JPH086544B2 - Construction method of self-supporting power pole and its basic structure - Google Patents

Construction method of self-supporting power pole and its basic structure

Info

Publication number
JPH086544B2
JPH086544B2 JP1179673A JP17967389A JPH086544B2 JP H086544 B2 JPH086544 B2 JP H086544B2 JP 1179673 A JP1179673 A JP 1179673A JP 17967389 A JP17967389 A JP 17967389A JP H086544 B2 JPH086544 B2 JP H086544B2
Authority
JP
Japan
Prior art keywords
pipe
screw auger
foundation
pair
foundation pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP1179673A
Other languages
Japanese (ja)
Other versions
JPH0343591A (en
Inventor
嗣彦 渡辺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Electric Power Co Inc
Original Assignee
Tokyo Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Electric Power Co Inc filed Critical Tokyo Electric Power Co Inc
Priority to JP1179673A priority Critical patent/JPH086544B2/en
Publication of JPH0343591A publication Critical patent/JPH0343591A/en
Publication of JPH086544B2 publication Critical patent/JPH086544B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)
  • Earth Drilling (AREA)

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明は、地下水脈を横切って電柱用基礎パイプを埋
設する方法とその基礎構造に関するものである。
Description: TECHNICAL FIELD The present invention relates to a method of burying a utility pole foundation pipe across a groundwater vein and its foundation structure.

[従来の技術] 通常の電柱用の基礎パイプの埋設に当っては、穴掘り
建柱車(図示せず)のスクリューオーガ1で基礎パイプ
2の長さに見合った先行穴3を掘穿する。(第9図) 次にスクリューオーガ1の先端銛4を基礎パイプ2内
に予め設定した電柱用の受け台5に連繋し、穴掘り建柱
車の自重を負荷しながらスクリューオーガ1を回転する
と、基礎パイプ2も同時に駆動回転され、その先端縁に
固定した切削刃6,6…が前述の既に掘穿した先行穴3の
周壁を切り崩しながら捻じ込まれ、第10図示のように基
礎パイプ2の外周壁が土に密接した状態で捻じ込まれ
る。
[Prior Art] When burying a base pipe for a normal utility pole, a preceding hole 3 corresponding to the length of the base pipe 2 is pierced by a screw auger 1 of a digging column truck (not shown). . (Fig. 9) Next, when the tip harpoon 4 of the screw auger 1 is connected to the pedestal 5 for the utility pole that is set in advance in the foundation pipe 2, and the screw auger 1 is rotated while applying the own weight of the digging construction pole car. , The foundation pipe 2 is also driven and rotated at the same time, and the cutting blades 6, 6 ... Fixed to the leading edge of the foundation pipe 2 are screwed in while breaking down the peripheral wall of the previously drilled preceding hole 3, and as shown in FIG. The outer peripheral wall of is screwed in close to the soil.

この時、第11図示のように掘穿された基礎パイプ1の
底部の受け台5の下方に、切削刃6,6…により削り取ら
れた土7が堆積すると同時に受け台5の下に空洞8を生
じた場合には、これを完全に土砂で埋設してから電柱9
を受け台5上に載置する。
At this time, the soil 7 scraped off by the cutting blades 6, 6 ... Deposits below the pedestal 5 at the bottom of the foundation pipe 1 that has been dug as shown in FIG. If it occurs, completely bury it in earth and sand and then
Place it on the pedestal 5.

この際、基礎パイプ2と電柱9との間の隙間dは土砂
で完全に間詰めして固めると共に地ぎわ部分10は速乾性
モルタル10′で固め、間詰めした砂が流出しないように
構成する(第13図)ものである。
At this time, the gap d between the foundation pipe 2 and the electric pole 9 is completely packed with sand and solidified, and the ground portion 10 is solidified with quick-drying mortar 10 'so that the packed sand does not flow out. (Fig. 13)

[発明が解決しようとする課題] 従来の技術で述べたように、地下水脈のない通常の土
地における自立電柱の建込みについては前述の通りであ
るが、スクリューオーガの掘穿に際して、第14図のよう
に地中に存在する水脈11を不幸にして横切るような場合
には、流出する水と共に先行穴3の内壁が崩れ落ちるこ
ととなり、ポンプ排水が手間どったり、水量が豊富な場
合には、先行穴3内の出水部分12が大きくえぐり取られ
る形となり(第15図)後刻施工される基礎パイプ2と土
との密着が阻害され、基礎パイプ2の固定がそれだけ不
安定なものとなり、基礎パイプ2の支持力が低下せざる
を得ない。(第16図) このことは日時の経過と共に土砂の崩れも次第に大き
くなり、不安定性を益々増大することとなった。
[Problems to be Solved by the Invention] As described in the prior art, the construction of the self-supporting utility pole in the normal land without a groundwater vein is as described above, but when digging the screw auger, FIG. When the water vein 11 existing in the ground is unfortunately crossed, the inner wall of the preceding hole 3 collapses along with the outflowing water, and when pump drainage is troublesome or the water amount is abundant, The flooded part 12 in the preceding hole 3 is largely scooped out (Fig. 15) and the adhesion between the foundation pipe 2 and the soil, which will be constructed later, is hindered, and the fixing of the foundation pipe 2 becomes so unstable that the foundation The bearing capacity of the pipe 2 is unavoidable. (Fig. 16) This means that the landslides will gradually increase with the passage of time, and the instability will increase.

本発明は、従来の技術の有するこのような問題点に鑑
みなされたもので、その目的とするところは、前述のよ
うな水脈が土中の基礎パイプ埋設部分を横切るような状
態にあっても基礎パイプ2の固定を充分に行い、経年的
使用に耐え得る電柱の建込みを行い得る方法とその基礎
構造を提案するものである。
The present invention has been made in view of the above problems of the conventional technique, and its object is to provide a water vein as described above even in a state where the water vein crosses a portion where the foundation pipe is buried in the soil. The present invention proposes a method and a basic structure that can sufficiently fix the foundation pipe 2 and build an electric pole that can endure long-term use.

[課題を解決するための手段] 上記の目的を達成するために、本発明の自立電柱の建
込み方法は、電柱を保持する基礎パイプを横切る水脈が
ある場合、スクリューオーガによる掘穿を前記水脈に達
しない上部に留どめ、先端に複数の切削刃を装備した完
全空洞の基礎パイプの上端開口に設けられた一対の係止
部に回動連繋工具の凸部を嵌合すると共に、前記回動連
繋工具に挿貫固定したボルトナットに前記スクリューオ
ーガの銛部を係止した状態で該スクリューオーガを回動
することによって前記水脈を横切って前記基礎パイプを
所要深さまで捻じ込んだ後、前記回動連繋工具を取り外
し、前記スクリューオーガのみで前記基礎パイプ内の土
砂を掘削排除して所望の深さにおいて前記スクリューオ
ーガを抜去し、懸吊受け台の一対のバンドを前記基礎パ
イプの各係止部に係架してビス止めすることにより、前
記バンドの下端間に固設された受け台部分を前記基礎パ
イプ内に懸吊した後、前記受け台部分の下方を土砂で埋
め固め、電柱を前記懸吊受け台の受け台部分に載せ、前
記基礎パイプと前記電柱間とを土砂で間詰めすると共に
地ぎわ部分は速乾性モルタルで充填するようにしたこと
を特徴としている。
[Means for Solving the Problems] In order to achieve the above object, the method for constructing a self-supporting utility pole of the present invention is such that when there is a water vein crossing a foundation pipe that holds the power pole, the water vein is formed by drilling with a screw auger. It stays in the upper part that does not reach, and fits the convex part of the rotation connecting tool to the pair of locking parts provided in the upper end opening of the complete hollow base pipe equipped with a plurality of cutting blades at the tip, and After screwing the foundation pipe to the required depth across the water vein by rotating the screw auger with the harpoon part of the screw auger locked to the bolt nut fixed through the rotation connecting tool, Remove the rotation connecting tool, excavate and remove the earth and sand in the foundation pipe with only the screw auger to remove the screw auger at a desired depth, and remove the pair of bands of the suspension cradle. By suspending the pedestal portion fixed between the lower ends of the bands in the basic pipe by suspending with screws with each locking portion of the basic pipe, the lower portion of the pedestal portion is It is filled with earth and sand, the electric pole is placed on the pedestal portion of the suspension cradle, the space between the foundation pipe and the electric pole is filled with earth and sand, and the ground line portion is filled with quick-drying mortar. I am trying.

また、本発明の自立電柱の建込み基礎構造は、地下水
脈を横切る所要長を有し、上端開口に一対の係止部が穿
設された完全空洞の基礎パイプと、該基礎パイプの前記
係止部に係架してビス止めされる一対のバンドの下端間
に受け台部分が固設されると共に、該受け台部分に前記
基礎パイプ内の中心点を定める規制杆が十文字状に張設
された懸吊受け台とを備え、両端に一対の凸部を固設す
ると共に、一側にボルトナットを挿貫固定して成る回動
連繋工具の前記凸部の夫々を前記基礎パイプの各係止部
に嵌合した状態で前記ボルトナットにスクリューオーガ
の銛部を連結して回動することにより、前記基礎パイプ
を地中に捻じ込み可能としたことを特徴としている。
Further, the built-in foundation structure of the self-supporting utility pole of the present invention has a required length that traverses a groundwater vein, and a completely hollow foundation pipe having a pair of locking portions formed in an upper end opening thereof, and the above-mentioned member of the foundation pipe. A pedestal portion is fixedly provided between the lower ends of a pair of bands that are fastened by screws to the stop portion, and a regulation rod that defines the center point of the base pipe is stretched in a cross shape on the pedestal portion. Each of the base pipes is provided with each of the protrusions of a rotary connection tool that is provided with a pair of protrusions fixedly provided at both ends and a bolt and nut is inserted and fixed on one side. It is characterized in that the foundation pipe can be screwed into the ground by connecting and rotating the harpoon portion of the screw auger with the bolt nut in a state of being fitted to the locking portion.

[作用] 地下の水脈を横切って基礎パイプの切削刃によって直
接掘り進めると同時に基礎パイプの側壁で水の流入及び
土砂崩れを阻止する掘穿方法により、先行穴の周壁が崩
れることを防止するものであり、基礎パイプを先ず捻じ
込んだ後、同パイプ内の土砂をスクリューオーガによっ
て掘穿排除するものであるから、地下水脈の横断がきわ
めて円滑に行われ得る。
[Operation] The surrounding wall of the preceding hole is prevented from collapsing by the digging method that cuts water directly into the underground pipe by the cutting edge of the foundation pipe and at the same time prevents the inflow of water and the landslide on the side wall of the foundation pipe. Since the foundation pipe is first screwed in and then the earth and sand in the pipe is excavated by a screw auger, the groundwater vein can be crossed very smoothly.

[実施例] 実施例について図面を参照して説明する。[Examples] Examples will be described with reference to the drawings.

注意すべきことは、本発明に係る第1図から第8図に
おいて、従来品と同じ部品には同一符号を符してある。
It should be noted that, in FIGS. 1 to 8 according to the present invention, the same parts as those of the conventional product are designated by the same reference numerals.

先ず、スクリューオーガ1にて第1図示のように地下
水脈11に達しない上部に留めて先行穴を掘穿し、そこで
スクリューオーガ11を抜き取って基礎パイプ2を完全に
空洞にしておき、第2図示のように先端銛4に回動連繋
工具13(第8図示)を介して、基礎パイプ2を連結す
る。
First, as shown in the first illustration, the screw auger 1 is fastened to the upper part that does not reach the groundwater vein 11 to dig a preceding hole, and then the screw auger 11 is pulled out to leave the foundation pipe 2 completely hollow, and the second As shown in the figure, the foundation pipe 2 is connected to the tip harpoon 4 via a rotary connection tool 13 (shown in FIG. 8).

この回動連繋工具13は、基礎パイプ2の内側に嵌合
し、その下端の突子14、14を基礎パイプ2の切欠部15、
15に嵌装するようにしてあり、回動連繋工具13の一側に
はパイプ16、16が各両端を突出した状態で固設され、こ
れらのパイプ16、16にボルト17を挿貫固定するようにし
てあり、第2図示のように、回動連繋工具13内を貫通し
たボルト17に対してスクリューオーガ1の先端銛4の一
部を当接して両者が連結されるようにしてある。このよ
うにして中心を全く空洞にした基礎パイプ2をスクリュ
ーオーガに連結して前述の先行穴3に押し込み捻じ込ん
で行き、同パイプ2の切削刃6,6…で先ず先行穴3の周
壁に沿ってこれを削り乍ら進入し、穴底部3aに至れば、
そのままパイプ2のみを強制的に捻じ込むもので、この
際、切削刃において6,6…に接して直ちに基礎パイプ2
の周壁が水脈11を殆ど遮断して水の流入を確実に阻止し
てパイプ内部に進入させることはなく、また第15図示の
ように土砂の崩れ落ちることを防止することができる。
The rotary connecting tool 13 is fitted inside the foundation pipe 2, and the lower end projections 14, 14 are provided with notches 15 in the foundation pipe 2.
The pipes 16 and 16 are fixedly mounted on one side of the rotary connection tool 13 with both ends projecting, and bolts 17 are inserted and fixed to these pipes 16 and 16. As shown in the second drawing, a part of the tip harpoon 4 of the screw auger 1 is brought into contact with the bolt 17 penetrating the rotation connecting tool 13 so that they are connected to each other. In this way, the foundation pipe 2 having a completely hollow center is connected to the screw auger and pushed into the preceding hole 3 and screwed in. The cutting blades 6, 6 ... If you cut this along and enter, and reach the bottom 3a of the hole,
Only the pipe 2 is forcibly screwed in as it is. At this time, the foundation pipe 2 is immediately contacted with 6, 6 ...
The peripheral wall of the device does not almost block the water vein 11 to reliably prevent the inflow of water to enter the inside of the pipe, and it is possible to prevent the sediment from collapsing as shown in FIG.

かくして水脈11を第4図示のように横切って一定の深
さに達した基礎パイプ2から回動連繋工具13を取り外し
てスクリューオーガ1のみで基礎パイプ2内の土砂を排
除し、所要の深さにおいて停止し、スクリューオーガ1
を抜き取って、第7図示の懸吊受け台18の両端に設けた
バンド19の先端鈎部20,20を基礎パイプ2の前記切欠部1
5,15に係架すると共にビス21,21で基礎パイプ2の係止
孔22,22に夫々固定し、受け台部分5の下方は充分に土
砂で埋め固めた後、電柱9をこの上に載置するもので受
け台部分5には十文字状の規制杆23を設けて中心点を出
すようにしてある。
Thus, the rotary connecting tool 13 is removed from the foundation pipe 2 which has reached a certain depth across the water vein 11 as shown in FIG. 4, and the earth and sand in the foundation pipe 2 are removed only by the screw auger 1 to obtain the required depth. Stop at the screw auger 1
And the tip hooks 20 and 20 of the band 19 provided at both ends of the suspension cradle 18 shown in FIG.
It is hung on 5,15 and fixed to the locking holes 22,22 of the base pipe 2 with screws 21,21 respectively, and the lower part of the pedestal part 5 is sufficiently filled with earth and sand, and then the utility pole 9 is placed on it. The pedestal portion 5 is to be placed and is provided with a cross-shaped regulating rod 23 so that the center point is provided.

かくして、受け台部分5に載置された電柱9とパイプ
周壁との間隙dには充分に土砂を間詰めすると共にグラ
ンド表面に近い地ぎわ部分10には速乾性モルタルを埋設
して工事を完了するものである。(第5図) [発明の効果] このようにして埋設された基礎パイプは、該パイプで
直接水脈を横切るため、第3図乃至第5図示のように極
力土砂崩れを防止することが可能であり、基礎パイプ埋
設後の耐用度もきわめて良好であり、作業の簡易化と共
に埋設作業及び構造においてきわめて優れた効果をもた
らし得たものである。
Thus, the gap d between the utility pole 9 placed on the cradle part 5 and the pipe peripheral wall is sufficiently filled with earth and sand, and the ground wrinkle part 10 near the ground surface is filled with quick-drying mortar to complete the construction. To do. (FIG. 5) [Effect of the invention] Since the foundation pipe thus buried crosses the water vein directly by the pipe, it is possible to prevent landslide as much as possible as shown in FIGS. 3 to 5. The durability after burying the foundation pipe was also extremely good, and it was possible to bring about an extremely excellent effect in the burying work and structure as well as simplifying the work.

【図面の簡単な説明】[Brief description of drawings]

第1図乃至第5図は本発明による電柱の埋設順序の具体
例を示す一部を切欠した側面図、第6図は基礎パイプの
斜視図、第7図は懸吊受け台の斜視図、第8図は回動連
繋工具の斜視図、第9図乃至第13図は従来の通常の場合
の埋設を順序的に示す一部切欠側面図、第14図乃至第16
図は地下に水脈の存在する場合の掘削状態を示す一部切
欠側面図である。 1〜スクリューオーガ、2〜基礎パイプ 3〜先行穴、4〜先端銛 5〜受け台部分、6〜切削刃 9〜電柱、11〜水脈 13〜回動連繋工具、18〜懸吊受け台
1 to 5 are partially cutaway side views showing a specific example of the order of burying electric poles according to the present invention, FIG. 6 is a perspective view of a foundation pipe, and FIG. 7 is a perspective view of a suspension cradle. FIG. 8 is a perspective view of the rotary connection tool, FIGS. 9 to 13 are partially cutaway side views sequentially showing the conventional embedding in a normal case, and FIGS. 14 to 16.
The figure is a partially cutaway side view showing an excavated state when a water vein exists underground. DESCRIPTION OF SYMBOLS 1-Screw auger, 2-Foundation pipe 3-Preceding hole, 4-Tip harpoon 5-Receptor part, 6-Cutting blade 9-Power pole, 11-Water vein 13-Rotating connection tool, 18-Suspended cradle

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】電柱を保持する基礎パイプ(2)を横切る
水脈がある場合、スクリューオーガ(1)による掘穿を
前記水脈に達しない上部に留どめ、先端に複数の切削刃
(6、6…)を装備した完全空洞の基礎パイプ(2)の
上端開口に設けられた一対の係止部(15、15)に回動連
繋工具(13)の凸部(14、14)を嵌合すると共に、前記
回動連繋工具(13)に挿貫固定したボルトナット(17)
に前記スクリューオーガ(1)の銛部を係止した状態で
該スクリューオーガ(1)を回動することによって前記
水脈を横切って前記基礎パイプ(2)を所要深さまで捻
じ込んだ後、前記回動連繋工具(13)を取り外し、前記
スクリューオーガ(1)のみで前記基礎パイプ(2)内
の土砂を掘削排除して所望の深さにおいて前記スクリュ
ーオーガ(1)を抜去し、懸吊受け台(18)の一対のバ
ンド(19、19)を前記基礎パイプ(2)の各係止部(1
5、15)に係架してビス止めすることにより、前記バン
ド(19、19)の下端間に固設された受け台部分(5)を
前記基礎パイプ(2)内に懸吊した後、前記受け台部分
(5)の下方を土砂で埋め固め、電柱(9)を前記懸吊
受け台(18)の受け台部分(5)に載せ、前記基礎パイ
プ(2)と前記電柱(9)間とを土砂で間詰めすると共
に地ぎわ部分(10)は速乾性モルタル(10′)で充填す
るようにしたことを特徴とする自立電柱の建込み方法。
1. When there is a water vein crossing a foundation pipe (2) holding a utility pole, the drilling by a screw auger (1) is retained at an upper portion which does not reach the water vein, and a plurality of cutting blades (6, (6 ...) equipped with a pair of locking parts (15, 15) provided on the upper end opening of a completely hollow base pipe (2), the convex parts (14, 14) of the rotary connection tool (13) are fitted. Bolt nut (17) which is inserted and fixed in the rotation connecting tool (13).
After screwing the foundation pipe (2) to the required depth across the water vein by rotating the screw auger (1) with the harpoon part of the screw auger (1) locked to the Remove the motion connecting tool (13), excavate and remove the earth and sand in the foundation pipe (2) with only the screw auger (1), and remove the screw auger (1) at a desired depth, and suspend the cradle. The pair of bands (19, 19) of (18) are connected to the respective locking portions (1) of the foundation pipe (2).
After suspending the pedestal part (5) fixed between the lower ends of the bands (19, 19) in the foundation pipe (2) by suspending it with screws by fixing it to the pipes (5, 15), The lower part of the pedestal part (5) is filled with earth and sand, and the electric pole (9) is placed on the pedestal part (5) of the suspension pedestal (18), the foundation pipe (2) and the electric pole (9). The method for constructing a self-supporting utility pole is characterized in that the space is filled with earth and sand and the ground line portion (10) is filled with a quick-drying mortar (10 ').
【請求項2】地下水脈を横切る所要長を有し、上端開口
に一対の係止部(15、15)が穿設された完全空洞の基礎
パイプ(2)と、該基礎パイプ(2)の前記係止部(1
5、15)に係架してビス止めされる一対のバンド(19、1
9)の下端間に受け台部分(5)が固設されると共に、
該受け台部分(5)に前記基礎パイプ(2)内の中心点
を定める規制杆(23)が十文字状に張設された懸吊受け
台(18)とを備え、両端に一対の凸部(14、14)を固設
すると共に、一側にボルトナット(17)を挿貫固定して
成る回動連繋工具(13)の前記凸部(14、14)の夫々を
前記基礎パイプ(2)の各係止部(15、15)に嵌合した
状態で前記ボルトナット(17)にスクリューオーガ
(1)の銛部を連結して回動することにより、前記基礎
パイプ(2)を地中に捻じ込み可能としたことを特徴と
する自立電柱の建込み基礎構造。
2. A completely hollow base pipe (2) having a required length that traverses a groundwater vein and having a pair of locking portions (15, 15) formed in an upper end opening, and the base pipe (2). The locking part (1
A pair of bands (19, 1) that are fastened to the
While the pedestal part (5) is fixed between the lower ends of 9),
The cradle part (5) is provided with a suspension cradle (18) in which a regulating rod (23) defining the center point of the base pipe (2) is stretched in a cross shape, and a pair of convex portions is provided at both ends. (14, 14) are fixedly mounted, and a bolt and nut (17) is inserted and fixed on one side, and each of the convex portions (14, 14) of the rotary connection tool (13) is connected to the base pipe (2). ), The harpoon portion of the screw auger (1) is connected to the bolt nut (17) while being fitted in the respective locking portions (15, 15), and the base pipe (2) is grounded. The foundation structure for the built-in self-supporting utility pole, which can be screwed in.
JP1179673A 1989-07-11 1989-07-11 Construction method of self-supporting power pole and its basic structure Expired - Fee Related JPH086544B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1179673A JPH086544B2 (en) 1989-07-11 1989-07-11 Construction method of self-supporting power pole and its basic structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1179673A JPH086544B2 (en) 1989-07-11 1989-07-11 Construction method of self-supporting power pole and its basic structure

Publications (2)

Publication Number Publication Date
JPH0343591A JPH0343591A (en) 1991-02-25
JPH086544B2 true JPH086544B2 (en) 1996-01-24

Family

ID=16069876

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1179673A Expired - Fee Related JPH086544B2 (en) 1989-07-11 1989-07-11 Construction method of self-supporting power pole and its basic structure

Country Status (1)

Country Link
JP (1) JPH086544B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6867664B1 (en) * 2020-12-22 2021-05-12 株式会社トラバース Foundation structure of structure, foundation construction method, and support pipe material used for foundation

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5500431B2 (en) * 2010-02-10 2014-05-21 日本地工株式会社 Basic steel pipe settlement prevention structure
CN102230357A (en) * 2011-05-31 2011-11-02 中冶集团武汉勘察研究院有限公司 Method for forming ultra-deep anchor hole in loose accumulation body and breakage rock layer
JP2021085141A (en) * 2019-11-25 2021-06-03 東日本旅客鉄道株式会社 Column body installation structure

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5750396Y2 (en) * 1978-01-31 1982-11-04

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6867664B1 (en) * 2020-12-22 2021-05-12 株式会社トラバース Foundation structure of structure, foundation construction method, and support pipe material used for foundation
JP2022098713A (en) * 2020-12-22 2022-07-04 株式会社トラバース Foundation structure of structure, foundation construction method, and support pipe material used for foundation

Also Published As

Publication number Publication date
JPH0343591A (en) 1991-02-25

Similar Documents

Publication Publication Date Title
CN213683930U (en) Conical umbrella-shaped drill bit
JPH086544B2 (en) Construction method of self-supporting power pole and its basic structure
JPS6225612A (en) Pile
US4701078A (en) Pile construction method for improving bearing power
JPS584128B2 (en) Pile embedding method
CN211312501U (en) Gardens civil engineering is with boring a device of irritating
CN1053246C (en) Construction method and device using large open caisson lowering water level in high-storied buiding and under ground engineering
JP2590157Y2 (en) Multi-wing conical steel pipe pile
JPS62253817A (en) Burying work of custom-made concrete pile with expanded head
JPH0421013B2 (en)
CN213390119U (en) Anchor rod for slope support
JPS6221089B2 (en)
JPS63161219A (en) Foundation pile and its construction
JP2607966B2 (en) Expanded connecting wall construction method
JPH1193166A (en) Simple leg-open anchor and bottom-spread concrete anchor block
JP2000178966A (en) Structure of diaphragm wall
JPS6221090B2 (en)
JPS6221088B2 (en)
JP2514596B2 (en) Ground drilling equipment
KR0127276Y1 (en) Apparatus for laying water pipes in a vinyl house
JPH01127726A (en) Base for supporting pole and embedding method
JPH0694673B2 (en) Utility pole erection device and its erection method
JP2807538B2 (en) Cast-in-place concrete pile method
JPH0519433Y2 (en)
JPS632542Y2 (en)

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090124

Year of fee payment: 13

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090124

Year of fee payment: 13

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees