JPH09144117A - Construction method for underground infiltration type side ditch - Google Patents

Construction method for underground infiltration type side ditch

Info

Publication number
JPH09144117A
JPH09144117A JP32806495A JP32806495A JPH09144117A JP H09144117 A JPH09144117 A JP H09144117A JP 32806495 A JP32806495 A JP 32806495A JP 32806495 A JP32806495 A JP 32806495A JP H09144117 A JPH09144117 A JP H09144117A
Authority
JP
Japan
Prior art keywords
gutter
base plate
underground
concrete
piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP32806495A
Other languages
Japanese (ja)
Other versions
JP2799845B2 (en
Inventor
Jun Tanaka
純 田中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hokukon Co Ltd
Original Assignee
Hokukon Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hokukon Co Ltd filed Critical Hokukon Co Ltd
Priority to JP32806495A priority Critical patent/JP2799845B2/en
Publication of JPH09144117A publication Critical patent/JPH09144117A/en
Application granted granted Critical
Publication of JP2799845B2 publication Critical patent/JP2799845B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Sewage (AREA)

Abstract

PROBLEM TO BE SOLVED: To efficiently construct a side ditch efficiently infiltrating part of flowing water into the underground. SOLUTION: Foundation boards 7 are mounted at required intervals on the bottom portion 6 of a side ditch construction section. Gate-shaped side ditch blocks 1 opened at the lower end are continuously installed while both end portions and intermediate portions are mounted on the foundation boards 7. Concrete is placed in recesses 17 formed between the form pieces 13, 13 erected at both end portions in the side ditch longitudinal direction of the foundation boards 7 and the side wall inner walls of a side ditch. Crushed stones 21 are filled in recesses 20 formed between the opposite forme pieces 13, 13 of the adjacent foundation boards 7, 7 to form an underground infiltration section of flowing water.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、流水の一部を地下
浸透させる側溝の構築工法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a gutter for infiltrating a part of flowing water underground.

【0002】[0002]

【従来の技術】都市化の進展につれて道路や宅地等が次
第にアスファルト等で舗装され、同時に、これらの道路
や宅地等における降雨が側溝に排水されて河川に流され
るように設備される。
2. Description of the Related Art As urbanization progresses, roads and residential lands are gradually paved with asphalt and the like, and at the same time, equipment is provided so that rainfall on these roads and residential lands is drained into gutters and flowed to rivers.

【0003】しかしながら従来の側溝は、殆どの場合、
流水路としての機能のみを重視して構築されていたた
め、降雨量が多いと多数の側溝からの流水が一時に河川
に流入し、その結果、河川が溢水して水害が発生する恐
れがあった。又舗装部分の地盤は雨水の地下浸透が殆ど
ないことから地下水の水位低下を招き、街路樹等の樹木
の繁茂を阻害したり水源枯渇の問題を生じさせる原因の
一つにもなっていた。
However, conventional gutters are almost always
Because it was constructed with emphasis only on the function as a water channel, if there was a large amount of rainfall, water from many gutters would flow into the river at one time, and as a result, the river might overflow and cause flood damage. . In addition, since the ground of the pavement has little infiltration of rainwater into the ground, the water level of the groundwater is lowered, which is one of the causes of inhibiting the growth of trees such as street trees and causing a problem of depletion of water sources.

【0004】かかる問題点を解決しうる地下浸透型側溝
の一例としては、実開平4−1284号公報が開示する
ものが提案されている。該側溝の一例は、図10に示す
ように、下端が開放した門形をなす側溝ブロックaの開
放底部に底部コンクリートを打設することにより側溝底
部bを形成し、該底部に水抜き孔cの多数を設けてなる
ものであった。
As an example of an underground seepage type gutter which can solve such a problem, Japanese Unexamined Utility Model Publication No. 4-1284 discloses a gutter. As shown in FIG. 10, one example of the gutter is formed by casting bottom concrete into the open bottom of a gate-shaped gutter block a having an open lower end to form a gutter bottom b, and forming a drainage hole c in the bottom. Were provided.

【0005】[0005]

【発明が解決しようとする課題】しかしながら前記門形
をなす側溝ブロックを用いて前記側溝を構築する場合、
その底部に多数の水抜き孔を設けるためには、底部コン
クリートの打設に先立ち、多くの中子を所要の位置に配
置する必要があり、施工に面倒さと手間を要する問題が
あった。加えて、地下浸透量の増大や目詰まりによる浸
透量の減少を防止する見地から、広い浸透面積を確保せ
んとするためには、より多くの水抜き孔を設けることが
必要となり、それだけ施工に手間を要することになっ
た。
However, when the gutter is constructed using the gate-shaped gutter block,
In order to provide a large number of drainage holes at the bottom, many cores must be arranged at required positions prior to casting of the bottom concrete, and there is a problem that the construction is troublesome and troublesome. In addition, from the viewpoint of preventing an increase in underground seepage and a decrease in seepage due to clogging, it is necessary to provide more drainage holes in order to secure a wide infiltration area. It took time.

【0006】本発明は下端開放の門形をなす側溝ブロッ
クを用いる場合において、広い地下浸透面積を確保しつ
つ、側溝底部の構築も容易に行ないうる地下浸透型側溝
の構築工法の提供を目的とするものである。
SUMMARY OF THE INVENTION An object of the present invention is to provide a method of constructing an underground infiltration type gutter capable of easily constructing a gutter bottom while securing a wide underground infiltration area when a gate-shaped gutter block having an open lower end is used. Is what you do.

【0007】[0007]

【課題を解決するための手段】本発明に係る地下浸透型
側溝の構築工法は、側溝構築部の底部分に、所要間隔で
コンクリート製の基礎板を載置して後、両側壁の上端部
相互を連結梁で連結してなる下端開放の側溝ブロックの
該両側壁の長さ方向の少なくとも両端部分を前記基礎板
上に載設することにより、該側溝ブロックを側溝構築部
に連設状態に敷設し、その後、前記基礎板の側溝長さ方
向の両端部分乃至両端寄り部位に立設状態の型枠片と、
前記側溝の側壁内面との間に形成されたコンクリート充
填用凹所にコンクリートを打設して、水路勾配を有する
側溝底部を形成し、且つ、隣り合う基礎板の対向する型
枠片間に形成された凹所には石を充填して流水の地下浸
透部を形成し、該側溝底部の上面と地下浸透部の上面と
で、水路勾配を有する側溝の連続底面を形成することを
特徴とするものである。
According to the construction method of the underground seepage type gutter according to the present invention, a concrete base plate is placed on a bottom portion of a gutter construction portion at a required interval, and then the upper end portions of both side walls are provided. By mounting at least both end portions in the longitudinal direction of the both side walls of the lower end open gutter block connected to each other by the connecting beam on the base plate, the gutter block is connected to the gutter construction portion. Laying, then, formwork pieces in an upright state at both end portions or both end portions in the side groove length direction of the base plate,
Concrete is poured into a concrete filling recess formed between the side wall inner surface of the gutter and the concrete filling recess to form a gutter bottom having a water channel gradient, and formed between opposed formwork pieces of adjacent base plates. The recess is filled with a stone to form an underground seepage portion of running water, and the upper surface of the gutter bottom and the upper surface of the underground seepage portion form a continuous bottom surface of a gutter having a channel gradient. Things.

【0008】前記構築工法において、側溝ブロックの両
側壁の長さ方向の両端部分及び中間部分を、夫々別個の
基礎板上に載設するのがよい。
In the above construction method, it is preferable that both end portions and an intermediate portion in the length direction of both side walls of the side groove block are respectively mounted on separate base plates.

【0009】又前記各構築工法において、互いに直角を
なす底片と立片とを具えるアングル状部材の該底片を基
礎板に埋設して、前記立片からなる型枠片を、基礎板に
立設状態に設けるのがよい。或いは、型枠片と基礎板と
をコンクリートを以って一体成形するのがよい。
In each of the above construction methods, the bottom piece of an angle-shaped member having a bottom piece and a vertical piece that are at right angles to each other is embedded in a base plate, and the form piece made of the vertical piece is mounted on the base plate. It is good to be provided in the installation state. Alternatively, the form piece and the base plate are preferably formed integrally with concrete.

【0010】本発明に係る構築工法の他の態様は、側溝
構築部の底部分に、所要間隔でコンクリート製の基礎板
を載置して後、両側壁の上端部相互を連結梁で連結して
なる下端開放の側溝ブロックの該両側壁の長さ方向の少
なくとも両端部分を前記基礎板上に載設することによ
り、該側溝ブロックを側溝構築部に連設状態に敷設し、
その後、前記基礎板上で且つ側溝の側壁間にコンクリー
ト製の底板を載置すると共に、該底板と側壁内面との間
の隙間にコンクリートを充填して該隙間を埋めることに
より、水路勾配を有する側溝底部を形成し、且つ、隣り
合う底板間に形成された凹所には石を充填して流水の地
下浸透部を形成し、該側溝底部の上面と地下浸透部の上
面とで、水路勾配を有する側溝の連続底面を形成するこ
とを特徴とするものである。
In another embodiment of the construction method according to the present invention, a concrete base plate is placed at a required interval on a bottom portion of a gutter construction portion, and then upper ends of both side walls are connected to each other by connecting beams. By placing at least both end portions in the length direction of the both side walls of the side groove block having the lower end open on the base plate, the side groove block is laid in a state of being continuously connected to the side groove construction portion,
Then, a concrete bottom plate is placed on the base plate and between the side walls of the side grooves, and a gap between the bottom plate and the inner surface of the side wall is filled with concrete to fill the gap, thereby having a water channel gradient. A groove formed at the bottom of the gutter, and a recess formed between the adjacent bottom plates is filled with stone to form an underground infiltration portion of flowing water, and an upper surface of the gutter bottom and an upper surface of the underground infiltration portion form a channel slope. And forming a continuous bottom surface of the side groove having the following.

【0011】この場合、側溝ブロックの両側壁の長さ方
向の両端部分及び中間部分を、夫々別個の基礎板上に載
設するのがよい。
In this case, it is preferable that both end portions and an intermediate portion in the longitudinal direction of both side walls of the side groove block are mounted on separate base plates.

【0012】[0012]

【発明の実施の形態】BEST MODE FOR CARRYING OUT THE INVENTION

〔第1の実施形態〕図1は、本発明に係る地下浸透型側
溝の構築工法で用いる側溝ブロック1を例示するもので
ある。該側溝ブロック1は、両側壁2,2の上端部の両
端側部分を連結梁3,3で連結してなる門形をなす下端
開放のプレキャストコンクリートブロックとして構成さ
れている。
[First Embodiment] FIG. 1 illustrates a gutter block 1 used in the construction method of an underground seepage type gutter according to the present invention. The gutter block 1 is configured as a precast concrete block having a gate-shaped lower end formed by connecting both end portions of upper ends of both side walls 2 and 2 with connecting beams 3 and 3.

【0013】かかる構成を有する側溝ブロック1を用い
て地下浸透型側溝5を構築するには、図2〜4に示すよ
うに、地盤を掘削して側溝構築部を形成した後、その掘
削部の底部分6に、所要間隔でコンクリート製の矩形板
状基礎板7を載置する。その後、前記側溝ブロック1の
両側壁2,2の長さ方向の両端部分9,9を、前記基礎
板7の長さ方向の半分10,10上に載設すると共に、
両側壁2,2の中間部分も基礎板7上に載設するものと
し、該側溝ブロックを、このようにして順次連設状態で
前記底部分6に敷設する。
In order to construct the underground seepage type gutter 5 using the gutter block 1 having such a structure, as shown in FIGS. 2 to 4, after excavating the ground to form a gutter construction part, the excavation part is formed. On the bottom part 6, a rectangular base plate 7 made of concrete is placed at required intervals. Thereafter, both end portions 9, 9 in the longitudinal direction of both side walls 2, 2 of the side groove block 1 are placed on half 10, 10 in the longitudinal direction of the base plate 7, and
The intermediate portion between the side walls 2 and 2 is also placed on the base plate 7, and the side groove blocks are sequentially laid on the bottom portion 6 in this manner.

【0014】前記基礎板7の側溝長さ方向の両端部分に
は、図1、図4に示すように、両端11,11が両側壁
2,2の内面12,12と略当接する型枠片13,13
が立設されている。該型枠片13は、本実施形態におい
ては、図5に示すように、互いに直角をなす底片14と
立片15(本実施形態においては、立片15の方が底片
14よりも、幅が稍広い)とを具えるアングル状部材1
6の該底片14を基礎板7に埋設させて、該立片15か
らなる前記型枠片13が設けられている。
As shown in FIGS. 1 and 4, at both ends of the base plate 7 in the side groove length direction, formwork pieces whose both ends 11, 11 are substantially in contact with the inner surfaces 12, 12 of both side walls 2, 2. 13,13
Is erected. In this embodiment, as shown in FIG. 5, the form piece 13 has a bottom piece 14 and a vertical piece 15 that are perpendicular to each other (in the present embodiment, the width of the vertical piece 15 is larger than that of the bottom piece 14). Angle-shaped member 1 comprising
The bottom piece 14 of 6 is buried in the base plate 7, and the form piece 13 composed of the standing piece 15 is provided.

【0015】その後、両型枠片13,13と、側壁内面
12,12との間に形成されたコンクリート充填用凹所
17にコンクリートを打設して側溝底部19を形成す
る。
After that, concrete is poured into the concrete filling recess 17 formed between the two mold pieces 13, 13 and the side wall inner surfaces 12, 12 to form a gutter bottom 19.

【0016】又、隣り合う基礎板7,7の対向する型枠
片13,13間に形成された凹所20に砕石21を充填
して、この部分を流水の地下浸透部22とする。このよ
うに形成された側溝底部19の上面23と地下浸透部2
2の上面25とで、水路勾配を有する側溝の連続底面を
形成する。
Further, crushed stones 21 are filled in recesses 20 formed between the facing mold pieces 13 of the adjacent base plates 7, 7, and this portion is used as an underground permeation portion 22 of running water. The upper surface 23 of the gutter bottom 19 thus formed and the underground infiltration part 2
The second upper surface 25 forms a continuous bottom surface of a gutter having a water channel gradient.

【0017】然して、かかる構成の側溝においては、側
溝内の流水の一部が地下浸透部22を通して地中に浸透
せしめられることになる。本実施形態において、図6に
示すように、型枠片13と基礎板7とをコンクリートを
以って一体成形することもでき、前記と同様にして、両
型枠片13,13と、側壁内面12,12との間にコン
クリート充填用凹所17を形成できる。
However, in the gutter having such a configuration, a part of the running water in the gutter is permeated into the ground through the underground permeation portion 22. In the present embodiment, as shown in FIG. 6, the mold piece 13 and the base plate 7 can be integrally formed with concrete. A concrete filling recess 17 can be formed between the inner surfaces 12 and 12.

【0018】〔第2の実施形態〕図7〜8は、本発明に
係る地下浸透型側溝の構築工法の他の構成を説明するも
のであり、前記実施形態と相違するのは、側溝底部を形
成するに当たり、型枠片と側壁内面との間の凹所にコン
クリートを打設する前記構成に代えて、基礎板7上で且
つ側溝の側壁2,2間に、図9に示すコンクリート製の
矩形板状の底板26を載置すると共に、該底板26と側
壁内面11との間の隙間gにコンクリートを充填して該
隙間gを埋めて(図8に符号27で示す)、側溝底部1
9を形成する点が異なる。
[Second Embodiment] FIGS. 7 and 8 illustrate another construction method of an underground seepage type gutter according to the present invention. In forming, instead of the above-described configuration in which concrete is cast in a recess between the formwork piece and the inner surface of the side wall, a concrete material shown in FIG. A rectangular plate-shaped bottom plate 26 is placed, and concrete is filled in the gap g between the bottom plate 26 and the side wall inner surface 11 to fill the gap g (indicated by reference numeral 27 in FIG. 8).
9 is different.

【0019】そして、図2に示すと同様に、隣り合う底
板26,26間に形成された凹所20に石を充填して流
水の地下浸透部22を形成し、前記側溝底部19の上面
23と地下浸透部22の上面25とで、水路勾配を有す
る側溝の連続底面を形成することは前記と同様であり、
流水の一部を、この地下浸透部22を通して地下に浸透
させることができる。
Then, as shown in FIG. 2, the recess 20 formed between the adjacent bottom plates 26, 26 is filled with stone to form the underground permeation portion 22 of the running water, and the upper surface 23 of the gutter bottom portion 19 is formed. And the upper surface 25 of the underground infiltration part 22 to form a continuous bottom surface of a gutter having a water channel gradient is the same as described above,
Part of the flowing water can be permeated into the underground through the underground permeation section 22.

【0020】[0020]

【発明の効果】本発明は、広い面積の地下浸透部を形成
しつつ安定構造の側溝を能率よく構築できる優れた効果
を奏する。即ち、 本発明は、下端が開放した門形をなす側溝ブロック
を用いて地下浸透型側溝を構築するに当たり、側溝ブロ
ックの両側壁の少なくとも両端部分を基礎板上に載設す
るため、側溝構築部の底部分で、側溝ブロックを安定的
に支持できる。
The present invention has an excellent effect that a gutter having a stable structure can be efficiently constructed while forming a large-area underground permeated portion. That is, in the present invention, when constructing an underground seepage type gutter using a gate-shaped gutter block having an open lower end, at least both end portions of both side walls of the gutter block are placed on the base plate, and the gutter construction portion is provided. Can support the side groove block stably.

【0021】 そして、基礎板間に形成された凹所に
石を充填して地下浸透部を形成するため、地下浸透量が
大きく且つ目詰まりしにくい広い面積の地下浸透部を形
成できることになる。
Then, since the underground seepage portion is formed by filling the recesses formed between the base plates with stones, it is possible to form the underground seepage portion with a large underground penetration amount and a large area that is difficult to be clogged.

【0022】 加えて、基礎板上における側溝底部
は、該基礎板上に立設された型枠片と側溝の側壁内面と
の間に形成されたコンクリート充填用凹所にコンクリー
トを打設することにより、現場施工併用で容易に構築で
きる。或いは基礎板上に底板を載置して後、該底板と側
壁内面との間の隙間にコンクリートを充填して該隙間を
埋めることにより、現場施工併用で容易に構築できる。
そしてこの側溝底部は、側溝の側壁下端部分を連結する
連結梁としても機能することになり、土圧を受けて側壁
が窄まり変形する恐れがない。
[0022] In addition, the bottom of the gutter on the base plate is formed by casting concrete in a concrete filling recess formed between the formwork piece erected on the base plate and the inner surface of the side wall of the gutter. Thereby, it can be easily constructed in combination with on-site construction. Alternatively, by placing the bottom plate on the base plate and then filling the gap between the bottom plate and the inner surface of the side wall with concrete to fill the gap, the construction can be easily carried out together with on-site construction.
The bottom of the side groove also functions as a connecting beam for connecting the lower end portion of the side wall of the side groove, and there is no possibility that the side wall is narrowed and deformed by the earth pressure.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の構築工法を説明する分解斜視図であ
る。
FIG. 1 is an exploded perspective view illustrating a construction method according to the present invention.

【図2】地下浸透型側溝を説明する平面図である。FIG. 2 is a plan view illustrating an underground seepage type gutter.

【図3】地下浸透型側溝を説明する縦断面図である。FIG. 3 is a longitudinal sectional view illustrating an underground seepage type gutter.

【図4】地下浸透型側溝を説明する横断面図である。FIG. 4 is a cross-sectional view illustrating an underground infiltration type gutter.

【図5】基礎板を説明する一部欠切斜視図である。FIG. 5 is a partially cutaway perspective view illustrating a base plate.

【図6】型枠片の他の態様を説明する斜視図である。FIG. 6 is a perspective view illustrating another embodiment of a mold piece.

【図7】本発明の他の態様を説明する断面図である。FIG. 7 is a cross-sectional view illustrating another embodiment of the present invention.

【図8】地下浸透型側溝の他の態様を説明する部分断面
図である。
FIG. 8 is a partial cross-sectional view illustrating another aspect of an underground infiltration type gutter.

【図9】基礎板上への底板の載置状態を説明する斜視図
である。
FIG. 9 is a perspective view illustrating how the bottom plate is placed on the base plate.

【図10】従来の地下浸透型側溝を説明する斜視図であ
る。
FIG. 10 is a perspective view illustrating a conventional subterranean infiltration type gutter.

【符号の説明】[Explanation of symbols]

1 側溝ブロック 2 側壁 3 連結梁 5 地下浸透型側溝 7 基礎板 13 型枠片 14 底片 15 立片 16 アングル状部材 17 コンクリート充填用凹所 19 側溝底部 20 凹所 22 地下浸透部 26 底板 DESCRIPTION OF SYMBOLS 1 Gutter block 2 Side wall 3 Connecting beam 5 Underground penetration type gutter 7 Base plate 13 Form piece 14 Bottom piece 15 Standing piece 16 Angle member 17 Concrete filling recess 19 Gutter bottom 20 recess 22 Underground penetration 26 bottom plate

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 側溝構築部の底部分に、所要間隔でコン
クリート製の基礎板を載置して後、両側壁の上端部相互
を連結梁で連結してなる下端開放の側溝ブロックの該両
側壁の長さ方向の少なくとも両端部分を前記基礎板上に
載設することにより、該側溝ブロックを側溝構築部に連
設状態に敷設し、その後、前記基礎板の側溝長さ方向の
両端部分乃至両端寄り部位に立設状態の型枠片と、前記
側溝の側壁内面との間に形成されたコンクリート充填用
凹所にコンクリートを打設して、水路勾配を有する側溝
底部を形成し、且つ、隣り合う基礎板の対向する型枠片
間に形成された凹所には石を充填して流水の地下浸透部
を形成し、該側溝底部の上面と地下浸透部の上面で、水
路勾配を有する側溝の連続底面を形成することを特徴と
する地下浸透型側溝の構築工法。
1. A concrete base plate is placed on a bottom portion of a gutter construction part at a required interval, and then upper ends of both side walls are connected to each other by a connecting beam. By placing at least both end portions in the length direction of the wall on the base plate, the gutter block is laid in a state of being continuously connected to the gutter construction portion, and thereafter, both end portions in the gutter length direction of the base plate or Formwork pieces in the standing state at the positions near both ends and concrete are poured into a concrete filling recess formed between the side wall inner surface of the side groove to form a side groove bottom having a water channel gradient, and The recesses formed between the opposing form pieces of the adjacent base plates are filled with stones to form the underground seepage portion of the flowing water, and the upper surface of the gutter bottom and the upper surface of the underground seepage portion have a water channel gradient. Underground seepage type gutter characterized by forming a continuous bottom surface of the gutter Construction method.
【請求項2】 側溝ブロックの両側壁の長さ方向の両端
部分及び中間部分を、夫々別個の基礎板上に載設するこ
とを特徴とする請求項1記載の地下浸透型側溝の構築工
法。
2. The method of constructing an underground seepage type gutter according to claim 1, wherein both end portions and intermediate portions in the longitudinal direction of both side walls of the gutter block are mounted on separate base plates.
【請求項3】 互いに直角をなす底片と立片とを具える
アングル状部材の該底片が基礎板に埋設されて、前記立
片からなる型枠片が、基礎板に立設状態に設けられてい
ることを特徴とする請求項1又は2記載の地下浸透型側
溝の構築工法。
3. An angle-shaped member having a bottom piece and a standing piece that are at right angles to each other, said bottom piece being buried in a base plate, and a form piece comprising said standing piece is provided upright on said base plate. 3. The method for constructing an underground seepage type gutter according to claim 1 or 2, wherein:
【請求項4】 型枠片と基礎板とがコンクリートを以っ
て一体成形されていることを特徴とする請求項1又は2
記載の地下浸透型側溝の構築工法。
4. The method according to claim 1, wherein the form piece and the base plate are integrally formed of concrete.
The construction method of the underground seepage type gutter described above.
【請求項5】 側溝構築部の底部分に、所要間隔でコン
クリート製の基礎板を載置して後、両側壁の上端部相互
を連結梁で連結してなる下端開放の側溝ブロックの該両
側壁の長さ方向の少なくとも両端部分を前記基礎板上に
載設することにより、該側溝ブロックを側溝構築部に連
設状態に敷設し、その後、前記基礎板上で且つ側溝の側
壁間にコンクリート製の底板を載置すると共に、該底板
と側壁内面との間の隙間にコンクリートを打設して該隙
間を埋めることにより、水路勾配を有する側溝底部を形
成し、且つ、隣り合う底板間に形成された凹所には石を
充填して流水の地下浸透部を形成し、該側溝底部の上面
と地下浸透部の上面とで、水路勾配を有する側溝の連続
底面を形成することを特徴とする地下浸透型側溝の構築
工法。
5. A concrete base plate is placed on a bottom portion of a gutter construction portion at a required interval, and then the upper ends of both side walls are connected to each other by connecting beams. By mounting at least both ends in the length direction of the wall on the base plate, the gutter block is laid in a state of being continuously connected to the gutter construction portion, and then concrete is placed on the base plate and between the side walls of the gutter. By placing concrete bottom plate and placing concrete in the gap between the bottom plate and the inner surface of the side wall to fill the gap, a gutter bottom having a channel gradient is formed, and between adjacent bottom plates. The formed recess is filled with stone to form an underground infiltration portion of running water, and the upper surface of the gutter bottom and the upper surface of the underground infiltration portion form a continuous bottom surface of a gutter having a channel gradient. Construction method of the underground seepage type gutter.
【請求項6】 側溝ブロックの両側壁の長さ方向の両端
部分及び中間部分を、夫々別個の基礎板上に載設するこ
とを特徴とする請求項5記載の地下浸透型側溝の構築工
法。
6. The method of constructing an underground seepage type gutter according to claim 5, wherein both end portions and intermediate portions in the longitudinal direction of both side walls of the gutter block are mounted on separate base plates.
JP32806495A 1995-11-21 1995-11-21 Construction method of underground seepage type gutter Expired - Fee Related JP2799845B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP32806495A JP2799845B2 (en) 1995-11-21 1995-11-21 Construction method of underground seepage type gutter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP32806495A JP2799845B2 (en) 1995-11-21 1995-11-21 Construction method of underground seepage type gutter

Publications (2)

Publication Number Publication Date
JPH09144117A true JPH09144117A (en) 1997-06-03
JP2799845B2 JP2799845B2 (en) 1998-09-21

Family

ID=18206119

Family Applications (1)

Application Number Title Priority Date Filing Date
JP32806495A Expired - Fee Related JP2799845B2 (en) 1995-11-21 1995-11-21 Construction method of underground seepage type gutter

Country Status (1)

Country Link
JP (1) JP2799845B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101663913B1 (en) * 2015-11-04 2016-10-07 주식회사 금성종합기술단 Rainwater infilration structures

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101663913B1 (en) * 2015-11-04 2016-10-07 주식회사 금성종합기술단 Rainwater infilration structures

Also Published As

Publication number Publication date
JP2799845B2 (en) 1998-09-21

Similar Documents

Publication Publication Date Title
HU226433B1 (en) Foundation slab of underground passage for road
JP2799845B2 (en) Construction method of underground seepage type gutter
US20050150429A1 (en) Drainage composition and uses thereof
JP2518390Y2 (en) Overhang walkway block and overhang walkway structure using it
KR100456610B1 (en) Structure method for drainageway of weak stratum and the conduct pipe thereof
CN210737589U (en) Gravity type retaining wall and wall unit thereof
JP6931876B2 (en) How to build a permeable wall for slope reinforcement
JPH0711691A (en) Underground water storage tank
IES67878B2 (en) A drainage installation for roads
JP2005097999A (en) Protrusion sidewalk structure and foundation part block used for the same
JPH0321709A (en) Revetment retaining wall block body with road plate and road widening method using block body
CN217710841U (en) Be applied to waterproof cling compound structure of striding underground space roof channel
JPH0369736A (en) Member pressured by earth pressure
JP2001241003A (en) Precast concrete board and installation structure of the same
CN220013546U (en) Concrete lattice slope protection for downstream dam slope of earth-rock dam
KR200258944Y1 (en) Erected retaining wall using concret blocks
JPH0885956A (en) Drain constructing method at minor step on slope face, draining structure, and block to constitute it
JP2622897B2 (en) Construction method of wall and drainage method of soil behind wall
JP3334947B2 (en) Structure of permeable pavement culvert and culvert block
JP2001317115A (en) Free inclination type conduit gutter
JPS6223898Y2 (en)
CN107287998B (en) A kind of roadbed construction method and water-permeable brick of pavement water-permeable brick
KR200265492Y1 (en) Impervious wall structures at inlet and outlet of channel concrete box
JP2001182141A (en) Side ditch block
JPS627736Y2 (en)

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19980519

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080710

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080710

Year of fee payment: 10

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313532

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080710

Year of fee payment: 10

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080710

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090710

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090710

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100710

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100710

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100710

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110710

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120710

Year of fee payment: 14

LAPS Cancellation because of no payment of annual fees