JPH0874252A - Underwater steel pipe pile driving process and device thereof - Google Patents

Underwater steel pipe pile driving process and device thereof

Info

Publication number
JPH0874252A
JPH0874252A JP20844394A JP20844394A JPH0874252A JP H0874252 A JPH0874252 A JP H0874252A JP 20844394 A JP20844394 A JP 20844394A JP 20844394 A JP20844394 A JP 20844394A JP H0874252 A JPH0874252 A JP H0874252A
Authority
JP
Japan
Prior art keywords
steel pipe
guide frame
pipe pile
deck
underwater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP20844394A
Other languages
Japanese (ja)
Other versions
JP2759428B2 (en
Inventor
Shinobu Takahashi
忍 高橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP20844394A priority Critical patent/JP2759428B2/en
Publication of JPH0874252A publication Critical patent/JPH0874252A/en
Application granted granted Critical
Publication of JP2759428B2 publication Critical patent/JP2759428B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PURPOSE: To enable pile-driving to be carried out even in a super-large water depth because steel pipe piles having sufficent length for driving are lowered underseas while they are held by guide frames, while the steal pipe piles are economical because of no need for extra steel pipe piles, and the pile driving can be executed quickly and in few processes even in an ocean on the surface of which the marine meteorological conditions are severe. CONSTITUTION: An underwater steel pipe pile driving device consisting of a deck 9 equipped with a winch 8 and hung above the water surface, an upper guide frame 10, and a lower guide frame 11 individually hung from the deck 9 by the winch 8, and underwater hammers 13, each of which is mounted removably to the upper end of a driven steel pipe pile 4 arranged so as to penetrate through the upper guide frame 10, and the lower guide frame 11 and hung from the deck 9 by the winch 8 so that it can freely rise and fall, is used. After the lower guide frame 11 and the lower end of the steel pipe pile 4 reach the bottom of the water, the upper guide frame 10 is suitably lowered to drive the underwater hammers 13 to drive the steel pipe piles 4.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、水中構造物の構築に必
要とされる水中基礎鋼管杭の打設工法および装置に関す
るものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and apparatus for driving an underwater foundation steel pipe pile required for constructing an underwater structure.

【0002】[0002]

【従来の技術】従来は、図10〜図13に示すようにリーダ
マスト2に昇降自在に杭打ハンマー3を設けた杭打船1
で鋼管杭4を海上から打設している。この鋼管杭4は図
示は省略するが杭台船で運搬してきたものを図11に示す
ようにクレーン付台船で吊り上げ、順次溶接して長尺杭
としていく。
2. Description of the Related Art Conventionally, as shown in FIGS. 10 to 13, a pile driving ship 1 in which a pile driving hammer 3 is provided on a leader mast 2 so as to be vertically movable.
The steel pipe pile 4 is driven from the sea. Although not shown, the steel pipe pile 4 is carried by a pile carrier and hoisted by a carrier with a crane as shown in Fig. 11, and sequentially welded to form a long pile.

【0003】このように海上までの余長を含んだ長尺杭
を打設し、その後、図12に示すように水中切断機5で切
断し、余長分を回収する。
In this way, long piles including an extra length up to the sea are laid, and thereafter, as shown in FIG. 12, they are cut by an underwater cutting machine 5 and the extra length is collected.

【0004】また、打設精度を高上させるために予めテ
ンプレート(定規)6を海底に設置することも行われて
いる。
In addition, a template (ruler) 6 is also installed in advance on the seabed in order to improve the accuracy of driving.

【0005】[0005]

【発明が解決しようとする課題】前記水中基礎鋼管杭の
打設工法では鋼管杭4の材料が例えば水深に長さだけ余
分に必要となる。さらに、50m〜100 mといった超大水
深においては杭の長さがそれを上まわるものが必要とさ
れ、実質上施工が困難である。
In the construction method of the underwater foundation steel pipe pile, the material of the steel pipe pile 4 is required to have an extra length, for example, in the water depth. Furthermore, piles with a length greater than 50 m to 100 m are required at super-deep water, which makes construction practically difficult.

