JPH08284556A - Installing method of grating - Google Patents

Installing method of grating

Info

Publication number
JPH08284556A
JPH08284556A JP8501995A JP8501995A JPH08284556A JP H08284556 A JPH08284556 A JP H08284556A JP 8501995 A JP8501995 A JP 8501995A JP 8501995 A JP8501995 A JP 8501995A JP H08284556 A JPH08284556 A JP H08284556A
Authority
JP
Japan
Prior art keywords
vertical
rail
rails
horizontal
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP8501995A
Other languages
Japanese (ja)
Other versions
JP2669800B2 (en
Inventor
Takashi Nakamura
孝 中村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nakamura Co Ltd
Original Assignee
Nakamura Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nakamura Co Ltd filed Critical Nakamura Co Ltd
Priority to JP8501995A priority Critical patent/JP2669800B2/en
Priority to TW84103653A priority patent/TW271457B/en
Publication of JPH08284556A publication Critical patent/JPH08284556A/en
Application granted granted Critical
Publication of JP2669800B2 publication Critical patent/JP2669800B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Grates (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

PURPOSE: To rationalize the installation of a grating by assembling a stile in a unit previously connected by string bodies, carrying the unit to an installation site and bring the unit to the state in which the unit can be incorporated into a rail. CONSTITUTION: Prepared holes for fitting sliders are bored at upper and lower two places in stiles 1, and the sliders 2 are mounted and fixed into the prepared holes through screws 3. String bodies 5 cut in specified length are inserted to the string-body holding sections 2C of the sliders having corresponding height, and the string-body holding sections 2C are caulked at the places of the string bodies 5 allocated, thus completing a style unit U, in which each stile 1 is coupled by the string bodies 5 through the sliders 2, The style unit U and fitments, etc., are transported to a builder, the sliders 2 fixed onto each stile 1 successively from the insides of left or right rails 6 are inserted so as to be placed on the guide rails 8C of the rails 6 at an installation site and the style unit U is assembled to the rails 6, and the internal end sections of the left and right rails 6 are connected mutually. The intermediate stiles 1 are coupled mutually by the string bodies 5 at that time, thus eliminating the need for style allocation operation on the site.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、柵または格子の設置方
法に関し、特に設置現場での割付作業を省略できると共
に、縦桟または斜桟の割付が正確にでき、しかも、安価
に設置できるようにした柵または格子の設置方法に関す
るものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of installing a fence or a grid, and in particular, it is possible to omit the allocation work at the installation site, to accurately allocate the vertical rails or the diagonal rails, and to inexpensively install them. It concerns the installation of fences or grate.

【0002】[0002]

【従来の技術】格子は互いに交差する平行な桟を間をす
かして組み合わせたものであり、窓や出入口に取り付け
る建具や柵に利用されている。代表的な格子としては縦
桟と横桟とを組み合わせたものがあり、菱格子のように
傾斜した桟を交差させたものがある。
2. Description of the Related Art A lattice is a combination of parallel crossing beams with a gap between them, and is used for fittings and fences attached to windows and doorways. As a typical grid, there is a combination of vertical bars and horizontal bars, and there is a grid in which slanted bars are crossed like a rhombus.

【0003】例えば多数の縦桟を2〜数本の横桟に組み
付けた格子を作る場合、横桟に所定の間隔を置いてマー
クを付け、このマークに縦桟を合わせて各縦桟を横桟に
固定するという手順が採用されている。
For example, when making a grid in which a large number of vertical rails are assembled to two or several horizontal rails, marks are provided at predetermined intervals on the horizontal rails, and the vertical rails are aligned with this mark to make each vertical rail horizontal. The procedure of fixing to the crosspiece is adopted.

【0004】[0004]

【発明が解決しようとする課題】この従来の方法を設置
現場において実施する場合には、横桟に縦桟の位置をマ
ークする時にマークの位置がずれたり、横桟に縦桟を固
定する時に縦桟の位置がずれたりして正確に縦桟を割付
られないことが少なくない。このため、従来ではあらか
じめ建具師などが格子を作成してから設置現場に運び込
んで建て込むという手順が多用されているが、この方法
では、格子そのものが高価になるうえ、格子を輸送する
上でも荷姿が大きな平板状になり、荷扱が難しく、ま
た、輸送コストが高くなるという問題がある。
When this conventional method is carried out at the installation site, when the position of the vertical rail is marked on the horizontal rail, the mark position shifts or when the vertical rail is fixed to the horizontal rail. It is not uncommon for vertical bars to be assigned incorrectly because the vertical bars are misaligned. For this reason, in the past, a procedure was often used in which a joiner created a grid in advance and then brought it to the installation site and built it.However, in this method, the grid itself was expensive, and it was also necessary to transport the grid. There is a problem in that the package becomes a large flat plate, handling is difficult, and the transportation cost increases.

【0005】本発明は、上記の事情を考慮して、設置現
場での割付作業を省略できると共に、縦桟または斜桟の
割付が正確にでき、しかも、安価に設置できるようにし
た格子の設置方法を提供することを目的とするものであ
る。
According to the present invention, in consideration of the above circumstances, the layout work can be omitted at the installation site, the vertical rails or the diagonal rails can be accurately allocated, and the grid can be installed at low cost. It is intended to provide a method.

【0006】[0006]

【課題を解決するための手段】本発明は、上記の目的を
達成するため、あらかじめ所定数の各縦桟または斜桟の
後面の軸方向に適当な間隔を置いた複数箇所に横桟の一
端から差し込まれ、横桟の軸方向に摺動可能に横桟に支
持される複数のスライダを固定すると共に、各縦桟また
は斜桟を紐体で所定間隔を置いて連結した縦桟ユニット
を組立て、設置現場において複数の横桟の各一端から各
縦桟または斜桟のスライダを順次差し込んだ後、両端の
縦桟または斜桟をビスまたはピンにより横桟の所定の位
置に固定することを特徴とする格子の設置方法である。
SUMMARY OF THE INVENTION In order to achieve the above object, the present invention has one end of a horizontal rail at a plurality of positions on the rear surface of a predetermined number of vertical rails or diagonal rails, which are appropriately spaced in the axial direction. Assemble the vertical rail unit in which the vertical rails or slant rails are connected with a string at a predetermined interval while fixing a plurality of sliders that are supported by the horizontal rail so as to be slidable in the axial direction of the horizontal rail. The feature is that after inserting the sliders of each vertical rail or diagonal rail from one end of each of the horizontal rails at the installation site in sequence, the vertical rails or diagonal rails at both ends are fixed to the horizontal rail at predetermined positions with screws or pins. This is the method of installing the grid.

【0007】[0007]

【作用】本発明によれば、各縦桟が紐体によって連結さ
れているので、各縦桟の間隔を狭くして輸送することが
できる。そして、設置現場で横桟に縦桟ユニットを組付
け、両端の縦桟を横桟の所定の位置に固定することによ
り格子が完成される。また、各縦桟があらかじめ紐体に
よって所定間隔を置いて連結されているので、設置現場
において縦桟ユニットを横桟に組み付けた後、両端の縦
桟または斜桟をビスまたはピンにより横桟の所定の位置
に固定することにより、両端の縦桟または斜桟の間の各
縦桟の間隔がそれぞれの間の紐体の長さによって決定さ
れ、各縦桟の位置を一々割付けなくても、各縦桟があら
かじめ与えられた所定の間隔を置いて割付られることに
なる。
According to the present invention, since the vertical rails are connected by the string body, the vertical rails can be transported with a narrow interval. Then, at the installation site, the vertical rail unit is assembled to the horizontal rail, and the vertical rails at both ends are fixed at predetermined positions of the horizontal rail to complete the lattice. Also, since each vertical rail is connected in advance by a cord at a predetermined interval, after the vertical rail unit is assembled to the horizontal rail at the installation site, the vertical rails or diagonal rails at both ends are secured by screws or pins. By fixing in a predetermined position, the interval between the vertical bars at the both ends or the vertical bars between the diagonal bars is determined by the length of the cord body between the vertical bars, and without allocating the position of each vertical bar one by one, Each vertical rail will be assigned at a predetermined interval.

【0008】本発明は、横桟が水平に設置される場合に
限らず、例えば傾斜地に設置される柵のように横桟が傾
斜して設置される場合にも適用できるのであり、横桟が
傾斜して設置される場合には、前記スライダが各縦桟に
横桟の傾斜に対応して傾斜して固定された縦桟ユニット
を用いることにより、縦桟が鉛直になる格子を設置する
ことができる。
The present invention can be applied not only to the case where the horizontal rail is installed horizontally but also to the case where the horizontal rail is installed with an inclination such as a fence installed on a sloped ground. When installed in a slanted manner, by using a vertical rail unit in which the slider is tilted and fixed to each vertical rail corresponding to the inclination of the horizontal rail, a grid in which the vertical rail is vertical is installed. Can be.

【0009】また、本発明は、縦桟と横桟とからなる格
子のみに適用されるものではなく、例えば菱格子のよう
に互いに交差する2方向の斜桟を組み合わせた格子にも
適用できる。ただし、この場合には、各斜桟に支持され
るスライダのうちの1つが各斜桟の所定の高さに支持さ
れ、他のスライダはそれぞれ所定の範囲で各斜桟の軸方
向に変位可能に支持させる。そして、各スライダを介し
て各斜桟が横桟に回転可能に支持されるようにすること
が必要である。
Further, the present invention is not only applied to a grid composed of vertical rails and horizontal rails, but can also be applied to a grid in which oblique rails in two directions intersecting with each other, such as a rhombic grid, are combined. However, in this case, one of the sliders supported by each oblique bar is supported at a predetermined height of each oblique bar, and the other sliders can be displaced in the axial direction of each oblique bar within a predetermined range. To support. Then, it is necessary that each oblique rail be rotatably supported by the horizontal rail via each slider.

【0010】[0010]

【実施例】本発明の一実施例に係る格子の設置方法を図
面に基づいて具体的に説明すれば以下の通りである。こ
の実施例に係る格子の設置方法は所定数の縦桟を上下2
本の横桟に均等間隔を置いて組み付けた格子を設置する
方法に適用される。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The method of installing a grid according to an embodiment of the present invention will be described in detail with reference to the drawings. In the installation method of the lattice according to this embodiment, a predetermined number of vertical bars are arranged above and below
It is applied to the method of installing grids assembled at equal intervals on the horizontal rail of a book.

【0011】図1はこの実施例に係る格子の製造方法及
び設置方法の流れを示すフロー図であり、アルミニウム
押出成形されたA字形断面の縦桟用押出型材を縦桟裁断
工程S1で所定の寸法に裁断し、さらに必要に応じて後
面1aの軸方向に適当な間隔を置いた複数箇所、例えば
上下2箇所にスライダ取付け用の下孔を形成することに
より図2の斜視図に示す縦桟1が形成される。
FIG. 1 is a flow chart showing the flow of the manufacturing method and the installation method of the lattice according to this embodiment, in which an aluminum extrusion-molded A-shaped cross-section vertical cross-section extruded material is subjected to a predetermined cross-cutting step S1. The vertical bars shown in the perspective view of FIG. 2 are formed by cutting into dimensions and further forming slider mounting pilot holes at a plurality of locations, for example, two locations above and below the rear surface 1a, which are appropriately spaced in the axial direction of the rear surface 1a. 1 is formed.

【0012】また、縦桟1とは別に、アルミニウム押出
成形されたスライダ用押出型材をスライダ裁断工程S2
で所定の長さに裁断し、ビス孔2dを形成して得た図2
および図4に示すスライダ2が形成され、スライド取付
工程S3で各縦桟1の後面の軸方向に適当な間隔を置い
た複数箇所(ここでは上下2箇所)に固定される。図2
および図4に示すように、前記スライダ2は、ほぼ逆L
字形の基部2aと、この基部2aの上縁に連続して形成
された逆U字形のサドル部2bと、さらにこのサドル部
2bに連続するC字形の紐体保持部2cとを備え、基部
2aの立辺部を縦桟1の後面1aに形成した凹溝に嵌め
込み、ビス孔2dに挿通したビス3を縦桟1の下孔にね
じ込むことにより縦桟1に固定される。
Separately from the vertical crosspiece 1, an extruded die material for slider formed by aluminum extrusion is subjected to a slider cutting step S2.
2 is obtained by cutting with a predetermined length with a screw hole 2d.
And the slider 2 shown in FIG. 4 is formed and fixed in a plurality of places (here, two places, upper and lower) at appropriate intervals in the axial direction of the rear surface of each vertical bar 1 in the slide attaching step S3. Figure 2
As shown in FIG. 4 and FIG.
A base portion 2a, a reverse U-shaped saddle portion 2b formed continuously on the upper edge of the base portion 2a, and a C-shaped cord body holding portion 2c continuous with the saddle portion 2b. The vertical side of the vertical rail 1 is fitted into the groove formed on the rear surface 1a of the vertical rail 1, and the screw 3 inserted in the screw hole 2d is screwed into the lower hole of the vertical rail 1 to be fixed to the vertical rail 1.

【0013】なお、各縦桟1へのスライダ2への取付け
に用いるビス3としては、いわゆる、タップインタイプ
のビス3が用いられ、これにより各縦桟1にビス孔を形
成する手間と時間とを不要にしている。さらに、必要に
応じて、図1に示すエンドキャップ取付工程S4で、各
縦桟1の両端にその裁断面を覆う例えば図2に示すよう
に射出成形された合成樹脂製のエンドキャップ4が嵌合
されると共に例えばビス、接着またはこれらの併用によ
り固定される。
A so-called tap-in type screw 3 is used as the screw 3 used to attach the slider 2 to each vertical bar 1, and the time and effort required to form a screw hole in each vertical bar 1 are increased. Is unnecessary. Further, if necessary, in an end cap attaching step S4 shown in FIG. 1, injection molding end caps 4 made of, for example, injection molding as shown in FIG. They are combined and fixed by, for example, screws, adhesion, or a combination thereof.

【0014】この後、紐体取付工程S5で、図3に示す
ように高さが対応するスライダ2の紐体保持部2cにそ
れぞれ所定の長さに裁断された紐体5が挿通され、紐体
5の所定の割付位置で各スライダ2の紐体保持部2cを
カシメ付けることにより、各縦桟1がスライダ2を介し
て紐体5で所定間隔を置いて連結された縦桟ユニットU
が完成する。
Thereafter, in the string attaching step S5, the strings 5 cut into predetermined lengths are inserted into the string holding portions 2c of the sliders 2 having corresponding heights as shown in FIG. By vertically crimping the string body holding portions 2c of the sliders 2 at predetermined allocation positions on the body 5, the vertical bar units U in which the vertical bars 1 are connected to each other with the string bodies 5 at predetermined intervals via the sliders 2 are provided.
Is completed.

【0015】もっとも、上記の工程順によらずに、例え
ば、裁断された縦桟1の両端にエンドピースSを取り付
ける一方、紐体5に所定の割付位置で各スライダ2の紐
体保持部2cをカシメ付け、この後に各スライダ2を対
応する各縦桟1に固定するという手順で縦桟ユニットU
を完成させることも可能である。一方、横桟6は図5な
いし図9に示すアルミニウム押出型材からなるC型部材
7と、これに組み合わされるアルミニウム押出型材から
なるT型部材8とを備えている。
Of course, regardless of the order of the steps described above, for example, the end pieces S are attached to both ends of the cut vertical rail 1, while the cord holding portions 2c of the sliders 2 are attached to the cord 5 at predetermined allocation positions. The vertical bar unit U is formed by caulking and then fixing each slider 2 to the corresponding vertical bar 1.
It is also possible to complete. On the other hand, the cross rail 6 is provided with a C-shaped member 7 made of an aluminum extruded material and a T-shaped member 8 made of an aluminum extruded material combined with the C-shaped member 7 shown in FIGS.

【0016】図7に示すように、前記T型部材8は横T
字形に形成され、横部材6の前面を覆う頂辺8aと、こ
の頂辺8aの中間部から後方に連出されたII字形の脚部
8bと、この頂辺8aの上端部を後側にクランク型に大
きく屈曲させて形成したガイドレール8cと、この頂辺
8aの下縁部を後側にクランク型に小さく屈曲させて形
成した組立用リブ8dとを備えている。
As shown in FIG. 7, the T-shaped member 8 has a lateral T
A top side 8a formed in the shape of a letter and covering the front surface of the lateral member 6, a II-shaped leg 8b extended rearward from an intermediate portion of the top side 8a, and an upper end of the top side 8a is positioned rearward. It is provided with a guide rail 8c formed by being largely bent in a crank shape, and an assembling rib 8d formed by making a lower edge portion of this top side 8a to be slightly bent in a crank shape on the rear side.

【0017】また、前記C型部材7は前面が解放される
ほぼC字形の断面を有し、その後面7aの中央部にはT
字溝7bが形成されている。また、このT字溝7bの底
板の前面にはT型部材8の脚部8bの先端が挿入される
T字溝7cが形成され、下前側の隅部にはT型部材8の
組立用リブ8dが挿入される受溝7dが形成されてい
る。
The C-shaped member 7 has a substantially C-shaped cross section whose front surface is open, and the rear surface 7a has a T-shaped section at the center thereof.
A groove 7b is formed. Further, a T-shaped groove 7c into which the tip of the leg portion 8b of the T-shaped member 8 is inserted is formed on the front surface of the bottom plate of the T-shaped groove 7b, and a rib for assembling the T-shaped member 8 is formed at the lower front corner. A receiving groove 7d into which 8d is inserted is formed.

【0018】横桟裁断工程S7では、これらC型部材7
とT型部材8とがそれぞれ所定の寸法に裁断され、さら
に必要に応じて外端部にその外端から所定の距離に図6
に示す取付用ボルト挿通孔7e・8eが形成される。ま
た、C型部材7にはさらにその軸方向の複数箇所に図6
に示す部材連結用のビス挿通孔7fと、図10に示す縦桟
固定用のビス挿通孔7gとが形成される。
In the horizontal cross-cutting step S7, these C-shaped members 7
6 and the T-shaped member 8 are cut into a predetermined size, and if necessary, the outer end portion is cut to a predetermined distance from the outer end.
The mounting bolt insertion holes 7e and 8e shown in are formed. In addition, the C-shaped member 7 is further provided at a plurality of positions in the axial direction as shown in FIG.
A screw insertion hole 7f for connecting members shown in Fig. 7 and a screw insertion hole 7g for fixing the vertical crosspiece shown in Fig. 10 are formed.

【0019】なお、外端から取付用ボルト挿通孔7e・
8eまでの距離と、内端から連結ネジ用下孔までの距離
とは同じであってもよいが、ここでは取付寸法との関係
上異ならせて、左右勝手が異なるC型部材7、T型部材
8がそれぞれ2組形成される。この後に、横桟組立工程
S7で、これらC型部材7とT型部材8とを図5ないし
図8に示すように、例えばC型部材7の外端からT型部
材8を内端側から差込み、両端を揃えた後、図6に示す
ように、ビス挿通孔7gからビス9を立て込んでC型部
材7とT型部材8とを互いに固定した後、外端に射出成
形された合成樹脂製の横桟用エンドキャップ10が嵌め込
まれる。
From the outer end, the mounting bolt insertion hole 7e
The distance to 8e may be the same as the distance from the inner end to the pilot hole for the connecting screw, but in this case, the C-shaped member 7 and the T-shaped member having different left-handedness may be used because of different mounting dimensions. Two sets of each member 8 are formed. After this, in the cross rail assembly step S7, the C-shaped member 7 and the T-shaped member 8 are, for example, from the outer end of the C-shaped member 7 to the T-shaped member 8 from the inner end side as shown in FIGS. After inserting and aligning both ends, as shown in FIG. 6, a screw 9 is raised from the screw insertion hole 7g to fix the C-shaped member 7 and the T-shaped member 8 to each other, and then a synthetic resin injection-molded at the outer end. The end cap 10 for the horizontal rail made of is fitted.

【0020】なお、このエンドキャップ10は必要に応じ
てビス、接着、あるいは接着とビスとの併用により横桟
6に固定してもよい。さらに、横桟6を支柱や建屋に固
定するためのL字形(コ字形あるいはクランク形でもよ
い。)のブラケット11や必要に応じて図8に示す平板状
の継金具12が付属部品製造工程S8で形成される。
If desired, the end cap 10 may be fixed to the horizontal rail 6 by screws, adhesion, or a combination of adhesion and screws. Further, an L-shaped (or U-shaped or crank-shaped) bracket 11 for fixing the cross rail 6 to a column or a building and, if necessary, a flat plate-like joint fitting 12 shown in FIG. 8 are attached parts manufacturing step S8. Is formed.

【0021】梱包工程S9では、縦桟ユニットU、横桟
6、ブラケット11、継金具12および設置時に必要なボル
ト、ナット、ビス等が梱包される。これらの梱包形態は
特に限定されないが、ここでは図11に示すように、組立
てられた縦桟ユニットUが円筒状のプラスチックケース
C1(あるいは両端が解放されたビニルチューブ)に詰
められ、組み立てられた所定数の横桟6の両端をビニル
チューブC2で結束した後、これら縦桟ユニットUおよ
び横桟6が袋詰めされたブラケット10、継金具11などの
付属部品セットC3および袋詰めされた現場組立て用の
ボルト、ナット、ビスなどからなるビスセットCSと共
に、化粧ダンボール紙製の化粧梱包ケースCに詰められ
る。
In the packing step S9, the vertical rail unit U, the horizontal rail 6, the bracket 11, the joint fitting 12 and the bolts, nuts, screws and the like necessary for installation are packed. The packing form is not particularly limited, but here, as shown in FIG. 11, the assembled vertical rail unit U is packed in a cylindrical plastic case C1 (or a vinyl tube whose both ends are open) and assembled. After binding both ends of a predetermined number of horizontal rails 6 with vinyl tubes C2, the vertical rail unit U and the horizontal rails 6 are packed in a bracket 10, an accessory set C3 such as a joint fitting 11, and the bag is assembled in the field. It is packed in a decorative packaging case C made of decorative cardboard paper together with a screw set CS composed of bolts, nuts, screws, and the like.

【0022】なお、この化粧梱包ケースCの外形寸法は
特に限定されないが、最大で 300mm× 100mm×1800mm程
度にすればよい。梱包された縦桟ユニットU、横桟6、
付属部品キットC3およびビスセットC4は出荷され、
施工業者あるいはエンドユーザに購入された後、例えば
設置現場で開梱されて、次のようにして設置される。
The external dimensions of the cosmetic packaging case C are not particularly limited, but may be up to about 300 mm × 100 mm × 1800 mm. The packaged vertical rail unit U, horizontal rail 6,
The accessory kit C3 and screw set C4 are shipped,
After being purchased by a contractor or end user, it is unpacked at the installation site and installed as follows.

【0023】まず、桟組立工程S11で、図7に示すよう
に、右または左の横桟6の内端から順に各縦桟1に固定
されたスライダ2をそのサドル部2bが横桟6のガイド
レール8cに騎乗するように差込んで、縦桟ユニットU
を横桟6に組み込む。この後、横桟継合工程S12で、図
8に示すようにこの横桟6のT字溝7bに継金具12を差
し込んでから左右の横桟6の内端部どうしを突き合わせ
S12、継金具12をその継ぎ目に移動させた後、継金具12
に形成した左右1対のビス孔12aから左右の横桟6にそ
れぞれビス13を立て込み、左右の横桟6の内端部どうし
を連結する。
First, in the cross rail assembly step S11, as shown in FIG. 7, the sliders 2 fixed to the vertical rails 1 in order from the inner end of the right or left horizontal rail 6 are moved so that the saddle portions 2b of the sliders 2 Insert the guide rail 8c so as to be mounted on the vertical rail unit U.
Is incorporated in the crosspiece 6. After this, in the horizontal beam joining step S12, as shown in FIG. 8, after inserting the joint metal fitting 12 into the T-shaped groove 7b of the horizontal rail 6, the inner ends of the left and right horizontal rails 6 are butted to each other S12, the joint metal fitting. After moving 12 to the joint,
The screws 13 are respectively erected from the pair of left and right screw holes 12a formed on the left and right horizontal rails 6 to connect the inner ends of the left and right horizontal rails 6 to each other.

【0024】さらに、縦桟ユニット展開工程S13で、一
端の縦桟1を図10に示すようにビス14で各横桟6の一方
の外端部寄りの所定の位置に固定した後、他端の縦桟1
を同様にしてビス14で他方の外端部寄りの所定の位置に
固定する。この時に、中間の縦桟1は互いに紐体5によ
って連結されているので、あらかじめ紐体5に固定され
た間隔で両端の縦桟1の間に割付られ、現場での縦桟割
付作業は不要になる。
Further, in the vertical rail unit expanding step S13, the vertical rail 1 at one end is fixed to a predetermined position near one outer end portion of each horizontal rail 6 by a screw 14 as shown in FIG. Vertical bar 1
Is fixed in the same manner with a screw 14 at a predetermined position near the other outer end. At this time, since the intermediate vertical rails 1 are connected to each other by the cords 5, they are allocated between the vertical rails 1 at both ends at intervals fixed to the cords 5 in advance, and the vertical rail allocation work on site is unnecessary. become.

【0025】さらにこの後、取付工程S14で、図6に示
すように、例えば窓周縁15にブラケット11を固定し、こ
のブラケット11に各横桟6の両外端部をボルト25とナッ
ト26によって固定することにより、あるいは、逆にブラ
ケット11を横桟6に固定してから窓周縁15に固定するこ
とにより、例えば図12に示すように窓に格子を設置でき
る。
Thereafter, in the mounting step S14, as shown in FIG. 6, for example, the bracket 11 is fixed to the window peripheral edge 15, and both outer ends of each horizontal rail 6 are fixed to the bracket 11 by the bolts 25 and the nuts 26. By fixing, or conversely, fixing the bracket 11 to the cross rail 6 and then to the window peripheral edge 15, it is possible to install a grid in the window, for example as shown in FIG.

【0026】そして、例えば非常時などに必要に応じて
何れか一方の端の縦桟1を固定しているビス14を螺解し
て、その縦桟1を反対側に端部の方向に移動させると、
格子で塞がれていた窓が解放され、窓を避難口として利
用できるようになる。なお、図12に2点鎖線で示すよう
に、上記の構成に加えて、縦桟ユニットUの両外側にさ
らに横桟6に固定される別の縦桟16を設けるようにして
もよい。
Then, if necessary, for example, in an emergency, the screw 14 fixing the vertical bar 1 at either end is screwed and the vertical bar 1 is moved to the opposite side in the direction of the end. And let
The windows closed by the lattice are released, and the windows can be used as evacuation outlets. As shown by the chain double-dashed line in FIG. 12, in addition to the above configuration, another vertical bar 16 fixed to the horizontal bar 6 may be provided on both outer sides of the vertical bar unit U.

【0027】上記の実施例では、開梱包した後、縦桟ユ
ニットUを組付け、横桟6を継ぎ足し、さらに縦桟ユニ
ットUを展張して格子を形成してから窓に取り付けてい
るが、先に横桟6を窓に組付け、この後、横桟6の一方
の外端のエンドキャップ10を外し、この一方の外端から
縦桟1のスライダ2を順次差し込んでから縦桟ユニット
Uを展張するようにしてもよい。
In the above embodiment, after unpacking, the vertical rail unit U is assembled, the horizontal rails 6 are replenished, and the vertical rail unit U is further expanded to form a lattice, which is then attached to the window. First, the horizontal rail 6 is assembled to the window, then the end cap 10 at one outer end of the horizontal rail 6 is removed, and the slider 2 of the vertical rail 1 is sequentially inserted from this one outer end, and then the vertical rail unit U is inserted. May be expanded.

【0028】また、上記の実施例では、縦桟ユニット
U、横桟6などを梱包しているが、梱包することが本発
明に必須でないことは明らかである。さらに、設置作業
に際してスライダ2の紐体保持部2cを例えばドライバ
ーなどを用いて広げ、縦桟1を紐体5に沿って移動した
後、紐体保持部2cをカシメ直して縦桟1の割付を変更
することも可能である。
Further, in the above embodiment, the vertical rail unit U, the horizontal rail 6, and the like are packed, but it is clear that packing is not essential to the present invention. Further, at the time of the installation work, the string body holding portion 2c of the slider 2 is spread using, for example, a screwdriver or the like, and after moving the vertical rail 1 along the string body 5, the string body holding portion 2c is crimped and the vertical rail 1 is allocated. Can also be changed.

【0029】加えて、上記の一実施例では、横桟6に縦
桟ユニットUを組み込んでから、横桟6を窓周縁15に取
り付けているが、横桟6を先に継ぎあわせてから窓周縁
15に取り付け、この後に、横桟6のエンドキャップ10を
取外して縦桟ユニットUを組み込み、エンドキャップ10
を嵌め直すという手順を採ることも可能である。図13に
示す本発明の他の実施例では、前記横桟6が傾斜地に立
設した支柱17に支持される。この場合、スライダ2は縦
桟1に対して図14に示すように傾斜させて固定したり、
図15に示すように斜めに裁断されたりすることを除けば
上記の一実施例と同様にして縦桟ユニットUが形成され
る。
In addition, in the above-described embodiment, the vertical rail unit U is incorporated into the horizontal rail 6, and then the horizontal rail 6 is attached to the window peripheral edge 15. However, the horizontal rail 6 is first spliced and then the window is joined. Margin
15 and thereafter, the end cap 10 of the horizontal rail 6 is removed, and the vertical rail unit U is assembled.
It is also possible to adopt the procedure of refitting. In another embodiment of the present invention shown in FIG. 13, the cross rail 6 is supported by a column 17 standing on a slope. In this case, the slider 2 is inclined and fixed to the vertical rail 1 as shown in FIG.
As shown in FIG. 15, the vertical rail unit U is formed in the same manner as in the above-described embodiment except that it is cut diagonally.

【0030】図16に示す本発明のまた他の実施例におい
ては、縦桟ユニットUが前後2段に並べられる斜桟18・
19を備え、これら斜桟18・19が展張した状態で菱格子状
になるように組み合わされる。両端を除く各前段の斜桟
18と4本の後段の斜桟19と交差するように配置され、前
後両斜桟18・19は上端から所定の距離を置いた位置で図
17に示すようにスライダ20に回転可能に連結される。
In another embodiment of the present invention shown in FIG. 16, the oblique rail 18 in which the vertical rail units U are arranged in two stages in front and rear.
It is provided with 19, and these oblique crosspieces 18 and 19 are combined so as to form a rhombic lattice in an expanded state. Oblique crossing at the front of each stage except both ends
It is arranged so that it intersects with the 18 and 4 diagonal swash bars 19 at the rear stage, and the front and rear sloping bars 18 and 19 are shown in a position at a predetermined distance from the upper end.
As shown at 17, it is rotatably coupled to the slider 20.

【0031】すなわち、前段の斜桟18の後面18aと、後
段の斜桟19にはそれぞれの軸と直交する連結孔18b・19
bが形成され、これら連結孔18b・19bに回転可能に挿
通されたブシュ21が例えばブラインドリベット22によっ
てスライダ20に固定される。前後の18・19の間および後
段の斜桟19とスライダ20との間には必要に応じてスペー
サを兼ねるスリップリング23・24を挿入して、各斜桟18
・19がブシュ21に対して回転しやすくなるようにしてい
る。
That is, the rear surface 18a of the front oblique bar 18 and the rear oblique bar 19 have connection holes 18b and 19 orthogonal to the respective axes.
A bush 21 having a b formed therein and rotatably inserted through the connecting holes 18b and 19b is fixed to the slider 20 by, for example, a blind rivet 22. If necessary, slip rings 23 and 24, which also function as spacers, are inserted between the front and rear 18 and 19 and between the slanting bar 19 and the slider 20 in the rear stage, respectively.
・ 19 makes it easier to rotate with respect to the bush 21.

【0032】また、前後両斜桟18・19は上端から所定の
距離を置いた位置で図18に示すようにスライダ20に回転
可能に、かつ、軸方向に進退可能に連結される。すなわ
ち、前段の斜桟18の後面18aと、後段の斜桟19にはそれ
ぞれの軸方向に延びる長孔18c・19cが形成され、これ
ら長孔18c・19cに回転可能に挿通されたブシュ21が例
えばブラインドリベット22によってスライダ20に固定さ
れる。前後の18・19の間および後段の斜桟19とスライダ
20との間には必要に応じてスペーサを兼ねるスリップリ
ング23・24を挿入して、各斜桟18・19がブシュ21に対し
て回転しやすくなるようにしている。
Both the front and rear diagonal bars 18, 19 are rotatably connected to the slider 20 at a position spaced from the upper end by a predetermined distance so as to be movable back and forth in the axial direction. That is, elongated holes 18c and 19c extending in the respective axial directions are formed in the rear surface 18a of the front diagonal bar 18 and the rear diagonal bar 19, and the bush 21 rotatably inserted into these long holes 18c and 19c is formed. For example, it is fixed to the slider 20 by a blind rivet 22. Between front and rear 18 and 19 and rear slanted bar 19 and slider
If necessary, slip rings 23 and 24 also serving as spacers are inserted between the shafts 20 and 20, so that the oblique crosspieces 18 and 19 can easily rotate with respect to the bush 21.

【0033】この実施例のその他の構成、作用ないし効
果は上記の一実施例のそれらと同様であるので、重複を
避けるためこれらの説明は省略する。
Since the other construction, operation and effect of this embodiment are the same as those of the above-mentioned one embodiment, their description will be omitted to avoid duplication.

【0034】[0034]

【発明の効果】以上に説明したように、本発明の格子の
設置方法によれば、各縦桟があらかじめ紐体によって連
結されているので、例えば各縦桟を束ねるなど各縦桟の
間隔を狭くして輸送することができ、輸送コストを削減
することができる。そして、設置現場で横桟に縦桟ユニ
ットを組付け、両端の縦桟を横桟の所定の位置にビスま
たはピンで固定することにより格子が完成されるので、
素人でも簡単に格子を完成することができる。
As described above, according to the method of installing a lattice according to the present invention, since the vertical beams are connected in advance by a string, the intervals between the vertical beams, such as bundling the vertical beams, can be reduced. It can be made narrower for transportation, and transportation costs can be reduced. Then, the vertical rail unit is assembled to the horizontal rail at the installation site, and the lattice is completed by fixing the vertical rails at both ends to the predetermined positions of the horizontal rail with screws or pins.
Even an amateur can easily complete the lattice.

【0035】しかも、各縦桟があらかじめ紐体によって
所定間隔を置いて連結されているので、設置現場におい
て縦格子ユニットを横桟に組み付けた後、両端の縦桟ま
たは斜桟をビスまたはピンにより横桟の所定の位置に固
定することにより、両端の縦桟または斜桟の間の各縦桟
の間隔がそれぞれの間の紐体の長さによって決定され、
各縦桟の位置を一々割付けなくても、各縦桟があらかじ
め与えられた所定の間隔を置いて割付られることにな
り、素人でもいわゆる日曜大工として例えば10分程度の
短時間で簡単に、かつ、正確に縦桟を割付けて施工でき
る効果が得られる。
Moreover, since the vertical rails are connected in advance by the cord body at a predetermined interval, the vertical grid units are assembled to the horizontal rails at the installation site, and then the vertical rails or the diagonal rails at both ends are fixed by screws or pins. By fixing the horizontal rail at a predetermined position, the distance between the vertical rails at both ends or the vertical rails between the diagonal rails is determined by the length of the cord between them.
Even without allocating the position of each vertical rail, each vertical rail will be allocated at a predetermined interval given in advance, so that even an amateur can easily do so as a so-called do-it-yourself in a short time of about 10 minutes, for example, and , It is possible to obtain the effect of accurately arranging vertical bars.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例の格子製造工程及び設置工程
のフロー図である。
FIG. 1 is a flow chart of a grid manufacturing process and an installation process according to an embodiment of the present invention.

【図2】本発明の一実施例の縦桟ユニットの要部の斜視
図である。
FIG. 2 is a perspective view of a main part of a vertical rail unit according to an embodiment of the present invention.

【図3】本発明の一実施例の縦桟ユニットを展開した背
面図である。
FIG. 3 is a rear view in which the vertical rail unit according to the embodiment of the present invention is developed.

【図4】本発明の一実施例の縦桟ユニットの要部の縦断
側面図である。
FIG. 4 is a vertical sectional side view of a main part of a vertical rail unit according to an embodiment of the present invention.

【図5】本発明の一実施例の横桟の斜視図である。FIG. 5 is a perspective view of a horizontal rail according to an embodiment of the present invention.

【図6】本発明の一実施例の横桟の要部の平面図であ
る。
FIG. 6 is a plan view of a main part of a horizontal rail according to an embodiment of the present invention.

【図7】本発明の一実施例の横桟の断面図である。FIG. 7 is a sectional view of a cross rail according to an embodiment of the present invention.

【図8】本発明の一実施例の格子の要部の縦断側面図で
ある。
FIG. 8 is a vertical sectional side view of a main part of a lattice according to an embodiment of the present invention.

【図9】本発明の一実施例の横桟継合わせ部の縦断側面
図である。
FIG. 9 is a vertical sectional side view of a horizontal rail joint portion according to one embodiment of the present invention.

【図10】本発明の一実施例の縦桟固定部の縦断側面図で
ある。
FIG. 10 is a vertical sectional side view of a vertical rail fixing portion according to an embodiment of the present invention.

【図11】本発明の一実施例の梱包の斜視図ずある。FIG. 11 is a perspective view of the packaging of the embodiment of the present invention.

【図12】本発明の一実施例の設置状態を示す正面図であ
る。
FIG. 12 is a front view showing an installed state of an embodiment of the present invention.

【図13】本発明の他の実施例の設置状態を示す正面図で
ある。
FIG. 13 is a front view showing an installed state of another embodiment of the present invention.

【図14】本発明の他の実施例の要部の背面図である。FIG. 14 is a rear view of the main part of another embodiment of the present invention.

【図15】本発明の他の実施例の変形例の要部の背面図で
ある。
FIG. 15 is a rear view of the main part of a modified example of another embodiment of the present invention.

【図16】本発明のまた他の実施例の設置状態を示す正面
図である。
FIG. 16 is a front view showing an installation state of another embodiment of the present invention.

【図17】本発明のまた他の実施例の格子の要部の縦断側
面図である。
FIG. 17 is a vertical cross-sectional side view of a main part of a lattice according to still another embodiment of the present invention.

【図18】本発明のまた他の実施例の格子の他の要部の縦
断側面図である。
FIG. 18 is a vertical cross-sectional side view of another main part of the lattice according to another embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1…縦桟 1a…後面 2…スライダ 5…紐体 6…横桟 14…ビス 18, 19…斜桟 20…スライダ U…縦桟ユニット 1 ... Vertical bar 1a ... Rear surface 2 ... Slider 5 ... String 6 ... Horizontal bar 14 ... Screw 18, 19 ... Oblique bar 20 ... Slider U ... Vertical bar unit

─────────────────────────────────────────────────────
─────────────────────────────────────────────────── ───

【手続補正書】[Procedure amendment]

【提出日】平成7年5月31日[Submission date] May 31, 1995

【手続補正1】[Procedure Amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0015[Name of item to be corrected] 0015

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【0015】もっとも上記の工程順によらず、例えば、
裁断された縦桟1の両側にエンドキャップ4を取り付け
る一方、紐体5に所定の割付位置で各スライダ2の紐体
保持部2cをカシメ付け、この後に各スライダ2を対応
する各縦桟1に固定するという手順で縦桟ユニットUを
完成させることも可能である 一方、横桟6は図5ないし図9に示すアルミニウム押出
型材からなるC型部材7と、これに組み合わされるアル
ミニウム押出型材からなるT型部材8とを備えている。
However, regardless of the order of the steps, for example,
The end caps 4 are attached to both sides of the cut vertical bar 1, while the cord body holding portions 2c of the sliders 2 are crimped to the cord body 5 at a predetermined allocation position, and then each slider 2 is attached to the corresponding vertical bar 1. It is also possible to complete the vertical rail unit U by fixing the vertical rail unit U to the horizontal rail 6. On the other hand, the horizontal rail 6 is composed of a C-shaped member 7 made of an aluminum extruded shape material shown in FIGS. 5 to 9 and an aluminum extruded shape material combined therewith. And a T-shaped member 8.

【手続補正2】[Procedure Amendment 2]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0018[Correction target item name] 0018

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【0018】横桟裁断工程S6では、これらC型部材7
とT型部材8とがそれぞれ所定の寸法に裁断され、さら
に必要に応じて外端部にその外端から所定の距離に図6
に示す取付用ボルト挿通孔7e・8eが形成される。ま
た、C型部材7にはさらにその軸方向の複数箇所に図6
に示す部材連結用のビス挿通孔7fと、図10に示す縦桟
固定用のビス挿通孔7gとが形成される。
In the horizontal cross-cutting step S6, these C-shaped members 7
6 and the T-shaped member 8 are cut into a predetermined size, and if necessary, the outer end portion is cut to a predetermined distance from the outer end.
The mounting bolt insertion holes 7e and 8e shown in are formed. In addition, the C-shaped member 7 is further provided at a plurality of positions in the axial direction as shown in FIG.
A screw insertion hole 7f for connecting members shown in Fig. 7 and a screw insertion hole 7g for fixing the vertical crosspiece shown in Fig. 10 are formed.

【手続補正3】[Procedure 3]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0019[Correction target item name] 0019

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【0019】なお、外端から取付用ボルト挿通孔7e・
8eまでの距離と、内端から連結ネジ用下孔までの距離
とは同じであってもよいが、ここでは取付寸法との関係
上異ならせて、左右勝手が異なるC型部材7、3型部材
8がそれぞれ2組形成される。この後に、横桟組立工程
S7で、これらC型部材7とT型部材8とを図5ないし
図8に示すように、例えばC型部材7の外端からT型部
材8を内端側から差込み、両端を揃えた後、図6に示す
ように、ビス挿通孔7fからビス9を立て込んでC型部
材7とT型部材8とを互いに固定した後、外端に射出成
形された合成樹脂製の横桟用エンドキャップ10が嵌め込
まれる。
From the outer end, the mounting bolt insertion hole 7e
The distance to 8e may be the same as the distance from the inner end to the pilot hole for the connecting screw, but in this case, the C-shaped members 7 and 3 are different in left-right handedness because of different mounting dimensions. Two sets of members 8 are formed. After this, in the cross rail assembly step S7, the C-shaped member 7 and the T-shaped member 8 are, for example, from the outer end of the C-shaped member 7 to the T-shaped member 8 from the inner end side as shown in FIGS. After inserting and aligning both ends, as shown in FIG. 6, a screw 9 is erected from the screw insertion hole 7f to fix the C-shaped member 7 and the T-shaped member 8 to each other, and then the synthetic resin injection-molded at the outer end. The end cap 10 for the horizontal rail made of is fitted.

【手続補正4】[Procedure amendment 4]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0021[Correction target item name] 0021

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【0021】梱包工程S9では、縦桟ユニットU、横桟
6、ブラケット11、継金具12および設置時に必要なボル
ト、ナット、ビス等が梱包される。これらの梱包形態は
特に限定されないが、ここでは図11に示すように、組立
てられた縦桟ユニットUが円筒状のプラスチックケース
C1 (あるいは両端が開放されたビニルチューブ) に詰
められ、組み立てられた所定数の横桟6の両端をビニル
チューブC2で結束した後、これら縦桟ユニットUおよ
び横桟6が袋詰めされたブラケット11、継金具12などの
付属部品セットC3および袋詰めされた現場組立て用の
ボルト、ナット、ビスなどからなるビスセットC4と共
に、化粧ダンボール紙製の化粧梱包ケースCに詰められ
る。
In the packing step S9, the vertical rail unit U, the horizontal rail 6, the bracket 11, the joint fitting 12 and the bolts, nuts, screws and the like necessary for installation are packed. Although these packaging forms are not particularly limited, as shown in FIG. 11, the assembled vertical rail unit U is packed in a cylindrical plastic case C1 (or a vinyl tube having both open ends) and assembled. After bundling both ends of a predetermined number of horizontal rails 6 with vinyl tubes C2, the vertical rail unit U and the horizontal rails 6 are packed in a bracket 11, an accessory set C3 such as a joint fitting 12, and the bag is assembled in the field. It is packed in a decorative packaging case C made of decorative cardboard paper together with a screw set C4 including bolts, nuts, screws and the like.

【手続補正5】[Procedure Amendment 5]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0023[Name of item to be corrected] 0023

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【0023】まず、桟組立工程S11で、図7に示すよう
に、右または左の横桟6の内端から順に各縦桟1に固定
されたスライダ2をそのサドル部2bが横桟6のガイド
レール8cに騎乗するように差込んで、縦桟ユニットU
を横桟6に組み込む。この後、横桟継合工程S12で、図
8に示すようにこの横桟6のT字溝7bに継金具12を差
し込んでから左右の横桟6の内端部どうしを突き合わ
せ、継金具12をその継ぎ目に移動させた後、継金具12に
形成した左右1対のビス孔12aから左右の横桟6にぞれ
ぞれビス13を立て込み、左右の横桟6の内端部どうしを
連結する。
First, in the cross rail assembly step S11, as shown in FIG. 7, the sliders 2 fixed to the vertical rails 1 in order from the inner end of the right or left horizontal rail 6 are moved so that the saddle portions 2b of the sliders 2 Insert the guide rail 8c so as to be mounted on the vertical rail unit U.
Is incorporated in the crosspiece 6. Thereafter, in the horizontal beam joining step S12, as shown in FIG. 8, after inserting the joint metal fitting 12 into the T-shaped groove 7b of the horizontal rail 6, the inner end portions of the left and right horizontal rails 6 are abutted to each other, and the joint metal fitting 12 is joined. After moving the joints to the joints, set up the screws 13 on the left and right horizontal rails 6 through the pair of left and right screw holes 12a formed in the joint metal fitting 12, and fix the inner ends of the left and right horizontal rails 6 to each other. connect.

【手続補正6】[Procedure correction 6]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】図面の簡単な説明[Name of item to be corrected] Brief description of the drawing

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例の格子製造工程および設置工
程のフロー図である。
FIG. 1 is a flow chart of a grid manufacturing process and an installation process according to an embodiment of the present invention.

【図2】本発明の一実施例の縦桟の要部の斜視図であ
る。
FIG. 2 is a perspective view of a main part of a vertical rail according to one embodiment of the present invention.

【図3】本発明の一実施例の縦桟ユニットを展開した背
面図である。
FIG. 3 is a rear view in which the vertical rail unit according to the embodiment of the present invention is developed.

【図4】本発明の一実施例の縦桟ユニットの要部の縦断
側面図である。
FIG. 4 is a vertical sectional side view of a main part of a vertical rail unit according to an embodiment of the present invention.

【図5】本発明の一実施例の横桟の斜視図である。FIG. 5 is a perspective view of a horizontal rail according to an embodiment of the present invention.

【図6】本発明の一実施例の横桟の要部の平面図であ
る。
FIG. 6 is a plan view of a main part of a horizontal rail according to an embodiment of the present invention.

【図7】本発明の一実施例の横桟の断面図である。FIG. 7 is a sectional view of a cross rail according to an embodiment of the present invention.

【図8】本発明の一実施例の格子の要部の縦断側面図で
ある。
FIG. 8 is a vertical sectional side view of a main part of a lattice according to an embodiment of the present invention.

【図9】本発明の一実施例の横桟継合わせ部の縦断側面
図である。
FIG. 9 is a vertical sectional side view of a horizontal rail joint portion according to one embodiment of the present invention.

【図10】本発明の一実施例の縦桟固定部の縦断側面図で
ある。
FIG. 10 is a vertical sectional side view of a vertical rail fixing portion according to an embodiment of the present invention.

【図11】本発明の一実施例の梱包の斜視図である。FIG. 11 is a perspective view of a package according to an embodiment of the present invention.

【図12】本発明の一実施例の設置状態を示す正面図であ
る。
FIG. 12 is a front view showing an installed state of an embodiment of the present invention.

【図13】本発明の他の実施例の設置状態を示す正面図で
ある。
FIG. 13 is a front view showing an installed state of another embodiment of the present invention.

【図14】本発明の他の実施例の要部の背面図である。FIG. 14 is a rear view of the main part of another embodiment of the present invention.

【図15】本発明の他の実施例の変形例の要部の背面図で
ある。
FIG. 15 is a rear view of the main part of a modified example of another embodiment of the present invention.

【図16】本発明のまた他の実施例の設置状態を示す正面
図である。
FIG. 16 is a front view showing an installation state of another embodiment of the present invention.

【図17】本発明のまた他の実施例の格子の要部の縦断側
面図である。
FIG. 17 is a vertical cross-sectional side view of a main part of a lattice according to still another embodiment of the present invention.

【図18】本発明のまた他の実施例の格子の他の要部の縦
断側面図である。
FIG. 18 is a vertical cross-sectional side view of another main part of the lattice according to another embodiment of the present invention.

【符号の説明】 1…縦桟 1a…後面 2…スライダ 5…紐体 6…横桟 14…ビス 18, 19…斜桟 20…スライダ U…縦桟ユニット[Explanation of Codes] 1 ... Vertical bar 1a ... Rear surface 2 ... Slider 5 ... String 6 ... Horizontal bar 14 ... Screw 18, 19 ... Oblique bar 20 ... Slider U ... Vertical bar unit

【手続補正7】[Procedure Amendment 7]

【補正対象書類名】図面[Document name to be corrected] Drawing

【補正対象項目名】図1[Name of item to be corrected] Figure 1

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【図1】 FIG.

【手続補正8】[Procedure Amendment 8]

【補正対象書類名】図面[Document name to be corrected] Drawing

【補正対象項目名】図6[Name of item to be corrected] Figure 6

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【図6】 [Figure 6]

【手続補正9】[Procedure Amendment 9]

【補正対象書類名】図面[Document name to be corrected] Drawing

【補正対象項目名】図10[Name of item to be corrected] Fig. 10

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【図10】 [Figure 10]

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 あらかじめ所定数の各縦桟の後面の軸方
向に適当な間隔を置いた複数箇所に横桟の一端から差し
込まれ、横桟の軸方向に摺動可能に横桟に支持される複
数のスライダを支持させると共に、各縦桟を紐体で所定
間隔を置いて連結した縦桟ユニットを組立て、設置現場
において複数の横桟の各一端から各縦桟または斜桟のス
ライダを順次差し込んだ後、両端の縦桟または斜桟をビ
スまたはピンにより横桟の所定の位置に固定することを
特徴とする格子の設置方法。
1. A predetermined number of the vertical rails are inserted from one end of the horizontal rail into a plurality of positions on the rear surface of the vertical rail at appropriate intervals in the axial direction, and are supported by the horizontal rail so as to be slidable in the axial direction of the horizontal rail. The vertical rail unit is constructed by connecting multiple vertical rails at a predetermined interval and connecting the vertical rails at predetermined intervals. A method of installing a lattice, characterized in that, after inserting, the vertical bars or the oblique bars at both ends are fixed to predetermined positions of the horizontal bars with screws or pins.
【請求項2】 前記スライダが各縦桟に横桟の傾斜に対
応して傾斜して固定された縦桟ユニットを用いる請求項
1に記載の格子の設置方法。
2. The grid installation method according to claim 1, wherein a vertical rail unit is used in which the slider is fixed to each vertical rail in an inclined manner corresponding to the inclination of the horizontal rail.
JP8501995A 1995-04-11 1995-04-11 How to install the grid Expired - Fee Related JP2669800B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP8501995A JP2669800B2 (en) 1995-04-11 1995-04-11 How to install the grid
TW84103653A TW271457B (en) 1995-04-11 1995-04-14 Method of installing grilles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8501995A JP2669800B2 (en) 1995-04-11 1995-04-11 How to install the grid

Publications (2)

Publication Number Publication Date
JPH08284556A true JPH08284556A (en) 1996-10-29
JP2669800B2 JP2669800B2 (en) 1997-10-29

Family

ID=13847031

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8501995A Expired - Fee Related JP2669800B2 (en) 1995-04-11 1995-04-11 How to install the grid

Country Status (2)

Country Link
JP (1) JP2669800B2 (en)
TW (1) TW271457B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4895237B2 (en) * 2009-10-28 2012-03-14 株式会社トッパン・コスモ Small closure structure for architectural louvers

Also Published As

Publication number Publication date
JP2669800B2 (en) 1997-10-29
TW271457B (en) 1996-03-01

Similar Documents

Publication Publication Date Title
US5755431A (en) Post assembly and mounting fitting therefor
US7856782B2 (en) Grid muntin retaining clips for muntins
US7735294B2 (en) Roof truss
US5271204A (en) Lightweight display post and method of making same
US7360754B2 (en) Interlocking fence system and method
US8756900B1 (en) System and method of preparing structural beams with gusset retaining slots
EP0568215A1 (en) Space frame construction
US6088989A (en) Framing member
US20090226246A1 (en) Universal gate kit and method of assembling universal gate
US6681833B2 (en) Screen frame having corners under compression
US4503640A (en) Unitized construction for sliding closures and method for making
JP2010511812A (en) Bracket for plug-in or fit-type joint between parts
JP2669800B2 (en) How to install the grid
DE69426073T2 (en) LIGHT METAL GRID SUPPORT AND FRAME SYSTEM
EP0380529B1 (en) Tray for cables and method of the manufacturing thereof
US8104527B1 (en) Method and apparatus for making an awning structure
US8281526B2 (en) Stairway tread and riser assembly
EP0522480A1 (en) Electric light fitting with anti-dazzle screen and method of producing such anti-dazzle screen
EP0353149B1 (en) Method for making a display panel, and panel obtained by this method
JPH0542182Y2 (en)
CN109707273B (en) Window wrap and installation method thereof
BE1029212B1 (en) A frame whose frame profiles contain an H profile
US20220081930A1 (en) Rackable panel assembly and methods of assembly thereof
JP2022036518A (en) Joint device of scaffold component member in suspended scaffold
DE19715247C1 (en) Composite frame, particularly for door

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080704

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080704

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090704

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090704

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100704

Year of fee payment: 13

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 14

Free format text: PAYMENT UNTIL: 20110704

LAPS Cancellation because of no payment of annual fees