JPH0781279B2 - LNG receiving base system and LNG shipping base system - Google Patents

LNG receiving base system and LNG shipping base system

Info

Publication number
JPH0781279B2
JPH0781279B2 JP3227403A JP22740391A JPH0781279B2 JP H0781279 B2 JPH0781279 B2 JP H0781279B2 JP 3227403 A JP3227403 A JP 3227403A JP 22740391 A JP22740391 A JP 22740391A JP H0781279 B2 JPH0781279 B2 JP H0781279B2
Authority
JP
Japan
Prior art keywords
lng
storage tank
facility
mooring
underground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP3227403A
Other languages
Japanese (ja)
Other versions
JPH0565718A (en
Inventor
勝行 筧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kawasaki Motors Ltd
Original Assignee
Kawasaki Jukogyo KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kawasaki Jukogyo KK filed Critical Kawasaki Jukogyo KK
Priority to JP3227403A priority Critical patent/JPH0781279B2/en
Publication of JPH0565718A publication Critical patent/JPH0565718A/en
Publication of JPH0781279B2 publication Critical patent/JPH0781279B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Ship Loading And Unloading (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、LNG受入基地システ
ム及びLNG出荷基地システムに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an LNG receiving base system and an LNG shipping base system.

【0002】[0002]

【従来の技術】クリーンエネルギーであり、発電用燃
料、都市ガス原料として重要な地位を占る天然ガスは、
わが国ではその大部分を海外からの輸入に依存してお
り、生産国において液化され液化天然ガス(LNG)と
してLNG船によりわが国に海上輸送され、受入基地に
受入れられ気化して利用に供される。
2. Description of the Related Art Natural gas, which is a clean energy and has an important position as a fuel for power generation and a raw material for city gas,
In Japan, most of them depend on imports from overseas, and in the producing countries they are liquefied and transported as liquefied natural gas (LNG) by sea to Japan by LNG vessels, and are received at the receiving terminal and vaporized for use. .

【0003】LNGは約−160℃の低温であり、パイ
プ輸送には高度の断熱処理を施した配管が必要なため、
遠距離のLNG輸送は経済的でないため、LNG受入基
地は火力発電所、大手都市ガス会社の供給基地に隣接し
てLNG船の入港可能な海岸に設置されるのが常であ
る。
LNG has a low temperature of about -160 ° C., and pipes that have been subjected to a high degree of heat insulation treatment are required for pipe transportation.
Since long-distance LNG transportation is not economical, LNG receiving bases are usually installed adjacent to the thermal power plants and the supply bases of large city gas companies on the coast where LNG ships can enter.

【0004】ところで、LNG輸入プロジェクトは、天
然ガス生産国における液化コスト、海上輸送コスト、受
入基地における気化コストの点で小規模の量では成立し
にくく、又、LNGの受入量と消費量との関係から、そ
の最適規模が自づから決り、現在世界中で運航中のLN
G船は積載量が12〜13万M3内外のものが大多数と
なっている。
By the way, the LNG import project is difficult to be realized in a small amount in terms of the liquefaction cost in the natural gas producing country, the marine transportation cost, and the vaporization cost in the receiving terminal, and the LNG receiving amount and the consuming amount are consumed. Due to the relationship, the optimum scale is decided by itself, and the LN currently operating all over the world.
The majority of G ships have a loading capacity of 120,000 to 130,000 M 3 and outside.

【0005】この積載量のLNG船のバースの水深は最
低12m程度必要であり、電力及び都市ガスの需要地で
ある大都市に比較的近く、受入基地の陸上設備を設置で
きる広い面積の敷地が得られる海岸は一般に遠浅で、L
NG受入基地の岸壁に平行にLNG船を横付けに着岸す
ることは困難な場合が多い。又、海岸を大水深の所迄埋
立てたとしても、埋立費用が掛り、又、岸壁にLNG船
が直接着岸できるように浚渫する場合も浚渫費が掛り、
又岸壁の土留めに巨額の費用が掛り経済的でない。
The water depth of the berth of the LNG carrier of this loading capacity is at least about 12 m, and it is relatively close to the big city where electricity and city gas are demanded, and there is a large-scale site on which the land facilities of the receiving terminal can be installed. The beaches obtained are generally shallow and L
It is often difficult to berth an LNG vessel alongside the quay of an NG receiving terminal. In addition, even if the coast is filled up to the depth of deep water, the landfill cost will be incurred, and the dredging cost will be incurred when the LNG ship is directly dredged on the quay.
Moreover, huge amount of money is required for retaining the quay, which is not economical.

【0006】そこで、遠浅の海岸に立地するLNG受入
基地では、一般に基地の岸壁から概ね直角方向に長い桟
橋を沖合に向って突設し、その先端付近に桟橋に平行に
LNG船を着桟するか、桟橋に対してT字形にLNG船
を係留できるように、ドルフィン等の係留設備を海上に
設け、係留されたLNG船からLNGを揚荷するための
ローディングアームを桟橋又はその先端に設けたプラッ
トホーム上に設置し、これからLNG貯槽迄LNG配管
を設けて、LNGをLNG貯槽に受入れるようにしてい
る。
[0006] Therefore, at an LNG receiving terminal located on a shallow coast, a jetty that is generally long at a right angle from the quay of the terminal is projected offshore, and an LNG ship is pierged near the tip of the jetty parallel to the jetty. Or, mooring equipment such as dolphins was installed on the sea so that the LNG carrier could be moored in a T-shape to the pier, and a loading arm for unloading LNG from the moored LNG carrier was installed at the pier or its tip. It is installed on the platform, and LNG piping is installed from this to the LNG storage tank so that LNG can be received in the LNG storage tank.

