JPH0828096A - Method and device for assembling steel tower on the ground - Google Patents

Method and device for assembling steel tower on the ground

Info

Publication number
JPH0828096A
JPH0828096A JP18309194A JP18309194A JPH0828096A JP H0828096 A JPH0828096 A JP H0828096A JP 18309194 A JP18309194 A JP 18309194A JP 18309194 A JP18309194 A JP 18309194A JP H0828096 A JPH0828096 A JP H0828096A
Authority
JP
Japan
Prior art keywords
steel tower
arm
outer iron
tower member
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP18309194A
Other languages
Japanese (ja)
Other versions
JP2691971B2 (en
Inventor
Tokuo Ishikawa
篤男 石川
Kiyoshi Okumura
清 奥村
Haruyoshi Saito
春吉 斎藤
Kazuo Hiratsuka
一男 平塚
Taku Futaki
卓 二木
Tomoyuki Mochizuki
智之 望月
Yoshikazu Ishii
良和 石井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YUA TEC KK
Nasu Denki Tekko Co Ltd
Original Assignee
YUA TEC KK
Nasu Denki Tekko Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUA TEC KK, Nasu Denki Tekko Co Ltd filed Critical YUA TEC KK
Priority to JP6183091A priority Critical patent/JP2691971B2/en
Publication of JPH0828096A publication Critical patent/JPH0828096A/en
Application granted granted Critical
Publication of JP2691971B2 publication Critical patent/JP2691971B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

PURPOSE:To achieve the safety of work and easily assemble a steel tower by stably elevating members of the steel tower on the ground. CONSTITUTION:A plurality of outer steel columns 3 are erected in properly spaced apart relationship on a proper base and arm members 5 are mounted on the columns 3 so as to be vertically movable along the columns 3 by means of a drive device. Top members 22 of a steel tower are assembled between the columns 3 and the lower ends of the side surfaces of the members 22 are fixed to each of the arm members 5 and each of the members 5 of the columns 3 is raised to lift the top members 22 up to a predetermined height from the ground. Members 23 of the tower succeeding the members 22 are connected to the lower ends of the members 22 to assemble them, and thereafter the arm members 5 are separated from the members 22 and lowered along the columns 3 so that the member 23 are fastened to the arm members 5 to raise the members 23 to a predetermined height from the ground. And members of the tower succeeding the members 23 are connected to the lower ends of the members 23 to assemble them, which is repeated to assemble the tower.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、送電用鉄塔やその他
適宜の鉄塔の組立てにおいて、高所作業を不要とし、全
て地上で鉄塔を組立てる、鉄塔地上組立て工法及びその
装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a steel tower ground assembling method and apparatus for assembling a steel tower for power transmission and other suitable steel towers, which does not require work at high places and assembles all steel towers on the ground.

【0002】[0002]

【従来の技術】従来送電用鉄塔の組立ては、クレーン等
を使用して鉄塔の最下部の柱から組立て、順に柱や部材
を組み上げていき、最終的に鉄塔頂部をこれらの上に取
り付けて完了する方式が採られていた。しかしながらこ
れらの方式は高所作業が不可欠であり、大変な肉体的疲
労を伴い、加えて高所による精神的疲労も大きい。
2. Description of the Related Art Conventionally, a power transmission tower is assembled by using a crane or the like from the lowest pillar of the tower, and the pillars and members are assembled in order, and finally the top of the tower is mounted on them. The method of doing was adopted. However, these methods require high-altitude work and are accompanied by a great deal of physical fatigue, as well as large mental fatigue due to high altitude.

【0003】そこでこれらの組立て作業を高所でなく地
上で行う方式が採られている。これは鉄塔の中心位置に
せり下げ用鉄柱を設け、このせり下げ用鉄柱上部にワイ
ヤー等を引っ掻けてこれらのワイヤーの一端を鉄塔部材
の下端に固定し、当該ワイヤーの他端をウインチ等でワ
イヤーを引っ張ることにより鉄塔部材をせり上げ、この
下方に下部の鉄塔部材を入れてつなぎ、これらを繰り返
して鉄塔部材の下に次の鉄塔部材をつなげて、鉄塔を組
み立てている。
Therefore, a method is adopted in which these assembling operations are performed on the ground instead of at a high place. This is to install a hanging iron pillar at the center position of the tower, scratch wires etc. on the upper part of the hanging iron pillar and fix one end of these wires to the lower end of the tower member, and the other end of the wire is a winch etc. The steel tower member is raised by pulling the wire with, and the lower steel tower member is inserted and connected below this, and by repeating these, the next steel tower member is connected under the steel tower member to assemble the steel tower.

【0004】[0004]

【発明が解決しようとする課題】しかしながらこの地上
組立て工法では、鉄塔部材の中にせり上げ用鉄柱を設け
ているため、この一個のせり上げ用鉄柱に荷重がかか
り、鉄塔部材をせり上げる際安定性が悪い。また上述の
如くワイヤー等で鉄塔部材をせり上げるため、せり上げ
の際の安定性も悪い。また鉄塔の内側にせり上げ用鉄柱
を設けているため、せり上げる鉄塔部材の内側にわたす
補剛部材をせり上げる前には取り付けることができず、
せり上げ後に取り付けなければならないため煩雑な作業
となる。さらに鉄塔部材へのワイヤーの取り付け、取外
し等の作業にも手間のかかるものであった。
However, in this ground assembly method, since the iron pillars for raising are provided in the steel tower member, a load is applied to this one iron pillar for raising, and when the steel tower member is raised, it is stable. The sex is bad. Further, since the steel tower member is raised by the wire or the like as described above, the stability at the time of raising is also poor. Also, since the iron columns for raising are installed inside the steel tower, it cannot be attached before raising the stiffening member that passes inside the steel tower member,
Since it must be installed after raising, it is a complicated work. Further, the work of attaching and detaching the wire to the steel tower member is troublesome.

【0005】この発明はこれらの点に鑑みて為されたも
のであり、各種の鉄塔の組立てにおいて吊り上げる鉄塔
部材の外周に間隔を開けて複数の外鉄柱を設け、これら
の各外鉄柱の腕部で吊り上げる鉄塔部材を支えて安定よ
く鉄塔部材をせり上げることができ、かつ作業に手間の
かからない地上組立て工法及びその装置を提供し上記課
題を解決するものである。
The present invention has been made in view of the above points, and a plurality of outer iron columns are provided at intervals on the outer periphery of an iron tower member to be lifted in assembling various steel towers, and arm portions of these outer iron columns are provided. (EN) A ground assembly method and an apparatus therefor which can support a steel tower member to be lifted up with stability and stably raise the steel tower member, and which does not require any labor for working.

【0006】[0006]

【課題を解決するための手段】請求項1項の発明は、適
宜の基盤上に間隔を開けて複数本の外鉄柱を立設し、こ
れらの各外鉄柱に、当該外鉄柱に沿って昇降自在な腕部
を設け、これらの各腕部を昇降させる適宜の駆動装置を
設け、これらの外鉄柱間で、鉄塔頂部の鉄塔部材を組立
て、上記各腕部に鉄塔頂部の鉄塔部材の側面下部を係止
し、各外鉄柱の各腕部を上昇させて鉄塔頂部の鉄塔部材
を地上から一定の高さまで上げ、上記鉄塔頂部の鉄塔部
材の下端にこれに続く鉄塔部材を接続して組立て、その
後上記鉄塔頂部の鉄塔部材から各腕部を外して各腕部を
各外鉄柱に沿って下ろし、各腕部に上記鉄塔部材の側面
下部を係止し、各外鉄柱の各腕部を上昇させて当該鉄塔
部材を地上から一定の高さまで上げ、この鉄塔部材の下
端にこれに続く鉄塔部材を接続して組立て、これらを繰
り返して鉄塔を組み立てる鉄塔地上組立て工法とした。
なお上述及び後述の適宜の基盤とは地面でもよく、コン
クリートの基礎でもよく、材質、構造は問わない。
According to a first aspect of the present invention, a plurality of outer iron columns are erected on an appropriate base with a space therebetween, and the outer iron columns are moved up and down along the outer iron columns. Providing a free arm part, providing an appropriate drive device for raising and lowering each of these arm parts, assembling the steel tower member at the top of the steel tower between these outer iron pillars, and lowering the side surface of the steel tower member at the top of the steel tower at each of the above arm parts. , And raise each arm of each outer iron pole to raise the steel tower member at the top of the steel tower to a certain height from the ground, and assemble by connecting the following steel tower member to the lower end of the steel tower member at the top of the steel tower, After that, remove each arm from the steel tower member at the top of the tower and lower each arm along each outer steel pole, lock the lower side surface of the steel tower member to each arm, and raise each arm of each outer steel pillar. Then, the steel tower member is raised from the ground to a certain height, and the iron Assembled by connecting members, and a pylon ground assembly method of assembling the tower by repeating them.
The above-mentioned and below-mentioned appropriate foundations may be the ground or concrete foundations, and may be made of any material and structure.

