JPH09209567A - Slab through pipe execution tool and slab structure - Google Patents

Slab through pipe execution tool and slab structure

Info

Publication number
JPH09209567A
JPH09209567A JP3716096A JP3716096A JPH09209567A JP H09209567 A JPH09209567 A JP H09209567A JP 3716096 A JP3716096 A JP 3716096A JP 3716096 A JP3716096 A JP 3716096A JP H09209567 A JPH09209567 A JP H09209567A
Authority
JP
Japan
Prior art keywords
slab
pipe
closing plate
storage chamber
tubular body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP3716096A
Other languages
Japanese (ja)
Inventor
Takeshi Isa
健 伊佐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Isa Takeshi
Original Assignee
Isa Takeshi
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Isa Takeshi filed Critical Isa Takeshi
Priority to JP3716096A priority Critical patent/JPH09209567A/en
Publication of JPH09209567A publication Critical patent/JPH09209567A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L5/00Devices for use where pipes, cables or protective tubing pass through walls or partitions

Abstract

PROBLEM TO BE SOLVED: To facilitate work by burying a tubular body larger in diameter than a through pipe and having a blocking plate storage chamber at an end section in a slab, and burying the gap with mortar after a pipe is inserted into the tubular body when forming a raw hole on the slab. SOLUTION: A vertical tubular body (through hole execution tool) 1 capable of being used in common for multiple slab through pipes P different in size is formed with a metal sheet, and a blocking plate storage chamber 2 is fitted at its lower end. The tubular body 1 is inserted between arranged bars 5 and fixed to a slab form (a) via a tongue piece 4 by nails or screws. A circular blocking plate 3 having the inner diameter matched with the outer diameter of the slab through pipe P is stored in the blocking plate storage chamber 2 in advance. Slab concrete (d) is placed, the slab form (a) is removed after slab concrete (d) is hardened, and the tubular body 1 is left in slab concrete (d). The slab through pipe P is inserted, mortar is filled into the gap between the slab through pipe P and the tubular body 1 to fix it. The tubular body 1 is not exposed to the outside, and work can be simplified.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】コンクリート造りの建築物を施工
する際に、水回り部においては、上の階の床を構成する
スラブを上下方向に貫通する貫通管を設けることが必要
であるが、本発明は、このスラブ貫通管を施工する際に
用いる施工用具およびこの施工用具を用いて施工したス
ラブの構造に関する。
[Industrial field of application] When constructing a concrete building, it is necessary to provide a through pipe that penetrates the slab that constitutes the floor of the upper floor in the vertical direction in the water supply section. The present invention relates to a construction tool used when constructing the slab through-pipe and a structure of a slab constructed using the construction tool.

【0002】[0002]

【従来の技術】図7は、実公平5−39152号公報に
掲載されている従来のスラブ貫通管施工具であり、まず
(1)のように、スラブ型枠a上に、円筒bを載置し
て、その下端の釘cで型枠aに固定した状態で、スラブ
コンクリートdを打設する。該スラブコンクリートdが
硬化したら、型枠aを取り外し、(2)図のように、貫
通管Pを配管するとともに、貫通管Pの周囲にベニア板
などの塞ぎ板eを前記の釘cで固定し、貫通管Pの周囲
を塞ぐ。
2. Description of the Related Art FIG. 7 shows a conventional slab through-pipe applying tool disclosed in Japanese Utility Model Publication No. 5-39152. First, as shown in (1), a cylinder b is mounted on a slab form a. The slab concrete d is placed in a state where the slab concrete d is placed and fixed to the form a with the nail c at its lower end. When the slab concrete d is hardened, the form a is removed, the through pipe P is piped as shown in (2), and the closing plate e such as a veneer plate is fixed around the through pipe P with the nail c. Then, the circumference of the through pipe P is closed.

【0003】その後、円筒bの内側にモルタルを打設し
て、貫通管Pとスラブdとの間を塞ぎ、上階から下階に
水漏れしたりするのを防止している。
Thereafter, mortar is cast inside the cylinder b to close the space between the through pipe P and the slab d to prevent water leakage from the upper floor to the lower floor.

【0004】[0004]

【発明が解決しようとする課題】しかしながら、ベニア
板で塞ぐためにベニア板を釘づけしたり、施工完了後に
ベニア板を外したりする特別の作業が必要となる。これ
に対し、ベニア板に代えて2分割構造の管周り型枠をバ
ンドで貫通管に固定する、取り外し不要な構造も提案さ
れているが、構造が複雑なうえ、貫通管の種類ごとにサ
イズの異なる管周り型枠を用意しておかなければならな
い、といった問題がある。
However, special work is required such as nailing the veneer plate in order to close it with the veneer plate or removing the veneer plate after the completion of construction. On the other hand, instead of the veneer plate, a structure that does not need to be removed has been proposed, in which the pipe surrounding formwork with a two-part structure is fixed to the through pipe with a band, but the structure is complicated and the size of each type of through pipe is different. There is a problem that it is necessary to prepare different forms around the pipe.

【0005】さらに、スラブの下面から管周り型枠の部
分だけ露出するので、駐車場などのように天井を施工し
ない部分では、見苦しくなること、バンドが腐食して管
周り型枠が落下し、下を通る人や車に当たったりする危
険がある。
Further, since only the pipe forming form part is exposed from the lower surface of the slab, it becomes unsightly in a portion where the ceiling is not constructed, such as a parking lot, the band corrodes and the pipe forming form falls, There is a danger of hitting people or cars passing by.

