JPH0751779B2 - Reverse pile construction method and device - Google Patents

Reverse pile construction method and device

Info

Publication number
JPH0751779B2
JPH0751779B2 JP30400790A JP30400790A JPH0751779B2 JP H0751779 B2 JPH0751779 B2 JP H0751779B2 JP 30400790 A JP30400790 A JP 30400790A JP 30400790 A JP30400790 A JP 30400790A JP H0751779 B2 JPH0751779 B2 JP H0751779B2
Authority
JP
Japan
Prior art keywords
reverse
pile
rotary table
work platform
machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP30400790A
Other languages
Japanese (ja)
Other versions
JPH04179729A (en
Inventor
信之 薬丸
研介 中江
為信 岡村
明茂 国本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP30400790A priority Critical patent/JPH0751779B2/en
Publication of JPH04179729A publication Critical patent/JPH04179729A/en
Publication of JPH0751779B2 publication Critical patent/JPH0751779B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は構築物の基礎となる現場造成杭をリバース工法
によって造成するリバース杭造成方法及び装置に係るも
のである。
DETAILED DESCRIPTION OF THE INVENTION (Industrial field of application) The present invention relates to a reverse pile construction method and device for constructing on-site construction piles which are the basis of a construction by a reverse construction method.

(従来の技術) 従来、リバース工法による杭造成方法においては、スタ
ンドパイプをバイブロハンマー等によって地盤内に圧入
しながらハンマークラブによって中堀りを行ない、スタ
ンドパイプを所定の深さまで圧入してリーバース機を設
置し、スタンドパイプ内の泥水をロータリテーブルによ
って駆動されるリバース機の回転軸の中空部から掘削土
とともに吸い上げ、圧力水を循環させながら掘削し、掘
削孔内に鉄筋篭を建込み、コンクリートを打設したのち
スタンドパイプを引抜き、覆土、養生を行なっている。
(Prior art) Conventionally, in the pile construction method by the reverse construction method, while the press-fitting the stand pipe into the ground with a vibro hammer, etc., the hammer club is used to carry out the inner digging, and the stand pipe is press-fitted to a predetermined depth, and the reversing machine The muddy water in the stand pipe is sucked up with the excavated soil from the hollow part of the rotary shaft of the reverse machine driven by the rotary table, excavated while circulating the pressure water, and the reinforced basket is built in the excavated hole to remove the concrete. After placing, the stand pipe is pulled out, covering the soil and curing.

(発明が解決しようとする課題) 前記従来のリバース工法は、バイブロハンマー等によっ
てスタンドパイプを圧入しながらハンマークラブ等を用
いて中堀りを行なうため、市街地山や狭隘な個所での現
場造成杭の施工においては、近隣に建設機械による騒
音、振動等の建設公害を及ぼす。
(Problems to be solved by the invention) In the conventional reverse construction method, since a middle digging is performed by using a hammer club or the like while press-fitting a stand pipe with a vibro hammer or the like, on-site construction piles in urban mountains or narrow places are used. During construction, construction pollution such as noise and vibration due to construction machinery will occur nearby.

特に狭隘な個所においては、建設機械の搬入及び設置場
所と、移動が困難で、各種の機械の設置替え等により施
工が煩雑となる。
Particularly in a narrow space, it is difficult to move the construction machine to and from where it is to be carried in and installed, and the construction becomes complicated due to replacement of various machines.

本発明は前記従来技術の有する問題点に鑑みて提案され
たものであって、その目的とする処は、市街地や狭隘な
個所においても建設公害の発生が抑止され、施工性が向
上されたリバース杭造成方法及びその装置を提供する点
にある。
The present invention has been proposed in view of the above problems of the prior art, the purpose of the purpose is to prevent the occurrence of construction pollution even in urban areas and narrow places, reverse construction improved It is a point to provide a pile forming method and an apparatus thereof.