【0007】請求項2項の発明は、適宜の基盤上に間隔
を開けて複数本の外鉄柱を立設し、これらの各外鉄柱
に、当該外鉄柱に沿って昇降自在な腕部を複数本の外鉄
柱間の中心にほぼ向けて設け、またこれらの各腕部は複
数本の外鉄柱間の中心方向に突出自在とし、これらの各
腕部を昇降及び水平移動させる適宜の駆動装置を設け、
これらの外鉄柱間の基盤上で鉄塔頂部の鉄塔部材を組立
て、上記各腕部を各外鉄柱の下部に下ろして鉄塔頂部の
鉄塔部材の側面下部を固定し、各外鉄柱の各腕部を上昇
させて鉄塔頂部の鉄塔部材を地上から一定の高さまで上
げ、上記鉄塔頂部の鉄塔部材の下端にこれに続く鉄塔部
材を接続して組立て、その後上記鉄塔頂部の鉄塔部材か
ら各腕部を外して各腕部を各外鉄柱に沿って下ろし、各
腕部に上記鉄塔部材の側面下部を固定し、各外鉄柱の各
腕部を上昇させて当該鉄塔部材を地上から一定の高さま
で上げ、この鉄塔部材の下端にこれに続く鉄塔部材を接
続して組立て、これらを繰り返して鉄塔を組み立てる鉄
塔地上組立て工法とした。
According to a second aspect of the present invention, a plurality of outer iron pillars are erected on a proper base with a space therebetween, and a plurality of arm portions that can be raised and lowered along the outer iron pillars are provided on each of the outer iron pillars. It is provided almost toward the center between the outer iron columns of the book, and each of these arm portions can freely project in the direction of the center between the plurality of outer iron columns, and an appropriate drive device for vertically moving and horizontally moving each of these arm portions is provided. Provided,
Assemble the steel tower member on the top of the steel tower on the base between these outer steel pillars, lower the above arm parts to the bottom of each outer steel pillar and fix the lower side surface of the steel tower member at the top of the steel tower, fix each arm portion of each outer steel pillar. Ascend to raise the steel tower member at the top of the tower to a certain height from the ground, and assemble by connecting the following steel tower member to the lower end of the steel tower member at the top of the steel tower, and then remove each arm from the steel tower member at the top of the steel tower. And lower each arm along each outer iron pole, fix the lower side surface of the steel tower member to each arm, raise each arm of each outer iron pillar to raise the steel tower member to a certain height from the ground, The steel tower member was connected to the lower end of the steel tower member to assemble the steel tower member, and these were repeated to assemble the steel tower.

【0008】請求項3項の発明は、適宜の基盤上に間隔
を開けて四本の外鉄柱を立設し、これらの各外鉄柱に、
当該外鉄柱に沿って昇降自在な腕部を四本の外鉄柱間の
中心にほぼ向けて設け、またこれらの各腕部は四本の外
鉄柱間の中心方向に突出自在とし、これらの各腕部を昇
降及び水平移動させる適宜の駆動装置を設け、これらの
外鉄柱間の基盤上で鉄塔頂部の鉄塔部材を組立て、上記
各腕部を各外鉄柱の下部に下ろして鉄塔頂部の鉄塔部材
の主柱材下部の上下二箇所を固定し、各外鉄柱の各腕部
を上昇させて鉄塔頂部の鉄塔部材を地上から一定の高さ
まで上げ、上記鉄塔頂部の鉄塔部材の下端にこれに続く
鉄塔部材を接続して組立て、その後上記鉄塔頂部の鉄塔
部材から各腕部を外して各腕部を各外鉄柱に沿って下ろ
し、各腕部に上記鉄塔部材の主柱材下部の上下二箇所を
固定し、各外鉄柱の各腕部を上昇させて当該鉄塔部材を
地上から一定の高さまで上げ、この鉄塔部材の下端にこ
れに続く鉄塔部材を接続して組立て、これらを繰り返し
て鉄塔を組み立てる鉄塔地上組立て工法とした。
According to the third aspect of the present invention, four outer iron columns are erected on an appropriate base with a space therebetween, and each of these outer iron columns is provided with:
An arm that can be raised and lowered along the outer iron column is provided almost toward the center between the four outer iron columns, and each of these arms can freely project toward the center between the four outer iron columns. An appropriate drive device for raising and lowering and horizontally moving the arm portion is provided, and the steel tower member at the top of the steel tower is assembled on the base between these outer steel pillars, and the above arm portions are lowered to the bottom of each outer steel pillar, and the steel tower member at the steel tower top Fix the upper and lower two places below the main pillar material, raise each arm of each outer iron pillar to raise the tower member at the top of the tower to a certain height from the ground, and continue to the lower end of the tower member at the top of the tower. Assemble by connecting steel tower members, then remove each arm from the steel tower member at the top of the steel tower and lower each arm along each outer iron pole, and in each arm two upper and lower parts below the main pillar material of the steel tower member. Fixed, and raise each arm of each outer iron pole to raise the tower member to a certain height from the ground. To raise the assembly to connect the tower members subsequent to the lower end of the tower member, and a pylon ground assembly method of assembling the tower by repeating them.

【0009】請求項4項の発明は、適宜の基盤上に間隔
を開けて複数本の外鉄柱を立設し、これらの各外鉄柱
に、当該外鉄柱に沿って昇降自在な腕部を複数本の外鉄
柱間の中心にほぼ向けて設け、またこれらの各腕部は複
数本の外鉄柱間の中心方向に突出自在とし、これらの各
腕部を昇降及び水平移動させる適宜の駆動装置を設け、
さらに上記各腕部の先端には鉄塔部材を把持自在な把持
部を設けた鉄塔地上組立て装置とした。
According to a fourth aspect of the present invention, a plurality of outer iron pillars are erected on a proper base with a space provided therebetween, and a plurality of arm portions that can be raised and lowered along the outer iron pillars are provided on each of the outer iron pillars. It is provided almost toward the center between the outer iron columns of the book, and each of these arm portions can freely project in the direction of the center between the plurality of outer iron columns, and an appropriate drive device for vertically moving and horizontally moving each of these arm portions is provided. Provided,
Further, the above-mentioned steel tower ground assembling device is provided with a gripping portion capable of gripping a steel tower member at the tip of each arm portion.

【0010】請求項5項の発明は、適宜の基盤上に水平
枠体を設け、この水平枠体に夫々の下端を接続した四本
の外鉄柱を立設し、これらの各外鉄柱に当該外鉄柱に沿
って昇降自在な腕部を四本の外鉄柱間の中心にほぼ向け
て設け、またこれらの各腕部は四本の外鉄柱間の中心方
向に突出自在とし、これらの各腕部を昇降及び水平移動
させる適宜の駆動装置を設け、さらに上記各腕部の先端
上下部には鉄塔部材を把持自在な把持部を夫々設けた鉄
塔地上組立て装置とした。
According to the fifth aspect of the present invention, a horizontal frame is provided on an appropriate base, and four outer iron poles each having a lower end connected thereto are erected on the horizontal frame, and each of these outer iron poles is concerned. Arms that can be raised and lowered along the outer iron pillar are provided almost toward the center between the four outer iron pillars, and each of these arms can project toward the center between the four outer iron pillars. A steel tower ground assembling apparatus is provided in which a proper drive device for raising and lowering and horizontally moving the parts is provided, and further gripping parts capable of gripping the steel tower members are respectively provided at upper and lower ends of the respective arm portions.

【0011】[0011]

【作用】請求項1項の発明において複数本の外鉄柱間の
基盤上で組み立てた鉄塔頂部やこれに続く鉄塔部材を複
数本の各腕部に係止するが、これらの鉄塔頂部や鉄塔部
材は、下方に行くに従って塔体幅が大きく成っている場
合が多く、従って小さな塔体幅外径のものは腕部の先端
で係止し、大きな塔体幅のものは腕部の基部で係止する
ことと成る。またこれらの各腕部を上昇させて鉄塔頂部
の鉄塔部材やその他の鉄塔部材を地上から一定の高さま
で上げ、この状態で停止して上記鉄塔頂部の鉄塔部材や
その他の鉄塔部材の下端にこれに続く鉄塔部材を接続し
て組立てる。その後鉄塔頂部の鉄塔部材やその他の鉄塔
部材から各腕部を外しても、この状態では鉄塔頂部の鉄
塔部材やその他の鉄塔部材の下に次の鉄塔部材が接続さ
れているため、これらのもので自立しており、転倒する
おそれはない。
According to the first aspect of the present invention, the iron tower tops assembled on the base between the plurality of outer iron columns and the steel tower members following the iron tower members are locked to the plurality of arms, respectively. In many cases, the width of the tower increases as it goes downwards.Therefore, those with a small outside diameter are locked at the tips of the arms, and those with a large tower width are engaged at the base of the arms. It will stop. In addition, each of these arms is raised to raise the steel tower member and other steel tower members at the top of the steel tower to a certain height from the ground, and in this state, stop and attach to the lower end of the steel tower member at the top of the steel tower and other steel tower members. Assemble by connecting the steel tower members following. After that, even if each arm is removed from the steel tower member or other steel tower members at the top of the steel tower, the following steel tower members are connected under the steel tower members at the top of the steel tower or other steel tower members in this state. Being self-reliant, there is no risk of falling.