【0006】また、施工手順が多く、気象現象の厳しい
外洋での施工では時間がかかり過ぎる。
Further, there are many construction procedures, and it takes too much time for construction in the open sea where severe weather phenomena occur.

【0007】これに加えて、テンプレート6を海底に設
置するには仮杭7を余分に打設しなければならず、本来
の鋼管杭4を打設するのに等しい手間がかかる。
In addition to this, in order to install the template 6 on the seabed, extra provisional piles 7 have to be placed, and it takes the same labor as placing the original steel pipe piles 4.

【0008】本発明の目的は前記従来例の不都合を解消
し、超大水深においても施工可能で、しかも、必要な長
さの杭を余分を見ることなく少ない工程で迅速に施工す
ることができる水中鋼管杭打設工法および装置を提供す
ることにある。
The object of the present invention is to eliminate the disadvantages of the prior art, to enable construction even in an extremely large depth of water, and to construct a pile of a required length promptly in a small number of steps without looking at excess. To provide a steel pipe pile driving method and device.

【0009】[0009]

【課題を解決するための手段】本発明は前記目的を達成
するため、水中鋼管杭打設工法としては、巻上げ装置を
設置したデッキを水面上に吊支し、このデッキから上部
ガイドフレーム、下部ガイドフレームを個別に巻上げ装
置により昇降自在に吊下げ、また、上部ガイドフレー
ム、下部ガイドフレームを貫通するように打設鋼管杭を
配置し、この鋼管杭の上端に水中ハンマーを着脱自在に
取付け、この水中ハンマーの部分を前記デッキから巻上
げ装置により昇降自在に吊下げ、これら上部ガイドフレ
ーム、下部ガイドフレーム、水中ハンマー付きの鋼管杭
を水中に同時に降下させ、下部ガイドフレーム、鋼管杭
下端が水底に着底後、上部ガイドフレームを適宜降下さ
せ、水中ハンマーを駆動して鋼管杭を打設すること、お
よび、下部ガイドフレームは水中構造物であることを要
旨とするものである。
In order to achieve the above-mentioned object, the present invention provides a submersible steel pipe pile driving method in which a deck on which a hoisting device is installed is suspended from the surface of the water, and an upper guide frame and a lower part are suspended from the deck. The guide frames are individually hung up and down by a hoisting device, and a cast steel pipe pile is placed so as to penetrate through the upper guide frame and the lower guide frame, and a submersible hammer is detachably attached to the upper end of this steel pipe pile. The part of this underwater hammer is hung up and down freely from the deck by a hoisting device, these upper guide frame, lower guide frame, steel pipe pile with a submersible hammer are simultaneously lowered into the water, the lower guide frame, the lower end of the steel pipe pile is at the bottom of the water. After landing, lower the upper guide frame appropriately and drive the underwater hammer to drive the steel pipe pile, and lower guide frame. Over arm is to summarized in that a underwater structures.

【0010】また、水中鋼管杭打設装置としては、巻上
げ装置を設置した水面上に吊支するデッキと、このデッ
キから巻上げ装置により個別に昇降自在に吊下げる上部
ガイドフレームと下部ガイドフレーム、および、上部ガ
イドフレーム、下部ガイドフレームを貫通するように配
置する打設鋼管杭の上端に着脱自在に取付け、前記デッ
キから巻上げ装置により昇降自在に吊下げる水中ハンマ
ーとからなることを要旨とするものである。
As the underwater steel pipe pile driving device, a deck for suspending and supporting the hoisting device on the surface of the water, an upper guide frame and a lower guide frame for individually lifting and lowering from the deck by the hoisting device, and , A submersible hammer that is detachably attached to the upper end of a cast steel pipe pile that is arranged so as to pass through the upper guide frame and the lower guide frame, and that is vertically hung from the deck by a hoisting device. is there.

