JPH07252835A - Construction method for diagonal shore strut - Google Patents

Construction method for diagonal shore strut

Info

Publication number
JPH07252835A
JPH07252835A JP4380494A JP4380494A JPH07252835A JP H07252835 A JPH07252835 A JP H07252835A JP 4380494 A JP4380494 A JP 4380494A JP 4380494 A JP4380494 A JP 4380494A JP H07252835 A JPH07252835 A JP H07252835A
Authority
JP
Japan
Prior art keywords
diagonal
foundation
ground
constructed
cutting beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP4380494A
Other languages
Japanese (ja)
Other versions
JP3505213B2 (en
Inventor
Hideo Inagaki
秀雄 稲垣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toda Corp
Original Assignee
Toda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toda Corp filed Critical Toda Corp
Priority to JP04380494A priority Critical patent/JP3505213B2/en
Publication of JPH07252835A publication Critical patent/JPH07252835A/en
Application granted granted Critical
Publication of JP3505213B2 publication Critical patent/JP3505213B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Foundations (AREA)

Abstract

PURPOSE:To shorten the construction period and construct a stable receiving foundation and a diagonal shore strut supporting an earth retaining wall when the height of the adjacent ground differs or in the underground work in a wide area. CONSTITUTION:A support pile 12 reaching to a support layer and a foundation section 13 integrally fixing the head section of the support pile 12 with concrete are constructed on an excavation bottom 11. A ground anchor 14 is constructed to maintain balance with a diagonal shore strut 4a on the foundation section 13, then the diagonal shore strut 4a is installed.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、地盤を掘削していく際
に、親杭横矢板工法やシートパイル工法等による山止壁
を支持するように構築される切梁に係り、更に詳しく
は、地盤の高さが相違している場合における切梁の構築
や、広い面積を掘削した場合における切梁の構築方法に
関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a crossbeam constructed so as to support a retaining wall formed by a main pile side sheet pile construction method or a sheet pile construction method when excavating the ground. The present invention relates to a construction of a crossbeam when the heights of the ground are different and a construction method of a crossbeam when a large area is excavated.

【0002】[0002]

【従来の技術】従来、図2に示すように、地盤1を掘削
していく場合に、地盤のA側とB側の高さが相違してい
ると、土圧による山止壁2の崩落を防ぐために前記山止
壁2に接して水平に取り付けられた腹起こし3を介して
山止壁2,2間に横架される通常の切り梁4を、斜め切
梁4aのように斜めに架設することになる。
2. Description of the Related Art Conventionally, as shown in FIG. 2, when excavating the ground 1, if the heights of the A side and the B side of the ground are different from each other, collapse of the retaining wall 2 due to earth pressure occurs. In order to prevent this, a normal cutting beam 4 which is horizontally installed between the mountain retaining walls 2 and 2 via a bellows raising 3 which is horizontally attached in contact with the mountain retaining wall 2 is slanted like an oblique cutting beam 4a. Will be erected.

【0003】しかし、このような斜め切梁4aでは、B
側の土圧をA側の腹起こし3で十分に受け持って支持す
ることができず、実際の施工は不可能であった。
However, in such an oblique cutting beam 4a, B
The earth pressure on the side could not be sufficiently supported and supported by the abdomen uplifting 3 on the side A, and the actual construction was impossible.

【0004】そこで、図3に示すように、各山止壁2,
2を地盤アンカー5によって支持するように施工するこ
とも可能ではあるが、この場合には、当該掘削地盤の隣
接地A,Bにアンカーを打ち込むことの許可が必要であ
り、その許可が無ければ施工することが不可能であっ
て、必ずしも確実な施工方法にならない不都合がある。
Therefore, as shown in FIG. 3, each cliff wall 2,
It is possible to construct so that 2 is supported by the ground anchor 5, but in this case, it is necessary to permit the anchor to be driven into the adjacent land A, B of the excavated ground, and if there is no such permission. There is an inconvenience that the construction is impossible and the construction method is not always reliable.

【0005】この他、図4に示すように、地盤1に支持
杭6を構築し、該支持杭6の頭部にコンクリート製基礎
7を形成して、この基礎7に斜め切梁4aの一端部を固
着し、この斜め切梁4aの他端部を腹起こし3に固着す
る、と言う方法もある。
In addition to this, as shown in FIG. 4, a support pile 6 is constructed on the ground 1, a concrete foundation 7 is formed on the head of the support pile 6, and one end of the diagonal cutting beam 4a is formed on the foundation 7. There is also a method of fixing the portion and fixing the other end of the oblique cutting beam 4a to the belly 3 and fixing it.

【0006】この方法では、大きな土圧が前記基礎7に
加わると支持力が不安定となり確実性がなく、また、コ
ストも嵩むという問題点があった。
In this method, when a large earth pressure is applied to the foundation 7, the supporting force becomes unstable, so that there is no certainty and the cost increases.

【0007】また、図5に示すように、大きな受け基礎
8を根切り底に構築して、前述と同様にして斜め切梁4
aを架設するようにもできる。
Further, as shown in FIG. 5, a large receiving foundation 8 is constructed on the root cutting bottom, and the diagonal cutting beams 4 are formed in the same manner as described above.
It is also possible to install a.

【0008】しかし、この場合にも、前記受け基礎8を
構築するのにコストが嵩み工期も長くなってしまうと言
う問題点があった。
However, also in this case, there is a problem in that the construction of the receiving base 8 requires a high cost and a long construction period.

【0009】また、図6に示すように、根切り底に厚い
捨てコンクリート9を構築して、この捨てコンクリート
9の両側に斜め切梁4a,4bを架設し、力の釣り合い
がとれるようにすることもできる。
Further, as shown in FIG. 6, a thick discarded concrete 9 is constructed at the root cutting bottom, and diagonal cut beams 4a and 4b are installed on both sides of the discarded concrete 9 so as to balance the forces. You can also

【0010】しかし、このような方法でも、斜め切梁4
a,4bの釣り合いがとれているような状態ではよい
が、前記隣接した地盤A,Bの高さが異なると不釣り合
いとなって不安定となるのは避けられず、工期も長くな
ると言う問題点があった。
However, even with such a method, the diagonal beams 4
It is good that the a and 4b are balanced, but if the heights of the adjacent grounds A and B are different, it is unavoidable that the grounds A and B are unbalanced and unstable, and the construction period becomes long. There was a point.

【0011】[0011]

【発明が解決しようとする課題】このように、従来の斜
め切梁の受け基礎においては、コストや工期または力の
釣り合いの関係の点において解決すべき課題を有してい
た。本発明は、上記の課題に鑑みてなされたもので、特
に隣接地盤の高さが相違している場合や広い面積の地下
工事において、工期を短縮して安定した受け基礎及び斜
め切梁を構築することを目的とする。
As described above, the conventional foundations for the slanted beams have problems to be solved in terms of cost, construction period, and balance of force. The present invention has been made in view of the above problems, and particularly when the height of adjacent ground is different or in the underground construction of a large area, the construction period is shortened to construct a stable receiving foundation and diagonal cutting beams. The purpose is to do.

【0012】[0012]

【課題を解決するための手段】本発明の上記課題を解決
し上記目的を達成するための要旨は、根切り底に支持層
まで達する支持杭と、該支持杭の頭部をコンクリートで
一体に固着した基礎部とを構築し、前記基礎部には斜め
切梁に対して釣り合いを保つようにして地盤アンカーを
構築し、その後前記斜め切梁を設置するようにした斜め
切梁の構築方法である。
Means for Solving the Problems The object of the present invention to solve the above problems and achieve the above objects is to provide a support pile reaching a support layer at a root cutting bottom and a head of the support pile integrally made of concrete. By building a fixed foundation part, constructing a ground anchor in the foundation part so as to maintain balance with the diagonal cutting beam, and then installing the diagonal cutting beam by the construction method of the diagonal cutting beam is there.

【0013】また、斜め切梁を設置する際には、当該斜
め切梁の架設ラインに沿って法面を残しておき、前記斜
め切梁を架設した後に前記法面を取り除くことによって
前記斜め切梁を設置するようにしたことである。
When installing the diagonal cutting beam, a slope is left along the erection line of the diagonal cutting beam, and after the diagonal cutting beam is installed, the slope is removed to remove the diagonal cutting beam. That is, the beams were installed.

【0014】[0014]

【作用】本発明の斜め切梁の構築方法によれば、地盤ア
ンカーと支持杭とで斜め切梁を支持する強固な反力体が
形成され、隣接する敷地内に亘って反力をとることな
く、工事施工範囲内における根切り底で構築される。
According to the method of constructing the diagonal truss of the present invention, a strong reaction force body for supporting the diagonal truss is formed by the ground anchor and the support pile, and the reaction force is taken over the adjacent site. Instead, it is constructed with a root cutting bottom within the construction range.

【0015】また、斜め切梁を設置する際には、当該斜
め切梁の架設ラインに沿って法面を残しておき、前記斜
め切梁を架設した後に前記法面を取り除くことによって
前記斜め切梁を設置するようにすれば、斜め切梁の架設
作業が容易となる。
Further, when the diagonal cutting beam is installed, a slope is left along the erection line of the diagonal cutting beam, and after the diagonal cutting beam is installed, the slope is removed to remove the diagonal cutting beam. If the beam is installed, the work of constructing the diagonal beam can be facilitated.

【0016】[0016]

【実施例】次に、本発明に係る一実施例について図面を
参照して詳細に説明する。なお、従来例に対応する部分
には理解容易のために同一符号を付けて説明する。図1
は、本発明に係る斜め切梁の構築方法の施工例を示して
いる。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Next, one embodiment according to the present invention will be described in detail with reference to the drawings. For the sake of easy understanding, the portions corresponding to the conventional example will be described with the same reference numerals. Figure 1
Shows an example of construction of a method for constructing a diagonal beam according to the present invention.

【0017】他人の敷地との境界線10に沿って山止壁
2を構築し、地盤1を掘削していく。そして、斜め切梁
4aを架設しようとする架設ラインに達して法面1aが
形成される。支持杭12の打設及び地盤アンカー14の
設置は、掘削前でも良いし、掘削後の法面1aを残した
状態のどちらでも実施できる。この支持杭12は既製品
に限らず現場打ち杭でもよい。
The cliff wall 2 is constructed along the boundary line 10 with the site of another person, and the ground 1 is excavated. Then, the slope 1a is formed by reaching the erection line for erection of the oblique cutting beam 4a. The mounting of the support piles 12 and the installation of the ground anchors 14 may be performed either before the excavation or after leaving the slope 1a after the excavation. The support pile 12 is not limited to a ready-made product, and may be a cast-in-place pile.

【0018】前記支持杭12の先端部は、地盤1の堅い
支持層に達するまで打ち込むものである。そして、前記
支持杭12の頭部にスタッドボルト12aを介して連結
を強固にしてコンクリートを打設し、一体にして基礎部
13を形成する。
The tip of the support pile 12 is driven into the hard support layer of the ground 1. Then, concrete is laid on the heads of the support piles 12 through the stud bolts 12a to strengthen the connection, and the foundation 13 is formed integrally.

【0019】次に、前記基礎部13に地盤アンカー14
を設ける。この地盤アンカー14は、力関係の釣り合い
を保つべく、後に架設しようとする斜め切梁4aとは略
同一の垂直面内に収まるように施工される。
Next, a ground anchor 14 is attached to the foundation portion 13.
To provide. The ground anchor 14 is constructed so as to fit within a vertical plane substantially the same as the diagonal cutting beam 4a to be installed later in order to maintain the balance of the force relationship.

【0020】前記地盤アンカー14は、地盤1内に穿孔
された孔にアンカー14aを挿入してコンクリートを打
設し、コンクリート定着体14bを形成する。そして、
基礎部13に設けられた貫通孔から突出しているアンカ
ー14aの後端部を、定着座金14cを嵌装し、所定の
緊張力で緊張した後に定着ナット14dを締め込んで定
着させる。
In the ground anchor 14, the anchor 14a is inserted into the hole drilled in the ground 1 and concrete is poured to form a concrete fixing body 14b. And
The fixing washer 14c is fitted to the rear end of the anchor 14a protruding from the through hole provided in the base portion 13, and the fixing nut 14d is tightened and fixed by tightening the fixing washer 14c with a predetermined tension force.

【0021】次に、存置された前記法面1aに沿って、
前記基礎部13と山止壁2に接して横架された腹起こし
3との間に、H鋼製の斜め切梁4aを架設する。
Next, along the existing slope 1a,
An H-steel diagonal cutting beam 4a is installed between the foundation portion 13 and the bellows erection 3 which is laterally bridged in contact with the mountain stop wall 2.

【0022】なお、前記腹起こし3には、地盤Bの土圧
による膨らみを防止するために、逆付ブラケット15が
斜材として固定されている。
In order to prevent the ground B from bulging due to earth pressure, a reverse mounting bracket 15 is fixed as a diagonal member to the abdomen uplifting 3.

【0023】その後、前記法面1a部分の地盤を掘削
し、根切り底11まで掘削して建物の基礎を構築するも
のである。また、この建物の基礎を構築していく手順
は、図1(イ)の紙面直行方向において、ある区画部分
を地上まで構築して順次前記斜め切梁4aを撤去してい
くものである。
After that, the ground of the slope 1a is excavated and the root cutting bottom 11 is excavated to construct the foundation of the building. In addition, the procedure for constructing the foundation of this building is to construct a certain section up to the ground in the direction perpendicular to the plane of FIG. 1 (a) and sequentially remove the diagonal cutting beams 4a.

【0024】また、地盤1の隣接した地盤A,Bが、図
1(ロ)に示すように、高さが相違している場合には、
両側の山止壁2から基礎部13に対して斜め切梁4aを
架設するものである。
When the grounds A and B adjacent to the ground 1 have different heights as shown in FIG. 1B,
The diagonal beams 4a are installed from the mountain stop walls 2 on both sides to the base portion 13.

【0025】[0025]

【発明の効果】以上説明したように、本発明の斜め切梁
の構築方法は、根切り底に支持層まで達する支持杭と、
該支持杭の頭部をコンクリートで一体に固着した基礎部
とを構築し、前記基礎部には斜め切梁に対して釣り合い
を保つようにして地盤アンカーを構築し、その後前記斜
め切梁を設置するようにしたので、地盤の土圧が大きく
ても前記地盤アンカーによって大耐力が得られ、斜め切
梁の支持力が安定すると共に工期の短縮となると言う優
れた効果を奏する。
As described above, the method for constructing an oblique beam according to the present invention comprises a support pile that reaches the root and the support layer,
The foundation of which the heads of the support piles are integrally fixed with concrete is constructed, and a ground anchor is constructed on the foundation so as to maintain balance with the diagonal cutting beam, and then the diagonal cutting beam is installed. Therefore, even if the earth pressure of the ground is large, a large yield strength can be obtained by the ground anchor, and the supporting force of the diagonal beam can be stabilized and the work period can be shortened.

【0026】また、地盤の堅い支持層に達する支持杭と
地盤アンカーによって、根切り底部の土質を選ばないの
で適用範囲が広く、各山止壁部分で独立して斜め切梁を
架設することができると言う優れた効果を奏する。
[0026] Further, since the soil quality of the root cutting bottom is not selected by the support pile and the ground anchor reaching the hard support layer of the ground, the application range is wide and it is possible to construct the diagonal cutting beams independently at each mountain wall. It has an excellent effect that it can be done.

【0027】そして、部分的に斜め切梁を解体すること
もでき、工区別に施工が可能であり、地盤の掘削深さが
各部で異なるような工事において、若しくは広い面積の
地下工事であっても本発明の構築方法を適用することが
できると言う優れた効果を奏する。
Further, the diagonal beams can be partially dismantled so that the construction can be carried out by different works, even in the construction where the excavation depth of the ground is different in each part, or even in the case of underground construction of a large area. There is an excellent effect that the construction method of the present invention can be applied.

【0028】更に、斜め切梁を設置する際には、当該斜
め切梁の架設ラインに沿って法面を残しておき、前記斜
め切梁を架設した後に前記法面を取り除くことによって
前記斜め切梁を設置するようにしたことで、当該斜め切
梁を容易に架設することができると言う優れた効果を奏
する。
Further, when the diagonal cutting beam is installed, a slope is left along the erection line of the diagonal cutting beam, and after the diagonal cutting beam is installed, the slope is removed to remove the diagonal cutting beam. Since the beam is installed, the diagonal cutting beam can be easily installed, which is an excellent effect.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係る斜め切梁の構築方法の施工例を示
す説明図(イ),(ロ)である。
FIG. 1 is explanatory diagrams (a) and (b) showing a construction example of a method for constructing a diagonal beam according to the present invention.

【図2】従来例に係る斜め切梁の施工例の説明図であ
る。
FIG. 2 is an explanatory diagram of a construction example of a diagonal slash according to a conventional example.

【図3】同従来例に係り、隣接地盤に地盤アンカーを設
けた場合の説明図である。
FIG. 3 is an explanatory diagram according to the conventional example, in which a ground anchor is provided on an adjacent ground.

【図4】同従来例に係り、支持杭を設けた場合の説明図
である。
FIG. 4 is an explanatory view of a case where a support pile is provided according to the conventional example.

【図5】同従来例に係り、受け基礎を設けた場合の説明
図である。
FIG. 5 is an explanatory diagram relating to the conventional example and including a receiving base.

【図6】同従来例に係り、厚い捨てコンクリートを打設
して斜め切梁を両側から架設してつり合わせた場合の説
明図である。
FIG. 6 is an explanatory diagram according to the conventional example, in which a thick discarded concrete is poured and diagonal slant beams are erected from both sides and balanced.

【符号の説明】[Explanation of symbols]

1 地盤、 1a 法面、 2 山止壁、 3 腹起こし、 4 切り梁、 4a,4b 斜め切梁、 5 地盤アンカー、 6 支持杭、 7 基礎、 8 受け基礎、 9 捨てコンクリート、 10 境界線、 11 根切り底 12 支持杭、 12a スタッドボルト、 13 基礎部、 14 地盤アンカー、 14a アンカー、 14b コンクリート定着体、 14c 定着座金、 14d 定着ナット。 1 ground, 1a slope, 2 mountain retaining wall, 3 waving up, 4 beam, 4a, 4b diagonal beam, 5 ground anchor, 6 support pile, 7 foundation, 8 receiving foundation, 9 waste concrete, 10 boundary line, 11 root cutting bottom 12 support pile, 12a stud bolt, 13 foundation part, 14 ground anchor, 14a anchor, 14b concrete fixing body, 14c fixing washer, 14d fixing nut.

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 根切り底に支持層まで達する支持杭と、
該支持杭の頭部をコンクリートで一体に固着した基礎部
とを構築し、前記基礎部には斜め切梁に対して釣り合い
を保つようにして地盤アンカーを構築し、その後前記斜
め切梁を設置するようにしたことを特徴する斜め切梁の
構築方法。
1. A support pile that reaches the root of the root and reaches the support layer,
The foundation of which the heads of the support piles are integrally fixed with concrete is constructed, and a ground anchor is constructed on the foundation so as to maintain balance with the diagonal cutting beam, and then the diagonal cutting beam is installed. A method for constructing an oblique cross beam, which is characterized in that
【請求項2】 斜め切梁を設置する際には、当該斜め切
梁の架設ラインに沿って法面を残しておき、前記斜め切
梁を架設した後に前記法面を取り除くことによって前記
斜め切梁を設置するようにしたことを特徴する請求項1
に記載の斜め切梁の構築方法。
2. When installing the diagonal cutting beam, a slope is left along the erection line of the diagonal cutting beam, and the slope is removed after the diagonal cutting beam is installed and the slope cutting is performed. A beam is installed, and the beam is installed.
Method for constructing diagonal beams as described in.
JP04380494A 1994-03-15 1994-03-15 Construction method of diagonally cut beam Expired - Fee Related JP3505213B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP04380494A JP3505213B2 (en) 1994-03-15 1994-03-15 Construction method of diagonally cut beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP04380494A JP3505213B2 (en) 1994-03-15 1994-03-15 Construction method of diagonally cut beam

Publications (2)

Publication Number Publication Date
JPH07252835A true JPH07252835A (en) 1995-10-03
JP3505213B2 JP3505213B2 (en) 2004-03-08

Family

ID=12673939

Family Applications (1)

Application Number Title Priority Date Filing Date
JP04380494A Expired - Fee Related JP3505213B2 (en) 1994-03-15 1994-03-15 Construction method of diagonally cut beam

Country Status (1)

Country Link
JP (1) JP3505213B2 (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007247308A (en) * 2006-03-17 2007-09-27 Takenaka Komuten Co Ltd Pulling-out bearing strength reinforcing for pile group comprised of inclined piles and structure constructed according to the same
JP2011174278A (en) * 2010-02-24 2011-09-08 Taisei Corp Earth retaining and earth retaining construction method
JP2012162848A (en) * 2011-02-03 2012-08-30 Okumura Corp Structure of earth retaining timbering and construction method of the same
CN103114595A (en) * 2013-01-06 2013-05-22 厦门源昌城建集团有限公司 Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN104153374A (en) * 2014-08-26 2014-11-19 上海强劲地基工程股份有限公司 Combined foundation pit supporting structure with inclined strut and pull anchor
CN106320348A (en) * 2016-08-30 2017-01-11 中建三局第建设工程有限责任公司 Opposite-pulling anchor cable supporting structure for adjacent deep foundation pits and construction method of opposite-pulling anchor cable supporting structure
CN106638618A (en) * 2016-12-20 2017-05-10 杭州江润科技有限公司 Construction method of reinforced concrete support structure of diaphgram wall retaining foundation pit
CN108005086A (en) * 2017-12-15 2018-05-08 安徽省城建设计研究总院股份有限公司 A kind of high buttress counter pull type inclined support structure for pattern foundation pit supporting structure
CN108035360A (en) * 2017-12-15 2018-05-15 安徽省城建设计研究总院股份有限公司 A kind of method for pattern foundation pit supporting structure
CN109113070A (en) * 2018-08-24 2019-01-01 洛阳理工学院 External supporting structure and construction method in a kind of building foundation pit
CN109356169A (en) * 2018-12-03 2019-02-19 中国建筑局(集团)有限公司 Foundation pit row pile supporting system and construction method thereof
CN112112169A (en) * 2020-09-30 2020-12-22 长春市城建维护集团股份有限公司 Deep foundation pit supporting system and construction method thereof
CN112267472A (en) * 2020-10-17 2021-01-26 江苏建院营造股份有限公司 Construction process for foundation pit support of inclined pile of advanced mixing pile
CN112627196A (en) * 2020-12-31 2021-04-09 东晟兴诚集团有限公司 Reinforced foundation pit supporting structure and construction method thereof
CN113914323A (en) * 2021-09-28 2022-01-11 中亿丰建设集团股份有限公司 Steel pipe grouting type tree root pile construction method for advanced support
CN114561956A (en) * 2022-03-14 2022-05-31 上海市基础工程集团有限公司 Emergency rescue structure for foundation pit engineering without inner support
CN114575356A (en) * 2022-04-15 2022-06-03 中国建筑第二工程局有限公司 Foundation pit supporting structure, supporting pile transaction processing method and basement construction method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101967829A (en) * 2010-10-29 2011-02-09 中国神华能源股份有限公司 Construction method of base pit

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007247308A (en) * 2006-03-17 2007-09-27 Takenaka Komuten Co Ltd Pulling-out bearing strength reinforcing for pile group comprised of inclined piles and structure constructed according to the same
JP2011174278A (en) * 2010-02-24 2011-09-08 Taisei Corp Earth retaining and earth retaining construction method
JP2012162848A (en) * 2011-02-03 2012-08-30 Okumura Corp Structure of earth retaining timbering and construction method of the same
CN103114595A (en) * 2013-01-06 2013-05-22 厦门源昌城建集团有限公司 Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch
CN104153374A (en) * 2014-08-26 2014-11-19 上海强劲地基工程股份有限公司 Combined foundation pit supporting structure with inclined strut and pull anchor
CN106320348A (en) * 2016-08-30 2017-01-11 中建三局第建设工程有限责任公司 Opposite-pulling anchor cable supporting structure for adjacent deep foundation pits and construction method of opposite-pulling anchor cable supporting structure
CN106638618A (en) * 2016-12-20 2017-05-10 杭州江润科技有限公司 Construction method of reinforced concrete support structure of diaphgram wall retaining foundation pit
CN106638618B (en) * 2016-12-20 2018-10-23 杭州江润科技有限公司 Ground-connecting-wall goes along with sb. to guard him the construction method of foundation pit reinforced concrete support construction
CN108035360B (en) * 2017-12-15 2019-08-02 安徽省城建设计研究总院股份有限公司 A method of for pattern foundation pit supporting structure
CN108005086A (en) * 2017-12-15 2018-05-08 安徽省城建设计研究总院股份有限公司 A kind of high buttress counter pull type inclined support structure for pattern foundation pit supporting structure
CN108035360A (en) * 2017-12-15 2018-05-15 安徽省城建设计研究总院股份有限公司 A kind of method for pattern foundation pit supporting structure
CN109113070A (en) * 2018-08-24 2019-01-01 洛阳理工学院 External supporting structure and construction method in a kind of building foundation pit
CN109356169A (en) * 2018-12-03 2019-02-19 中国建筑局(集团)有限公司 Foundation pit row pile supporting system and construction method thereof
CN109356169B (en) * 2018-12-03 2024-04-19 中国建筑一局(集团)有限公司 Foundation pit row pile supporting system and construction method thereof
CN112112169A (en) * 2020-09-30 2020-12-22 长春市城建维护集团股份有限公司 Deep foundation pit supporting system and construction method thereof
CN112267472A (en) * 2020-10-17 2021-01-26 江苏建院营造股份有限公司 Construction process for foundation pit support of inclined pile of advanced mixing pile
CN112627196A (en) * 2020-12-31 2021-04-09 东晟兴诚集团有限公司 Reinforced foundation pit supporting structure and construction method thereof
CN113914323A (en) * 2021-09-28 2022-01-11 中亿丰建设集团股份有限公司 Steel pipe grouting type tree root pile construction method for advanced support
CN114561956A (en) * 2022-03-14 2022-05-31 上海市基础工程集团有限公司 Emergency rescue structure for foundation pit engineering without inner support
CN114575356A (en) * 2022-04-15 2022-06-03 中国建筑第二工程局有限公司 Foundation pit supporting structure, supporting pile transaction processing method and basement construction method
CN114575356B (en) * 2022-04-15 2024-01-05 中国建筑第二工程局有限公司 Foundation pit supporting structure, supporting pile abnormal movement processing method and basement construction method

Also Published As

Publication number Publication date
JP3505213B2 (en) 2004-03-08

Similar Documents

Publication Publication Date Title
JP3505213B2 (en) Construction method of diagonally cut beam
US6299386B1 (en) Method and apparatus for a shoring wall
US5551810A (en) Retaining wall with an outer face and method of forming the same
JP2000513773A (en) Underground structure for constructing tunnel, underground passage, underground parking lot, etc., method of constructing the same, and prefabricated member for the structure
US5588784A (en) Soil or rock nail wall with outer face and method of constructing the same
KR100831332B1 (en) Underground retaining wall for public works and method for constructing the same
JP4069509B2 (en) Construction method of reverse struts in the outer periphery of underground excavation space
JP2831909B2 (en) Connection structure of steel columns, piles and foundation beams
JP2868651B2 (en) Earth retaining method above existing underground structure
JP2000144769A (en) Method of landslide protection work for preparing housing lot
JP2950325B1 (en) Construction method of seismic isolation building
KR102195496B1 (en) Pile for earth self-retaining wall using cast in place concrete pile with double I beam
KR102065941B1 (en) Method for constructing soil retaining wall structure using h-pile
JPH05179647A (en) Supporting structure for earth retaining wall
JP3244324B2 (en) Mountain retaining method
JPS63280153A (en) Underground inverted lining method
JPH10299009A (en) Method for building basement in house
JP2824217B2 (en) Construction method of retaining wall and retaining material for retaining wall
JPH11193529A (en) Earth retaining method for underground work, and building method for underground structure
JPH0813494A (en) Fixing method of earth retaining wall and timbering
CN111648375B (en) Inner supporting structure based on shear wall as support
KR102194394B1 (en) Construction method for earth self-retaining wall using reinforcing member and SCW construction method
JPH04366229A (en) Temporary corresponding standard used for method of reverse driving construction
JP2002105973A (en) Construction method for column
JP2649682B2 (en) Underground structure

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20031208

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20031215

LAPS Cancellation because of no payment of annual fees