displayed on the display screen of the server 1 to instruct that re-input is necessary. At this time, the re-inputtable time zone may be displayed.

【0040】また、再調整リストにプールされた作業を
行う業者の入力端末2に、再入力が必要である旨及び理
由と、再入力可能な時間帯を転送してもよい。このよう
にすれば、再調整が必要なことを通知するための文書の
郵送、電話、FAXによる指示等の時間及び手間を、大
幅に減少させることができる。さらに、通知をデータ通
信により行うため、より確実に行うことが可能となる。
Further, the fact that the re-input is necessary and the reason and the re-inputtable time zone may be transferred to the input terminal 2 of the trader who performs the work pooled in the readjustment list. By doing so, it is possible to greatly reduce the time and labor required for mailing a document for notifying that readjustment is necessary, telephone call, fax instruction, and the like. Furthermore, since the notification is made by data communication, it is possible to make the notification more reliably.

【0041】図6における具体例では、「道路交通情報
板点検作業」がプールされた作業であるが、サーバの表
示画面に、この点検作業の入力業者名、作業場所、日
時、内容等が表示され、さらに再入力可能な空き時間帯
が表示される。また、この点検作業を行う業者の入力端
末2にも同様の内容が表示される。業者の入力端末で
は、上記のような再入力の通知がされたことを業者の担
当者に知らせるために、アラーム音を鳴動させてもよ
い。
In the specific example shown in FIG. 6, the “road traffic information board inspection work” is a pooled work, but the input supplier name, work place, date and time, contents, etc. of this inspection work are displayed on the display screen of the server. Then, the free time zone that can be re-entered is displayed. Similar contents are also displayed on the input terminal 2 of the trader who performs the inspection work. The input terminal of the trader may sound an alarm sound in order to notify the person in charge of the trader that the re-input notification as described above has been given.

【0042】再入力の通知を受けた業者は、必要に応じ
て自己の内部調整を行って、通知された空き時間帯のう
ち希望する時間帯を入力すればよい。この再度入力され
た希望時間帯はサーバ1に転送され、図8に示された作
業調整フローに従って再度調整が試みられる。以上のよ
うな調整作業を、業者が依頼してきた作業のすべてがス
ケジュールに割当てられるまで行えば、1ヶ月の作業の
スケジュール調整が完了する。
Upon receipt of the re-input notification, the trader may make internal adjustments as necessary and input a desired time slot from the notified free time slots. The re-input desired time zone is transferred to the server 1, and the adjustment is tried again according to the work adjustment flow shown in FIG. If the adjustment work described above is performed until all the work requested by the contractor is assigned to the schedule, the schedule adjustment of the work for one month is completed.

【0043】なお、各業者の入力端末2とサーバ1の間
で送受信される情報は、せいぜい数百バイト程度である
ので、情報転送は数秒間で終了する。また、1台のサー
バ1に対して、入力端末2は複数台接続されることにな
るが、いわゆるワークステーションクラスの処理能力を
持つコンピュータをサーバとして用いれば、図8に示し
たステップS3以下の作業調整の処理は数十分程度で可
能である。
Since the information transmitted and received between the input terminal 2 of each trader and the server 1 is about several hundred bytes at most, the information transfer is completed within several seconds. Further, although a plurality of input terminals 2 are connected to one server 1, if a computer having a so-called workstation class processing capacity is used as a server, steps S3 and below shown in FIG. The work adjustment process can be performed in about tens of minutes.

【0044】したがって、入力端末2側での人手を介す
る作業内容の新規入力及び再調整入力に最も多くの時間
を要すると考えられるが、この人手を介する入力も含む
作業調整全体は、ほぼ1日あれば完了できる。すなわ
ち、依頼作業を入力する前の作業計画段階の各業者の検
討時間は従来とほぼ同様な手順及び時間が必要である
が、全作業の調整を行う段階において、従来作業調整に
10日以上かかっていた時間が、この発明の作業調整シ
ステムを利用することによって1/10以下に減少させ
ることができる。
Therefore, it can be considered that the new input and the re-adjustment input of the work contents on the input terminal 2 side by manpower take the most time, but the whole work adjustment including the manpower input is about one day. If you can complete it. That is, the examination time of each contractor at the work planning stage before inputting the requested work requires substantially the same procedure and time as before, but at the stage of adjusting all work, it takes 10 days or more for the conventional work adjustment. The time spent can be reduced to 1/10 or less by using the work adjusting system of the present invention.

【0045】以上のように、調整対象となる作業の優先
順位付けと同時作業の可否についての条件を予め設定し
ておき、優先順位の高い作業を優先的に選択し、選択さ
れなかった重複作業は再入力を促すようにして重複の回
避をしているため、作業調整にかかる時間を飛躍的に短
縮することができる。また、作業には直接関係はないが
影響を与える例外事象を予め設定しているので、作業調
整精度を向上させ、効率のよい作業スケジュールを作成
することができる。
As described above, the conditions for prioritizing the work to be adjusted and the possibility of simultaneous work are set in advance, the work with the higher priority is selected preferentially, and the duplicate work that is not selected is selected. Avoids duplication by prompting re-entry, so the time required for work adjustment can be dramatically reduced. Further, since an exceptional event that is not directly related to the work but has an influence is set in advance, it is possible to improve the work adjustment accuracy and create an efficient work schedule.

【0046】また、一旦作業調整をした後に、突発的な
例外事象が発生した場合でも、この発明の作業調整シス
テムを利用すれば、柔軟かつ迅速に対応することができ
る。なお、この発明の作業調整システムは、制限のある
多数の作業を行う必要のある設備を監視するシステムで
利用することができ、上記実施の形態で示した道路設備
監視システムのほか、鉄道、空港、エネルギー、又はビ
ル等の設備監視システムで利用可能である。
Further, even when a sudden exceptional event occurs after the work adjustment, the work adjusting system of the present invention can flexibly and swiftly respond. The work adjustment system of the present invention can be used in a system that monitors equipment that needs to perform a large number of restricted works. In addition to the road equipment monitoring system shown in the above-described embodiment, a railway and an airport can be used. It can be used in equipment monitoring systems for energy, energy, and buildings.

【0047】[0047]

【発明の効果】この発明によれば、記憶手段に記憶され
た作業条件と優先順位に従って重複する作業を回避する
ようにしているので、作業調整時間を短縮化することが
できる。さらに、作業の実施に影響を与える例外事象を
入力し、例外事象と重複する作業についても優先順位に
従って重複回避するようにしているので、効率のよい作
業スケジュールを作成することができる。
According to the present invention, the work adjustment time can be shortened because the redundant work is avoided in accordance with the work condition stored in the storage means and the priority order. Further, since an exceptional event that affects the performance of the work is input and the work overlapping with the exceptional event is avoided according to the priority order, an efficient work schedule can be created.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明の作業調整システムの一実施例におけ
る構成図である。
FIG. 1 is a configuration diagram of an embodiment of a work adjustment system according to the present invention.

【図2】この発明で入力される作業依頼情報の具体例を
示す図である。
FIG. 2 is a diagram showing a specific example of work request information input in the present invention.

【図3】この発明の作業マスタの具体例を示す図であ
る。
FIG. 3 is a diagram showing a specific example of a work master of the present invention.

【図4】この発明の例外事象マスタの具体例を示す図で
ある。
FIG. 4 is a diagram showing a specific example of an exception event master of the present invention.

【図5】この発明の例外事象マスタの具体例を示す図で
ある。
FIG. 5 is a diagram showing a specific example of an exception event master of the present invention.

【図6】同時作業不可能な場合の具体例を示す図であ
る。
FIG. 6 is a diagram showing a specific example when simultaneous work is impossible.

【図7】作業不可能な場合の具体例を示す図である。FIG. 7 is a diagram showing a specific example when work is impossible.

【図8】この発明の作業調整のフローチャートである。FIG. 8 is a flowchart of work adjustment according to the present invention.

【図9】この発明の作業調整の具体例を示す図である。FIG. 9 is a diagram showing a specific example of work adjustment according to the present invention.

【図10】この発明の作業調整の具体例を示す図であ
る。
FIG. 10 is a diagram showing a specific example of work adjustment according to the present invention.

【図11】従来の作業調整のフローチャートである。FIG. 11 is a flowchart of a conventional work adjustment.

【符号の説明】[Explanation of symbols]

1 サーバ 2 入力端末 1 server 2 input terminal

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 作業情報を入力する入力手段と、 複数の作業の優先順位を記憶した第1の記憶手段と、 同時作業可能性の情報を含む作業条件を記憶した第2の
記憶手段と、 前記作業情報から時間的かつ位置的に重複する複数の作
業を抽出する重複作業抽出手段と、 前記作業条件と優先順位に従って、前記重複作業抽出手
段によって抽出された作業の重複を回避する重複回避手
段とを備え、 前記作業条件を参照することにより同時作業可能性のな
い作業が重複していると判定された場合に、前記重複回
避手段が優先順位の高い作業を選択することを特徴とす
る作業調整システム。
1. An input means for inputting work information, a first storage means for storing a priority of a plurality of works, and a second storage means for storing a work condition including information on the possibility of simultaneous work. Overlapping work extracting means for extracting a plurality of temporally and positionally overlapping works from the work information, and duplication avoiding means for avoiding duplication of the works extracted by the overlapping work extracting means according to the work condition and the priority order. And a work characterized in that the work avoiding means selects a work having a high priority when it is determined by referring to the work condition that the work having no possibility of simultaneous work is duplicated. Adjustment system.
【請求項2】 作業の実施に影響を及ぼす例外事象と例
外事象の優先順位を入力する第2の入力手段と、出力手
段とをさらに備え、 前記重複作業抽出手段が、前記作業情報から前記例外事
象と時間的かつ位置的に重複する作業を抽出し、 抽出された作業が前記例外事象よりも低い優先順位の場
合には前記重複回避手段はこの抽出された作業を確定せ
ず、 再入力を促すために前記出力手段がこの抽出された作業
を出力することを特徴とする請求項1記載の作業調整シ
ステム。
2. The method further comprises: a second input means for inputting an exceptional event that affects the performance of the work and the priority of the exceptional event; and an output means, wherein the duplicate work extraction means uses the exception from the work information. The work that overlaps with the event temporally and positionally is extracted, and if the extracted work has a lower priority than the exception event, the duplication avoiding means does not confirm the extracted work and re-enters it. 2. The work adjusting system according to claim 1, wherein the output means outputs the extracted work for prompting.
JP1767296A 1996-02-02 1996-02-02 Work control system Pending JPH09209569A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1767296A JPH09209569A (en) 1996-02-02 1996-02-02 Work control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1767296A JPH09209569A (en) 1996-02-02 1996-02-02 Work control system

Publications (1)

Publication Number Publication Date
JPH09209569A true JPH09209569A (en) 1997-08-12

Family

ID=11950357

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1767296A Pending JPH09209569A (en) 1996-02-02 1996-02-02 Work control system

Country Status (1)

Country Link
JP (1) JPH09209569A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003223540A (en) * 2002-01-31 2003-08-08 Denso Corp Method for managing construction work of facility and support system thereof
JP2005122707A (en) * 2003-09-24 2005-05-12 Toshiba Corp Maintenance management method and maintenance management system
JP2008117261A (en) * 2006-11-07 2008-05-22 Chugoku Electric Power Co Inc:The Construction planning system and construction planning method
JP2008542875A (en) * 2005-05-25 2008-11-27 マイクロソフト コーポレーション Method, system, and computer-readable storage medium for synchronizing a modifiable document with multiple clients
JP2011022909A (en) * 2009-07-17 2011-02-03 Mitsubishi Electric Corp Device and method for adjusting competitive work
JP5944582B2 (en) * 2013-12-27 2016-07-05 日本郵船株式会社 Work management system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003223540A (en) * 2002-01-31 2003-08-08 Denso Corp Method for managing construction work of facility and support system thereof
JP2005122707A (en) * 2003-09-24 2005-05-12 Toshiba Corp Maintenance management method and maintenance management system
JP2008542875A (en) * 2005-05-25 2008-11-27 マイクロソフト コーポレーション Method, system, and computer-readable storage medium for synchronizing a modifiable document with multiple clients
JP2008117261A (en) * 2006-11-07 2008-05-22 Chugoku Electric Power Co Inc:The Construction planning system and construction planning method
JP4592673B2 (en) * 2006-11-07 2010-12-01 中国電力株式会社 Construction planning system
JP2011022909A (en) * 2009-07-17 2011-02-03 Mitsubishi Electric Corp Device and method for adjusting competitive work
JP5944582B2 (en) * 2013-12-27 2016-07-05 日本郵船株式会社 Work management system

Similar Documents

Publication Publication Date Title
US6714829B1 (en) Dual path scheduling method
Boyer et al. Vehicle and crew scheduling for flexible bus transportation systems
US20040107111A1 (en) Delivery system and method for vehicles and the like
JPH09209569A (en) Work control system
JP5191284B2 (en) Vehicle operation system
JP2004110496A (en) Serviceman management system
JP2017068750A (en) Vehicle allocation auxiliary system and vehicle allocation auxiliary program
JP2003536186A (en) Traffic information display configuration system and method
WO1994016397A2 (en) Method of enterprise-wide to do list scheduling
JP2013105386A (en) Advertisement information management server, advertisement information management system, and advertisement information management program
Darby-Dowman et al. Integrated decision support systems for urban transport scheduling: Discussion of implementation and experience
CN114548719A (en) Bus shift acquisition method, device, equipment and storage medium
JP2002358343A (en) System, method and program for information delivery, and computer readable recording medium
JP2010218324A (en) Task allocation device, task allocation method and task allocation program
JP2000268091A (en) Device and system for evaluating maintenance system condition
CN108877201B (en) Police force resource optimization method based on traffic command index
JP2006178940A (en) Refuse collection calendar creation device, refuse collection calendar creation software, refuse collection calendar information creation system and information terminal device
CN110472848A (en) Based on maintenance task dispatching method, car owner, service and the car trader end linked in many ways
JPH07296062A (en) Method for supporting decision of staff arrangement
JPH0591665A (en) Work stop schedule supporting system
CN101727341B (en) Method for controlling distribution and deployment of distributed information system software
Daduna A decision support system for vehicle scheduling in public transport
KR20050001557A (en) A Method and Apparatus on Safety Checklist Whick has Time Schedule
JP2002083101A (en) Maintenance patrol work table preparation device
JP4430294B2 (en) Work classification correction system by group according to work progress