JPH0738555Y2 - Beam formwork support frame - Google Patents

Beam formwork support frame

Info

Publication number
JPH0738555Y2
JPH0738555Y2 JP1989131888U JP13188889U JPH0738555Y2 JP H0738555 Y2 JPH0738555 Y2 JP H0738555Y2 JP 1989131888 U JP1989131888 U JP 1989131888U JP 13188889 U JP13188889 U JP 13188889U JP H0738555 Y2 JPH0738555 Y2 JP H0738555Y2
Authority
JP
Japan
Prior art keywords
beam form
vertical rods
horizontal rod
rod
rods
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP1989131888U
Other languages
Japanese (ja)
Other versions
JPH0374747U (en
Inventor
光哉 小野寺
Original Assignee
住金鋼材工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 住金鋼材工業株式会社 filed Critical 住金鋼材工業株式会社
Priority to JP1989131888U priority Critical patent/JPH0738555Y2/en
Publication of JPH0374747U publication Critical patent/JPH0374747U/ja
Application granted granted Critical
Publication of JPH0738555Y2 publication Critical patent/JPH0738555Y2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

【考案の詳細な説明】 〔産業上の利用分野〕 この考案は、コンクリート打設直後の床型枠及び梁型枠
を支持する為の梁型枠支持フレームに関するものであ
る。
DETAILED DESCRIPTION OF THE INVENTION [Industrial Application Field] The present invention relates to a beam form supporting frame for supporting a floor form and a beam form immediately after placing concrete.

〔従来の技術〕[Conventional technology]

コンクリート打設直後の床型枠及び梁型枠はコンクリー
トが充分な強度を発言するまで支保工によって相当の期
間支持する必要があるが、従来、梁型枠はパイプサポー
ト等によって下側より支持するのが一般的であり、作業
員の通行の妨げとなっていた。
Immediately after placing concrete, floor and beam forms need to be supported for a considerable period of time by concrete support until the concrete shows sufficient strength, but conventionally, beam forms are supported from below by pipe supports, etc. Was common, which was an obstacle to the passage of workers.

パイプサポートは長さを自由に変えることができてきわ
めて便利であるが、一本一本数多く設置する必要がある
ので、その設置及び管理がきわめて煩わしいものであっ
た。
The pipe support is extremely convenient because its length can be freely changed, but since it is necessary to install many pipe supports one by one, its installation and management were extremely troublesome.

このため、最近ではパイプサポートの使用を少なくして
支保工の組み立てを可能な限り省略化するために、梁型
枠専用の梁型枠支持フレームが種々考案されている。
For this reason, in recent years, various beam form supporting frames dedicated to the beam form have been devised in order to reduce the use of the pipe supports and to simplify the assembly of the supporting work as much as possible.

その多くは梁型枠の下側にこれと略直角に設置すると共
に、少なくとも2本のパイプサポートによって支持し、
パイプサポートの長さを適宜変えることによってレベル
調整を行う構成のもので、当出願人も幾つか開発し実施
もしている。
Most of them are installed on the lower side of the beam formwork at a right angle to this, and are supported by at least two pipe supports.
The configuration is such that the level is adjusted by appropriately changing the length of the pipe support, and the present applicant has also developed and implemented some of them.

〔考案が解決しようとする課題〕[Problems to be solved by the device]

しかし、この種の梁型枠支持フレームによると梁成が略
同じか若しくはそんなに違わない場合には、一種類の梁
型枠支持フレームで充分間に合うが、梁成が大きく異な
る場合には、支持フレームの上下移動が大きくなるた
め、レベル調整が面倒になるだけでなく、一種類では対
応出来ず、数種類の梁型枠支持フレームを必要とした。
However, according to this type of beam form supporting frame, when the beam form is almost the same or not so different, one type of beam form supporting frame is sufficient, but when the beam form is largely different, the supporting frame is Since the vertical movement of the robot becomes large, it is not only difficult to adjust the level, but it is not possible to deal with one type, and several types of beam formwork support frames are required.