【0012】請求項2項の発明において複数本の外鉄柱
間の基盤上で組み立てた鉄塔頂部の鉄塔部材やこれに続
く鉄塔部材を複数本の各腕部に係止するが、これらの鉄
塔頂部の鉄塔部材やその他の鉄塔部材は、下方に行くに
従って外径が大きく成っている場合が多く、従って小さ
な塔体幅のものの場合は各腕部を複数本の外鉄柱間の中
心に突出させて鉄塔頂部の鉄塔部材やその他の鉄塔部材
の適宜箇所を係止し、大きな塔体幅のものの場合は各腕
部を複数本の外鉄柱間の中心から外側にずらせて鉄塔頂
部の鉄塔部材やその他の鉄塔部材の適宜箇所を係止する
ことと成る。またこれらの各腕部を上昇させて鉄塔頂部
の鉄塔部材やその他の鉄塔部材を地上から一定の高さま
で上げ、この状態で停止して上記鉄塔頂部の鉄塔部材や
その他の鉄塔部材の下端にこれに続く鉄塔部材を接続し
て組立てる。その後鉄塔頂部の鉄塔部材やその他の鉄塔
部材から各腕部を外しても、この状態では鉄塔頂部の鉄
塔部材やその他の鉄塔部材の下に次の鉄塔部材が接続さ
れているため、これらのもので自立しており、転倒する
おそれはない。
According to the second aspect of the present invention, the steel tower member of the steel tower top assembled on the base between the plurality of outer iron columns and the steel tower member following the steel tower member are locked to the respective arm portions of the plurality of steel towers. In many cases, the steel tower members and other steel tower members have a larger outer diameter as they go downwards.Therefore, in the case of a small tower body width, each arm should be projected to the center between the outer steel columns. Lock the steel tower members at the top of the steel tower or other appropriate parts of the steel tower members, and in the case of a large tower width, shift each arm outward from the center between the outer shells and other steel tower members at the top. The appropriate parts of the steel tower member will be locked. In addition, each of these arms is raised to raise the steel tower member and other steel tower members at the top of the steel tower to a certain height from the ground, and in this state, stop and attach to the lower end of the steel tower member at the top of the steel tower and other steel tower members. Assemble by connecting the steel tower members following. After that, even if each arm is removed from the steel tower member or other steel tower members at the top of the steel tower, the following steel tower members are connected under the steel tower members at the top of the steel tower or other steel tower members in this state. Being self-reliant, there is no risk of falling.

【0013】請求項3項の発明において四本の外鉄柱間
の基盤上で組み立てた鉄塔頂部の鉄塔部材やこれに続く
鉄塔部材を複数本の各腕部に係止するが、これらの鉄塔
頂部の鉄塔部材やその他の鉄塔部材は、下方に行くに従
って塔体幅が大きく成っている場合が多く、従って各鉄
塔部材の塔体幅に合わせて腕部を伸縮させ、小さな塔体
幅のものの場合は各腕部を四本の外鉄柱間の中心に突出
させて鉄塔頂部の鉄塔部材やその他のや鉄塔部材の主柱
材の上下二箇所を係止し、大きな塔体幅のものの場合は
各腕部を四本の外鉄柱間の中心から外側にずらせて鉄塔
頂部の鉄塔部材やその他の鉄塔部材の主柱材の上下二箇
所を係止することと成る。またこれらの各腕部を上昇さ
せて鉄塔頂部の鉄塔部材やその他の鉄塔部材を地上から
一定の高さまで上げ、この状態で停止して上記鉄塔頂部
の鉄塔部材やその他の鉄塔部材の下端にこれらに続く鉄
塔部材を接続して組立てる。その後鉄塔頂部の鉄塔部材
やその他の鉄塔部材から各腕部を外しても、この状態で
は鉄塔頂部の鉄塔部材やその他の鉄塔部材の下に次の鉄
塔部材が接続されているため、これらのもので自立して
おり、転倒するおそれはない。
According to the third aspect of the present invention, the steel tower member at the top of the steel tower assembled on the base between the four outer iron columns and the steel tower member following the steel member are locked to each of the plurality of arms. In many cases, the steel tower members and other steel tower members have a larger tower width as they go downward, and therefore the arms are expanded and contracted in accordance with the tower body width of each steel tower member to make the tower width small. Is to project each arm to the center between the four outer iron poles and lock the steel tower member at the top of the tower and the other two upper and lower parts of the main pillar material of the steel tower member. The arm portion is shifted outward from the center between the four outer iron columns, and the upper and lower two positions of the main column member of the steel tower member at the top of the steel tower and other steel tower members are locked. In addition, each of these arm parts is raised to raise the steel tower member and other steel tower members at the top of the steel tower to a certain height from the ground, and in this state, the steel tower members at the top of the steel tower and the lower ends of the other steel tower members are stopped. Assemble by connecting the steel tower members. After that, even if each arm is removed from the steel tower member or other steel tower members at the top of the steel tower, the following steel tower members are connected under the steel tower members at the top of the steel tower or other steel tower members in this state. Being self-reliant, there is no risk of falling.

【0014】請求項4項の発明においては、これらの外
鉄柱間で鉄塔頂部の鉄塔部材を組立て、上記各腕部先端
の把持部で鉄塔頂部の鉄塔部材の主柱材下部を把持し、
各外鉄柱の各腕部を上昇させて鉄塔頂部の鉄塔部材を地
上から一定の高さまで上げる。この状態で上記鉄塔頂部
の鉄塔部材の下端にこれに続く鉄塔部材を接続して組立
て、その後上記鉄塔頂部の鉄塔部材から各腕部先端の把
持部を外して各腕部を各外鉄柱に沿って下ろし、各腕部
先端の把持部に上記鉄塔部材の主柱材下部を把持し、各
外鉄柱の各腕部を上昇させて当該鉄塔部材を地上から一
定の高さまで上げる。この状態でこの鉄塔部材の下端に
これに続く鉄塔部材を接続して組立て、これらを繰り返
して鉄塔を組み立てる。その際これらの鉄塔頂部の鉄塔
部材やその他の鉄塔部材は、下方に行くに従って塔体幅
が大きく成っている場合が多く、従って小さな塔体幅の
ものの場合は各腕部を四本の外鉄柱間の中心に突出させ
て鉄塔頂部の鉄塔部材やその他の鉄塔部材の主柱材を把
持し、大きな塔体幅のものの場合は各腕部を四本の外鉄
柱間の中心から外側にずらせて鉄塔頂部の鉄塔部材やそ
の他の鉄塔部材の主柱材を把持することと成る。
According to the invention of claim 4, the steel tower member at the top of the steel tower is assembled between these outer iron pillars, and the lower part of the main pillar material of the steel tower member at the top of the steel tower is gripped by the gripping portion at the end of each arm.
Each arm of each outer iron pole is elevated to raise the steel tower member at the top of the steel tower from the ground to a certain height. In this state, the steel tower member at the top of the steel tower is assembled by connecting the steel tower member following it to the lower end of the steel tower member, and then the grips at the end of each arm portion are removed from the steel tower member at the steel tower top, and each arm portion is provided along each outer steel pole. Then, the lower part of the main pillar material of the steel tower member is gripped by the grip portion at the tip of each arm portion, and each arm portion of each outer iron pillar is lifted to raise the steel tower member to a certain height from the ground. In this state, a steel tower member following this is connected to the lower end of the steel tower member and assembled, and these are repeated to assemble a steel tower. At that time, the steel tower members at the top of these steel towers and other steel tower members often have a larger tower body width as they go downward, and therefore in the case of a small tower body width, each arm is provided with four outer steel pillars. Grip the main pillar material of the steel tower members and other steel tower members at the top of the steel tower by protruding it to the center of the space, and in the case of a large tower body width, shift each arm outward from the center between the four outer steel pillars. The main pillar material of the steel tower member at the top of the steel tower and other steel tower members is gripped.

【0015】請求項5項の発明においては、これらの外
鉄柱間で鉄塔頂部の鉄塔部材を組立て、上記各腕部先端
の上下二箇所の把持部で鉄塔頂部の鉄塔部材の主柱材下
部を把持し、各外鉄柱の各腕部を上昇させて鉄塔頂部の
鉄塔部材を地上から一定の高さまで上げる。この状態で
上記鉄塔頂部の鉄塔部材の下端にこれに続く鉄塔部材を
接続して組立て、その後上記鉄塔頂部の鉄塔部材から各
腕部先端の把持部を外して各腕部を各外鉄柱に沿って下
ろし、各腕部先端の上下二箇所の把持部に上記鉄塔部材
の主柱材下部を把持し、各外鉄柱の各腕部を上昇させて
当該鉄塔部材を地上から一定の高さまで上げる。この状
態でこの鉄塔部材の下端にこれに続く鉄塔部材を接続し
て組立て、これらを繰り返して鉄塔を組み立てる。その
際これらの鉄塔頂部の鉄塔部材やその他の鉄塔部材は、
下方に行くに従って塔体幅が大きく成っている場合が多
く、従って小さな塔体幅のものの場合は各腕部を四本の
外鉄柱間の中心に突出させて鉄塔頂部の鉄塔部材やその
他の鉄塔部材の主柱材を把持し、大きな塔体幅のものの
場合は各腕部を四本の外鉄柱間の中心から外側にずらせ
て鉄塔頂部の鉄塔部材やその他の鉄塔部材の主柱材を把
持することと成る。また各外鉄柱は基盤上の水平枠体に
より連結されているため、各外鉄柱への荷重に対しても
相互に補強しあい、強固である。
According to the invention of claim 5, the steel tower member at the top of the steel tower is assembled between these outer iron pillars, and the lower part of the main pillar material of the steel tower member at the top of the steel tower is made up of two upper and lower grips at the end of each arm. Grasp and raise each arm of each outer iron pole to raise the steel tower member at the top of the steel tower from the ground to a certain height. In this state, the steel tower member at the top of the steel tower is assembled by connecting the steel tower member following it to the lower end of the steel tower member, and then the grips at the end of each arm portion are removed from the steel tower member at the steel tower top so that each arm portion extends along each outer iron pole. Then, the lower part of the main pillar of the steel tower member is gripped by the upper and lower grips at the tip of each arm, and each arm of each outer iron pillar is lifted to raise the steel tower member to a certain height from the ground. In this state, a steel tower member following this is connected to the lower end of the steel tower member and assembled, and these are repeated to assemble a steel tower. At that time, the steel tower members at the top of these steel towers and other steel tower members are
In many cases, the tower width becomes wider as it goes downwards, so in the case of a small tower width, each arm is projected to the center between the four outer iron poles, and the steel tower members at the top of the tower and other steel towers. Holds the main pillar material of the member, and in the case of a large tower width, shifts each arm outward from the center between the four outer iron pillars and holds the main pillar material of the steel tower member and other steel tower members Will be done. Further, since each outer iron column is connected by the horizontal frame body on the base, it is reinforced against each other against the load applied to each outer iron column and is strong.

【0016】[0016]

【実施例】以下この発明の実施例を図について説明す
る。図1乃至図6はこの発明の工法に使用する装置を示
すもので、図1に示すように適宜の鉄塔基礎の上に、十
字型のベース梁下敷き板1を設置し、このベース梁下敷
き板1の上に自体の中央部が載るように十字型のベース
梁2を設置してある。このベース梁2は各突出部の長さ
を調節、固定自在となっている。従って組み立てる鉄塔
の大きさに合わせてベース梁2の大きさを決定する。ま
たこのベース梁2の各先端部には、二本の柱からなる外
鉄柱3が四本建てられ、これらの各外鉄柱3相互は外梁
4で連結されている。
Embodiments of the present invention will be described below with reference to the drawings. 1 to 6 show an apparatus used in the construction method of the present invention. As shown in FIG. 1, a cross-shaped base beam underlaying plate 1 is installed on an appropriate steel tower foundation, and this base beam underlaying plate is installed. A cross-shaped base beam 2 is installed so that the central portion of the base 1 rests on the base 1. The base beam 2 can be fixed by adjusting the length of each protruding portion. Therefore, the size of the base beam 2 is determined according to the size of the steel tower to be assembled. Further, four outer iron pillars 3 composed of two pillars are built at each tip of the base beam 2, and these outer iron pillars 3 are connected to each other by an outer beam 4.

【0017】これらの各外鉄柱3には二本で一対の腕部
5が上下に間隔を保持して二対夫々装着され、これらの
各腕部5は上記十字型のベース梁2の中心部に向かって
ほぼ水平に設けられている。これらの各腕部5は各外鉄
柱3に沿って上下に移動自在な支持筒体6に支持され、
上下二対の腕部5の各支持筒体6相互が一体に固定さ
れ、腕部ユニット7を構成している。それ故二対の腕部
5はこの腕部ユニット7により一体となって各外鉄柱3
に沿って上下に移動自在である。またこれらの各腕部5
は各支持筒体6の中を遊貫して摺動、固定自在に支持さ
れ、上下の各対の各腕部5の内側先端には、これらの各
腕部5をつなぐ連結腕8が夫々固定され、上下各対の腕
部5が一体となって上記ベース梁2の中心に向かって突
出、固定自在となっており、各対の腕部5を移動させる
適宜の駆動装置(図示省略)が設けられている。またこ
れらの各連結腕8の中央部には鉄塔部材の主柱材を把持
する把持具9を設けている。
Two pairs of arm portions 5 are mounted on each of these outer iron columns 3 with two pairs being vertically spaced from each other, and each of these arm portions 5 is at the central portion of the cross-shaped base beam 2. It is installed almost horizontally toward. Each of these arm portions 5 is supported by a support cylinder 6 which is vertically movable along each outer iron pillar 3,
The support cylinders 6 of the two pairs of upper and lower arms 5 are integrally fixed to each other to form an arm unit 7. Therefore, the two pairs of arm portions 5 are integrated by the arm portion unit 7 to form each outer iron pole 3
Can be moved up and down along. Also, each of these arms 5
Is slidably and fixedly supported by freely penetrating the inside of each of the support cylinders 6, and the connecting arms 8 connecting the respective arm portions 5 are respectively provided at the inner ends of the upper and lower arm portions 5 respectively. An appropriate drive device (not shown) that is fixed and is capable of integrally protruding the upper and lower arm portions 5 toward the center of the base beam 2 and fixing the arm portions 5 and moving the pair of arm portions 5 Is provided. Further, a gripping tool 9 for gripping the main pillar material of the steel tower member is provided at the center of each of the connecting arms 8.

【0018】この把持具9は図5に示すごとく、「く」
の字形の基体9aの基部を連結腕8から突出した軸受1
0に軸支され、この基体9aの一端にピン9bで軸支さ
れた「く」の字形の開閉枠体9cを設け、これらの基体
9aと開閉枠体9cとの間で鉄塔の支柱材22aを挾持
し、これらの基体9aと開閉枠体9cの両端でボルトナ
ット9dにより固定するものである。
As shown in FIG. 5, the gripping tool 9 has a "ku" shape.
Bearing 1 in which the base portion of the V-shaped base body 9a projects from the connecting arm 8
0 is provided, and an open / close frame 9c having a V shape is provided at one end of the base 9a and is pivotally supported by a pin 9b. A pillar material 22a of a steel tower is provided between the base 9a and the open / close frame 9c. Is held and fixed by bolts and nuts 9d at both ends of the base body 9a and the opening / closing frame body 9c.

【0019】また上記各外鉄柱3の頂部には図6に示す
ごとく、隣接する各二本の外鉄柱3をつなぐ頭つなぎ材
11が着脱自在にわたされ、また各外鉄柱3の頂部には
スプロケット12が固定され、これらの各外鉄柱3の各
スプロケット12には、図4に示すごとくチェーン13
を掛け、各チェーン13の一端をロードセル14を介し
て上記各腕部ユニット7の上部に固定し、他端をベース
梁2箇所に設けた駆動モータ15のローラ(図示省略)
に掛けて折り返し、さらに締め付け具16を介して上記
各腕部ユニット7の下部に固定してループを形成してい
る。またこれらの四台の各駆動モータ15の回転を制御
する制御器17及び電源となる発電機18が、図6に示
す如く設けられている。なお図6では全ての隣接する外
鉄柱3の上端部間に上記頭つなぎ材11をわたしている
が、鉄塔の組立てに際しては一対の相対する二本の頭つ
なぎ材11は渡しておかない。
Further, as shown in FIG. 6, a head tie member 11 for connecting two adjacent outer iron pillars 3 is detachably attached to the top of each outer iron pillar 3, and each outer iron pillar 3 has a top portion. A sprocket 12 is fixed, and a chain 13 is attached to each sprocket 12 of each outer iron column 3 as shown in FIG.
, One end of each chain 13 is fixed to the upper portion of each arm unit 7 via the load cell 14, and the other end is provided with two rollers of the drive motor 15 (not shown).
It hangs over and folds back, and is further fixed to the lower part of each arm unit 7 through a fastener 16 to form a loop. Further, a controller 17 for controlling the rotation of each of these four drive motors 15 and a generator 18 as a power source are provided as shown in FIG. In FIG. 6, the head connecting material 11 is provided between the upper ends of all the adjacent outer iron columns 3, but the pair of two head connecting materials 11 facing each other are not passed when the tower is assembled.

【0020】また上記ベース梁2の上の中程には図9に
示すように、一番外側に鉄塔基礎主脚材19を上記鉄塔
基礎から突設し、さらにこの各鉄塔基礎主脚材19の内
側に、後述する鉄塔主柱材を挿入支持する主柱材仮固定
具20を塔体幅の変化に合わせて各ベース梁2に沿った
所定の位置に複数個設け、これらの各主柱材仮固定具2
0の下端は回動自在とし、鉄塔の組立て傾斜と対応可能
な支持方法としている。
Further, in the middle of the base beam 2, as shown in FIG. 9, a steel tower foundation main leg material 19 is provided on the outermost side so as to project from the steel tower foundation, and each of the steel tower foundation main leg materials 19 is further provided. Inside, a plurality of main pillar temporary fixing members 20 for inserting and supporting main tower pillars, which will be described later, are provided at predetermined positions along each base beam 2 in accordance with changes in the width of the tower body. Temporary material fixture 2
The lower end of 0 is rotatable so that it can be supported by the inclination of the steel tower assembly.

【0021】次にこの装置を使ってこの発明の鉄塔地上
組立て工法を説明する。まず図7に示すごとく、上記二
つの頭つなぎ材11を渡していない、外鉄柱3の間に鉄
塔腕金部21が位置するように鉄塔頂部部材22をこれ
らの外鉄柱3に囲まれている中のベース梁2の上で組み
立てる。そして上記制御器17により各駆動モータ15
を駆動させてチェーン13を回転させて各外鉄柱3の各
腕部ユニット7を降下させる。そして各腕部ユニット7
の上下の対の腕部5を上記制御器17により駆動装置を
駆動させて各支持筒体6に対して水平に摺動させて上下
夫々の幅で外鉄柱3に囲まれた中央部に突出させる。そ
して各連結腕8の把持具9で上述のごとく鉄塔頂部部材
22の主柱材22aを把持する。図12はこの状態を示
す説明概略図である。
Next, a method of assembling a steel tower above ground according to the present invention using this apparatus will be described. First, as shown in FIG. 7, the steel tower top member 22 is surrounded by the outer steel pillars 3 so that the steel tower arm member 21 is located between the outer steel pillars 3 without passing the two head connecting members 11. Assemble on the base beam 2 inside. Then, each drive motor 15 is controlled by the controller 17.
Is driven to rotate the chain 13 to lower each arm unit 7 of each outer iron column 3. And each arm unit 7
The pair of upper and lower arm portions 5 are driven by the controller 17 so as to be slid horizontally with respect to the respective support cylinders 6 so as to project to the central portion surrounded by the outer iron column 3 with the respective upper and lower widths. Let Then, the main pillar member 22a of the steel tower top member 22 is gripped by the gripping tool 9 of each connecting arm 8 as described above. FIG. 12 is an explanatory schematic diagram showing this state.

【0022】この様にして鉄塔頂部部材22の四本の主
柱材22aを上下部で夫々腕部5に固定する。そして上
記制御器17により各駆動モータ15を動かしてチェー
ン13を回して、各腕部ユニット7を引き上げる。これ
により図8及び図13に示すごとく鉄塔頂部部材22は
鉄塔基礎から一定の高さまで浮き上がり、この状態を保
持してこの鉄塔頂部22の下で、これに続く鉄塔部材2
3を組立て、この鉄塔部材23の上部を鉄塔頂部部材2
2の下端に接続する。その際図9に示すごとく、上述の
主柱材仮固定具20の一つに鉄塔部材23の主柱材23
aを仮止めしておく。
In this manner, the four main pillar members 22a of the tower top member 22 are fixed to the arm portions 5 at the upper and lower portions, respectively. Then, the controller 17 drives each drive motor 15 to rotate the chain 13 and pull up each arm unit 7. As a result, as shown in FIGS. 8 and 13, the steel tower top member 22 floats up from the steel tower foundation to a certain height, and in this state, the steel tower top member 22 is continued under the steel tower top portion 22 to continue.
3 is assembled, and the upper part of the steel tower member 23 is attached to the steel tower top member 2
Connect to the bottom of 2. At that time, as shown in FIG. 9, one of the above-mentioned temporary fixing members 20 for the main pillar is provided with the main pillar 23 of the steel tower member 23.
Temporarily fix a.

【0023】そして各腕部ユニット7の各把持具9を鉄
塔頂部部材22の主柱材22aから外し、図10に示す
ごとく各腕部ユニット7を各外鉄柱3に沿って降ろし、
各腕部ユニット7の上下の対の腕部5を水平移動させ、
外方に突出させる。またこの状態ですでに鉄塔頂部部材
22の鉄塔腕金部21が各外鉄柱3の上端より上方に突
出しているため、図11に示すごとく頭つなぎ材11の
渡されていない外鉄柱3の上端に頭つなぎ材11を渡し
て固定する。そして鉄塔部材23の四本の主柱材23a
の下部に上記各腕部ユニット7の各把持具9を固定す
る。そして次の鉄塔部材の主柱材をその外側の主柱材仮
固定具20に建立し、固定する。図14はこの状態を示
す。そして上記制御器17により各駆動モータ15を駆
動させてチェーン13を回転させて各外鉄柱3の各腕部
ユニット7を上昇させ、ベース梁2から鉄塔部材23を
図15に示すごとく次の鉄塔部材の主柱材の接続位置ま
で浮きあがらせる。
Then, each gripping tool 9 of each arm unit 7 is removed from the main column member 22a of the tower top member 22, and each arm unit 7 is lowered along each outer iron column 3 as shown in FIG.
Horizontally move the pair of upper and lower arms 5 of each arm unit 7,
Let it protrude outward. Further, in this state, since the steel tower arm member 21 of the steel tower top member 22 has already projected above the upper end of each outer iron pillar 3, as shown in FIG. 11, the upper end of the outer steel pillar 3 to which the head tie member 11 is not passed. The head tie material 11 is passed over and fixed. And four main pillar members 23a of the steel tower member 23
The grips 9 of the arm units 7 are fixed to the lower part of the. Then, the main pillar material of the next steel tower member is erected and fixed to the main pillar material temporary fixing tool 20 on the outside thereof. FIG. 14 shows this state. Then, the controller 17 drives the drive motors 15 to rotate the chains 13 to raise the arm units 7 of the outer iron columns 3 to move the base beam 2 to the steel tower member 23 to the next steel tower as shown in FIG. Lift up to the connection position of the main pillar of the member.

【0024】そしてさらにこの状態を保持してこの鉄塔
部材23の下端にこれに続く上記次の鉄塔部材の主柱材
の上端を接続、固定し、当該次の鉄塔部材(図示省略)
を組立て、これらを繰り返して鉄塔を組み立てる。
Further, while maintaining this state, the upper end of the main pillar material of the next steel tower member connected to the lower end of the steel tower member 23 is connected and fixed to the next steel tower member (not shown).
Assemble and repeat these steps to assemble a steel tower.

【0025】なお上記実施例では外鉄柱3を四本用意し
たが、これら限らず複数本の外鉄柱を設けても、この発
明の工法は実施できる。またこれらの外鉄柱3はベース
梁2で連結しているが、この連結による補強の効果があ
るが、これもこの発明の必須要件ではない。また各腕部
5は水平方向にも移動、固定自在としたが、この様に水
平移動自在としなくともよい。その場合当該腕部で支持
して持ち上げる鉄塔部材の塔体幅が異なってくるが、各
腕部の適宜箇所でこれらの鉄塔部材を係止する構成とす
ればよい。さらに各腕部ユニット7の各外鉄柱3に沿っ
た上下移動をチェーン13を回転させて行っているが、
これも適宜の駆動手段で行えばよい。
Although the four outer iron columns 3 are prepared in the above embodiment, the invention is not limited to these, and the method of the present invention can be implemented by providing a plurality of outer iron columns. Further, the outer iron columns 3 are connected by the base beam 2, and there is a reinforcing effect by this connection, but this is also not an essential requirement of the present invention. Further, although each arm portion 5 can be moved and fixed in the horizontal direction as well, it is not necessary to be horizontally movable like this. In that case, the tower body width of the steel tower members supported and lifted by the arm portions is different, but the steel tower members may be locked at appropriate positions of the respective arm portions. Further, the chain 13 is rotated to move the arm units 7 up and down along the outer iron columns 3,
This may also be performed by an appropriate driving means.

【0026】また上記実施例におけるベース梁2の中程
の鉄塔基礎から突出させた鉄塔基礎主脚材19又は鉄塔
基礎に当該ベース梁2を固定させることにより、外鉄柱
3等の荷重を分担させ、これらの部材を軽量化させるこ
ともできる。またこの発明は鉄塔が水平な基盤上に建て
られる場合に加え、組み立てられる鉄塔が片継脚の場合
でも、図16に示すごとく、当該傾斜地に架台24を設
けて当該架台24の水平板24a上を基礎として外鉄柱
3等を設け、上記実施例と同様に鉄塔を組み立てること
ができる。また上記実施例では送電用鉄塔の組立てを示
したが、これに限らず、この発明は単一の柱から成るも
の等その他適宜の構成や形状の鉄塔の組立にも使用でき
る。
Further, by fixing the base beam 2 to the steel tower foundation main leg material 19 or the steel tower foundation projected from the steel tower foundation in the middle of the base beam 2 in the above-described embodiment, the load of the outer iron pillar 3 or the like is shared. It is also possible to reduce the weight of these members. Further, according to the present invention, in addition to the case where the steel tower is built on a horizontal base, even when the steel tower to be assembled is a single leg, as shown in FIG. It is possible to assemble the steel tower in the same manner as in the above-mentioned embodiment by providing the outer iron pillar 3 and the like on the basis of. Further, in the above-mentioned embodiment, the assembling of the power transmission tower is shown, but the present invention is not limited to this, and the present invention can also be used for assembling a tower having a proper configuration or shape such as a single column.

【0027】[0027]

【発明の効果】請求項1項の発明の工法によれば組み立
てる鉄塔の外周に設けた複数本の外鉄柱に上下摺動自在
に設けた腕部により、鉄塔部材を支持して、これらを一
定の高さまでせり上げ、この状態でこの鉄塔部材の次の
鉄塔部材の主柱材を接続して組み立て、さらに上記腕部
を下方に降下させて、新たに組み立てられた鉄塔部材の
下部を上記腕部に係止し、これらの鉄塔部材をせり上げ
る。従って従来の組み立てる鉄塔の中央部にせり上げ用
鉄柱を設けて、鉄塔部材をせり上げるのに比べ、複数本
の外鉄柱でせり上げるため鉄塔部材の荷重は各外鉄柱に
その荷重を分散させているので、外鉄柱が倒れるおそれ
がなく、極めて安定性が良い。またせり上げる鉄塔部材
の内側に鉄柱等の装置が介在しておらず、それ故せり上
げる前から鉄塔部材の内側に横梁や斜材を取り付けて置
くことができ、作業性がよい。
According to the method of the invention as set forth in claim 1, a plurality of outer iron columns provided on the outer periphery of the steel tower to be assembled are supported by arm portions slidable up and down to keep the steel tower members constant. , The main pillar material of the steel tower member next to this steel tower member is connected and assembled in this state, and the arm portion is further lowered, and the lower part of the newly assembled steel tower member is attached to the arm. It locks to the part and raises these tower members. Therefore, compared to the conventional method of providing an iron pillar for raising in the central part of the steel tower to be assembled and raising the steel tower member, the load of the steel tower member is to be distributed by the outer iron pillars because it is lifted by multiple outer iron pillars. Since there is no risk of the outer iron column falling down, it is extremely stable. In addition, there is no device such as an iron pillar inside the steel tower member to be raised, and therefore, a horizontal beam or diagonal member can be attached and placed inside the steel tower member before rising, and workability is good.

【0028】請求項2項の発明の工法によれば組み立て
る鉄塔の外周に設けた複数本の外鉄柱に上下摺動自在に
設けた腕部により、鉄塔部材を支持して、これらを一定
の高さまでせり上げ、この状態でこの鉄塔部材の次の鉄
塔部材の主柱材を接続して組み立て、さらに上記腕部を
下方に降下させて、鉄塔部材の下部を上記腕部に係止し
てこれらの鉄塔部材をせり上げる。従って従来の組み立
てる鉄塔の中央部にせり上げ用鉄柱を設けて、鉄塔部材
をせり上げるのに比べ、複数本の外鉄柱でせり上げるた
め鉄塔部材の荷重は各外鉄柱にその荷重を分散させてい
るので、外鉄柱が倒れるおそれがなく、極めて安定性が
良い。またせり上げる鉄塔部材の内側に鉄柱等の装置が
介在しておらず、それ故せり上げる前から鉄塔部材の内
側に横梁や斜材を取り付けて置くことができ、作業性が
よい。さらに腕部が水平方向にも移動自在であるため、
上部の鉄塔部材から順に塔体幅が大きくなる鉄塔部材を
腕部に固定してせり上げて行く場合、鉄塔部材の塔体幅
に合わせて各腕部を外鉄柱の外方に移動させて行くこと
ができる。従って、外鉄柱の位置をかえることなく任意
の塔体幅に合わせて腕部の水平突出度合いを自由に調整
可能であり、工事の作業性がよい。
According to the construction method of the invention as claimed in claim 2, the steel tower members are supported by a plurality of outer iron columns provided on the outer periphery of the steel tower to be assembled, and the arm portions are slidable up and down, and these are fixed to a certain height. Raise up to this point, in this state, assemble by connecting the main pillar material of the next steel tower member of this steel tower member, further lower the arm part downward, and lock the lower part of the steel tower member to the arm part. Raise the steel tower members. Therefore, compared to the conventional method of providing an iron pillar for raising in the central part of the steel tower to be assembled and raising the steel tower member, the load of the steel tower member is to be distributed by the outer iron pillars because it is lifted by multiple outer iron pillars. Since there is no risk of the outer iron column falling down, it is extremely stable. In addition, there is no device such as an iron pillar inside the steel tower member to be raised, and therefore, a horizontal beam or diagonal member can be attached and placed inside the steel tower member before rising, and workability is good. Furthermore, since the arms can be moved horizontally,
When the steel tower members that increase in tower width gradually increase from the upper steel tower member to the arm part and lift up, move each arm part to the outside of the outer iron pole according to the tower body width of the steel tower member. be able to. Therefore, the degree of horizontal protrusion of the arms can be freely adjusted according to the width of the tower body without changing the position of the outer iron column, and the workability of the construction is good.

【0029】請求項3項の発明の工法によれば組み立て
る鉄塔の外周に設けた四本の各外鉄柱に上下摺動自在に
設けた腕部により、鉄塔部材を支持して、これらを一定
の高さまでせり上げ、この状態でこの鉄塔部材の次の鉄
塔部材の主柱材を接続して組み立て、さらに上記腕部を
下方に降下させて、鉄塔部材の下部を上記腕部に係止し
てこれらの鉄塔部材をせり上げる。従って従来の組み立
てる鉄塔の中央部にせり上げ用鉄柱を設けて鉄塔部材を
せり上げるのに比べ、四本の外鉄柱でせり上げるため鉄
塔部材の荷重は各外鉄柱にその荷重を分散させているの
で、外鉄柱が倒れるおそれがなく、極めて安定性が良
い。しかも各腕部での鉄塔部材の支持は、鉄塔部材の上
下二箇所で支持するため、極めて安定よく鉄塔部材をせ
り上げることができる。またせり上げる鉄塔部材の内側
に鉄柱等の装置が介在しておらず、それ故せり上げる前
から鉄塔部材の内側に横梁や斜材を取り付けて置くこと
ができ、作業性がよい。さらに腕部が水平方向にも移動
自在であるため、上部の鉄塔部材から順に塔体幅が大き
くなる鉄塔部材を腕部に固定してせり上げて行く場合、
鉄塔部材の塔体幅に合わせて各腕部を外鉄柱の外方に移
動させて行くことができる。従って、外鉄柱の位置をか
えることなく任意の塔体幅に合わせて腕部の水平突出度
合いを自由に調整可能であり、工事の作業性がよい。
According to the construction method of the invention of claim 3, the steel tower members are supported by the arm portions slidable up and down on each of the four outer iron pillars provided on the outer periphery of the steel tower to be assembled, and these are fixed. Raise to the height, and in this state, connect and assemble the main pillar material of the next steel tower member of this steel tower member, further lower the arm portion downward, and lock the lower part of the steel tower member to the arm portion. Raise these steel tower members. Therefore, compared with the conventional method of providing an iron pillar for raising in the central portion of the steel tower to be assembled and raising the steel tower member, the load of the steel tower member is raised by four outer iron pillars so that the load is distributed to each outer iron pillar. Therefore, there is no risk of the outer iron column falling over, and the stability is extremely good. Moreover, since the steel tower member is supported by each arm at two positions above and below the steel tower member, the steel tower member can be raised very stably. In addition, there is no device such as an iron pillar inside the steel tower member to be raised, and therefore, a horizontal beam or diagonal member can be attached and placed inside the steel tower member before rising, and workability is good. Furthermore, since the arm part is also movable in the horizontal direction, when fixing the steel tower member in which the tower width increases in order from the upper steel tower member to the arm part and raising it,
It is possible to move each arm portion to the outside of the outer iron pole in accordance with the width of the steel tower member. Therefore, the degree of horizontal protrusion of the arms can be freely adjusted according to the width of the tower body without changing the position of the outer iron column, and the workability of the construction is good.

【0030】請求項4項の発明の装置を用いれば、これ
らの外鉄柱内で鉄塔頂部の鉄塔部材やその下の鉄塔部材
を組立て、上記各腕部先端の把持部で鉄塔頂部の鉄塔部
材やその他の鉄塔部材の側面下部を把持し、各外鉄柱の
各腕部を上昇させて鉄塔頂部やその他の鉄塔部材を地上
から一定の高さまで上げる。この状態で上記鉄塔頂部の
鉄塔部材やその他の鉄塔部材の下端にこれに続く鉄塔部
材を接続して組立て、その後これらの下部を腕部で把持
して各外鉄柱の各腕部を上昇させて当該鉄塔部材を地上
から一定の高さまで上げる、という工法には適するもの
であり、この工法において、鉄塔部材等を極めて安定良
くせり上げることができる。
If the apparatus according to the invention of claim 4 is used, the steel tower member at the top of the steel tower and the steel tower member below it are assembled in these outer iron columns, and the steel tower member at the top of the steel tower or the steel tower member at the end of each arm is assembled. The lower side surfaces of the other steel tower members are gripped, and the arms of the outer iron columns are lifted to raise the tower top and other steel tower members to a certain height from the ground. In this state, the steel tower members at the top of the steel tower and the other steel tower members are connected to the lower tower members to assemble them, and then these lower parts are gripped by the arm parts to raise each arm part of each outer iron pole. It is suitable for a construction method of raising the steel tower member to a certain height from the ground, and in this construction method, the steel tower member and the like can be raised very stably.

【0031】請求項5項の発明の装置を用いれば、これ
らの外鉄柱内で鉄塔頂部の鉄塔部材やその下の鉄塔部材
を組立て、上記各腕部先端の把持部で鉄塔頂部の鉄塔部
材やその他の鉄塔部材の主柱材下部の上下二箇所を把持
し、各外鉄柱の各腕部を上昇させて鉄塔頂部やその他の
鉄塔部材を地上から一定の高さまで上げる。この状態で
上記鉄塔頂部の鉄塔部材やその他の鉄塔部材の下端にこ
れに続く鉄塔部材を接続して組立て、その後これらの下
部を腕部で把持て各外鉄柱の各腕部を上昇させて当該鉄
塔部材を地上から一定の高さまで上げる、という工法に
は適するものである。この工法において外鉄柱を四本設
け、これらの四本の外鉄柱でせり上げる鉄塔部材の荷重
を各外鉄柱に分散させ、鉄塔部材等を極めて安定良くせ
り上げることができる。
If the apparatus of the invention of claim 5 is used, the steel tower member at the top of the steel tower and the steel tower member below it are assembled in these outer iron poles, and the steel tower member at the top of the steel tower and the steel tower member at the end of each arm are assembled. The upper and lower parts of the lower part of the main pillar of the other steel tower members are gripped, and the arms of the outer steel pillars are raised to raise the tower top and other steel tower members to a certain height from the ground. In this state, the steel tower members at the top of the steel tower and other steel tower members are connected to the steel tower members connected to the lower ends of the steel tower members to assemble, and then these lower parts are gripped by the arm parts to raise each arm part of each outer iron pole It is suitable for the construction method of raising the tower member from the ground to a certain height. In this construction method, four outer iron columns are provided, and the load of the steel tower members raised by these four outer iron columns is distributed to the respective outer iron columns, so that the steel tower members and the like can be raised very stably.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明の装置の組立の第1工程を示す説明斜
視図である。
FIG. 1 is an explanatory perspective view showing a first step of assembling the device of the present invention.

【図2】この発明の装置の組立の第2工程を示す説明斜
視図である。
FIG. 2 is an explanatory perspective view showing a second step of assembling the device of the present invention.

【図3】この発明の装置の組立の第3工程を示す説明斜
視図である。
FIG. 3 is an explanatory perspective view showing a third step of assembling the device of the present invention.

【図4】この発明の装置を示す説明正面図である。FIG. 4 is an explanatory front view showing the device of the present invention.

【図5】この発明の装置の鉄塔部材を把持する把持具の
一部断面平面図である。
FIG. 5 is a partial cross-sectional plan view of a gripping tool for gripping a steel tower member of the device of the present invention.

【図6】この発明の装置の完成状態を示す説明斜視図で
ある。
FIG. 6 is an explanatory perspective view showing a completed state of the device of the present invention.

【図7】この発明の方法における鉄塔組立ての第1工程
を示す斜視図である。
FIG. 7 is a perspective view showing a first step of assembling a steel tower in the method of the present invention.

【図8】この発明の方法における鉄塔組立ての第2工程
を示す斜視図である。
FIG. 8 is a perspective view showing a second step of assembling a steel tower in the method of the present invention.

【図9】この発明の各鉄塔基礎主脚材と主柱材仮固定具
の側面図である。
FIG. 9 is a side view of each steel tower foundation main leg material and main pillar temporary fixing tool of the present invention.

【図10】この発明の方法における鉄塔組立ての第3工
程を示す斜視図である。
FIG. 10 is a perspective view showing a third step of assembling a steel tower in the method of the present invention.

【図11】この発明の方法における鉄塔組立ての第4工
程を示す斜視図である。
FIG. 11 is a perspective view showing a fourth step of assembling a steel tower in the method of the present invention.

【図12】この発明の方法における鉄塔組立ての第1工
程を示す説明概略図である。
FIG. 12 is an explanatory schematic diagram showing a first step of assembling a steel tower in the method of the present invention.

【図13】この発明の方法における鉄塔組立ての第2工
程を示す説明概略図である。
FIG. 13 is an explanatory schematic view showing a second step of assembling a steel tower in the method of the present invention.

【図14】この発明の方法における鉄塔組立ての第5工
程を示す説明概略図である。
FIG. 14 is an explanatory schematic diagram showing a fifth step of assembling a steel tower in the method of the present invention.

【図15】この発明の方法における鉄塔組立ての第6工
程を示す説明概略図である。
FIG. 15 is an explanatory schematic diagram showing a sixth step of assembling a steel tower in the method of the present invention.

【図16】この発明の方法を片継脚の鉄塔に使用した場
合を示す説明概略図である。
FIG. 16 is an explanatory schematic diagram showing a case where the method of the present invention is used for a steel tower having a single leg.

【符号の説明】[Explanation of symbols]

2 ベース梁枠 3 外鉄柱 5 腕部 6 支持筒体 7 腕部ユニット 8 連結腕 9 把持具 12 スプロケット 13 チェーン 15 駆動モータ 19 制御器 19 鉄塔基礎主脚材 20 主柱材仮固定具 21 鉄塔腕金部 22 鉄塔頂部部材 23 鉄塔部材 2 Base beam frame 3 Outer iron pole 5 Arms 6 Support cylinder 7 Arm unit 8 Linking arm 9 Grip tool 12 Sprocket 13 Chain 15 Drive motor 19 Controller 19 Steel tower foundation main footing 20 Main pillar temporary fixing tool 21 Steel tower arm Kinbe 22 Steel tower top member 23 Steel tower member

───────────────────────────────────────────────────── フロントページの続き (72)発明者 斎藤 春吉 宮城県名取市田高字原554 株式会社ユア テック送電工事センター内 (72)発明者 平塚 一男 宮城県名取市田高字原554 株式会社ユア テック送電工事センター内 (72)発明者 二木 卓 東京都新宿区新宿1丁目1番14号 那須電 機鉄工株式会社内 (72)発明者 望月 智之 東京都新宿区新宿1丁目1番14号 那須電 機鉄工株式会社内 (72)発明者 石井 良和 東京都新宿区新宿1丁目1番14号 那須電 機鉄工株式会社内 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Haruyoshi Saito, 554, Yutaka Tech, Nataka City, Miyagi Prefecture Yutaka Tech Co., Ltd. (72) Inventor, Kazuo Hiratsuka, 554, Yutaka Tech, Natori City, Miyagi Prefecture Yutec Power Co., Ltd. Inside the construction center (72) Inventor Taku Futaki 1-1-14 Shinjuku, Shinjuku-ku, Tokyo Inside Nasu Electric Iron Works Co., Ltd. (72) Tomoyuki Mochizuki 1-1-14 Shinjuku-ku, Tokyo Nasu Electric Inside Iron Works Co., Ltd. (72) Inventor Yoshikazu Ishii 1-14-14 Shinjuku, Shinjuku-ku, Tokyo Nasu Denki Iron Works Co., Ltd.

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 適宜の基盤上に間隔を開けて複数本の外
鉄柱を立設し、これらの各外鉄柱に、当該外鉄柱に沿っ
て昇降自在な腕部を設け、これらの各腕部を昇降させる
適宜の駆動装置を設け、これらの外鉄柱間で、鉄塔頂部
の鉄塔部材を組立て、上記各腕部に鉄塔頂部の鉄塔部材
の側面下部を係止し、各外鉄柱の各腕部を上昇させて鉄
塔頂部の鉄塔部材を地上から一定の高さまで上げ、上記
鉄塔頂部の鉄塔部材の下端にこれに続く鉄塔部材を接続
して組立て、その後上記鉄塔頂部の鉄塔部材から各腕部
を外して各腕部を各外鉄柱に沿って下ろし、各腕部に上
記鉄塔部材の側面下部を係止し、各外鉄柱の各腕部を上
昇させて当該鉄塔部材を地上から一定の高さまで上げ、
この鉄塔部材の下端にこれに続く鉄塔部材を接続して組
立て、これらを繰り返して鉄塔を組み立てることを特徴
とする、鉄塔地上組立て工法。
1. A plurality of outer iron columns are erected on an appropriate base with a space provided therebetween, and each of these outer iron columns is provided with an arm that can be raised and lowered along the outer iron column. Providing a suitable drive device for moving up and down, between these outer iron pillars, assemble the steel tower member at the top of the steel tower, lock the lower side surface of the steel tower member at the top of the steel tower to each of the above arm parts, each arm portion of each outer iron pillar To raise the steel tower member at the top of the tower to a certain height from the ground, and assemble by connecting the following steel tower member to the lower end of the steel tower member at the top of the tower, and then each arm from the steel tower member at the top of the tower. Remove and lower each arm along each outer iron pole, lock the side part lower part of the steel tower member to each arm, raise each arm of each outer iron pillar to raise the steel tower member to a certain height from the ground Raise,
A steel tower ground assembly method, characterized in that the steel tower member is connected to the lower end of the steel tower member to assemble the steel tower member, and the steel tower member is assembled by repeating these operations.
【請求項2】 適宜の基盤上に間隔を開けて複数本の外
鉄柱を立設し、これらの各外鉄柱に、当該外鉄柱に沿っ
て昇降自在な腕部を複数本の外鉄柱間の中心にほぼ向け
て設け、またこれらの各腕部は複数本の外鉄柱間の中心
方向に突出自在とし、これらの各腕部を昇降及び水平移
動させる適宜の駆動装置を設け、これらの外鉄柱間の基
盤上で鉄塔頂部の鉄塔部材を組立て、上記各腕部を各外
鉄柱の下部に下ろして鉄塔頂部の鉄塔部材の側面下部を
固定し、各外鉄柱の各腕部を上昇させて鉄塔頂部の鉄塔
部材を地上から一定の高さまで上げ、上記鉄塔頂部の鉄
塔部材の下端にこれに続く鉄塔部材を接続して組立て、
その後上記鉄塔頂部の鉄塔部材から各腕部を外して各腕
部を各外鉄柱に沿って下ろし、各腕部に上記鉄塔部材の
側面下部を固定し、各外鉄柱の各腕部を上昇させて当該
鉄塔部材を地上から一定の高さまで上げ、この鉄塔部材
の下端にこれに続く鉄塔部材を接続して組立て、これら
を繰り返して鉄塔を組み立てることを特徴とする、鉄塔
地上組立て工法。
2. A plurality of outer iron columns are erected on an appropriate base with a space provided therebetween, and an arm portion that can be raised and lowered along the outer iron column is provided between each of the outer iron columns. It is provided almost toward the center, and each of these arm portions is allowed to project in the direction of the center between a plurality of outer iron columns, and an appropriate drive device for raising and lowering and horizontally moving each of these arm portions is provided. Assemble the steel tower member on the top of the steel tower on the base between them, lower each arm to the lower part of each outer steel column to fix the lower part of the side surface of the steel tower member at the top of the steel tower, and raise each arm part of each outer steel pillar to raise the steel tower. Raise the top tower member from the ground to a certain height, and assemble by connecting the following tower member to the lower end of the top tower member.
After that, remove each arm from the steel tower member at the top of the tower and lower each arm along each outer iron pillar, fix the lower side surface of the steel tower member to each arm, and raise each arm portion of each outer steel pillar. A steel tower ground assembly method, characterized in that the steel tower member is raised from the ground to a certain height, the steel tower member is connected to the lower end of the steel tower member to assemble, and the steel tower is assembled by repeating these.
【請求項3】 適宜の基盤上に間隔を開けて四本の外鉄
柱を立設し、これらの各外鉄柱に、当該外鉄柱に沿って
昇降自在な腕部を四本の外鉄柱間の中心にほぼ向けて設
け、またこれらの各腕部は四本の外鉄柱間の中心方向に
突出自在とし、これらの各腕部を昇降及び水平移動させ
る適宜の駆動装置を設け、これらの外鉄柱間の基盤上で
鉄塔頂部の鉄塔部材を組立て、上記各腕部を各外鉄柱の
下部に下ろして鉄塔頂部の鉄塔部材の主柱材下部の上下
二箇所を固定し、各外鉄柱の各腕部を上昇させて鉄塔頂
部の鉄塔部材を地上から一定の高さまで上げ、上記鉄塔
頂部の鉄塔部材の下端にこれに続く鉄塔部材を接続して
組立て、その後上記鉄塔頂部の鉄塔部材から各腕部を外
して各腕部を各外鉄柱に沿って下ろし、各腕部に上記鉄
塔部材の主柱材下部の上下二箇所を固定し、各外鉄柱の
各腕部を上昇させて当該鉄塔部材を地上から一定の高さ
まで上げ、この鉄塔部材の下端にこれに続く鉄塔部材を
接続して組立て、これらを繰り返して鉄塔を組み立てる
ことを特徴とする、鉄塔地上組立て工法。
3. Four outer iron columns are erected on an appropriate base with a space provided therebetween, and an arm portion that can be raised and lowered along the outer iron column is provided between each of the outer iron columns. It is provided almost toward the center, and each of these arm parts is allowed to project in the direction of the center between the four outer iron columns, and an appropriate drive device for moving up and down and horizontally moving each arm part is provided. Assemble the steel tower member on the top of the steel tower on the base between, and lower each arm to the lower part of each outer iron pillar, and fix the upper and lower two places below the main pillar material of the steel tower member at the top of the steel tower, and each arm of each outer steel pillar. Part of the steel tower member at the top of the steel tower from the ground to a certain height, and the steel tower member at the top of the steel tower member is connected to the lower end of the steel tower member to assemble the steel tower member. And lower each arm along each outer iron pole, and lower the main pillar material of the steel tower member on each arm. The upper and lower two parts of the above are fixed, each arm of each outer iron pole is raised to raise the steel tower member from the ground to a certain height, and the steel tower member following this is connected to the lower end of this steel tower member to assemble them. A steel tower ground assembly method characterized by repeatedly assembling a steel tower.
【請求項4】 適宜の基盤上に間隔を開けて複数本の外
鉄柱を立設し、これらの各外鉄柱に、当該外鉄柱に沿っ
て昇降自在な腕部を複数本の外鉄柱間の中心にほぼ向け
て設け、またこれらの各腕部は複数本の外鉄柱間の中心
方向に突出自在とし、これらの各腕部を昇降及び水平移
動させる適宜の駆動装置を設け、さらに上記各腕部の先
端には鉄塔部材を把持自在な把持部を設けたことを特徴
とする、鉄塔地上組立て装置。
4. A plurality of outer iron pillars are erected on a proper base with a space provided therebetween, and an arm portion that can be raised and lowered along the outer iron pillars is provided between each of the outer iron pillars. Provided substantially toward the center, each of these arm portions is allowed to project in the direction of the center between the plurality of outer iron columns, and an appropriate drive device for raising and lowering and horizontally moving each of these arm portions is provided. A steel tower ground assembling apparatus, characterized in that a gripping portion capable of gripping a steel tower member is provided at the tip of the section.
【請求項5】 適宜の基盤上に水平枠体を設け、この水
平枠体に夫々の下端を接続した四本の外鉄柱を立設し、
これらの各外鉄柱に当該外鉄柱に沿って昇降自在な腕部
を四本の外鉄柱間の中心にほぼ向けて設け、またこれら
の各腕部は四本の外鉄柱間の中心方向に突出自在とし、
これらの各腕部を昇降及び水平移動させる適宜の駆動装
置を設け、さらに上記各腕部の先端上下部には鉄塔部材
を把持自在な把持部を夫々設けたことを特徴とする、鉄
塔地上組立て装置。
5. A horizontal frame body is provided on an appropriate base, and four outer iron pillars each having a lower end connected to the horizontal frame body are erected.
Each of these outer iron pillars is provided with an arm that can be raised and lowered along the outer iron pillar approximately toward the center between the four outer iron pillars, and each of these arm portions projects toward the center between the four outer iron pillars. Freedom,
An appropriate drive device for raising and lowering and horizontally moving each of these arm portions is provided, and further, gripping portions capable of gripping a steel tower member are provided at upper and lower ends of the respective arm portions, respectively. apparatus.
JP6183091A 1994-07-13 1994-07-13 Steel tower ground assembly method and its equipment Expired - Lifetime JP2691971B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6183091A JP2691971B2 (en) 1994-07-13 1994-07-13 Steel tower ground assembly method and its equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6183091A JP2691971B2 (en) 1994-07-13 1994-07-13 Steel tower ground assembly method and its equipment

Publications (2)

Publication Number Publication Date
JPH0828096A true JPH0828096A (en) 1996-01-30
JP2691971B2 JP2691971B2 (en) 1997-12-17

Family

ID=16129607

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6183091A Expired - Lifetime JP2691971B2 (en) 1994-07-13 1994-07-13 Steel tower ground assembly method and its equipment

Country Status (1)

Country Link
JP (1) JP2691971B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002106207A (en) * 2000-10-02 2002-04-10 Tohoku Electric Power Co Inc Steel tower raising construction method by slide steel structure and device for the same
JP2003035052A (en) * 2001-07-26 2003-02-07 Yurtec Corp Gripper for steel-pipe steel tower and device with it
KR101337125B1 (en) * 2011-10-11 2013-12-06 육영성 Earthquake-resistant system
KR101372294B1 (en) * 2013-03-27 2014-03-11 대림산업 주식회사 Lifting method for meteorological mast using jacking system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4826615A (en) * 1971-08-10 1973-04-07
JPS4919147A (en) * 1972-06-14 1974-02-20

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4826615A (en) * 1971-08-10 1973-04-07
JPS4919147A (en) * 1972-06-14 1974-02-20

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002106207A (en) * 2000-10-02 2002-04-10 Tohoku Electric Power Co Inc Steel tower raising construction method by slide steel structure and device for the same
JP2003035052A (en) * 2001-07-26 2003-02-07 Yurtec Corp Gripper for steel-pipe steel tower and device with it
KR101337125B1 (en) * 2011-10-11 2013-12-06 육영성 Earthquake-resistant system
KR101372294B1 (en) * 2013-03-27 2014-03-11 대림산업 주식회사 Lifting method for meteorological mast using jacking system

Also Published As

Publication number Publication date
JP2691971B2 (en) 1997-12-17

Similar Documents

Publication Publication Date Title
US6868646B1 (en) Method and means for erecting a wind energy tower
JP2005042313A (en) Tower structure assembling method and tower structure assembling apparatus
BR112019005699B1 (en) METHOD AND EQUIPMENT TO REPLACE WIND TURBINE COMPONENTS
JP3732414B2 (en) Method and apparatus for constructing tower structure
JP2691971B2 (en) Steel tower ground assembly method and its equipment
JPH10218563A (en) Installing method of tie rod of tower jig crane and device thereof
JP4143517B2 (en) Construction method of tower structure
JP2579715B2 (en) External tower crane
JPH10205429A (en) Construction method for wind power generator
JP2002004635A (en) Device for assembling steel pipe column
CN112850452A (en) Transformer mounting structure and construction method thereof
JP2002294633A (en) Method and device for constructing arch-shaped structural body
JPH09242191A (en) Construction of large span structure
JP4310583B2 (en) Steel tower lifting device
JP2002106207A (en) Steel tower raising construction method by slide steel structure and device for the same
JPH1088786A (en) Scaffold for columnar structure
JP2572642B2 (en) Scaffolding disassembly method
JP3128178B2 (en) How to build a tent frame
CN112695996B (en) Self-climbing device in elevator shaft and construction method thereof
JPS6213474B2 (en)
JPH10219629A (en) Windproof and snowproof fence with spike and its folding and erecting method
JPH11411A (en) Structure for safety net
CN116876350A (en) Bridge arch rib erection method and equipment
JP2607384B2 (en) Scaffold assembly and disassembly methods
JPH05311868A (en) Pillar reinforcement structure in temporarily installed beam assembly device for building construction

Legal Events

Date Code Title Description
FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090905

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 12

Free format text: PAYMENT UNTIL: 20090905

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100905

Year of fee payment: 13

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110905

Year of fee payment: 14

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 14

Free format text: PAYMENT UNTIL: 20110905

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120905

Year of fee payment: 15

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 15

Free format text: PAYMENT UNTIL: 20120905

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 16

Free format text: PAYMENT UNTIL: 20130905

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140905

Year of fee payment: 17

EXPY Cancellation because of completion of term