JPH0771028A - Ground imprgnation method and ground impregnation device - Google Patents

Ground imprgnation method and ground impregnation device

Info

Publication number
JPH0771028A
JPH0771028A JP24201793A JP24201793A JPH0771028A JP H0771028 A JPH0771028 A JP H0771028A JP 24201793 A JP24201793 A JP 24201793A JP 24201793 A JP24201793 A JP 24201793A JP H0771028 A JPH0771028 A JP H0771028A
Authority
JP
Japan
Prior art keywords
ground
pipe
improvement material
injection
injecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP24201793A
Other languages
Japanese (ja)
Other versions
JP3367025B2 (en
Inventor
Sumio Nakano
中野澄男
Shigeo Kokubu
国分茂夫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP24201793A priority Critical patent/JP3367025B2/en
Publication of JPH0771028A publication Critical patent/JPH0771028A/en
Application granted granted Critical
Publication of JP3367025B2 publication Critical patent/JP3367025B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Abstract

PURPOSE:To enable the impregnation of the soil improvement material into holes in the ground efficiently. CONSTITUTION:A reinforcing pipe is inserted in the ground, and in the case the soil improvement material is impregnated from the reinforcing pipe 1, impregnation ports 11 are provided lengthwise of the reinforcing pipe 1. A plurality of packers 2 are inserted in the reinforcing pipe 1, and the packers 2 are swelled to cut off the hollow of the reinforcing pipe 1 into several spaces. The soil improvement material is impregnated into the ground from the impregnation ports 11 in the spaces.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、地盤の中に地盤改良材
を注入する工法及び装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method and a device for injecting a ground improvement material into the ground.

【0002】[0002]

【従来の技術】従来、地盤に掘削孔5を開け、パイプを
挿入して、パイプの口元から地盤改良材を掘削孔5に注
入する方法が行われていた。
2. Description of the Related Art Conventionally, a method has been used in which an excavation hole 5 is opened in the ground, a pipe is inserted, and a ground improvement material is injected into the excavation hole 5 from the mouth of the pipe.

【0003】[0003]

【発明が解決しようとする問題点】しかし、従来の方法
では、次のような問題点がある。 <イ>パイプの口元から地盤改良材を地盤中に注入する
方法では、改良材の入りやすい箇所だけ入り、パイプ全
長にわたって注入することが難しかった。 <ロ>地盤改良材として、早く固まる地盤改良材や強度
のある発泡性の材料(例えば、硬質発泡ウレタンなど)
などでは、長いパイプや太いパイプでは、先端まで地盤
改良材が行き着くまでに時間がかかるために、パイプの
途中や手前の部分で硬化してしまい、パイプ全長にわた
って注入することが難しかった。 <ハ>パイプの先端の1ヶ所から地山へ注入していたた
め、その部分の地山にしか地盤改良材が浸透できず、パ
イプ全長に亘って地盤に注入することが難しかった。
However, the conventional method has the following problems. <A> In the method of injecting the ground improvement material into the ground from the mouth of the pipe, it was difficult to inject the improvement material only in a portion where the improvement material easily enters and to fill the entire length of the pipe. <B> As a soil improvement material, a soil improvement material that hardens quickly and a foamable material with high strength (for example, hard urethane foam)
In the case of a long pipe or a thick pipe, it took time for the ground improvement material to reach the tip, so that it hardened in the middle of the pipe or in the front part, and it was difficult to inject it over the entire length of the pipe. <C> Since the soil was injected from one point at the tip of the pipe into the ground, it was difficult to inject it into the ground over the entire length of the pipe because the ground improvement material could only penetrate into the ground at that portion.

【0004】[0004]

【本発明の目的】本発明は、地盤中の孔に地盤改良材を
効率良く注入できる工法及び装置を提供することにあ
る。
SUMMARY OF THE INVENTION It is an object of the present invention to provide a method and an apparatus capable of efficiently injecting a ground improvement material into a hole in the ground.

【0005】[0005]

【問題点を解決するための手段】本発明は、地盤中に地
盤改良材を注入する地盤注入工法において、長手方向に
複数の注入孔が開けられたパイプを地盤中に設置し、該
パイプ内に複数のパッカーと地盤改良材を注入する複数
のチューブとを配置し、該パイプ内で該注入孔の間に配
置された複数のパッカーにより該パイプの内空を複数の
空間に遮断し、遮断された空間毎に地盤改良材を注入で
きるチューブを対応させ、各チューブ、遮断された空間
及び注入孔を介して地盤改良材を地盤中に注入すること
を特徴とする地盤注入工法、又は、地盤中に地盤改良材
を注入する地盤注入装置において、長手方向に複数の注
入孔が設けられているパイプと、該パイプ内で該注入孔
の間に配置され、該パイプの内空を複数の空間に遮断す
る複数のパッカーと、該遮断された空間毎に地盤改良材
を注入できるチューブを対応させた複数の注入用チュー
ブと、各該注入用チューブ、該遮断された空間及び該注
入孔を介して地盤改良材を地盤中に注入することができ
ることを特徴とする地盤注入装置にある。
DISCLOSURE OF THE INVENTION The present invention relates to a ground pouring method for pouring a ground improving material into the ground, in which a pipe having a plurality of injection holes in the longitudinal direction is installed in the ground and A plurality of packers and a plurality of tubes for injecting ground improvement material are arranged in the pipe, and the insides of the pipe are cut off into a plurality of spaces by the plurality of packers arranged between the injection holes in the pipe. A ground injection method characterized by injecting a ground improvement material into each of the created spaces, and injecting the ground improvement material into the ground through each tube, the blocked space and the injection hole, or the ground In a ground pouring device for pouring a ground improvement material into a pipe, a pipe provided with a plurality of pouring holes in a longitudinal direction, and a pipe arranged inside the pipe between the pouring holes, and having a plurality of spaces inside the pipe. Multiple packers to block , A plurality of injection tubes corresponding to tubes capable of injecting a ground improvement material into each of the blocked spaces, and each of the injection tubes, the blocked space, and the injection holes, through which the ground improvement material is placed in the ground It is in the ground injection device characterized by being able to inject into.

【0006】[0006]

【実施例1】以下、図面を用いて本発明の実施例を説明
する。
Embodiment 1 An embodiment of the present invention will be described below with reference to the drawings.

【0007】<イ>実施例の概要 掘削孔5に地盤改良材を均質に注入するものである。そ
のために、長手方向に複数の注入口11が設けられた補
強パイプ1を掘削孔5内に設置する。補強パイプ1の内
部に複数のパッカー2を挿入し、膨らませて補強パイプ
1の内空を幾つかの空間に遮断する。遮断された空間に
は注入口11を有する。そして、それぞれの空間に地盤
改良材を別々に注入し、注入口11から地盤改良材を掘
削孔5全体に均質に注入することができる。
<B> Outline of Embodiment The ground improvement material is uniformly injected into the excavation hole 5. For that purpose, the reinforcing pipe 1 provided with a plurality of inlets 11 in the longitudinal direction is installed in the excavation hole 5. A plurality of packers 2 are inserted into the reinforcing pipe 1 and inflated to block the inner space of the reinforcing pipe 1 into some spaces. An injection port 11 is provided in the closed space. Then, the ground improvement material can be separately injected into each space, and the ground improvement material can be uniformly injected into the entire excavation hole 5 through the injection port 11.

【0008】<ロ>補強パイプ 補強パイプ1は、パッカー2が挿入できる中空の形状で
あり、長手方向に中空と連通する複数の注入口11を有
している。また、補強パイプ1の周囲方向にも複数の注
入孔11を形成する。掘削孔5の口元の補強パイプ1の
周辺にはコーキング材51が配置され、掘削孔5内部に
注入された地盤改良材が漏洩するのを防止している。
<B> Reinforcing Pipe The reinforcing pipe 1 has a hollow shape into which the packer 2 can be inserted, and has a plurality of inlets 11 communicating with the hollow in the longitudinal direction. Further, a plurality of injection holes 11 are also formed in the circumferential direction of the reinforcing pipe 1. A caulking material 51 is arranged around the reinforcing pipe 1 at the mouth of the excavation hole 5 to prevent the ground improvement material injected into the excavation hole 5 from leaking.

【0009】<ハ>パッカー パッカー2は袋体であり、中空のパッカーチューブ3に
複数個接続されている。パッカー2内部にはパッカーチ
ューブ3に形成されたパッカー入口31が位置し、この
入口から注入材がパッカー2内部に注入される。その結
果、パッカー2が膨脹する。注入材として、例えば、セ
メントミルク、発泡ウレタンなどが使用される。パッカ
ー2が補強パイプ1内部で、注入口11と注入口11の
間に配置されるので、膨脹すると、補強パイプ1の内空
を複数の空間に遮断する。その結果、遮断された空間に
注入口11が配置される。
<C> Packer The packers 2 are bags and are connected to a plurality of hollow packer tubes 3. A packer inlet 31 formed in the packer tube 3 is located inside the packer 2, and the injection material is injected into the packer 2 through this inlet. As a result, the packer 2 expands. As the injection material, for example, cement milk, urethane foam or the like is used. Since the packer 2 is disposed inside the reinforcing pipe 1 and between the inlet 11 and the inlet 11, when it expands, the inner space of the reinforcing pipe 1 is blocked into a plurality of spaces. As a result, the injection port 11 is arranged in the closed space.

【0010】<ニ>地盤改良材チューブ 地盤改良材チューブ4は、複数本、パッカーチューブ3
と共に補強パイプ1に配置される。地盤改良材チューブ
4の先端は、開口41になっており、地盤改良材がその
開口41から排出される。ある地盤改良材チューブ4の
先端は、あるパッカー2で区切られた空間に配置され、
他の地盤改良材チューブ4の先端は別のパッカー2で区
切られた空間に配置される。即ち、パッカー2で区切ら
れた空間毎に別の地盤改良材チューブ4の先端が配置さ
れ、地盤改良材が独立に供給される。なお、必ずしも、
開口41は先端に設ける必要はなく、側面に設けても良
い。その場合、開口41はパッカーで区切られた空間に
各々配置される。
<D> Ground improvement material tube A plurality of ground improvement material tubes 4 and a packer tube 3 are provided.
Together with the reinforcing pipe 1. The tip of the soil improvement material tube 4 has an opening 41, and the soil improvement material is discharged from the opening 41. The tip of a certain ground improvement material tube 4 is arranged in a space partitioned by a certain packer 2,
The tip of another ground improvement material tube 4 is arranged in a space separated by another packer 2. That is, the tip of another soil improvement material tube 4 is arranged in each space divided by the packer 2, and the soil improvement material is supplied independently. In addition, not necessarily
The opening 41 need not be provided at the tip, but may be provided at the side surface. In that case, the openings 41 are respectively arranged in spaces separated by the packer.

【0011】以下に、地盤改良材を注入する工程を説明
する。
The process of injecting the ground improvement material will be described below.

【0012】<イ>パッカーの膨脹 掘削孔5に補強パイプ1を挿入し、口元にコーキング材
51を取付ける。補強パイプ1内部にパッカーチューブ
3、地盤改良材チューブ4と共にパッカー2を挿入し、
注入口11の間に配置する。パッカーチューブ3にウレ
タンなどの注入材を注入し、パッカー2を膨脹させ、補
強パイプ1の内空を複数の空間に遮断する。各遮断され
た空間には注入口11が対応して存在する。パッカー2
は膨脹する際、地盤改良材チューブ4を覆うように膨ら
み、補強パイプ1の内空を遮断する。
<a> Expansion of packer The reinforcing pipe 1 is inserted into the excavation hole 5, and the caulking material 51 is attached to the mouth. Insert the packer 2 together with the packer tube 3 and the ground improvement material tube 4 inside the reinforcing pipe 1,
It is placed between the inlets 11. An injecting material such as urethane is injected into the packer tube 3, the packer 2 is expanded, and the inner space of the reinforcing pipe 1 is blocked into a plurality of spaces. There is a corresponding inlet 11 in each closed space. Packer 2
When it expands, it expands so as to cover the ground improvement material tube 4 and blocks the inner space of the reinforcing pipe 1.

【0013】<ロ>掘削孔への地盤改良材の注入 各地盤改良材チューブ4から同時に地盤改良材をパッカ
ー2で遮断された各空間に注入する。各空間では地盤改
良材が充満し、そこから注入口11を通して掘削孔5に
注入される。この時、各空間には別々の地盤改良材チュ
ーブ4の先端が配置されているので、各地盤改良材チュ
ーブ4に流す地盤改良材を調整すると、掘削孔5の奥で
も手前でも均等に地盤改良材を注入することができる。
<B> Injection of ground improvement material into excavation hole The ground improvement material is simultaneously injected from each ground improvement material tube 4 into each space blocked by the packer 2. The ground improvement material is filled in each space, and is injected into the excavation hole 5 from there through the injection port 11. At this time, since the tip of the ground improvement material tube 4 is arranged in each space separately, adjusting the ground improvement material flowing in each ground improvement material tube 4 will improve the ground evenly in the front or rear of the excavation hole 5. Material can be injected.

【0014】[0014]

【発明の効果】本発明は、次のような効果を得ることが
できる。 <イ>早く固まる地盤改良材や強度のある発泡性の材
料、例えば硬質発泡ウレタンなど、を長いパイプや太い
パイプを使用して地山に全長にわたって均質な注入をす
ることができるので、信頼性の高い地盤改良を行うこと
ができる。 <ロ>地山に挿入する補強パイプ1は、注入口11を複
数開けるだけでよく、高価な逆止弁などを取付ける必要
がないので、安価になる。 <ハ>長いパイプの注入も、一度に注入できるので、短
時間に注入することができる。 <ニ>補強パイプ1による地盤の補強と地盤改良材によ
る補強が同時に得られる。
According to the present invention, the following effects can be obtained. <B> Since a ground improvement material that hardens quickly and a foamable material with strong strength, such as hard urethane foam, can be injected uniformly into the ground using a long pipe or a thick pipe, reliability is improved. High ground improvement can be performed. <B> The reinforcing pipe 1 to be inserted into the ground is inexpensive because it is only necessary to open a plurality of injection ports 11 and it is not necessary to attach an expensive check valve or the like. <C> Since long pipes can be injected at a time, it can be injected in a short time. <D> The reinforcement of the ground by the reinforcement pipe 1 and the reinforcement by the ground improvement material can be obtained at the same time.

【図面の簡単な説明】[Brief description of drawings]

【図1】補強パイプとパッカーの配置図[Fig.1] Layout of reinforcing pipe and packer

【図2】補強パイプとパッカーの外観図[Fig. 2] External view of the reinforcing pipe and packer

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】地盤中に地盤改良材を注入する地盤注入工
法において、 長手方向に複数の注入孔が開けられたパイプを地盤中に
設置し、 該パイプ内に複数のパッカーと地盤改良材を注入する複
数のチューブとを配置し、 該パイプ内で該注入孔の間に配置された複数のパッカー
により該パイプの内空を複数の空間に遮断し、 遮断された空間毎に地盤改良材を注入できるチューブを
対応させ、 各チューブ、遮断された空間及び注入孔を介して地盤改
良材を地盤中に注入することを特徴とする、 地盤注入工法。
1. A ground pouring method for pouring a ground improving material into the ground, wherein a pipe having a plurality of injection holes formed in a longitudinal direction is installed in the ground, and a plurality of packers and the ground improving material are provided in the pipe. A plurality of tubes to be injected are arranged, and a plurality of packers arranged between the injection holes in the pipe block the inner space of the pipe into a plurality of spaces, and a ground improvement material is provided for each of the blocked spaces. The ground injection method is characterized by injecting tubes that can be injected and injecting the ground improvement material into the ground through each tube, the blocked space, and the injection hole.
【請求項2】地盤中に地盤改良材を注入する地盤注入装
置において、 長手方向に複数の注入孔が設けられているパイプと、 該パイプ内で該注入孔の間に配置され、該パイプの内空
を複数の空間に遮断する複数のパッカーと、 該遮断された空間毎に地盤改良材を注入できるチューブ
を対応させた複数の注入用チューブと、 各該注入用チューブ、該遮断された空間及び該注入孔を
介して地盤改良材を地盤中に注入することができること
を特徴とする、 地盤注入装置。
2. A ground injection device for injecting a soil improvement material into the ground, comprising: a pipe having a plurality of injection holes in a longitudinal direction; and a pipe disposed between the injection holes in the pipe. A plurality of packers for blocking the inner space into a plurality of spaces, a plurality of injection tubes corresponding to the tubes capable of injecting a soil improvement material in each of the blocked spaces, each of the injection tubes, and the blocked space And a ground improvement material capable of injecting the ground improvement material into the ground through the injection hole.
JP24201793A 1993-09-02 1993-09-02 Ground injection method and ground injection device Expired - Lifetime JP3367025B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP24201793A JP3367025B2 (en) 1993-09-02 1993-09-02 Ground injection method and ground injection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP24201793A JP3367025B2 (en) 1993-09-02 1993-09-02 Ground injection method and ground injection device

Publications (2)

Publication Number Publication Date
JPH0771028A true JPH0771028A (en) 1995-03-14
JP3367025B2 JP3367025B2 (en) 2003-01-14

Family

ID=17083032

Family Applications (1)

Application Number Title Priority Date Filing Date
JP24201793A Expired - Lifetime JP3367025B2 (en) 1993-09-02 1993-09-02 Ground injection method and ground injection device

Country Status (1)

Country Link
JP (1) JP3367025B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000345789A (en) * 1999-06-03 2000-12-12 Tokai Rubber Ind Ltd Mouth caulking device used for filling type long-sized steel pipe tip receiving work, and filling type long-sized steel pipe tip receiving method using the device
KR100402953B1 (en) * 2000-10-20 2003-10-22 최용기 Multistage grouting equipment by Fiberglass Reinforced Plastics inject pipe and its construcion work method
KR100697629B1 (en) * 2006-08-11 2007-03-20 광성지엠(주) Grout injector and nailing apparatus having the same
KR101217841B1 (en) * 2010-04-01 2013-01-03 변권식 Capsule type grouting device for groundwater hole or geothemal hole
KR101868086B1 (en) * 2014-02-18 2018-06-15 김순길 drive rod apparatus for a drilling and grouting

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000345789A (en) * 1999-06-03 2000-12-12 Tokai Rubber Ind Ltd Mouth caulking device used for filling type long-sized steel pipe tip receiving work, and filling type long-sized steel pipe tip receiving method using the device
KR100402953B1 (en) * 2000-10-20 2003-10-22 최용기 Multistage grouting equipment by Fiberglass Reinforced Plastics inject pipe and its construcion work method
KR100697629B1 (en) * 2006-08-11 2007-03-20 광성지엠(주) Grout injector and nailing apparatus having the same
KR101217841B1 (en) * 2010-04-01 2013-01-03 변권식 Capsule type grouting device for groundwater hole or geothemal hole
KR101868086B1 (en) * 2014-02-18 2018-06-15 김순길 drive rod apparatus for a drilling and grouting

Also Published As

Publication number Publication date
JP3367025B2 (en) 2003-01-14

Similar Documents

Publication Publication Date Title
MX2007007284A (en) A method and a device for sealing a void incompletely filled with a cast material.
KR100645071B1 (en) A grouting unit of a high powerness steel pipe
KR100927038B1 (en) Pipe grouting method using ufunctional injection pipes
KR20120004672A (en) Tublar member, chemical injection apparatus and chemical injection method using the same
JPH0771028A (en) Ground imprgnation method and ground impregnation device
KR102162788B1 (en) Empty space filing structure and grouting method using thereof
KR102154266B1 (en) Packer for ground reinforcement and ground reinforcement method using the same
JPH0387412A (en) Natural ground consolidation process and combined pipes to be used for same process
KR102368275B1 (en) grouting device for pressing multi-level areas by one-step, and packer device of removal type for this
KR20190136221A (en) Grouting apparatus the grouting method thereof
JP3790232B2 (en) Packer and the ground reinforcement method using it
JPH0776822A (en) Method and apparatus for grouting
JP4062009B2 (en) Penetration injection method
JP3373301B2 (en) Underground injection device for foaming resin liquid
JP3675705B2 (en) Ground reinforcement method
JP3467221B2 (en) Ground reinforcement method
JP2003301448A (en) Device and construction method for injecting grouting material
JP3615511B2 (en) Ground reinforcement method
JPH033769B2 (en)
JP3898308B2 (en) A discharge device for resin material for solid ground consolidation and a solid mountain consolidation method using the same
JPH01193489A (en) Engineering method for regenerating outworn pipe
JP2005314940A (en) Chemical grouting device
JPH11182172A (en) Natural ground consolidation process
JP4009083B2 (en) Discharge device for resin material for solid ground
JP3413416B2 (en) Ground improvement method and tools used for it

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091108

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 8

Free format text: PAYMENT UNTIL: 20101108

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111108

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 9

Free format text: PAYMENT UNTIL: 20111108

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 10

Free format text: PAYMENT UNTIL: 20121108

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121108

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 11

Free format text: PAYMENT UNTIL: 20131108