【0006】本発明の技術的課題は、このような問題に
着目し、スラブから露出することがなく、しかも作業が
容易で、貫通管のサイズに係わりなく共用できるスラブ
貫通管施工具を実現することにある。
The technical problem of the present invention is to pay attention to such a problem, and to realize a slab through pipe applying tool which is not exposed from the slab, is easy to work, and can be commonly used regardless of the size of the through pipe. Especially.

【0007】[0007]

【課題を解決するための手段】本発明の技術的課題は次
のような手段によって解決される。請求項1は、スラブ
貫通管用の貫通孔を形成するために用いるスラブ貫通管
施工具であって、スラブ打設用の型枠aの上に載置され
る鉛直筒状体1から成り、その内径は、貫通管Pの外径
より大きく、該鉛直筒状体1の下端には、該鉛直筒状体
1より大径の閉塞板収納室2を連通させてある。
The technical problem of the present invention is solved by the following means. Claim 1 is a slab penetration pipe processing tool used for forming a through hole for a slab penetration pipe, which comprises a vertical cylindrical body 1 placed on a form frame a for slab casting. The inner diameter is larger than the outer diameter of the through pipe P, and a closing plate storage chamber 2 having a diameter larger than that of the vertical tubular body 1 is communicated with the lower end of the vertical tubular body 1.

【0008】該閉塞板収納室2の底板2cには、前記鉛
直筒状体1の真下に貫通孔2dが開けてあり、該閉塞板
収納室2の中には、貫通管Pの外径に合った内径の環状
閉塞板3を収納してある。そして、この閉塞板収納室2
が、前記型枠a上に載置した状態で固定される。
A through hole 2d is formed in the bottom plate 2c of the closing plate storage chamber 2 just below the vertical cylindrical body 1 and has an outer diameter of the through pipe P in the closing plate storage chamber 2. An annular closing plate 3 having a matched inner diameter is stored. And this closing plate storage chamber 2
Are fixed in a state of being placed on the form a.

【0009】この構造によると、スラブ貫通管施工具は
スラブd中に埋設されるので、スラブdの外に露出する
ことはない。また、貫通管Pを閉塞板3の穴3aに貫通
させた状態で、鉛直筒状体1の中にモルタルを充填する
だけで作業は完了であり、作業性に優れている。
According to this structure, since the slab through-pipe applying tool is embedded in the slab d, it is not exposed to the outside of the slab d. Further, the work is completed only by filling the vertical cylindrical body 1 with mortar in a state where the through pipe P penetrates the hole 3a of the closing plate 3, and the workability is excellent.

【0010】請求項2のスラブ貫通管施工具は、請求項
1記載の閉塞板収納室2の底板2cが着脱構造になって
いる。その結果、底板2cを外して、閉塞板収納室2の
中に閉塞板3を収納してから、底板2cを閉じて固定す
ることにより、閉塞板3のみを貫通管Pの各サイズに合
わせて用意しておけば足り、スラブ貫通管施工具自体
は、各サイズの貫通管に共用できる。
In the slab penetration pipe processing tool according to claim 2, the bottom plate 2c of the closing plate storage chamber 2 according to claim 1 has a detachable structure. As a result, the bottom plate 2c is removed, the closing plate 3 is stored in the closing plate storage chamber 2, and then the bottom plate 2c is closed and fixed, so that only the closing plate 3 is adjusted to each size of the through pipe P. It is sufficient if you prepare it, and the slab through pipe application tool itself can be used for each size of through pipe.

【0011】請求項3は、請求項1または請求項2に記
載の閉塞板収納室2が、その内部空間のすべてにモルタ
ルが行き渡るような高さを有しているスラブ貫通管施工
具である。
A third aspect of the present invention is a tool for applying a slab through pipe, wherein the closing plate storage chamber 2 according to the first or second aspect has a height such that the mortar is spread over the entire internal space thereof. .

【0012】閉塞板収納室2の高さ方向の寸法が小さい
と、モルタルが閉塞板収納室2の全体に行き渡りにく
く、また強度も弱くなるが、高さ方向の寸法を十分にし
ておくと、モルタルが閉塞板収納室2中の全体に円滑に
移動でき、かつ高さ方向の寸法が十分なため、モルタル
厚が大きくて強度が高くなり、スラブdとの結合が強固
となる。
When the size of the closing plate storage chamber 2 in the height direction is small, the mortar is less likely to spread over the entire closing plate storage chamber 2 and the strength is weak, but if the size in the height direction is set sufficiently, Since the mortar can be smoothly moved into the whole of the closing plate storage chamber 2 and the dimension in the height direction is sufficient, the mortar thickness is large and the strength is high, and the connection with the slab d is strong.

【0013】請求項4は、請求項1、請求項2または請
求項3に記載の閉塞板収納室2と前記の鉛直筒状体1と
が分離しており、少なくとも閉塞板収納室2側には、前
記の鉛直筒状体1を載置する際のガイド手段を有してい
るスラブ貫通管施工具である。
According to a fourth aspect of the present invention, the closing plate storage chamber 2 according to claim 1, 2 or 3 is separated from the vertical cylindrical body 1, and at least the closing plate storage chamber 2 side is provided. Is a slab penetration pipe processing tool having guide means for mounting the vertical cylindrical body 1.

【0014】スラブ型枠aの上に配筋した後に、本発明
のスラブ貫通管施工具が設置されるので、配筋5・5間
からスラブ貫通管施工具を通して、型枠aの上に固定す
ることになる。したがって、太い貫通管に備えて大型の
スラブ貫通管施工具を設置するには、配筋5・5間を通
過できない恐れがあるが、本発明のように鉛直筒状体1
と閉塞板収納室2が別体になっていると、別々に通過で
きるので、容易に作業できる。また、ガイド手段を有し
ているので、閉塞板収納室2に鉛直筒状体1を容易にか
つ確実に位置決めして連結することで、スラブ貫通管施
工具として使用可能となる。
Since the slab penetrating pipe working tool of the present invention is installed after the bar is arranged on the slab form a, it is fixed on the form a through the slab penetrating tool from between the bar arrangements 5 and 5. Will be done. Therefore, in order to install a large slab penetration pipe processing tool in preparation for a thick penetration pipe, there is a possibility that it cannot pass between the bar arrangements 5, 5, but as in the present invention, the vertical tubular body 1
If the closing plate storage chamber 2 and the closing plate storage chamber 2 are separate bodies, they can pass through separately, so that work can be easily performed. Further, since the guide means is provided, the vertical tubular body 1 can be easily and surely positioned and connected to the closing plate storage chamber 2 to be used as a slab penetration pipe processing tool.

【0015】請求項5は前記のスラブ貫通管施工具を用
いて施工したスラブの構造であって、建築物のスラブを
貫通する貫通管Pとスラブdとの間に鉛直筒状体1が埋
め込まれており、該鉛直筒状体1は、その内径が、貫通
管Pの外径より大きい。そして、該鉛直筒状体1の下端
には、該鉛直筒状体1より大径の閉塞板収納室2を連通
させてあり、該閉塞板収納室2の底板2cには、前記鉛
直筒状体1の真下に貫通孔2dが開けてある。
A fifth aspect of the present invention is a structure of a slab constructed by using the slab through pipe applying tool, wherein the vertical tubular body 1 is embedded between a slab d and a through pipe P penetrating the slab of a building. The inner diameter of the vertical tubular body 1 is larger than the outer diameter of the through pipe P. A closing plate storage chamber 2 having a diameter larger than that of the vertical cylindrical body 1 is communicated with the lower end of the vertical cylindrical body 1, and the bottom plate 2c of the closing plate storage chamber 2 has the vertical cylindrical shape. A through hole 2d is opened just below the body 1.

【0016】また、該閉塞板収納室2の中には、貫通管
Pの外径に合った内径の環状閉塞板3を収納してあり、
該閉塞板収納室2は前記型枠aに固定されている。さら
に、該鉛直筒状体1、該閉塞板収納室2および環状閉塞
板3の中を貫通管Pが貫通しており、該貫通管Pと鉛直
筒状体1との間および閉塞板収納室2中の空間にモルタ
ルが打設されている。
In addition, an annular closing plate 3 having an inner diameter matching the outer diameter of the through pipe P is housed in the closing plate housing chamber 2,
The closing plate storage chamber 2 is fixed to the frame a. Further, a through pipe P penetrates through the vertical tubular body 1, the closing plate storage chamber 2 and the annular closing plate 3, and the space between the through pipe P and the vertical tubular body 1 and the closing plate storage chamber. Mortar is placed in the space in 2.

【0017】このように、スラブ貫通管施工具は、スラ
ブd中に埋設されるため、スラブ面から外に露出して残
るようなことはなく、腐食して落下したりする危険もな
い。鉛直筒状体1と貫通管Pとの間の空間が、閉塞板収
納室2と連通していて、これらの空間にモルタルが充填
されるので、堅牢な構造となる。
As described above, since the slab penetration pipe processing tool is embedded in the slab d, it does not remain exposed outside from the slab surface, and there is no risk of corrosion and dropping. The space between the vertical cylindrical body 1 and the through pipe P communicates with the closing plate storage chamber 2 and these spaces are filled with mortar, so that a robust structure is obtained.

【0018】[0018]

【発明の実施の形態】次に本発明によるスラブ貫通管施
工具およびスラブ構造が実際上どのように具体化される
かを説明する。図1は本発明によるスラブ貫通管施工具
の一実施形態を示す平面図と部分断面側面図である。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Next, how the slab through pipe tool and slab structure according to the present invention are practically embodied will be described. FIG. 1 is a plan view and a partial cross-sectional side view showing an embodiment of a slab penetration pipe processing tool according to the present invention.

【0019】1は鉛直筒状体であり、その内部1aと閉
塞板収納室2とが連通している。この閉塞板収納室2の
高さhは、鉛直筒状体1の高さHより小さく、例えば1
〜2cm程度である。閉塞板収納室2は、円筒状の筒体
2aと天井部2bと底板2cとによって形成されてお
り、筒体2aの内径は鉛直筒状体1の内径より十分に大
きい。
Reference numeral 1 is a vertical cylindrical body, and the inside 1a thereof communicates with the closing plate storage chamber 2. The height h of the closing plate storage chamber 2 is smaller than the height H of the vertical cylindrical body 1, for example, 1
It is about 2 cm. The closing plate storage chamber 2 is formed by a cylindrical tubular body 2a, a ceiling portion 2b, and a bottom plate 2c, and the inner diameter of the tubular body 2a is sufficiently larger than the inner diameter of the vertical tubular body 1.

【0020】閉塞板収納室2の底板2cには、鉛直筒状
体1の真下に貫通孔2dが開けてある。そして、該閉塞
板収納室2中には、貫通管の外径に合った内径の環状閉
塞板3を収納してある。
In the bottom plate 2c of the closing plate storage chamber 2, a through hole 2d is opened just below the vertical cylindrical body 1. Then, in the closing plate storage chamber 2, an annular closing plate 3 having an inner diameter matching the outer diameter of the through pipe is stored.

【0021】閉塞板収納室2の円筒状の側壁は、二重構
造になっていて、外側の側壁2aは天井板2bと一体で
あるのに対し、内側の側壁2eは底板2cと一体となっ
ている。したがって、鎖線で示すように、底板2cを天
井板2bおよび外側の側壁2aから離脱させ、内部に閉
塞板3を入れてから、再び実線で示すように、外側側壁
2a中に挿入することができる。そして、二重側壁2
a、2eに横からネジをねじ込んで固定する。
The cylindrical side wall of the closing plate accommodating chamber 2 has a double structure, and the outer side wall 2a is integral with the ceiling plate 2b, while the inner side wall 2e is integral with the bottom plate 2c. ing. Therefore, as shown by the chain line, the bottom plate 2c can be detached from the ceiling plate 2b and the outer side wall 2a, and the closing plate 3 can be inserted inside and then inserted into the outer side wall 2a again as shown by the solid line. . And the double side wall 2
Screw a screw into a and 2e from the side to fix it.

【0022】閉塞板収納室2中に入れる閉塞板3は環状
をしていて、中央に貫通孔3aが開いているが、図2に
示すように、貫通孔3aの内径が、スラブ貫通管Pの外
径に合ったサイズの閉塞板3を、閉塞板収納室2中に挿
入しておく。
The closing plate 3 to be put into the closing plate storage chamber 2 has an annular shape, and the through hole 3a is opened in the center. However, as shown in FIG. 2, the inside diameter of the through hole 3a is the slab through pipe P. The closing plate 3 having a size matching the outer diameter of the closing plate is inserted into the closing plate storage chamber 2.

【0023】次にこのスラブ貫通管施工具を用いたスラ
ブの施工方法を図3から図5において説明する。まず、
図3のように、前記のスラブ貫通管施工具をスラブ型枠
aの上に設置するが、このとき、内径が貫通管Pの外径
に合った環状閉塞板3(図2)を閉塞板収納室2の中に
入れておく。そし、貫通管Pの貫通する位置が、鉛直筒
状体1の中央に来るように、位置決めして、閉塞板収納
室2の外壁2aを舌片4を利用して型枠aに固定する。
Next, a method of constructing a slab using this slab penetration pipe processing tool will be described with reference to FIGS. 3 to 5. First,
As shown in FIG. 3, the slab through pipe application tool is installed on the slab form a. At this time, the annular closing plate 3 (FIG. 2) whose inner diameter matches the outer diameter of the through pipe P is closed. Put it in the storage room 2. Then, the penetrating pipe P is positioned such that the penetrating position is at the center of the vertical cylindrical body 1, and the outer wall 2a of the closing plate storage chamber 2 is fixed to the form a using the tongue piece 4.

【0024】すなわち、図1、図2のように、閉塞板収
納室2の外壁2aの外周下部に、例えば120度間隔に
舌片4がついており、この舌片4を型枠aに釘付け又は
ネジ止めすることで固定する。
That is, as shown in FIGS. 1 and 2, tongues 4 are attached to the outer wall 2a of the closing plate housing chamber 2 at intervals of 120 degrees, for example, and the tongues 4 are nailed to the form a or Fix with screws.

【0025】型枠aの上には、縦横にスラブ配筋5を設
けてあるので、これらの配筋5と5との間からスラブ貫
通管施工具を挿入するが、各配筋5・5の間から挿入不
能な大きなスラブ貫通管施工具の場合は、図6のような
分割構造のものを用いる。
Since slab reinforcements 5 are provided vertically and horizontally on the form a, a slab penetration pipe tool is inserted between the reinforcements 5 and 5, but each reinforcement 5/5 In the case of a tool for applying a large slab through pipe that cannot be inserted from between, use a split structure as shown in FIG.

【0026】スラブ貫通管施工具を固定し、かつ鉛直筒
状体1中にコンクリートが入らないように、上端の開口
をガムテープなどで塞いだ状態で、型枠aの上にコンク
リートを打設すると、図4のようになる。すなわち、ス
ラブ貫通管施工具がスラブdの中に埋め込まれた構造と
なる。
When the slab through pipe application tool is fixed and the vertical opening 1 is covered with gum tape or the like so that concrete does not enter the vertical cylindrical body 1, concrete is placed on the form a. , As shown in FIG. That is, the slab through-pipe applying tool is embedded in the slab d.

【0027】本発明のスラブ貫通管施工具は、型枠a上
に固定したとき、スラブコンクリートdの厚さとほぼ同
程度あるいは多少高めの高さとなるように、形成されて
いる。また、前記貫通管Pに横配管を接続する必要があ
る場合は、図1の鉛直筒状体1に鎖線で示したように、
鉛直筒状体1の上端を半円状に切り欠いた形状とし、こ
の部分に横配管用の紙筒などを位置合わせしてから、コ
ンクリートを打設する。
The slab penetration pipe processing tool of the present invention is formed so that when it is fixed on the form a, it has a height approximately the same as or slightly higher than the thickness of the slab concrete d. When it is necessary to connect a horizontal pipe to the through pipe P, as shown by a chain line in the vertical cylindrical body 1 of FIG.
The upper end of the vertical tubular body 1 is cut into a semicircular shape, and a paper tube for horizontal piping is aligned with this portion, and then concrete is poured.

【0028】コンクリートを養生した後、型枠aを外す
と、図5の(1)のようになる。すなわち、閉塞板収納
室2の中に閉塞板3が内蔵されているスラブ貫通管施工
具が、スラブコンクリートd中に埋設固定された状態と
なる。
After curing the concrete and removing the form a, the result is as shown in FIG. That is, the slab through-pipe applying tool having the closing plate 3 built in the closing plate storage chamber 2 is embedded and fixed in the slab concrete d.

【0029】次に、図5(2)のように、スラブ貫通管
施工具の中に貫通管Pを通すが、このとき閉塞板3中央
の貫通孔3a中を貫通管Pが貫通するように位置合わせ
する。貫通管Pが鉛直筒状体1のちょうど真ん中に来る
とは限らないが、両者の中心が一致しない場合でも、閉
塞板3の外径が閉塞板収納室2の内径より小さく、図1
の平面図に破線で示すように、閉塞板収納室2の中で自
由に移動できるので、貫通管Pの位置に応じて閉塞板3
を移動させればよい。
Next, as shown in FIG. 5 (2), the through pipe P is passed through the slab through pipe applying tool so that the through pipe P penetrates through the through hole 3 a at the center of the closing plate 3. Align. Although the penetrating pipe P does not always come to the center of the vertical tubular body 1, the outer diameter of the closing plate 3 is smaller than the inner diameter of the closing plate storage chamber 2 even when the centers of the two do not coincide.
As indicated by the broken line in the plan view of FIG.
Should be moved.

【0030】次いで、貫通管Pとスラブ貫通管施工具と
の間にモルタル6を充填して、硬化させると、作業は完
了する。
Next, the work is completed when the mortar 6 is filled between the through-pipe P and the slab through-pipe application tool and hardened.

【0031】閉塞板収納室2は、その内部空間のすべて
にモルタルが行き渡るような高さをしているので、モル
タルが閉塞板収納室2の内部の全体に円滑に移動でき
る。また、高さ方向の寸法が十分なため、スラブとの結
合強度が確保される。なお、閉塞板収納室2中のモルタ
ル62の厚さ、すなわちカブリ寸法は、1〜2cm程度
で足りる。
Since the closing plate storage chamber 2 has such a height that the mortar spreads over the entire inner space thereof, the mortar can be smoothly moved to the entire inside of the closing plate storage chamber 2. Moreover, since the dimension in the height direction is sufficient, the bonding strength with the slab is secured. The thickness of the mortar 62 in the closing plate storage chamber 2, that is, the fog size is about 1 to 2 cm.

【0032】貫通管Pの外径は種々であるので、各管径
に応じて本発明のスラブ貫通管施工具も大小そろえてお
く。例えば、13、16、20、25mm用の物、3
0、40mm用の物、50mm用の物、65mm用の
物、100mm用の物というように、5種類程度用意し
ておく。
Since the outer diameter of the through pipe P is various, the slab through pipe application tool of the present invention is also prepared in various sizes according to each pipe diameter. For example, for 13, 16, 20, 25 mm, 3
About 5 types are prepared, such as 0, 40 mm, 50 mm, 65 mm, and 100 mm.

【0033】そして、例えば13、16、20、25m
m用の物の場合であれば、閉塞板3のみを、管径が1
3、16、20、25mmの各貫通管Pに応じた4種類
を用意しておき、その他(鉛直筒状体1や閉塞板収納室
2など)は共用とする。4種類の閉塞板の外径は同等で
あり、スラブ貫通管の外径に応じた内径の環状閉塞板を
選んで閉塞板収納室2に入れておくことで、径の異なる
4種類の貫通管に対応できる。
And, for example, 13, 16, 20, 25 m
In the case of a product for m, only the closing plate 3 with a pipe diameter of 1
Four types corresponding to each of the through pipes P of 3, 16, 20, 25 mm are prepared, and the others (vertical cylindrical body 1, closing plate storage chamber 2, etc.) are shared. The outer diameters of the four types of blocking plates are the same, and by selecting an annular blocking plate having an inner diameter corresponding to the outer diameter of the slab penetration pipe and placing it in the blocking plate storage chamber 2, four types of penetration pipes with different diameters are provided. Can handle.

【0034】貫通管の外径が30mm以上になると、別
の、より大径のスラブ貫通管施工具を用いるが、例えば
65mm、100mmというようにさらに太くなると、
スラブ貫通管施工具がスラブ配筋5、5の間を通過でき
なくなる場合もある。このような場合は、図6のように
鉛直筒状体1と閉塞板収納室2とが分離したタイプの物
を用いる。
When the outer diameter of the through pipe is 30 mm or more, another slab through pipe processing tool having a larger diameter is used. When the outer diameter of the through pipe becomes larger, for example, 65 mm or 100 mm,
In some cases, the slab penetration pipe processing tool cannot pass between the slab reinforcements 5 and 5. In such a case, as shown in FIG. 6, the vertical cylindrical body 1 and the closing plate storage chamber 2 are separated from each other.

【0035】図6の分離タイプの場合は、鉛直筒状体1
は、円筒の下端外周にフランジ1bがついた構造になっ
ている。また、閉塞板収納室2の天井部2bの中央に、
上向きの円筒部2fが一体についており、その他は図1
の閉塞板収納室2と同じ構造になっている。この円筒部
2fの外径は、鉛直筒状体1の中に入る大きさになって
いる。
In the case of the separation type of FIG. 6, the vertical cylindrical body 1
Has a structure in which a flange 1b is attached to the outer circumference of the lower end of the cylinder. Further, in the center of the ceiling portion 2b of the closing plate storage chamber 2,
The upward cylindrical portion 2f is integrated, and the other parts are shown in FIG.
It has the same structure as the closing plate storage chamber 2. The outer diameter of the cylindrical portion 2f is sized to fit inside the vertical tubular body 1.

【0036】貫通管が例えば65mm以上の大径の場合
は、分離タイプのスラブ貫通管施工具の閉塞板収納室側
2gのみを、スラブ配筋5、5間から挿入し、型枠aの
上に配置し、舌片4を型枠aに釘やビスで固定する。
When the through pipe has a large diameter of, for example, 65 mm or more, only the closing plate storage chamber side 2 g of the separation type slab through pipe application tool is inserted from between the slab reinforcements 5 and 5 and placed on the form a. Then, the tongue piece 4 is fixed to the form a with nails or screws.

【0037】次に、鉛直筒状体1をスラブ配筋5、5間
から挿入して、閉塞板収納室2の上に被せる。すなわ
ち、閉塞板収納室2の上側の円筒部2fが、鉛直筒状体
1の中に入るように位置合わせして、互いに嵌合させ
る。そして、フランジ1bに開けた穴1cからビス7を
挿入し天井板2bにネジ止めして、固定する。なお、フ
ランジ1bを省き、横からネジを挿入して円筒部2fに
鉛直筒状体下端を固定することもできる。
Next, the vertical cylindrical body 1 is inserted between the slab reinforcements 5 and 5 and covered on the closing plate storage chamber 2. That is, the upper cylindrical portion 2f of the closing plate storage chamber 2 is positioned so as to enter the vertical tubular body 1 and fitted to each other. Then, the screw 7 is inserted through the hole 1c formed in the flange 1b and fixed to the ceiling plate 2b by screwing. It is also possible to omit the flange 1b and insert a screw from the side to fix the lower end of the vertical cylindrical body to the cylindrical portion 2f.

【0038】以上の実施形態において、鉛直筒状体1の
フランジ1bと天井板2bとの固定は、ビス止め以外で
も差し支えない。また、型枠aに固定するための舌片4
は、図示のように天井板2bと一体の外側側壁2a側に
設けてもよいが、内側側壁2eと一体の底板2cに設け
てもよい。なお、スラブ貫通管施工具の各部の材料は、
不燃材である金属を用いる。
In the above embodiment, the flange 1b of the vertical cylindrical body 1 and the ceiling plate 2b may be fixed by means other than screw fixing. Also, a tongue piece 4 for fixing to the form a
May be provided on the side of the outer side wall 2a integrated with the ceiling plate 2b as shown, but may be provided on the bottom plate 2c integrated with the inner side wall 2e. In addition, the material of each part of the slab through pipe application tool,
A metal that is a noncombustible material is used.

【0039】[0039]

【発明の効果】請求項1によると、スラブ型枠aの上に
載置される鉛直筒状体1の下端に、該鉛直筒状体1より
大径の閉塞板収納室2を連通させ、該閉塞板収納室2の
底板2cに貫通孔が開けてあり、該閉塞板収納室2の中
に、貫通管Pの外径に合った内径の環状閉塞板3を収納
し、この閉塞板収納室2が、前記型枠aに載置固定され
る構造になっている。
According to the first aspect of the present invention, the closing plate storage chamber 2 having a diameter larger than that of the vertical cylindrical body 1 is communicated with the lower end of the vertical cylindrical body 1 placed on the slab form a. A through hole is formed in the bottom plate 2c of the closing plate storage chamber 2, and an annular closing plate 3 having an inner diameter that matches the outer diameter of the through pipe P is stored in the closing plate storage chamber 2. The chamber 2 is structured to be placed and fixed on the mold a.

【0040】その結果、スラブ貫通管施工具の全体がス
ラブd中に埋設されるので、スラブの外に露出すること
はなく、腐食して脱落するようなこともない。また、貫
通管Pを閉塞板3の穴に貫通させた状態で、鉛直筒状体
1の中にモルタルを充填するだけですみ、作業が容易に
なる。
As a result, since the entire slab through-pipe applying tool is embedded in the slab d, it is not exposed to the outside of the slab and is not corroded and fallen off. Further, it is only necessary to fill the vertical cylindrical body 1 with mortar in a state where the through pipe P penetrates the hole of the closing plate 3, and the work becomes easy.

【0041】請求項2によると、閉塞板収納室2の底板
2cが着脱構造なため、底板2cを外して、閉塞板収納
室2の中に閉塞板3を収納してから、底板2cを閉じて
固定することにより、閉塞板3のみを貫通管Pの各サイ
ズに合わせて用意しておけば足り、スラブ貫通管施工具
自体は、各サイズの貫通管に共用できるので、廉価とな
る。
According to the second aspect, since the bottom plate 2c of the closing plate storage chamber 2 has a detachable structure, the bottom plate 2c is removed, the closing plate 3 is stored in the closing plate storage chamber 2, and then the bottom plate 2c is closed. It is sufficient to prepare only the closing plate 3 in accordance with each size of the through-pipe P by fixing it by fixing with the slab through-pipe application tool itself, which can be used for each size of the through-pipe.

【0042】請求項3によると、閉塞板収納室2の内部
空間のすべてにモルタルが行き渡るような高さ寸法とな
っているため、モルタルが閉塞板収納室2の全体に円滑
に移動でき、かつ高さ方向の寸法が十分となるため、強
度も大きく、スラブとの結合が堅牢となる。
According to the third aspect, since the height dimension is such that the mortar spreads over the entire internal space of the closing plate storage chamber 2, the mortar can be smoothly moved to the entire closing plate storage chamber 2 and Since the dimension in the height direction is sufficient, the strength is high and the connection with the slab is robust.

【0043】請求項4によると、閉塞板収納室2と鉛直
筒状体1とが分離しており、かつ両者の間にガイド手段
を有しているので、閉塞板収納室2を配筋5の間から挿
入して型枠a上に設置し、次いで鉛直筒状体1を配筋5
の間から挿入でき、大径の貫通管を施工する際でも、配
筋5に妨げられることなしに、設置できる。またガイド
手段を利用して、閉塞板収納室2上に鉛直筒状体1を容
易にかつ確実に位置決めし、連結できる。
According to the fourth aspect, since the closing plate storage chamber 2 and the vertical cylindrical body 1 are separated and the guide means is provided between them, the closing plate storage chamber 2 is arranged with the reinforcing bar 5. The vertical cylindrical body 1 is placed on the form a by inserting the vertical cylindrical body 1
It can be inserted from between and can be installed without being obstructed by the bar arrangement 5 even when constructing a large-diameter through pipe. Further, by using the guide means, the vertical cylindrical body 1 can be easily and reliably positioned and connected on the closing plate storage chamber 2.

【0044】請求項5のスラブ構造によると、スラブ貫
通管施工具の全体がスラブd中に埋設されているため、
スラブ面から外に露出して残るようなことはなく、腐食
して落下したりする危険もない。鉛直筒状体1と貫通管
Pとの間の空間が閉塞板収納室3と連通していて、これ
らの空間にモルタルが充填されるので、堅牢な構造とな
る。
According to the slab structure of the fifth aspect, since the entire slab through-pipe applying tool is embedded in the slab d,
It does not remain exposed outside the slab surface, and there is no risk of corrosion and falling. The space between the vertical cylindrical body 1 and the through pipe P communicates with the closing plate storage chamber 3, and since these spaces are filled with mortar, the structure is robust.

【図面の簡単な説明】[Brief description of drawings]

【図1】 本発明によるスラブ貫通管施工具の一実施形
態を示す平面図と部分断面側面図である。
FIG. 1 is a plan view and a partial cross-sectional side view showing an embodiment of a slab penetration pipe processing tool according to the present invention.

【図2】 図1のスラブ貫通管施工具の使用方法を説明
する平面図と部分断面側面図である。
2A and 2B are a plan view and a partial cross-sectional side view illustrating a method of using the slab penetration pipe processing tool of FIG.

【図3】 図3から図5は図1のスラブ貫通管施工具を
用いたスラブの施工方法を説明する図で、図3はスラブ
型枠上にスラブ貫通管施工具を設置した状態の斜視図で
ある。
3 to 5 are views for explaining a slab construction method using the slab penetration pipe processing tool of FIG. 1, and FIG. 3 is a perspective view of a state in which the slab penetration pipe processing tool is installed on the slab formwork. It is a figure.

【図4】 スラブ型枠上にスラブコンクリートを打設し
た状態の縦断面図である。
FIG. 4 is a vertical sectional view showing a state where slab concrete is cast on a slab formwork.

【図5】 型枠除去後に貫通管を取り付け固定する順序
を説明する縦断面図である。
FIG. 5 is a vertical cross-sectional view for explaining the order of attaching and fixing the through tube after removing the mold.

【図6】 鉛直筒状体と閉塞板収納室との分離タイプの
実施形態を示す平面図と縦断面図である。
6A and 6B are a plan view and a vertical sectional view showing an embodiment of a separation type of a vertical cylindrical body and a closing plate storage chamber.

【図7】 従来のスラブ貫通管施工具を説明する縦断面
図である。
FIG. 7 is a vertical cross-sectional view for explaining a conventional slab penetration pipe processing tool.

【符号の説明】[Explanation of symbols]

a スラブ型枠 d スラブ P スラブ貫通管 1 鉛直筒状体 2 閉塞板収納室 3 閉塞板 4 固定用の舌片 5 スラブ配筋 6、62 モルタル a Slab formwork d Slab P Slab penetrating pipe 1 Vertical cylindrical body 2 Closure plate storage chamber 3 Closure plate 4 Tongue for fixing 5 Slab reinforcement 6, 62 Mortar