【0007】外航LNG船により輸入されるLNGを受
入れるLNG受入基地のLNG貯槽は容量が大きく、か
つ低温・低圧の貯槽となっており、従来、図4に構造を
示す金属製二重殻平底球面屋根付竪形円筒貯槽1か、図
5に示すメンブレン式半地下式貯槽2が専ら使用されて
いる。
The LNG storage tank at the LNG receiving terminal for receiving LNG imported by an ocean-going LNG carrier has a large capacity and is a low temperature / low pressure storage tank. Conventionally, a metal double shell flat bottom whose structure is shown in FIG. 4 is shown. The vertical cylindrical storage tank 1 with a spherical roof or the membrane type semi-underground storage tank 2 shown in FIG. 5 is exclusively used.

【0008】前者のLNG貯槽1は耐低温金属材料で作
られた内槽11と常温用金属材料で作られた外槽12と
の間に保冷層13を設けて構成され、地盤面14上に設
置される。
The former LNG storage tank 1 is constructed by providing a cold insulation layer 13 between an inner tank 11 made of a low temperature resistant metal material and an outer tank 12 made of a metal material for room temperature, and on the ground surface 14. Is installed.

【0009】後者のLNG貯槽2は貯槽の深さの大部分
が地盤面21の下方にあり、側部はコンクリート側壁2
2の内側に保冷層23、金属メンブレン24を積層して
成り、底部もほゞ同様の構成とし、屋根はドーム型鋼製
屋根25より吊りロッド26によりサスペンションデッ
キ27を吊下げ、その上に保冷層28を設けて構成され
ている。
In the latter LNG storage tank 2, most of the depth of the storage tank is below the ground surface 21, and the side portion is the concrete side wall 2.
2 is formed by stacking a cold insulation layer 23 and a metal membrane 24 on the inner side, and the bottom part has almost the same configuration. The roof is made by suspending a suspension deck 27 from a dome-shaped steel roof 25 with a suspension rod 26, and keeping the cold insulation on it. It is constructed by providing a layer 28.

【0010】これらの貯槽の構成自体はよく知られてい
るので、これ以上の説明は省略するが、これらの貯槽
は、いずれも図6、図7に示すように受入基地陸上部に
設置され、そのための敷地は、基地の面積の半ば以上を
占める。図6に示す地上式タンクを用いた基地の場合は
地盤を造成し支持層迄パイルを打ちその上に貯槽1を建
設すれば済むが、万一の事故に備え隣接貯槽あるいは他
の設備との間及び隣地境界線や周辺の保安物件との間に
法定の離隔距離を保ち、かつ、貯槽を囲繞して防液堤1
4を設けなければならない。又、図7に示す半地下式タ
ンク2を設けた基地の例では、貯槽内の液面は周囲の盛
土29(図5参照)の上面より下にあるので防液堤は不
要になるが、法定の離隔距離は必要であり、貯槽及びそ
の周囲の相当範囲は他の目的に利用することに制限があ
る。
Since the constructions of these storage tanks are well known, further explanation will be omitted. However, as shown in FIGS. 6 and 7, these storage tanks are installed on the land portion of the receiving terminal. The site for that purpose occupies more than half of the area of the base. In the case of the base using the above-ground tank shown in Fig. 6, it suffices to construct the ground and hit the pile up to the support layer to build the storage tank 1 on top of it, but in case of an accident, it is necessary to use the adjacent storage tank or other equipment. Maintaining a legal separation distance between the property and the borderline between neighboring areas and surrounding security properties, and enclosing a storage tank to form a breakwater 1
4 must be provided. Further, in the example of the base provided with the semi-underground tank 2 shown in FIG. 7, since the liquid level in the storage tank is below the upper surface of the surrounding embankment 29 (see FIG. 5), the liquid barrier is not necessary. Legal separation is required and the storage tank and its surrounding area is limited in its use for other purposes.

【0011】図6及び図7に示す受入基地は共にLNG
貯槽1又は2、LNG気化設備等のLNG処理設備3及
び基地陸上部の沖合に設けられたLNG船4の係留設備
5、この係留設備に係留されたLNG船4からLNGを
揚荷するためプラットホーム6上に設けられたローディ
ングアーム7、プラットホーム6と基地陸上部とを結ぶ
桟橋8とより成る。図6及び図7には紙面の都合で係留
設備5は陸岸に近い位置に画かれているが遠浅の海岸で
は、桟橋8は数100mから数kmに及ぶことがある。
ローディングアーム7によりLNG船より揚荷されたL
NGはこの桟橋8上に延々と敷設されたLNG配管によ
り陸上のLNG貯槽1又は2に輸送される。桟橋8の建
設費は極めて高価であるが、加えて、断熱材も含めたL
NG配管の建設費も高価である。
The receiving terminals shown in FIGS. 6 and 7 are both LNG.
Storage tank 1 or 2, LNG treatment equipment 3 such as LNG vaporization equipment, mooring equipment 5 for LNG vessels 4 installed offshore offshore of the base, and platform for unloading LNG from LNG vessels 4 moored at this mooring equipment. 6, a loading arm 7 and a pier 8 connecting the platform 6 and the base land area. 6 and 7, the mooring equipment 5 is drawn at a position close to the land shore due to space limitations, but the pier 8 may extend from several hundred meters to several kilometers on a shallow coast.
L unloaded from LNG ship by loading arm 7
The NG is transported to the onshore LNG storage tank 1 or 2 by the LNG piping laid endlessly on the jetty 8. The cost of constructing the pier 8 is extremely high, but in addition to the L
The construction cost of NG piping is also high.

【0012】以上の如く、従来のLNG受入基地は貯槽
の設置のために広いスペースを必要とし、地価の高い大
都市に近い海岸に受入基地を建設する場合は、土地の価
格が極めて高く付き、又、遠浅の海岸でLNG船の係留
位置が海岸から離れて設けられる場合の桟橋及びその上
に敷設されるLNG受入配管の費用が極めて高価に付く
難点がある。
As described above, the conventional LNG receiving terminal requires a large space for installing a storage tank, and when constructing the receiving terminal on the coast near a large city with a high land price, the land price is extremely high. In addition, when the mooring position of the LNG ship is provided away from the coast on a shallow beach, the cost of the jetty and the LNG receiving piping laid on the jetty is extremely high.

【0013】天然ガス生産国におけるLNG積出基地は
天然ガス液化設備、この設備により液化されたLNGを
貯溜するLNG貯槽、LNG船係留設備、この係留設備
に係留されたLNG船にLNG貯槽からLNGを積荷す
るローディングアームから成り、LNG船係留設備が基
地の沖合にある場合は陸上の基地からローディングアー
ムに延びる桟橋上にLNG払出配管を設けてLNG貯槽
のLNGをLNG船に積荷する。そのため、桟橋とその
上に敷設されるLNG配管の建設費については、LNG
受入基地と同様の問題が発生する。
The LNG unloading terminal in a natural gas producing country is a natural gas liquefaction facility, an LNG storage tank for storing LNG liquefied by this facility, an LNG ship mooring facility, and an LNG tank moored to an LNG ship moored at this mooring facility. When the LNG ship mooring equipment is offshore from the base, an LNG delivery pipe is provided on the pier extending from the onshore base to the loading arm to load the LNG in the LNG storage tank to the LNG ship. Therefore, for the construction cost of the jetty and the LNG piping laid on it,
The same problems as at the receiving terminal will occur.

【0014】[0014]

【発明が解決しようとする課題】本発明は、従来のLN
G受入基地及び出荷基地の上記の難点にかんがみ、受入
基地に必要な敷地の面積が少くて済み、かつ、遠浅でL
NG船の係留位置が沖合に離れて設置される場合でも桟
橋及びその上に敷設されるLNG受入配管が不要となる
LNG受入基地システムを提供することを第1の課題と
し、天然ガス生産国におけるLNG積出基地においてL
NG船の係留設備が沖合に設けられた場合に陸地からの
桟橋及びLNG積込配管に費用が掛らないLNG出荷基
地システムを提供することを第2の課題とする。
SUMMARY OF THE INVENTION The present invention is a conventional LN.
In consideration of the above-mentioned difficulties of the G receiving terminal and the shipping terminal, the area required for the receiving terminal is small, and the area is shallow and L
The first problem is to provide an LNG receiving terminal system that eliminates the need for a jetty and LNG receiving piping laid on the pier even when the mooring positions of NG ships are installed offshore. L at the LNG shipping base
A second object is to provide an LNG shipping base system that does not cost the pier from the land and the LNG loading pipe when the mooring equipment of the NG ship is installed offshore.

【0015】[0015]

【課題を解決するための手段】上記の第1の課題を解決
するための第1の発明の構成は、海岸のLNG受入基地
陸上部に設けられたLNG気化設備等のLNG処理設
備、上記陸上部の沖合海上に設けられLNG船を係留す
る係留設備、該係留設備に係留されたLNG船よりLN
Gを揚荷する揚荷手段、該揚荷手段により揚荷されたL
NGを貯溜するLNG貯槽、上記揚荷手段より上記LN
G貯槽にLNGを移送する受入配管、上記LNG処理設
備にLNGを払出す払出配管を有するLNG受入基地シ
ステムにおいて、上記のLNG貯槽は上記LNG受入基
地陸上部の地下より上記の係留設備近傍の海底下迄延設
されたトンネル式地下埋設型貯槽として構成され、該L
NG貯槽の沖合側には、該貯槽上面より海上迄立上り、
上記受入配管等を収容しLNG貯槽との間に気密性を有
するケーソンが設けられ、上記LNG貯槽の陸上側地下
部には、該貯槽上面より地上迄立上り、上記払出し配管
等を内部に収容しLNG貯槽との間に圧密性を有する竪
坑が設けられていることを特徴とする。
[Means for Solving the Problems] The structure of the first invention for solving the above-mentioned first problem is an LNG treatment facility such as an LNG vaporization facility provided at an onshore portion of an LNG receiving terminal on the coast, and the above-mentioned onshore facility. Mooring equipment for mooring LNG vessels installed offshore some parts of the sea, LN from LNG vessels moored to the mooring equipment
Unloading means for unloading G, L unloaded by the unloading means
LNG storage tank for storing NG, LN from the above-mentioned unloading means
In an LNG receiving terminal system having a receiving pipe for transferring LNG to a G storage tank and a discharging pipe for discharging LNG to the LNG processing equipment, the LNG storage tank is located below the LNG receiving base on the sea floor and near the mooring equipment. It is constructed as a tunnel type underground buried type storage tank that extends to the bottom.
On the offshore side of the NG storage tank, rising from the top surface of the storage tank to the sea,
An airtight caisson is installed between the receiving pipe and the LNG storage tank, and the land side underground portion of the LNG storage tank rises from the upper surface of the storage tank to the ground and houses the dispensing pipe and the like inside. A vertical shaft is provided between the LNG storage tank and the LNG storage tank.

【0016】又、上記の第2の課題を解決するための第
2の発明の構成は、海岸のLNG出荷基地陸上部に設け
られた天然ガス液化設備、該天然ガス液化設備により液
化されたLNGを貯槽するLNG貯槽、上記液化設備よ
りLNG貯槽にLNGを移送する受入配管、上記陸上部
の沖合海上に設けられLNG船を係留する係留設備、該
係留設備に係留されたLNG船にLNGを積荷する積荷
手段、上記LNG貯槽より上記積荷手段にLNGを移送
する払出し配管を有するLNG出荷基地システムにおい
て、上記のLNG貯槽は上記LNG出荷基地陸上部の地
下より上記の係留設備近傍の海底迄延設されたトンネル
式地下埋設型貯槽として構成され、該LNG貯槽の沖合
側には、該貯槽上面より海上迄立上り、上記の払出配管
等を収容しLNG貯槽との間に気密性を有するケーソン
が設けられ、上記LNG貯槽の陸上側地下部には該貯槽
上面より地上迄立上り、上記受入配管等を収容しLNG
貯槽との間に気密性を有する竪坑が設けられていること
を特徴とする。
Further, the structure of the second invention for solving the above-mentioned second problem is a natural gas liquefaction facility provided at an onshore portion of an LNG shipping base on the coast, and an LNG liquefied by the natural gas liquefaction facility. LNG storage tank for storing LNG, a receiving pipe for transferring LNG from the liquefaction facility to the LNG storage tank, a mooring facility for mooring an LNG ship on the offshore sea of the land area, and an LNG vessel for mooring the LNG ship moored at the mooring facility. In the LNG shipping terminal system having a loading means and a delivery pipe for transferring LNG from the LNG storage tank to the loading means, the LNG storage tank extends from the underground of the LNG shipping base land area to the seabed near the mooring facility. The LNG storage tank is constructed as an underground buried storage tank, and on the offshore side of the LNG storage tank, the LNG storage tank rises above the storage tank to the sea and accommodates the above-mentioned dispensing pipes and the like. Bath and caisson is provided with airtightness between, on the land side underground portion of the LNG storage tank to accommodate rising up ground from 該貯 tank top, the receiving piping LNG
A vertical shaft having airtightness is provided between the storage tank and the storage tank.

【0017】[0017]

【作用】第1の発明の構成の受入基地システムでは、L
NG船から揚荷手段によりLNG船から揚荷されたLN
Gは基地陸上側地下部より沖合の係留設備近傍の海底下
迄延設されたトンネル式地下貯槽の沖合側端部近傍で貯
槽上面から海上迄立上ったケーソン内に設けられたLN
G受入配管を経て貯槽に受入れられ貯蔵される。貯蔵さ
れたLNGはLNG貯槽の陸上側で貯槽上面より地上迄
立上った竪坑内に配管された払出し配管を経て基地の陸
上のLNG処理設備に払出される。
In the receiving base system of the first aspect of the invention, L
LN unloaded from NG ship by unloading means by LNG ship
G is an LN installed in a caisson that rises from the upper surface of the storage tank to the sea near the end of the offshore side of a tunnel-type underground storage tank that extends from the underground part on the base side of the base to the bottom of the sea near the mooring facility offshore.
It is received and stored in the storage tank through the G receiving pipe. The stored LNG is delivered to the onshore LNG treatment facility at the base via a delivery pipe installed on the land side of the LNG storage tank in a vertical shaft rising from the upper surface of the storage tank to the ground.

【0018】以上の構成により基地の陸上部から沖合係
留設備迄の桟橋及びその上に敷設されるLNG受入配管
が不要となり、LNG受入配管は係留設備のある地点の
水深に若干の長さを加えた長さで済み建設費が安くな
り、建設工期が短縮できる。
With the above construction, the jetty from the land part of the base to the offshore mooring facility and the LNG receiving pipe laid on it are not required, and the LNG receiving pipe is added to the water depth at the point where the mooring facility is installed to add a little length. The construction cost is low and the construction period can be shortened.

【0019】又、LNG貯槽は陸上部より海上部の地
下、海底下にトンネル式に埋設されるので、LNG受入
基地の陸上部のLNG貯槽のために必要な面積は従来の
貯槽を陸上にのみ設ける場合に比して減少し、しかもト
ンネル式に地下深く埋設されるので、万一の貯槽の事故
に対して安全性が高くその上部の地表上を運動場等の他
の用途に使用することも可能である。貯槽とするトンネ
ルは、シールド掘進機を用いて短期間に容易に掘削する
ことができる。
Since the LNG storage tank is buried in a tunnel form below the sea floor above the sea above the land, the area required for the LNG storage on the land of the LNG receiving terminal is only for the conventional storage on land. Compared to the case where it is installed, it will be buried deep underground in a tunnel type, so it is highly safe against accidents of storage tanks and the upper surface of it can be used for other purposes such as playgrounds. It is possible. The tunnel used as a storage tank can be easily excavated in a short period of time using a shield machine.

【0020】第2の発明のLNG出荷基地システムの場
合も同様に陸地からLNG船係留位置迄の桟橋及びその
上に敷設されるLNG積出し配管は不要となる。又、L
NG貯槽は地下に完全に埋設され、地上部には屋根も出
ないので、従来の貯槽方式に比べて安全性が高いといえ
る。
Also in the case of the LNG shipping base system of the second invention, similarly, the jetty from the land to the mooring position of the LNG ship and the LNG shipping pipes laid on it are unnecessary. Also, L
Since the NG storage tank is completely buried underground and there is no roof above the ground, it can be said that the NG storage tank is safer than the conventional storage tank system.

【0021】[0021]

【実施例】以下、本発明の実施例を、LNG受入基地シ
ステムを主として図面に基づいて詳細に説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The embodiments of the present invention will be described below in detail with reference to the drawings, mainly regarding an LNG receiving base system.

【0022】図1は本発明によるLNG受入基地システ
ムの一実施例の構成の概念を示す斜視図であり、図2は
そのLNG貯槽及びその受入・払出部を示す断面図であ
る。
FIG. 1 is a perspective view showing the concept of the construction of an embodiment of an LNG receiving terminal system according to the present invention, and FIG. 2 is a sectional view showing its LNG storage tank and its receiving / delivering portion.

【0023】LNG貯槽は、LNG受入基地陸上部30
の地下より、沖合のLNG船4の係留設備5の中央のロ
ーディングアーム7を据付けたプラットホーム6の近傍
の海底下迄延設されたトンネル式地下埋設型貯槽31と
されており、この実施例では2基平行に設けられてい
る。LNG受入基地陸上部30には地上にLNG気化設
備等のLNG地上設備32が設けられている。
The LNG storage tank is the land portion 30 of the LNG receiving base.
It is a tunnel type underground buried storage tank 31 which extends from the underground to the bottom of the sea near the platform 6 where the loading arm 7 at the center of the mooring equipment 5 of the offshore LNG ship 4 is installed. In this embodiment, Two units are provided in parallel. The LNG receiving terminal onshore unit 30 is provided with an LNG ground facility 32 such as an LNG vaporizing facility on the ground.

【0024】LNG貯槽31の沖合側端部近傍には、貯
槽上面より海上迄立上るケーソン33が立設され、その
内部にはローディングアーム7により揚荷されたLNG
をLNG貯槽31に移送するLNG受入配管34や貯槽
内で気化して発生したガスをLNG船内に戻すリターン
ガス配管等が収容されている。
A caisson 33 rising up from the upper surface of the storage tank to the sea is erected near the end of the LNG storage tank 31 on the offshore side, and the LNG loaded by the loading arm 7 is placed inside the caisson 33.
The LNG receiving pipe 34 for transferring the gas to the LNG storage tank 31, the return gas pipe for returning the gas generated by vaporization in the storage tank to the LNG ship, and the like are accommodated.

【0025】一方、LNG貯槽31の陸地側端部近傍に
は、LNG貯槽31の上面から地上迄立上る竪坑35が
立設されている。竪坑35内にはポンプバレルを含む払
出配管36等が収容されている。
On the other hand, in the vicinity of the land side end of the LNG storage tank 31, a vertical shaft 35 is erected from the upper surface of the LNG storage tank 31 to the ground. A discharge pipe 36 including a pump barrel is housed in the vertical shaft 35.

【0026】したがって、従来、LNG受入基地陸上部
からプラットホーム6迄延設されていた桟橋及びその上
に敷設されていたLNG受入配管は不要となる。
Therefore, the jetty which has been conventionally extended from the land portion of the LNG receiving terminal to the platform 6 and the LNG receiving pipe laid on the jetty are unnecessary.

【0027】なお、図1及び図2は一例を示したもので
あり、トンネル式地下貯槽はこれらの図よりも更に海側
/陸側共に延設することが可能である。従って、ケーソ
ンや竪坑が貯槽端部近傍にあるとは限らない。
It should be noted that FIGS. 1 and 2 show an example, and the tunnel type underground storage tank can be extended further on both the sea side / land side than these drawings. Therefore, the caisson and vertical shaft are not always near the end of the storage tank.

【0028】LNG貯槽31の横断面を図3に示す。L
NG貯槽となるトンネル40の掘削には、地下鉄道や鉄
道トンネルを掘削するためのシールド掘進機そのもの又
は、それと同様の機構で掘削可能な直径をさらに拡大し
たものが使用可能である。
A cross section of the LNG storage tank 31 is shown in FIG. L
For excavation of the tunnel 40 serving as an NG storage tank, a shield machine itself for excavating a subway or a railway tunnel, or a machine having a similar diameter to the excavable diameter, can be used.

【0029】シールド掘進機により掘削されたトンネル
40の内面には鉄道トンネルと同様、コンクリート製セ
グメント41が張り詰められ、その内側にコンクリート
ライニング42、断熱材層43、金属製メンブレン44
がこの順に積層される。コンクリートライニング42の
内部の外側付近にはヒーティングパイプ45が埋設さ
れ、該ヒーティングパイプ中に熱媒体を流すことにより
LNG貯槽31を囲む土壌の凍結を防止する。
Similar to a railroad tunnel, a concrete segment 41 is filled on the inner surface of the tunnel 40 excavated by the shield machine, and a concrete lining 42, a heat insulating material layer 43, and a metal membrane 44 are provided inside the segment 41.
Are laminated in this order. A heating pipe 45 is embedded near the outside of the inside of the concrete lining 42, and a heat medium is caused to flow in the heating pipe to prevent the soil surrounding the LNG storage tank 31 from freezing.

【0030】このLNG受入基地システムは以上の如く
構成されているので、作用の項で述べたとおり、沖合の
係留設備5に係留されたLNG船4からローティングア
ーム7により揚荷されたLNGはケーソン33内に設け
られたLNG受入配管34を経てLNG貯槽31内に受
入れられる。LNG貯槽31内に貯溜されたLNGは竪
坑35内に収容されたポンプバレルを含む払出し配管3
6を経てLNG地上設備32に払出される。
Since this LNG receiving terminal system is constructed as described above, the LNG unloaded from the LNG ship 4 moored by the offshore mooring equipment 5 by the loading arm 7 is It is received in the LNG storage tank 31 via the LNG receiving pipe 34 provided in the caisson 33. The LNG stored in the LNG storage tank 31 is the delivery pipe 3 including the pump barrel housed in the vertical shaft 35.
It is delivered to the LNG ground equipment 32 via 6.

【0031】シールド掘進機によるトンネルの掘削は、
従来の地上式又は半地下式の貯槽の建設のための地盤の
造成、シートパイルの打設等の一連の工事に比較して作
業能率が優れ、短期間で確実な貯槽建設工事が可能とな
り、LNG船係留設備迄の桟橋及びその上のLNG配管
工事が不要となることと相俟って、工期を短縮すること
ができる。
Excavation of the tunnel by the shield machine is
Compared with a series of construction work such as construction of the ground for construction of the above-ground type or semi-underground type storage tank, placement of sheet pile, etc., the work efficiency is excellent and reliable storage tank construction work can be done in a short period of time. Combined with the fact that the pier up to the LNG ship mooring equipment and the LNG piping work on it will not be required, the construction period can be shortened.

【0032】又、LNG貯槽の設置のための敷地が少な
くて済むことと桟橋及びその上のLNG配管が不要とな
ることとが相俟って、建設費用も大幅に低減する。
In addition, the construction cost is greatly reduced due to the fact that the site for installing the LNG storage tank is small and the jetty and the LNG piping on it are unnecessary.

【0033】以上、LNG受入基地システムに対する第
1発明の実施例を説明したが、図1のLNG地上設備3
2を天然ガス液化設備とし、竪坑35内の払出配管36
を受入配管に、ケーソン33内の受入配管34を払出し
配管と読み替えることにより、LNG出荷基地システム
に対する第2発明の実施例とすることができる。
The embodiment of the first invention for the LNG receiving base system has been described above. The LNG ground facility 3 shown in FIG.
2 is a natural gas liquefaction facility, and a discharge pipe 36 in the vertical shaft 35
Can be read as the receiving pipe, and the receiving pipe 34 in the caisson 33 can be read as the payout pipe, whereby the second invention of the LNG shipping base system can be realized.

【0034】この場合も貯槽用トンネル掘削に対する工
事期間の短縮、桟橋及びその上のLNG配管が不要とな
ることによる工費の低減が期待できる。
Also in this case, it can be expected that the construction period for excavating the storage tunnel will be shortened, and the construction cost will be reduced because the jetty and the LNG piping on the jetty will not be required.

【0035】[0035]

【発明の効果】以上の如く、本発明によればLNG受入
基地システム及びLNG出荷基地システムの陸上部から
LNG船の係留設備迄の桟橋及びその上のLNG配管が
不要と成り、又陸上部のLNG貯槽のための敷地面積が
少なくて済むことから基地の建設費の低減に効果があ
り、又LNG貯槽を作業能率の良いシールド掘進機で掘
削可能なトンネル式地下埋設型としたことと、桟橋及び
その上のLNG配管が不要となることと相俟って工期の
短縮にも効果が得られる。
As described above, according to the present invention, the pier from the land portion of the LNG receiving terminal system and the LNG shipping terminal system to the mooring equipment of the LNG ship and the LNG piping on the pier are unnecessary, and the land portion Since the site area for the LNG storage tank is small, it is effective in reducing the construction cost of the base. Also, the LNG storage tank is a tunnel type underground buried type that can be excavated by a shield machine with good work efficiency, and the pier Also, combined with the fact that the LNG piping on it is not necessary, the effect of shortening the construction period can be obtained.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明によるLNG受入基地システムの構成の
概念を示す一部断面を含む斜視図である。
FIG. 1 is a perspective view including a partial cross section showing a concept of a configuration of an LNG receiving base system according to the present invention.

【図2】そのLNG貯槽の中心線を含む垂直断面図であ
る。
FIG. 2 is a vertical sectional view including a center line of the LNG storage tank.

【図3】そのLNG貯槽の構成を示す横断面図である。FIG. 3 is a cross-sectional view showing the configuration of the LNG storage tank.

【図4】公知の二重殻平底竪形円筒LNG貯槽の概略構
成を示す断面図である。
FIG. 4 is a cross-sectional view showing a schematic configuration of a known double-shell flat-bottomed vertical cylindrical LNG storage tank.

【図5】公知のメンブレン式半地下式LNG貯槽の概略
構成を示す断面図である。
FIG. 5 is a sectional view showing a schematic configuration of a known membrane-type semi-underground type LNG storage tank.

【図6】二重殻平底竪形円筒LNG貯槽を使用した従来
のLNG受入基地の概念を示す斜視図である。
FIG. 6 is a perspective view showing a concept of a conventional LNG receiving terminal using a double shell flat bottom vertical cylindrical LNG storage tank.

【図7】メンブレン式半地下式LNG貯槽を使用した従
来のLNG受入基地の概念を示す斜視図である。
FIG. 7 is a perspective view showing the concept of a conventional LNG receiving terminal using a membrane type semi-underground type LNG storage tank.

【符号の説明】[Explanation of symbols]

4 LNG船 5 係留設備 6 プラットホーム 7 ローディングアーム(揚荷設備、積荷設備) 30 LNG受入基地陸上部 31 トンネル式LNG地下貯槽 32 LNG地上設備(出荷基地システムの天然ガ
ス液化設備) 33 ケーソン 34 受入配管(出荷基地システムの払出配管) 35 竪坑 36 払出配管(出荷基地システムの受入配管) 40 トンネル 41 セグメント 42 コンクリートライニング 43 断熱材層 44 メンブレン
4 LNG carrier 5 Mooring equipment 6 Platform 7 Loading arm (unloading equipment, loading equipment) 30 LNG receiving terminal land area 31 Tunnel type LNG underground storage tank 32 LNG aboveground equipment (natural gas liquefaction equipment of shipping terminal system) 33 Caisson 34 Receiving piping (Delivery piping for shipping base system) 35 Vertical shaft 36 Delivery pipe (receiving piping for shipping base system) 40 Tunnel 41 Segment 42 Concrete lining 43 Thermal insulation layer 44 Membrane

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 海岸のLNG受入基地陸上部に設けられ
たLNG気化設備等のLNG処理設備、上記陸上部の沖
合海上に設けられLNG船を係留する係留設備、該係留
設備に係留されたLNG船よりLNGを揚荷する揚荷手
段、該揚荷手段により揚荷されたLNGを貯蔵するLN
G貯槽、上記揚荷手段より上記LNG貯槽にLNGを移
送する受入配管、上記LNG処理設備にLNGを払出す
払出配管を有するLNG受入基地システムにおいて、 上記のLNG貯槽は上記LNG受入基地陸上部の地下よ
り上記の係留設備近傍の海底下迄延設されたトンネル式
地下埋設型貯槽として構成され、 該LNG貯槽の沖合側には、該貯槽上面より海上迄立上
り、上記受入配管等を収容し、LNG貯槽との間に気密
性を有するケーソンが設けられ、 上記LNG貯槽の陸上側地下部には、該貯槽上面より地
上迄立上り、上記払出し配管等を内部に収容し、LNG
貯槽との間に気密性を有する竪坑が設けられていること
を特徴とする、LNG受入基地システム。
1. An LNG treatment facility such as an LNG vaporization facility provided onshore at an onshore LNG receiving terminal, a mooring facility for mooring an LNG ship provided offshore of the land, and an LNG moored at the mooring facility. Unloading means for unloading LNG from a ship, LN for storing LNG unloaded by the unloading means
In an LNG receiving terminal system having a G storage tank, a receiving pipe for transferring LNG from the unloading means to the LNG storage tank, and a discharging pipe for discharging LNG to the LNG processing facility, the LNG storage tank is a land part of the LNG receiving terminal onshore. It is configured as a tunnel-type underground buried type storage tank that extends from the underground to the bottom of the sea near the mooring facility. On the offshore side of the LNG storage tank, it rises from the top surface of the storage tank to the sea and accommodates the receiving pipes, An airtight caisson is provided between the LNG storage tank and the land side underground portion of the LNG storage tank, which rises from the upper surface of the storage tank to the ground and accommodates the dispensing pipes and the like inside.
An LNG receiving terminal system, characterized in that a vertical shaft having airtightness is provided between the storage tank and the storage tank.
【請求項2】 上記のLNG貯槽は地下トンネル内面に
コンクリートセグメント、コンクリートライニング、断
熱材層、金属メンブレンをこの順に積層して構成される
ことを特徴とする請求項2に記載のLNG受入基地シス
テム。
2. The LNG receiving terminal system according to claim 2, wherein the LNG storage tank is configured by laminating a concrete segment, a concrete lining, a heat insulating material layer, and a metal membrane in this order on the inner surface of the underground tunnel. .
【請求項3】 上記のコンクリートライニング内にヒー
ティングパイプを埋設配管したことを特徴とする請求項
3に記載のLNG受入基地システム。
3. The LNG receiving terminal system according to claim 3, wherein a heating pipe is embedded in the concrete lining.
【請求項4】 海岸のLNG出荷基地陸上部に設けられ
た天然ガス液化設備、該天然ガス液化設備により液化さ
れたLNGを貯蔵するLNG貯槽、上記液化設備よりL
NG貯槽にLNGを移送する受入配管、上記陸上部の沖
合海上に設けられLNG船を係留する係留設備、該係留
設備に係留されたLNG船にLNGを積荷する積荷手
段、上記LNG貯槽より上記積荷手段にLNGを移送す
る払出し配管を有するLNG出荷基地システムにおい
て、 上記のLNG貯槽は上記LNG出荷基地陸上部の地下よ
り上記の係留設備近傍の海底迄延設されたトンネル式地
下埋設型貯槽として構成され、 該LNG貯槽の沖合側には、該貯槽上面より海上迄立上
り、上記の払出配管等を収容しLNG貯槽との間に気密
性を有するケーソンが設けられ、 上記LNG貯槽の陸上側地下部には該貯槽上面より地上
迄立上り、上記受入配管等を収容しLNG貯槽との間に
気密性を有する竪坑が設けられていることを特徴とする
LNG出荷基地システム。
4. A natural gas liquefaction facility provided onshore at an LNG shipping base on the coast, an LNG storage tank for storing LNG liquefied by the natural gas liquefaction facility, and an LNG from the liquefaction facility.
A receiving pipe for transferring LNG to an NG storage tank, a mooring facility for mooring an LNG ship provided offshore of the land, a loading means for loading LNG on an LNG ship moored at the mooring facility, and the above-mentioned load from the LNG storage tank In the LNG shipping terminal system having a delivery pipe for transferring LNG to the means, the LNG storage tank is configured as a tunnel-type underground underground storage tank extending from the underground of the LNG shipping base onshore to the seabed near the mooring equipment. On the offshore side of the LNG storage tank, there is provided a caisson that rises from the upper surface of the storage tank to the sea and houses the above-mentioned payout pipe and the like and has airtightness with the LNG storage tank. The LNG has a vertical shaft that rises from the upper surface of the storage tank to the ground, accommodates the receiving pipes and the like, and has airtightness with the LNG storage tank. Load base system.
JP3227403A 1991-09-06 1991-09-06 LNG receiving base system and LNG shipping base system Expired - Fee Related JPH0781279B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3227403A JPH0781279B2 (en) 1991-09-06 1991-09-06 LNG receiving base system and LNG shipping base system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3227403A JPH0781279B2 (en) 1991-09-06 1991-09-06 LNG receiving base system and LNG shipping base system

Publications (2)

Publication Number Publication Date
JPH0565718A JPH0565718A (en) 1993-03-19
JPH0781279B2 true JPH0781279B2 (en) 1995-08-30

Family

ID=16860288

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3227403A Expired - Fee Related JPH0781279B2 (en) 1991-09-06 1991-09-06 LNG receiving base system and LNG shipping base system

Country Status (1)

Country Link
JP (1) JPH0781279B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008230849A (en) * 2006-12-06 2008-10-02 Shimizu Corp Low-temperature rock reservoir and its construction method
JP5158622B2 (en) * 2007-04-11 2013-03-06 清水建設株式会社 Low temperature rock storage tank
JP5184177B2 (en) 2008-03-28 2013-04-17 古河電気工業株式会社 Flexible tube for cryogenic fluid transport
JP5227635B2 (en) 2008-03-28 2013-07-03 古河電気工業株式会社 Fluid leak detection system
KR101116880B1 (en) 2011-06-15 2012-03-06 조형권 The coupling device of the vacuum cleaner bag
JP5795050B2 (en) 2013-12-27 2015-10-14 田中貴金属工業株式会社 HERMETIC SEALING PACKAGE MEMBER, ITS MANUFACTURING METHOD, AND HERMETIC SEALING PACKAGE MANUFACTURING METHOD USING THE HERMETIC SEALING PACKAGE MEMBER

Also Published As

Publication number Publication date
JPH0565718A (en) 1993-03-19

Similar Documents

Publication Publication Date Title
US4188157A (en) Marine structure
US20050115248A1 (en) Liquefied natural gas structure
US7448223B2 (en) Method of unloading and vaporizing natural gas
CN105121271B (en) The liquefied system and method for relocatable code rostral for natural gas
JP5808431B2 (en) LNG re-vaporization facility using maritime jack-up platform
KR101449691B1 (en) Offshore platform using guide pile and method of installing the same
JP6550128B2 (en) Submarine terminal for maritime activities
US6347910B1 (en) Submarine power storage system
US20100074692A1 (en) Open-Sea Berth LNG Import Terminal
US3675431A (en) Off-shore storage tanks
JPH0781279B2 (en) LNG receiving base system and LNG shipping base system
WO2005043032A1 (en) Unloading equipment systems for liquefied natural gas storage structure
WO2005043030A1 (en) Liquefied natural gas storage structure having equipment platforms
WO2005045306A1 (en) Liquefied natural gas storage structure having wave deflectors
WO2005043034A1 (en) Vaporizing systems for liquified natural gas storage and receiving structures
WO2005045307A1 (en) Liquefied natural gas storage structure having direct mooring for carriers
RU2762588C1 (en) Integrated production facility based on gravity type (gtb)
JPS5824357B2 (en) Tetsukin Concrete Mataha Prestressed Concrete
WO2005045143A2 (en) Water intake systems for structures
WO2005043031A1 (en) Liquefied natural gas storage structure coupled to a distribution pipeline network
EP2045506A1 (en) Offshore system for vaporizing a liquefied hydrocarbon stream, method of providing such a system, and method of vaporizing a liquefied hydrocarbon stream
WO2005045308A1 (en) Ballasts for liquefied natural gas storage structures
RU2807839C1 (en) Reverse pumping system for cryogenic liquids
WO2005045304A1 (en) Liquefied natural gas storage structure having foundations extending into a bottom of a body of water
RU2767649C1 (en) Gravity type base (gtb)

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees