JPH078546Y2 - Boom telescopic device - Google Patents

Boom telescopic device

Info

Publication number
JPH078546Y2
JPH078546Y2 JP1986063153U JP6315386U JPH078546Y2 JP H078546 Y2 JPH078546 Y2 JP H078546Y2 JP 1986063153 U JP1986063153 U JP 1986063153U JP 6315386 U JP6315386 U JP 6315386U JP H078546 Y2 JPH078546 Y2 JP H078546Y2
Authority
JP
Japan
Prior art keywords
boom
sheave
extension
attached
rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1986063153U
Other languages
Japanese (ja)
Other versions
JPS62176184U (en
Inventor
幸夫 木下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Komatsu Ltd
Original Assignee
Komatsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Komatsu Ltd filed Critical Komatsu Ltd
Priority to JP1986063153U priority Critical patent/JPH078546Y2/en
Publication of JPS62176184U publication Critical patent/JPS62176184U/ja
Application granted granted Critical
Publication of JPH078546Y2 publication Critical patent/JPH078546Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Description

【考案の詳細な説明】 産業上の利用分野 本考案は、クレーン等のブーム伸縮装置に関するもので
ある。
TECHNICAL FIELD The present invention relates to a boom telescopic device such as a crane.

従来の技術 第3図、第4図に示すように、第1ブーム1内に第2・
第3・第4ブーム2,3,4を伸縮自在に順次嵌挿し、第1
ブームと第2ブーム2とに亘つて第1シリンダ5を連結
し、第2ブーム2と第3ブーム3とに亘つてシリンダ6
を連結すると共に、第3ブーム3と第4ブーム4とに伸
長用ロープ7と縮少用ロープ8とを取付けて、第2シリ
ンダ6を伸縮することで第3・第4ブーム3,4を伸縮で
きるようにした装置が知られている。
2. Description of the Related Art As shown in FIGS. 3 and 4, the second boom is installed in the first boom 1.
The 3rd and 4th booms 2, 3 and 4 are telescopically inserted one by one,
The first cylinder 5 is connected between the boom and the second boom 2, and the cylinder 6 is connected between the second boom 2 and the third boom 3.
The third and fourth booms 3, 4 are connected by connecting the extension boom 7 and the reduction rope 8 to the third boom 3 and the fourth boom 4 and extending and contracting the second cylinder 6. A device capable of expanding and contracting is known.

考案が解決しようとする問題点 かかる装置であると、伸長用ロープ7の両端は第2ブー
ム2の先端に保持具9でそれぞれ連結され、第3ブーム
の先端に設けた一対のシーブ10,10及び第4ブーム4の
後端に設けたイコライザシーブ11に巻掛けてあり、第3
ブーム3が伸長すると伸長用ロープ7が引張られて第4
ブーム4が伸長するようにしてあるので、第4ブーム4
の内部にイコライザシーブ11を内蔵するから、第4ブー
ム4をイコライザシーブ11を内蔵できる大きさとする必
要があつて第4ブーム4が大きくなるのでブーム全体が
大きくなつて重量大となり、クレーンの吊荷重がそれだ
け小さくなつてしまうと共に、伸長用ロープ7の巻掛け
作業が面倒となつてしまう。
Problems to be Solved by the Invention In such a device, both ends of the extension rope 7 are connected to the tip of the second boom 2 by the holders 9, respectively, and a pair of sheaves 10, 10 provided at the tip of the third boom. And around the equalizer sheave 11 provided at the rear end of the fourth boom 4, and the third boom
When the boom 3 is extended, the extension rope 7 is pulled and the fourth
Since the boom 4 is extended, the fourth boom 4
Since the equalizer sheave 11 is built into the inside of the, it is necessary to make the fourth boom 4 large enough to accommodate the equalizer sheave 11, and since the fourth boom 4 becomes large, the entire boom becomes large and heavy, and the crane is suspended. The load is reduced accordingly, and the work of winding the extension rope 7 is also troublesome.

なお、縮少用ロープ8の両端は第4ブーム4の後端に連
結され、第3ブーム3の後端に設けた一対のシーブ12,1
2及び第2ブーム2の先端に設けたシーブ13に巻掛けら
れ、第3ブーム3が縮少すると第4ブーム4が縮少する
ようにしてある。
Both ends of the reduction rope 8 are connected to the rear end of the fourth boom 4, and a pair of sheaves 12, 1 provided at the rear end of the third boom 3 are connected.
It is wound around a sheave 13 provided at the tip of the second boom 2 and the second boom 2, and when the third boom 3 contracts, the fourth boom 4 contracts.

問題点を解決するための手段及び作用 第1のブーム内に第2のブームを伸縮自在に嵌挿し、こ
の第1のブームと第2のブームに亘って第2のブームを
伸縮するシリンダを取付け、前記第2のブーム内に第3
のブームを伸縮自在に嵌挿し、前記第2のブームの基端
にシーブ32を取付け、このシーブ32に巻掛けた縮少用ロ
ープ31の両端部を前記第1のブームの先端と第3のブー
ムの基端に連結して第2のブームとともに第3のブーム
が縮小するように構成し、前記第1のブームの外側面に
保持ヨーク34を備えたネジ杆35をブーム伸縮方向に移動
自在に支承し、そのネジ杆35に調整ナット38を螺合して
保持ヨーク34をブーム伸縮方向に移動調整自在とし、そ
の保持ヨーク34にイコライザシーブ30を取付け、前記イ
コライザシーブ30に巻掛けた伸長用ロープ28の両端部
を、前記第2のブームの先端に取付けたシーブ29を経て
前記第3のブームの基端に連結して第3のブームが第2
のブームとともに伸長するようにしたブーム伸縮装置。
Means and Actions for Solving the Problems A second boom is telescopically inserted into the first boom, and a cylinder for extending and retracting the second boom is attached between the first boom and the second boom. A third in the second boom
Of the boom is telescopically inserted, the sheave 32 is attached to the base end of the second boom, and both ends of the reduction rope 31 wound around the sheave 32 are attached to the tip of the first boom and the third boom. A screw rod 35 having a holding yoke 34 on the outer surface of the first boom is movable in the boom extension / contraction direction by connecting to the base end of the boom so that the third boom shrinks together with the second boom. The holding yoke 34 is movable in the boom extension / contraction direction by screwing an adjusting nut 38 onto the threaded rod 35, and the equalizer sheave 30 is attached to the holding yoke 34, and the extension wound around the equalizer sheave 30 is performed. Both ends of the rope for use 28 are connected to the base end of the third boom via the sheave 29 attached to the tip of the second boom so that the third boom moves to the second end.
Boom telescopic device that is designed to extend with the boom.

これにより、シリンダを伸縮することで第2のブームを
第1のブームに対して伸縮すると第3のブームが伸長用
ロープ28、縮少用ロープ31により同時に伸縮するし、第
3のブームを伸長する伸長用ロープ28の両端を第3のブ
ームの基端に連結し、その伸長用ロープ28が巻掛けられ
るイコライザシーブ30を第1のブームの外側面に設けた
ので、第3のブームをイコライザシーブ30の大きさに限
定されずに小さくできてブーム全体を小型にできると共
に、伸長用ロープ28の巻掛け作業も簡単となり、しかも
イコライザシーブ30を取付けた保持ヨーク34は第1のブ
ームの外側面にネジ杆35、調整ナット38でブーム伸縮方
向に移動調整自在に設けてあるので、その調整ナット38
を締付、弛めることでイコライザシーブ30をブーム伸縮
方向に移動して伸長用ロープ28の張りを調整でき、その
伸長用ロープ28自体の伸び歪みによる張り調整作業をブ
ームの外から簡単に行なうことができる。
Accordingly, when the second boom is expanded and contracted with respect to the first boom by expanding and contracting the cylinder, the third boom is expanded and contracted simultaneously by the extension rope 28 and the contraction rope 31, and the third boom is extended. Since both ends of the extension rope 28 to be connected are connected to the base end of the third boom, and the equalizer sheave 30 around which the extension rope 28 is wound is provided on the outer surface of the first boom, the third boom is equalized. The boom is not limited to the size of the sheave 30, and the entire boom can be made small, and the work of winding the extension rope 28 can be easily performed. Moreover, the holding yoke 34 to which the equalizer sheave 30 is attached is located outside the first boom. Since it is provided so that it can be moved and adjusted in the boom extension and contraction direction with the screw rod 35 and the adjustment nut 38 on the side
You can adjust the tension of the extension rope 28 by moving the equalizer sheave 30 in the boom extension and contraction direction by tightening and loosening, and easily perform the tension adjustment work due to the extension strain of the extension rope 28 itself from the outside of the boom. You can

実施例 第1ブーム20内に第2・第3・第4・第5ブーム21,22,
23,24が伸縮自在に順次嵌挿され、第1・第2ブーム20,
21間に第1シリンダ25が、第2・第3ブーム21,22間に
第2シリンダ26が、第3・第4ブーム22,23間に第3シ
リンダ27がそれぞれ連結され、伸長用ロープ28の両端は
第5ブーム24の後端に連結され、かつ第4ブーム23の先
端に設けた一対のシーブ29,29を経て第3ブーム22の先
端に設けた半円形のイコライザシーブ30に巻掛けてある
と共に、左右一対の縮少用ロープ31の両端は第5ブーム
24の基端に連結され、かつ第4ブーム23の後端に設けた
一対のシーブ32,32を経て第3ブーム22の先端に設けた
保持具33に連結してある。
In the first boom 20, the second, third, fourth and fifth booms 21,22,
23 and 24 are telescopically and sequentially inserted, and the first and second booms 20,
The first cylinder 25 is connected between the two, the second cylinder 26 is connected between the second and third booms 21 and 22, and the third cylinder 27 is connected between the third and fourth booms 22 and 23. Both ends of are connected to the rear end of the fifth boom 24, and are wound around a semicircular equalizer sheave 30 provided at the tip of the third boom 22 via a pair of sheaves 29, 29 provided at the tip of the fourth boom 23. Both ends of the pair of left and right reducing ropes 31 have a fifth boom.
It is connected to the base end of 24 and through a pair of sheaves 32, 32 provided at the rear end of the fourth boom 23, and is connected to a holder 33 provided at the tip of the third boom 22.

前記イコライザシーブ30は保持ヨーク34に支承され、そ
のネジ杆35が第3ブーム22の両端壁に固着した一対のブ
ラケット36,36間に固着した板37に螺合して調整ナツト3
8が螺合してあり、調整ナツト38を弛め・締付けること
で保持ヨーク34で移動してイコライザシーブ30の位置を
調整できるようにしてある。
The equalizer sheave 30 is supported by a holding yoke 34, and a screw rod 35 thereof is screwed into a plate 37 fixed between a pair of brackets 36 fixed to both end walls of the third boom 22 to adjust the nut 3.
8 is screwed together, and the position of the equalizer sheave 30 can be adjusted by moving the holding yoke 34 by loosening and tightening the adjusting nut 38.

しかして、第3シリンダ27を伸縮して第4ブーム23を伸
縮作動すると伸長用ロープ28,縮少用ロープ31で第5ブ
ーム24が伸縮作動する。
Then, when the third cylinder 27 is extended and contracted to extend and retract the fourth boom 23, the extension rope 28 and the reduction rope 31 cause the fifth boom 24 to extend and retract.

考案の効果 シリンダを伸縮することで第2のブームを第1のブーム
に対して伸縮すると第3のブームが伸長用ロープ28、縮
少用ロープ31により同時に伸縮する。
Effect of the Invention When the second boom is expanded and contracted with respect to the first boom by expanding and contracting the cylinder, the third boom is expanded and contracted simultaneously by the extension rope 28 and the reduction rope 31.

第3のブームを伸長する伸長用ロープ28の両端を第3の
ブームの基端に連結し、その伸長用ロープ28が巻掛けら
れるイコライザシーブ30を第1のブームの外側面に設け
たので、第3のブームをイコライザシーブ30の大きさに
限定されずに小さくできてブーム全体を小型にできると
共に、伸長用ロープ28の巻掛け作業も簡単となる。
Since both ends of the extension rope 28 for extending the third boom are connected to the base end of the third boom, and the equalizer sheave 30 around which the extension rope 28 is wound is provided on the outer surface of the first boom, The third boom can be made smaller without being limited to the size of the equalizer sheave 30, and the entire boom can be made compact, and the work of wrapping the extension rope 28 also becomes easy.

イコライザシーブ30を取付けた保持ヨーク34は第1のブ
ームの外側面にネジ杆35、調整ナット38でブーム伸縮方
向に移動調整自在に設けてあるので、その調整ナット38
を締付、弛めることでイコライザシーブ30をブーム伸縮
方向に移動して伸長用ロープ28の張りを調整でき、その
伸長用ロープ28自体の伸び歪みによる張り調整作業をブ
ームの外から簡単に行なうことができる。
The holding yoke 34 to which the equalizer sheave 30 is attached is provided on the outer surface of the first boom so as to be movable and adjustable in the boom extension / contraction direction by the screw rod 35 and the adjusting nut 38.
You can adjust the tension of the extension rope 28 by moving the equalizer sheave 30 in the boom extension and contraction direction by tightening and loosening, and easily perform the tension adjustment work due to the extension strain of the extension rope 28 itself from the outside of the boom. You can

【図面の簡単な説明】[Brief description of drawings]

第1図、第2図は本考案の実施例を示す正面断面図、平
面図、第3図、第4図は従来例の正面断面図、平面図で
ある。 28は伸長用ロープ、29はシーブ、30はイコライザシー
ブ。
1 and 2 are front sectional views, plan views, and FIGS. 3 and 4 are front sectional views and plan views of a conventional example showing an embodiment of the present invention. 28 is an extension rope, 29 is a sheave, and 30 is an equalizer sheave.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】第1のブーム内に第2のブームを伸縮自在
に嵌挿し、この第1のブームと第2のブームに亘って第
2のブームを伸縮するシリンダを取付け、前記第2のブ
ーム内に第3のブームを伸縮自在に嵌挿し、 前記第2のブームの基端にシーブ32を取付け、このシー
ブ32に巻掛けた縮少用ロープ31の両端部を前記第1のブ
ームの先端と第3のブームの基端に連結して第2のブー
ムとともに第3のブームが縮少するように構成し、 前記第1のブームの外側面に保持ヨーク34を備えたネジ
杆35をブーム伸縮方向に移動自在に支承し、そのネジ杆
35に調整ナット38を螺合して保持ヨーク34をブーム伸縮
方向に移動調整自在とし、その保持ヨーク34にイコライ
ザシーブ30を取付け、 前記イコライザシーブ30に巻掛けた伸長用ロープ28の両
端部を、前記第2のブームの先端に取付けたシーブ29を
経て前記第3のブームの基端に連結して第3のブームが
第2のブームと共に伸長するようにしたことを特徴とす
るブーム伸縮装置。
1. A second boom is telescopically inserted into the first boom, and a cylinder for extending and contracting the second boom is attached between the first boom and the second boom, and the second boom is attached. A third boom is telescopically inserted into the boom, a sheave 32 is attached to the base end of the second boom, and both ends of a reduction rope 31 wound around the sheave 32 are attached to the first boom. A screw rod 35 having a holding yoke 34 is provided on the outer side surface of the first boom so that the third boom is reduced together with the second boom by connecting to the tip end and the base end of the third boom. It is movably supported in the boom extension and contraction direction and its screw rod is attached.
Adjusting nut 38 is screwed to 35 to make it possible to move and adjust holding yoke 34 in the boom extension and contraction direction, attach equalizer sheave 30 to the holding yoke 34, and attach both ends of extension rope 28 wrapped around equalizer sheave 30. A boom telescopic device characterized in that the third boom is extended together with the second boom by being connected to the base end of the third boom via a sheave 29 attached to the tip end of the second boom. .
JP1986063153U 1986-04-28 1986-04-28 Boom telescopic device Expired - Lifetime JPH078546Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1986063153U JPH078546Y2 (en) 1986-04-28 1986-04-28 Boom telescopic device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1986063153U JPH078546Y2 (en) 1986-04-28 1986-04-28 Boom telescopic device

Publications (2)

Publication Number Publication Date
JPS62176184U JPS62176184U (en) 1987-11-09
JPH078546Y2 true JPH078546Y2 (en) 1995-03-01

Family

ID=30898113

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1986063153U Expired - Lifetime JPH078546Y2 (en) 1986-04-28 1986-04-28 Boom telescopic device

Country Status (1)

Country Link
JP (1) JPH078546Y2 (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60130286U (en) * 1984-02-08 1985-08-31 株式会社 多田野鉄工所 Boom simultaneous expansion and contraction device

Also Published As

Publication number Publication date
JPS62176184U (en) 1987-11-09

Similar Documents

Publication Publication Date Title
WO2012003767A1 (en) Super lift device and telescope arm lift device with the same
US4049238A (en) Porta-crane
US4310098A (en) Portable boom structure
JPH078546Y2 (en) Boom telescopic device
JPH06305689A (en) Elongation and contraction type jib crane
JPS6225513Y2 (en)
JP2541692Y2 (en) Oil and power transmission equipment for 5-stage telescopic boom
JPH0441691Y2 (en)
JPS6016632Y2 (en) Telescopic boom with built-in sub-boom
CN217996511U (en) Unhooking prevention device for travelling crane
JPS6338219Y2 (en)
JPS63148694U (en)
JPS6016628Y2 (en) Oil supply device to the preceding boom in a multi-stage telescopic boom
JPH0419929Y2 (en)
JPH0432395Y2 (en)
JPH0221515Y2 (en)
JPS61502675A (en) How to fix a crane
JPH0111671Y2 (en)
JPH0225833Y2 (en)
JP2567978Y2 (en) Multi-stage telescopic boom
US4068881A (en) Arrangement for automatic regulation of the cable length of a holding cable of grab means
JPH0313511Y2 (en)
JPH0444282U (en)
JP2501141Y2 (en) Wire tension device for simultaneous telescopic boom
JPH0840691A (en) Jib housing device of crane