JPH0791023B2 - Lifting device - Google Patents
Lifting deviceInfo
- Publication number
- JPH0791023B2 JPH0791023B2 JP2089496A JP8949690A JPH0791023B2 JP H0791023 B2 JPH0791023 B2 JP H0791023B2 JP 2089496 A JP2089496 A JP 2089496A JP 8949690 A JP8949690 A JP 8949690A JP H0791023 B2 JPH0791023 B2 JP H0791023B2
- Authority
- JP
- Japan
- Prior art keywords
- rope
- suspension arm
- hoisting
- base
- winch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000000725 suspension Substances 0.000 claims description 54
- 229910000831 Steel Inorganic materials 0.000 claims description 19
- 239000010959 steel Substances 0.000 claims description 19
- 238000010276 construction Methods 0.000 claims description 9
- 238000004804 winding Methods 0.000 description 8
- 230000003028 elevating effect Effects 0.000 description 7
- 238000005452 bending Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000009415 formwork Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 210000000078 claw Anatomy 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
Landscapes
- Jib Cranes (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Load-Engaging Elements For Cranes (AREA)
Description
【発明の詳細な説明】 [産業上の利用分野] この発明は建造物の梁用型枠等の重量物を吊上げるとき
に適用される吊上げ装置に関する。TECHNICAL FIELD The present invention relates to a hoisting device applied when hoisting a heavy object such as a beam formwork of a building.
[従来の技術] 従来のこの種の吊上げ装置では、基端部がウインチの巻
胴にそれぞれ繋止されかつ先端部が吊上げ台の前後端部
にそれぞれ繋止された2本の索条によって吊上げ台を昇
降させて吊上げ台上の梁を吊上げていた。[Prior Art] In the conventional lifting device of this type, the hoisting device is hoisted by two cords whose base ends are respectively fastened to winch winding cylinders and front ends are respectively fastened to front and rear ends of a hoisting stand. The platform was lifted and the beams on the platform were suspended.
[発明が解決しようとする課題] 上記吊上げ装置では2本の索条間で伸び量の差異が起生
したり、両索条をウインチの巻胴に巻取るときの巻取り
長が不同となったり、巻取り形態が不揃いとなって吊上
げ台が前傾もしくは後傾状に傾斜した姿勢で昇降する問
題点があった。[Problems to be Solved by the Invention] In the above-mentioned hoisting device, a difference in the amount of elongation occurs between the two ropes, and the winding lengths when the two ropes are wound on the winch winding cylinder become unequal. In addition, there is a problem in that the winding forms are not uniform and the hoisting base moves up and down in a posture inclining forward or backward.
本発明は上記問題点を解消することを課題とするもので
ある。The present invention aims to solve the above problems.
[課題を解決するための手段] 本発明の吊上げ装置は、ウインチのウインチ本体が取付
けられた基台の先端部上に立設された支柱の上端には横
長状に形成された吊腕の基端部を水平方向への回転およ
び上下方向への傾動可能に連結し、前記吊腕には前記ウ
インチの索条の一部に折り返し端が形成されるように前
記索条の一部が下方から掛装された上滑車と、この上滑
車の前方に配置されて前記索条の先端部が繋止されたフ
ックとを取付け、前記吊腕の下方に設置された吊上げ台
には前記索条のうち、その先端部と前記折り返し端の中
間部位が上方から折り返し状に掛装された1対の昇降滑
車を取付けて前記吊上げ台を前記索条によって吊支し、
前記吊腕の中央部付近にはこの吊腕を建設中の建造物の
鉄骨に連結して固定する吊腕連結機構を取付けた構成を
有する。[Means for Solving the Problems] A hoisting device of the present invention is a hoisting arm base formed in a laterally long shape at the upper end of a column that is erected on the tip of a base to which a winch body of a winch is attached. The ends are connected so as to be rotatable in the horizontal direction and tiltable in the vertical direction, and a part of the rope is formed from below so that a folding end is formed in a part of the rope of the winch in the suspension arm. A hooked upper pulley and a hook arranged at the front of the upper pulley and having the tip end of the rope attached thereto are attached, and the lifting table installed below the suspension arm is provided with the rope. Among them, a pair of lifting pulleys are attached, in which an intermediate portion between the tip end portion and the folding end is hooked in a folded shape from above, and the lifting platform is suspended and supported by the rope.
The suspension arm has a structure in which a suspension arm connecting mechanism for connecting and fixing the suspension arm to a steel frame of a building under construction is attached near the central portion of the suspension arm.
(作用) 上記した構成を有する吊上げ装置において、ウインチの
索条を、この索条の折り返し端を上滑車に掛装して索条
の先端をフックに繋止し、索条の先端部と折り返し端と
の中間部位を吊上げ台の両昇降滑車に掛装し、また、吊
腕を吊腕連結機構によって建造中の建造物の鉄骨に固定
した状態で吊上げ台を吊支する。(Operation) In the hoisting device having the above-mentioned configuration, the rope of the winch is hooked to the upper pulley at the folded end of the rope, and the tip of the rope is connected to the hook, and folded back with the tip of the rope. An intermediate part between the end is hung on both hoisting pulleys of the hoisting platform, and the hoisting platform is suspended while the suspension arm is fixed to the steel frame of the building under construction by the suspension arm connecting mechanism.
(発明の効果) 本発明は上記したように構成したことによって、吊上げ
台上の重量物を吊上げるときに索条に摺転しながら索条
によって押上げられる両昇降滑車に対してこの両昇降滑
車を同一水平レベルに保持する規正作用が働くので、吊
上げ台を自動的に水平状態に保持して上方へ並行移動さ
せることができ、吊上げ台の昇降姿勢を常に適正化する
ことができる。(Effects of the Invention) With the present invention configured as described above, both lifting and lowering pulleys are pushed up and down by the ropes while sliding on the ropes when lifting a heavy object on the hoisting platform. Since the regulation action that holds the pulleys at the same horizontal level works, the lifting platform can be automatically held in the horizontal state and moved upward in parallel, and the lifting posture of the lifting platform can always be optimized.
また、1本の索条によって吊上げ台を昇降させるので、
索条の案内機構を簡略化し得るとともに、索条の所要長
さを短縮させることができる。Also, since the hoisting platform is lifted and lowered by one rope,
The guide mechanism of the rope can be simplified and the required length of the rope can be shortened.
さらに、吊腕を建造中の建造物の鉄骨に固定することが
できるので、吊腕を鉄骨によって安定に支持して吊上げ
台の吊支状態を安定化することができるとともに、吊腕
を水平回転および傾動させることによって吊腕をその高
さや角度を変えて鉄骨に的確に連結することができる。Furthermore, since the suspension arm can be fixed to the steel frame of the building under construction, the suspension arm can be stably supported by the steel frame to stabilize the suspension support state of the hoist, and the suspension arm can be rotated horizontally. By tilting and tilting, the height and angle of the suspension arm can be changed and the suspension arm can be accurately connected to the steel frame.
[実施例] 次に、本発明の一実施例を図面に従って説明する。[Embodiment] Next, an embodiment of the present invention will be described with reference to the drawings.
建造物の建設中に梁用型枠等の重量物Hを吊上げるため
に装設された吊上げ装置Tにおいて、基台1は方形枠状
の前フレーム1aと、方形枠状の後フレーム1bと、両フレ
ーム1a,1bを連結する水平状の連結杆1cとが組付けられ
て形成され、前後フレーム1a,1bの左右端部には基台1
を走行させるために左右各1対の車輪2がそれぞれ取付
けられている。In a hoisting device T installed for hoisting a heavy object H such as a beam formwork during the construction of a building, a base 1 has a rectangular frame-shaped front frame 1a and a rectangular frame-shaped rear frame 1b. , A horizontal connecting rod 1c for connecting both frames 1a, 1b is assembled and formed, and a base 1 is provided at the left and right ends of the front and rear frames 1a, 1b.
A pair of left and right wheels 2 are mounted for traveling the vehicle.
後フレーム1bの中央部上にはウインチ本体4と、このウ
インチ本体4の巻胴4aに基端部が繋止された索条5とを
有するウインチ3のウインチ本体4が設置される一方、
連結杆1cの前端部付近の上面に取着されたブラケット6
にはウインチ本体4の巻胴4aに巻取られる索条5の一部
をウインチ本体4の先方で案内して上方からウインチ本
体4側もしくはウインチ本体4側から上方へ曲進させる
ために索条5の一部が掛装された下滑車7がブラケット
6に水平状に貫挿された支軸7aを介して回転及び軸方向
への移動可能に軸支されている。A winch body 4 of a winch 3 having a winch body 4 and a cord 5 having a base end portion connected to a winding drum 4a of the winch body 4 is installed on the center portion of the rear frame 1b, while
Bracket 6 attached to the upper surface near the front end of the connecting rod 1c
In order to guide a part of the rope 5 wound around the winding drum 4a of the winch body 4 at the tip of the winch body 4 and bend the rope 5 upward from the winch body 4 side or from the winch body 4 side. A lower pulley 7 on which a part of 5 is hung is rotatably and axially movably supported by a support shaft 7a which is horizontally inserted through a bracket 6.
基台1の先端部上には丸パイプ材の上柱体9aと下柱体9b
とが伸縮可能に連結されて形成された支柱9が、前フレ
ーム1aの前端中央部に取着された角筒状の保持部材22内
に遊挿された方形板状のベース10aと、このベース10aに
下端部が固着されて支柱9内の下端部に上部が挿入され
たボルト10bと、支柱9を支承した状態でボルト10bに螺
嵌された操作ナット10cとを有するジャッキ10を介して
上下方向への移動調節可能に立設されている。On the tip of the base 1, an upper column 9a and a lower column 9b of round pipe material are provided.
A columnar base 10a, which is loosely inserted into a rectangular tubular holding member 22 attached to the center of the front end of the front frame 1a, is formed by a pillar 9 formed by extensiblely connecting and. Up and down via a jack 10 having a bolt 10b having a lower end fixed to 10a and an upper part inserted into the lower end of the column 9 and an operation nut 10c screwed to the bolt 10b with the column 9 supported. It is erected so that the movement in the direction can be adjusted.
支柱9の上柱体9aの上端には上面が球面状に湾曲された
座金27が固着されるとともに、この座金27にはその中心
部に貫挿された係止ピン28が固着されている。A washer 27 having an upper surface curved in a spherical shape is fixed to the upper end of the upper column 9a of the column 9, and a locking pin 28 inserted through the center of the washer 27 is fixed.
支柱9の上端には角パイプ材で形成されて支柱9の先方
へ延出された吊腕12が、この吊腕12の基端部内に係止ピ
ン28の上部が挿入されかつ座金27上に吊腕12の基端部が
載置された状態で水平方向への回転及び上下方向への傾
動可能に繋止されている。A suspension arm 12 formed of a square pipe material and extending toward the end of the support column 9 is provided at the upper end of the support column 9, and an upper portion of a locking pin 28 is inserted into the base end portion of the suspension arm 12 and is placed on a washer 27. The suspension arm 12 is locked so that it can be rotated in the horizontal direction and tilted in the vertical direction in a state where the base end portion of the suspension arm 12 is placed.
吊腕12を建設中の建造物の鉄骨Tに連結する吊腕連結機
構において、吊腕12の中央部付近上には左右端部が吊腕
12の外方へ突出された前後1対の吊板23が並行状に載置
され、この両吊板23の左右端部には吊腕12を建設中の建
造物の各階毎に横架された既設の鉄骨Tに直交状に固定
するために吊腕12の両側に垂下された前後2対の連結ボ
ルト24の各上端部がそれぞれ貫挿され、各連結ボルト24
はその各上端部にそれぞれ螺嵌されたナット25を介して
吊板23に吊支されている。各連結ボルト24の下端には鉄
骨Tの上側の側縁T1に掛止するための掛止爪24aがそれ
ぞれ形成されている。吊腕12と鉄骨との間には吊腕12の
下面に吊板23と平行に添接された添え板26aと、この添
え板26aの左右端部にそれぞれ垂直状に固着された左右
1対の筒杆26bと、この両筒杆26bを連結するために左右
両端部が両筒杆26bにそれぞれ固着された連結板26cとを
それぞれ有する前後1対の介装部材26が介装されてい
る。各連結ボルト24の下部を各筒杆26b内に貫挿して各
掛止爪24aを鉄骨Tの両側縁T1にそれぞれ掛止した状態
でナット25を螺進すると、両介装部材26が吊腕12と鉄骨
Tとの間でそれぞれ挟止されて吊腕12が鉄骨Tの上方一
で鉄骨Tに直交状に固定される。In the suspension arm connection mechanism that connects the suspension arm 12 to the steel frame T of the building under construction, the left and right ends are located above the central portion of the suspension arm 12.
A pair of front and rear suspension plates 23 projecting outwardly of 12 are placed in parallel, and suspension arms 12 are horizontally installed on the left and right ends of both suspension plates 23 for each floor of the building under construction. The upper ends of the two pairs of front and rear connecting bolts 24 hung on both sides of the suspension arm 12 for orthogonally fixing to the existing steel frame T are respectively inserted, and the connecting bolts 24
Is suspended and supported by a suspension plate 23 via nuts 25 screwed onto the respective upper ends thereof. Locking claws 24a for locking the upper side edge T1 of the steel frame T are formed at the lower ends of the connecting bolts 24, respectively. Between the suspension arm 12 and the steel frame, a support plate 26a is attached to the lower surface of the suspension arm 12 in parallel with the suspension plate 23, and a pair of left and right vertically secured to the left and right ends of the support plate 26a. A pair of front and rear interposing members 26, each of which has a cylindrical rod 26b and connecting plates 26c whose left and right ends are fixed to the cylindrical rods 26b, respectively, are provided to connect the cylindrical rods 26b. . When the nuts 25 are screwed with the lower portions of the connecting bolts 24 inserted into the cylindrical rods 26b and the hooks 24a hooked on both side edges T1 of the steel frame T, the interposition members 26 are hung. The suspension arm 12 is clamped between the steel frame T and the steel frame T, and the suspension arm 12 is fixed to the steel frame T at an upper position above the steel frame T in an orthogonal manner.
吊腕12の基端部内には索条5の一部を支柱9の上端付近
で案内して下方から下方へ折り返し状に曲進させ、索条
5の一部に折り返し端5bを形成するために支柱9の上端
付近に配設されて索条6の一部が下方から折り返し状に
掛装された前後1対の上滑車13,13が吊腕12に水平状に
貫挿された支軸13aを介してそれぞれ回転可能に軸支さ
れている。両上滑車13は吊腕12の一方の側壁12aに接近
した位置に偏位した状態で両支軸13aに嵌装され、両支
軸13aには軸方向への上滑車13の移動を規制するための
ピン29が貫挿されている。In order to form a folded-back end 5b in a part of the rope 5 by guiding a part of the rope 5 in the vicinity of the upper end of the support column 9 in the base end portion of the suspension arm 12 and bending it downward. A pair of front and rear upper pulleys 13, 13 arranged in the vicinity of the upper end of the column 9 and having a part of the rope 6 hung from the bottom in a folded shape, and horizontally inserted into the suspension arm 12 Each of them is rotatably supported via 13a. Both upper pulleys 13 are fitted to both support shafts 13a in a state of being displaced to a position close to one side wall 12a of the suspension arm 12, and both support shafts 13a regulate the movement of the upper pulleys 13 in the axial direction. The pin 29 for is inserted.
吊腕12の先端部には上滑車13の斜め前方に配置されて索
条5の先端部5aが螺止されたフック15が吊腕12の先端部
に水平状に貫挿された支持ピン16を介して吊支されてい
る。このフック15には索条5の先端部5aに形成したルー
プを掛止するための鉤形状の掛止部15aと、この掛止部1
5aの上方に連設されて支持ピン16が挿通されたリング状
の取付部15bと、索条5の先端部5aを抜け止めするため
に掛止部15aの上端にピン着された抜け止め片15cとが形
成され、フック15は吊腕12の先端部で両上滑車13の偏位
方向側の反対側の側壁12bに接近した位置に偏位した状
態で吊支されている。At the tip of the suspension arm 12, a hook 15 which is arranged diagonally forward of the upper pulley 13 and to which the tip 5a of the rope 5 is screwed is inserted horizontally into the support pin 16 at the tip of the suspension arm 12. It is suspended through. The hook 15 has a hook-shaped hooking portion 15a for hooking a loop formed on the tip portion 5a of the cord 5, and the hooking portion 1
A ring-shaped mounting portion 15b which is continuously provided above 5a and through which the support pin 16 is inserted, and a retaining piece which is pinned to the upper end of the hooking portion 15a to prevent the distal end portion 5a of the cord 5 from coming off. 15c is formed, and the hook 15 is suspended and supported at the tip end of the suspension arm 12 in a state of being displaced to a position close to the side wall 12b on the opposite side of the displacement direction side of both upper pulleys 13.
吊腕12の下方には基台1の先方の下端位置から支柱9に
沿って吊上げられる梁用型枠等の重量物Hを載置するた
めに基台1の先方に隣設された吊上げ台17が水平状に設
置され、吊上げ台17のベース18は前後枠杆18a,18aと左
右枠杆18b,18bとによって方形枠状に形成されるととも
に、ベース18の中央部付近には前後方向に対して横方向
へ傾斜した状態で前後枠杆18a間に斜めに橋架された角
パイプ状の中枠杆18cが形成されている。Below the suspension arm 12, a hoisting base adjacent to the front side of the base 1 for placing a heavy object H such as a beam form frame to be hoisted along the support column 9 from the lower end position of the base 1 forward. 17 is installed horizontally, the base 18 of the lifting platform 17 is formed in a rectangular frame shape by the front and rear frame rods 18a, 18a and the left and right frame rods 18b, 18b, and in the front-back direction near the center of the base 18. On the other hand, an angled pipe-shaped middle frame rod 18c is formed obliquely bridged between the front and rear frame rods 18a in a state of being inclined in the lateral direction.
吊上げ台17の横幅方向の中央部付近の前後端部にはこの
吊上げ台17の横幅方向の中央部付近が前後方向および左
右方向へ離隔した2つ位置で索条5によって吊支される
ように索条5のうち、その先端部5aと折り返し端5bとの
中間部位が吊上げ台17を斜めに横切って折返し状に掛装
された1対の昇降滑車19,19が取付けられている。両昇
降滑車19はベース18の中枠杆18cの前後端部にそれぞれ
水平状に貫挿された支軸19aを介してそれぞれ中枠杆18c
の傾斜方向と同方向へ傾斜して回転可能に横架され、両
昇降滑車19の下方にはそれぞれカバー22が取外し可能に
設置されている。At the front and rear ends near the center of the hoist 17 in the width direction, the center of the hoist 17 in the width direction may be suspended by the rope 5 at two positions separated in the front-rear direction and the left-right direction. A pair of hoisting pulleys 19 and 19 are attached, in which the intermediate portion between the tip end 5a and the folded end 5b of the cord 5 crosses the hoisting base 17 diagonally and is hung in a folded shape. Both lifting pulleys 19 are respectively connected to the middle frame rods 18c through the support shafts 19a which are horizontally inserted at the front and rear ends of the middle frame rods 18c of the base 18.
It is rotatably laterally installed inclining in the same direction as the tilting direction, and covers 22 are removably installed below both lift pulleys 19.
両昇降滑車19は索条5の折り返し端5bの下方位置と先端
部5aの下方位置とにそれぞれ配置され、両昇降滑車19の
配列方向は上滑車13およびフック15の配列方向とほぼ一
致している。The both elevating sheaves 19 are disposed below the folded-back end 5b of the rope 5 and below the tip 5a, respectively, and the arrangement directions of the both elevating sheaves 19 substantially coincide with the arrangement direction of the upper sheave 13 and the hooks 15. There is.
吊上げ台17のベース18の中枠杆18cの中央部下面に取着
されたブラケット21には索条5が両昇降滑車19にそれぞ
れ接触する位置での索条5の折り曲げ角度を拡大して索
条5を両昇降滑車19との接触部で円滑に曲進させるため
に両昇降滑車19の中間部の下方に配設された補助滑車20
がブラケット21に貫挿された支軸20aを介して回転可能
に軸支され、索条5は両昇降滑車19及び補助滑車20に逆
山形状に掛装されている。ブラケット21の下端には索条
5を補助滑車20のガイド溝内に保持するための抜け止め
片21aが形成されている。On the bracket 21 attached to the lower surface of the central portion of the middle frame rod 18c of the base 18 of the hoisting base 17, the bending angle of the rope 5 is enlarged at the position where the rope 5 comes into contact with both the elevating sheaves 19. Auxiliary sheaves 20 arranged below the middle portion of the two elevating sheaves 19 in order to smoothly bend the strip 5 at the contact portion with the both elevating sheaves 19.
Is rotatably supported by a support shaft 20a inserted through a bracket 21, and the rope 5 is hooked on both the elevating sheaves 19 and the auxiliary sheaves 20 in an inverted mountain shape. At the lower end of the bracket 21, a retaining piece 21a for retaining the cord 5 in the guide groove of the auxiliary pulley 20 is formed.
索条5はその先端部5aが吊腕12の先端部に繋止され、吊
腕12の下方で両昇降滑車19および補助滑車20によって上
方へ折り返され、支柱9の上端付近で両上滑車13によっ
て下方へ折り返され、さらに、基台1の先端付近で下滑
車7によってウインチ3のウインチ本体4側へ折り曲げ
られた状態で、各滑車19,20,13,7に掛渡されてウインチ
本体4によって巻取られる。The rope 5 has its tip portion 5a connected to the tip portion of the suspension arm 12, is folded back below the suspension arm 12 by both the elevating sheaves 19 and the auxiliary sheaves 20, and both upper sheaves 13 near the upper ends of the columns 9. Is folded back downward by the lower pulley 7, and is further folded near the tip of the base 1 by the lower pulley 7 toward the winch body 4 side of the winch 3, and is hung on the pulleys 19, 20, 13, 7 to winch body 4 Wound up by.
索条5をウインチ本体4の巻胴4aに巻取り、もしくは巻
胴4aから解舒したときには吊上げ台17は索条5が巻取ら
れた長さもしくは解舒された長さの1/2の距離だけ上下
方向へ平行移動する。When the rope 5 is wound around the winding drum 4a of the winch body 4 or unwound from the winding drum 4a, the lifting platform 17 has a length of 1/2 of the wound length or the unwound length of the rope 5. Translate up and down by a distance.
なお、吊上げ台17上に重量物Hを載置して吊上げるに際
し、重量物Hの長手方向の両端部にそれぞれロープ等を
繋止し、このロープ等を作業者が操作して重量物Hを水
平状態に保持しながら吊上げ台17を上昇させる。When the heavy object H is placed on the hoist 17 and hoisted, ropes or the like are connected to both ends of the heavy object H in the longitudinal direction, and the operator operates the rope or the like to operate the heavy object H. The lifting table 17 is raised while keeping the horizontal position.
続いて、上記した構成をもつ実施例の作用と効果を説明
する。Next, the operation and effect of the embodiment having the above-mentioned configuration will be described.
本例ではウインチ3のウインチ本体4が取付けられた基
台1の先端部上に立設された支柱9の上端には横長状に
形成された吊腕12の基端部を水平方向への回転および上
下方向への傾動可能に連結し、吊腕12にはウインチ3の
索条5の一部に折り返し端5bが形成されるように索条5
の一部が下方から掛装された上滑車13と、この上滑車13
の前方に配置されて索条5の先端部5aが繋止されたフッ
ク15とを取付け、吊腕12の下方に設置された吊上げ台17
には索条5のうち、その先端部5aと折り返し端5bの中間
部位が上方から折り返し状に掛装された1対の昇降滑車
19を取付けて吊上げ台17を索条5によって吊支し、吊腕
12の中央部付近にはこの吊腕12を建設中の建造物の鉄骨
Tに連結して固定する吊腕連結機構を取付けてある。In this example, the base end of a horizontally extending suspension arm 12 is horizontally rotated at the upper end of a column 9 standing on the tip of a base 1 to which a winch body 4 of a winch 3 is attached. And the slant arm 12 so as to be tiltable in the vertical direction, and the rope 5 is formed on the suspension arm 12 so that the folded-back end 5b is formed on a part of the rope 5 of the winch 3.
Part of the upper pulley 13 is hung from below, and this upper pulley 13
And a hook 15 to which the tip 5a of the rope 5 is attached and which is arranged in front of the
In the rope 5, a pair of lifting sheaves in which an intermediate portion of the leading end 5a and the folded end 5b of the cord 5 is hooked in a folded shape from above.
19 is attached, and the hoisting base 17 is suspended by the rope 5,
A suspension arm connecting mechanism for connecting and fixing the suspension arm 12 to the steel frame T of the building under construction is attached near the central portion of 12.
このため、吊上げ台17上の重量物Hを吊上げるときに索
条5に摺転しながら索条5によって押上げられる両昇降
滑車19に対してこの両昇降滑車19を同一水平レベルに保
持する規正作用が働くので、吊上げ台17を自動的に水平
状態に保持して上方へ並行移動させることができ、吊上
げ台17の昇降姿勢を常に適正化することができる。Therefore, when the heavy object H on the hoisting base 17 is hoisted, the both hoisting sheaves 19 are held at the same horizontal level with respect to the both hoisting sheaves 19 that are pushed up by the hoisting rope 5 while being slid on the rope 5. Since the regulation action works, the lifting table 17 can be automatically held in the horizontal state and moved upward in parallel, and the lifting posture of the lifting table 17 can always be optimized.
また、1本の索条5によって吊上げ台17を昇降させるの
で、索条5の案内機構を簡略化し得るとともに、索条5
の所要長さを短縮させることができる。Further, since the hoisting base 17 is moved up and down by one rope 5, the guide mechanism for the rope 5 can be simplified and the rope 5
The required length of can be shortened.
さらに、吊腕12を建設中の建造物の鉄骨Tに固定するこ
とができるので、吊腕12を鉄骨Tによって安定に支持し
た吊上げ台17の吊支状態を安定化することがきるととも
に、吊腕12を水平回転および傾動させることによって吊
腕12をその高さや角度を変えて鉄骨Tに的確に連結する
ことができる。Further, since the suspension arm 12 can be fixed to the steel frame T of the building under construction, it is possible to stabilize the suspension state of the hoisting platform 17 that stably supports the suspension arm 12 by the steel frame T, and to suspend the suspension. By horizontally rotating and tilting the arm 12, the height and angle of the suspension arm 12 can be changed and the suspension arm 12 can be accurately connected to the steel frame T.
図面は本発明の一実施例を示すもので、第1図は吊上げ
装置の側面図、第2図は基台の先端部付近の縦断面図、
第3図は第2図のX1−X1線矢視図、第4図は吊腕付近の
一部破断拡大側面図、第5図は第4図のX2−X2線断面
図、第6図は第4図のX3−X3線矢視図、第7図は吊上げ
台の裏面図、第8図は第7図のX4−X4線拡大断面図であ
る。 1……基台 4……ウインチ本体 5……索条 5a……先端部 5b……折り返し端 9……支柱 12……吊腕 13……上滑車 17……吊上げ台 19……昇降滑車 T……吊上げ装置The drawings show one embodiment of the present invention. FIG. 1 is a side view of a hoisting device, FIG. 2 is a vertical cross-sectional view of the vicinity of the tip of a base,
Fig. 3 is a view taken along the line X1-X1 in Fig. 2, Fig. 4 is a partially cutaway enlarged side view near the suspension arm, Fig. 5 is a sectional view taken along line X2-X2 in Fig. 4, and Fig. 6 is Fig. 4 is a view taken along the line X3-X3 in Fig. 4, Fig. 7 is a rear view of the hoist, and Fig. 8 is an enlarged sectional view taken along line X4-X4 of Fig. 7. 1 ...... Base 4 ...... Winch body 5 ...... Rope 5a ...... Tip part 5b ...... Folding end 9 ...... Strut 12 ...... Suspension arm 13 ...... Upper pulley 17 ...... Lifting platform 19 ...... Lifting pulley T ...... Lifting device
Claims (1)
台の先端部上に立設された支柱の上端には横長状に形成
された吊腕の基端部を水平方向への回転および上下方向
への傾動可能に連結し、前記吊腕には前記ウインチの索
条の一部に折り返し端が形成されるように前記索条の一
部が下方から掛装された上滑車と、この上滑車の前方に
配置されて前記索条の先端部が繋止されたフックとを取
付け、前記吊腕の下方に設置された吊上げ台には前記索
条のうち、その先端部と前記折り返し端の中間部位が上
方から折り返し状に掛装された1対の昇降滑車を取付け
て前記吊上げ台を前記索条によって吊支し、前記吊腕の
中央部付近にはこの吊腕を建設中の建造物の鉄骨に連結
して固定する吊腕連結機構を取付けたことを特徴とする
吊上げ装置。1. A horizontally extending base end portion of a horizontally extending suspension arm is provided at the upper end of a column standing on the tip end portion of a base on which a winch body of a winch is mounted. And an upper pulley on which a part of the rope is hooked from below so that a folding end is formed on a part of the rope of the winch. And a hook to which the tip end of the cord is locked is attached to the front of the cord, and a lifting table installed below the suspension arm is provided with an intermediate portion between the tip end and the folded end of the cord. A pair of hoisting pulleys whose parts are folded from above are attached to suspend the hoisting platform by the ropes, and the hoisting arm is constructed near the center of the hoisting arm of a building under construction. A hoisting device having a hanging arm connecting mechanism for connecting and fixing to a steel frame.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2089496A JPH0791023B2 (en) | 1990-04-04 | 1990-04-04 | Lifting device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2089496A JPH0791023B2 (en) | 1990-04-04 | 1990-04-04 | Lifting device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH03288795A JPH03288795A (en) | 1991-12-18 |
| JPH0791023B2 true JPH0791023B2 (en) | 1995-10-04 |
Family
ID=13972373
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2089496A Expired - Lifetime JPH0791023B2 (en) | 1990-04-04 | 1990-04-04 | Lifting device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0791023B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102259806A (en) * | 2011-07-12 | 2011-11-30 | 大连博瑞重工有限公司 | Winding mechanism distributed along curved surface |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5596892U (en) * | 1978-12-25 | 1980-07-05 | ||
| JPS59130890U (en) * | 1983-02-21 | 1984-09-03 | 対馬 弥吉 | hoist |
-
1990
- 1990-04-04 JP JP2089496A patent/JPH0791023B2/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102259806A (en) * | 2011-07-12 | 2011-11-30 | 大连博瑞重工有限公司 | Winding mechanism distributed along curved surface |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH03288795A (en) | 1991-12-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| RU2145934C1 (en) | Method of and device for mounting tower crane boom | |
| JPH04317977A (en) | Buict-up scaffold movable through elevator shaft for attaching shaft device | |
| US3415339A (en) | Fork lift attachment | |
| JPS6317757B2 (en) | ||
| US4861219A (en) | Apparatus for lifting and carrying heavy loads | |
| US4740131A (en) | Apparatus for lifting and carrying heavy loads | |
| JP4353343B2 (en) | Large elevating stage, lifting method and reverse driving method using the same | |
| JPH0791023B2 (en) | Lifting device | |
| JP2884023B2 (en) | Trolley crane | |
| JP7392820B2 (en) | Crane connecting beam installation method | |
| JP2992504B2 (en) | lift device | |
| JP2003054876A (en) | Device and method for attaching and detaching side frame | |
| JP4103322B2 (en) | Method and apparatus for lifting drive unit to height position near elevator hoistway ceiling surface | |
| JP7663452B2 (en) | Pile driver | |
| JP3413760B2 (en) | Passenger conveyor installation equipment | |
| CN215326574U (en) | Hoisting assembly | |
| JP2007099402A (en) | Long material suspension | |
| JP3779510B2 (en) | Heavy lifting | |
| JPH0712907B2 (en) | Lifting device | |
| JPH0328066Y2 (en) | ||
| CN223328952U (en) | Movable lifting mechanism | |
| CN214653155U (en) | Telescopic suspension double-beam crane | |
| JPH08231161A (en) | Descending type construction elevator and method of extending the elevator mast in the descending direction | |
| JPH0728179Y2 (en) | Lifting device for tower erection crane | |
| JP6246707B2 (en) | Boom mounting device and crane |