JPH08277008A - Catching and collecting device of dust scattered from outdoor storage yard - Google Patents

Catching and collecting device of dust scattered from outdoor storage yard

Info

Publication number
JPH08277008A
JPH08277008A JP8300995A JP8300995A JPH08277008A JP H08277008 A JPH08277008 A JP H08277008A JP 8300995 A JP8300995 A JP 8300995A JP 8300995 A JP8300995 A JP 8300995A JP H08277008 A JPH08277008 A JP H08277008A
Authority
JP
Japan
Prior art keywords
mound
dust
storage yard
dusts
powders
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP8300995A
Other languages
Japanese (ja)
Inventor
Yoshimitsu Murahashi
喜満 村橋
Kazutoshi Toyowaka
和利 豊若
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Nippon Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Corp filed Critical Nippon Steel Corp
Priority to JP8300995A priority Critical patent/JPH08277008A/en
Publication of JPH08277008A publication Critical patent/JPH08277008A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Fencing (AREA)

Abstract

PURPOSE: To reduce blowing and scattering of dusts due to wind and to improve efficiency for catching and collecting scattered dusts by providing a mound having an inclined surface by specified times more than the height of a pile between a storage yard having a massive pile of fluid mixtures and a city area and arranging a through-hole shutting off body, for instance a net, on its surface. CONSTITUTION: In an outdoor storage yard 1, massive coals having a mixture of coals and powders are piled and coal piles 5a to 5c each having a height (h) are formed at the intervals of about 4h to 6h(m). A mound 8 composed of blast furnace slags is provided between a city area 7 and the coal pile 5c. The height of the mound is set to the range of 1 to 1.5 times higher than the heights (h) of the coal piles 5a to 5c. By setting a flow passage for powders and dusts 6 scattered by an air current after being blown up from the coal piles 5a to 5c via the inclined surface 8t of the mound 8, the powders and dusts 6 are caught and collected by net fences 9a to 9n erected in the mound 8. By simultaneously reducing the speed of an air current 4, the scattering quantities of the powders and dusts 6 to the city area 7 are reduced.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、鉱石、石炭等の粉体混
合の塊粒体を野外貯蔵ヤードに貯蔵した場合に、風によ
って飛散した粉体を該ヤードと市街地間で捕集し、野外
貯蔵ヤード周辺の地域環境を改善するための野外貯蔵ヤ
ードからの飛散粉塵の捕集設備に関するものである。
BACKGROUND OF THE INVENTION The present invention, when agglomerates of powder mixture of ores, coal, etc. are stored in an outdoor storage yard, the powder scattered by wind is collected between the yard and the urban area, The present invention relates to a facility for collecting scattered dust from an outdoor storage yard to improve the local environment around the outdoor storage yard.

【0002】[0002]

【従来の技術】従来、鉱石、石炭等の粉体混合の塊粒体
原料を野外貯蔵ヤードに貯蔵した場合に、風によって飛
散し粉塵が市街地まで飛散して、この野外貯蔵ヤード周
辺の地域環境を損なうことから、種々の粉塵対策が講じ
られている。
2. Description of the Related Art Conventionally, when an agglomerated raw material of powder mixture of ore, coal, etc. is stored in an outdoor storage yard, it is scattered by the wind, dust is scattered to the city area, and the local environment around this outdoor storage yard Therefore, various dust countermeasures have been taken.

【0003】これらの対策としては、(a) 野外貯蔵
ヤード周辺の風速を低減して発塵を少なくする(参考技
術 特開昭58−59105号公報)、(b) 野外貯
蔵ヤードに山積みされた粉体混合の塊粒体に散水して発
塵を少なくする、(c) 野外貯蔵ヤードに山積みされ
た粉体混合の塊粒体に表面に固化剤を散布して発塵を少
なくする、等の方法が一般的に知られている。
As measures against these problems, (a) the wind speed around the outdoor storage yard is reduced to reduce dust generation (reference art: Japanese Patent Laid-Open No. 58-59105), and (b) piles are piled up in the outdoor storage yard. To reduce dust generation by sprinkling water on the powder-mixed agglomerates, (c) To reduce dust generation by spraying a solidifying agent on the surface of the powder-mixed agglomerates piled up in the outdoor storage yard, etc. The method is generally known.