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 スラブ貫通管用の貫通孔を形成するため
に用いる道具であって、 スラブ型枠の上に載置される鉛直筒状体から成り、その
内径は、貫通管の外径より大きいこと、 該鉛直筒状体の下端には、該鉛直筒状体より大径の閉塞
板収納室を連通させてあること、 該閉塞板収納室の底板には、前記鉛直筒状体の真下に貫
通孔が開けてあること、 該閉塞板収納室の中には、貫通管の外径に合った内径の
環状閉塞板を収納してあること、 を特徴とするスラブ貫通管施工具。
1. A tool used for forming a through hole for a slab through-pipe, comprising a vertical cylindrical body mounted on a slab formwork, the inner diameter of which is larger than the outer diameter of the through-tube. The lower end of the vertical tubular body is communicated with a closing plate storage chamber having a diameter larger than that of the vertical tubular body. The bottom plate of the closing plate storage chamber is directly below the vertical tubular body. A tool for applying a slab through pipe, wherein a through hole is formed, and an annular closing plate having an inner diameter matching the outer diameter of the through pipe is stored in the closing plate storage chamber.
【請求項2】 前記の閉塞板収納室の底板は、着脱構造
になっており、かつ底板を閉塞板収納室に固定する手段
を有していることを特徴とする請求項1記載のスラブ貫
通管施工具。
2. The slab penetration according to claim 1, wherein the bottom plate of the closing plate storage chamber has a detachable structure, and has means for fixing the bottom plate to the closing plate storage chamber. Pipe tool.
【請求項3】 前記の閉塞板収納室は、その内部空間の
すべてにモルタルが行き渡るような高さを有しているこ
とを特徴とする請求項1または請求項2に記載のスラブ
貫通管施工具。
3. The slab penetrating pipe according to claim 1, wherein the closing plate accommodating chamber has a height such that the mortar is distributed in the entire inner space thereof. tool.
【請求項4】 前記の閉塞板収納室と前記の鉛直筒状体
とが分離しており、少なくとも閉塞板収納室側には、前
記の鉛直筒状体を載置する際のガイド手段を有している
ことを特徴とする請求項1、請求項2または請求項3に
記載のスラブ貫通管施工具。
4. The closing plate storage chamber and the vertical cylindrical body are separated from each other, and a guide means for mounting the vertical cylindrical body is provided at least on the closing plate storage chamber side. The slab penetration pipe processing tool according to claim 1, 2 or 3, characterized in that
【請求項5】 建築物のスラブを貫通する貫通管とスラ
ブとの間に鉛直筒状体が埋め込まれており、 該鉛直筒状体は、その内径が、貫通管の外径より大きい
こと、 該鉛直筒状体の下端には、該鉛直筒状体より大径の閉塞
板収納室を連通させてあること、 該閉塞板収納室の底板には、前記鉛直筒状体の真下に貫
通孔が開けてあること、 該閉塞板収納室の中には、貫通管の外径に合った内径の
環状閉塞板を収納してあること、 該閉塞板収納室が前記型枠に固定されていること、 該鉛直筒状体、該閉塞板収納室および環状閉塞板の中を
貫通管が貫通していること、 該貫通管と鉛直筒状体との間および閉塞板収納室中の空
間にモルタルが打設されていること、 を特徴とするスラブの構造。
5. A vertical tubular body is embedded between a slab and a through pipe penetrating the slab of a building, and the inner diameter of the vertical tubular body is larger than the outer diameter of the through pipe. The lower end of the vertical tubular body is communicated with a closing plate storage chamber having a diameter larger than that of the vertical tubular body. The bottom plate of the closing plate storage chamber has a through hole just below the vertical tubular body. An opening is provided, an annular closing plate having an inner diameter matching the outer diameter of the through pipe is stored in the closing plate storage chamber, and the closing plate storage chamber is fixed to the mold. A through tube penetrating through the vertical tubular body, the closing plate storage chamber and the annular closing plate; and mortar in the space between the through pipe and the vertical tubular body and in the closing plate storage chamber. The slab structure is characterized by being cast.
JP3716096A 1996-01-30 1996-01-30 Slab through pipe execution tool and slab structure Pending JPH09209567A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3716096A JPH09209567A (en) 1996-01-30 1996-01-30 Slab through pipe execution tool and slab structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3716096A JPH09209567A (en) 1996-01-30 1996-01-30 Slab through pipe execution tool and slab structure

Publications (1)

Publication Number Publication Date
JPH09209567A true JPH09209567A (en) 1997-08-12

Family

ID=12489853

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3716096A Pending JPH09209567A (en) 1996-01-30 1996-01-30 Slab through pipe execution tool and slab structure

Country Status (1)

Country Link
JP (1) JPH09209567A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017057564A (en) * 2015-09-14 2017-03-23 本清鋼材株式会社 Circular blockout fixing device and bedrock structure related to the same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017057564A (en) * 2015-09-14 2017-03-23 本清鋼材株式会社 Circular blockout fixing device and bedrock structure related to the same

Similar Documents

Publication Publication Date Title
US5656194A (en) Assembly jig for prefabricated concrete walls
US5377602A (en) Installation of safes
JPH09209567A (en) Slab through pipe execution tool and slab structure
CN217448805U (en) Fire hose assembly prefabricated frame
KR20210001050U (en) Retaining Holder of Supporting Rebar of Electric Wire Guide Duct for Building
JP4421123B2 (en) Construction method of underground outer wall of structure
JP2004003168A (en) Fixing metal fitting of concrete form
JPH0340272B2 (en)
JPH051747Y2 (en)
JPH0539153Y2 (en)
JP4182514B2 (en) Precast concrete wall forming method, wiring box fixing method to precast concrete wall, wiring space forming device, and cover member
JPS6316774Y2 (en)
JPH10121724A (en) Molding tool for slab throgh hole for piping
JP2507228B2 (en) Form for burying anchor bolts
JPH1150466A (en) Forming method of column leg part form and member for sheathing connection of the column leg form
JPS6315390Y2 (en)
JPS5840183Y2 (en) Corner drain mounting fixing device
JP3335336B2 (en) Piping hole forming method and pipe hole forming tool in concrete buildings
JPH06341226A (en) Cone for concrete form and form fastening metal fitting used for this cone
JPH0712421Y2 (en) Pile head metal fittings
JP2552145Y2 (en) Temporary lid device for preventing pipe clogging at roof drain
JPH086859Y2 (en) Concrete block
JP2742965B2 (en) Balcony construction method
JP2002161605A (en) Method for executing floor buried type piping box
JPH0246607Y2 (en)