JPH0913302A - Installation method and structure of directly connected sleeper - Google Patents

Installation method and structure of directly connected sleeper

Info

Publication number
JPH0913302A
JPH0913302A JP16900795A JP16900795A JPH0913302A JP H0913302 A JPH0913302 A JP H0913302A JP 16900795 A JP16900795 A JP 16900795A JP 16900795 A JP16900795 A JP 16900795A JP H0913302 A JPH0913302 A JP H0913302A
Authority
JP
Japan
Prior art keywords
sleeper
bolt
roadbed
holding
anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP16900795A
Other languages
Japanese (ja)
Other versions
JP2928745B2 (en
Inventor
Tomoyoshi Nakajo
友義 中條
Shuichi Konuma
修一 小沼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NIPPON KOGEN CONCRETE
NIPPON KOGEN CONCRETE KK
Original Assignee
NIPPON KOGEN CONCRETE
NIPPON KOGEN CONCRETE KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NIPPON KOGEN CONCRETE, NIPPON KOGEN CONCRETE KK filed Critical NIPPON KOGEN CONCRETE
Priority to JP16900795A priority Critical patent/JP2928745B2/en
Publication of JPH0913302A publication Critical patent/JPH0913302A/en
Application granted granted Critical
Publication of JP2928745B2 publication Critical patent/JP2928745B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To increase the workability, by screwing support bolts in support nuts embedded in vertical pierced holes at both ends of a sleeper and removing the support bolts after the level has been adjusted and screwing anchor bolts into the support nuts. SOLUTION: After rails have been fixed on a plurality of sleepers 1 laid on ballast 2, the upper male screw part 17a of a support bolt 17 is screwed in the support nut 16 embedded in the pierced hole 11 of the sleeper 1 to erect the bolt 17 on the ballast 2. Next, the bolt 17 is rotated to adjust the protruded length of the lower male screw part 17b and adjust the level of the sleeper 1. Then an anchor plate 13 is fixed to the male screw 17b through an anchor sheath 18. Thereafter, ballast concrete 3 is placed between the sleepers and the ballast 2 and cured. And further, the bolt 17 is removed and the anchor bolt is inserted in the screw hole 13a of the anchor plate 13 and the sleepers are fixed to the anchor bolts with the nuts. In this way, the level adjustment and the fixing works can be efficiently carried out.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】この発明は、道床の上に、こ
の道床の上に打設される道床コンクリートに埋設されて
設置される直結まくら木の設置構造および設置方法に関
する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an installation structure and an installation method for a directly-connected sleeper which is installed on a roadbed by being embedded in the roadbed concrete placed on the roadbed.

【0002】[0002]

【従来の技術】図6および図7は、従来のレール直結軌
道およびその設置方法の一例を示し、図において、符号
1は道床2の上に、この道床2の上に打設された道床コ
ンクリート3に埋設されて所定間隔おきに設置されたP
Cまくら木(以下「まくら木」という)、4はこのまく
ら木1の上に敷設されたレール、5はこのレール4を各
まくら木1に固定するレール締結金具、そして、符号6
は軌道の中央部に軌道の長手方向に沿って形成された排
水路である。
2. Description of the Related Art FIGS. 6 and 7 show an example of a conventional rail direct-connection track and its installation method. In the drawings, reference numeral 1 is a roadbed 2 and roadbed concrete cast on the roadbed 2. P embedded in 3 and installed at regular intervals
C sleepers (hereinafter referred to as "sleepers"), 4 rails laid on the sleepers 1, 5 rail fastening fittings for fixing the rails 4 to the sleepers 1, and a reference numeral 6
Is a drainage channel formed along the longitudinal direction of the track at the center of the track.

【0003】また、符号7はレール4の敷設に際し、道
床2とレール4との間に介在され、レール4のレベルを
調整するレベル調整ジャッキ、そして、符号8、9、10
は道床2の上に順に重ねて取り付けられ、レベル調整後
のレール4を仮固定するコンクリートブロック、木製ブ
ロック、木製キャンバーである。
Further, reference numeral 7 is a level adjusting jack which is interposed between the roadbed 2 and the rail 4 when the rail 4 is laid, and which adjusts the level of the rail 4, and the reference numerals 8, 9, 10
Are a concrete block, a wooden block, and a wooden camber, which are mounted in order on the track bed 2 and temporarily fix the rail 4 after the level adjustment.

【0004】このような構成において、道床2の上にま
くら木1を設置し、このまくら木1の上にレール4を敷
設するには、最初に道床2の上にまくら木1を所定間隔
おきに設置し、このまくら木1の上にレール4を設置
し、かつ、各まくら木1にレール4をレール締結ボルト
5によって固定する。
In such a construction, in order to install the sleepers 1 on the track 2 and to lay the rails 4 on the sleepers 1, first, the sleepers 1 are installed on the track 2 at predetermined intervals. The rails 4 are installed on the sleepers 1, and the rails 4 are fixed to the sleepers 1 by the rail fastening bolts 5.

【0005】次に、道床2とレール4との間にレベル調
整ジャッキ7を介在し、このレベル調整ジャッキ7によ
ってまくら木1およびレール4のレベルを調整する。ま
くら木1およびレール4のレベルを調整し終えたら、道
床2とレール4との間にコンクリート8、木製ブロック
9、木製チャンバー10を順に重ねて介在してまくら木1
とレール4とを仮支持し、レベル調整ジャッキ7を撤去
する。次に、道床2とコンクリートまくら木1との間に
道床コンクリート3を打設する。そして、最後に木製ブ
ロック9とキャンバー10を撤去する。
Next, a level adjusting jack 7 is interposed between the track bed 2 and the rail 4, and the level of the sleeper 1 and the rail 4 is adjusted by the level adjusting jack 7. After adjusting the levels of the sleeper 1 and the rail 4, the concrete 8, the wooden block 9, and the wooden chamber 10 are sequentially stacked and interposed between the track bed 2 and the rail 4, and the sleeper 1
And the rail 4 are temporarily supported, and the level adjustment jack 7 is removed. Next, the roadbed concrete 3 is placed between the roadbed 2 and the concrete sleeper 1. And finally, the wooden block 9 and the camber 10 are removed.

【0006】[0006]

【発明が解決しようとする課題】従来の直結まくら木の
設置構造および設置方法は、以上説明したような方法で
行われているので、非常に手間がかかり、作業がきわめ
て面倒なだけでなく、いろいろ道具を必要とするため、
作業が煩雑になるなどの課題もあった。
Since the conventional installation structure and method for directly connecting sleepers are performed by the method described above, not only is it extremely time-consuming and labor-intensive, but various operations are required. I need tools,
There were also problems such as complicated work.

【0007】この発明は、以上の課題を解決するために
なされたもので、まくら木の設置を容易に行えるように
した直結まくら木の設置構造および設置方法を提供する
ことを目的とする。
The present invention has been made to solve the above problems, and an object of the present invention is to provide an installation structure and an installation method for a directly-connected sleeper tree which enables easy installation of the sleeper tree.

【0008】[0008]

【課題を解決するための手段】この発明に係る請求項第
1項記載の直結まくら木の設置構造は、道床の上に、こ
の道床の上に打設される道床コンクリートに埋設されて
設置される直結まくら木の設置構造において、前記まく
ら木の両端部に上下方向に貫通して形成された貫通孔に
埋設された保持ナットと、前記貫通孔に挿通され、か
つ、前記保持ナットに螺合されて前記道床の上に立設さ
れ、前記道床コンクリートが打設される前の、前記まく
ら木を保持する保持ボルトと、前記保持ボルトが引き抜
かれた後に前記貫通孔に挿通され、かつ、前記道床コン
クリート中に埋設されたアンカープレートのねじ孔に螺
合されるアンカーボルトと、このアンカーボルトの上端
部に螺合され、前記まくら木を固定する固定ナットとを
備えて構成されている。
The installation structure for a directly connected sleeper according to claim 1 of the present invention is installed on a roadbed by being embedded in the roadbed concrete cast on the roadbed. In a directly connected sleeper installation structure, a holding nut embedded in through holes formed by vertically penetrating both ends of the sleeper, and inserted through the through hole and screwed to the holding nut, Standing on the roadbed, before the roadbed concrete is placed, holding bolts for holding the sleepers, and after being inserted into the through hole after the holding bolt is pulled out, and in the roadbed concrete An anchor bolt that is screwed into a screw hole of an embedded anchor plate, and a fixing nut that is screwed to an upper end portion of the anchor bolt and that fixes the sleeper are configured. .

【0009】この発明に係る請求項第2項記載の直結ま
くら木の設置方法は、請求項第1項において、保持ボル
トをまくら木の貫通孔に挿通し、かつ、保持ナットに螺
合して道床の上に立設するとともに、この保持ボルトを
回して前記まくら木を所定の高さに保持し、次に、前記
保持ボルトの下端部にアンカープレートを取り付け、次
に、前記まくら木と前記道床との間に道床コンクリート
を打設し、前記コンクリートが硬化したら、前記保持ボ
ルトを引き抜き、その後にアンカーボルトを挿通すると
もに、前記アンカープレートに螺合し、次に、前記アン
カーボルトの上端部に固定ナットを螺合することを特徴
とする。
According to a second aspect of the present invention, there is provided a method for installing a directly connected sleeper according to the first aspect, wherein the holding bolt is inserted into the through hole of the sleeper and is screwed into the holding nut to secure the road bed. While standing upright, turn the holding bolt to hold the sleeper tree at a predetermined height, then attach an anchor plate to the lower end of the holding bolt, and then between the sleeper tree and the roadbed. Place the concrete on the roadbed, and when the concrete hardens, pull out the holding bolt, insert the anchor bolt after that, screw it into the anchor plate, and then attach the fixing nut to the upper end of the anchor bolt. It is characterized by being screwed together.

【0010】[0010]

【実施例】図1〜図5は、この発明に係るレール直結軌
道およびその施工方法の一実施例を示し、図において、
前記従来例と同一部分に同一符号を付し、その説明を省
略する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS FIGS. 1 to 5 show an embodiment of a rail direct connecting track and a construction method therefor according to the present invention.
The same parts as those in the conventional example are designated by the same reference numerals and the description thereof will be omitted.

【0011】また、図1〜図3において、符号11はまく
ら木1の両端部に鉛直に貫通して形成された貫通孔、12
は金属管または合成樹脂管などから形成され、かつ、貫
通孔11内に取り付けられ、貫通孔11の内壁を保護する上
部養生シース、13は中央部にねじ孔13a を有して形成さ
れ、かつ、道床コンクリート3内に埋設されたアンカー
プレート、14は上端部と下端部とにそれぞれ上部雄ねじ
部14a と下部雄ねじ部14b とを有して形成され、貫通孔
11に鉛直に挿通され、かつ、下部雄ねじ部14bがアンカ
ープレート13のねじ孔13a に螺合されたアンカーボル
ト、そして、符号15はアンカーボルト14の上部雄ねじ部
14a に螺合され、まくら木1を固定する固定ナットであ
る。固定ナット15は弛まないように二重に締め付けられ
ている。
Further, in FIGS. 1 to 3, reference numeral 11 denotes a through hole vertically formed at both ends of the sleeper 1, and 12
Is an upper curing sheath formed of a metal tube or a synthetic resin tube, and attached inside the through hole 11 to protect the inner wall of the through hole 11, and 13 is formed with a screw hole 13a at the center, and An anchor plate embedded in the roadbed concrete 3, and 14 is formed with an upper male screw portion 14a and a lower male screw portion 14b at the upper end and the lower end, respectively, and has a through hole.
Anchor bolt which is vertically inserted in 11 and whose lower male screw portion 14b is screwed into the screw hole 13a of the anchor plate 13, and reference numeral 15 is an upper male screw portion of the anchor bolt 14.
It is a fixing nut that is screwed to 14a and fixes the sleeper 1. The fixing nut 15 is doubly tightened so as not to loosen.

【0012】また、図4および図5において、符号16は
貫通孔11の中間部に埋設され、後述する保持ボルトを保
持する保持ナット、17は貫通孔11に貫通され、保持ナッ
ト16およびアンカープレート13のねじ孔13a に螺合さ
れ、かつ、道床2の上に立設され、道床コンクリート3
を打設する前のまくら木1を所定の高さに保持し、か
つ、道床コンクリート3を打設する前のアンカープレー
ト13をまくら木1と道床2との間に保持する保持ボル
ト、そして、符号18は金属管または合成樹脂管などから
形成され、かつ、保持ボルト17の下部雄ねじ部17b に挿
通され、道床コンクリート3が保持ボルト17の下部雄ね
じ部17b に付着するのを防止する下部養生シースであ
る。
4 and 5, reference numeral 16 is embedded in the middle portion of the through hole 11 to hold a holding bolt, which will be described later, and 17 is penetrated into the through hole 11 to hold the holding nut 16 and the anchor plate. It is screwed into the screw hole 13a of 13 and is erected on the roadbed 2 and is made of concrete 3
A holding bolt for holding the sleeper tree 1 before placing the slab at a predetermined height and for holding the anchor plate 13 before placing the roadbed concrete 3 between the sleeper tree 1 and the roadbed 2, and a reference numeral 18 Is a lower curing sheath that is formed of a metal pipe or a synthetic resin pipe and is inserted into the lower male screw portion 17b of the holding bolt 17 to prevent the roadbed concrete 3 from adhering to the lower male screw portion 17b of the holding bolt 17. .

【0013】保持ボルト17はは中間部と下端部とに保持
ナット16とアンカープレート13のねじ孔13a とにそれぞ
れ螺合される上部雄ねじ部17a と下部雄ねじ部17b とを
有して形成され、下部雄ねじ部17b は上部雄ねじ部17a
より細く形成されている。
The holding bolt 17 is formed with an upper male screw portion 17a and a lower male screw portion 17b which are respectively screwed into the holding nut 16 and the screw hole 13a of the anchor plate 13 at the middle portion and the lower end portion, The lower male screw part 17b is the upper male screw part 17a.
It is formed thinner.

【0014】このような構成において、次にこの発明に
係る直結まくら木の設置方法について説明する。
Next, a method of installing the directly-connected sleeper according to the present invention having such a structure will be described.

【0015】(1) 最初に、道床2の上に複数本のまくら
木1を所定間隔おきに設置し、このまくら木1の上にレ
ール4を架け渡し、かつ、レール締結金具5によって各
まくら木1をレール2に固定する。
(1) First, a plurality of sleepers 1 are installed on the roadbed 2 at predetermined intervals, rails 4 are bridged over the sleepers 1, and each sleeper 1 is secured by the rail fasteners 5. Secure to rail 2.

【0016】(2) 次に、各まくら木1の貫通孔11に保持
ボルト17を挿通し、かつ、上部雄ねじ部17a を保持ナッ
ト16に螺合して保持ボルト17を道床2の上に立設する。
(2) Next, the holding bolt 17 is inserted into the through hole 11 of each sleeper 1 and the upper male screw portion 17a is screwed into the holding nut 16 to stand the holding bolt 17 on the roadbed 2. To do.

【0017】なお、道床2と保持ボルト17との間にライ
ナー19を介在することによって保持ボルト17の安定を図
るものとする。
A liner 19 is interposed between the track bed 2 and the holding bolt 17 to stabilize the holding bolt 17.

【0018】また、保持ボルト17の上部雄ねじ部17a お
よび下部雄ねじ部17b には充分に油を塗布して錆び付き
を防止する。特に、下部雄ねじ部17b の下端部(下部養
生シース18でカバーできない部分)には、硬化前の道床
コンクリート3が付着しないようにグリースなどを塗着
する。
Further, sufficient oil is applied to the upper male screw portion 17a and the lower male screw portion 17b of the holding bolt 17 to prevent rusting. In particular, grease or the like is applied to the lower end portion of the lower male screw portion 17b (the portion that cannot be covered by the lower curing sheath 18) so that the roadbed concrete 3 before hardening does not adhere.

【0019】(3) 次に、各まくら木1の保持ボルト17を
回して下部雄ねじ部17b の突出長さを適当に変えること
によって各まくら木1のレベルを調整し、かつ、各まく
ら木1を所定の高さに保持する。
(3) Next, the level of each railroad tie 1 is adjusted by turning the holding bolt 17 of each railroad tie 1 to appropriately change the protruding length of the lower male screw portion 17b, and each railroad tie 1 is set to a predetermined length. Hold at height.

【0020】なお、各まくら木1のレベルを調整し終え
たら、まくら木1を引きずるなどして保持ボルト17を曲
げないように注意する。
After adjusting the level of each sleeper 1, be careful not to bend the holding bolt 17 by dragging the sleeper 1 or the like.

【0021】(4) 次に、各まくら木1のレベル調整を終
了したら、保持ボルト17の下部雄ねじ部17b に下部養生
シース18を挿通し、下部雄ねじ部17b にアンカープレー
ト13を取り付ける。なお、下部養生シース18およびアン
カープレート13は各まくら木1のレベル調整を行う前に
取り付けてもよい。
(4) Next, when the level adjustment of each sleeper 1 is completed, the lower curing sheath 18 is inserted into the lower male screw portion 17b of the holding bolt 17, and the anchor plate 13 is attached to the lower male screw portion 17b. The lower curing sheath 18 and the anchor plate 13 may be attached before the level adjustment of each sleeper 1.

【0022】また、アンカープレート13の下部養生シー
ス18との当接面部には、ゴムシートなどの弾性シート20
を接着しておく。さらに、アンカープレート13は下部養
生シース18の下端部に軽く触れる位置に取り付け、下部
養生シース18に強く密着しないように注意する。
An elastic sheet 20 such as a rubber sheet is provided on the contact surface of the anchor plate 13 with the lower curing sheath 18.
Glue. Further, the anchor plate 13 is attached to a position where it touches the lower end of the lower curing sheath 18 lightly, and care should be taken not to make strong contact with the lower curing sheath 18.

【0023】このように、アンカープレート13の下部養
生シート18との当接面部に弾性シート20を取り付け、か
つ、アンカープレート13を下部養生シース18の下端部に
強く密着しないようにするのは、コンクリート3が硬化
した後でも、アンカープレート13と保持ボルト17との間
に弛みを持たせて、保持ボルト17を容易に回すことがで
きてスムーズに引き抜けるようにするためである。
As described above, the elastic sheet 20 is attached to the contact surface portion of the anchor plate 13 with the lower curing sheet 18, and the anchor plate 13 is not strongly adhered to the lower end portion of the lower curing sheath 18. This is because even after the concrete 3 is hardened, there is slack between the anchor plate 13 and the holding bolt 17 so that the holding bolt 17 can be easily turned and pulled out smoothly.

【0024】(5) 次に、まくら木1と道床2との間に道
床コンクリート3を充填し、この道床コンクリート3を
充分に養生する。そして、道床コンクリート3が充分な
強度を発現したら、保持ボルト17をインパクトレンチな
どの回転治具によって回しながら引き抜きく。
(5) Next, the roadbed concrete 3 is filled between the sleeper 1 and the roadbed 2, and the roadbed concrete 3 is sufficiently cured. Then, when the roadbed concrete 3 exhibits sufficient strength, the holding bolt 17 is pulled out while being rotated by a rotating jig such as an impact wrench.

【0025】(6) 次に、保持ボルト17を引き抜いた後、
貫通孔11内にアンカーボルト14を挿入するとともに、下
部雄ねじ部14b をアンカープレート13のねじ孔13a に螺
合する。そして、アンカーボルト14の上部雄ねじ部14a
にゴムパッキン21、ワッシャー22を順に取り付け、そし
て、固定ナット15を締め付ける。この場合、固定ナット
15は500kgcm トルク適度の締め付け力で締め付ける。
(6) Next, after pulling out the holding bolt 17,
The anchor bolt 14 is inserted into the through hole 11, and the lower male screw portion 14b is screwed into the screw hole 13a of the anchor plate 13. Then, the upper male screw portion 14a of the anchor bolt 14
Attach the rubber packing 21 and washer 22 in order, and tighten the fixing nut 15. In this case, the fixing nut
15 is 500kgcm torque Tighten with an appropriate tightening force.

【0026】また、アンカーボルト14の頭は固定ナット
15の上端部より2mm以下の突出量で納まるようにす
る。
The head of the anchor bolt 14 is a fixing nut.
Make sure that the protruding amount is less than 2 mm from the upper end of 15.

【0027】なお、必要に応じて、アンカーボルト14の
周囲にモルタル等のグラウト材を充填してもよい。
If desired, a grout material such as mortar may be filled around the anchor bolt 14.

【0028】(7) そして、最後に、アンカーボルト14の
上端部に養生用のキャップ23を取り付ける。
(7) Finally, a cap 23 for curing is attached to the upper end of the anchor bolt 14.

【0029】[0029]

【発明の効果】この発明に係る直結まくら木の設置構造
および設置方法は、以上説明した構成からなり、まくら
木の両端部に上下方向に貫通して形成された貫通孔に埋
設された保持ナットと、前記貫通孔に挿通され、かつ、
前記保持ナットに螺合されて道床の上に立設され、道床
コンクリートが打設される前の、前記まくら木を保持す
る保持ボルトと、前記保持ボルトが引き抜かれた後に前
記貫通孔に挿通され、かつ、前記道床コンクリート内に
埋設されたアンカープレートのねじ孔に螺合されるアン
カーボルトと、このアンカーボルトの上端部に螺合さ
れ、前記まくら木を固定する固定ナットとを備えて構成
され、まくら木の設置に際しては、最初に保持ボルトを
まくら木の貫通孔に挿通し、前記保持ナットに螺合して
前記道床の上に立設するとともに、この保持ボルトを回
して前記まくら木を所定の高さに保持し、次に、前記保
持ボルトの下端部にアンカープレートを取り付け、次
に、前記まくら木と前記道床との間に道床コンクリート
を打設し、前記道床コンクリートが硬化したら、前記保
持ボルトを引き抜き、その後にアンカーボルトを挿通す
るともに、前記アンカープレートに螺合し、次に、前記
アンカーボルトの上端部に固定ナットを螺合するので、
構造がきわめて簡単であるとともに、まくら木のレベル
調整とまくら木の固定とをきわめて効率的に行うことが
できるなどの効果がある。
The installation structure and installation method of the directly-connected sleeper according to the present invention are constituted as described above, and the holding nuts are embedded in the through holes formed by vertically penetrating both ends of the sleeper, and Inserted into the through hole, and
It is screwed to the holding nut and is erected on the roadbed, before the roadbed concrete is placed, the holding bolt for holding the sleeper, and the holding bolt is inserted into the through hole after being pulled out, An anchor bolt that is screwed into a screw hole of an anchor plate that is embedded in the roadbed concrete, and a fixing nut that is screwed to the upper end of the anchor bolt and that fixes the sleeper is constructed. When installing, first insert the holding bolt through the through hole of the sleeper, screw it into the holding nut to stand up on the track, and turn the holding bolt to bring the sleeper to a predetermined height. Then, an anchor plate is attached to the lower end portion of the holding bolt, and then a roadbed concrete is placed between the sleeper and the roadbed. Once the cleat is cured, pulling the retaining bolt, then together inserted anchor bolt, screwed into the anchor plate, then since screwing the fixing nut to the upper end of the anchor bolt,
The structure is extremely simple, and there is an effect that the level adjustment of the sleeper and the fixing of the sleeper can be performed very efficiently.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明に係る軌道の一例を示す縦断面図であ
る。
FIG. 1 is a vertical sectional view showing an example of a track according to the present invention.

【図2】アンカーボルトの取付状態を示す縦断面図であ
る。
FIG. 2 is a vertical cross-sectional view showing a mounting state of anchor bolts.

【図3】アンカーボルトの取付状態を示す拡大縦断面図
である。
FIG. 3 is an enlarged vertical sectional view showing a mounting state of anchor bolts.

【図4】この発明に係るまくら木の設置方法の一例を示
す縦断面図である。
FIG. 4 is a vertical cross-sectional view showing an example of a method of installing a sleeper according to the present invention.

【図5】保持ボルトの取付状態を示す拡大縦断面図であ
る。
FIG. 5 is an enlarged vertical sectional view showing a mounting state of holding bolts.

【図6】従来のまくら木の設置方法の一例を示す縦断面
図である。
FIG. 6 is a vertical cross-sectional view showing an example of a conventional method of installing a sleeper.

【図7】図6における一部横断面図である。FIG. 7 is a partial cross-sectional view of FIG.

【符号の説明】[Explanation of symbols]

1…まくら木、2…道床、3…道床コンクリート、4…
レール、5…レール締結金具、6…排水路、7…レベル
調整ジャッキ、8…コンクリートブロック、9…木製ブ
ロック、10…木製キャンバー、11…貫通孔、12…上部養
生シース、13…アンカープレート、14…アンカーボル
ト、15…固定ナット、16…保持ナット、17…保持ボル
ト、18…下部養生シース、19…ライナー、20…弾性シー
ト、21…パッキン、22…ワッシャー、23…キャップ。
1 ... Pillow, 2 ... Roadbed, 3 ... Roadbed concrete, 4 ...
Rails, 5 ... Rail fasteners, 6 ... Drainage channels, 7 ... Level adjustment jacks, 8 ... Concrete blocks, 9 ... Wooden blocks, 10 ... Wooden cambers, 11 ... Through holes, 12 ... Upper curing sheath, 13 ... Anchor plates, 14 ... Anchor bolt, 15 ... Fixing nut, 16 ... Holding nut, 17 ... Holding bolt, 18 ... Lower curing sheath, 19 ... Liner, 20 ... Elastic sheet, 21 ... Packing, 22 ... Washer, 23 ... Cap.

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 道床の上に、この道床の上に打設される
道床コンクリートに埋設されて設置される直結まくら木
の設置構造において、前記まくら木の両端部に上下方向
に貫通して形成された貫通孔に埋設された保持ナット
と、前記貫通孔に挿通され、かつ、前記保持ナットに螺
合されて前記道床の上に立設され、前記道床コンクリー
トが打設される前の、前記まくら木を保持する保持ボル
トと、前記保持ボルトが引き抜かれた後に前記貫通孔に
挿通され、かつ、前記道床コンクリート中に埋設された
アンカープレートのねじ孔に螺合されるアンカーボルト
と、このアンカーボルトの上端部に螺合され、前記まく
ら木を固定する固定ナットとを備えてなることを特徴と
する直結まくら木の設置構造。
1. A direct-connecting sleeper installation structure that is installed on a roadbed by being embedded in the roadbed concrete that is cast on the roadbed, and is formed by vertically penetrating both ends of the sleeper tree. A holding nut embedded in a through hole, inserted into the through hole, and screwed to the holding nut to stand upright on the roadbed, before the roadbed concrete is placed, the sleeper A holding bolt for holding, an anchor bolt that is inserted into the through hole after the holding bolt is pulled out, and is screwed into a screw hole of an anchor plate embedded in the roadbed concrete, and an upper end of the anchor bolt An installation structure for a directly connected sleeper, comprising a fixing nut that is screwed to the portion and that fixes the sleeper.
【請求項2】 請求項第1項において、保持ボルトをま
くら木の貫通孔に挿通し、かつ、保持ナットに螺合して
道床の上に立設するとともに、この保持ボルトを回して
前記まくら木を所定の高さに保持し、次に、前記保持ボ
ルトの下端部にアンカープレートを取り付け、次に、前
記まくら木と前記道床との間に道床コンクリートを打設
し、前記道床コンクリートが硬化したら、前記保持ボル
トを引き抜き、その後にアンカーボルトを挿通するとも
に、前記アンカープレートのねじ孔に螺合し、次に、前
記アンカーボルトの上端部に固定ナットを螺合すること
を特徴とする直結まくら木の設置方法。
2. The holding bolt according to claim 1, wherein the holding bolt is inserted into the through hole of the sleeper and is screwed to the holding nut to stand upright on the roadbed, and the holding bolt is turned to secure the sleeper. Hold at a predetermined height, then attach an anchor plate to the lower end of the holding bolt, then drive the roadbed concrete between the sleepers and the roadbed, and when the roadbed concrete hardens, Installation of a direct connection sleeper, characterized in that the holding bolt is pulled out, the anchor bolt is then inserted, the screw is screwed into the screw hole of the anchor plate, and then the fixing nut is screwed to the upper end of the anchor bolt. Method.
JP16900795A 1995-07-04 1995-07-04 Installation structure of directly connected pillows and installation method of directly connected pillows Expired - Fee Related JP2928745B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16900795A JP2928745B2 (en) 1995-07-04 1995-07-04 Installation structure of directly connected pillows and installation method of directly connected pillows

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16900795A JP2928745B2 (en) 1995-07-04 1995-07-04 Installation structure of directly connected pillows and installation method of directly connected pillows

Publications (2)

Publication Number Publication Date
JPH0913302A true JPH0913302A (en) 1997-01-14
JP2928745B2 JP2928745B2 (en) 1999-08-03

Family

ID=15878617

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16900795A Expired - Fee Related JP2928745B2 (en) 1995-07-04 1995-07-04 Installation structure of directly connected pillows and installation method of directly connected pillows

Country Status (1)

Country Link
JP (1) JP2928745B2 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1426490A2 (en) * 2002-12-07 2004-06-09 Sleepasafe Limited Method and apparatus for refurbishing parts of a railway track
WO2008141532A1 (en) * 2007-05-22 2008-11-27 Kohler (China) Investment Company Ltd. Stone link structure
WO2011079676A1 (en) * 2009-12-30 2011-07-07 中铁八局集团有限公司 Construction method for supporting layer of double-block ballastless track
CN102829287A (en) * 2011-11-30 2012-12-19 凯迈(洛阳)机电有限公司 Supporting and levelling device and test stand using same
CN105525539A (en) * 2016-01-11 2016-04-27 北京城建设计发展集团股份有限公司 Plate type roadbed built-in adjuster
CN105970748A (en) * 2016-06-13 2016-09-28 中国十九冶集团有限公司 Rail adjusting method
CN109881542A (en) * 2019-04-16 2019-06-14 郑州铁路职业技术学院 A kind of embedded traffic track component
CN113417173A (en) * 2021-08-04 2021-09-21 杨清福 Track structure suitable for super-high-speed train

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1426490A2 (en) * 2002-12-07 2004-06-09 Sleepasafe Limited Method and apparatus for refurbishing parts of a railway track
EP1426490A3 (en) * 2002-12-07 2005-05-04 Sleepasafe Limited Method and apparatus for refurbishing parts of a railway track
WO2008141532A1 (en) * 2007-05-22 2008-11-27 Kohler (China) Investment Company Ltd. Stone link structure
WO2011079676A1 (en) * 2009-12-30 2011-07-07 中铁八局集团有限公司 Construction method for supporting layer of double-block ballastless track
CN102829287A (en) * 2011-11-30 2012-12-19 凯迈(洛阳)机电有限公司 Supporting and levelling device and test stand using same
CN105525539A (en) * 2016-01-11 2016-04-27 北京城建设计发展集团股份有限公司 Plate type roadbed built-in adjuster
CN105970748A (en) * 2016-06-13 2016-09-28 中国十九冶集团有限公司 Rail adjusting method
CN105970748B (en) * 2016-06-13 2017-07-25 中国十九冶集团有限公司 The method of orbit adjusting
CN109881542A (en) * 2019-04-16 2019-06-14 郑州铁路职业技术学院 A kind of embedded traffic track component
CN113417173A (en) * 2021-08-04 2021-09-21 杨清福 Track structure suitable for super-high-speed train
CN113417173B (en) * 2021-08-04 2022-11-01 杨清福 Track structure suitable for super-high-speed train

Also Published As

Publication number Publication date
JP2928745B2 (en) 1999-08-03

Similar Documents

Publication Publication Date Title
US5538182A (en) Railroad crossing system
JPH0913302A (en) Installation method and structure of directly connected sleeper
JP3936864B2 (en) Cable storage duct device
JP3569878B2 (en) Jig for connecting precast concrete slabs
JP3472725B2 (en) Precast concrete sound barrier and its construction method
CA2388220C (en) Subway rail anchor assembly
JP2001295496A (en) Structure and method of installing viscous seismic control wall onto existing src constructed beam
JP3450054B2 (en) Installation method of floor slab on bridge girder and slab cradle
JP2853016B2 (en) Construction method of anti-vibration sleeper track
JP2912912B1 (en) Steel plate sandwich reinforcement method for concrete slab
JP2000045433A (en) Form fitting method and work execution method of concrete structure
JPH0554611U (en) Height adjustment structure of slab for bridge repair
JP3744832B2 (en) Lining method for water channel inner surface
KR100389562B1 (en) temporary assembling apparatus used in reilway branching point and method therefor
JP2003321913A (en) Method for repairing handrail and attachment device for new handrail
US20060054714A1 (en) Method of installing a railway sleeper
JP2000144648A (en) Soundproof wall made of precast concrete and its execution method
JP3926026B2 (en) Anchor fixed track structure and anchor fixed sleeper
JP3076534B2 (en) Concrete trackbed forming formwork device
JP2887720B2 (en) Level crossing pavement
JPH0138947B2 (en)
JPH086289B2 (en) Temporary tensioning method for bridge slab repair work
JP3452245B2 (en) Reinforcement method for concrete structure, reinforcement / form structure used therefor, and reinforcement / form support device constituting the reinforcement / form structure
JP2826682B2 (en) How to install precast members
JPS5837444B2 (en) Sleeper fixing method

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

R371 Transfer withdrawn

Free format text: JAPANESE INTERMEDIATE CODE: R371

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 10

Free format text: PAYMENT UNTIL: 20090514

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 10

Free format text: PAYMENT UNTIL: 20090514

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100514

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100514

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 12

Free format text: PAYMENT UNTIL: 20110514

LAPS Cancellation because of no payment of annual fees