JPH083993A - Structure of earth retaining anchor - Google Patents

Structure of earth retaining anchor

Info

Publication number
JPH083993A
JPH083993A JP13856294A JP13856294A JPH083993A JP H083993 A JPH083993 A JP H083993A JP 13856294 A JP13856294 A JP 13856294A JP 13856294 A JP13856294 A JP 13856294A JP H083993 A JPH083993 A JP H083993A
Authority
JP
Japan
Prior art keywords
anchor
bolt
earth retaining
bent
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP13856294A
Other languages
Japanese (ja)
Other versions
JP2926090B2 (en
Inventor
Mitsutoshi Ogata
光俊 尾形
Yoji Kikuchi
洋司 菊地
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nittoc Constructions Co Ltd
Original Assignee
Nittoc Constructions Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nittoc Constructions Co Ltd filed Critical Nittoc Constructions Co Ltd
Priority to JP13856294A priority Critical patent/JP2926090B2/en
Publication of JPH083993A publication Critical patent/JPH083993A/en
Application granted granted Critical
Publication of JP2926090B2 publication Critical patent/JP2926090B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Retaining Walls (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

PURPOSE:To form a bent portion of an anchor having relatively large angles in a stable manner by disposing an axially mounted hinge fitting provided with a bolt at a predetermined angle bent portion of the anchor. CONSTITUTION:An earth retaining structure 2,is erected so as to be spaced a predetermined interval from the ground and an excavated bore formed in the ground is inclined downwardly toward the bottom of the ground and hardener is filled into the excavated bore to fix an anchor 3. A portion of the anchor 3 protruding from the bore is bent through a predetermined angle to make the portion horizontal and the earth retaining structure 2 is fixed to the end of the horizontal portion. And an axially mounted hinge fitting 9 with a bolt 8 is provided to bend the anchor 3. In the fitting 9, opposed ends of threaded sockets 9a having a male portion and female portion respectively are connected to each other and the bolt 8 is passed therethrough, while a nut is fitted onto the end of the bolt 8 to prevent the bolt from falling out. A threaded socket 11 is fixed to the end of the anchor 3 so that the socket 9a of the fitting 9 and the socket 11 on the end of the anchor 3 are connected by a bolt pin 12.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、土留めパネル、矢板、
杭などの土留め構造物を、地山に沿って配置し、地山に
打設したアンカーによって支える土留めアンカー構造に
関するものである。
BACKGROUND OF THE INVENTION The present invention relates to an earth retaining panel, sheet pile,
The present invention relates to a soil retaining anchor structure in which earth retaining structures such as piles are arranged along the natural ground and supported by anchors placed in the natural soil.

【0002】[0002]

【従来の技術】図5に示すように、地山1に対して所定
間隔離してコンクリート擁壁ブロック等の土留め構造物
2を建て込み、この土留め構造物をアンカー3によって
支える場合に、アンカー3の定着を行うために地山に設
ける掘削孔4は硬化材5を注入するのに充分充満させ、
内部の水(ブリージング水)を全て外へ排出して硬化材
5の質を良質のものにするために、底部に行くに従って
深くなるように傾斜させる。このようにすれば、硬化材
5を底から順次充填してブリージング水を押し上げるこ
とで排除できる。
2. Description of the Related Art As shown in FIG. 5, when an earth retaining structure 2 such as a concrete retaining wall block is erected at a predetermined distance from a natural ground 1 and the earth retaining structure is supported by an anchor 3, The excavation hole 4 provided in the natural ground for fixing the anchor 3 is sufficiently filled with the hardening material 5,
In order to discharge all the internal water (breathing water) to the outside and improve the quality of the hardened material 5, the hardened material 5 is inclined so that it becomes deeper toward the bottom. In this way, the hardening material 5 can be sequentially filled from the bottom and the breathing water can be pushed up to be eliminated.

【0003】そして、この掘削孔4から真っ直ぐに延ば
してアンカー3の先端で土留め構造物2を固定するので
はこの土留め構造物2の面に対するアンカーヘッドの取
り付けも斜めとなり、また、土留め構造物2の下端にそ
の重量とともに土圧の分散荷重が加わることになり、大
きな局部応力が発生するおそれもある。
If the earth retaining structure 2 is fixed at the tip of the anchor 3 by extending straight from the excavation hole 4, the attachment of the anchor head to the surface of the earth retaining structure 2 will be slanted, and the earth retaining structure will be fixed. A distributed load of earth pressure is applied to the lower end of the structure 2 together with its weight, which may cause a large local stress.

【0004】そこで、出願人が先に出願した特願平4-14
8222号(特開平5-311666号公報)では、この図5に示す
ように掘削孔4から出るアンカー3は所定角度屈曲させ
て水平とし、この水平部分の先端に前記土留め構造物2
を固定するようにした。
Therefore, Japanese Patent Application No. 4-14 filed by the applicant earlier
In 8222 (Japanese Patent Laid-Open No. 5-311666), as shown in FIG. 5, the anchor 3 protruding from the excavation hole 4 is bent at a predetermined angle to be horizontal, and the earth retaining structure 2 is attached to the tip of this horizontal portion.
I fixed it.

【0005】図中6はH形鋼による主柱、7はアンカー
3の屈曲部に被せる保護管、8はアンカー3の中間部緊
張材である。
In the figure, 6 is a main pillar made of H-shaped steel, 7 is a protective tube for covering the bent portion of the anchor 3, and 8 is a tension member in the middle portion of the anchor 3.

【0006】[0006]

【発明が解決しようとする課題】このように土留め構造
物2を水平にアンカー3で固定することで、土圧荷重に
効率良く対応できるが、前記図5に示すアンカー構造で
は、アンカー3は屈曲させるのに円弧を描くように徐徐
に曲げるので、屈曲角度はそれほど大きなものとするこ
とができない。けだし、大きな屈曲角度とすると保護管
7に当たり、この部分に集中荷重が生じ、損壊するおそ
れがあるからである。
By fixing the earth retaining structure 2 horizontally with the anchors 3 in this manner, it is possible to efficiently cope with earth pressure loads. In the anchor structure shown in FIG. The bending angle cannot be made so large because it is gradually bent so as to draw an arc to bend it. This is because, if it is barely bent and has a large bending angle, it may hit the protection tube 7 and a concentrated load may be generated at this portion, resulting in damage.

【0007】本発明の目的は前記従来例の不都合を解消
し、地山の底部に行くに従って深くなるように傾斜させ
た掘削孔内に配置したアンカーの端部を定着し、掘削孔
から出るアンカーは所定角度屈曲させて水平とし、この
水平部分の先端に土留め構造物を固定する土留めアンカ
ー構造において、比較的大きな角度で、安定したアンカ
ーの屈曲部が簡単な構成で得られる土留めアンカー構造
を提供することにある。
The object of the present invention is to eliminate the disadvantages of the above-mentioned conventional example, to fix the end portion of the anchor arranged in the excavation hole that is inclined so as to become deeper as it goes to the bottom of the ground, and to leave the excavation hole. Is an earth retaining anchor structure in which the earth retaining structure is fixed to the tip of this horizontal portion by bending it at a predetermined angle, and with a relatively large angle, a stable anchor bending portion can be obtained with a simple configuration. To provide the structure.

【0008】[0008]

【課題を解決するための手段】本発明は前記目的を達成
するため、アンカーの所定角度屈曲部にはボルトによる
軸着蝶番金物を配設したこと、および、アンカーの端と
ボルトによる軸着蝶番金物にネジソケットを形成し、こ
のソケット相互をボルトピンで結合させることを要旨と
するものである。
In order to achieve the above-mentioned object, the present invention provides that a shaft-attached hinge metal fitting by a bolt is arranged at a predetermined angle bent portion of the anchor, and an end of the anchor and a shaft-attached hinge by the bolt. The gist of the invention is to form a screw socket on a metal object and to connect the sockets with each other by bolt pins.

【0009】[0009]

【作用】請求項1の本発明によれば、蝶番金物はボルト
による軸で自由に屈折するので、この部分を介して簡単
にアンカーを所定角度屈曲させることができる。
According to the first aspect of the present invention, since the hinge metal is freely bent by the axis of the bolt, the anchor can be easily bent at a predetermined angle through this portion.

【0010】請求項2記載の本発明によれば、前記作用
に加えて、ソケットとボルトピンとの結合で簡単にアン
カーの途中に蝶番金物をセットできるとともに、ボルト
ピンをソケットに深く螺入していくことで緊張すること
も可能となる。
According to the second aspect of the present invention, in addition to the above action, the hinge metal can be easily set in the middle of the anchor by coupling the socket and the bolt pin, and the bolt pin is deeply screwed into the socket. It is possible to get nervous.

【0011】[0011]

【実施例】以下、図面について本発明の実施例を詳細に
説明する。図1は本発明の土留めアンカー構造の1実施
例を示す要部の側面図、図4は全体の縦断側面図で、前
記従来例を示す図5と同一構成要素には同一参照符号を
付したものである。
Embodiments of the present invention will now be described in detail with reference to the drawings. FIG. 1 is a side view of an essential part showing an embodiment of the earth retaining anchor structure of the present invention, and FIG. 4 is a vertical side view of the whole. The same components as those of FIG. It was done.

【0012】すなわち、岩盤1aや表土1bからなる地
山1に対して所定間隔離してコンクリート擁壁ブロック
等の土留め構造物2を建て込み、地山1に設ける掘削孔
4は地山1の底部に行くに従って深くなるように傾斜さ
せ、この掘削孔4に硬化材5を充填してアンカー3の定
着を行う。
That is, an earth retaining structure 2 such as a concrete retaining wall block is built in a ground 1 composed of a bedrock 1a and a topsoil 1b at a predetermined distance, and an excavation hole 4 provided in the ground 1 is The anchor 3 is fixed by inclining it so that it becomes deeper as it goes to the bottom, and the hardened material 5 is filled in the drilled hole 4.

【0013】そして、掘削孔4から出るアンカー3は所
定角度屈曲させて水平とし、この水平部分の先端に前記
土留め構造物2を固定するようにした。
The anchor 3 protruding from the excavation hole 4 is bent at a predetermined angle to be horizontal, and the earth retaining structure 2 is fixed to the tip of this horizontal portion.

【0014】本発明は、このようにアンカー3を屈曲さ
せるにボルト8による軸着蝶番金物9を配設した。この
蝶番金物9は図2、図3に示すように、ネジソケット9
aの端同士を雄部、雌部として嵌合させ、ボルト8で貫
通し、ボルト8の他端にナット10を嵌めて抜け出し防止
とする。
According to the present invention, the shaft-attached hinge hardware 9 using the bolts 8 is arranged to bend the anchor 3 in this manner. As shown in FIGS. 2 and 3, the hinge hardware 9 is a screw socket 9
The ends of a are fitted to each other as a male part and a female part, penetrated by a bolt 8, and a nut 10 is fitted to the other end of the bolt 8 to prevent slipping out.

【0015】一方、アンカー3の端にもネジソケット11
を固着し、これら蝶番金物9のネジソケット9aとアン
カー3端のネジソケット11相互をボルトピン12で結合さ
せる。このボルトピン12は中央に回動用の孔12aを形成
した。
On the other hand, the screw socket 11 is also provided at the end of the anchor 3.
Then, the screw sockets 9a of the hinge hardware 9 and the screw sockets 11 at the ends of the anchors 3 are coupled with each other by bolt pins 12. The bolt pin 12 has a hole 12a for rotation in the center.

【0016】このようにして、ボルトピン12をネジソケ
ット9aやネジソケット11に螺入してアンカー3と蝶番
金物9を結合させ、かつ、このボルトピン12を回動して
より深くネジソケット9aやネジソケット11に螺入する
ことでアンカー3に緊張力を与えることもできる。
In this way, the bolt pin 12 is screwed into the screw socket 9a or the screw socket 11 to connect the anchor 3 and the hinge metal 9, and the bolt pin 12 is rotated to deepen the screw socket 9a or the screw. It is also possible to give tension to the anchor 3 by screwing it into the socket 11.

【0017】そして、蝶番金物9はボルト8を軸に屈折
するので、モルタル等の硬化材5を充填して定着を行っ
たアンカー3が掘削孔4を出た所で水平となるように所
定角度屈曲させて緊張することができる。
Since the hinge metal 9 is bent about the bolt 8 as an axis, the anchor 3 filled with the hardening material 5 such as mortar and fixed is horizontal at a position where it exits the excavation hole 4. Can be bent and tense.

【0018】なお、前記蝶番金物9での屈曲個所は保護
管7で覆うが、その内部には保護油としての合成油13を
充填する。また、アンカー3は土留め構造物2の主柱6
に結合させるとして、その結合方法はこの主柱6からも
ボルトピン14を溶接等で突設してアンカー3端のネジソ
ケット11に螺入させるようにしてもよい。
The bent portion of the hinge metal 9 is covered with a protective pipe 7, and the inside thereof is filled with synthetic oil 13 as protective oil. The anchor 3 is the main pillar 6 of the earth retaining structure 2.
As for the method of connection, the bolt pin 14 may be projected from the main pillar 6 by welding or the like and screwed into the screw socket 11 at the end of the anchor 3.

【0019】[0019]

【発明の効果】以上述べたように本発明の土留めアンカ
ー構造は、地山の底部に行くに従って深くなるように傾
斜させた掘削孔内に配置したアンカーの端部を定着し、
掘削孔から出るアンカーは所定角度屈曲させて水平と
し、この水平部分の先端に土留め構造物を固定する土留
めアンカー構造において、比較的大きな角度で、安定し
たアンカーの屈曲部が簡単な構成で得られるものであ
る。
As described above, the earth retaining anchor structure of the present invention fixes the end portion of the anchor arranged in the excavation hole inclined so as to become deeper as it goes to the bottom of the ground,
The anchor that comes out of the excavation hole is bent at a predetermined angle to make it horizontal, and in the earth retaining anchor structure that fixes the earth retaining structure to the tip of this horizontal portion, the anchor is stable at a relatively large angle with a simple configuration. Is what you get.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の土留めアンカー構造の1実施例を示す
要部の側面図である。
FIG. 1 is a side view of a main part showing an embodiment of an earth retaining anchor structure of the present invention.

【図2】アンカーの屈曲個所の分解正面図である。FIG. 2 is an exploded front view of a bent portion of the anchor.

【図3】蝶番金物の平面図である。FIG. 3 is a plan view of a hinge hardware.

【図4】本発明の土留めアンカー構造の1実施例を示す
全体の縦断正面図である。
FIG. 4 is an overall vertical sectional front view showing one embodiment of the earth retaining anchor structure of the present invention.

【図5】従来例を示す縦断正面図である。FIG. 5 is a vertical sectional front view showing a conventional example.

【符号の説明】[Explanation of symbols]

1…地山 1a…岩盤 1b…表土 2…土留め構造物 3…アンカー 4…掘削孔 5…硬化材 6…主柱 7…保護管 8…ボルト 9…蝶番金物 9a…ネジソケッ
ト 10…ナット 11…ネジソケット 12…ボルトピン 12a…孔 13…合成油 14…ボルトピン
1 ... Ground 1a ... Rock 1b ... Top soil 2 ... Soil retaining structure 3 ... Anchor 4 ... Excavation hole 5 ... Hardened material 6 ... Main pillar 7 ... Protective tube 8 ... Bolt 9 ... Hinged metal 9a ... Screw socket 10 ... Nut 11 … Screw socket 12… Bolt pin 12a… Hole 13… Synthetic oil 14… Bolt pin

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 地山の底部に行くに従って深くなるよう
に傾斜させた掘削孔内に配置したアンカーの端部を定着
し、掘削孔から出るアンカーは所定角度屈曲させて水平
とし、この水平部分の先端に土留め構造物を固定する土
留めアンカー構造において、アンカーの所定角度屈曲部
にはボルトによる軸着蝶番金物を配設したことを特徴と
する土留めアンカー構造。
1. An anchor disposed at an end of an excavation hole that is inclined so as to become deeper toward the bottom of the natural ground is fixed, and the anchor that comes out of the excavation hole is bent at a predetermined angle to be horizontal. In the earth retaining anchor structure for fixing the earth retaining structure to the tip of the, the earth retaining anchor structure is characterized in that the hinged metal fittings by bolts are arranged at the bent portion of the anchor at a predetermined angle.
【請求項2】 アンカーの端とボルトによる軸着蝶番金
物にネジソケットを形成し、このソケット相互をボルト
ピンで結合させる請求項1記載の土留めアンカー構造。
2. The earth retaining anchor structure according to claim 1, wherein a threaded socket is formed on the end of the anchor and a shaft-attached hinge hardware using bolts, and the sockets are connected to each other by bolt pins.
JP13856294A 1994-06-21 1994-06-21 Earth retaining anchor structure Expired - Fee Related JP2926090B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13856294A JP2926090B2 (en) 1994-06-21 1994-06-21 Earth retaining anchor structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13856294A JP2926090B2 (en) 1994-06-21 1994-06-21 Earth retaining anchor structure

Publications (2)

Publication Number Publication Date
JPH083993A true JPH083993A (en) 1996-01-09
JP2926090B2 JP2926090B2 (en) 1999-07-28

Family

ID=15225051

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13856294A Expired - Fee Related JP2926090B2 (en) 1994-06-21 1994-06-21 Earth retaining anchor structure

Country Status (1)

Country Link
JP (1) JP2926090B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100642341B1 (en) * 2006-07-27 2006-11-15 (주)유원건축사사무소 A pile for retaining wall
KR100767453B1 (en) * 2006-03-17 2007-10-17 홍건영 Coupling device in reinforced retainaing wall
KR101360288B1 (en) * 2013-05-10 2014-03-14 (주)에스오씨산업 Reinforced earth retaining wall a method of construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100767453B1 (en) * 2006-03-17 2007-10-17 홍건영 Coupling device in reinforced retainaing wall
KR100642341B1 (en) * 2006-07-27 2006-11-15 (주)유원건축사사무소 A pile for retaining wall
KR101360288B1 (en) * 2013-05-10 2014-03-14 (주)에스오씨산업 Reinforced earth retaining wall a method of construction

Also Published As

Publication number Publication date
JP2926090B2 (en) 1999-07-28

Similar Documents

Publication Publication Date Title
KR101888737B1 (en) Prefabricated shoring structure
JPH07252835A (en) Construction method for diagonal shore strut
JP2981213B1 (en) Foundation piles and building structure
JPH083993A (en) Structure of earth retaining anchor
KR100505329B1 (en) Tension nail method of construction
KR20120131996A (en) Structure of temporary installation for land-side protection wall, and construction method thereof
JP3121327B2 (en) Retaining wall construction anchor
KR100505330B1 (en) Tension nail of construction
JP2552220B2 (en) Oblique beam construction method
JP2002194986A (en) Tie rod construction method
KR200203646Y1 (en) Rihforcement fixer for secondary pre-stress
KR20090049663A (en) Connecting structure of steel pipe strut
JPH0232417B2 (en)
JPH06185140A (en) Steel beam joining structure with reinforced concrete earthquake resisting wall
JP2992915B2 (en) Supporting method for underground continuous wall
CN215368662U (en) Detachable scaffold wall connecting piece
KR200273758Y1 (en) Couplers for Steel Pipe Piles
JPH08302834A (en) Earthquake resistant reinforcing metallic material
KR19980015214U (en) An ANCHER FOR FIXING FLASH BOARD
JPH0747450Y2 (en) Joint fitting and joint structure of pillar and cross member using the joint fitting
JPH1150460A (en) Foundation work for avalanche-protecting facilities and construction method therefor
KR0155662B1 (en) Earth anchor using stiffening the side of foundation pits
JPH1181461A (en) Joint metal for steel frame column base or steel pipe column base, and its fixing method
JP2649682B2 (en) Underground structure
JPH0978694A (en) Earthquake resistant reinforcing metal fittings of building

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees