JPH0842123A - Piping equipment unit and piping equipment construction work method using this - Google Patents

Piping equipment unit and piping equipment construction work method using this

Info

Publication number
JPH0842123A
JPH0842123A JP17725494A JP17725494A JPH0842123A JP H0842123 A JPH0842123 A JP H0842123A JP 17725494 A JP17725494 A JP 17725494A JP 17725494 A JP17725494 A JP 17725494A JP H0842123 A JPH0842123 A JP H0842123A
Authority
JP
Japan
Prior art keywords
piping equipment
building
housing
unit
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP17725494A
Other languages
Japanese (ja)
Inventor
Yoshihito Yamashita
良仁 山下
Takeshi Kimura
剛 木村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP17725494A priority Critical patent/JPH0842123A/en
Publication of JPH0842123A publication Critical patent/JPH0842123A/en
Pending legal-status Critical Current

Links

Landscapes

  • Domestic Plumbing Installations (AREA)

Abstract

PURPOSE:To more simplify construction work of a piping equipment in a multiple dwelling house such as an apartment building, and enhance a degree of freedom of planning of a dwelling unit space without pressuring the welding unit space. CONSTITUTION:In a piping equipment unit to be arranged in an opening corridor C in a building having the opening corridor adjacently to dwelling units of the respective floors, the unit contains a housing 2 which has a height corresponding to a height of the respective floors of the building and has a prescribed cross-sectional shape, a water supply main pipe element 9 and a gas main pipe element 8 arranged in the vertical direction in this housing 2, and branch pipes for the dwelling units of the respective floors are respectively connected to the respective main pipe elements 8 and 9. For example, after a vertical through hole H having a prescribed shape is formed in a part adjacent to a building outer wall in the opening corridor C, a connecting body by connecting a prescribed number of piping equipment units to each other in the vertical direction, is communicated with and inserted in the through hole H, and the piping equipment units are arranged so as to run along the building outer wall in the opening corridor on the respective floors.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本願発明は、配管設備ユニットお
よびこれを用いた配管設備施工方法に関し、マンション
等の集合住宅において、配管設備の施工をより簡便に行
えて工期の短縮を図ることができる技術に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a piping equipment unit and a piping equipment construction method using the same, and in a collective housing such as a condominium, the piping equipment can be constructed more easily and the construction period can be shortened. Regarding technology.

【0002】[0002]

【従来の技術】マンション等の集合住宅においては、各
住戸への給排水、ガス供給は、パイプスペースと呼ばれ
る空間を介して行われる。パイプスペースは、通常、開
放廊下側に開口を有するとともに、住戸空間とはコンク
リート壁で仕切られた矩形の凹状空間とされるのが普通
であり、各階のパイプスペースを上下方向に貫通するよ
うにして、給水主管、およびガス主管、またはこれらに
加えて排水主管が配設される。
2. Description of the Related Art In collective housing such as condominiums, water supply and drainage and gas supply to each dwelling unit are performed through a space called a pipe space. The pipe space usually has an opening on the side of the open corridor and is usually a rectangular concave space separated from the dwelling unit space by a concrete wall. Then, a water supply main pipe, a gas main pipe, or a drainage main pipe in addition to these is provided.

【0003】各住戸用の給水管、ガス管等は、パイプス
ペース内において上記各主管から枝分かれさせられる。
また、パイプスペース内には、ガス湯沸器が配設される
場合が多く、この場合には、給水管からの分岐管および
ガス管からの分岐管がそれぞれガス湯沸器に接続される
とともに、ガス湯沸器に一端が接続された給湯管が住戸
内に配管される。さらに、各住戸用の給水管およびガス
管には、それぞれ、水道メータおよびガスメータが介装
され、これらもパイプスペース内の所定位置に配置され
る。そして、このパイプスペースの廊下側開口は、ドア
式に開閉可能な蓋部材によって閉じられる。
A water supply pipe, a gas pipe, etc. for each dwelling unit are branched from each main pipe in the pipe space.
In addition, a gas water heater is often installed in the pipe space. In this case, a branch pipe from the water supply pipe and a branch pipe from the gas pipe are connected to the gas water heater, respectively. A hot water supply pipe, one end of which is connected to the gas water heater, is installed inside the dwelling unit. Further, a water meter and a gas meter are respectively installed in the water supply pipe and the gas pipe for each dwelling unit, and these are also arranged at predetermined positions in the pipe space. The corridor side opening of the pipe space is closed by a lid member that can be opened and closed in a door manner.

【0004】[0004]

【発明が解決しようとする課題】従来のパイプスペース
は、建物躯体形成時に、コンクリート打ち込みによって
形成されるため、パイプスペース形成後に各階を貫通す
る給水主管、配水主管、ガス主管等を配管する作業、お
よび、各主管から各住戸用の配管をパイプスペースを介
して行う作業をせねばならない。すなわち、配管資材を
各階に搬入し、狭いパイプスペース内に作業者が入り込
んで上記の各配管作業をせねばならないのであり、かか
る作業は非常に厄介であって、そのゆえに建物の建設工
期を所定以下に短縮することが困難であった。
Since the conventional pipe space is formed by concrete driving when the building frame is formed, the work of piping the water supply main pipe, the water distribution main pipe, the gas main pipe, etc., which penetrates each floor after the pipe space is formed, In addition, it is necessary to work from each main pipe to the pipe for each dwelling unit through the pipe space. In other words, the piping materials must be brought into each floor, and the workers must enter the narrow pipe space to perform the above-mentioned piping work, which is very troublesome, and therefore the construction period of the building must be specified. It was difficult to shorten to the following.

【0005】また、前述したように、従来のマンション
等のパイプスペースは、開放廊下から凹入する形態にお
いて、各住戸ごとに独立して設けられるのが普通であっ
たため、住戸空間がそれだけ圧迫されるとともに、住戸
空間からみればパイプスペース部分が室内側に膨出する
恰好となるため、住戸空間の平面計画の自由度がそれだ
け制限されていた。
Further, as described above, since the conventional pipe space of a condominium or the like is usually provided independently for each dwelling unit in the form of being recessed from the open corridor, the dwelling unit space is compressed accordingly. In addition, from the perspective of the dwelling unit space, the pipe space portion bulges inward, which limits the degree of freedom in planning the dwelling unit space.

【0006】本願発明は、このような事情のもとで考え
出されたものであって、マンション等の集合住宅におけ
る配管設備の施工をより簡略化することができるととも
に、住戸空間を圧迫することがなく、住戸空間の平面計
画の自由度を高めることができるようにした配管設備ユ
ニットおよびこれを用いた配管設備の施工方法を提供す
ることをその課題としている。
The present invention was devised under such circumstances, and it is possible to further simplify the construction of piping equipment in an apartment house such as a condominium and to pressurize the dwelling unit space. It is an object of the present invention to provide a piping equipment unit capable of increasing the degree of freedom of the floor plan of a dwelling unit space and a construction method of piping equipment using the piping equipment unit.

【0007】[0007]

【課題を解決するための手段】上記の課題を解決するた
め、本願発明では、次の各技術的手段を講じている。
In order to solve the above problems, the present invention takes the following technical means.

【0008】本願発明の第1の側面によれば、配管設備
ユニットは、次のように構成される。すなわち、各階の
住戸に隣接して開放廊下を備える建物における上記開放
廊下に配置するべき配管整備ユニットであって、建物の
各階高さに相当する高さを有するとともに所定の断面形
状を有するハウジングと、このハウジング内に上下方向
に配設された給水主管要素およびガス主管要素とを含ん
でおり、各主管要素には、それぞれ各階住戸用の分岐管
が連結されている。
According to the first aspect of the present invention, the piping equipment unit is configured as follows. That is, a piping maintenance unit to be arranged in the open corridor in a building having an open corridor adjacent to the dwelling unit on each floor, and a housing having a height corresponding to each floor height of the building and having a predetermined cross-sectional shape The housing includes a water supply main pipe element and a gas main pipe element arranged vertically in the housing, and each main pipe element is connected to a branch pipe for each floor dwelling unit.

【0009】上記ハウジングは、不燃性材料を用いて形
成されるのが好ましく(請求項2)、また、上記ハウジ
ング内には、好ましくは給水分岐管およびガス分岐管に
つながる湯沸器がさらに含まれる(請求項3)。
The housing is preferably formed of a non-combustible material (Claim 2), and a water heater preferably further connected to the water supply branch pipe and the gas branch pipe is further included in the housing. (Claim 3).

【0010】好ましい実施例においては、上記配管設備
ユニットは、隣合う2住戸用に形成されており、この場
合、上記給水主管およびガス主管から枝分かれする給水
分岐管およびガス分岐管は2系統に形成される(請求項
4)。
In a preferred embodiment, the piping equipment unit is formed for two adjacent dwelling units, in which case the water supply branch pipe and the gas branch pipe branching from the water supply main pipe and the gas main pipe are formed in two systems. (Claim 4).

【0011】さらに、好ましい実施例では、上記ハウジ
ングの正面部には開口部が形成されており、この開口部
は、開閉ドア式の蓋体が取付けられている(請求項
5)。
Further, in a preferred embodiment, an opening is formed in the front surface of the housing, and an opening / closing door type lid is attached to the opening (claim 5).

【0012】上記各配管設備ユニットのハウジングの背
面は、開放状となっていてもよく、この場合、この開放
状背面は、建物躯体に取付けられたとき、住戸外壁によ
って閉じられることになる(請求項6)。
The rear surface of the housing of each of the piping equipment units may be open, and in this case, the open rear surface is closed by the outer wall of the dwelling unit when attached to the building frame (claim). Item 6).

【0013】本願発明の第2の側面によれば、上記第1
の側面による配管設備ユニットを用い、次のようにして
配管設備の施工が行われる。すなわち、上記開放廊下形
成前の段階の建物躯体に対し、上記配管設備ユニットを
所定個数上下方向に連結した状態において、上記建物躯
体における上記開放廊下に面するべき外壁に沿って取付
け、その後、上記開放廊下を形成する(請求項7)。
According to a second aspect of the present invention, there is provided the above-mentioned first aspect.
The piping equipment is constructed in the following manner using the piping equipment unit according to the side. That is, with respect to the building skeleton before the formation of the open corridor, in a state in which a predetermined number of the piping equipment units are vertically connected, attached along the outer wall of the building skeleton to face the open corridor, then the above An open corridor is formed (Claim 7).

【0014】また、本願発明の第3の側面によれば、上
記第1の側面による配管設備ユニットを用い、次のよう
にして配管設備の施工が行われる。すなわち、開放廊下
が形成された建物躯体の各階の開放廊下における建物外
壁に隣接する部位に、所定形状の上下貫通穴を形成して
おき、上記配管設備ユニットを所定個数上下方向に連結
した連結体を上記貫通穴に連通挿することによって、各
階の開放廊下における建物外壁に沿うようにして上記配
管設備ユニットを配置する。
According to the third aspect of the present invention, the piping facility is constructed in the following manner by using the piping facility unit according to the first aspect. That is, a connecting body formed by forming a predetermined number of vertical through holes in a portion adjacent to the building outer wall in the open corridor of each floor of the building structure in which the open corridor is formed, and connecting a predetermined number of the above piping equipment units in the vertical direction. Is inserted into the through hole to arrange the piping equipment unit along the outer wall of the building in the open corridor on each floor.

【0015】[0015]

【発明の作用および効果】本願発明の配管設備ユニット
は、ハウジング内にあらかじめ必要な主管要素およびこ
れから枝分かれする分岐管、あるいは必要に応じて湯沸
器、ならびにこれに必要な配管等、パイプスペースとし
て必要な機能部品が組み込まれているので、建物の建築
現場における配管作業は著しく軽減される。このような
配管設備ユニットの組立ては、たとえば工場内で行うこ
とができる。
The pipe facility unit of the present invention is used as a pipe space such as a main pipe element and a branch pipe branching from the main pipe element which are required in advance in the housing, or a water heater if necessary, and pipes necessary for the water heater. Plumbing work at the building construction site is significantly reduced because the necessary functional components are incorporated. Assembly of such a piping equipment unit can be performed in a factory, for example.

【0016】建築現場において、上記配管設備ユニット
が必要個数上下方向に連結され、この連結体をたとえば
クレーンで吊り上げるなどして、建築中の建物躯体の所
定の場所に組み付けられる。配管設備ユニットの連結
は、ハウジングどうしの連結と、その内部の主管要素の
端部どうしの連結を図ればよく、それほど困難な作業で
はない。こうして、連結状態の配管設備ユニットが建物
躯体に組み付けられると、あとは、各階の住戸内の配管
と、ユニット内の配管とを相互に連結するだけの作業に
より、配管系の施工が大略終了する。
At a construction site, a required number of the above-mentioned piping equipment units are vertically connected, and the connected body is mounted on a predetermined place of a building frame under construction by, for example, hoisting a crane. The connection of the piping equipment units may be achieved by connecting the housings and the ends of the main pipe elements inside the housings, which is not so difficult work. In this way, when the connected piping equipment unit is assembled to the building frame, the construction of the piping system is almost completed by the work of simply connecting the piping inside the dwelling unit on each floor and the piping inside the unit. .

【0017】本願発明の配管設備ユニットはまた、マン
ション等の集合住宅の開放廊下に配置する形態としてい
る。したがって、住戸外壁から凹入する形態の従来のパ
イプスペースのように住戸空間を圧迫することがなく、
各住戸の平面計画の自由度を大幅に高めることができ
る。好ましい実施例においては、配管整備ユニットは、
2住戸用に形成されており、各階において各配管整備ユ
ニット内を隣合う2住戸用に共用するようにしている。
このようにすれば、無駄なスペースを省略することがで
き、集合住宅全体としてのスペース効率を高めることが
できる。
The piping facility unit of the present invention is also arranged in an open corridor of an apartment house such as an apartment. Therefore, unlike the conventional pipe space that is recessed from the outer wall of the dwelling unit, it does not press the dwelling unit space,
The degree of freedom in the floor plan of each dwelling unit can be greatly increased. In the preferred embodiment, the plumbing maintenance unit comprises:
It is designed for two dwelling units, and each pipe maintenance unit is shared on each floor for two adjacent dwelling units.
By doing so, it is possible to omit a wasteful space and improve the space efficiency of the entire collective housing.

【0018】本願発明の第2および第3の側面は、上記
のような配管設備ユニットの施工方法を提供している。
第2の側面では、開放廊下を形成する前の、住戸部分の
みが全部または部分的に形成された段階の建物躯体に本
願発明の配管設備ユニットを組込む手法例を規定してい
る。この場合、配管ユニット連結体は、吊り上げ状態に
おいて横方向に移動させることによって建物躯体の対応
部分に位置づけることができ、必要以上に高く上記連結
体を吊り上げる必要がなくなる。
The second and third aspects of the present invention provide a method of constructing a piping equipment unit as described above.
The second aspect stipulates an example of a method of incorporating the piping facility unit of the present invention into a building frame at a stage where only the dwelling unit portion is wholly or partially formed before forming an open corridor. In this case, the connected pipe unit can be positioned in the corresponding portion of the building frame by moving it laterally in the lifted state, and it is not necessary to lift the connected body higher than necessary.

【0019】第3の側面では、開放廊下が形成された段
階での建物躯体に本願発明の配管設備ユニットを組込む
手法例を規定している。この場合、各階の開放廊下に
は、配管設備ユニットの断面形状と対応した上下貫通穴
を形成しておく必要がある。配管ユニットの連結体は、
高く吊り上げた上、上記貫通穴を上から下へと連通挿さ
れることになる。
The third aspect stipulates an example of a method of incorporating the piping equipment unit of the present invention into the building frame at the stage where the open corridor is formed. In this case, it is necessary to form vertical through holes corresponding to the sectional shape of the piping equipment unit in the open corridor on each floor. The connected body of the piping unit is
After being lifted high, the through holes are inserted from top to bottom.

【0020】いずれの施工方法を採用するにせよ、従来
のように狭いパイプスペース内に作業者が入り込んで煩
雑な配管作業をする必要がなくなるのであり、このこと
が建物の建築工期の短縮に大きく寄与する。
Whichever construction method is adopted, it is not necessary for a worker to enter a narrow pipe space and perform a complicated piping work as in the conventional method, which greatly reduces the construction period of a building. Contribute.

【0021】また、本願発明の配管設備ユニットは、建
物躯体に取付けられたとき、開放廊下において、住戸外
壁を背にして配置される。したがって、ハウジングの背
面を開放状にしておき、この開放状背面が住戸外壁によ
って閉じられるようにすることができる。そうすると、
ハウジング用の部材が少なくてすみ、ユニットの体積お
よび重量を軽減することができ、部材コストおよび搬送
コストの両面でさらに有利となる。
Further, the pipe facility unit of the present invention is arranged in the open corridor with the outer wall of the dwelling unit as the back when it is attached to the building frame. Therefore, the back surface of the housing can be left open, and the open back surface can be closed by the outer wall of the dwelling unit. Then,
The number of members for the housing is small, the volume and weight of the unit can be reduced, which is further advantageous in terms of both member cost and transportation cost.

【0022】さらに、ハウジングは、一般的には耐火軽
量コンクリート板を組合せて形成される。したがって、
この配管設備ユニットが建物躯体に組み付けられた後、
建物躯体の外壁処理と同じ処理を連続的にユニットのハ
ウジング外壁に延出させて行うことができる。したがっ
て、建物完成時においては、配管設備ユニットは、外観
上建物躯体と一体部分であるかのようになり、たとえ
ば、配管スペースを板金製のカバーで覆うなどといった
手法を採用することに比較し、建物それ自体の外観を向
上させ、高級感、豪華さをかもし出すことができる。
Further, the housing is generally formed by combining refractory lightweight concrete boards. Therefore,
After this plumbing unit is assembled to the building frame,
The same treatment as the outer wall treatment of the building frame can be continuously performed by extending the outer wall of the housing of the unit. Therefore, when the building is completed, the piping equipment unit looks as if it is an integral part of the building skeleton, and compared to adopting a method such as covering the piping space with a sheet metal cover, for example. The appearance of the building itself can be improved, giving it a luxurious feel.

【0023】[0023]

【実施例の説明】以下、本願発明の好ましい実施例を、
図面を参照しつつ具体的に説明する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The preferred embodiments of the present invention will be described below.
A specific description will be given with reference to the drawings.

【0024】図1ないし図4に示すように、配管設備ユ
ニット1は、ハウジング2と、このハウジング内にあら
かじめ組み込まれた配管構成要素とを備える。上記ハウ
ジング2は、アングル材等の鋼材を溶接等によって組み
立ててなるフレーム3に対し、たとえば耐火軽量コンク
リート板4を取付けるなどして形成される。図に示す実
施例では、上記ハウジングは、建物外壁を背にして開放
廊下Cに設置するのに適するとともに、隣合う2住戸用
に共用できる断面スペースを有するように形成される。
すなわち、図3に示すように、正面壁部21と、この正
面壁21の左右両端から傾斜状に続く左右一対の傾斜側
面壁部22と、これら傾斜側面壁部22の端部から垂直
状に建物壁面に向かって延びる垂直側面壁部23とを有
するように形成されており、背面は、開放状としてあ
る。また、図1に示すように、正面壁部21の下方に
は、開口部5が設けられ、この開口部には、左右に並ぶ
2住戸と対応した左右一対の開閉ドア式の蓋体6が取付
けられている。これら蓋体の適部には、透明窓孔61,
61が設けられており、蓋体を開けることなく、その内
部の電力積算計、ガスメータ、水道メータ等を読み取る
ことができるようにしてある。また、正面壁部の上方に
は、2住戸と対応して、左右一対の湯沸器7がその前面
吸気部および排気部が廊下側に臨むようにして配置され
ている。なお、上記ハウジング2の上下高さは、建物の
各階高さと対応した高さとなっている。
As shown in FIGS. 1 to 4, the piping equipment unit 1 includes a housing 2 and piping components previously incorporated in the housing. The housing 2 is formed by attaching, for example, a fireproof lightweight concrete plate 4 to a frame 3 formed by assembling a steel material such as an angle material by welding or the like. In the illustrated embodiment, the housing is suitable for installation in an open corridor C with the outer wall of the building as a back, and has a cross-sectional space that can be shared by two adjacent dwelling units.
That is, as shown in FIG. 3, the front wall portion 21, a pair of left and right inclined side wall portions 22 that continue in an inclined shape from the left and right ends of the front wall 21, and a vertical shape from the end portions of these inclined side wall portions 22. It is formed so as to have a vertical side wall portion 23 extending toward the building wall surface, and the rear surface is open. In addition, as shown in FIG. 1, an opening 5 is provided below the front wall portion 21, and a pair of left and right openable door-type lid bodies 6 corresponding to two dwelling units arranged side by side are provided in this opening. Installed. In appropriate parts of these lids, transparent window holes 61,
61 is provided so that an electric power integrating meter, a gas meter, a water meter and the like can be read without opening the lid. Further, a pair of left and right water heaters 7 are arranged above the front wall portion so as to correspond to the two dwelling units so that the front intake portion and the exhaust portion thereof face the corridor side. The vertical height of the housing 2 corresponds to the height of each floor of the building.

【0025】図2および図3に示すように、上記ハウジ
ング2内の左方位置には、上下方向に延びるガス主管要
素8が配置され、右方位置には、上下方向に延びる給水
主管要素9が配置される。これら各主管要素8,9は、
ハウジング2の上下高さと対応した上下長さをもってお
り、上記フレーム3と一体化させたブラケット10に対
してたとえばクランプバンド12(図4参照)を用いる
などして固定または上下位置調節可能に支持されてい
る。また、各主管要素8,9の端部には、たとえばフラ
ンジ継手等の管継手12が設けられており、後述するよ
うに、配管設備ユニット1を上下に連結する際に、上下
方向に隣接する主管要素どうしを互いに連結して、建物
高さ方向に一連に導通するガス主管および給水主管を形
成することができるようにしてある。
As shown in FIGS. 2 and 3, a gas main pipe element 8 extending vertically is arranged at a left position in the housing 2, and a water supply main pipe element 9 vertically extending at a right position. Are placed. These main pipe elements 8 and 9 are
It has a vertical length corresponding to the vertical height of the housing 2, and is supported by a bracket 10 integrated with the frame 3 so as to be fixed or adjustable in vertical position, for example, by using a clamp band 12 (see FIG. 4). ing. A pipe joint 12 such as a flange joint is provided at the end of each of the main pipe elements 8 and 9. The pipe joints 1 are vertically adjacent to each other when the pipe equipment units 1 are vertically connected, as described later. The main pipe elements are connected to each other to form a gas main pipe and a water main pipe which are continuously connected in the building height direction.

【0026】上記ガス主管要素8から枝分かれさせられ
たガス枝管81は、さらに2住戸用に分岐させられ、そ
れらはそれぞれガスメータ13を介した後、住戸用ガス
管81aおよび湯沸器用ガス管に分岐させられる。住戸
用ガス管81aは、ハウジング2の背面部まで延ばさ
れ、住戸内ガス管との接続に供されるとともに、湯沸器
用ガス管81bは、上記湯沸器7にそれぞれ連結され
る。
The gas branch pipe 81 branched from the gas main pipe element 8 is further branched for two dwelling units, which are respectively passed through the gas meter 13 and then to the dwelling unit gas pipe 81a and the water heater gas pipe. It is branched. The dwelling unit gas pipe 81a extends to the back surface of the housing 2 and is used for connection with the dwelling unit gas pipe, and the water heater gas pipe 81b is connected to the water heater 7.

【0027】上記給水主管要素9から枝分かれさせられ
た給水枝管91は、さらに2住戸用に分岐させられ、そ
れらはそれぞれ水道メータ14を介した後、住戸用水道
管91aおよび湯沸器用給水管91bに分岐させられ
る。住戸用水道管91aは、ハウジング2の背面部まで
延ばされ、住戸内水道管との接続に供されるとともに、
湯沸器用給水管91bは、上記湯沸器7にそれぞれ連結
される。
The water supply branch pipe 91 branched from the water supply main pipe element 9 is further branched for two dwelling units, which are respectively passed through the water meter 14 and then the dwelling unit water pipe 91a and the water heater water supply pipe. It is branched to 91b. The dwelling unit water pipe 91a is extended to the rear surface of the housing 2 to be used for connection with a dwelling unit water pipe,
The water heater water supply pipe 91b is connected to the water heater 7.

【0028】なお、ガスメータ13、水道メータ14
(あるいはこれに加えて電力積算計)は、それぞれガス
供給会社、水道局等の公共事業体によって建物建築後に
取付けられる。したがって、実際上、配管設備ユニット
1の形成時には、上記メータ類の取付けを前提とした配
管があらかじめ行われることになる。
The gas meter 13 and the water meter 14
(Or in addition to this, an electric power integrating meter) is installed after the building is constructed by a public utility such as a gas supply company or a water department. Therefore, in practice, when the piping facility unit 1 is formed, piping is preliminarily performed on the assumption that the meters are attached.

【0029】上記ハウジング2の下部には、底板15を
設けておくことが望ましい。また、図7において符号1
6は、ユニット取付け時にその上下高さを調節するため
の調節手段を示している。図示例では、ハウジング2の
下部の複数箇所において、垂直取付け部17aと水平支
持部17bとをもつL字状の部材17を用い、その垂直
取付け部17aをボルト・ナット18でハウジング側フ
レーム3に対して取付けるとともに、水平支持部17b
に上下方向の調節ボルト19を取付けた構成としてあ
る。なお、この調節手段16は、後述するように、ユニ
ット連結体を開放廊下の貫通穴Hに連通挿した段階にお
いてハウジング2に対して取付けられる。
It is desirable to provide a bottom plate 15 at the bottom of the housing 2. Further, in FIG. 7, reference numeral 1
Reference numeral 6 denotes an adjusting means for adjusting the vertical height when the unit is attached. In the illustrated example, L-shaped members 17 having vertical mounting portions 17a and horizontal supporting portions 17b are used at a plurality of lower portions of the housing 2, and the vertical mounting portions 17a are attached to the housing-side frame 3 with bolts and nuts 18. The horizontal support 17b
The vertical adjusting bolt 19 is attached to the. As will be described later, the adjusting means 16 is attached to the housing 2 when the unit connecting body is inserted into the through hole H of the open corridor.

【0030】以上のように構成される配管設備ユニット
1は、その大部分を工場内で組み立てることができる。
そうして、建物建築現場に搬入された上記配管設備ユニ
ット1は、たとえば、次のようにして建物躯体Bに組み
付けられる。
Most of the piping equipment unit 1 configured as described above can be assembled in a factory.
Then, the piping facility unit 1 carried into the building construction site is assembled to the building frame B, for example, as follows.

【0031】建物躯体に開放廊下Cが形成された段階に
おいて、上記配管設備ユニット1を組み付ける場合に
は、図5に示すように、各階の開放廊下Cに上記配管設
備ユニット1の断面形状と対応した貫通穴Hをあらかじ
め形成しておく。図5において符号20は、ユニット下
部に取付けられる上下位置調節手段16を載せるために
上記貫通穴Hと連通するように凹陥形成した受け座部を
示している。
When the piping equipment unit 1 is assembled at the stage where the open corridor C is formed in the building frame, as shown in FIG. 5, the open corridor C on each floor corresponds to the sectional shape of the piping equipment unit 1. The through hole H is formed in advance. In FIG. 5, reference numeral 20 designates a receiving seat portion which is recessed so as to communicate with the through hole H for mounting the vertical position adjusting means 16 attached to the lower portion of the unit.

【0032】図9に示すように、所定個数の配管設備ユ
ニット1が上下方向に連結したユニット連結体UBが、
たとえばクレーンで吊り上げるようにしながら、上記開
放廊下Cの各貫通穴Hに連通挿される(図6)。そし
て、吊り状態を維持したまま、各ユニットのハウジング
2の下部に、上記の位置調節手段16が取付けられる。
そしてさらに吊り状態を維持しつつ連結体UBを下ろし
てゆくと、各階において、対応するユニット1は、その
下部に取付けた上記位置調節手段16の調節ボルト19
が上記受け座部20に載るような恰好となって止まる
(図7、図8)。各階の開放廊下Cの上下位置誤差は、
ハウジングの下部に複数設定された上記位置調節手段1
6の調節ボルト19の突出量を調節することによって吸
収することができる。また、各階におけるユニットの姿
勢の調節も、上記調節手段16の調節ボルトの突出量を
加減することによって行うことができる。建物が高層で
ある場合には、上記の手順を複数回に分けて行えばよ
い。また、ユニットを1個ずつ積み重ねるようにして組
み付けてもよい。
As shown in FIG. 9, a unit connection body UB in which a predetermined number of piping equipment units 1 are connected in the vertical direction,
For example, while being lifted up by a crane, it is inserted into each through hole H of the open corridor C (FIG. 6). The position adjusting means 16 is attached to the lower portion of the housing 2 of each unit while maintaining the suspended state.
Then, when the connecting body UB is further lowered while maintaining the suspended state, the corresponding unit 1 on each floor has the adjusting bolt 19 of the position adjusting means 16 attached to the lower part thereof.
Stops as it looks like it rests on the seat 20 (FIGS. 7 and 8). The vertical position error of the open corridor C on each floor is
The plurality of position adjusting means 1 set in the lower part of the housing
It can be absorbed by adjusting the protrusion amount of the adjusting bolt 19 of No. 6. Further, the posture of the unit on each floor can be adjusted by adjusting the protrusion amount of the adjusting bolt of the adjusting means 16. If the building is high-rise, the above procedure may be performed multiple times. Alternatively, the units may be assembled one by one.

【0033】上記のようにして建物躯体Bに対して配管
設備ユニット1が組み付けられると、前述したように、
ユニット内の配管と、住戸内の配管との連結作業が行わ
れる。図に示す実施例では、各ユニットのハウジングの
背面は開放状としてあるので、かかる配管連結作業はよ
り容易に行うことができる。そして、所定の手段によっ
て各ユニットが建物躯体Bに対してしっかりと固定され
ると、建物躯体と同質の外壁化粧処理がハウジング2の
外面に対して施される。また、開放廊下C上に設けた上
記凹陥状の受け座部20は、セメント材等によって埋め
られる。
When the piping equipment unit 1 is assembled to the building frame B as described above, as described above,
Connection work between the piping inside the unit and the piping inside the dwelling unit is performed. In the embodiment shown in the drawings, the rear surface of the housing of each unit is open, so that such pipe connecting work can be performed more easily. Then, when each unit is firmly fixed to the building frame B by a predetermined means, the outer surface makeup treatment of the same quality as the building frame is applied to the outer surface of the housing 2. Further, the recessed receiving seat portion 20 provided on the open corridor C is filled with a cement material or the like.

【0034】建物躯体Bの形成手法として、住戸部分の
みを先に形成した後、開放廊下Cを後付けによって形成
する場合がある。このように建物躯体Bを形成する場合
には、住戸部分のみを先に形成した段階において、上述
したユニット連結体UBを建物躯体に対して組み付ける
ことができる。この場合には、吊り状態としたユニット
連結体UBを横方向に移動させて建物躯体の所定の部位
に位置づけることができるので、必要以上にユニット連
結体を吊り上げる必要がなくなる。
As a method of forming the building skeleton B, there is a case where only the dwelling unit portion is formed first, and then the open corridor C is formed by retrofitting. When the building skeleton B is formed in this manner, the above-described unit connection body UB can be assembled to the building skeleton at the stage where only the dwelling unit portion is formed first. In this case, the unit connecting body UB in the suspended state can be moved in the lateral direction to be positioned at a predetermined portion of the building frame, so that it is not necessary to lift the unit connecting body more than necessary.

【0035】本願発明の配管設備ユニットは、これを連
結した状態において、相互伸縮できるようにしておく
と、建物躯体の各階高さに誤差があったとしても、これ
を容易に吸収して、適正に建物躯体に組み付けることが
できる。
When the piping equipment unit of the present invention is arranged so that it can be expanded and contracted in the connected state, even if there is an error in each floor height of the building frame, it can be easily absorbed and the It can be attached to the building frame.

【0036】もちろん、この発明の範囲は上述した実施
例に限定されることはない。実施例では、ハウジングの
背面が開放状となっているが、この背面は背面板によっ
て閉じられていてもよい。また、実施例の配管設備ユニ
ットは、給水配管系とガス配管系を含んでいるが、さら
に、排水配管系を含ませることも可能である。
Of course, the scope of the present invention is not limited to the above embodiments. In the embodiment, the back surface of the housing is open, but this back surface may be closed by a back plate. Further, although the piping equipment unit of the embodiment includes the water supply piping system and the gas piping system, it is possible to further include the drainage piping system.

【図面の簡単な説明】[Brief description of drawings]

【図1】本願発明の配管設備ユニットの一実施例の正面
図。
FIG. 1 is a front view of an embodiment of a piping equipment unit of the present invention.

【図2】図1の配管設備ユニットの正面断面図。2 is a front cross-sectional view of the piping equipment unit of FIG.

【図3】図1の配管設備ユニットの横断面図。3 is a cross-sectional view of the piping equipment unit of FIG.

【図4】図1の配管設備ユニットの部分拡大断面図。FIG. 4 is a partially enlarged sectional view of the piping equipment unit shown in FIG.

【図5】図1の配管設備ユニットが取付けられるべき建
物躯体の部分平面図。
5 is a partial plan view of a building frame to which the piping equipment unit of FIG. 1 is to be attached.

【図6】図5の建物躯体に図1の配管設備ユニットが取
付けられた状態を示す部分断面平面図。
6 is a partial cross-sectional plan view showing a state in which the piping equipment unit of FIG. 1 is attached to the building body of FIG.

【図7】図6のVII−VII線に沿う断面図。7 is a sectional view taken along line VII-VII of FIG.

【図8】図7のA部詳細図。FIG. 8 is a detailed view of part A of FIG.

【図9】図1の配管設備ユニットを複数個上下方向に連
結した連結体を吊り上げている状態を示す斜視図。
FIG. 9 is a perspective view showing a state in which a connected body in which a plurality of the piping equipment units in FIG. 1 are connected in the vertical direction is being lifted.

【符号の説明】[Explanation of symbols]

1 配管設備ユニット 2 ハウジング 7 湯沸器 8 ガス主管要素 9 給水主管要素 B 建物躯体 C 開放廊下 H 貫通穴 UB (配管設備ユニットの)連結体 1 Piping equipment unit 2 Housing 7 Water heater 8 Gas main pipe element 9 Water supply main pipe element B Building frame C Open corridor H Through hole UB (of piping equipment unit)

Claims (8)

【特許請求の範囲】[Claims] 【請求項1】 各階の住戸に隣接して開放廊下を備える
建物における上記開放廊下に配置するべき配管設備ユニ
ットであって、 建物の各階高さに相当する高さを有するとともに所定の
断面形状を有するハウジングと、このハウジング内に上
下方向に配設された給水主管要素およびガス主管要素と
を含んでおり、各主管要素には、それぞれ各階住戸用の
分岐管が連結されていることを特徴とする、配管設備ユ
ニット。
1. A piping equipment unit to be arranged in the open corridor in a building having an open corridor adjacent to a dwelling unit on each floor, which has a height corresponding to each floor height of the building and has a predetermined cross-sectional shape. A housing having, and a water supply main pipe element and a gas main pipe element vertically arranged in the housing, wherein each main pipe element is connected with a branch pipe for each floor dwelling unit, respectively. A plumbing equipment unit.
【請求項2】 上記ハウジングは、不燃性材料を用いて
形成されている、請求項1の配管設備ユニット。
2. The piping equipment unit according to claim 1, wherein the housing is formed of a nonflammable material.
【請求項3】 上記ハウジング内には、給水分岐管およ
びガス分岐管につながる湯沸器がさらに含まれている、
請求項1または2の配管設備ユニット。
3. A water heater connected to the water supply branch pipe and the gas branch pipe is further included in the housing.
The piping equipment unit according to claim 1 or 2.
【請求項4】 隣合う2住戸用に形成されており、上記
給水主管およびガス主管からそれぞれ枝分かれする給水
分岐管およびガス分岐管は、2系統に形成されている、
請求項1ないし3のいずれかの配管設備ユニット。
4. A water supply branch pipe and a gas branch pipe, which are formed for two adjacent dwelling units and branch off from the water supply main pipe and the gas main pipe, respectively, are formed in two systems.
The piping equipment unit according to claim 1.
【請求項5】 上記ハウジングの正面部には開口部が形
成されており、この開口部には、開閉ドア式の蓋体が取
付けられている、請求項1ないし4のいずれかの配管設
備ユニット。
5. The piping equipment unit according to claim 1, wherein an opening is formed in a front portion of the housing, and an opening / closing door type lid is attached to the opening. .
【請求項6】 上記ハウジングの背面は開放状となっお
り、この開放状背面は、建物躯体に取付けられたとき、
住戸外壁によって閉じられるようになっている、請求項
1ないし5のいずれかの配管設備ユニット。
6. The housing has an open rear surface, and the open rear surface, when attached to a building frame,
The piping equipment unit according to any one of claims 1 to 5, which is adapted to be closed by an outer wall of a dwelling unit.
【請求項7】 上記開放廊下形成前の段階の建物躯体に
対し、請求項1ないし6のいずれかの配管設備ユニット
を所定個数上下方向に連結した状態において、上記建物
躯体における上記開放廊下に面するべき外壁に沿って取
付け、その後、上記開放廊下を形成することを特徴とす
る、配管設備の施工方法。
7. The surface of the building corridor in the building structure is connected to the building structure at a stage before the formation of the opening corridor in a state in which a predetermined number of pipe equipment units according to claim 1 are vertically connected. A method for constructing piping equipment, which comprises mounting along an outer wall to be formed, and then forming the open corridor.
【請求項8】 開放廊下が形成された建物躯体の各階の
開放廊下における建物外壁に隣接する部位に、所定形状
の上下貫通穴を形成しておき、請求項1ないし6のいず
れかの配管設備ユニットを所定個数上下方向に連結した
連結体を上記貫通穴に連通挿することによって、各階の
開放廊下における建物外壁に沿うようにして上記配管設
備ユニットを配置すること特徴とする、配管設備の施工
方法。
8. The pipe facility according to claim 1, wherein vertical through holes having a predetermined shape are formed in a portion adjacent to the outer wall of the building in the open corridor on each floor of the building structure in which the open corridor is formed. By installing a connecting body in which a predetermined number of units are vertically connected into the through hole, the piping equipment unit is arranged along the outer wall of the building in the open corridor on each floor, and the piping equipment is constructed. Method.
JP17725494A 1994-07-28 1994-07-28 Piping equipment unit and piping equipment construction work method using this Pending JPH0842123A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17725494A JPH0842123A (en) 1994-07-28 1994-07-28 Piping equipment unit and piping equipment construction work method using this

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17725494A JPH0842123A (en) 1994-07-28 1994-07-28 Piping equipment unit and piping equipment construction work method using this

Publications (1)

Publication Number Publication Date
JPH0842123A true JPH0842123A (en) 1996-02-13

Family

ID=16027865

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17725494A Pending JPH0842123A (en) 1994-07-28 1994-07-28 Piping equipment unit and piping equipment construction work method using this

Country Status (1)

Country Link
JP (1) JPH0842123A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2722463A1 (en) 2012-08-14 2014-04-23 Alvarx OY Building engineering module
JP2015158075A (en) * 2014-02-24 2015-09-03 株式会社長谷工コーポレーション Meter box for apartment house
WO2022200198A1 (en) * 2021-03-24 2022-09-29 ecoworks GmbH Building service element

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2722463A1 (en) 2012-08-14 2014-04-23 Alvarx OY Building engineering module
JP2015158075A (en) * 2014-02-24 2015-09-03 株式会社長谷工コーポレーション Meter box for apartment house
WO2022200198A1 (en) * 2021-03-24 2022-09-29 ecoworks GmbH Building service element

Similar Documents

Publication Publication Date Title
CN103726597B (en) Adopt the frame type cell curtain wall of auxiliary mounting deck and profile of tooth corner brace and profile of tooth bearing
JPS5931332A (en) Transportable prefabricated building structure
JPH10234493A (en) Kitchen structure
JPH0842123A (en) Piping equipment unit and piping equipment construction work method using this
JPH0842124A (en) Piping equipment unit, piping equipment construction work method using this and piping equipment structure of building
JP3016635B2 (en) Construction method of prefab toilet
JPH0519446U (en) Suspended structure of prefabricated building
JP2736616B2 (en) Building unit
KR102699060B1 (en) Pipe Duct partition fastened to stud
JPH09256611A (en) Installation method for equipment piping in multiple dwelling house
JP2557161B2 (en) Roof unit with parapet
JP3484232B2 (en) Unit building
JPH05505433A (en) modular building
JPH0347097Y2 (en)
JP2790015B2 (en) How to assemble wall panels
JP3062810B2 (en) Assembling method of plumbing unit in building and plumbing unit
JP2530213Y2 (en) Balcony mounting structure
JP2519330Y2 (en) Japanese style toilet unit
JP2571347Y2 (en) Ceiling connection structure of prefabricated building unit
JPH0519403U (en) Wall connection structure of prefabricated building unit
JPH03194038A (en) Fitting method for balcony
JPH11200498A (en) Method for constructing multiple dwelling house and room unit for use therein
JPS6133775Y2 (en)
JP2863442B2 (en) Gondola guide rail mounting method and mounting structure
JP2618058B2 (en) How to build a building