JPH0781264B2 - Impermeable wall construction method - Google Patents

Impermeable wall construction method

Info

Publication number
JPH0781264B2
JPH0781264B2 JP27496486A JP27496486A JPH0781264B2 JP H0781264 B2 JPH0781264 B2 JP H0781264B2 JP 27496486 A JP27496486 A JP 27496486A JP 27496486 A JP27496486 A JP 27496486A JP H0781264 B2 JPH0781264 B2 JP H0781264B2
Authority
JP
Japan
Prior art keywords
impermeable
water
construction method
wall construction
membrane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP27496486A
Other languages
Japanese (ja)
Other versions
JPS63130819A (en
Inventor
靖 神崎
和男 山田
弘義 田川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Civil Engineering and Construction Co Ltd
Original Assignee
Takenaka Civil Engineering and Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Civil Engineering and Construction Co Ltd filed Critical Takenaka Civil Engineering and Construction Co Ltd
Priority to JP27496486A priority Critical patent/JPH0781264B2/en
Publication of JPS63130819A publication Critical patent/JPS63130819A/en
Publication of JPH0781264B2 publication Critical patent/JPH0781264B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Description

【発明の詳細な説明】 「産業上の利用分野」 本発明は、不透水性膜材を用いた遮水壁工法に関する。TECHNICAL FIELD The present invention relates to an impermeable wall construction method using an impermeable membrane material.

「従来の技術」 地中・地下構造物の築造及び河川漏水等地中・地下水に
対する止水、産業廃棄物の処理地からの有害物質の漏水
防止等の対策として、現在、シートパイル、ソイルパイ
ル柱列壁、地中連続壁あるいは掘削中に溝壁を安定させ
る目的で使用した安定液を固化させて成る地中壁又は不
透水性膜材等を、遮水壁として用いている。
“Conventional technology” Currently, sheet piles and soil pile pillars are used as countermeasures such as construction of underground and underground structures and water leakage in underground and groundwater such as river leakage, and prevention of leakage of harmful substances from industrial waste disposal sites. A row wall, a continuous underground wall, an underground wall formed by solidifying a stabilizing liquid used for stabilizing a trench wall during excavation, or an impermeable membrane material is used as the impermeable wall.

「発明が解決しようとする問題点」 しかし、これらは、不透水性膜材を除いて、施工上、接
合部でのジョイントの存在が不可避であり、施工精度上
の問題として、このジョイント部を完全な水密性とする
ことは不可能であり、不透水性膜材を用いた場合、部分
的に破損する可能性があり、これとても同様である。
"Problems to be solved by the invention" However, except for the water-impermeable membrane material, it is unavoidable that there is a joint at the joint in terms of construction. It is not possible to make it completely watertight, and if a water-impermeable membrane material is used, it may be partially damaged, and this is very similar.

また、このジョイント部あるいは不透水性膜材の破損部
からの漏水や漏出については、それらの現象の発生自体
を把握することが困難であると共に、そのほとんどの場
合において、発生箇所を実用的な精度で範囲を限定し、
検知することは困難である。
Also, regarding water leakage and leakage from this joint part or the damaged part of the impermeable membrane material, it is difficult to grasp the occurrence itself of those phenomena, and in most cases, the occurrence location is practical. Limit the range with accuracy,
It is difficult to detect.

そこで、本発明は、斯る従来の欠点を除去しようとする
ものであり、止水性を向上させ、貯蔵あるいは処分する
物質の漏出を適確に防止しようとするものである。
Therefore, the present invention is intended to eliminate such conventional drawbacks, and is intended to improve water blocking performance and appropriately prevent leakage of a substance to be stored or disposed.

「問題点を解決するための手段」 本発明は、掘削溝に不透水性膜材から成る帯状の有底二
重膜を連続して挿入し、該有底二重膜の内側に水硬性材
料又は吸水膨潤性材料から成る中詰め材を投入し、遮水
壁を築造することにある。
"Means for Solving Problems" The present invention is to insert a strip-shaped bottomed double membrane made of an impermeable membrane material into an excavation groove continuously, and a hydraulic material inside the bottomed double membrane. Alternatively, a water-impermeable wall is constructed by introducing a filling material made of a water-swelling material.

「作用」 如上の構成であるから、所期の目的の達成が可能とな
る。
With the above-mentioned structure of "action", the intended purpose can be achieved.

「実施例」 図面は、本発明の実施例で、第1図I乃至IVは、工程を
示している。
[Examples] The drawings are examples of the present invention, and FIGS. 1 to IV show steps.

I.遮水壁の築造が対象となる地盤には、一般に、透水性
の高い砂、礫等の土質で構成され、あるいは、このよう
な土質で構成される地層を挟んでおり、このような地盤
において、予定深度の掘削溝1を掘削すると同時に、溝
壁を安定に保持させるため、ベントナイト泥水等の安定
液2を充填する。
I. The ground targeted for the construction of impermeable walls is generally composed of highly permeable sand, gravel, or other such soil material, or a stratum composed of such soil material is sandwiched between them. At the same time as excavating the excavation groove 1 at the planned depth in the ground, a stabilizing solution 2 such as bentonite muddy water is filled in order to stably hold the groove wall.

II.次に、その掘削溝1内の安定液中に不透水性膜材か
ら成る帯状の有底二重膜3を連続して挿入する。この有
底二重膜3は、例えば、第3図、第4図に示すように、
先端と末端を連結させる。
II. Next, the strip-shaped bottomed double membrane 3 made of an impermeable membrane material is continuously inserted into the stable liquid in the excavation trench 1. This bottomed double membrane 3 is, for example, as shown in FIG. 3 and FIG.
Connect the tip and end.

有底二重膜3を形成する素材としては、各種合成樹脂、
ゴム、布等のシートを用いる。
As a material for forming the bottomed double film 3, various synthetic resins,
A sheet of rubber or cloth is used.

III.続いて、上記有底二重膜3の内側へ水硬性材料又は
吸水膨潤性材料から成る中詰め材4を納入する。水硬性
材料としては、セメント系材料、石炭灰、高炉スラグ等
を原料とした材料を、また、吸水膨潤性材料としては、
ベントナイトあるいはベントナイトを原料とする混合材
等を用いる。斯様な中詰め材を用いると、第2図に示す
ように、万一、有底二重膜3すなわち遮水膜に欠損部a
が生じ、漏水が発生しても、中詰め材が水を吸収して、
硬化あるいは膨潤し、不透水性ゲル状の防水家期bも造
る。
III. Subsequently, the filling material 4 made of a hydraulic material or a water-swellable material is delivered to the inside of the bottomed double membrane 3. As the hydraulic material, cement-based materials, coal ash, materials made from blast furnace slag, etc. as raw materials, and as the water-swellable material,
Bentonite or a mixed material containing bentonite as a raw material is used. If such a filling material is used, as shown in FIG.
Even if a water leak occurs, the filling material absorbs the water,
It also hardens or swells and creates a waterproof house b in the form of an impermeable gel.

IV.中詰め材4を十分に充填して終了し、遮水壁Aを完
成する。
IV. Fill the filling material 4 sufficiently to finish, and complete the impermeable wall A.

なお、遮水壁Aしたがって有底二重膜3の形状は、第3
図、第4図に限るものではなく、所要現場に応じて適宜
である。
The shape of the impermeable wall A and thus the bottomed double membrane 3 is the third
It is not limited to the drawings and FIG. 4, but may be appropriate depending on the required site.

「発明の効果」 本発明によれば、次の効果を奏する。"Effects of the Invention" According to the present invention, the following effects are achieved.

(1) 遮水膜が二重になり、その間に中詰め材の層が
あり、しかも、これらを一連のものとすることができる
ので、止水性を向上でき、万一、遮水膜の一部に欠損部
が生じても、水硬性材料又は吸水膨潤性材料の中詰め材
が漏水を吸収して、硬化あるいは膨潤し、不透水性ゲル
状の防水壁を造り、高い止水性を確保できる。したがっ
て、漏水や貯蔵あるいは処分する物質の漏出を適確に防
止でき、漏水・漏出のための検知手段も事後の防止対策
も不要である。
(1) Since the water-blocking film is doubled and there is a layer of filling material between them, and these can be made into a series, the water-stopping property can be improved, and by any chance Even if a defect occurs in the part, the filling material of the hydraulic material or the water-swelling material absorbs water leakage and hardens or swells, creating a waterproof wall in the form of an impermeable gel and ensuring high waterproofness. . Therefore, it is possible to appropriately prevent leakage of water or leakage of a substance to be stored or disposed of, and there is no need for detection means for leakage or leakage and subsequent preventive measures.

(2) 掘削溝に安定液を用いても、中詰め材がその安
定液に直接触れることがなく、安定液の劣化を低くおさ
えることができ、該安定液を再度の使用に供することが
できる。
(2) Even if the stabilizing solution is used for the excavation trench, the filling material does not directly contact the stabilizing solution, deterioration of the stabilizing solution can be suppressed to a low level, and the stabilizing solution can be reused. .

(3) 安定液は勿論、地下水も中詰め材に混入するこ
とがなく、したがって、均質な、安定した、遮水壁を築
造でき、安定液のロスを防止できる。
(3) Not only the stabilizing solution but also groundwater is not mixed in the filling material, so that a homogeneous and stable impermeable wall can be constructed and the loss of the stabilizing solution can be prevented.

(4) 適用可能な分野としては、 i)環境保全上有害な物質の廃棄、処分地の内部あるい
は外周部で、地下水や降雨等によって有害物質の漏出が
問題となる箇所 ii)放射性物質の貯蔵、処理、処分地 iii)その他、高い止水性を有する遮水壁の設置が求め
られる箇所 等が挙げられる。
(4) Applicable fields are: i) Disposal of harmful substances for environmental conservation, locations where leakage of harmful substances due to groundwater, rainfall, etc. becomes a problem inside or outside the disposal site ii) Storage of radioactive substances , Treatment and disposal sites iii) Other places where it is required to install impermeable walls with high water-blocking properties.

【図面の簡単な説明】[Brief description of drawings]

図面は、本発明の実施例で、第1図I乃至IVは、工程説
明図、第2図は、要部説明図、第3図は、遮水壁の平面
図、第4図は、有底二重膜の斜視図である。 A……遮水壁、1……掘削溝 2……安定液、3……有底二重膜 4……中詰め材
The drawings are embodiments of the present invention, and FIGS. 1 to IV are process explanatory views, FIG. 2 is an explanatory view of main parts, FIG. 3 is a plan view of an impermeable wall, and FIG. It is a perspective view of a bottom double membrane. A: water-blocking wall, 1 ... excavation trench, 2 ... stabilizing solution, 3 ... bottomed double membrane, 4 ... filling material

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】掘削溝に不透水性膜材から成る帯状の有底
二重膜を連続して挿入し、該有底二重膜の内側に水硬性
材料又は吸水膨潤性材料から成る中詰め材を投入し、遮
水壁を築造することを特徴とする遮水壁工法。
1. A strip-shaped bottomed double membrane made of an impermeable membrane material is continuously inserted into an excavation trench, and a filling material made of a hydraulic material or a water-swellable material is placed inside the bottomed double membrane. The impermeable wall construction method, which is characterized by putting in materials and constructing impermeable walls.
JP27496486A 1986-11-18 1986-11-18 Impermeable wall construction method Expired - Fee Related JPH0781264B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP27496486A JPH0781264B2 (en) 1986-11-18 1986-11-18 Impermeable wall construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP27496486A JPH0781264B2 (en) 1986-11-18 1986-11-18 Impermeable wall construction method

Publications (2)

Publication Number Publication Date
JPS63130819A JPS63130819A (en) 1988-06-03
JPH0781264B2 true JPH0781264B2 (en) 1995-08-30

Family

ID=17549023

Family Applications (1)

Application Number Title Priority Date Filing Date
JP27496486A Expired - Fee Related JPH0781264B2 (en) 1986-11-18 1986-11-18 Impermeable wall construction method

Country Status (1)

Country Link
JP (1) JPH0781264B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015021327A (en) * 2013-07-22 2015-02-02 誠一 成島 Water-shielding method of radioactively contaminated area and impervious wall of radioactively contaminated area

Also Published As

Publication number Publication date
JPS63130819A (en) 1988-06-03

Similar Documents

Publication Publication Date Title
JP2001348862A (en) Cut-off structure for steel sheet pile joint part, impervious revetment structure and construction method
CN111441375A (en) Flexible continuous wall for underground pollution blocking and construction method thereof
JP3918648B2 (en) Tunnel impermeable structure and steel box segment
JPS63128298A (en) Method of storing and processing industrial waste such as radioactive substance
JPH0781264B2 (en) Impermeable wall construction method
JP2888428B1 (en) Improvement of contaminated soil
JP2003071401A (en) Water sealing treatment method of revetment for controlled waste landfill
JP2002201623A (en) Double sheet pile bulkhead and method of constructing the bulkhead
CN111877262B (en) Antiseep structure in old bittern salt pan
JPH0781263B2 (en) Impermeable wall construction method
JP2981165B2 (en) Underground impermeable wall and method of forming the same
KR20030087288A (en) Executon method of wall for intercepting contamination zone of using steel sheet pile
JP3248437B2 (en) Waste disposal site and its construction method
JPH0543999B2 (en)
JPS61196025A (en) Lining method for cut off of structure buried in ground
JPS62236914A (en) Formation of underground cut-off wall
JPS62288216A (en) Water stopper and water-stopping work therewith
JP2000170481A (en) Method for constructing waste disposal plant
JP2000303428A (en) Cut-off method using impervious sheet
JP3586744B2 (en) Construction method of impermeable wall
JPH055080B2 (en)
JP3240394B2 (en) Construction method of impermeable wall
JPH0538125Y2 (en)
JPH08151652A (en) Pile foundation and its construction method
JPS61159200A (en) Radioactive waste storage facility and execution method thereof

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees