Equipment control device

Info

Publication number
JPH0743613B2
JPH0743613B2 JP61145159A JP14515986A JPH0743613B2 JP H0743613 B2 JPH0743613 B2 JP H0743613B2 JP 61145159 A JP61145159 A JP 61145159A JP 14515986 A JP14515986 A JP 14515986A JP H0743613 B2 JPH0743613 B2 JP H0743613B2
Authority
JP
Japan
Prior art keywords
signal
detection circuit
control device
circuit
signal processing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP61145159A
Other languages
Japanese (ja)
Other versions
JPS63717A (en
Inventor
政司 兼武
義平 大岩
裕行 道端
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Holdings Corp
Original Assignee
Matsushita Electric Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matsushita Electric Industrial Co Ltd filed Critical Matsushita Electric Industrial Co Ltd
Priority to JP61145159A priority Critical patent/JPH0743613B2/en
Publication of JPS63717A publication Critical patent/JPS63717A/en
Publication of JPH0743613B2 publication Critical patent/JPH0743613B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Control Of Non-Electrical Variables (AREA)

Description

【発明の詳細な説明】 産業上の利用分野 本発明は温度、湿度等を検知して負荷を制御する衣類乾
燥機あるいは食器洗い機等の機器の制御装置に関するも
のである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a control device for a device such as a clothes dryer or a dishwasher that detects a temperature, a humidity and the like to control a load.

従来の技術 機器の制御装置として衣類乾燥機の制御装置を一例とし
て説明する。衣類乾燥機の制御装置は第5図に示すよう
に、衣類乾燥機のドラム内あるいは排気の温度あるいは
湿度を検知するセンサー1を設け、このセンサー1の信
号は検知回路2を介して信号処理回路3に取込まれる。
信号処理回路3はセンサー1の信号に応じてファンやド
ラムを回転させるモーター、熱風をドラム内に送り込む
ヒーター等の負荷5を負荷駆動回路4を介して制御す
る。この一連の制御動作を第6図により説明する。すな
わち、検知回路2の信号が設定値にあるかどうかを信号
処理回路3で判断し、設定値であればある処理(例えば
遅延時間の実行等)を行なった後、負荷駆動回路へ制御
信号を出力する。
2. Description of the Related Art As a device control device, a clothes dryer control device will be described as an example. As shown in FIG. 5, the control device of the clothes dryer is provided with a sensor 1 for detecting the temperature or humidity of the drum of the clothes dryer or the exhaust gas, and the signal of this sensor 1 is sent through a detection circuit 2 to a signal processing circuit. Incorporated in 3.
The signal processing circuit 3 controls a load 5 such as a motor for rotating a fan or a drum, a heater for sending hot air into the drum, or the like according to a signal from the sensor 1 via a load driving circuit 4. This series of control operations will be described with reference to FIG. That is, the signal processing circuit 3 determines whether or not the signal of the detection circuit 2 is at the set value, and if the signal is the set value, a certain process (for example, execution of delay time) is performed, and then the control signal is sent to the load drive circuit. Output.

発明が解決しようとする問題点 このような従来の衣類乾燥機の制御装置では、検知回路
2からの信号が信号処理回路3に正常出力されているか
どうかを検査するには、負荷駆動回路4への制御信号が
正常に出力されるまでのt時間必要とし、この時間t
経過後、負荷5が所定の処理にもとづく動作を行って
いるかをみなければならず、製造上に行う検査、あるい
は補修上で行う検査に多大な時間を必要とする問題点を
有していた。
Problems to be Solved by the Invention In such a conventional clothes dryer control device, in order to check whether the signal from the detection circuit 2 is normally output to the signal processing circuit 3, the load drive circuit 4 is connected. It takes t 1 hour until the control signal of is normally output, and this time t
After one lapse, it is necessary to check whether the load 5 is performing an operation based on a predetermined process, and there is a problem that a large amount of time is required for an inspection performed during manufacturing or an inspection performed during repair. It was

本発明は上記問題点に鑑み、検査時間の短縮化を目的と
する。
The present invention has been made in view of the above problems, and an object thereof is to shorten the inspection time.

問題点を解決するための手段 上記目的を達成するために本発明の機器の制御装置は、
検知回路からの信号にもとづいて負荷を制御する信号処
理回路を設け、この信号処理回路は前記検知回路からの
設定値に達すると負荷を制御する設定時間より短い時間
を経て信号を出力するように構成したものである。
Means for Solving the Problems In order to achieve the above object, the device control device of the present invention is
A signal processing circuit for controlling the load based on the signal from the detection circuit is provided, and this signal processing circuit outputs the signal after a time shorter than the set time for controlling the load when the set value from the detection circuit is reached. It is composed.

作用 上記構成により、製造上または補修上での検査は、検知
回路に信号を入力して信号処理回路から信号が出力され
ているかを観測することで、短時間のうちに行なうこと
ができる。
Operation With the above configuration, the inspection during manufacturing or repair can be performed in a short time by inputting a signal to the detection circuit and observing whether the signal is output from the signal processing circuit.

実施例 以下、本発明の一実施例について第1図から第4図にも
とづいて説明する。
Embodiment An embodiment of the present invention will be described below with reference to FIGS. 1 to 4.

第1図において、1は温度あるいは湿度等のセンサー
で、このセンサー1の信号は検知回路2を介して信号処
理回路7へ出力される。信号処理回路7の出力信号によ
って負荷駆動回路4が負荷5を駆動する。表示装置6
は、検知回路2の入力信号が設定値であると信号処理回
路7で判断したときに出力される信号(検知受理信号)
によって点灯する。その制御動作を第2図により説明す
る。8で検知回路2からの信号を取組み、9でその信号
が設定値であるか否かを判断する。ここで、入力した信
号が設定値でなければ再度7の検知回路からの信号の取
込みを行ない、入力した信号が設定値であれば10に移
り、検知回路2が信号を検知したことを示す出力信号を
信号処理回路7から出力し、表示装置6を点灯する。続
いて11の所定の処理に移る。ここの処理とは、センサー
が例えば温度50℃を検知すれば運転開始からその検知を
行なうまでの時間T50の3倍の時間3T50を遅延させる等
の演算処理や、複数の検知回路の出力信号によって駆動
する負荷を選択する等を意味する。11での処理の後、12
で負荷駆動回路制御信号の出力へと移行する。この出力
信号は、モータ・ヒーター・電磁弁等の負荷を制御する
ものである。
In FIG. 1, reference numeral 1 is a sensor such as temperature or humidity, and the signal of this sensor 1 is output to a signal processing circuit 7 via a detection circuit 2. The load drive circuit 4 drives the load 5 by the output signal of the signal processing circuit 7. Display device 6
Is a signal output when the signal processing circuit 7 determines that the input signal of the detection circuit 2 is a set value (detection acceptance signal)
Lights up. The control operation will be described with reference to FIG. At 8 the signal from the detection circuit 2 is taken, and at 9 it is determined whether or not the signal is the set value. Here, if the input signal is not the set value, the signal from the detection circuit 7 is fetched again, and if the input signal is the set value, the process moves to 10 and an output indicating that the detection circuit 2 has detected the signal A signal is output from the signal processing circuit 7, and the display device 6 is turned on. Subsequently, the process proceeds to 11 predetermined processes. The processing here means, for example, if the sensor detects a temperature of 50 ° C., it delays a time 3T 50 which is three times the time T 50 from the start of operation to the detection, and the output of a plurality of detection circuits. It means selecting a load driven by a signal. After processing at 11, then 12
Then, the flow shifts to the output of the load drive circuit control signal. This output signal controls loads such as a motor, a heater and a solenoid valve.

このような構成の制御装置の動作の検査は、検知回路2
へ信号を入力し、表示装置6が点灯するか否かで行なう
ことができる。この検査は特に信号処理回路7が検知回
路2の信号を正確に認識しているかどうかを見るための
ものである。これにより従来は、負荷駆動の有無で認識
していた時間に比べ短時間に認識できる。すなわち、第
2図に示すように、従来tの時間を要したものが、t
で済むようになる。
The inspection of the operation of the control device having such a configuration is performed by the detection circuit 2
This can be performed by inputting a signal to the display device 6 and turning on or off the display device 6. This test is especially for checking whether the signal processing circuit 7 correctly recognizes the signal of the detection circuit 2. As a result, the recognition can be performed in a shorter time than the time conventionally recognized with or without load driving. That is, as shown in FIG. 2, the time required for the conventional t 1 is t
2 will be enough.

本実施例では、検知回路が1つの場合を示したが、第3
図に示すように複数の検知回路2a〜2dを設け、この検知
回路2a〜2cに対応する表示を有していても同様である。
また、表示装置6a〜6cを設けている。なお表示装置は、
特に検査の必要がない検知回路2dの動作状態を表示しな
い。
In this embodiment, the case where the number of detection circuits is one is shown, but the third
The same applies when a plurality of detection circuits 2a to 2d are provided as shown in the figure and a display corresponding to the detection circuits 2a to 2c is provided.
Further, display devices 6a to 6c are provided. The display device is
The operating state of the detection circuit 2d that does not require special inspection is not displayed.

また、第4図に示すように、信号処理回路7に検知受理
信号によって点灯する表示装置がなくとも、外部検査装
置によって接続可能な端子7を備え、外部検査装置に有
する対応した表示装置の点灯によって検査することもで
き同様に検査時間を短縮することができる。
Further, as shown in FIG. 4, even if the signal processing circuit 7 does not have a display device that is turned on by a detection acceptance signal, the terminal 7 that can be connected by an external inspection device is provided and the corresponding display device that is included in the external inspection device is turned on. The inspection time can be shortened as well.

発明の効果 このように本発明によれば、温度、湿度等を検知する検
知回路からの信号が設定値に達したことを、負荷を制御
する所定時間より短い時間を経て信号処理回路が出力す
ることにより、従来より短時間で検知回路が正常に信号
を入力したか否かを確認でき、製造上または補修上にお
ける制御装置の動作検査の時間を短縮することができ
る。
As described above, according to the present invention, the signal processing circuit outputs that the signal from the detection circuit for detecting temperature, humidity, etc. has reached the set value after a time shorter than a predetermined time for controlling the load. Thus, it is possible to confirm whether or not the detection circuit has normally input the signal in a shorter time than in the conventional case, and it is possible to shorten the operation inspection time of the control device during manufacturing or repair.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明の一実施例を示す制御装置の回路構成
図、第2図は同制御動作を示すフローチャート、第3
図、第4図は他の実施例を示す制御装置の回路構成図、
第5図は従来の制御装置の回路構成図、第6図は同制御
動作を示すフローチャートである。 1……センサー、2……検知回路、6……表示装置、7
……信号処理回路。
FIG. 1 is a circuit configuration diagram of a control device showing an embodiment of the present invention, FIG. 2 is a flow chart showing the control operation, and FIG.
FIG. 4 is a circuit configuration diagram of a control device showing another embodiment,
FIG. 5 is a circuit configuration diagram of a conventional control device, and FIG. 6 is a flowchart showing the control operation. 1 ... Sensor, 2 ... Detection circuit, 6 ... Display device, 7
...... Signal processing circuit.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】温度、湿度等を検知する少なくとも一つ以
上の検知回路と、この検知回路信号が設定値に達すると
所定時間後に負荷の状態を変化させる制御を行う信号処
理回路を備え、前記信号処理回路は少なくとも一つ以上
の前記検知回路信号が設定値に達したとき、検知回路か
らの出力が設定値に達したことを示す信号を出力するよ
うに構成した機器の制御装置。
1. At least one detection circuit for detecting temperature, humidity, etc., and a signal processing circuit for controlling the load state to change after a predetermined time when the detection circuit signal reaches a set value, A control device for a device, wherein the signal processing circuit is configured to output a signal indicating that the output from the detection circuit has reached a set value when at least one of the detection circuit signals has reached a set value.
JP61145159A 1986-06-20 1986-06-20 Equipment control device Expired - Fee Related JPH0743613B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP61145159A JPH0743613B2 (en) 1986-06-20 1986-06-20 Equipment control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP61145159A JPH0743613B2 (en) 1986-06-20 1986-06-20 Equipment control device

Publications (2)

Publication Number Publication Date
JPS63717A JPS63717A (en) 1988-01-05
JPH0743613B2 true JPH0743613B2 (en) 1995-05-15

Family

ID=15378789

Family Applications (1)

Application Number Title Priority Date Filing Date
JP61145159A Expired - Fee Related JPH0743613B2 (en) 1986-06-20 1986-06-20 Equipment control device

Country Status (1)

Country Link
JP (1) JPH0743613B2 (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61149847U (en) * 1985-03-08 1986-09-16

Also Published As

Publication number Publication date
JPS63717A (en) 1988-01-05

Similar Documents

Publication Publication Date Title
JP4046759B2 (en) Inspection method for electronic control unit
US4554662A (en) Input signal testing device for electronic copier
JPH0743613B2 (en) Equipment control device
JPS63133202A (en) Vehicle controller
JPH10171677A (en) Microprocessor and its inspection method
KR950704142A (en) ANTI-LOCK CONTROLLER
JPH0577143A (en) Failure diagnosis device for automated line
JPH0644032B2 (en) Semiconductor integrated circuit device
JPS6045812A (en) Microcomputer control system for high frequency heating device
JPH05101228A (en) Analog switch input card system
JPH0749232Y2 (en) Combustion equipment control device
JPS60186744A (en) Measuring device for water content of grain
JPH0750467B2 (en) One-chip microcomputer
JP4304964B2 (en) Semiconductor circuit device and semiconductor circuit device inspection device
JPS6078362A (en) Function check system of automatic testing device
JPH0650035Y2 (en) High frequency heating device
JPH02207160A (en) Engine control unit for vehicle
JP2599795B2 (en) Test method for circuits with microprocessor
JPS633535A (en) System controller detecting connection of each unit
JPH109650A (en) Control device of air conditioning apparatus
JPH0816228A (en) Control equipment with inspecting function
JPS58153024A (en) Room heating equipment having checking function of control circuit
KR19980051281A (en) V-seal's product inspection method and device
JPH0635531A (en) Diagnostic method and device for controller
JPH04363727A (en) Batch test system for plural objective part to be tested

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees