JPH09158181A - Excavation and sheathing, and sheathing pile - Google Patents
Excavation and sheathing, and sheathing pileInfo
- Publication number
- JPH09158181A JPH09158181A JP34555795A JP34555795A JPH09158181A JP H09158181 A JPH09158181 A JP H09158181A JP 34555795 A JP34555795 A JP 34555795A JP 34555795 A JP34555795 A JP 34555795A JP H09158181 A JPH09158181 A JP H09158181A
- Authority
- JP
- Japan
- Prior art keywords
- pile
- holes
- root cutting
- soil retaining
- sheet pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、道路・排水路の構
築や管の埋設、建物の基礎工事等の際に行う地面の根切
りと土止め工法であって、根切り面とこれを支える土止
め壁を様々な角度に折曲して連続する配置にでき、か
つ、土止め壁を強度の高い構造に構築できる、根切り・
土止め工法およびこれに用いる土止め用パイルに関す
る。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a root cutting and earth retaining method for constructing roads and drainage channels, burying pipes, building foundation work, etc. The earth retaining wall can be bent at various angles to make a continuous arrangement, and the earth retaining wall can be constructed to have a strong structure.
The present invention relates to a soil retaining method and a soil retaining pile used therefor.
【0002】[0002]
【従来の技術】地面を掘下げて、道路や排水路の構築、
大口径管の埋設、または、建物の基礎工事等を行う際
の、地面の掘下げ(根切り)および土止めには、従来か
ら、地面の根切り面位置に鋼矢板を連続して打込んだ後
根切りを行う方法(鋼矢板工法)あるいは、根切り面位
置にアースオーガで所定間隔で穴あけ(予掘り)を行
い、各穴に親杭となるH形鋼を挿入し、さらに根切り底
深さより深く打込んで安定させた後(根入れという)、
根切り面に沿って根切りし、根切りの進行に伴い、露出
する根切り面のH形鋼の間に逐次上から矢板をはめ込む
と共に裏込めを行っていく方法(親杭横矢板工法、図8
参照)が一般的に用いられていた。これら従来の方法の
うち、鋼矢板工法は、鋼矢板で強固な土止め壁を構築で
きるが、大きく重い鋼矢板の根切り面への設置は、全て
ハンマー等の機械による打込みで行うため、作業が大が
かりになってしまい、作業性が悪い上、狭い場所では実
施が難しかった。もう一方の、H形鋼を用いた親杭横矢
板工法では、親杭のみ打込みとして、作業をより細かく
進められ、比較的狭い場所でも行えるが、所定間隔に設
置する親杭としての各H形鋼は、隣り合うH形鋼との間
に矢板をはめ込むために、それぞれのH形鋼の溝部分が
隣り合うものどうしで互いに向き合うようにする必要が
あった。そのため、根切り面を平面的に見て直角などの
所要の角度に折曲させて設けたい場合でも、間に矢板を
入れられるよう溝部分が向き合う範囲でH形鋼を少しず
つ向きを変えながら配置して、根切り面を徐々に曲げた
形にするしかなく(図9参照)、根切り面の平面レイア
ウトの制約が大きかった。一方、各H形鋼の間にはめ込
む矢板は、両側をH形鋼の溝部分に支えられるだけであ
り、土圧を十分に支えるには厚く丈夫なものを用いる必
要があって、コスト的に不利だった。2. Description of the Related Art The ground is dug down to construct roads and drainage channels,
For digging (root cutting) and earth stop when burying large diameter pipes or building foundation work, steel sheet piles have been continuously driven into the ground cutting surface position. Rear root cutting method (steel sheet pile method) or drilling (pre-drilling) at the root cutting surface position with earth auger at predetermined intervals, inserting H-shaped steel to be the main pile into each hole, and further cutting the root After hitting deeper than the depth to stabilize (called rooting),
Root cutting along the root cutting surface, and as the root cutting progresses, a sheet pile is sequentially fitted between the exposed H-shaped steel of the root cutting surface from above and backfilling is performed (parent pile side sheet pile construction method, Figure 8
(See) was commonly used. Among these conventional methods, the steel sheet pile construction method can construct a strong earth retaining wall with steel sheet piles, but installation on the root cutting surface of large and heavy steel sheet piles is performed by hammering etc. Has become a large scale, and the workability is poor, and it is difficult to implement in a narrow space. On the other hand, in the parent pile horizontal sheet pile construction method using H-section steel, only the parent pile can be driven, and the work can be carried out more finely, and it can be performed in a relatively narrow place, but each H-shaped parent pile installed at a predetermined interval In order to fit the sheet pile between the adjacent H-section steels, it was necessary for the groove portions of the respective H-section steels to face each other adjacent to each other. Therefore, even if you want to bend the root cut surface at a required angle such as a right angle when viewed in plan, while gradually changing the direction of the H-section steel so that the groove parts face each other so that a sheet pile can be inserted between them. There was no choice but to arrange them so that the root cutting surface was gradually bent (see FIG. 9), and there was a large restriction on the planar layout of the root cutting surface. On the other hand, the sheet piles fitted between the H-section steels are supported on both sides only by the groove portions of the H-section steels, and it is necessary to use thick and sturdy ones in order to sufficiently support earth pressure. It was a disadvantage.
【0003】[0003]
【発明が解決しようとする課題】本発明が解決しようと
する課題は、上記した問題点を解消し、矢板自体の強度
を下げても土圧に対して十分な強度を確保でき、矢板の
低コスト化がはかれると共に、横部材を挿入する孔の向
きを複数通りに設定可能な土止め用パイルを親杭とし
て、親杭位置で根切り面を折曲させて適切な平面配置に
して施工が行え、またさらに土止め用パイルを螺動させ
て地面に圧入することで、振動・騒音を少なくできると
共に、予掘りや排土処理が不要で手間がかからず高精度
かつ向き調整容易に根入れでき作業性がよい、根切り・
土止め工法およびこれに用いる土止め用パイルを提供す
ることにある。The problem to be solved by the present invention is to solve the above-mentioned problems and to secure a sufficient strength against earth pressure even if the strength of the sheet pile itself is lowered. In addition to cost reduction, the soil retaining pile that can set the direction of the hole for inserting the lateral member in multiple ways is used as the main pile, and the root cutting surface is bent at the main pile position to make an appropriate flat layout. Vibration and noise can be reduced by screwing the soil retaining pile into the ground and pressing it into the ground.In addition, pre-digging and earth removal treatment are not required, and it is highly accurate and the orientation can be adjusted easily. Can be put in and has good workability, root cutting
An object is to provide an earth retaining method and an earth retaining pile used for this method.
【0004】[0004]
【課題を解決するための手段】かかる課題を解決した本
発明の構成は、 1) 長い筒状の杭の側面に所定形状の孔を所定の周位
置に二組上下方向に所定間隔離してそれぞれ複数設けた
構造とした土止め用パイルを、地面の根切りを行う根切
り面位置に沿って所定間隔離して根入れ深さまで打設
し、隣り合う各土止め用パイルどうしで孔が向き合うよ
う合わせた後、設定した根切り面に沿って根切りを行
い、隣り合う各土止め用パイルの互いに向き合う孔を双
方露出させ、露出したこれらの孔に横部材の端を挿入し
て孔間に横部材を渡設すると共に横部材の裏側に矢板を
設置して土止め壁を構築し、根切り面を支持する、根切
り・土止め工法 2) 前記土止め用パイルを、長い円筒状の杭の側面に
所定形状の孔を所定の円周位置に二組上下方向に所定間
隔離してそれぞれ複数設けると共に、同杭の最下部の外
周に地中推進用のらせん刃を設けた構造とし、この土止
め用パイルを地面に対し回転させながら根入れ深さまで
鉛直に押し込み、隣り合う各土止め用パイルどうしで孔
が向き合うよう各土止め用パイルを回転させて合わせ
る、前記1)に記載の根切り・土止め工法 3) 前記矢板を、上下寸法が土止め用パイルの上下方
向の孔の間隔より少し長くかつ左右寸法が各土止め用パ
イル間の距離と等しくした矩形状とし、各土止め用パイ
ルの孔間にそれぞれ渡設した平行な横部材の間に根切り
面正面側から矢板を差し入れて通し、横部材の裏側に設
置する、前記1)または2)に記載の根切り・土止め工
法 4) 前記矢板を、上下寸法が根切り底深さと等しくか
つ左右寸法が各土止め用パイル間の距離と等しくした縦
長の矩形状とし、各土止め用パイルの向き合う孔間に横
部材を渡設した後、地面から矢板を押し込んで横部材の
裏側に設置する、前記1)または2)に記載の根切り・
土止め工法 5) 前記矢板を、左右寸法が各土止め用パイル間の距
離より少し短い矩形状とすると共に、同矢板正面側に土
止め用パイルの上下方向の孔間隔と同じ間隔で横部材を
その両端部が矢板側部からはみ出すようにあらかじめ複
数本平行に取付けて一体化し、矢板に取付けた横部材の
数だけ隣り合う土止め用パイルの向き合う孔が露出した
ら、矢板からはみ出た横部材の端をこれらの孔に挿入し
て孔間に渡設し、かつ、矢板と土止め用パイル間に生じ
た間隙をふさぐ補助矢板を横部材の裏側に挿入して、横
部材と同時に矢板を設置する、前記1)または2)に記
載の根切り・土止め工法 6) 長い筒状の杭の側面に所定形状の孔を所定の周位
置に二組上下方向に所定間隔離してそれぞれ複数設けた
構造とした、土止め用パイル 7) 長い円筒状の杭の側面に所定形状の孔を所定の円
周位置に二組上下方向に所定間隔離してそれぞれ複数設
けると共に、同杭の最下部の外周に地中推進用のらせん
刃を設けた構造とした、前記6)に記載の土止め用パイ
ル 8) 前記孔形状をL字形とし、二組の周位置でそれぞ
れ孔のL字の向きが左右逆となるようにした、前記6)
または7)に記載の土止め用パイルにある。Means for Solving the Problems The constitution of the present invention which has solved the above problems is as follows: 1) Two sets of holes each having a predetermined shape are formed on a side surface of a long cylindrical pile at predetermined peripheral positions and are separated from each other by a predetermined distance in the vertical direction. Plural earth retaining piles with a structure provided are separated by a prescribed distance along the root cutting surface position where the ground is cut, and are driven to the depth of the rooting so that the holes are facing each other. After aligning, perform root cutting along the set root cutting surface, expose both holes facing each other of adjacent soil stopping piles, insert the end of the horizontal member into these exposed holes, and insert between the holes A cross member is installed on the back of the horizontal member to construct a soil stop wall and supports the root cutting surface. 2) The root cutting and earth stopping method is used. Two sets of holes with a specified shape on the side of the pile at a specified circumferential position in the vertical direction In addition to providing a plurality of each with a predetermined interval, and a spiral blade for underground propulsion on the outer periphery of the bottom of the pile, while pushing this soil stop pile against the ground, push it vertically to the insertion depth, The root-cutting and earth-stopping construction method described in 1) above, in which the soil-stopping piles are rotated and aligned so that the holes face each other between the adjacent soil-stopping piles. Make a rectangular shape that is slightly longer than the distance between the holes in the vertical direction and has the right and left dimensions equal to the distance between the soil retaining piles, and cut the roots between the parallel horizontal members installed between the holes of each soil retaining pile. Inserting and inserting a sheet pile from the front side of the surface, and installing it on the back side of the horizontal member. 1) or 2) above-mentioned root cutting and earth retaining method 4) The sheet pile has a vertical dimension equal to the root cutting bottom depth and left and right. The dimensions are different for each soil stopper. 1) or 2 above, which has a vertically long rectangular shape equal to the distance between the piles, and the cross member is installed between the facing holes of the soil retaining piles, and then the sheet pile is pushed from the ground to install it on the back side of the cross member. ) Described in
Earth retaining method 5) The sheet pile is formed into a rectangular shape whose left and right dimensions are slightly shorter than the distance between the soil retaining piles, and a horizontal member is provided on the front side of the sheet pile at the same interval as the vertical hole interval of the soil retaining piles. If a plurality of horizontal members attached to the sheet pile expose the facing holes of the adjacent soil retaining piles, the horizontal members protrude from the sheet pile. Insert the ends of these into these holes and extend them between the holes, and insert an auxiliary sheet pile that closes the gap created between the sheet pile and the soil retaining pile on the back side of the horizontal member, and simultaneously install the sheet pile at the same time as the horizontal member. The root cutting and earth retaining method described in 1) or 2) to be installed. 6) Two sets of holes each having a predetermined shape are provided at a predetermined circumferential position on a side surface of a long tubular pile, and a plurality of sets are provided at predetermined intervals in the vertical direction. Pile for earth retaining structure 7) Long On the side surface of the cylindrical pile, two sets of holes of a predetermined shape were provided at predetermined circumferential positions, separated by a predetermined distance in the vertical direction, and a plurality of holes were provided respectively, and a spiral blade for underground propulsion was provided on the outer periphery of the bottom of the pile. 6) The earth retaining pile according to 6), which has a structure 8) The hole shape is L-shaped, and the L-shapes of the holes are left-right reversed at two circumferential positions.
Or it is in the pile for earth retaining as described in 7).
【0005】[0005]
【作用】本発明の根切り・土止め工法では、まず、地面
の根切り面位置に所定間隔に土止め用パイルを配置し、
これを地面に打設する。土止め用パイルがあらかじめ設
定した根入れ深さまで達した状態で土止め用パイルの各
孔が隣り合う土止め用パイルの対応する各孔とそれぞれ
向き合うようにしておく。土止め用パイルを設置し終え
たら、設定した根切り面に沿って根切りを行っていく。
根切りにより、隣り合う各土止め用パイルのそれぞれ向
き合う孔が共に表面に現れたら、逐次これらの孔と孔の
間に、横部材をそれぞれの孔に端を挿入する形で渡設す
る。各土止め用パイル間のそれぞれの横部材の根切り面
正面から見て裏側には、根切り面の土圧を受ける矢板を
それぞれ設置して、土止め用パイルと横部材、矢板で土
止め壁を構築する。矢板が、土止め用パイル間に渡設さ
れた複数の横部材で支えられけることで、両側のみを支
えられる場合に比べて応力の集中が少なく、強度的に有
利であり、より薄く軽い材質の矢板が使用可能となる。In the root cutting and earth stopping method of the present invention, first, the earth stopping piles are arranged at predetermined intervals at the root cutting surface position of the ground,
Place this on the ground. Each hole of the soil retaining pile faces each corresponding hole of the adjacent soil retaining pile in a state where the soil retaining pile reaches the preset rooting depth. After installing the soil retaining pile, perform root cutting along the set root cutting surface.
When the holes facing each of the adjacent piles for soil stop appear on the surface by the root cutting, the transverse member is successively installed between these holes in such a manner that the end is inserted into each hole. Root cutting surface of each horizontal member between each pile for soil protection A sheet pile that receives the earth pressure of the root cutting surface is installed on the back side when viewed from the front, and the soil retaining pile, horizontal member, and sheet pile are used for soil protection. Build a wall. Since the sheet pile can be supported by a plurality of lateral members that are provided between the soil retaining piles, stress concentration is less compared to the case where it is supported on both sides only, which is advantageous in strength and is a thinner and lighter material. The sheet pile can be used.
【0006】円筒状とした土止め用パイルを用いる方法
では、まず、地面の根切り面位置に所定間隔に土止め用
パイルを配置し、これをらせん刃が下向きに進もうとす
る向きに回転させながら地面に対し鉛直下向きに押し込
む。土止め用パイルはらせん刃に案内されて螺動しなが
ら地中にすみやかに進入して、大きな騒音や振動、そし
て排土が発生しない。土止め用パイルがあらかじめ設定
した根入れ深さまで達したら押し込みを止め、土止め用
パイルの各孔が隣り合う各土止め用パイルの対応する孔
とそれぞれ向き合うよう、すなわち、各孔がそれぞれ根
切り面と平行な向きに開口した形となるように各土止め
用パイルを回転させて合わせる。土止め用パイルは円柱
状で回転させやすく、容易に孔の向きを合わせられ、わ
ざわざ引抜いて合わせなくてもよい。土止め用パイルを
設置し終えたら、設定した根切り面に沿って根切りを行
っていき、前記同様各土止め用パイル間に横部材および
矢板を設置して、土止め壁を構築する。In the method of using the soil retaining pile in the form of a cylinder, first, the soil retaining piles are arranged at predetermined intervals at the root cutting surface position of the ground, and the spiral blades are rotated in a direction in which the spiral blade tends to move downward. While pushing it down, push it vertically downward against the ground. The soil retaining pile is guided by the spiral blade and quickly moves into the ground while screwing, and no large noise, vibration, or soil discharge occurs. When the soil retaining pile reaches the preset rooting depth, stop pushing it so that each hole of the soil retaining pile faces the corresponding hole of each adjacent soil retaining pile, that is, each hole is cut. Rotate each soil retaining pile so that it is open parallel to the surface. The soil retaining pile has a columnar shape and can be easily rotated, and the holes can be easily aligned with each other, so that it is not necessary to pull out the soil for alignment. After the soil retaining piles have been installed, root cutting is performed along the set root cutting surface, and the transverse members and the sheet piles are installed between the soil retaining piles in the same manner as described above to construct the soil retaining wall.
【0007】矢板を平行に隣り合う上下二つの横部材の
間から差し入れて横部材の裏側に設置する方法では、根
切りを進めて、隣り合う各土止め用パイルのそれぞれ向
き合う孔が共に表面に現れたら、逐次これらの孔と孔の
間に、孔と同じ断面形状の横部材を渡設する。根切りと
横部材の渡設をそれぞれ進め、土止め用パイル間のすで
に渡設した横部材の下方に新しく横部材を渡設したら、
上下寸法が土止め用パイルの上下方向の孔の間隔すなわ
ち横部材の間隔より少し長く、左右寸法が各土止め用パ
イル間距離に等しい矩形状の矢板を、この二つの横部材
の裏側と地盤面の間に矢板上部を深く差し込み、矢板下
部が下側の横部材の上方を通過できるようにしてから、
矢板全体を上下の横部材間に押し入れる。その後、矢板
全体を下げ、深く差し込んだ上部を戻すと共に、矢板下
部を下側の横部材の裏側に位置させる。矢板は、上下の
横部材と地盤面間に挟まれる形となり、下方を根切りし
ても脱落することはない。前記同様に根切りと横部材の
渡設、矢板の設置を、あらかじめ設定した根切り底深さ
まで逐次進めていけば、根切り面を支える土止め壁が完
成する。In the method of inserting the sheet pile between two adjacent upper and lower horizontal members in parallel and installing it on the back side of the horizontal member, the root cutting is advanced so that the facing holes of the adjacent soil retaining piles are both on the surface. When it appears, a transverse member having the same sectional shape as the hole is successively provided between these holes. After proceeding with root cutting and laying of the horizontal member respectively, if a new horizontal member is laid under the horizontal member already laid between the soil retaining piles,
A rectangular sheet pile whose vertical dimension is slightly longer than the distance between the holes in the vertical direction of the soil retaining pile, that is, the distance between the lateral members, and whose left and right dimensions are equal to the distance between the soil retaining piles. Insert the upper part of the sheet pile deeply between the faces so that the lower part of the sheet pile can pass above the lower lateral member,
Push the entire sheet pile between the upper and lower horizontal members. After that, the entire sheet pile is lowered, the upper portion inserted deeply is returned, and the lower portion of the sheet pile is positioned on the back side of the lower lateral member. The sheet pile is sandwiched between the upper and lower horizontal members and the ground surface, and does not fall off even if the lower part is root-cut. In the same manner as above, if the root cutting, the cross member installation, and the sheet pile installation are sequentially advanced to the preset root cutting bottom depth, the earth retaining wall that supports the root cutting surface is completed.
【0008】矢板を地面から押し込んで横部材の裏側に
設置する方法では、前記同様根切りと横部材の渡設をそ
れぞれ進め、土止め用パイル間のすでに渡設した横部材
の下方に新しく横部材を渡設したら、上下寸法が根切り
底深さと等しく左右寸法が土止め用パイル間距離に等し
い矢板を、地面から土止め用パイル間に押し込んで、新
しく渡設した横部材の裏側に矢板下部が達するようにす
る。根切りと横部材の渡設、および矢板の押し込みを、
あらかじめ設定した根切り底深さまで逐次進め、最後に
各矢板の裏側に十分裏込めを行えば、根切り面を支える
土止め壁が完成する。In the method of pushing the sheet pile from the ground and installing it on the back side of the lateral member, the root cutting and the lateral member are installed in the same manner as described above, and a new lateral member is provided below the lateral member already installed between the soil retaining piles. After laying the members, push a sheet pile with the vertical dimension equal to the root cutting bottom depth and the horizontal dimension equal to the distance between the soil retaining piles from the ground between the soil retaining piles, and place the sheet piles on the back side of the newly laid lateral member. Make sure the bottom reaches. Root cutting and lateral member installation, and pushing the sheet pile,
By successively advancing to the preset depth of root cutting and finally backfilling the back side of each sheet pile, the earth retaining wall that supports the root cutting surface is completed.
【0009】矢板と横部材を一体化し、横部材の渡設と
同時に矢板を設置する方法では、左右寸法を各土止め用
パイル間距離より少し短い矩形状とした矢板を、その正
面側で土止め用パイルの上下方向の孔間隔と同じ間隔で
横部材を、その両端が矢板側部からはみ出すようにあら
かじめ複数本取付けて一体化した状態で用いる。前記同
様設定した根切り面に沿って根切りを進めていき、隣り
合う土止め用パイルのそれぞれ向き合う孔を、矢板に取
付けた横部材の数だけ露出させたら、矢板の左右いずれ
かの側の各横部材の端を、対応する各孔にそれぞれ深く
差し込み、各横部材の反対側の端がその側の土止め用パ
イルと接触しないようにしてから、矢板全体を土止め用
パイルの間に入れる。その後、矢板全体を深く差し込ん
だ側と反対側に動かし、各横部材の差し込んでいなかっ
た側の端を対応する土止め用パイルの各孔に差し込ん
で、矢板全体を土止め用パイル間に保持させる。矢板と
土止め用パイルとの間に生じた間隙には、この間隙の幅
に対応する補助矢板を、横部材の裏側に間隙をふさぐよ
う設置して、ここからの土圧の逃げを防ぐ。前記と同様
に根切りと矢板および横部材の設置をあらかじめ設定し
た根切り底深さまで逐次進めれば、根切り面を支える土
止め壁が完成する。In the method in which the sheet pile and the horizontal member are integrated and the sheet pile is installed at the same time as the transverse member is laid, a rectangular sheet pile having a lateral dimension slightly shorter than the distance between the soil retaining piles is used. A plurality of horizontal members are attached in advance at the same intervals as the vertical hole intervals of the retaining pile so that both ends thereof protrude from the side portion of the sheet pile and are used in an integrated state. We proceed with root cutting along the root cutting surface set in the same way as above, and when the holes facing each of the adjacent soil stopping piles are exposed by the number of lateral members attached to the sheet pile, either of the left and right sides of the sheet pile will be exposed. Insert the end of each cross member deeply into each corresponding hole so that the opposite end of each cross member does not contact the earth retaining pile on that side, and then place the entire sheet pile between the earth retaining piles. Put in. After that, move the entire sheet pile to the side opposite to the side where it was deeply inserted, insert the end of each side that was not inserted into each hole of the corresponding soil retaining pile, and insert the entire sheet pile between the soil retaining piles. Hold it. In the gap formed between the sheet pile and the soil retaining pile, an auxiliary sheet pile corresponding to the width of the gap is installed on the back side of the lateral member so as to close the gap to prevent escape of earth pressure from here. Similar to the above, if the root cutting and the installation of the sheet pile and the horizontal member are sequentially advanced to the preset root cutting bottom depth, the earth retaining wall that supports the root cutting surface is completed.
【0010】[0010]
【発明の実施の形態】本発明の根切り・土止め工法で使
用する土止め用パイルとしては、円筒状または多角形断
面の筒状とした鋼製杭の他、同様な形状のPC杭、RC
杭でもかまわない。これらの杭本体に孔を設けて使用す
るのが一般的である。土止め用パイルの孔を設ける周位
置は、多角形断面の筒状の場合はいずれか二つの側面
に、円筒状の場合は任意の二つの円周位置に、それぞれ
自由に設定でき、孔の向きをいろいろ変えた土止め用パ
イルを多数用いて、根切り面を土止め用パイルの位置で
様々な角度に折曲させて配置することができる。円筒状
の土止め用パイルには、最下部に鋼製のらせん刃を取付
けて、螺動させて打設できるようにするのが望ましい。BEST MODE FOR CARRYING OUT THE INVENTION As a soil retaining pile used in the root cutting and soil retaining method of the present invention, in addition to a steel pile having a cylindrical shape or a tubular shape having a polygonal cross section, a PC pile having a similar shape, RC
It doesn't matter if it is a pile. It is common to use holes in these pile bodies. The circumferential position where the holes for the soil retaining pile are provided can be freely set on any two side surfaces in the case of a cylinder with a polygonal cross section, and in any two circumferential positions in the case of a cylindrical shape. By using a large number of soil retaining piles having different orientations, the root cutting surface can be bent and arranged at various angles at the position of the soil retaining pile. A steel spiral blade is preferably attached to the bottom of the cylindrical earth retaining pile so that it can be driven by screwing.
【0011】本発明における根切り作業は、根切りを所
定の深さまで行ってから、その深さまで根切り面に対し
横部材・矢板を設置した後、さらに根切りを進めるとい
うように少しずつ段階的に行うのが作業上望ましいが、
根切りを行う地盤が比較的堅固で短期的に崩壊する恐れ
のない場合は、根切り底深さまで一気に根切りし、その
後横部材・矢板を設置していく方法を用いてもかまわな
い。The root cutting work in the present invention is carried out step by step such that the root cutting is carried out to a predetermined depth, the horizontal member and the sheet pile are installed to the root cutting surface to the depth, and then the root cutting is further advanced. Although it is desirable to do it in a working manner,
If the ground to be root-cut is relatively firm and there is no risk of collapse in the short term, a method may be used in which root cutting is performed all at once to the depth of the root cutting and then transverse members and sheet piles are installed.
【0012】本発明の工法で用いる横部材としては、丈
夫な鋼製で曲げに対して強い断面形状の、L形アングル
や山形、H形アングルが望ましいが、パイプや丸棒、角
棒を用いてもかまわない。土止め用パイルの孔も横部材
の断面形状と同じ形とするのが一般的である。横部材の
土止め用パイルの孔への取付けは、そのまま挿入するだ
けでもよいが、土止め用パイルが鋼製の場合は、さらに
溶接を行う方が強度的に望ましい。As the lateral member used in the method of the present invention, an L-shaped angle, a chevron, or an H-shaped angle, which is made of durable steel and has a cross-sectional shape that is strong against bending, is preferable, but a pipe, a round bar, or a square bar is used. It doesn't matter. The holes in the soil retaining pile are also generally of the same shape as the cross-sectional shape of the transverse member. The transverse member may be attached to the hole of the soil retaining pile simply by inserting it as it is, but if the soil retaining pile is made of steel, it is preferable to further weld it in terms of strength.
【0013】本発明の工法で使用する矢板は、木製の丈
夫な板を用いるのが一般的である。上下の大きさは土止
め用パイル間に平行に渡設した横部材の間隔程度や、根
切り底深さと同じにした一枚板など、設置の方法に合わ
せたサイズのものを利用する。横部材をあらかじめ取付
けて一体化させて同時に土止め用パイル間に取付けるよ
うにしてもよい。その場合は矢板と土止め用パイル間に
隙間が生じるので、これをふさぐ補助矢板を設置するの
が望ましい。The sheet pile used in the method of the present invention is generally made of a strong wooden board. For the size of the top and bottom, use the size that suits the installation method, such as the distance between the horizontal members that are laid in parallel between the soil retaining piles and a single plate that has the same depth as the root cutting bottom. The lateral members may be previously attached and integrated so that they are simultaneously attached between the soil retaining piles. In that case, a gap is created between the sheet pile and the soil pile, so it is desirable to install an auxiliary sheet pile to close the gap.
【0014】本発明の工法で地中に設置した土止め用パ
イルは、基礎の構築や管の埋設等の本体工事が終了した
後で根切り部分を埋戻す際、引抜いて撤去するのが一般
的であるが、地面の安定やコストとの関係もあり、その
まま埋めた状態で残してもかまわない。The soil retaining pile installed in the ground according to the method of the present invention is generally pulled out and removed when the root cutting part is backfilled after the main body construction such as foundation building and pipe burying is completed. However, it may be left as it is because it is related to the stability of the ground and cost.
【0015】[0015]
【実施例】本発明の実施例1,2,3を図面に基づいて
説明する。実施例1は、矢板を平行な二つの横部材の間
から差し入れて横部材の裏側に設置する方法の例、実施
例2は矢板を地面から押し込んで横部材の裏側に設置す
る方法の例、実施例3は矢板と横部材を一体化して横部
材の渡設と同時に矢板を設置する方法の例である。図1
は実施例1の根切り・土止め工法を示す説明図、図2は
実施例1で使用する土止め用パイルを示す側面図、図3
は実施例1の矢板の設置方法を示す説明図、図4は実施
例1による土止め壁の配置状態を示す説明図、図5は実
施例2の矢板の設置状態を示す説明図、図6は実施例3
の矢板およびL形アングルの設置状態を示す説明図、図
7は実施例3の矢板およびL形アングルの設置方法を示
す説明図である。DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments 1, 2, and 3 of the present invention will be described with reference to the drawings. Example 1 is an example of a method of inserting a sheet pile between two parallel horizontal members and installing it on the back side of the horizontal member, and Example 2 is an example of a method of pushing the sheet pile from the ground and installing it on the back side of the horizontal member. The third embodiment is an example of a method in which a sheet pile and a horizontal member are integrated and the sheet pile is installed at the same time when the horizontal member is installed. FIG.
3 is an explanatory view showing the root cutting and earth stopping method of Embodiment 1, FIG. 2 is a side view showing the earth stopping pile used in Embodiment 1, FIG.
6 is an explanatory view showing the installation method of the sheet pile of Example 1, FIG. 4 is an explanatory view showing the arrangement state of the soil retaining wall according to Example 1, FIG. 5 is an explanatory view showing the installation state of the sheet pile of Example 2, FIG. Is Example 3
FIG. 7 is an explanatory view showing the installation state of the sheet pile and the L-shaped angle, and FIG. 7 is an explanatory view showing the installation method of the sheet pile and the L-shaped angle of the third embodiment.
【0016】実施例1の根切りおよび土止め工法で使用
する土止め用パイル1は、十分な根入れ長さを確保した
長さ8mの円柱状の鋼製杭の側面の、圧入後の根切りに
より露出する上半分の範囲で、地面7にあたる位置から
90cm間隔に、横部材としてのL形アングル2端部を
差し込めるL形孔1aを、所定の周位置に二組それぞれ
設けている。二組のL形孔1aを設ける周位置は、根切
り面5の折曲に合わせて、土止め用パイル1を挟んで直
接根切り面5を支える矢板3どうしがなす角度を設定
し、それぞれの矢板3を上辺と下辺で各々支えるL形ア
ングル2をこの角度に合わせてそれぞれ差し込めるよう
に配置する。根切り面5が連続した一つの面の場合、L
形孔1aは互いに180°をなす周位置にそれぞれ対向
させて設けて、これらに差し込んだそれぞれのL形アン
グル2が一直線となるようにする。土止め用パイル1の
根入れ部分の最下部には、一周分のらせん刃1bを設
け、土止め用パイル1を回転させながら地面7に押し込
むと、螺動しながら容易に地中深く進入し、騒音や振動
を発生させずに根切り面5の位置に設置できる仕組みと
している。一方、土止め用パイル1の上部には、土止め
用パイル1を地面7へ押し込む圧入装置(図示せず)
や、根切り面5から撤去する際に上から引抜く引抜き装
置(図示せず)等と接続するための作業用穴1cを設け
ている。The soil retaining pile 1 used in the root cutting and soil retaining method of Example 1 is a root after press-fitting on the side surface of a cylindrical steel pile having a length of 8 m and ensuring a sufficient rooting length. Two sets of L-shaped holes 1a, into which the ends of the L-shaped angle 2 as a lateral member can be inserted, are provided at predetermined circumferential positions at 90 cm intervals from the position corresponding to the ground 7 in the upper half range exposed by cutting. The circumferential position where the two sets of L-shaped holes 1a are provided is set in accordance with the bending of the root cutting surface 5 to set the angle between the sheet piles 3 that directly support the root cutting surface 5 with the soil retaining pile 1 interposed therebetween. The L-shaped angles 2 for supporting the sheet pile 3 at the upper side and the lower side are arranged so that they can be inserted according to this angle. If the root cutting surface 5 is one continuous surface, L
The shaped holes 1a are provided so as to face each other at circumferential positions forming an angle of 180 ° so that the respective L-shaped angles 2 inserted therein are aligned. A spiral blade 1b for one round is provided at the bottom of the rooting portion of the soil retaining pile 1. When the soil retaining pile 1 is pushed into the ground 7 while rotating, it easily moves deep into the ground while screwing. The mechanism is such that it can be installed at the position of the root cutting surface 5 without generating noise or vibration. On the other hand, a press-fitting device (not shown) that pushes the soil retaining pile 1 onto the ground 7 is provided above the soil retaining pile 1.
In addition, a working hole 1c is provided for connecting to a pulling device (not shown) that pulls out the root cutting surface 5 from above when removing it from the root cutting surface 5.
【0017】実施例1の根切りおよび土止め工法では、
まず、根切り面5のレイアウトに合わせて、矢板3の向
きを決定するL形孔1aの周位置をそれぞれ変えた土止
め用パイル1を、地面7の根切り面5位置のそれぞれ対
応した箇所に所定間隔に配置し、圧入装置で地面7に対
し鉛直下向きに回転させながら押し込む。土止め用パイ
ル1は下部のらせん刃1bに案内されて螺動しながら騒
音や振動を発生させずに地中へすみやかに進入してい
く。土止め用パイル1があらかじめ設定した根入れ深さ
まで達したら、押し込みを止め、圧入装置で土止め用パ
イル1の各L形孔1aがそれぞれ根切り面5と平行な向
きに開口した形となるよう土止め用パイル1を回転させ
て合わせる。土止め用パイル1は円柱状で回転させやす
く、L形孔1aが正しい位置からずれていても容易に合
わせられ、一度引抜いて合わせ直す必要がない。土止め
用パイル1を設置し終えたら、根切りを少しずつ行って
いく。根切り面5に沿って根切りを進めていき、隣り合
う各土止め用パイル1のそれぞれ相対するL形孔1aが
現れたら、これらのL形孔1a間の距離より少し長い寸
法をもつL形アングル2を、まず一方のL形孔1aに一
端を深く差し込んでから二つのL形孔1aの間に入れ、
差し込んだ分を戻すと同時に他端をもう一方のL形孔1
aに差し込んで、土止め用パイル1間に取付ける(図1
(b)参照)。根切りとL形アングル2取付けをそれぞ
れ進めて、土止め用パイル1間のすでに取付けたL形ア
ングル2の90cm下にさらにまたL形アングル2を取
付けたら、上下がL形アングル2間隔より長く、左右が
土止め用パイル1間距離に等しい矢板3を始めに上側の
L形アングル2とその後ろの地盤8との間に下から深く
差し込んで上下のL形アングル2の間に押し入れ、全体
を下げて差し込んだ分を戻すと同時に下縁を下側のL形
アングル2に載せて、L形アングル2間に取付ける(図
3参照)。根切りとL形アングル2、矢板3の取付け作
業をあらかじめ設定した根切り底6深さまで逐次進めて
いけば、確実に土止めを行いながらの根切りとなり、安
全である。全ての根切り面5において同様に作業を進
め、最終的に根切り底6を構築したら、作業完了とな
る。土止め用パイル1とL形アングル2、矢板3からな
る土止め壁4が根切り面5を堅固に支え、その後の別の
作業に支障を与えない。仮設の土止め壁4とする場合
は、撤去の際、前記と逆の手順で矢板3、L形アングル
2を外し、埋戻し後に土止め用パイル1を引抜き装置で
引抜けばよい。In the root cutting and earth retaining method of Example 1,
First, in accordance with the layout of the root cutting surface 5, the soil retaining pile 1 in which the circumferential position of the L-shaped hole 1a that determines the direction of the sheet pile 3 is changed is set at a position corresponding to each position of the root cutting surface 5 of the ground 7. Are arranged at predetermined intervals and are pushed in while rotating vertically downward with respect to the ground 7 by a press-fitting device. The soil retaining pile 1 is guided by the lower spiral blade 1b to be swung into the soil and quickly enter the ground without generating noise or vibration. When the soil retaining pile 1 reaches a preset rooting depth, the pushing is stopped, and each L-shaped hole 1a of the soil retaining pile 1 is opened by a press-fitting device in a direction parallel to the root cutting surface 5. Rotate the soil retaining pile 1 to match. The soil retaining pile 1 has a cylindrical shape and can be easily rotated, and even if the L-shaped hole 1a is displaced from the correct position, it can be easily aligned, and it is not necessary to pull it out and realign it. After setting up the soil retaining pile 1, start root cutting little by little. When the root cutting is advanced along the root cutting surface 5 and the L-shaped holes 1a facing each other of the adjacent soil retaining piles 1 appear, L having a dimension slightly longer than the distance between these L-shaped holes 1a. First insert the angle 2 into the one L-shaped hole 1a, and then insert it between the two L-shaped holes 1a.
At the same time that the inserted part is returned, the other end is the other L-shaped hole 1
Insert it in a and attach it between the soil retaining piles 1 (Fig. 1
(B)). Root cutting and installation of the L-shaped angle 2 are advanced respectively, and if the L-shaped angle 2 is installed 90 cm below the already installed L-shaped angle 2 between the soil retaining piles 1, the top and bottom are longer than the L-shaped angle 2 interval. , The left and right are equal to the distance between the soil retaining piles 1, the sheet pile 3 is first inserted deeply from below between the upper L-shaped angle 2 and the ground 8 behind it, and pushed between the upper and lower L-shaped angles 2, And lower the inserted part, and at the same time place the lower edge on the lower L-shaped angle 2 and attach it between the L-shaped angles 2 (see FIG. 3). If the root cutting and the installation work of the L-shaped angle 2 and the sheet pile 3 are successively advanced to the depth of the root cutting bottom 6 which is set in advance, the root cutting will be performed while surely stopping the soil, which is safe. The work is completed on all the root cutting surfaces 5 and finally the root cutting bottom 6 is constructed, and the work is completed. A soil retaining wall 4 composed of the soil retaining pile 1, the L-shaped angle 2, and the sheet pile 3 firmly supports the root cutting surface 5 and does not hinder other subsequent work. When the temporary earth retaining wall 4 is to be removed, the sheet pile 3 and the L-shaped angle 2 may be removed in the reverse order of the above, and the earth retaining pile 1 may be pulled out by a pulling device after backfilling.
【0018】実施例2の根切りおよび土止め工法は、実
施例1において、矢板3として、根切り底深さを上下寸
法にもつ一枚板を用いる例である。矢板3の構造やその
取付け作業以外は実施例1と同じである。実施例1と同
様に根切りとL形アングル2取付けをそれぞれ進め、す
でに取付けたL形アングル2の下にさらにL形アングル
2を取付けたら、上下が根切り底深さと同寸法で、左右
が土止め用パイル1間距離に等しい矢板3を土止め用パ
イル1間に地面7から押し込んで、各L形アングル2の
裏側に位置するようにする(図5参照)。根切りとL形
アングル2の取付け、および矢板3の押し込みを、あら
かじめ設定した根切り底6深さまで逐次進め、最後に矢
板3の裏側に十分裏込めを行えば、根切り面5を確実に
支える土止め壁4が完成する。The root-cutting and earth-stopping method of the second embodiment is an example in which the single sheet having the root-cutting bottom depth in the vertical dimension is used as the sheet pile 3 in the first embodiment. The structure of the sheet pile 3 is the same as that of the first embodiment except for its mounting work. Similar to the first embodiment, the root cutting and the L-shaped angle 2 mounting are performed respectively, and when the L-shaped angle 2 is further mounted below the already mounted L-shaped angle 2, the upper and lower sides have the same dimension as the root cutting bottom depth, and the left and right sides are A sheet pile 3 having the same distance between the soil retaining piles 1 is pushed between the soil retaining piles 1 from the ground 7 so as to be located on the back side of each L-shaped angle 2 (see FIG. 5). Root cutting, attachment of L-shaped angle 2 and pushing of the sheet pile 3 are sequentially advanced to the depth of the root cutting bottom 6 that has been set in advance, and if the back side of the sheet pile 3 is fully back-filled at the end, the root cutting surface 5 will be securely The earth retaining wall 4 to support is completed.
【0019】実施例3の根切りおよび土止め工法は、実
施例1において、L形アングル2および矢板3をあらか
じめ一体化させてこれらを同時に取付ける例である。実
施例1同様根切りを進めていき、隣り合う各土止め用パ
イル1のそれぞれ相対するL形孔1a一組と、さらにそ
れらの90cm下にあるL形孔1aのもう一組の、計二
組を露出させたら、上下寸法が土止め用パイル1のL形
孔1a設置間隔二つ分に相当する長さで、左右が土止め
用パイル1間距離より若干狭い矢板3の、上下寸法の上
から1/4,3/4の位置に、それぞれL形アングル2
を矢板3幅と土止め用パイル1間距離との差に等しい長
さだけ矢板3の左右いずれの側においてもはみ出すよう
にして各々取付けた構成としたものを用意し、まず左右
いずれかの側の上下のL形アングル2の端を対応するL
形孔1aにそれぞれ深く差し込んでから、これら全体を
土止め用パイル1間に入れ、差し込んだ分を少し戻すと
同時に上下のL形アングル2の他端を対応するもう一方
の側のL形孔1aに差し込んで、土止め用パイル1間に
取付ける(図7参照)。矢板3と土止め用パイル1との
間に生じた間隙には、この間隙の幅に対応し、上下寸法
が矢板3に等しい補助矢板3aを、根切り面5正面側か
ら差し入れ、上下のL形アングル2の裏側の矢板3上下
辺と揃う位置に設置して、ここからの土圧の逃げを防
ぐ。根切りと、矢板・L形アングルの取付けをあらかじ
め設定した根切り底6深さまで逐次進め、最後に矢板3
の裏側に十分裏込めを行えば、根切り面5を確実に支え
る土止め壁4が完成する。The root cutting and earth stopping method of the third embodiment is an example of the first embodiment in which the L-shaped angle 2 and the sheet pile 3 are previously integrated and attached at the same time. Root cutting is carried out in the same manner as in Example 1, and a pair of L-shaped holes 1a facing each other for each soil retaining pile 1 and another set of L-shaped holes 1a 90 cm below them are provided in total. When the set is exposed, the vertical dimension of the sheet pile 3 has a length corresponding to two L-shaped hole 1a installation intervals of the soil retaining pile 1, and the left and right sides of the sheet pile 3 are slightly narrower than the distance between the soil retaining piles 1. L-shaped angle 2 at 1/4 and 3/4 positions from the top
Prepare a structure in which each of the sheet piles 3 is attached so as to protrude on either the left or right side of the sheet pile 3 by a length equal to the difference between the width of the sheet pile 3 and the distance between the soil piles 1. First, either side The ends of the L-shaped angle 2 above and below the corresponding L
After deeply inserting into the shaped holes 1a, put the whole between the soil retaining piles 1 and return the inserted amount a little, and at the same time, the other ends of the upper and lower L-shaped angles 2 correspond to the L-shaped holes on the other side. 1a and attach it between the soil retaining piles 1 (see FIG. 7). In the gap created between the sheet pile 3 and the soil retaining pile 1, an auxiliary sheet pile 3a corresponding to the width of the gap and having a vertical dimension equal to that of the sheet pile 3 is inserted from the front side of the root cutting surface 5, and the upper and lower L It is installed on the back side of the angle 2 to be aligned with the upper and lower sides of the sheet pile 3 to prevent escape of earth pressure from here. Root cutting and mounting of sheet piles and L-shaped angles are sequentially advanced to a preset depth of root cutting bottom 6 and finally sheet pile 3
By backfilling the backside sufficiently, the earth retaining wall 4 that securely supports the root cutting surface 5 is completed.
【0020】[0020]
【発明の効果】本発明は、上記した方法を採用すること
により、矢板を支える親杭である土止め用パイルの孔の
周位置の設定で矢板の取付け向きを変えられ、根切り面
の平面配置形状の設計の自由度が高く、様々な工事状況
に対応できる。また、横部材で矢板を支えることで根切
り面の支圧力が増し、矢板自体の強度を下げても対応で
き、多数使用する矢板の低コスト化がはかれ経済的であ
る。According to the present invention, by adopting the above-mentioned method, the mounting direction of the sheet pile can be changed by setting the circumferential position of the hole of the soil retaining pile, which is the parent pile supporting the sheet pile, and the flat surface of the root cutting surface. It has a high degree of freedom in designing the layout shape and can handle various construction situations. Further, since the lateral members support the sheet piles, the bearing pressure of the root cutting surface increases, and the strength of the sheet piles itself can be reduced, which is economical because the cost of the sheet piles to be used is reduced.
【0021】円筒状とし、らせん刃を取付けた構造の土
止め用パイルを用いる方法を採用すると、土止め用パイ
ルを螺動を利用して少ない振動・騒音で根入れまで一動
作で行え、位置や姿勢の精度を確保しやすい上、作業環
境を選ばない。そして、予掘りや排土処理の手間を省い
て作業能率が高く、根入れの際の向き調整も容易に行
え、作業性に優れる。When the method of using the soil retaining pile having a cylindrical shape and a spiral blade attached is employed, the soil retaining pile can be rooted in a single operation with little vibration and noise by using screwing. It is easy to secure the accuracy of posture and posture, and the work environment can be selected. Further, the work efficiency is high by omitting the labor of pre-digging and earth removal treatment, and the orientation can be easily adjusted at the time of rooting, resulting in excellent workability.
【図1】実施例1の根切り・土止め工法を示す説明図で
ある。FIG. 1 is an explanatory view showing a root cutting and earth retaining method of a first embodiment.
【図2】実施例1で使用する土止め用パイルを示す側面
図である。FIG. 2 is a side view showing a soil retaining pile used in the first embodiment.
【図3】実施例1の矢板の設置方法を示す説明図であ
る。FIG. 3 is an explanatory diagram showing a method of installing the sheet pile according to the first embodiment.
【図4】実施例1による土止め壁の配置状態を示す説明
図である。FIG. 4 is an explanatory diagram showing an arrangement state of the earth retaining wall according to the first embodiment.
【図5】実施例2の矢板の設置状態を示す説明図であ
る。FIG. 5 is an explanatory diagram showing an installed state of the sheet pile according to the second embodiment.
【図6】実施例3の矢板およびL形アングルの設置状態
を示す説明図である。FIG. 6 is an explanatory diagram showing a state of installation of a sheet pile and an L-shaped angle according to a third embodiment.
【図7】実施例3の矢板およびL形アングルの設置方法
を示す説明図である。FIG. 7 is an explanatory diagram showing a method of installing the sheet pile and the L-shaped angle of the third embodiment.
【図8】従来の根切り・土止め工法を示す説明図であ
る。FIG. 8 is an explanatory view showing a conventional root cutting and earth stopping method.
【図9】従来の土止め壁の配置状態を示す説明図であ
る。FIG. 9 is an explanatory view showing an arrangement state of a conventional earth retaining wall.
1 土止め用パイル 1a L形孔 1b らせん刃 1c 作業用穴 2 L形アングル 3 矢板 3a 補助矢板 4 土止め壁 5 根切り面 6 根切り底 7 地面 8 地盤 9 ドリル 10 H形鋼 11 穴 1 Earth retaining pile 1a L-shaped hole 1b Helical blade 1c Working hole 2 L-shaped angle 3 Sheet pile 3a Auxiliary sheet pile 4 Earth stop wall 5 Root cutting surface 6 Root cutting bottom 7 Ground 8 Ground 9 Drill 10 H-shaped steel 11 hole
Claims (8)
定の周位置に二組上下方向に所定間隔離してそれぞれ複
数設けた構造とした土止め用パイルを、地面の根切りを
行う根切り面位置に沿って所定間隔離して根入れ深さま
で打設し、隣り合う各土止め用パイルどうしで孔が向き
合うよう合わせた後、設定した根切り面に沿って根切り
を行い、隣り合う各土止め用パイルの互いに向き合う孔
を双方露出させ、露出したこれらの孔に横部材の端を挿
入して孔間に横部材を渡設すると共に横部材の裏側に矢
板を設置して土止め壁を構築し、根切り面を支持する、
根切り・土止め工法。1. A soil retaining pile having a structure in which two sets of holes each having a predetermined shape are provided at a predetermined circumferential position on a side surface of a long cylindrical pile and are separated from each other by a predetermined distance in the vertical direction, and the ground is cut off. After placing for a predetermined interval along the root cutting surface position and placing it up to the rooting depth, after aligning the holes so that the adjacent soil retaining piles face each other, perform root cutting along the set root cutting surface, Both of the holes facing each other of the adjacent soil retaining piles are exposed, the ends of the lateral members are inserted into these exposed holes, the lateral members are provided between the holes, and the sheet pile is installed on the back side of the lateral members. Build earth retaining wall and support root cutting surface,
Root cutting and earth stop method.
の側面に所定形状の孔を所定の円周位置に二組上下方向
に所定間隔離してそれぞれ複数設けると共に、同杭の最
下部の外周に地中推進用のらせん刃を設けた構造とし、
この土止め用パイルを地面に対し回転させながら根入れ
深さまで鉛直に押し込み、隣り合う各土止め用パイルど
うしで孔が向き合うよう各土止め用パイルを回転させて
合わせる、請求項1に記載の根切り・土止め工法。2. The earth retaining pile is provided with two sets of holes of a predetermined shape on a side surface of a long cylindrical pile at predetermined circumferential positions and is separated from each other by a predetermined distance in the vertical direction, and at the bottom of the pile. It has a structure with a spiral blade for underground propulsion on the outer periphery of
The earth retaining pile is pushed vertically to the rooting depth while rotating with respect to the ground, and the soil retaining piles are rotated and aligned so that the holes face each other adjacent to each other. Root cutting and earth stop method.
の上下方向の孔の間隔より少し長くかつ左右寸法が各土
止め用パイル間の距離と等しくした矩形状とし、各土止
め用パイルの孔間にそれぞれ渡設した平行な横部材の間
に根切り面正面側から矢板を差し入れて通し、横部材の
裏側に設置する、請求項1または2に記載の根切り・土
止め工法。3. The sheet pile is a rectangular shape whose vertical dimension is slightly longer than the distance between the holes in the vertical direction of the soil retaining pile and whose horizontal dimension is equal to the distance between the soil retaining piles. The root cutting and earth stopping method according to claim 1 or 2, wherein a sheet pile is inserted from the front side of the root cutting surface between the parallel horizontal members provided between the holes, and is installed on the back side of the horizontal member.
等しくかつ左右寸法が各土止め用パイル間の距離と等し
くした縦長の矩形状とし、各土止め用パイルの向き合う
孔間に横部材を渡設した後、地面から矢板を押し込んで
横部材の裏側に設置する、請求項1または2に記載の根
切り・土止め工法。4. The sheet pile is formed into a vertically long rectangular shape having a vertical dimension equal to the root cutting bottom depth and a horizontal dimension equal to the distance between the soil retaining piles, and is horizontally disposed between the facing holes of the soil retaining piles. The root-cutting and earth-stopping method according to claim 1 or 2, wherein after the members are installed, the sheet pile is pushed in from the ground and installed on the back side of the lateral member.
ル間の距離より少し短い矩形状とすると共に、同矢板正
面側に土止め用パイルの上下方向の孔間隔と同じ間隔で
横部材をその両端部が矢板側部からはみ出すようにあら
かじめ複数本平行に取付けて一体化し、矢板に取付けた
横部材の数だけ隣り合う土止め用パイルの向き合う孔が
露出したら、矢板からはみ出た横部材の端をこれらの孔
に挿入して孔間に渡設し、かつ、矢板と土止め用パイル
間に生じた間隙をふさぐ補助矢板を横部材の裏側に挿入
して、横部材と同時に矢板を設置する、請求項1または
2に記載の根切り・土止め工法。5. The sheet pile is formed in a rectangular shape whose left and right dimensions are slightly shorter than the distance between the soil retaining piles, and a transverse member is provided on the front side of the sheet pile at the same spacing as the vertical hole spacing of the soil retaining piles. If a plurality of horizontal members attached to the sheet pile exposes the facing holes of the adjacent soil retaining piles, the horizontal members that protrude from the sheet pile are exposed. Insert the ends of these into these holes and extend them between the holes, and insert an auxiliary sheet pile that closes the gap created between the sheet pile and the soil retaining pile on the back side of the horizontal member, and simultaneously install the sheet pile at the same time as the horizontal member. The root cutting and earth retaining construction method according to claim 1 or 2, which is installed.
定の周位置に二組上下方向に所定間隔離してそれぞれ複
数設けた構造とした、土止め用パイル。6. A soil retaining pile having a structure in which two sets of holes of a predetermined shape are provided on a side surface of a long tubular pile at predetermined peripheral positions and are separated from each other by a predetermined distance in the vertical direction.
所定の円周位置に二組上下方向に所定間隔離してそれぞ
れ複数設けると共に、同杭の最下部の外周に地中推進用
のらせん刃を設けた構造とした、請求項6に記載の土止
め用パイル。7. A pair of holes of a predetermined shape are provided on a side surface of a long cylindrical pile at predetermined circumferential positions with a plurality of sets each being vertically separated from each other by a predetermined distance, and at the bottom outer periphery of the pile for underground propulsion. The soil retaining pile according to claim 6, wherein the pile has a spiral blade.
でそれぞれ孔のL字の向きが左右逆となるようにした、
請求項6または7に記載の土止め用パイル。8. The shape of the hole is L-shaped, and the directions of the L-shape of the holes are left-right reversed at two circumferential positions.
The earth retaining pile according to claim 6 or 7.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP34555795A JPH09158181A (en) | 1995-12-07 | 1995-12-07 | Excavation and sheathing, and sheathing pile |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP34555795A JPH09158181A (en) | 1995-12-07 | 1995-12-07 | Excavation and sheathing, and sheathing pile |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH09158181A true JPH09158181A (en) | 1997-06-17 |
Family
ID=18377403
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP34555795A Pending JPH09158181A (en) | 1995-12-07 | 1995-12-07 | Excavation and sheathing, and sheathing pile |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH09158181A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2014163107A (en) * | 2013-02-25 | 2014-09-08 | Takenaka Komuten Co Ltd | Earth retaining wall |
| KR101649948B1 (en) * | 2015-09-03 | 2016-08-22 | 주식회사 산천개발 | Construction Method for Circumscribed Regular Polygon Deep Foundation |
-
1995
- 1995-12-07 JP JP34555795A patent/JPH09158181A/en active Pending
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2014163107A (en) * | 2013-02-25 | 2014-09-08 | Takenaka Komuten Co Ltd | Earth retaining wall |
| KR101649948B1 (en) * | 2015-09-03 | 2016-08-22 | 주식회사 산천개발 | Construction Method for Circumscribed Regular Polygon Deep Foundation |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR100891949B1 (en) | Low depth simple earthquake structure suitable for water and sewage construction | |
| US20070214735A1 (en) | Pile Assembly for Engineering and Construction Works | |
| CA2885091C (en) | Ground engaging shaft | |
| JP2011084938A (en) | Earth retaining wall and method of constructing the same | |
| KR100935006B1 (en) | Temporary retaining wall structure for water supply and drainage works in high depth | |
| JPH09158181A (en) | Excavation and sheathing, and sheathing pile | |
| KR100633013B1 (en) | Thumb bolt for connector bolt prefabricated wall, connection structure of earth wall and concrete underground wall using the same and construction method | |
| JP3185190B2 (en) | Construction method of PC hollow pile and underground structure | |
| KR101599931B1 (en) | Retaining Wall using Precast Panels and PHC Piles having Steel Bands, and Constructing Method of such Retaining Wall | |
| KR200389267Y1 (en) | Box type trench shoring apparatus | |
| KR102511387B1 (en) | Connecting structure of reinforced wall and constructing method thereof | |
| KR20230166261A (en) | Composite retaining wall of steel pipe pile and sheet pile and its contruction method | |
| JP3500446B2 (en) | Earth retaining method for earth excavation and earth retaining structure | |
| JP2007247308A (en) | Pulling-out bearing strength reinforcing for pile group comprised of inclined piles and structure constructed according to the same | |
| KR20120049602A (en) | Temporary retaining wall and constructing method thereof | |
| JP3015935B2 (en) | Drilling equipment for foundation ground | |
| KR101866792B1 (en) | Temporary retaining wall structure | |
| JPH05321257A (en) | Method and structure for timbering of underground continuous wall | |
| JP3227141B2 (en) | Earth retaining plate | |
| KR102511386B1 (en) | Connecting structure of reinforced wall using reinforced block and constructing method thereof | |
| JPH01198920A (en) | Reinforcing method for underground earth guarding wall by earth anchor | |
| KR950011722B1 (en) | Pipe angle wall method | |
| JP2876266B2 (en) | Sheet pile for underground continuous wall and underground continuous wall method | |
| KR101915189B1 (en) | Temporary retaining wall structure | |
| KR101915188B1 (en) | Temporary retaining wall structure |