(課題を解決するための手段) 前記の目的を達成するため、本発明に係るリバース杭造
成方法によれば、一側部にはケーシングジヤツキが懸吊
され、上部にはリバース機及びロータリテーブルが移動
自在に搭載された可動作業架台を杭造成位置に設置し、
前記リバース機及びロータリテーブルを前記架台上にお
いて杭芯の外方位置に移動し、前記ケーシングジヤツキ
を介してスタンドパイプを地中に貫入したのち、前記リ
バース機とロータリテーブルを杭芯位置に移動してリバ
ースサーキユレーシヨン工法によって竪孔を掘削したの
ち、前記リバース機及びロータリテーブルを杭芯位置外
方に移動せしめ、前記掘削孔内に鉄筋篭を建込み杭躯体
コンクリートを打設して前記ケーシングジヤツキによっ
てスタンドパイプを引抜くものである。
(Means for Solving the Problem) In order to achieve the above object, according to the method for forming a reverse pile according to the present invention, the casing jack is suspended on one side, and the reverse machine and the rotary table are provided on the upper side. A movable work platform, which is movably mounted on the pile, is installed at the pile construction position,
After moving the reverse machine and the rotary table to the outer position of the pile core on the mount and penetrating the stand pipe into the ground through the casing jack, move the reverse machine and the rotary table to the pile core position. Then, after excavating the vertical hole by the reverse circular lacing method, move the reverse machine and the rotary table to the outside of the pile core position, and place a reinforced cage in the excavation hole to place the concrete of the pile structure. The stand pipe is pulled out by the casing jack.

また本発明に係るリバース杭造成方法は、可動作業架台
と、同作業架台の一側部に懸吊されたスタンドパイプ圧
入引抜用ケーシングジヤツキと、前記作業架台上に移動
自在に搭載されたリバース機及びロータリテーブルと、
前記作業架台上に載荷されたケーシングパイプ圧入反力
支持体とより構成されている。
The reverse pile forming method according to the present invention includes a movable work platform, a stand pipe press-fitting / extracting casing jack suspended on one side of the work platform, and a reverse mount movably mounted on the work platform. Machine and rotary table,
It is composed of a casing pipe press-fitting reaction force support which is loaded on the work platform.

(作用) 本発明によれば杭造成位置にリバース杭造成用可動作業
架台を設置し、同架台上に移動自在に搭載されたリバー
ス機及びロータリテーブルを一旦杭芯位置の外方に移動
せしめたのち、前記架台より懸吊されたケーシングジヤ
ツキによってスタンドパイプを圧入することによって、
同スタンドパイプを無振動で圧入する。
(Operation) According to the present invention, the movable work platform for reverse pile construction is installed at the pile construction position, and the reverse machine and the rotary table movably mounted on the same platform are once moved to the outside of the pile core position. After that, by press-fitting the stand pipe with the casing jack suspended from the mount,
Press in the stand pipe without vibration.

次いで前記架台上に載架したリバース機及びロータリテ
ーブルを再び杭芯位置に移動し、リバース機及びロータ
リテーブルによって、スタンドパイプ内を所要深度まで
掘削し、しかるのち前記リバース機及びロータリテーブ
ルを杭芯位置外側に移動して掘削孔内に鉄筋篭を建込
み、掘削孔内にコンクリートを打設して杭躯体を造成
し、次いでケーシングジヤツキによってスタンドパイプ
を引抜き、しかるのち前記架台を次の施工位置に移動す
るものである。
Next, the reverse machine and the rotary table mounted on the platform are moved to the pile core position again, and the reverse machine and the rotary table excavate the inside of the stand pipe to a required depth, and then the reverse machine and the rotary table are pile core. Move to the outside of the position and build a rebar cage in the excavation hole, place concrete in the excavation hole to create a pile frame, then pull out the stand pipe with the casing jack and then construct the pedestal next time. It moves to a position.

請求項2の発明は、スタンドパイプ圧入用ケーシングジ
ヤツキと、移動自在なリバース機及びロータリテーブル
を搭載した可動作業架台に、スタンドパイプ圧入反力支
持体を載荷することによって、前記スタンドパイプの圧
入時に、同パイプの圧入反力を支承し、同パイプが振動
することなく圧入されるようにしたものである。
According to a second aspect of the present invention, a stand pipe press-fitting reaction force support is loaded on a movable work platform on which a stand pipe press-fitting casing jack, a movable reverse machine, and a rotary table are mounted. At times, the press-fitting reaction force of the pipe is supported so that the pipe can be press-fitted without vibrating.

(実施例) 以下本発明を図示の実施例について説明する。(Examples) The present invention will be described below with reference to illustrated examples.

第1図及び第2図において、1はリバース杭造成装置A
の作業架台で、地盤B上に敷設された軌条2上を走行す
る走行輪3が装着され、前記架台1上にはスタンドパイ
プ圧入反力支持体4を構成するカウンターウエイトが載
荷されている。
In FIGS. 1 and 2, 1 is a reverse pile forming device A.
On the work platform, traveling wheels 3 traveling on a rail 2 laid on the ground B are mounted, and on the platform 1, counterweights constituting a stand pipe press-fitting reaction force support body 4 are loaded.

前記架台1の一側寄りにケーシングジヤツキ5が懸架さ
れ、同架台1の上部には公知のリバース機6及びロータ
リテーブル7が第1図の左右方向に移動自在なように装
架されている。
A casing jack 5 is suspended near one side of the gantry 1, and a known reverse machine 6 and a rotary table 7 are mounted on the gantry 1 so as to be movable in the left-right direction in FIG. .

図中8は枕木である。In the figure, reference numeral 8 is a sleeper.

而して杭を造成する所定位置まで、地盤B上に設置され
た軌条2上に沿って前記架台1を移動せしめ、同架台1
上のリバース機6及びロータリテーブル7を杭芯より離
隔した位置にまで移動させ、(第4図参照)前記ケーシ
ングジヤツキ5にスタンドパイプCを挿入し、(第5図
参照)同パイプCを前記ケーシングジヤツキ5によって
所定深度まで圧入する。(第6図参照)しかるのち前記
リバース機6及びロータリテーブル7を再び旧の位置に
復帰せしめ、同ロータリテーブル7によってドリルパイ
プ9を回転してスタンドパイプC内の泥水を同パイプ9
の中空部から掘削土とともに吸上げ、水を循環させなが
ら掘削する。(第7図参照)図中10はサーキユレーシヨ
ンホースである。
Thus, the pedestal 1 is moved along the rail 2 installed on the ground B to a predetermined position where the pile is formed, and the pedestal 1
The reverse machine 6 and the rotary table 7 are moved to a position separated from the pile core (see FIG. 4), and the stand pipe C is inserted into the casing jack 5 (see FIG. 5). The casing jack 5 press-fits to a predetermined depth. (See FIG. 6) Then, the reverse machine 6 and the rotary table 7 are returned to the old positions again, and the drill pipe 9 is rotated by the rotary table 7 to remove the muddy water in the stand pipe C.
It is sucked up with the excavated soil from the hollow part of the, and excavated while circulating water. (See FIG. 7) In the figure, reference numeral 10 is a circulation hose.

かくして所定深度まで掘削すると、前記リバース機6及
びロータリテーブル7を再び移動して、掘削孔内に鉄筋
篭を建込み、同掘削孔内のスライムを処理し、コンクリ
ートを打設したのち、ケーシングジヤツキ5によってス
タンドパイプCを引抜き、リバース杭造成装置Aを次位
の施工位置まで移動せしめるとともに、杭上部に覆土、
養生を施す。
Thus, when excavating to a predetermined depth, the reverse machine 6 and the rotary table 7 are moved again, a rebar cage is installed in the excavation hole, the slime in the excavation hole is treated, concrete is poured, and then the casing jar is placed. The stand pipe C is pulled out by the wood 5, the reverse pile forming device A is moved to the next construction position, and soil is covered on the top of the pile.
Give a cure.

なおリバースサーキユレーシヨンによって掘削された泥
水、ベントナイト等の安定液は後方に設置された処理装
置によって、泥土のみ搬出され、前記安定液は調整され
て再び循環される。
Note that the stabilizing solution such as muddy water and bentonite excavated by the reverse circulation is carried out only by the treatment device installed at the rear side, and the stabilizing solution is adjusted and circulated again.

第3図はリバース杭施工装置の他の実施例を示し、作業
架台1は杭造成地盤付近に敷設された覆工板11上をタイ
ヤ等の車輪3′で走行し、杭造成に際して、前記架台1
の側面に装架されたアウトリガー12によって前記架台1
を浮上せしめて同架台1を支承するように構成されてい
る。
FIG. 3 shows another embodiment of the reverse pile construction device, in which the work platform 1 travels on wheels 3 ′ such as tires on a lining plate 11 laid near the pile construction ground, and when the pile is constructed, the above-mentioned platform is used. 1
The outrigger 12 mounted on the side surface of the pedestal 1
Is so constructed as to support the same frame 1.

なお前記架台1以外の装置は前記実施例と同一である。The apparatus other than the gantry 1 is the same as that of the above-mentioned embodiment.

(発明の効果) 本発明によれば前記したように、一側部にはケーシング
ジヤツキが懸架され、上部にはリバース機及びロータリ
テーブルが移動自在に搭載された可動作業台を使用し、
スタンドパイプを前記ケーシングジヤツキによって圧入
することによって振動、騒音を軽減し、前記リバース機
及びロータリテーブルを前記架台上に移動せしめること
によって、前記スタンドパイプの圧入、引抜作業と、同
パイプ内の掘削及び掘削孔内に対する鉄筋篭の建込み、
コンクリート打設作業とが干渉し合うことのないように
して、従来のようにバイブロハンマー、ハンマグラブ、
リバース機の機械の振替えの手間を省き、リバース杭の
造成を市街地、狭隘な個所においても効率よく、建設公
害を発生させることなく行なうことができるようにした
ものである。
(Effect of the invention) According to the present invention, as described above, the casing work is suspended on one side and the movable work table on which the reverse machine and the rotary table are movably mounted is used in the upper part,
Vibration and noise are reduced by press-fitting a stand pipe with the casing jack, and press-fitting and pulling-out work of the stand pipe and excavation in the pipe are performed by moving the reverse machine and the rotary table onto the mount. And reinforced cage construction in the excavation hole,
As it does not interfere with concrete pouring work, vibro hammer, hammer mag,
This eliminates the need to transfer the machinery of the reverse machine and enables the construction of reverse piles efficiently in urban areas and in narrow places without causing construction pollution.

請求項2の発明は、可動作業架台と、同作業架台の一側
部に懸吊されたスタンドパイプ圧入引抜用ケーシングジ
ヤツキと、前記作業架台上に移動自在に搭載されたリバ
ース機及びロータリテーブルと、前記作業架台上に載荷
されたケーシングパイプ圧入反力支持体とよりリバース
杭造成装置を構成したことによって、前記リバース杭造
成作業を効率よく遂行するとともに、前記架台上に載荷
されたスタンドパイプ圧入反力支持体によって、スタン
ドパイプ圧入時の反力を支承し、同パイプの振動を防止
したものである。
The invention according to claim 2 is characterized in that a movable work platform, a casing pipe press-in / out casing jack suspended from one side of the work platform, a reverse machine and a rotary table movably mounted on the work platform. And a reverse pile forming device composed of the casing pipe press-fitting reaction force support loaded on the work platform, the reverse pile forming work is efficiently performed, and the stand pipe loaded on the platform is constructed. The press-fitting reaction force support supports the reaction force at the time of press-fitting the stand pipe to prevent vibration of the pipe.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明に係るリバース杭造成装置の一実施例を
示す正面図、第2図は第1図の矢視II−II図、第3図は
本発明に係るリバース杭造成装置の他の実施例における
可動作業架台部分を示す正面図、第4図乃至第7図は本
発明に係るリバース杭造成方法の一実施例の工程を示す
正面図である。 A……リバース杭造成装置、B……地盤、C……スタン
ドパイプ、1……作業架台、4……スタンドパイプ圧入
反力支持体、5……ケーシングジヤツキ、6……リバー
ス機、7……ロータリテーブル。
FIG. 1 is a front view showing an embodiment of a reverse pile forming device according to the present invention, FIG. 2 is a view taken along the line II-II in FIG. 1, and FIG. 3 is another reverse pile forming device according to the present invention. 4 is a front view showing the movable work platform portion in the embodiment of the present invention, and FIGS. 4 to 7 are front views showing the steps of an embodiment of the reverse pile construction method according to the present invention. A: Reverse pile forming device, B: Ground, C: Stand pipe, 1 ... Work platform, 4 ... Stand pipe press-fitting reaction force support body, 5 ... Casing jack, 6 ... Reverse machine, 7 ...... Rotary table.

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】一側部にはケーシングジヤツキが懸吊さ
れ、上部にはリバース機及びロータリテーブルが移動自
在に搭載された可動作業架台を杭造成位置に設置し、前
記リバース機及びロータリテーブルを前記架台上におい
て杭芯の外方位置に移動し、前記ケーシングジヤツキを
介してスタンドパイプを地中に貫入したのち、前記リバ
ース機とロータリテーブルを杭芯位置に移動してリバー
スサーキユレーシヨン工法によって竪孔を掘削したの
ち、前記リバース機及びロータリテーブルを杭芯位置外
方に移動せしめ、前記掘削孔内に鉄筋篭を建込み杭躯体
コンクリートを打設して前記ケーシングジヤツキによっ
てスタンドパイプを引抜くことを特徴とするリバース杭
造成方法。
1. A movable work platform having a casing jack suspended from one side and a reverse machine and a rotary table movably mounted on the upper side thereof is installed at a pile forming position, and the reverse machine and the rotary table are installed. Is moved to the outer position of the pile core on the mount, and the stand pipe is penetrated into the ground through the casing jack, and then the reverse machine and the rotary table are moved to the pile core position to reverse the reverse circle After excavating the vertical hole by the syon method, move the reverse machine and the rotary table to the outside of the core position of the pile, install a rebar cage in the excavation hole, place a concrete pile body, and stand by the casing jack. A reverse pile construction method characterized by pulling out a pipe.
【請求項2】可動作業架台と、同作業架台の一側部に懸
吊されたスタンドパイプ圧入引抜用ケーシングジヤツキ
と、前記作業架台上に移動自在に搭載されたリバース機
及びロータリテーブルと、前記作業架台上に載荷された
ケーシングパイプ圧入反力支持体とよりなることを特徴
とするリバース杭造成装置。
2. A movable work platform, a casing pipe press-fitting / extracting casing jack suspended from one side of the work platform, a reverse machine and a rotary table movably mounted on the work platform. A reverse pile forming device comprising a casing pipe press-fitting reaction force support body loaded on the work platform.
JP30400790A 1990-11-13 1990-11-13 Reverse pile construction method and device Expired - Lifetime JPH0751779B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP30400790A JPH0751779B2 (en) 1990-11-13 1990-11-13 Reverse pile construction method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP30400790A JPH0751779B2 (en) 1990-11-13 1990-11-13 Reverse pile construction method and device

Publications (2)

Publication Number Publication Date
JPH04179729A JPH04179729A (en) 1992-06-26
JPH0751779B2 true JPH0751779B2 (en) 1995-06-05

Family

ID=17927940

Family Applications (1)

Application Number Title Priority Date Filing Date
JP30400790A Expired - Lifetime JPH0751779B2 (en) 1990-11-13 1990-11-13 Reverse pile construction method and device

Country Status (1)

Country Link
JP (1) JPH0751779B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5292019B2 (en) * 2008-08-27 2013-09-18 東急建設株式会社 Pile construction device and cast-in-place concrete pile construction method
PT2295646E (en) * 2009-08-28 2012-08-28 Bauer Maschinen Gmbh Drilling equipment and method

Also Published As

Publication number Publication date
JPH04179729A (en) 1992-06-26

Similar Documents

Publication Publication Date Title
CN214245731U (en) Underwater concrete pouring pile body construction structure
JPH0543011B2 (en)
JP2017166294A (en) Underground structure construction method
JPH0751779B2 (en) Reverse pile construction method and device
JP5378066B2 (en) Mountain fastening method
JPH1136338A (en) Construction method of underground structure
EP0687777A1 (en) Method for arranging concrete piles in the ground
JP3418343B2 (en) Earth retaining wall formation method in root cutting method
JP4635725B2 (en) Pile construction system
JPH11303063A (en) Execution method for wall body type cast-in-place pile and excavator
JPH05287745A (en) Mounting method for wale in column aligning method
JP3773459B2 (en) Construction method of underground continuous wall
JP5876353B2 (en) Steel pipe pile construction method
JP3009846B2 (en) Method and apparatus for cleaning steel material for underground diaphragm wall
JP4182387B2 (en) Underground replacement method
JP3377444B2 (en) How to build underground side walls
JP5865760B2 (en) Steel pipe press-fitting device moving device and steel pipe press-fitting device installation method
JPS598827A (en) Large-diameter foundation work
JPH0122410B2 (en)
JP4034481B2 (en) Horizontal shaft construction method and horizontal shaft construction device
JP3567387B2 (en) How to build an underground skeleton
JPS602280Y2 (en) Slime processing equipment for mud drilling method
KR101667962B1 (en) Apparatus for removing slime in cast in place structure
JPH01322020A (en) Pile head processing cap for in-situ pile
JPS60181426A (en) Method of burying pipe in soft soil layer