【0011】[0011]

【作用】請求項1および請求項3記載の本発明によれ
ば、水面上に吊支されるデッキから、上部ガイドフレー
ム、下部ガイドフレーム、および、水中ハンマーを着脱
自在に取付けた打設鋼管杭をそれぞれ個別に巻上げ装置
により昇降自在に吊下げるので、これらガイドフレーム
にガイドされながら鋼管杭は必要長さ分を水中ハンマー
による水中打設で精度良く水底に建込むことができる。
According to the present invention as set forth in claims 1 and 3, a cast steel pipe pile in which an upper guide frame, a lower guide frame, and a submersible hammer are detachably attached from a deck suspended above the water surface. Since each of them is individually hung up and down by a hoisting device, the steel pipe pile can be accurately laid on the bottom of the water by a submersible hammer for the required length while being guided by these guide frames.

【0012】請求項2記載の本発明によれば、下部ガイ
ドフレームは施工しようとする水中構造物を構成するの
で仮設ではなく本設利用として工事の合理化を図ること
ができる。
According to the present invention as set forth in claim 2, since the lower guide frame constitutes the underwater structure to be constructed, the construction can be rationalized not by temporary construction but by permanent construction.

【0013】[0013]

【実施例】以下、図面について本発明の実施例を詳細に
説明する。図1〜図6は本発明の水中鋼管杭打設工法の
1実施例を示す各工程の正面図である。
Embodiments of the present invention will now be described in detail with reference to the drawings. 1 to 6 are front views of respective steps showing one embodiment of the underwater steel pipe pile driving method of the present invention.

【0014】先に、この工法で使用する本発明の水中鋼
管杭打設装置について説明すると、図7にも示すように
巻上げ装置としてのウィンチ8を複数設置したデッキ9
を水面上に吊支する。図中9aは吊点である。
First, the underwater steel pipe pile driving device of the present invention used in this method will be described. As shown in FIG. 7, a deck 9 having a plurality of winches 8 as hoisting devices is installed.
Is suspended above the surface of the water. In the figure, 9a is a hanging point.

【0015】後述の鋼管杭4の貫通孔12を有するものと
して、図8に示すような上部ガイドフレーム10と、図9
に示すような下部ガイドフレーム11とを前記ウィンチ8
を介してデッキ9から昇降自在に吊下げる。この下部ガ
イドフレーム11は内部に注水可能なブイベースタイプの
ものであり、施工しようとする水中構造物の1部を兼ね
るものであってもよい。
An upper guide frame 10 as shown in FIG. 8 having a through hole 12 for a steel pipe pile 4 to be described later, and FIG.
The lower guide frame 11 as shown in FIG.
Suspend freely from deck 9 via. The lower guide frame 11 is of a buoy base type capable of injecting water, and may also serve as a part of an underwater structure to be constructed.

【0016】これら上部ガイドフレーム10と下部ガイド
フレーム11とを貫通して配置される鋼管杭4の上端に油
圧の水中ハンマー13を着脱自在に取付け、この水中ハン
マー13も前記ウィンチ8により昇降自在に吊下げる。
A hydraulic submersible hammer 13 is removably attached to the upper end of the steel pipe pile 4 arranged so as to pass through the upper guide frame 10 and the lower guide frame 11, and the submersible hammer 13 can also be raised and lowered by the winch 8. Hang.

【0017】次に、このような水中鋼管杭打設装置を用
いて行う本発明の水中鋼管杭打設工法について説明す
る。図1に示すようにウィンチ8を設置したデッキ9を
起重機船で水面上に吊支する。動力、計測ラインを船上
と接続する。
Next, an underwater steel pipe pile driving method of the present invention using such an underwater steel pipe pile driving apparatus will be described. As shown in FIG. 1, a deck 9 provided with a winch 8 is suspended on a water surface by a hoist ship. Power and measurement lines are connected to the ship.

【0018】その際、このデッキ9から上部ガイドフレ
ーム10、下部ガイドフレーム11を個別にウィンチ8によ
り昇降自在に吊下げ、また、上部ガイドフレーム10、下
部ガイドフレーム11を貫通するように打設鋼管杭4を配
置し、この鋼管杭4の上端に水中ハンマー13を着脱自在
に取付け、この水中ハンマー13の部分を前記デッキ9か
ら昇降自在に吊下げる。
At this time, the upper guide frame 10 and the lower guide frame 11 are individually suspended from the deck 9 by the winch 8 so that the upper guide frame 10 and the lower guide frame 11 can be lifted up and down. A pile 4 is arranged, a submersible hammer 13 is detachably attached to the upper end of the steel pipe pile 4, and the portion of the submersible hammer 13 is suspended from the deck 9 so as to be vertically movable.

【0019】図2に示すように旋回起伏で所定位置を合
わせ、巻下げる。デッキ9が海面上5mの位置で巻下げ
停止し、このデッキ9は海面上で位置固定を行う。そし
て、上部ガイドフレーム10、下部ガイドフレーム11、鋼
管杭4などをウィンチ8で巻下げ、同時に海中に降下さ
せる。
As shown in FIG. 2, a predetermined position is aligned by turning up and down, and it is wound down. The deck 9 stops unwinding at a position 5 m above sea level, and this deck 9 fixes its position above sea level. Then, the upper guide frame 10, the lower guide frame 11, the steel pipe pile 4, etc. are wound down by the winch 8 and simultaneously lowered into the sea.

【0020】図3に示すように、鋼管杭4の下端および
下部ガイドフレーム11を水底に着底させ、下部ガイドフ
レーム11はウィンチ8の荷重管理で水平保持する。鋼管
杭4は自沈安定させる。
As shown in FIG. 3, the lower end of the steel pipe pile 4 and the lower guide frame 11 are attached to the bottom of the water, and the lower guide frame 11 is held horizontally by the load control of the winch 8. The steel pipe pile 4 is stabilized by self-sinking.

【0021】鋼管杭4の打設準備に入り、図4に示すよ
うに上部ガイドフレーム10を適当な位置まで巻下げる。
Preparation for driving the steel pipe pile 4 is started, and the upper guide frame 10 is wound down to an appropriate position as shown in FIG.

【0022】図5に示すように、水中ハンマー13を起動
して鋼管杭4を打設し、同時に上部ガイドフレーム10を
順次巻下げる。
As shown in FIG. 5, the submersible hammer 13 is activated to drive the steel pipe pile 4, and at the same time, the upper guide frame 10 is sequentially lowered.

【0023】打設完了後、図6に示すように、水中ハン
マー13のチャック13aを開放し、巻上げ回収を行う。ま
た、上部ガイドフレーム10を巻上げ引き抜き、回収す
る。下部ガイドフレーム11の吊具を切り離し、吊具を回
収する。
After the driving is completed, as shown in FIG. 6, the chuck 13a of the submersible hammer 13 is opened, and the winding and collecting are performed. Further, the upper guide frame 10 is wound up, pulled out, and collected. The lifting tool of the lower guide frame 11 is separated and the lifting tool is collected.

【0024】[0024]

【発明の効果】以上述べたように本発明の水中鋼管杭打
設工法および装置は、鋼管杭は打設するだけの長さのも
のをガイドフレームで保持して水中に降下させるので、
超大水深においても施工可能なものであり、しかも、鋼
管杭は余分を見る必要がなく経済的であり、また、気象
海象の厳しい外洋での施工でも、少ない工程で迅速に施
工することができるものである。
As described above, in the method and apparatus for driving a submerged steel pipe pile according to the present invention, a steel pipe pile having a length sufficient for driving is held by the guide frame and lowered into water.
It can be constructed even in super-deep water, and it is economical because it does not need to see extra steel pipe piles, and it can be constructed quickly with a small number of steps even in the open sea where the weather and sea conditions are severe. Is.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の水中鋼管杭打設工法の1実施例を示す
第1工程の正面図である。
FIG. 1 is a front view of a first step showing one embodiment of a method for driving a submerged steel pipe pile according to the present invention.

【図2】本発明の水中鋼管杭打設工法の1実施例を示す
第2工程の正面図である。
FIG. 2 is a front view of a second step showing one embodiment of the underwater steel pipe pile driving method of the present invention.

【図3】本発明の水中鋼管杭打設工法の1実施例を示す
第3工程の正面図である。
FIG. 3 is a front view of a third step showing an embodiment of the underwater steel pipe pile driving method of the present invention.

【図4】本発明の水中鋼管杭打設工法の1実施例を示す
第4工程の正面図である。
FIG. 4 is a front view of a fourth step showing an embodiment of the underwater steel pipe pile driving method of the present invention.

【図5】本発明の水中鋼管杭打設工法の1実施例を示す
第5工程の正面図である。
FIG. 5 is a front view of a fifth step showing an embodiment of the underwater steel pipe pile driving method of the present invention.

【図6】本発明の水中鋼管杭打設工法の1実施例を示す
第5工程の正面図である。
FIG. 6 is a front view of a fifth step showing one embodiment of the method for driving a submerged steel pipe pile according to the present invention.

【図7】デッキ部分の平面図である。FIG. 7 is a plan view of a deck portion.

【図8】上部ガイドフレームの平面図である。FIG. 8 is a plan view of an upper guide frame.

【図9】下部ガイドフレームの平面図である。FIG. 9 is a plan view of a lower guide frame.

【図10】従来例の杭打設時の側面図である。FIG. 10 is a side view of a conventional example when driving a pile.

【図11】従来例の杭継ぎ足し時の側面図である。FIG. 11 is a side view of a conventional example when adding piles.

【図12】従来例の杭切断時の側面図である。FIG. 12 is a side view of a conventional example when cutting a pile.

【図13】他の従来例の杭打設時の側面図である。FIG. 13 is a side view of another conventional example when driving piles.

【符号の説明】[Explanation of symbols]

1…杭打船 2…リーダマスト 3…杭打ハンマー 4…鋼管杭 5…水中切断機 6…テンプレート 7…仮杭 8…ウィンチ 9…デッキ 9a…吊点 10…上部ガイドフレーム 11…下部ガイドフレ
ーム 12…貫通孔 13…水中ハンマー 13a…チャック
1 ... Pile driving ship 2 ... Leader mast 3 ... Pile driving hammer 4 ... Steel pipe pile 5 ... Underwater cutting machine 6 ... Template 7 ... Temporary pile 8 ... Winch 9 ... Deck 9a ... Suspension point 10 ... Upper guide frame 11 ... Lower guide frame 12 ... Through hole 13 ... Submersible hammer 13a ... Chuck

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 巻上げ装置を設置したデッキを水面上に
吊支し、このデッキから上部ガイドフレーム、下部ガイ
ドフレームを個別に巻上げ装置により昇降自在に吊下
げ、また、上部ガイドフレーム、下部ガイドフレームを
貫通するように打設鋼管杭を配置し、この鋼管杭の上端
に水中ハンマーを着脱自在に取付け、この水中ハンマー
の部分を前記デッキから巻上げ装置により昇降自在に吊
下げ、これら上部ガイドフレーム、下部ガイドフレー
ム、水中ハンマー付きの鋼管杭を水中に同時に降下さ
せ、下部ガイドフレーム、鋼管杭下端が水底に着底後、
上部ガイドフレームを適宜降下させ、水中ハンマーを駆
動して鋼管杭を打設することを特徴とする水中鋼管杭打
設工法。
1. A deck on which a hoisting device is installed is suspended from the surface of the water, and an upper guide frame and a lower guide frame are individually hung from the deck by a hoisting device, and an upper guide frame and a lower guide frame are suspended. A steel pipe pile is arranged so as to penetrate through, a submersible hammer is removably attached to the upper end of this steel pipe pile, and the portion of this submersible hammer is suspended from the deck by a hoisting device, these upper guide frames, Lower the lower guide frame and steel pipe pile with a submersible hammer at the same time into the water, and after the lower guide frame and the lower end of the steel pipe pile reach the bottom of the water,
An underwater steel pipe pile driving method characterized by lowering the upper guide frame appropriately and driving a submersible hammer to drive a steel pipe pile.
【請求項2】 下部ガイドフレームは水中構造物である
請求項1記載の水中鋼管杭打設工法。
2. The underwater steel pipe pile driving method according to claim 1, wherein the lower guide frame is an underwater structure.
【請求項3】 巻上げ装置を設置した水面上に吊支する
デッキと、このデッキから巻上げ装置により個別に昇降
自在に吊下げる上部ガイドフレームと下部ガイドフレー
ム、および、上部ガイドフレーム、下部ガイドフレーム
を貫通するように配置する打設鋼管杭の上端に着脱自在
に取付け、前記デッキから巻上げ装置により昇降自在に
吊下げる水中ハンマーとからなることを特徴とする水中
鋼管杭打設装置。
3. A deck for suspending and supporting the hoisting device on the surface of the water, an upper guide frame and a lower guide frame which are individually hung up and down from the deck by the hoisting device, and an upper guide frame and a lower guide frame. An underwater steel pipe pile placing device comprising a submersible hammer detachably attached to an upper end of a cast steel pipe pile arranged so as to penetrate therethrough and hung up and down by a hoisting device from the deck.
JP20844394A 1994-09-01 1994-09-01 Underwater steel pipe pile driving method and equipment Expired - Fee Related JP2759428B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP20844394A JP2759428B2 (en) 1994-09-01 1994-09-01 Underwater steel pipe pile driving method and equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP20844394A JP2759428B2 (en) 1994-09-01 1994-09-01 Underwater steel pipe pile driving method and equipment

Publications (2)

Publication Number Publication Date
JPH0874252A true JPH0874252A (en) 1996-03-19
JP2759428B2 JP2759428B2 (en) 1998-05-28

Family

ID=16556301

Family Applications (1)

Application Number Title Priority Date Filing Date
JP20844394A Expired - Fee Related JP2759428B2 (en) 1994-09-01 1994-09-01 Underwater steel pipe pile driving method and equipment

Country Status (1)

Country Link
JP (1) JP2759428B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014129686A (en) * 2012-12-28 2014-07-10 Nippon Steel & Sumikin Engineering Co Ltd Construction method for rotary press-in pile
CN115045276A (en) * 2022-07-11 2022-09-13 广东省水利水电第三工程局有限公司 Mobile positioning pile splicing platform device for steel pipe piles in water and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014129686A (en) * 2012-12-28 2014-07-10 Nippon Steel & Sumikin Engineering Co Ltd Construction method for rotary press-in pile
CN115045276A (en) * 2022-07-11 2022-09-13 广东省水利水电第三工程局有限公司 Mobile positioning pile splicing platform device for steel pipe piles in water and construction method

Also Published As

Publication number Publication date
JP2759428B2 (en) 1998-05-28

Similar Documents

Publication Publication Date Title
CN109629568A (en) The process for sinking of the steady stake platform of offshore wind farm jacket foundation steel pipe pile floating
US4126008A (en) Sea-floor template
EP0453487B1 (en) A method and a device for mounting the piles associated with the installation of a pile-founded offshore platform
JPH10140536A (en) Frame for laying underwater mat and laying method of underwater mat
JP2759428B2 (en) Underwater steel pipe pile driving method and equipment
CN104627326A (en) Special lifting and vibration-driving ship for integrated driving of cell type steel sheet pile large cylinders and vice cells
JPH06322764A (en) Underwater concrete construction method and device thereof
JP2939777B2 (en) How to install underwater beams
CN106335608A (en) Mounting method of seabed anchor
JPH0619642Y2 (en) Sea garden building equipment
CN217231819U (en) Steel pile positioning overwater vibro-replacement pile construction ship
JP2001182072A (en) Caisson attitude control method and device therefor
CN220746852U (en) Self-elevating platform suitable for marine rock-soil survey
JPH1046597A (en) Execution work method of steel shell caisson
CN218288058U (en) Pile inserting drilling ship for tidal zone and shoal water area exploration
JPS60215924A (en) Settlement of steel skeleton for underwater foundation structure
JPS58207410A (en) Assembler for prefabricated steel sheet pile cell
CN212223882U (en) Underwater pile stabilizing system for pile sinking of deep water jacket pile
JPS6024795Y2 (en) Submarine ground work boat
JP2001152467A (en) Method for submerging submerged caisson
JPH0483094A (en) Tunnelling under water and suspension aid of ring piece
JPH0213098B2 (en)
JPS62112809A (en) Setting of one-point mooring device
JPS59165721A (en) Driving tower for prefabricated drain material in water
JPH1018298A (en) Caisson settling method

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees