JPH08257487A - Method for supplying coating material in steel sheet coating line - Google Patents
Method for supplying coating material in steel sheet coating lineInfo
- Publication number
- JPH08257487A JPH08257487A JP9188795A JP9188795A JPH08257487A JP H08257487 A JPH08257487 A JP H08257487A JP 9188795 A JP9188795 A JP 9188795A JP 9188795 A JP9188795 A JP 9188795A JP H08257487 A JPH08257487 A JP H08257487A
- Authority
- JP
- Japan
- Prior art keywords
- paint
- amount
- coating material
- coating
- amt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Coating Apparatus (AREA)
- Application Of Or Painting With Fluid Materials (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】この発明は、厚鋼板等にスプレー
塗装を施す塗装ラインにおいて、塗装装置へ常に適正量
の塗料を供給することが可能な塗料供給方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a coating material supply method capable of constantly supplying an appropriate amount of coating material to a coating device in a coating line for spraying thick steel plates and the like.
【0002】[0002]
【従来の技術】厚鋼板等にスプレー塗装を施す塗装ライ
ン(例えばプライマーライン)は、図2にその概要を示
すごとく、テーブルローラ2からなる鋼板搬送ライン1
の上方にスプレー塗装装置3が設置され、この塗装装置
に塗料供給タンク4内の塗料がポンプ5にて供給され、
搬送ライン1上の鋼板6に一枚ずつ塗装が施されるよう
になっている。2. Description of the Related Art A coating line (for example, a primer line) for spraying thick steel plates is shown in FIG.
A spray coating device 3 is installed above, and the paint in the paint supply tank 4 is supplied to this coating device by a pump 5.
The steel plates 6 on the transfer line 1 are coated one by one.
【0003】その塗装手順について簡単に説明すると、
今回塗装を施す鋼板(被塗装鋼板)の仕様(塗布面積、
塗膜厚、塗料原単位等)から必要塗料量を計算して求
め、その量の塗料を塗料供給タンク4に供給する。しか
る後、スプレー塗装装置3にて搬送ライン1上の鋼板6
に対し一枚ずつ塗装を施していく。その後、操業終了近
くになると、操業中に発生する塗料のチップ詰りやオー
バースプレー、あるいは操業に先立って行う試し吹き等
の実施により塗料供給タンク4内の塗料が前記必要塗料
量より少なくなっており、今回予定した鋼板をすべて塗
装するには塗料が不足するため、再度塗料供給タンク内
に塗料を供給し、残りの未塗装鋼板に塗装を施してい
る。その際、従来は塗料タンク内の残存塗料量を正確に
判断できないために経験に基づいてオペレーターが判断
して塗料を供給している。The coating procedure will be briefly described below.
Specifications of the steel plate to be painted this time (painted steel plate) (application area,
The required amount of paint is calculated from the coating film thickness, paint unit, etc.), and that amount of paint is supplied to the paint supply tank 4. After that, the steel plate 6 on the transfer line 1 is sprayed by the spray coating device 3.
I will paint one by one. Then, near the end of the operation, the amount of paint in the paint supply tank 4 becomes less than the required amount due to chip clogging and overspray of the paint generated during the operation, or trial spraying performed prior to the operation. Since there is not enough paint to paint all the steel plates planned this time, paint is supplied again to the paint supply tank and the remaining unpainted steel plates are painted. At that time, conventionally, the amount of the remaining paint in the paint tank cannot be accurately determined, and therefore the operator supplies the paint based on his experience.
【0004】[0004]
【発明が解決しようとする課題】鋼板の塗装ラインにお
いては、上記の通り、今回予定した鋼板をすべて塗装す
るのに、現在塗料供給タンク内に残存している塗料量で
は操業中の塗料のチップ詰りやオーバースプレー、ある
いは試し吹き等の実施により塗料が不足するため、再度
タンク内に塗料を供給する方法がとられるが、再度タン
ク内に塗料を供給する場合に、塗料タンク内の残存塗料
量を正確に判断できないためにその補充塗料量を経験に
基づいてオペレーターが判断して供給する従来の供給方
法では、塗料を過剰に供給してしまう。塗料を過剰に供
給してしまうと、タンク内に残存した塗料は時間の経過
とともに粘度が高くなり固化してしまい使用不可とな
る。As described above, in the steel plate coating line, it is necessary to coat all of the steel plates planned this time, but with the amount of paint currently remaining in the paint supply tank, the chips of the paint in operation The amount of paint remaining in the paint tank can be reduced by supplying paint again to the tank because the paint is insufficient due to clogging, overspraying, or trial spraying. However, in the conventional supply method in which the operator judges the amount of the replenishment paint based on experience and supplies it, the paint is excessively supplied. If the coating material is excessively supplied, the coating material remaining in the tank has a high viscosity and solidifies with the passage of time, and becomes unusable.
【0005】この発明は、従来のこのような実状に鑑み
なされたもので、塗料の過剰供給を防止し塗料を無駄な
く経済的に使用できるようにするために、タンク内の残
存塗料量を的確に把握して常に適切な量の塗料をタンク
に補充できる塗料供給方法を提案しようとするものであ
る。The present invention has been made in view of such a conventional situation, and in order to prevent the excessive supply of the paint and to use the paint economically without waste, the amount of the paint remaining in the tank is accurately determined. Therefore, it is intended to propose a paint supply method capable of always replenishing the tank with an appropriate amount of paint.
【0006】[0006]
【課題を解決するための手段】この発明は、今回予定し
た鋼板をすべて塗装するのに、現在塗料供給タンク内に
残存している塗料量では不足するために再度塗料を供給
する場合に、その不足量を的確に把握し、常に必要最小
限の塗料を塗料タンクに供給し得る方法であり、その要
旨は、搬送テーブル上の鋼板に対し、塗料供給タンク内
の塗料をポンプにて供給してスプレー塗装を施す塗装装
置を備えた鋼板塗装ラインにおいて、今回塗装を施す被
塗装鋼板の仕様(塗布面積、塗膜厚、塗料原単位等)に
基づいて所定枚数の必要塗料量を算出しその量の塗料を
塗料供給タンクに供給し、スプレー塗装開始後、操業途
中または操業終了近くにおいて、塗装が施された鋼板の
枚数から現在までに消費した塗料量を算出し、この消費
塗料量に、操業中の塗料のチップ詰り、オーバースプレ
ー、試し吹き等により生ずる不可避的塗料消費量を加え
た消費塗料量と前記必要塗料量とから塗料供給タンク内
の残存塗料量を求め、その残存塗料量と被塗装鋼板の仕
様(塗布面積、塗膜厚、塗料原単位)に基づいて算出し
た未塗装鋼板の必要塗料量とから不足塗料量を求め、そ
の不足塗料分をタンクに供給し補充することを特徴とす
るものである。SUMMARY OF THE INVENTION The present invention is applied to the case where all the steel sheets planned this time are to be painted, but the paint is supplied again because the amount of paint remaining in the paint supply tank is insufficient. It is a method that can accurately grasp the shortage amount and always supply the minimum necessary paint to the paint tank.The point is that the paint in the paint supply tank is pumped to the steel plate on the transport table. In a steel plate coating line equipped with a spraying device that performs spray coating, calculate the required number of required paints based on the specifications (coating area, coating thickness, paint unit, etc.) of the steel plate to be coated this time. The above paint is supplied to the paint supply tank, and after the start of spray painting, the amount of paint consumed up to the present is calculated from the number of coated steel plates during or near the end of operation, and the amount of paint consumed During ~ The amount of paint remaining in the paint supply tank is calculated from the amount of paint consumed including the amount of paint inevitable that is inevitable due to paint clogging, overspray, test spraying, etc., and the amount of paint remaining and the steel sheet to be coated It is characterized in that the insufficient paint amount is obtained from the required paint amount of the unpainted steel sheet calculated based on the specifications (application area, coating film thickness, paint unit) and supplies the insufficient paint amount to the tank. It is a thing.
【0007】[0007]
【作用】この発明では、まず、今回塗装を施す被塗装鋼
板の仕様(塗布面積、塗膜厚、塗料原単位等)および塗
装枚数をビジネスコンピューター(上位)に入力し、こ
のビジネスコンピューターからの情報に基づいてプロセ
スコンピューターにてその所定枚数の必要塗料量を計算
し、その必要塗料量をオペレーターがプロセスコンピュ
ーターに入力させておくと同時に、その量を塗料供給タ
ンクに供給する。塗料供給タンク内には、今回塗装を施
す全枚数に対応する量の塗料が貯えられる。In the present invention, first, the specification (application area, coating thickness, paint unit, etc.) of the steel sheet to be coated this time and the number of coatings are input to the business computer (upper level), and information from this business computer is input. Based on the above, the process computer calculates the required amount of the required number of paints, and the operator causes the process computer to input the required amount of the paints, and at the same time, supplies the amount to the paint supply tank. In the paint supply tank, the amount of paint corresponding to the total number of paints to be applied this time is stored.
【0008】搬送テーブル上の鋼板に対し、塗料供給タ
ンク内の塗料がポンプにて供給されて塗装装置にてスプ
レー塗装が開始されると、予めプロセスコンピューター
に登録された順と、下位シーケンサーからのセンサーo
n/offの信号より、プロセスコンピューターが搬送
ライン上における鋼板の位置を求める。この時、未塗装
鋼板と塗装済鋼板の区別は、下位シーケンサーからの塗
装開始/完了信号にて判断する。When the paint in the paint supply tank is supplied to the steel plate on the transport table by the pump and the spray painting is started by the painting device, the order registered in the process computer in advance and the sequence from the lower sequencer Sensor o
From the n / off signal, the process computer determines the position of the steel plate on the transfer line. At this time, the distinction between the unpainted steel plate and the painted steel plate is determined by the painting start / completion signal from the lower sequencer.
【0009】スプレー塗装開始後、操業途中または操業
終了近くになると、残りの未塗装鋼板をすべて塗装する
のに必要な塗料量をプロセスコンピューターにて算出す
る。その際は、まず塗装が施された鋼板の枚数から現在
までに消費した塗料量を算出し、この消費塗料量に、操
業中に他の原因(操業中での塗料のチップ詰り、オーバ
ースプレー、試し吹き等)により生ずる不可避的塗料消
費量を加えた消費塗料量と、今回塗装を施す被塗装鋼板
の仕様(塗布面積、塗膜厚、塗料原単位等)および塗装
枚数から最初に求めた全鋼板の塗装に必要な塗料量とか
ら、現在の塗料供給タンク内の残存塗料量を計算にて求
め、さらに、残りの未塗装鋼板の枚数から当該枚数の鋼
板の塗装に必要な塗料量を計算にて求め、前記残存塗料
量と未塗装鋼板の必要塗料量とを比較し、残存塗料量で
塗装可能な枚数と、ライン上の塗装鋼板をすべて塗装す
るのに必要な塗料量を計算し、未塗装鋼板すべてを塗装
するのに必要な塗料量(不足塗料量)をオペレーターに
ガイダンスする。なお、操業中での塗料のチップ詰り、
オーバースプレー、試し吹き等)により生ずる不可避的
塗料消費量は推定値である。After the spray coating is started, the amount of paint required to coat all the remaining unpainted steel sheets is calculated by the process computer during or near the end of the operation. In that case, first calculate the amount of paint consumed up to the present from the number of coated steel plates, and use this consumed amount of paint for other causes (clogging of paint chips during operation, overspray, The total amount initially calculated from the consumption paint amount including the unavoidable paint consumption amount caused by trial spraying, etc., the specifications of the coated steel sheet to be coated this time (application area, coating thickness, coating unit, etc.) and the number of coatings. The amount of paint remaining in the current paint supply tank is calculated from the amount of paint required to coat steel plates, and the amount of paint required to coat that number of steel plates is calculated from the number of remaining unpainted steel plates. Then, the residual paint amount is compared with the required paint amount of the unpainted steel plate, and the number of paints that can be applied with the residual paint amount and the paint amount required to paint all the painted steel plates on the line are calculated. Amount of paint required to paint all unpainted steel The lack of paint amount) guidance to the operator. In addition, clogging of paint chips during operation,
The inevitable paint consumption caused by overspray, test spraying, etc.) is an estimated value.
【0010】[0010]
実施例1 図1はこの発明を鋼板のプライマーラインに適用した場
合の実施例を示す概略図で、11はプライマーライン、
12はスプレー塗装装置、13は塗料供給ポンプ、14
は塗料供給タンク、15は塗料供給制御系、16はプロ
セスコンピューター、17はビジネスコンピューター
(上位)、18はシーケンサー(下位)、19はトラン
スファー、20はショットブラストライン、21はショ
ットブラスト装置、A〜Nは今回塗装する鋼板である。Example 1 FIG. 1 is a schematic view showing an example in which the present invention is applied to a steel sheet primer line, 11 is a primer line,
12 is a spray coating device, 13 is a paint supply pump, 14
Is a paint supply tank, 15 is a paint supply control system, 16 is a process computer, 17 is a business computer (upper), 18 is a sequencer (lower), 19 is transfer, 20 is a shot blasting line, 21 is a shot blasting device, A to N is the steel plate to be painted this time.
【0011】本実施例は、14枚の鋼板にプライマー塗
装を施す場合を例示したもので、プライマー塗装を施す
鋼板は、その前処理としてショットブラストライン20
にて表面処理が行われ、トランスファー19を介してプ
ライマーライン11に導入される。この14枚の鋼板に
プライマー塗装を施す場合は、まず今回塗装を施す14
枚の鋼板の仕様(塗布面積、塗膜厚、塗料原単位等)を
ビジネスコンピューター(上位)17に入力し、このビ
ジネスコンピューター17からの情報に基づいてプロセ
スコンピューター16にて各鋼板1枚当りの必要な塗料
量と14枚全部の必要塗料量を計算し、その値を当該プ
ロセスコンピューター16に入力しておくと同時に、そ
の量を塗料供給制御系15に指示し塗料供給タンク14
に前記必要塗料量を貯える。鋼板1枚当りの必要な塗料
量は、塗料原単位X、板幅W、板長さlを乗算して求め
る。14枚全部の必要塗料量は、前記各鋼板の必要塗料
量に枚数を乗算して求める。This embodiment illustrates the case where 14 steel plates are coated with a primer, and the steel plate to be coated with the primer is shot blast line 20 as a pretreatment.
The surface treatment is carried out at and is introduced into the primer line 11 via the transfer 19. When applying primer coating to these 14 steel plates, first apply this time 14
The specifications (application area, coating thickness, paint unit, etc.) of one steel plate are input to the business computer (upper) 17, and based on the information from this business computer 17, the process computer 16 per steel plate The necessary paint amount and the necessary paint amount for all 14 sheets are calculated, and the values are input to the process computer 16, and at the same time, the amount is instructed to the paint supply control system 15 and the paint supply tank 14
The required amount of paint is stored in. The required amount of paint per steel plate is obtained by multiplying the paint basic unit X, the plate width W, and the plate length l. The required paint amount of all 14 sheets is obtained by multiplying the required paint amount of each steel plate by the number of sheets.
【0012】プロセスコンピューター16には、予めA
〜Nの14枚の鋼板が登録されており、その登録順と、
下位シーケンサー18からのセンサーon/off信号
よりプライマーライン11およびショットブラストライ
ン20における各鋼板の位置を把握できるようになって
いる。また、プロセスコンピューター16は、下位シー
ケンサー18から塗装開始/完了信号を受信することに
より塗装済鋼板と未塗装鋼板を区別する機能も備えてい
る。In the process computer 16, A
~ 14 sheets of steel plate are registered, and the order of registration is
The position of each steel plate in the primer line 11 and the shot blast line 20 can be grasped from the sensor on / off signal from the lower sequencer 18. The process computer 16 also has a function of distinguishing a painted steel sheet from an unpainted steel sheet by receiving a painting start / completion signal from the lower sequencer 18.
【0013】塗料供給タンク14に必要塗料量が貯えら
れると、プライマーライン11上の鋼板に対しスプレー
塗装装置12にて順次塗装が施されていく。図面では、
鋼板A〜Dが塗装済鋼板、E〜Nは未塗装鋼板である。When the required amount of paint is stored in the paint supply tank 14, the steel plate on the primer line 11 is successively coated by the spray coating device 12. In the drawing,
Steel plates A to D are painted steel plates, and E to N are unpainted steel plates.
【0014】塗装開始後、操業終了近くになると、鋼板
のみの消費に加え、操業中での塗料のチップ詰り、オー
バースプレー、試し吹き等により塗料供給タンク14内
の塗料が不足しているため、塗料供給タンク14内の残
存塗料量を確認し、ライン上の未塗装鋼板すべての塗装
に必要な塗料量をプロセスコンピューター16により求
める。その残存塗料量の求め方は、まず塗装済鋼板の枚
数を下位シーケンサー18からの塗装開始/完了信号に
より求め、その枚数から現在までに鋼板のみの塗装に消
費した塗料量を計算し、この消費塗料量に、操業中での
塗料のチップ詰り、オーバースプレー、試し吹き等によ
り消費された不可避的塗料消費量を加えた量を、現在ま
でに消費された塗料量とし、この消費塗料量を、最初に
塗料供給タンク14に貯えた14枚分の鋼板の必要塗料
量から減算して現在の塗料供給タンク14内の残存塗料
量を求める。また、プロセスコンピューター16では、
先に入力されている各未塗装鋼板の必要塗料量から、残
り全部の未塗装鋼板の必要塗料量が求められる。そし
て、前記タンク内残存塗料量と未塗装鋼板の必要塗料量
が比較され、残存塗料量で塗装可能な鋼板枚数と、ライ
ン上の未塗装鋼板すべてを塗装するのに必要な塗料量す
なわち不足分が計算され、このプロセスコンピューター
16より、その不足分を塗料供給タンク14へ供給する
よう塗料供給制御系15に信号が送られる。塗料供給制
御系15では、プロセスコンピューター16からの信号
に基づいて塗料供給タンク14に、残りの未塗装鋼板す
べてを塗装することができ、かつ全鋼板の塗装完了後に
タンク14内に残存塗料が発生しない適切な量の塗料を
供給する。しかる後、残りの未塗装鋼板に対し再び塗装
を開始する。Near the end of operation after the start of coating, in addition to the consumption of only the steel plate, there is a shortage of paint in the paint supply tank 14 due to clogging of paint chips during operation, overspray, trial spraying, etc. The amount of paint remaining in the paint supply tank 14 is confirmed, and the amount of paint required for painting all unpainted steel sheets on the line is determined by the process computer 16. To determine the amount of paint remaining, first find the number of painted steel plates from the painting start / completion signal from the lower sequencer 18, calculate the amount of paint consumed to paint only the steel plate up to the present from that number, and The amount of paint that has been consumed up to the present is the amount of paint that has been inevitably consumed due to chip clogging of the paint during operation, overspray, test spraying, etc. First, the amount of residual paint in the current paint supply tank 14 is obtained by subtracting from the required paint amount of the 14 steel plates stored in the paint supply tank 14. In the process computer 16,
From the previously input required paint amount of each unpainted steel plate, the required paint amount of all remaining unpainted steel plates is obtained. Then, the residual paint amount in the tank and the required paint amount of the unpainted steel plate are compared, and the number of steel plates that can be painted with the residual paint amount and the paint amount necessary for painting all unpainted steel plates on the line, that is, the shortage amount Is calculated, and a signal is sent from the process computer 16 to the paint supply control system 15 to supply the shortage to the paint supply tank 14. In the paint supply control system 15, all the remaining unpainted steel plates can be applied to the paint supply tank 14 based on the signal from the process computer 16, and residual paint is generated in the tank 14 after the completion of the application of all the steel plates. Do not supply an appropriate amount of paint. After that, the remaining unpainted steel sheets are painted again.
【0015】[0015]
【発明の効果】以上説明したごとく、この発明方法によ
れば、鋼板の塗装ラインにおいて操業途中または操業終
了近くで塗料供給タンク内の塗料が不足する場合に、塗
料供給タンク内の残存塗料量を的確に把握して適切な量
の塗料を供給することができるので、塗料の過剰供給の
防止により塗料を無駄なく経済的に使用することがで
き、塗料コストを低減できるという大なる経済的効果を
奏する。As described above, according to the method of the present invention, when the paint in the paint supply tank runs short on the steel plate coating line during or near the end of the operation, the amount of the remaining paint in the paint supply tank is reduced. Since it is possible to accurately grasp and supply the appropriate amount of paint, it is possible to use the paint economically by preventing the excess supply of paint, and it is possible to reduce the paint cost. Play.
【図1】この発明を鋼板のプライマーラインに適用した
場合の実施例を示す概略図である。FIG. 1 is a schematic view showing an example in which the present invention is applied to a steel sheet primer line.
【図2】冷延鋼板や亜鉛めっき鋼板等にスプレー塗装を
施す塗装ライン(例えばプライマーライン)の一例を示
す概略図である。FIG. 2 is a schematic view showing an example of a coating line (for example, a primer line) for performing spray coating on a cold rolled steel plate, a galvanized steel plate, or the like.
【符号の説明】 11 プライマーライン 12 スプレー塗装装置 13 塗料供給ポンプ 14 塗料供給タンク 15 塗料供給制御系 16 プロセスコンピューター 17 ビジネスコンピューター(上位) 18 シーケンサー(下位) 19 トランスファー 20 ショットブラストライン 21 ショットブラスト装置 A〜N 鋼板[Explanation of symbols] 11 Primer line 12 Spray coating device 13 Paint supply pump 14 Paint supply tank 15 Paint supply control system 16 Process computer 17 Business computer (upper) 18 Sequencer (lower) 19 Transfer 20 Shot blast line 21 Shot blasting device A ~ N steel plate
Claims (1)
タンク内の塗料をポンプにて供給してスプレー塗装を施
す塗装装置を備えた鋼板塗装ラインにおいて、今回塗装
を施す被塗装鋼板の仕様(塗布面積、塗膜厚、塗料原単
位等)に基づいて所定枚数の必要塗料量を算出しその量
の塗料を塗料供給タンクに供給し、スプレー塗装開始
後、操業途中または操業終了近くにおいて、塗装が施さ
れた鋼板の枚数から現在までに消費した塗料量を算出
し、この消費塗料量に、操業中の塗料のチップ詰り、オ
ーバースプレー、試し吹き等により生ずる不可避的塗料
消費量を加えた消費塗料量と前記必要塗料量とから塗料
供給タンク内の残存塗料量を求め、その残存塗料量と被
塗装鋼板の仕様(塗布面積、塗膜厚、塗料原単位)に基
づいて算出した未塗装鋼板の必要塗料量とから不足塗料
量を求め、その不足塗料分をタンクに供給し補充するこ
とを特徴とする鋼板塗装ラインにおける塗料供給方法。1. A steel plate coating line equipped with a coating device for spray-coating a paint in a paint supply tank to a steel plate on a carrying table, the specification of the steel plate to be coated this time ( Calculate the required amount of the required amount of paint based on the coating area, coating film thickness, paint unit, etc., and supply that amount of paint to the paint supply tank.After spray coating has begun, during or near the end of operation, coating The amount of paint consumed up to the present is calculated from the number of coated steel sheets, and the amount of paint consumed is added to the amount of paint unavoidable that is caused by clogging of paint chips during operation, overspray, test spraying, etc. Unpainted steel calculated from the amount of paint remaining and the amount of paint required in the paint supply tank based on the amount of paint required and the amount of paint remaining and the specifications of the steel sheet to be coated (coating area, coating thickness, paint unit) A paint supply method in a steel plate coating line, characterized in that the amount of paint deficiency is calculated from the amount of paint required for the plate, and the amount of paint deficiency is supplied to a tank and replenished.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP07091887A JP3125843B2 (en) | 1995-03-24 | 1995-03-24 | Paint supply method in steel plate painting line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP07091887A JP3125843B2 (en) | 1995-03-24 | 1995-03-24 | Paint supply method in steel plate painting line |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH08257487A true JPH08257487A (en) | 1996-10-08 |
JP3125843B2 JP3125843B2 (en) | 2001-01-22 |
Family
ID=14039079
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP07091887A Expired - Fee Related JP3125843B2 (en) | 1995-03-24 | 1995-03-24 | Paint supply method in steel plate painting line |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3125843B2 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0813511A (en) * | 1994-06-29 | 1996-01-16 | Natl House Ind Co Ltd | Foundation structure |
JPH0813512A (en) * | 1994-06-29 | 1996-01-16 | Natl House Ind Co Ltd | Foundation constructing method |
DE102018220405A1 (en) * | 2017-12-06 | 2019-06-06 | Robert Bosch Gmbh | Media applicator |
-
1995
- 1995-03-24 JP JP07091887A patent/JP3125843B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP3125843B2 (en) | 2001-01-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH042672B2 (en) | ||
JPH08257487A (en) | Method for supplying coating material in steel sheet coating line | |
JP2003135998A (en) | Equipment and method for multicolor pattern coating | |
JPH0338281A (en) | Preparation of precoated metal plate | |
JP2992443B2 (en) | Building board edge coating machine | |
CN109610833B (en) | Construction technology of building coating | |
KR0145590B1 (en) | System and method of complex painting | |
CN110116059A (en) | A method of suitable for DOS oil electrostatic oiler rotary sprayer height optimization | |
JP4523846B2 (en) | Continuous production method of Zn-based plated steel sheet having surface modified layer | |
JP6740888B2 (en) | Surface-treated metal plate and method for manufacturing the same | |
JP3580067B2 (en) | Control method of chromate adhesion amount | |
JPS59130567A (en) | Method and agent for applying conductivity to work support means for electrical painting | |
JP3436068B2 (en) | Coating method and coating device for coating pattern edge | |
JPS591733Y2 (en) | Solvent supply device for spray painting equipment | |
JPH0846339A (en) | Spray type solder flux coating system | |
JP2000197846A (en) | Method and apparatus for continuous coating of metal strip | |
JP3276022B2 (en) | Electrodeposition method | |
CN114392908A (en) | Method for spraying surface coating on fine cloth of faucet in cabin | |
JPH11147071A (en) | High hardness coating method | |
JPH07228978A (en) | Production of galvannealed steel sheet composite material having excellent bare corrosion resistance and coatability | |
JPH06146079A (en) | Electrodeposition coating device | |
JPH0734262A (en) | Production of automotive surface treated steel sheet | |
JPH09201567A (en) | Decoration method for outside wall | |
Stevenson et al. | Water-Wash Spray Booth Apparatus | |
JP2019141774A (en) | Manufacturing method of surface-treatment metal plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
LAPS | Cancellation because of no payment of annual fees |