【0004】上記(a)の方法は、図5に示すように、
野外貯蔵ヤード1の擁壁2a,2bの上部にネット、
柵、フェンス等の防風柵3a,3bを立設して、風上側
の防風柵2aにより、通過する風4の流速を減速させ、
これによって、防風柵3aの後流で発生する風の旋回流
の流速をさらに減速して、山5a,5b,5cからの粉
塵6の舞い上がり飛散を減少させるとともに、この防風
柵3bをフィルターとして機能させ、市街地7側に流出
する粉塵量を減少させるようにしたものである。
The above method (a) is performed as shown in FIG.
A net on the retaining walls 2a, 2b of the outdoor storage yard 1,
The windbreak fences 3a and 3b such as fences and fences are erected, and the windflow fence 2a on the windward side slows down the flow velocity of the passing wind 4.
By this, the flow velocity of the swirling flow of the wind generated in the wake of the windbreak fence 3a is further reduced to reduce the dust 6 flying up from the mountains 5a, 5b, 5c, and the windbreak fence 3b functions as a filter. The amount of dust flowing out to the urban area 7 side is reduced.

【0005】しかし、貯蔵ヤードが広い場合には、ネッ
ト、柵、フェンス等の防風柵を広範囲に配設する必要が
あるため、建設コストが増大する。そのため、ネット、
柵、フェンス等の防風柵はできるだけ低くしている場合
が多く、風の流速を低減する効果が小さく、粉塵の捕集
効果も小さいため、十分に満足できるものではない。
However, when the storage yard is large, it is necessary to dispose windproof fences such as nets, fences and fences over a wide area, which increases construction costs. Therefore, the net,
In many cases, windbreak fences such as fences and fences are made as low as possible, and the effect of reducing the flow velocity of the wind is small and the effect of collecting dust is also small, which is not sufficiently satisfactory.

【0006】(b),(c)の方法においては、水、固
化剤等の飛散防止剤を頻繁に散布する必要があり、貯蔵
ヤードが広い場合には、飛散防止剤の散布作業の負担が
大きく、飛散防止剤を大量に用いる必要があり、飛散防
止剤のコスト負担が大きい。また、散水を行うと、使う
時に乾燥させる必要があったり、飛散防止剤の種類によ
っては、貯蔵された塊粒体原料の品位を低下させる恐れ
がある等のいくつかの問題を抱えながら実用されている
のが現状である。
[0006] In the methods (b) and (c), it is necessary to frequently spray the anti-scattering agent such as water and a solidifying agent, and when the storage yard is large, the work of spraying the anti-scattering agent is burdened. Large, it is necessary to use a large amount of anti-scattering agent, and the cost burden of the anti-scattering agent is large. In addition, when water is sprinkled, it is necessary to dry before use, and depending on the type of anti-scattering agent, it may cause deterioration of the quality of the stored agglomerate raw material, and it is practically used while having some problems. Is the current situation.

【0007】[0007]

【発明が解決しようとする課題】本発明は、野外貯蔵ヤ
ードに粉体が混合した塊粒体を山積み貯蔵した場合に、
風による粉塵の舞い上がり飛散を少なくするとともに、
舞い上がり飛散した粉塵の捕集効率を向上し、設備コス
トを大幅低減できる野外貯蔵ヤードの粉塵捕集設備を提
供するものである。
DISCLOSURE OF THE INVENTION The present invention is directed to the case where aggregates in which powders are mixed are piled up and stored in an outdoor storage yard.
While reducing dust flying up and scattering by the wind,
It is intended to provide a dust collection facility for an outdoor storage yard that can improve the efficiency of collecting dust that has risen and scattered, and can significantly reduce facility costs.

【0008】[0008]

【課題を解決するための手段】本発明の第一の発明は、
粒体混合の塊粒体を山積みした貯蔵ヤードと市街地間
に、山積み高さの1〜1.5倍の傾斜面を有するマウン
ドを配設し、このマウンドの表面に、ネット、柵、フェ
ンス等の通孔遮蔽体を配設したことを特徴とする野外貯
蔵ヤードからの飛散粉塵の捕集設備であり、また、第二
の発明は、第一の発明において、通孔遮蔽体に散水管を
付設し、粉塵の飛散量が多いときには簡易遮蔽部に水膜
を形成したり通孔遮蔽体を洗浄したりすることができる
ようにしたことを特徴とする野外貯蔵ヤードからの飛散
粉塵の捕集設備である。
The first invention of the present invention is as follows:
A mound with an inclined surface of 1 to 1.5 times the pile height is placed between a storage yard where piles of mixed granules are piled up and an urban area, and a net, fence, fence, etc. is placed on the surface of this mound. Is a facility for collecting scattered dust from an outdoor storage yard, which is characterized in that a through hole shield is provided, and a second invention is the first invention, wherein a water spray pipe is provided in the through hole shield. When attached, it is possible to form a water film on the simple shielding part and to wash the through-hole shield when the amount of scattered dust is large, to collect scattered dust from the outdoor storage yard. Equipment.

【0009】[0009]

【作用】本発明においては、例えば高炉滓、転炉滓等の
製鉄副生物等により安価に形成できるマウンドによっ
て、風の通る経路を形成してこの経路の粉塵濃度を高
め、この粉塵高濃度領域にネット、柵、フェンス等の通
孔遮蔽体を立設することにより、粉塵の捕集効率を向上
することができる。また、通孔遮蔽体を立設する領域は
野外貯蔵ヤードと市街地間に選択されるため、操業に障
害にならない設置場所を選択できる。また、この通孔遮
蔽体に散水管を付設して通孔遮蔽部に水膜を形成させれ
ば、粉塵捕集効率を一段とに向上させるとともに、この
通孔遮蔽体を洗浄して通孔の詰まりを防止することがで
き、長期間にわたってこの通孔遮蔽体の機能を維持する
ことができる。
In the present invention, a mound that can be formed at a low cost by, for example, a steelmaking by-product such as a blast furnace slag or a converter slag forms a path through which wind passes to increase the dust concentration of this path, and this dust high concentration region By arranging a through-hole shield such as a net, a fence, or a fence, the dust collection efficiency can be improved. In addition, since the area where the through-hole shield is erected is selected between the outdoor storage yard and the urban area, it is possible to select an installation location that does not hinder the operation. If a water pipe is attached to this through-hole shield to form a water film on the through-hole shield, the dust collection efficiency will be further improved, and this through-hole shield will be washed to remove the through-hole. It is possible to prevent clogging and maintain the function of the through hole shield for a long period of time.

【0010】本発明者等は、野外貯蔵ヤードに粉体が混
合した塊粒体を山積み貯蔵した場合に、ネット、柵、フ
ェンス等の防風柵を立設して、風による粉塵の舞い上が
り飛散を抑制する前記従来の方法をベースとして、舞い
上がり飛散した粉塵をより効率的でかつ低コストで捕集
できる方法を得るため、実験、数値解析を重ね、風の経
路を作り、舞い上がり飛散した粉塵をこの経路に集め、
この高濃度化した粉塵を狭い領域で捕集することを着想
し本発明を完成するに至った。
The inventors of the present invention installed windproof fences, such as nets, fences, and fences, to prevent dust from flying up and scattering when piles of agglomerates mixed with powder were stored in an outdoor storage yard. Based on the above-mentioned conventional method of suppressing, in order to obtain a method that can collect dust flying up and scattering more efficiently and at low cost, repeat experiments, numerical analysis, create a wind path, and collect dust flying up Collect on the route,
The present invention has been completed based on the idea of collecting this highly concentrated dust in a narrow area.

【0011】本発明では、図1に示すように、野外貯蔵
ヤード1と市街地間7に、傾斜面8tを有するマウンド
8を形成し、ここに粉塵6を集めて高濃度化する経路を
形成する。例えば矢印の方向からの風4により貯蔵ヤー
ド1の各山5a,5b,5cから粉塵6が舞い上がり飛
散し風の流れに乗ってマウンド8方向に流動する。この
粉塵は自重作用により少しづつ落下するが、マウンドの
斜面8tの影響をうけ上向いた気流の流れに乗り、再び
上昇する。
In the present invention, as shown in FIG. 1, a mound 8 having an inclined surface 8t is formed between the outdoor storage yard 1 and the urban area 7, and a path for collecting the dust 6 and increasing the concentration is formed there. . For example, the wind 4 from the direction of the arrow causes dust 6 to fly up from the mountains 5a, 5b, and 5c of the storage yard 1 and scatter and fly along the wind to flow toward the mound 8. The dust gradually falls due to its own weight, but it is influenced by the slope 8t of the mound and rides in the upward flow of the airflow, and rises again.

【0012】次に、この上昇気流は、マウンドの斜面8
tを越えようとする気流の流れと、次々に合流するた
め、上昇した粉塵もこのマウンドの頂上に向かうにした
がって、さらに合流を続け粉塵の濃度の高い経路が形成
される。
Next, the ascending air current is directed to the slope 8 of the mound.
Since the flow of the air flow that tries to exceed t merges with each other one after another, the rising dust particles also continue to merge with each other toward the top of the mound to form a path having a high dust concentration.

【0013】そこで、このマウンド8の傾斜面8t、頂
部8oに形成される粉塵高濃度経路にネット、柵、ネッ
トフェンス等の通孔遮蔽体9a,9b,9cを立設し、
この通孔遮蔽体で高濃度化した粉塵を捕集する。
Therefore, through-hole shields 9a, 9b, 9c such as nets, fences and net fences are erected on the dust high-concentration route formed on the inclined surface 8t and the top portion 8o of the mound 8,
The high density dust is collected by this through hole shield.

【0014】つまり、本発明では、風4により野外貯蔵
ヤード1から舞い上がり飛散している粉塵6をマウンド
8効果で狭い経路(領域)に集め、ここに通孔遮蔽体9
a〜9cを立設して粉塵を効率的に捕集し、市街地7へ
の飛散量を少なくするすることを特徴としている。この
マウンドは、低すぎると飛散粉塵がマウンドを越えてし
まい捕集できなくなる。また、高すぎると設備コストが
増大する。マウンドの高さHは、これらのことに建設場
所の地形や気象条件を考慮して決めるが、貯蔵ヤードの
山の高さをhとすれば1h〜1.5hの範囲にすること
が望ましい。
That is, according to the present invention, the dust 6 flying up from the outdoor storage yard 1 by the wind 4 and scattered is collected in a narrow path (region) by the mound 8 effect, and there is a through hole shield 9 there.
It is characterized in that a to 9c are installed upright to efficiently collect dust and reduce the amount of scattering to the city area 7. If this mound is too low, scattered dust will go over the mound and cannot be collected. If it is too high, the equipment cost will increase. Although the height H of the mound is determined in consideration of the topography of the construction site and the weather conditions, it is preferable that the height H of the mountain in the storage yard is in the range of 1 h to 1.5 h.

【0015】また、マウンドの斜面の勾配は緩過ぎると
風に対する抵抗が小さく、斜面効果すなわち粉塵の高濃
度化作用が小さくなり、捕集効率が低くなる。勾配が急
過ぎると風の流れがマウンドの前で大きく乱れ、粉塵が
広範囲に拡散してしまい、粉塵の高濃度化作用が小さく
なり、捕集効率が低くなる。このようなことを勘案する
と、このマウンドの勾配θは、20〜30度にすること
が望ましい。
Further, if the slope of the slope of the mound is too gentle, the resistance to wind is small, the slope effect, that is, the effect of increasing the concentration of dust is small, and the collection efficiency is low. If the gradient is too steep, the wind flow will be greatly disturbed in front of the mound, and the dust will spread over a wide area, reducing the effect of increasing the dust concentration and reducing the collection efficiency. Considering this, it is desirable that the mound gradient θ be 20 to 30 degrees.

【0016】このマウンドの配置位置については、貯蔵
対象、貯蔵条件、市街地までの距離、粉塵の舞い上がり
と飛散距離等に大きな影響を与える気象の変動等を考慮
して決める。例えば鉱石、石炭を貯蔵対象とする貯蔵ヤ
ードの場合、貯蔵ヤードの最終発塵点(最終の山裾)か
ら10〜40h(m)程度離れた位置に配設すれば、十
分な効果が得られる。遠過ぎると、マウンドによる粉塵
の捕集効果が少なく、粉塵が広範囲に着地してしまい再
飛散量が増加する。
The location of the mound is determined in consideration of the storage object, storage conditions, distance to the city area, fluctuations in weather that greatly affect dust flying and scattering distance, and the like. For example, in the case of a storage yard that stores ore or coal, a sufficient effect can be obtained by disposing the storage yard at a position about 10 to 40 h (m) away from the final dust generation point (final mountain hem) of the storage yard. If it is too far, the mound's dust collection effect will be small, and the dust will land on a wide area, increasing the amount of re-scattering.

【0017】なお、このマウンドの配設幅は市街地の範
囲に応じて決めるが、複数のマウンドを並設して配設幅
を確保してもよい。
Although the width of the mounds is determined according to the area of the city, a plurality of mounds may be arranged side by side to secure the width of the mounds.

【0018】この場合には、マウンドによって上空に舞
い上った気流は、マウンドの後流で渦を形成し、5〜1
5h(m)の地点で地面に着地することから、5〜15
h(m)以上の間の間隔で並置することが効果的であ
る。また、このマウンドは、設備コスト面では少ない範
囲に配設することが望ましいが、捕集効率を重視する場
合には、貯蔵ヤードから市街地方向に直列に複数配設す
ることも考慮する。
In this case, the air flow that has flown upwards by the mound forms a vortex in the wake of the mound, and the air flow is 5 to 1
Since it lands on the ground at the point of 5h (m), 5-15
It is effective to juxtapose at intervals of h (m) or more. Further, it is desirable that the mounds are arranged in a small range in terms of equipment cost, but if importance is attached to the collection efficiency, it is also considered to arrange a plurality of mounds in series from the storage yard toward the city area.

【0019】次に、マウンドに立設する通孔遮蔽体は、
粉塵の拡散抑制、捕集の効率化の観点から通孔率は45
〜75%が好ましく、マウンドの斜面および頂部面にほ
ぼ直角に立設することが望ましい。また、高さは高い
程、粉塵捕集効果が大きくなるが、0.1〜0.2h
(m)あれば十分である。また、マウンドに立設する通
孔遮蔽体の立設範囲は、マウンドの粉塵が飛んで側の全
表面範囲とする。この通孔遮蔽体を立設する場合は、通
孔遮蔽面が貯蔵ヤードに対して対向するように並列配置
し、貯蔵ヤードに対して直列に複数配置することが望ま
しい。
Next, the through-hole shield standing on the mound is
From the viewpoint of suppressing the diffusion of dust and improving the efficiency of collection, the porosity is 45
˜75% is preferable, and it is desirable that the mound is erected substantially at right angles to the slope and the top surface. Also, the higher the height, the greater the dust collection effect, but 0.1 to 0.2 h
(M) is sufficient. Further, the standing range of the through hole shield standing on the mound is the entire surface area on the side where the dust of the mound flies. When this through-hole shield is erected, it is desirable to arrange the through-hole shields in parallel so that the through-hole shield surfaces face the storage yard, and to arrange a plurality of them in series with the storage yard.

【0020】なお、この通孔遮蔽体9a〜9cに,図2
に示すように散水管10を付設し、通孔遮蔽部に連続的
あるいは間欠的に水膜11を形成できるようにすれば、
捕集効率をさらに向上するとともに、この通孔遮蔽体を
洗浄して通孔の詰まりを防止することができ、長期間に
わたってこの通孔遮蔽体の機能を維持することができ
る。
The through-hole shields 9a to 9c are shown in FIG.
If a sprinkler pipe 10 is attached as shown in FIG. 2 and the water film 11 can be formed continuously or intermittently in the through hole shielding part,
In addition to further improving the collection efficiency, the through hole shield can be washed to prevent clogging of the through hole, and the function of the through hole shield can be maintained for a long period of time.

【0021】[0021]

【実施例】以下に本発明を、図3に示す本発明を実施す
る設備構成例とともに説明する。この実施例は、本発明
を野外貯炭ヤードにおいて適用した場合のものである。
図3において、1は野外貯蔵ヤードで、ここには、粉炭
が混合した塊粒状の石炭が山積みされ、3つ石炭の山5
a,5b,5cがほぼ4h〜6h(m)間隔に形成され
ている。7は市街地で、この市街地と貯蔵ヤード1の石
炭山5cとの間には、高炉滓、転炉滓、盛土によるマウ
ンド8がに配設されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below together with an example of equipment configuration for carrying out the present invention shown in FIG. This example is a case where the present invention is applied to an outdoor coal storage yard.
In FIG. 3, reference numeral 1 denotes an outdoor storage yard, in which lump-grained coal mixed with pulverized coal is piled up, and three piles of coal 5
a, 5b, 5c are formed at intervals of approximately 4h to 6h (m). 7 is an urban area, and between this urban area and the coal pile 5c of the storage yard 1, a blast furnace slag, a converter slag, and a mound 8 for embankment are arranged.

【0022】このマウンド8の斜面8tと頂部8oに
は、図4に示すように、上部に散水孔10oを有する散
水管10を配設した複数のネットフェンス(通孔遮蔽
体)9a〜9nが、そのフェンス面を貯蔵ヤード1側に
対向するように立設されており、散水管10は、水道管
(図示省略)に連結されており、水道管の弁操作により
散水管10から散水して、ネットフェンス9a〜9n表
面に水膜11を形成し、飛散粉塵6の捕集効率を向上さ
せるとともに、ネットフェンス9a〜9n無人洗浄し、
通孔の詰まりを防止してこの通孔遮蔽体の機能を維持す
る。
As shown in FIG. 4, a plurality of net fences (through hole shields) 9a to 9n provided with a water spray pipe 10 having a water spray hole 10o on the upper portion thereof are provided on the slope 8t and the top 8o of the mound 8. , The fence surface is erected so as to face the storage yard 1 side, and the sprinkler pipe 10 is connected to a water pipe (not shown), and water is sprinkled from the sprinkler pipe 10 by operating the valve of the water pipe. , Forming a water film 11 on the surface of the net fences 9a to 9n to improve the efficiency of collecting the scattered dust 6, and to perform unattended cleaning of the net fences 9a to 9n,
The clogging of the through hole is prevented and the function of this through hole shield is maintained.

【0023】このように構成した本発明においては、風
4によって貯蔵ヤード1の各石炭山5a〜5nから舞い
上がりマウンド8方向に風(気流)に乗って飛散してく
る粉塵6の流路を、マウンドの斜面8tを経由するよう
に形成することができ、風(気流)4に乗って飛散して
くる粉塵6をこのマウンド8に立設したネットフェンス
9a〜9nにより捕集する(落下させる)ことができ、
同時に風(気流)4の流速を減速することができるの
で、市街地7まで飛散する粉塵6の量を大幅に減少させ
ることができる。なお、マウンドおよびネットフェンス
で捕集され堆積した粉塵量が増加して再飛散の恐れがあ
るときは、必要に応じて捕集粉塵の排除処理を行う。
In the present invention constructed as described above, the flow path of the dust 6 flying up from the coal mountains 5a to 5n of the storage yard 1 by the wind 4 and flying along the wind (air flow) in the direction of the mound 8, It can be formed so as to pass through the slope 8t of the mound, and the dust 6 scattered on the wind (air flow) 4 is collected (falls) by the net fences 9a to 9n standing on the mound 8. It is possible,
At the same time, the flow velocity of the wind (air flow) 4 can be reduced, so that the amount of dust 6 scattered to the city area 7 can be greatly reduced. If the amount of dust collected and accumulated by the mound and net fence increases and there is a risk of re-scattering, the collected dust is removed as necessary.

【0024】この実施例では、ネットフェンス9a〜9
fの上部に散水管10を配置して、散水し、この通孔遮
蔽体表面に水膜11を形成するようにしているので、粉
塵捕集効率を一段と向上させることができる。なお、本
発明は、この実施例に限定されるものではない。例えば
石炭に限らず、各種の鉱石を貯蔵対象としても適用が可
能である。また、マウンドは、一基に限らず複数でもよ
く、市街地の方向、距離等に応じてその配置を決めるも
のであり、複数方向に粉塵捕集機能を有するように配置
することもある。通孔遮蔽体は、ネットフェンスに限ら
ず柵あるいは、樹木等を用いても類似的効果が得られ
る。
In this embodiment, the net fences 9a-9
Since the water sprinkling pipe 10 is arranged on the upper part of f to sprinkle water and form the water film 11 on the surface of the through-hole shield, the dust collection efficiency can be further improved. The present invention is not limited to this embodiment. For example, not only coal but also various ores can be applied as storage targets. Further, the mound is not limited to one group, and a plurality of mounds may be arranged depending on the direction, distance, etc. of the city, and may be arranged so as to have a dust collecting function in a plurality of directions. The through-hole shield is not limited to the net fence, but a similar effect can be obtained by using a fence or a tree.

【0025】このように、本発明は上記実施例に限られ
るものではなく、貯蔵対象、貯蔵配置、貯蔵ヤードと市
街地の位置関係(方向と距離)、気象条件等に応じて、
前記請求項1および請求項2の範囲を越えない範囲内で
設備の配置、構造、規模等は変更されるものである。
As described above, the present invention is not limited to the above-mentioned embodiment, but may be changed depending on the storage object, the storage arrangement, the positional relationship (direction and distance) between the storage yard and the city area, the weather conditions, etc.
The arrangement, structure, scale, etc. of the equipment are changed within the range not exceeding the scopes of claims 1 and 2.

【0026】[0026]

【発明の効果】本発明においては、盛り土により安価に
形成できるマウンドによって、風の通る経路を形成して
この経路の粉塵濃度を高め、この粉塵高濃度領域にネッ
ト、柵、フェンス等の通孔遮蔽体を立設することによ
り、粉塵の捕集効率を向上することができる。また立設
する領域は野外外貯蔵ヤードと市街地間に選択されるた
め、設備コストを大幅に低減できる。また、この通孔遮
蔽体に散水管を付設して通孔遮蔽部に水膜を形成させれ
ば、粉塵捕集効率を一段とに向上させるとともに、この
通孔遮蔽体を無人洗浄して通孔の詰まりを防止すること
ができ長期間にわたってこの通孔遮蔽体の機能を維持す
ることができる。
According to the present invention, a mound that can be formed at a low cost by embankment forms a path through which the wind passes to increase the dust concentration of this path, and the high concentration area of dust has holes such as nets, fences, and fences. By erecting the shield, the dust collection efficiency can be improved. Moreover, since the area to be erected is selected between the outdoor storage yard and the urban area, the equipment cost can be significantly reduced. If a water pipe is attached to the through-hole shield to form a water film on the through-hole shield, the dust collection efficiency will be further improved, and the through-hole shield will be washed unattended. Can be prevented and the function of the through hole shield can be maintained for a long period of time.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の構成の概念を説明するための設備とそ
の配置例を示す側面概要説明図。
FIG. 1 is a side schematic explanatory view showing equipment and an example of arrangement thereof for explaining the concept of the configuration of the present invention.

【図2】本発明で用いる通孔遮蔽体例とその作用を示す
側面概要説明図。
FIG. 2 is a side schematic explanatory view showing an example of a through-hole shield used in the present invention and its action.

【図3】本発明の実施例を示す平面概要説明図、(b)
図は、(a)図の側面概要説明図。
FIG. 3 is a schematic plan view showing an embodiment of the present invention, (b)
The figure is a schematic side view of FIG.

【図4】図3におけるネットフェンスの正面拡大概要説
明図。
FIG. 4 is an enlarged schematic front view of the net fence in FIG.

【図5】公知の粉塵飛散対策例を示す側面拡大概要説明
図。
FIG. 5 is a side enlarged schematic explanatory view showing an example of a known dust scattering countermeasure.

【符号の説明】[Explanation of symbols]

1 :野外貯蔵ヤード 2a,2b:擁壁 3a,3b:防風柵 4 :風 5a〜5c:山 6 :粉塵 7 :市街地 8 :マウンド 8t:前部傾斜面面 8o:頂部 9a〜9n:通孔遮蔽体(ネットフェンス) 10 :散水管 10o:散水孔 11 :水膜 1: Outdoor storage yard 2a, 2b: Retaining wall 3a, 3b: Windbreak fence 4: Wind 5a-5c: Mountain 6: Dust 7: Urban area 8: Mound 8t: Front slope surface 8o: Top 9a-9n: Through hole Shield (net fence) 10: Sprinkler pipe 10o: Sprinkler hole 11: Water film

