JPH0819727B2 - Hole filling method for concrete slabs - Google Patents

Hole filling method for concrete slabs

Info

Publication number
JPH0819727B2
JPH0819727B2 JP23898592A JP23898592A JPH0819727B2 JP H0819727 B2 JPH0819727 B2 JP H0819727B2 JP 23898592 A JP23898592 A JP 23898592A JP 23898592 A JP23898592 A JP 23898592A JP H0819727 B2 JPH0819727 B2 JP H0819727B2
Authority
JP
Japan
Prior art keywords
wire
formwork
hole
concrete
slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP23898592A
Other languages
Japanese (ja)
Other versions
JPH0665979A (en
Inventor
弘 近藤
Original Assignee
弘 近藤
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 弘 近藤 filed Critical 弘 近藤
Priority to JP23898592A priority Critical patent/JPH0819727B2/en
Publication of JPH0665979A publication Critical patent/JPH0665979A/en
Publication of JPH0819727B2 publication Critical patent/JPH0819727B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】コンクリート建築物のスラブにお
いては、配管、配線などのために梁間に1箇所程度穴を
設ける。そして、その穴が当座不用である場合にはコン
クリートスラブの施工後にここにコンクリートを充填し
て閉塞しておく。また、床材をH鋼などで仮支持した場
合、H鋼対応部にはスラブ形成時にコンクリートを打設
できないので穴が生じるため、スラブ施工後に穴を閉塞
しなければならない。この発明はコンクリートスラブに
形成された上記のような不用な穴(駄目穴)にコンクリ
ートを充填して穴を閉塞する方法に関するものである。
[Industrial application] In slabs of concrete buildings, one hole is provided between beams for piping and wiring. If the hole is not required for the time being, the concrete slab is filled with concrete after the construction of the concrete slab and closed. Further, when the flooring material is temporarily supported by H steel or the like, holes cannot be formed in the H steel corresponding portion because concrete cannot be placed when the slab is formed. Therefore, the holes must be closed after the slab construction. The present invention relates to a method for filling unnecessary holes (useless holes) as described above formed in a concrete slab with concrete to close the holes.

【0002】[0002]

【従来の技術】従来は図10に示すように、コンクリー
トスラブ1の穴部2の下側に型枠となるベニヤ板21を
添接し、その下側に沿わせたパイプ22と穴部2の上側
に掛け渡したパイプ23との間にワイヤ24を巻き回し
てベニヤ21をスラブ1の下面に圧接させた後、穴部2
にコンクリートを打設し、硬化後にワイヤ24の上下双
方を切断し、上下のパイプ22、23を除去している。
2. Description of the Related Art Conventionally, as shown in FIG. 10, a veneer plate 21 serving as a formwork is attached to the lower side of a hole 2 of a concrete slab 1, and the pipe 22 and the upper side of the hole 2 are arranged along the lower side. The wire 24 is wound between the pipe 23 and the pipe 23, and the veneer 21 is pressed against the lower surface of the slab 1.
Concrete is poured into the concrete, and after hardening, both the upper and lower sides of the wire 24 are cut to remove the upper and lower pipes 22 and 23.

【0003】[0003]

【発明が解決しようとする課題】上記従来の方法におい
ては、穴部の上下にパイプを配設しているので、型枠取
付け時にはスラブの下側から支持しつつワイヤを巻き回
さなければならず、型枠の設置に手間が掛った。またコ
ンクリート硬化後に上下のパイプを除去しなければなら
ず、設置時と同様にスラブの下側での作業も必要とされ
た。そして、スラブ下面の位置が高い場合には、作業者
はハシゴに上って作業する必要も生じている。
In the above-mentioned conventional method, since the pipes are arranged above and below the hole, the wire must be wound while being supported from the lower side of the slab when mounting the formwork. Instead, it took time to install the formwork. Also, the upper and lower pipes had to be removed after the concrete had hardened, and the work on the lower side of the slab was required as at the time of installation. Further, when the position of the lower surface of the slab is high, it is necessary for the worker to go up and work on the ladder.

【0004】[0004]

【課題を解決するための手段】この発明は、コンクリー
トスラブに形成された穴部下側にワイヤ挿通部を有する
型枠を添設し、前記穴部上側に吊り杆を掛け渡し、ワイ
ヤを前記型枠の挿通部に挿通すると共に前記吊り杆と型
枠とをワイヤで結束して型枠をコンクリートスラブの下
面に圧接させて型枠を設置した後、穴部にコンクリート
を打設し、コンクリートの硬化後にワイヤを切断して前
記吊り杆を除去することにより、上記従来の課題を解決
するものである。前記型枠は、2枚の鉄板を蝶番で連結
した構造のものを使用すると、穴部の最大寸法よりも型
枠の最少寸法が大きくとも、型枠は穴部を通過してスラ
ブの下側に挿入することができる。
According to the present invention, a mold having a wire insertion portion is attached to the lower side of a hole formed in a concrete slab, and a hanging rod is hung on the upper side of the hole to wire the wire in the mold. After inserting the hanging rod and the formwork with a wire while inserting the formwork through the insertion part of the frame and placing the formwork by pressing the formwork against the lower surface of the concrete slab, concrete is placed in the hole and the concrete The conventional problem is solved by cutting the wire after curing and removing the suspension rod. If the mold used has a structure in which two iron plates are connected by a hinge, the mold will pass through the hole and the lower side of the slab even if the minimum size of the mold is larger than the maximum size of the hole. Can be inserted into.

【0005】[0005]

【作用】この発明において、型枠のワイヤ挿通部にワイ
ヤを予め挿通しておき、型枠を上方から穴部を通過させ
て穴部下側に添設させ、次いでワイヤを吊り杆に巻き締
めることにより、型枠の設置作業は全てスラブの上側か
ら行なうことができる。また、コンクリート硬化後は型
枠はそのまま埋め殺しにすることができるので、型枠を
除去する必要はなく、上側に配設されたパイプのみを除
去すればよく、このときにもスラブ下側での作業は不用
である。
In the present invention, the wire is previously inserted into the wire insertion portion of the form, the form is passed through the hole from above and attached to the lower side of the hole, and then the wire is wound around the hanging rod. Thus, all the work of installing the formwork can be performed from the upper side of the slab. Also, since the formwork can be buried as it is after the concrete has hardened, it is not necessary to remove the formwork, only the pipes arranged on the upper side need to be removed. Work is unnecessary.

【0006】[0006]

【実施例】図1はこの発明の型枠の設置状態を示す断面
図であって、コンクリートスラブ1の穴部2の下側に鉄
板製の型枠3が添接され、この型枠3に形成されたワイ
ヤ挿通孔3aにワイヤ4が挿通されている。そして、コ
ンクリートスラブ1の上面孔部2の近傍には桟木5が配
置され、桟木5間にパイプ製の吊り杆6が掛け渡され、
前記ワイヤ4は吊り杆6に巻き付けられ、ワイヤ4に引
張られて前記型枠2の周縁部はコンクリートスラブ1に
圧接されている。図中符号7は補強筋である。
1 is a cross-sectional view showing an installed state of a formwork of the present invention, in which an iron plate formwork 3 is attached below a hole 2 of a concrete slab 1, and The wire 4 is inserted through the formed wire insertion hole 3a. Then, a pier 5 is arranged near the upper surface hole portion 2 of the concrete slab 1, and a hanging rod 6 made of a pipe is hung between the piers 5,
The wire 4 is wound around a suspension rod 6 and pulled by the wire 4 so that the peripheral edge of the form 2 is pressed against the concrete slab 1. Reference numeral 7 in the figure is a reinforcing bar.

【0007】上記のように型枠を設置する手順は以下の
通りである。なお、これらの作業は全てコンクリートス
ラブ1の上側で行なう。まず型枠3のワイヤ挿通孔3a
にワイヤ4を挿通し、ワイヤ4を吊り杆6に巻いてワイ
ヤの両端を仮止する。次いで型枠3をコンクリートスラ
ブ1の上側から穴部2を通過させて穴部2の下側に添接
して穴部2を閉塞した後、コンクリートスラブ1の穴部
2の近傍に桟木5を配設し、この桟木5間に吊り杆6を
掛け渡す。その後、前記ワイヤ4の仮止め部を更に締め
付けて型枠3を吊り上げ、これをスラブ1の下面に圧接
させる。なお、型枠3をスラブ1の下側に配置した後、
ワイヤ4を吊り杆6に巻き付けてもよい。
The procedure for installing the formwork as described above is as follows. It should be noted that all of these operations are performed on the upper side of the concrete slab 1. First, the wire insertion hole 3a of the mold 3
The wire 4 is inserted through the wire 4, the wire 4 is wound around the hanging rod 6, and both ends of the wire are temporarily fixed. Next, the formwork 3 is passed from the upper side of the concrete slab 1 through the hole 2 and attached to the lower side of the hole 2 to close the hole 2, and then the pier 5 is placed in the vicinity of the hole 2 of the concrete slab 1. The hanging rod 6 is hung between the piers 5. After that, the temporary fixing portion of the wire 4 is further tightened to lift the form 3, and the form 3 is pressed against the lower surface of the slab 1. After arranging the formwork 3 on the lower side of the slab 1,
The wire 4 may be wound around the hanging rod 6.

【0008】このようにして型枠を設置した後、穴部2
にコンクリート8を打設し、、コンクリートが硬化した
後にワイヤ4のスラブ上方に突出している部分を切断
し、吊り杆6及び桟木5を除去する。
After installing the formwork in this way, the hole 2
Concrete 8 is cast on the concrete, and after the concrete hardens, the portion of the wire 4 protruding above the slab is cut, and the hanging rod 6 and the splint 5 are removed.

【0009】図4ないし図8はこの発明に使用する型枠
3の例である。図4の型枠3は、鉄板10の上面に複数
の凸部11をプレス加工で成型し、この凸部11の傾斜
面にワイヤ挿通孔3aを形成したものである。このよう
に孔3aを傾斜面に形成すると、打設コンクリートの漏
れを可及的に少なくすることができる。図5の型枠3
は、鉄板10に凸部を形成することなく、平面部にワイ
ヤ挿通孔3aを設けたものである。
4 to 8 show an example of the mold 3 used in the present invention. In the mold 3 of FIG. 4, a plurality of protrusions 11 are formed on the upper surface of the iron plate 10 by press working, and the wire insertion holes 3a are formed on the inclined surfaces of the protrusions 11. By forming the hole 3a on the inclined surface in this way, it is possible to reduce the leakage of the poured concrete as much as possible. Form 3 of FIG.
Is the one in which the wire insertion hole 3a is provided in the flat portion without forming the convex portion on the iron plate 10.

【0010】図6の型枠は、鉄板10の上面に吊り材1
2を固着し、この吊り材にトラス13を吊り下げたもの
で、ワイヤ4は吊り材12又はトラス13と吊り杆との
間に巻き回す。この型枠3においては、トラス13を有
するので補強筋7を配設する必要がない。なお、トラス
13は吊り下げなくともよい。図7の型枠は、鉄板10
の上面に逆U字状の金物14を固着したもので、ワイヤ
4はこの金物14と吊り杆6との間に巻き回す。
The formwork of FIG. 6 has a hanging member 1 on the upper surface of an iron plate 10.
2 is fixed, and the truss 13 is hung on this suspension material. The wire 4 is wound between the suspension material 12 or the truss 13 and the suspension rod. Since the formwork 3 has the truss 13, it is not necessary to dispose the reinforcing bar 7. The truss 13 does not have to be suspended. The formwork of FIG. 7 is an iron plate 10.
An inverted U-shaped metal piece 14 is fixed to the upper surface of the wire 4, and the wire 4 is wound between the metal piece 14 and the hanging rod 6.

【0011】図8及び図9は請求項2の発明の実施に使
用する型枠3であって、半月状の鉄板10a、10bを
蝶番15を介して連結し、円形で、折畳み可能としたも
のである。図には上記図4の型枠と同様に凸部にワイヤ
挿通孔3aを形成した構造が示してあるが、上記図5な
いし図7に示したワイヤ挿通部の構造を適宜使用するこ
とができる。この型枠を使用すれば、図8に鎖線で示す
穴部2の最大寸法よりも型枠の最少寸法が大きくとも、
折畳むことにより穴部2を通過させることができ、スラ
ブ上側からの作業が可能である。また、円形であるから
方向性がなく、作業時に型枠の向きを配慮する必要がな
い。更に、周縁部を屈曲させてにリブ16を形成してお
けば、仕上り状態がきれいであって、内装材を張らない
場合であっても単なるカバーと同様に見える。
FIGS. 8 and 9 show a mold 3 used for carrying out the invention of claim 2, which is a circular and foldable structure in which half-moon shaped iron plates 10a and 10b are connected via a hinge 15. Is. Although the drawing shows the structure in which the wire insertion hole 3a is formed in the convex portion similarly to the mold of FIG. 4, the structure of the wire insertion portion shown in FIGS. 5 to 7 can be appropriately used. . If this form is used, even if the minimum size of the form is larger than the maximum size of the hole 2 shown by the chain line in FIG.
By folding, the hole 2 can be passed, and the work from the upper side of the slab is possible. Further, since it is circular, it has no directionality, and it is not necessary to consider the orientation of the formwork during work. Furthermore, if the ribs 16 are formed by bending the peripheral portion, the finished state is beautiful, and even when the interior material is not stretched, it looks like a simple cover.

【0012】[0012]

【発明の効果】この発明によれば、型枠のワイヤ挿通部
にワイヤを予め挿通しておき、型枠を上方から穴部を通
過させて穴部下側に添接させ、次いでワイヤで吊り杆と
型枠とを結束することにより、スラブ上側での作業のみ
により型枠をスラブ下側に圧接させることができ、型枠
の設置作業はは全てスラブの上側から行なうことができ
る。また、コンクリート硬化後は型枠はそのまま埋め殺
しにすることができるので、型枠を除去する必要はな
い。そして、ワイヤの上側を切断すれば上側に配設され
たパイプを除去することができるので、型枠の解体作業
もスラブ上側での作業にみで可能である。したがって、
スラブ下側での作業は不用となり作業性が向上する。ま
た、埋め殺しにされた型枠の存在により穴部の位置が容
易に探知できるので、後日配管等の必要が生じた際に誤
りなく穴部を解体することができる。
According to the present invention, the wire is previously inserted into the wire insertion portion of the mold, the mold is passed through the hole from above to be attached to the lower side of the hole, and then the wire is suspended by the wire. By tying the mold and the formwork together, the formwork can be brought into pressure contact with the lower side of the slab only by the work on the upper side of the slab, and the work of installing the formwork can be performed from the upper side of the slab. Further, since the formwork can be left as it is after the concrete is hardened, it is not necessary to remove the formwork. Since the pipe arranged on the upper side of the wire can be removed by cutting the upper side of the wire, the work of dismantling the formwork can be performed only by the work on the upper side of the slab. Therefore,
Work under the slab is unnecessary and workability is improved. Further, since the position of the hole can be easily detected by the presence of the buried mold, the hole can be disassembled without error when the need for piping or the like arises at a later date.

【図面の簡単な説明】[Brief description of drawings]

【図1】 この発明実施例における型枠設置状態の断面
図である。
FIG. 1 is a cross-sectional view of a mold installation state in an embodiment of the present invention.

【図2】 同じく型枠設置過程を示す側面断面図であ
る。
FIG. 2 is a side sectional view showing the process of installing the formwork as well.

【図3】 同じく型枠解体後の状態を示す断面図であ
る。
FIG. 3 is a sectional view showing a state after the mold is disassembled.

【図4】 同じく型枠の一部拡大断面図である。FIG. 4 is a partially enlarged cross-sectional view of the form likewise.

【図5】 同じく直接ワイヤ挿通孔を形成した型枠の一
部拡大断面図である。
FIG. 5 is a partially enlarged cross-sectional view of a mold in which a wire insertion hole is also formed directly.

【図6】 同じく吊り材を固着した型枠の斜視図であ
る。
FIG. 6 is a perspective view of a form frame to which suspension materials are also fixed.

【図7】 同じくU字型金物を固着した型枠の斜視図で
ある。
FIG. 7 is a perspective view of a frame to which a U-shaped metal piece is also fixed.

【図8】 同じく折畳み可能とした型枠の平面図であ
る。
FIG. 8 is a plan view of a mold frame that is also foldable.

【図9】 同じく断面図である。FIG. 9 is a sectional view of the same.

【図10】 従来例の断面図である。FIG. 10 is a sectional view of a conventional example.

【符号の説明】[Explanation of symbols]

1 コンクリートスラブ 2 穴部 3 型枠 3a ワイヤ挿通孔 4 ワイヤ 5 桟木 6 吊り杆 1 concrete slab 2 hole 3 formwork 3a wire insertion hole 4 wire 5 splint 6 suspension rod

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 コンクリートスラブに形成された穴部下
側にワイヤ挿通部を有する型枠を添接し、前記穴部上側
に吊り杆を掛け渡し、ワイヤを前記型枠の挿通部に挿通
すると共に前記吊り杆と型枠とをワイヤで結束して型枠
をコンクリートスラブの下面に圧接させた後、穴部にコ
ンクリートを打設し、コンクリートの硬化後にワイヤを
切断して前記吊り杆を除去することを特徴とする、コン
クリートスラブの穴充填方法
1. A formwork having a wire insertion part is attached to a lower side of a hole formed in a concrete slab, a suspension rod is hung over the hole side, and a wire is inserted into the insertion part of the formwork. After the hanging rod and the formwork are bound with a wire and the formwork is pressed against the lower surface of the concrete slab, concrete is placed in the hole, and after the concrete hardens, the wire is cut to remove the hanging rod. Method for filling holes in concrete slabs characterized by
【請求項2】 型枠は、2枚の鉄板を蝶番で連結した構
造のものを使用した、請求項1記載のコンクリートスラ
ブの穴充填方法
2. The method of filling holes in a concrete slab according to claim 1, wherein the formwork has a structure in which two iron plates are connected by a hinge.
JP23898592A 1992-08-14 1992-08-14 Hole filling method for concrete slabs Expired - Lifetime JPH0819727B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23898592A JPH0819727B2 (en) 1992-08-14 1992-08-14 Hole filling method for concrete slabs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23898592A JPH0819727B2 (en) 1992-08-14 1992-08-14 Hole filling method for concrete slabs

Publications (2)

Publication Number Publication Date
JPH0665979A JPH0665979A (en) 1994-03-08
JPH0819727B2 true JPH0819727B2 (en) 1996-02-28

Family

ID=17038217

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23898592A Expired - Lifetime JPH0819727B2 (en) 1992-08-14 1992-08-14 Hole filling method for concrete slabs

Country Status (1)

Country Link
JP (1) JPH0819727B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007032043A (en) * 2005-07-26 2007-02-08 Kazumi Hiramatsu Construction method and holder
DE102019125409A1 (en) * 2019-09-20 2021-03-25 Redima Ag End shuttering of a double wall element

Also Published As

Publication number Publication date
JPH0665979A (en) 1994-03-08

Similar Documents

Publication Publication Date Title
JP2994222B2 (en) Construction method of cast-in-place slab of precast concrete girder and its formwork
US3864888A (en) Apparatus and method for employing gypsum board as forms for poured concrete ceiling and floor structures
JPH0819727B2 (en) Hole filling method for concrete slabs
JP3707006B2 (en) New method for opening openings in existing masonry walls
JPH04334405A (en) Manufacture of precast concrete beam
JP2000110235A (en) Execution method of concrete structure
JPH0932288A (en) Support method and tool for gap filling filler for pipe insertion hole
JP3029908B2 (en) Construction method of concrete structure
JP3487934B2 (en) Trench for laying piping and method of construction
JP2533344B2 (en) Method for manufacturing half PCa board
JPH07180239A (en) Manufacture of precast concrete board
JPH06257214A (en) Concrete casting method of uppermost floor having steer sloping roof
JP2002070317A (en) Slab provisional hole constructing and curing method
KR200235135Y1 (en) A Fixing Device for Steel form Panel
JP3612108B2 (en) RC wall construction method
JP2941172B2 (en) Manufacturing method of PC segment
JP2942370B2 (en) Formwork method for vertical joints such as reinforced concrete beams and walls and guide metal fittings used in this method
KR200343278Y1 (en) Net-type dowel box for the separated materials
KR200237627Y1 (en) Construction joint structure at the reinforced concrete of building
JP3368360B2 (en) How to install a packer plate for equipment installation
JP2560054B2 (en) Floor wiring construction method and construction structure
JP3021610U (en) Wire mesh for floor filling work for pipes
JPH03281855A (en) Floor framing construction for building
JPH1046814A (en) Method of placing concrete separately
JPS61155504A (en) Floor panel structure