Method for constructing stabilizer-equipped mat foundation

Info

Publication number
JPH08232273A
JPH08232273A JP6357395A JP6357395A JPH08232273A JP H08232273 A JPH08232273 A JP H08232273A JP 6357395 A JP6357395 A JP 6357395A JP 6357395 A JP6357395 A JP 6357395A JP H08232273 A JPH08232273 A JP H08232273A
Authority
JP
Japan
Prior art keywords
soil
stabilizer
solid foundation
foundation
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP6357395A
Other languages
Japanese (ja)
Other versions
JP2797066B2 (en
Inventor
Yoshiro Watanabe
義郎 渡辺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP6357395A priority Critical patent/JP2797066B2/en
Publication of JPH08232273A publication Critical patent/JPH08232273A/en
Application granted granted Critical
Publication of JP2797066B2 publication Critical patent/JP2797066B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

PURPOSE: To prevent uneven settlement of a mat foundation for a wooden house or a low-rise house. CONSTITUTION: As a trench used for constructing a stabilizer and adjusted in width and depth (normally 200 to 500mm wide and 600 to 1200mm deep) depending on the strength of a portion where a house foundation is to be constructed or the ground nearby is excavated, improved soil obtained by mixing of soil cement with reinforcing fibers of vinylon type or the like therein and soil is substituted. This soil-substituted part 13 is rolled by a rammer or the like to construct a stabilizer 11 where the soil is improved. After a small channel 14 is excavated in the top surface of the stablizer and rib reinforcement 16 is provided therein, the rib reinforcement 16 is bound or welded to mat foundation reinforcement 17. Next, concrete is poured into the small channel 14 and the mat foundation, and a rib 15 molded by the small channel 14 in the top surface of the stabilizer is integrated with the mat foundation 10.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、不同沈下を抑止する安
定材付きベタ基礎工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a solid foundation method with a stabilizer for suppressing uneven settlement.

【0002】[0002]

【従来の技術】軟弱地盤において多少の沈下が許容され
る場合の基礎工法としてベタ基礎、摩擦杭の打ち込み、
またはその両者の併用等が行われている。いずれの場合
も粘性土の性質上、圧密、塑性変形による沈下のおそれ
があり、それによって不同沈下が生じると、建物の使用
に支障を来すことになる。
2. Description of the Related Art A solid foundation, driving a friction pile, and
Or the combination of both is performed. In any case, due to the nature of cohesive soil, there is a risk of settlement due to consolidation and plastic deformation, and if this causes uneven settlement, the use of the building will be hindered.

【0003】[0003]

【発明が解決しようとする課題】従来の布基礎工法は掘
削排土量が多いし、基礎そのものの剛性が小さいし、更
に型枠施工や配筋等の作業工数も多い。軟弱地盤の場合
には不同沈下があり、基礎の剛性が小さいので地震発生
時に割裂を生じ、建物に多大の被害を与える。摩擦杭を
併用したベタ基礎工法においては摩擦杭を必要とするた
め、コストが高く工期の短縮も望めない。本発明は、不
同沈下のおそれが少なく、等沈下を前提とした低コスト
のベタ基礎工法を提供するすることを目的としている。
The conventional cloth foundation method requires a large amount of excavated soil, the rigidity of the foundation itself is low, and the number of man-hours required for formwork and bar arrangement is large. In the case of soft ground, there is uneven settlement, and since the rigidity of the foundation is low, cracks occur when an earthquake occurs, causing great damage to the building. The solid foundation method that also uses friction piles requires friction piles, so the cost is high and the construction period cannot be shortened. An object of the present invention is to provide a low-cost solid foundation method that is less likely to cause uneven settlement and is premised on equal settlement.

【0004】[0004]

【課題を解決するための手段】上記目的を達成するた
め、本発明は、建家基礎部を施工する部分に溝を掘って
安定材を造り、その上にベタ基礎部分を打設して安定材
付きベタ基礎を構築するものである。請求項1では、基
礎構築部分の近くに地盤の強弱により幅及び深さを調整
(通常は幅200〜500mm、深さ600〜1200
mm)した安定材造成用の溝を掘削すると同時に、ソイ
ルセメントまたはビニロン系その他の補強繊維を混入し
たソイルセメントと土とを混合した土質と置換し、土質
置換部分をランマー等で転圧して土質強度と靱性をもた
せた改良土質による安定材を造り、該安定材の上面に所
定幅のリブ成形用の小溝を形成し、該小溝内にリブ用配
筋を設けてベタ基礎配筋と定着したのち、前記小溝内と
ベタ基礎部分とにコンクリートを打設して安定材上面内
の小溝によって成形されたリブとベタ基礎とを一体化す
る。
In order to achieve the above object, the present invention provides a stable material by digging a groove in a portion where a building foundation is to be constructed, and then a solid foundation is placed on the stabilizing material to stabilize the building. It is to build a solid foundation with lumber. According to claim 1, the width and the depth are adjusted near the foundation construction portion depending on the strength of the ground (usually, the width is 200 to 500 mm and the depth is 600 to 1200).
(mm) excavating a groove for stabilizing material, and at the same time, replacing soil soil with soil cement or soil cement mixed with vinylon-based and other reinforcing fibers with soil and rolling the soil replacement portion with a rammer etc. A stabilizer with improved soil quality with strength and toughness was made, a small groove for rib formation of a predetermined width was formed on the upper surface of the stabilizer, and a rib bar was provided in the groove to fix the solid foundation bar. Then, concrete is poured into the small groove and the solid foundation portion to integrate the rib formed by the small groove in the upper surface of the stabilizer and the solid foundation.

【0005】請求項2は、前記小溝内とベタ基礎部分と
にコンクリートを打設して安定材上面内のリブとベタ基
礎とを一体化したのち、ベタ基礎上部の立ち上がり部分
の外周部にコンクリートとの付着性をよくした仕上げ材
をそのまま型枠として建て込み、内側に捨て型枠を建て
込んで基礎立ち上がり造成用のコンクリートを打設する
ことを特徴とする。
According to a second aspect of the present invention, concrete is cast in the small groove and in the solid foundation portion to integrate the ribs in the upper surface of the stabilizer and the solid foundation, and then the concrete is formed on the outer peripheral portion of the rising portion above the solid foundation. It is characterized in that a finishing material with good adhesion to and is built as it is as a formwork, a waste formwork is built inside, and concrete for the foundation rise construction is placed.

【0006】請求項3は、軟弱地盤であるベタ基礎施工
領域内に、所要数の現場打設杭(ソイルセメントまたは
ビニロン系その他の補強繊維を混入したソイルセメント
を用い土と水とを同時に攪伴して作る現場杭)を構築
し、前記現場打設杭で支持力が増強された土質周囲を囲
んで連続する安定材造成用の溝を掘削し、同時にソイル
セメントまたはビニロン系その他の補強繊維を混入した
ソイルセメントと土とを混合した土質と置換し、土質置
換部分をランマー等で転圧して土質強度と靱性とをもた
せた改良土質による安定材を造り、該安定材の上面に所
定幅のリブ成形用の小溝を形成し、該小溝内にリブ用配
筋を設けてベタ基礎配筋と定着したのち、前記小溝、現
場打設杭頂部及びベタ基礎部分にコンクリートを打設し
て小溝によって成形されたリブと現場打設杭頂部とベタ
基礎とを一体化することを特徴とする。
A third aspect of the present invention is that the required number of on-site piles (soil cement or soil cement mixed with vinylon-based or other reinforcing fibers) is used to simultaneously mix soil and water in a solid foundation construction area which is soft ground. (Site pile to be made together) is built, and a continuous groove for stabilizing material is drilled around the soil surrounding the bearing capacity of which is strengthened by the above-mentioned pile, and at the same time soil cement or vinylon-based other reinforcing fiber Soil cement mixed with soil is mixed with soil to replace it with soil, and the soil replacement part is compacted with a rammer to create a stabilizer with improved soil quality with soil strength and toughness. After forming a small groove for rib forming of the above, and providing a reinforcing bar for the rib in the small groove and fixing it with the solid foundation bar arrangement, concrete is poured into the small groove, the top of the pile piled on site and the solid foundation part to form the small groove. Molded by Characterized by integral ribs and the and the solid foundation site droplet 設杭 top.

【0007】請求項4は、前記小溝内とベタ基礎部分と
にコンクリートを打設して安定材上面内のリブと現場打
ち杭頂部とベタ基礎とを一体化したのち、基礎立ち上が
り造成部分の外周部にコンクリートとの付着性をよくし
た仕上げ材をそのまま型枠として建て込み、内側に捨て
型枠を建て込んで基礎造成用のコンクリートを打設する
ことを特徴とする。
According to a fourth aspect of the present invention, concrete is placed in the small groove and the solid foundation portion to integrate the ribs in the upper surface of the stabilizer, the tops of the cast-in-place piles, and the solid foundation, and then the outer periphery of the foundation rising formation portion. The feature is that a finishing material with good adhesion to concrete is built into the part as it is as a formwork, and a waste formwork is built inside and the concrete for foundation construction is placed.

【0008】[0008]

【作用】建家基礎部分にあたる所要の幅だけトレンチ溝
を掘削しながら、ソイルセメントまたはビニロン系その
他の補強繊維を混入したソイルセメントと土と水とを混
合して土質を置換し、土質置換部分をランマー等で転圧
して土質強度と靱性をもたせた改良土質による安定材を
造る。安定材の上面に所定幅のリブ構築用の小溝を掘削
し、前記小溝内にリブ用配筋をしてベタ基礎配筋と定着
たのち、前記小溝内とベタ基礎部分とにコンクリートを
打設して安定材上面内のリブとベタ基礎とを一体化す
る。安定材の高さは、地盤の状態により決定する。安定
材とベタ基礎とで囲まれた土は剛体となる。
[Operation] While excavating the trench groove by the required width corresponding to the building foundation part, soil cement or soil cement mixed with vinylon-based or other reinforcing fibers is mixed with soil and water to replace the soil, and the soil replacement part By using a rammer, etc., to compact a stable material with improved soil quality that gives soil strength and toughness. A small groove for rib construction of a predetermined width is excavated on the upper surface of the stabilizer, and a rib reinforcement is set in the small groove to fix the solid foundation reinforcement, and then concrete is placed in the small groove and the solid foundation portion. Then, the ribs in the upper surface of the stabilizer are integrated with the solid foundation. The height of the stabilizer is determined by the condition of the ground. The soil surrounded by the stabilizer and the solid foundation becomes a rigid body.

【0009】安定材と現場打設杭とを併用する場合に
は、軟弱地盤であるベタ基礎施工領域内に、所要数の現
場打設杭(ソイルセメントまたはビニロン系その他の補
強繊維を混入したソイルセメントを用い土と水とを同時
に混合攪拌して作る現場杭)を構築する。現場打設杭で
補強された土質周囲を囲んで連続する安定材造成用の溝
を掘削して前記と同様に土質強度と靱性とをもたせた改
良土質による安定材を造る。安定材の上面の小溝内にリ
ブ用配筋を設けてベタ基礎配筋と定着したのち、前記小
溝、現場打設杭頂部及びベタ基礎部分にコンクリートを
打設して小溝によって成形されたリブと現場打設杭頂部
とベタ基礎とを一体化する。
When the stabilizer and the field-casting piles are used together, a required number of field-casting piles (soil cement or vinylon-based or other reinforcing fibers are mixed in the solid foundation construction area of soft ground). Construct a field pile) that is made by mixing and stirring soil and water at the same time using cement. A groove for continuous stabilizer formation surrounding a soil reinforced with field piles is excavated to produce a stabilizer with improved soil quality having soil strength and toughness as described above. After the rib reinforcement is set in the small groove on the upper surface of the stabilizer to settle with the solid foundation reinforcement, concrete is placed in the small groove, on-site cast pile top and solid foundation part and the rib formed by the small groove. The top of piles cast on site and the solid foundation are integrated.

【0010】[0010]

【実施例】次に図面に基づいて本発明を具体的に説明す
る。図1は本発明の1実施例の断面図である。図示のよ
うに、建家基礎部の適当間隔にトレンチ溝を掘って安定
材11を造り、その上にコンクリートを打設して安定材
付きベタ基礎10を構築する。その際、安定材11は地
盤の強弱により幅Wと深さHを調整(通常は幅200〜
500mm、深さ600〜1200mm位まで)する。
また、基礎底盤を平面からみて、ほぼ4等分または6等
分程度に区画するように安定材を造成する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described in detail with reference to the drawings. FIG. 1 is a sectional view of one embodiment of the present invention. As shown in the figure, trenches are dug at appropriate intervals in the building foundation to form the stabilizer 11, and concrete is placed thereon to construct the solid foundation 10 with the stabilizer. At that time, the stabilizer 11 adjusts the width W and the depth H depending on the strength of the ground (usually, the width 200 to
500 mm, depth 600 to 1200 mm).
In addition, the stabilizer is constructed so as to divide the foundation bottom plate into approximately four or six equal parts when seen from a plane.

【0011】上記安定材11を造成するには、基礎造成
位置に土を掘削すると同時に、土とソイルセメント(ま
たはビニロン系、カーボンファイバー、その他の補強繊
維を混入したソイルセメント)を混合して土質を置換
し、土質置換部分をランマー等で転圧して土質強度と靱
性とをもたせた改良土質の安定材とする。ソイルセメン
トは土質に対し通常100〜200kg/m3程度混合
する。
In order to form the stabilizer 11, the soil is excavated at the foundation forming position, and at the same time, soil is mixed with soil cement (or soil cement containing vinylon type, carbon fiber or other reinforcing fiber) to obtain soil quality. Is replaced, and the soil replacement portion is compacted with a rammer or the like to provide a stable soil material having improved soil strength and toughness. Soil cement is usually mixed in a soil content of about 100 to 200 kg / m3.

【0012】この安定材11の上面長手方向に所定幅の
リブ構築用小溝14を掘削し、小溝14内に所定の間隔
でリブ用配筋16を設けてベタ基礎配筋17と結束又は
溶着により定着する。次いで、小溝内とベタ基礎部分と
にコンクリートを打設して小溝14によって成形された
リブ15とベタ基礎10とを一体化したのち、基礎立ち
上がり部分18を造成して、通常のとおり上部構造を構
築する。
A small groove 14 for rib construction having a predetermined width is excavated in the longitudinal direction of the upper surface of the stabilizer 11, and rib reinforcing bars 16 are provided in the small groove 14 at predetermined intervals to bind or weld the solid foundation bar 17 to each other. Establish. Next, concrete is poured into the small groove and the solid foundation portion to integrate the rib 15 formed by the small groove 14 and the solid foundation 10, and then the foundation rising portion 18 is formed to form the upper structure as usual. To construct.

【0013】 基礎立ち上がり部分18は、普通の型枠
を建て込み、コンクリート打設後に型枠外しとしても良
いが、図1のように、基礎立ち上がり部分の外周部にコ
ンクリートとの付着性をよくした仕上げ材22をそのま
ま型枠として用い、内側に捨て型枠21を建て込み基礎
立ち上がり部造成用のコンクリートを打設することによ
り、コンクリート硬化後の型枠外し作業を省略するよう
にしてもよい。
The foundation rising portion 18 may be constructed by building a normal formwork and removing the formwork after placing concrete, but as shown in FIG. 1, the outer peripheral portion of the foundation rising portion has good adhesion to concrete. The finishing material 22 may be used as it is as a formwork, the discarding formwork 21 may be built inside, and the concrete for building up the foundation rising part may be placed so that the work of removing the formwork after hardening the concrete may be omitted.

【0014】図示例では、安定材11の上面長手方向を
掘削して所定幅のリブ構築用小溝14を形成させたもの
を示したが、掘削以外の方法により小溝を形成してもよ
い。例えば、土質改良部分13をランマー等で予備的に
転圧し転圧上面内にバタ角材を埋設して(図示省略)、
最終的に転圧することにより地耐力を改良した安定材を
成形したのち、安定材11の上面のバタ角材を取り外し
て所定幅のリブ構築用小溝を形成させてもよい。
In the illustrated example, the stabilizer 11 is drilled in the longitudinal direction of the upper surface to form the rib-building small groove 14 having a predetermined width. However, the small groove may be formed by a method other than the drilling. For example, the soil-improved portion 13 is preliminarily compacted by a rammer or the like, and flaps are embedded in the compacted upper surface (not shown),
Finally, after rolling to form a stabilizer having improved ground strength, the flap square member on the upper surface of the stabilizer 11 may be removed to form a rib-building small groove having a predetermined width.

【0015】図2及び図3は別の実施例を示す。この場
合は、まず軟弱地盤であるベタ基礎施工領域内に、所要
数の無筋の現場打設杭25を造成する。現場打設杭25
は、穿孔した杭孔に、ソイルセメントを掘削土に混合攪
拌(例えば300kg/m3)し、これに水を加えたス
ラリーを充填することで施工される。この現場打設杭2
5は、支持杭ではなく安定材的な目的をもっている。現
場打設杭25で補強された施工領域内に連続する安定材
造成用のトレンチ溝を掘削しながら、ソイルセメント
(またはビニロン系その他の補強繊維を混入したソイル
セメント)と土とを混合して土質を置換する。土質置換
部分13をランマー等で転圧して土質強度と靱性とをも
たせた改良土質による安定材11を成形し、安定材の上
面に所定幅のリブ構築用小溝14を掘削し、前記小溝内
に所定の間隔でリブ用配筋16を設けてベタ基礎配筋1
7と結束又は溶着したのち、前記小溝内とベタ基礎とに
コンクリートを打設して安定材上面内のリブ15と現場
打設杭25の頂部とベタ基礎10とを一体化する(図
2)。
2 and 3 show another embodiment. In this case, first, the required number of unreinforced spot-casting piles 25 are formed in the solid foundation construction area which is the soft ground. On-site pile 25
Is constructed by mixing soil cement with excavated soil in the drilled pile holes (for example, 300 kg / m 3) and filling the slurry with water added thereto. This on-site pile 2
5 has a purpose as a stabilizer, not as a support pile. Mixing soil cement (or soil cement mixed with vinylon-based or other reinforcing fibers) and soil while excavating a continuous trench groove for stabilizing material in the construction area reinforced by the field pile 25 Replace soil. The soil replacement portion 13 is compacted by a rammer or the like to form a stabilizer 11 with improved soil quality having soil strength and toughness, and a rib-building small groove 14 having a predetermined width is excavated on the upper surface of the stabilizer, and the inside of the small groove is formed. A solid foundation bar arrangement 1 by providing rib arrangements 16 at predetermined intervals.
After bundling or welding with No. 7, concrete is cast in the small groove and the solid foundation to integrate the ribs 15 in the upper surface of the stabilizer, the top of the on-site cast pile 25 and the solid foundation 10 (FIG. 2). .

【0016】図2の場合も、前記小溝14内とベタ基礎
部分とにコンクリートを打設して安定材上面内のリブ1
5とベタ基礎とを一体化したのち、基礎造成部分の外周
部にコンクリートとの付着性をよくした仕上げ材をその
まま型枠22として建て込み、内側に捨て型枠21を建
て込んで基礎立ち上がり部18造成用のコンクリートを
打設することにより、基礎部の施工を完了する。
In the case of FIG. 2 as well, concrete is placed in the small groove 14 and the solid foundation portion to form the rib 1 in the upper surface of the stabilizer.
After integrating 5 and the solid foundation, a finishing material with good adhesion to concrete is built into the outer peripheral portion of the foundation building portion as it is as a formwork 22, and a discarding formwork 21 is built inside to form a foundation rising part. 18 The construction of the foundation is completed by placing concrete for construction.

【0017】[0017]

【発明の効果】上述のように、本発明によれば、基礎部
等に土質を改良した安定材を造り、安定材上面にリブ成
形用の小溝を形成し、この小溝内に設けたリブ用配筋を
ベタ基礎配筋に定着したため、溝内に形成された鉄筋コ
ンクリートはベタ基礎部分と一体性のある強固な安定材
となる。すなわち、安定材とベタ基礎部分とで囲まれた
土は剛体となる。また、安定材と現場打設杭とを併用す
る場合には、周囲の土質より著しく強固なものとなり、
しかも安定材と現場打設杭とベタ基礎とを一体化したた
め、建造物の不同沈下を大幅に防止できる。
As described above, according to the present invention, a stabilizer having an improved soil quality is made on a foundation or the like, a small groove for rib formation is formed on the upper surface of the stabilizer, and a rib provided in the small groove is used. Since the reinforcement is fixed on the solid foundation reinforcement, the reinforced concrete formed in the groove becomes a strong stabilizer that is integral with the solid foundation. That is, the soil surrounded by the stabilizer and the solid foundation becomes a rigid body. Also, when using both stabilizers and on-site piles, it becomes significantly stronger than the surrounding soil,
Moreover, since the stabilizer, the cast-in-place pile, and the solid foundation are integrated, uneven settlement of the building can be largely prevented.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明ベタ基礎工法の断面図である。FIG. 1 is a cross-sectional view of a solid foundation method of the present invention.

【図2】本発明ベタ基礎工法の別例における断面図であ
る。
FIG. 2 is a cross-sectional view of another example of the solid foundation method of the present invention.