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 粒体混合の塊粒体を野外に山積みした貯
蔵ヤードと市街地間に、山積み高さの1〜1.5倍の高
さに形成された傾斜面を有するマウンドを配設し、この
マウンドの表面に、ネット、柵、フェンス等の通孔遮蔽
体を立設したことを特徴とする野外貯蔵ヤードからの飛
散粉塵の捕集設備
1. A mound having an inclined surface formed at a height of 1 to 1.5 times the pile height is provided between a storage yard in which piles of mixed granules are piled outdoors and an urban area. , A facility for collecting scattered dust from an outdoor storage yard, characterized in that a through-hole shield such as a net, fence or fence is erected on the surface of this mound.
【請求項2】 請求項1において、通孔遮蔽体に散水管
を付設したことを特徴とする野外貯蔵ヤードからの飛散
粉塵の捕集設備。
2. The facility for collecting scattered dust from an outdoor storage yard according to claim 1, wherein a sprinkler pipe is attached to the through hole shield.
JP8300995A 1995-04-07 1995-04-07 Catching and collecting device of dust scattered from outdoor storage yard Withdrawn JPH08277008A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8300995A JPH08277008A (en) 1995-04-07 1995-04-07 Catching and collecting device of dust scattered from outdoor storage yard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8300995A JPH08277008A (en) 1995-04-07 1995-04-07 Catching and collecting device of dust scattered from outdoor storage yard

Publications (1)

Publication Number Publication Date
JPH08277008A true JPH08277008A (en) 1996-10-22

Family

ID=13790258

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8300995A Withdrawn JPH08277008A (en) 1995-04-07 1995-04-07 Catching and collecting device of dust scattered from outdoor storage yard

Country Status (1)

Country Link
JP (1) JPH08277008A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6986624B1 (en) * 2004-06-30 2006-01-17 Tabler Ronald D Porous tubular device and method for controlling windblown particle stabilization deposition and retention
US7097385B2 (en) 2004-09-29 2006-08-29 Tabler Ronald D Tetrapod control device and method for stabilizing, depositing and retaining windblown particles
JP2018188809A (en) * 2017-04-28 2018-11-29 五洋建設株式会社 Soundproof wall for construction work site
CN112482885A (en) * 2020-11-03 2021-03-12 广东亨利达环保科技有限公司 Construction site dust raising control method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6986624B1 (en) * 2004-06-30 2006-01-17 Tabler Ronald D Porous tubular device and method for controlling windblown particle stabilization deposition and retention
US7048474B2 (en) 2004-06-30 2006-05-23 Tabler Ronald D Apparatus and method for efficiently fabricating, dismantling and storing a porous tubular windblown particle control device
US7097385B2 (en) 2004-09-29 2006-08-29 Tabler Ronald D Tetrapod control device and method for stabilizing, depositing and retaining windblown particles
JP2018188809A (en) * 2017-04-28 2018-11-29 五洋建設株式会社 Soundproof wall for construction work site
CN112482885A (en) * 2020-11-03 2021-03-12 广东亨利达环保科技有限公司 Construction site dust raising control method

Similar Documents

Publication Publication Date Title
JP2001207431A (en) Debris flow disaster protection dam
CN101487357A (en) Wind-proof dust-suppression method for open bulk materials stacking field, and its wind-proof dust-suppression net and use
CN105102719B (en) Apparatus and method for controlling atmosphere pollution
Moore et al. Historic littoral cones in Hawaii
JPH08277008A (en) Catching and collecting device of dust scattered from outdoor storage yard
Sæbø et al. Urban forestry and pollution mitigation: 8
CN111401715A (en) Aviation accurate fire extinguishing assessment method and assessment system thereof
CN209017513U (en) A kind of afforestation guard system
CN106368672B (en) Coal dust capturing device and method suitable for coal bed gas well aerodynamic cave
Zhang et al. Engineering measures to control windblown sand in Shiquanhe Town, Tibet
RU2741294C1 (en) Method for funnel-shaped pit ventilation
CN209260856U (en) A kind of automatic diverter of rain leader downspout initial rainwater
CN2460552Y (en) Ventilation-type down ventilation guide board
CN113713894A (en) Dregs breaker with dust removal function
Zhonglong et al. Research on prevention of snow-drifts by blower fences
CN113027452A (en) Multi-stage multi-dimensional atomized dust prevention and control method and device for large-mining-height fully-mechanized coal mining face
Van Jaarsveld Characterising and mapping of wind transported sediment associated with opencast gypsum mining
JPS6031413A (en) Windbreak fence
CN213161774U (en) Grain screening machine
CN221546576U (en) Dustproof fence
CN207525858U (en) A kind of ornamental and afforestation trees proof mechanism of water
CN208340345U (en) A kind of wind-proof dust-suppression device of Fang Mountain peach european bird cherry blade face groined type groove microstructure
JPS6123126B2 (en)
JPS6139244B2 (en)
Poppema The effect of buildings on the morphological development of the beach-dune system: Literature report

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20020702