【図3】図2の平面図である。FIG. 3 is a plan view of FIG. 2;

【符号の説明】[Explanation of symbols]

10 ベタ基礎 11 安定材 13 土質置換部分 14 小溝 15 リブ 16 リブ用配筋 17 ベタ基礎配筋 18 基礎立ち上がり部 21、22 型枠 23 タイバー 25 現場打設杭 10 Solid Foundation 11 Stabilizer 13 Soil Replacement Part 14 Small Groove 15 Rib 16 Rib Reinforcing Bar 17 Solid Foundation Reinforcing Bar 18 Foundation Rise 21, 22 Formwork 23 Tie Bar 25 Field Pile

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 基礎構築部分の近くに地盤の強弱により
幅及び深さを調整した安定材造成用の溝を掘削すると同
時に、ソイルセメントまたはビニロン系その他の補強繊
維を混入したソイルセメントと土とを混合した土質と置
換し、 土質置換部分をランマー等で転圧して土質強度と靱性を
もたせた改良土質による安定材を造り、 該安定材の上面に所定幅のリブ成形用の小溝を形成し、 該小溝内にリブ用配筋を設けてベタ基礎配筋と定着した
のち、 前記小溝内とベタ基礎部分とにコンクリートを打設して
安定材上面内の小溝によって成形されたリブとベタ基礎
とを一体化することを特徴とする安定材付きベタ基礎工
法。
1. A trench for stabilizing material, the width and depth of which are adjusted depending on the strength of the ground, is excavated near the foundation construction portion, and at the same time soil cement or soil cement mixed with vinylon-based or other reinforcing fibers and soil are formed. Is replaced with mixed soil, and the soil replacement part is compacted with a rammer etc. to create a stabilizer with improved soil quality that has soil strength and toughness, and a small groove for rib formation with a predetermined width is formed on the upper surface of the stabilizer. The ribs and solid foundations formed by the small grooves in the upper surface of the stabilizer by placing rib reinforcements in the small grooves and fixing them with the solid foundation reinforcements, and then placing concrete in the small grooves and the solid foundation portion Solid foundation method with stabilizer, which is characterized by integrating and.
【請求項2】 前記小溝内とベタ基礎部分とにコンクリ
ートを打設して安定材上面内のリブとベタ基礎とを一体
化したのち、ベタ基礎上部の立ち上がり部分の外周部に
コンクリートとの付着性をよくした仕上げ材をそのまま
型枠として建て込み、内側に捨て型枠を建て込んで基礎
立ち上がり造成用のコンクリートを打設することを特徴
とする請求項1記載の安定材付きベタ基礎工法。
2. The concrete is placed in the small groove and the solid foundation portion to integrate the ribs in the stabilizer upper surface with the solid foundation, and then the concrete is attached to the outer peripheral portion of the rising portion of the solid foundation upper portion. The solid foundation method with a stabilizer according to claim 1, characterized in that a finishing material having good properties is built as it is as a formwork, a discarding formwork is built inside, and concrete for foundation rise construction is placed.
【請求項3】 軟弱地盤であるベタ基礎施工領域に、所
要数の現場打設杭を構築し、 前記現場打設杭で補強された土質周囲を囲んで連続する
安定材造成用の溝を掘削しながら、ソイルセメントまた
はビニロン系その他の補強繊維を混入したソイルセメン
トと土とを混合した土質を置換し、 土質置換部分をランマー等で転圧して土質強度と靱性を
もたせた改良土質による安定材を造り、 該安定材の上面に所定幅のリブ成形用の小溝を形成し、 該小溝内にリブ用配筋を設けてベタ基礎配筋と定着した
のち、 前記小溝、現場打設杭頂部及びベタ基礎部分にコンクリ
ートを打設して小溝によって成形されたリブと現場打設
杭頂部とベタ基礎とを一体化することを特徴とする安定
材付きベタ基礎工法。
3. A required number of on-site cast piles are constructed in a solid foundation construction area which is soft ground, and a continuous groove for stabilizing material is excavated surrounding the soil reinforced by the on-site cast piles. However, the soil is mixed with soil cement or soil cement mixed with vinylon-based or other reinforcing fibers and the soil is replaced, and the soil replacement part is compacted with a rammer etc. to improve soil strength and toughness. A small groove for rib formation having a predetermined width is formed on the upper surface of the stabilizer, and a rib bar is provided in the groove to fix it to a solid foundation bar. A solid foundation method with a stabilizer, characterized in that the ribs formed by small grooves are cast into the solid foundation portion, the top of the pile cast on site and the solid foundation are integrated.
【請求項4】 前記小溝内とベタ基礎部分とにコンクリ
ートを打設して安定材上面内のリブと現場打ち杭頂部と
ベタ基礎とを一体化したのち、基礎立ち上がり造成部分
の外周部にコンクリートとの付着性をよくした仕上げ材
をそのまま型枠として建て込み、内側に捨て型枠を建て
込んで基礎造成用のコンクリートを打設することを特徴
とする請求項3記載の安定材付きベタ基礎工法。
4. The concrete is cast in the small groove and in the solid foundation portion to integrate the ribs in the stabilizer upper surface, the top of the cast-in-place pile and the solid foundation, and then the concrete is formed in the outer peripheral portion of the foundation rising formation portion. The solid foundation with a stabilizer according to claim 3, characterized in that a finishing material having good adhesiveness with is built in as a form as it is, a discarding form is built inside, and concrete for foundation formation is placed. Construction method.
JP6357395A 1995-02-28 1995-02-28 Solid foundation method with stabilizer Expired - Lifetime JP2797066B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6357395A JP2797066B2 (en) 1995-02-28 1995-02-28 Solid foundation method with stabilizer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6357395A JP2797066B2 (en) 1995-02-28 1995-02-28 Solid foundation method with stabilizer

Publications (2)

Publication Number Publication Date
JPH08232273A true JPH08232273A (en) 1996-09-10
JP2797066B2 JP2797066B2 (en) 1998-09-17

Family

ID=13233138

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6357395A Expired - Lifetime JP2797066B2 (en) 1995-02-28 1995-02-28 Solid foundation method with stabilizer

Country Status (1)

Country Link
JP (1) JP2797066B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011219993A (en) * 2010-04-09 2011-11-04 Konguro Engineering Kk Ground improvement spread foundation construction method
JP2015168944A (en) * 2014-03-05 2015-09-28 株式会社竹中工務店 Foundation structure of building

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011219993A (en) * 2010-04-09 2011-11-04 Konguro Engineering Kk Ground improvement spread foundation construction method
JP2015168944A (en) * 2014-03-05 2015-09-28 株式会社竹中工務店 Foundation structure of building

Also Published As

Publication number Publication date
JP2797066B2 (en) 1998-09-17

Similar Documents

Publication Publication Date Title
KR102195504B1 (en) Construction method for Eearth self-retaining wall using reinforcing member and CIP construction method
JP2008231816A (en) Construction method of pile foundation structure
JP5480744B2 (en) Foundation for structure and its construction method
JPH08232273A (en) Method for constructing stabilizer-equipped mat foundation
JPH062336A (en) Method of mat foundation with stabilizing material
JP3059058U (en) Solid foundation structure with stabilizer
JPH01290824A (en) High horizontal bearing force foundation method using solidification process
KR102195496B1 (en) Pile for earth self-retaining wall using cast in place concrete pile with double I beam
JPH0721196B2 (en) Reverse construction method of underground structure
JPH09111754A (en) Soldier pile cut-of wall construction method
JP3228199U (en) Construction structure of earth retaining support
KR102426192B1 (en) File fof retaining wall and construction method using file
JP5480745B2 (en) Reinforcement method for existing foundations for structures
JP2555838B2 (en) Independent panel mountain retaining method
JP2558414B2 (en) Construction method of the main retaining wall and the retaining wall
JP3098457B2 (en) Construction method of multi-functional underground diaphragm wall
JP4344733B2 (en) Seismic reinforcement structure for existing pile foundation structures
JP2001159141A (en) Floating foundation
JPS58120918A (en) Burying method for pile
JP4576768B2 (en) Composite type underground continuous wall and construction method of the same wall
JP3567387B2 (en) How to build an underground skeleton
JP3889168B2 (en) Construction method of submerged structure and reinforcement piece used in the construction method
JP2000064300A (en) Continuous footing execution method
JPH04185820A (en) Foundation structure of building
JP5066854B2 (en) Construction method of underground structure

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080703

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090703

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100703

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100703

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110703

Year of fee payment: 13

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110703

Year of fee payment: 13

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120703

Year of fee payment: 14

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120703

Year of fee payment: 14

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130703

Year of fee payment: 15

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140703

Year of fee payment: 16

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term