また、パイプサポートも梁型枠の下に少なくとも2本は
必要とし、パイプサポートの大幅省略化には未だ遠いも
のがあった。
Also, at least two pipe supports were required under the beam formwork, and there was a long way to go before the pipe supports were largely omitted.

この考案はこのような前記従来の問題点を解消するため
になされたもので、一種類で梁成の大きく異なる梁型枠
の支持に対応できるようにした梁型枠支持フレームを提
供することを目的とする。
The present invention has been made in order to solve the above-mentioned conventional problems, and it is an object of the present invention to provide a beam form frame support frame capable of supporting beam form frames of one type, which are greatly different in beam formation. To aim.

〔課題を解決する為の手段〕[Means for solving the problem]

この考案に係る梁型枠支持フレームは、構築される梁型
枠の下側に、この梁型枠と直交して設置される上部横杆
材及び下部横杆材と、この上部横杆材と下部横杆材との
間に所定間隔おきに立設された複数本の中間縦杆材と、
前記上部横杆材及び下部横杆材の両端部に立設された両
端縦杆材と、前記両端及び中間の縦杆材間にそれぞれ設
置された複数本の斜め杆材とを備えてトラス梁状に構成
され、前記両端縦杆材の一端が他端より長く突設され、
かつ、前記両端縦杆材の両端部に建て地材と連結するた
めの継ぎ手部が、前記中間縦杆材の端部に前記梁型枠を
支持するためのジャッキ又は支持杆材がそれぞれ着脱自
在に取り付けられて構成されている。
A beam form supporting frame according to the present invention includes an upper horizontal rod and a lower horizontal rod, which are installed under the beam form to be constructed so as to be orthogonal to the beam form, and the upper horizontal rod. A plurality of intermediate vertical rods which are erected at predetermined intervals between the lower horizontal rods,
Truss beam provided with both-end vertical rods erected at both ends of the upper horizontal rod and the lower horizontal rod, and a plurality of diagonal rods respectively installed between the both ends and the intermediate vertical rods One end of the both ends of the vertical rod is projected longer than the other end,
Moreover, joints for connecting with the building material are attached to both ends of the both-end vertical rods, and jacks or support rods for supporting the beam form are detachably attached to the ends of the intermediate vertical rods. It is attached to and configured.

〔実施例〕〔Example〕

以下、この考案に係る梁型枠支持フレームを図示する一
実施例に基いて説明すると、梁型枠支持フレーム1は、
構築される梁型枠Aの下側に、この梁型枠Aと直交して
設置される上部横杆材10及び下部横杆材11と、この上部
横杆材10と下部横杆材11との間に所定間隔おきに立設さ
れた複数本の中間縦杆材3と、前記上部横杆材10及び下
部横杆材11の両端部に立設された両端縦杆材2と、前記
両端及び中間縦杆材2,3及び2,3間にそれぞれ設置された
複数本の斜め杆材とを備えてトラス梁状に構成されてい
る。
The beam form supporting frame 1 according to the present invention will be described below with reference to an embodiment showing the beam form supporting frame.
Below the beam form A to be constructed, an upper horizontal rod 10 and a lower horizontal rod 11 which are installed orthogonally to the beam form A, and an upper horizontal rod 10 and a lower horizontal rod 11 are provided. A plurality of intermediate vertical rods 3 which are erected at predetermined intervals between the upper and lower horizontal rods 10 and 11 and two vertical rods 2 which are vertically erected on both ends of the upper and lower horizontal rods 10 and 11. And a plurality of diagonal rods respectively installed between the intermediate vertical rods 2, 3 and 2, 3 to form a truss beam shape.

両端縦杆材2,2の一端は中央2本の縦杆材3,3より長めに
形成され、長い分だけ下端部が縦杆材3,3の下端部より
突出している。
One end of each of the vertical rods 2 and 2 at both ends is formed to be longer than the central two vertical rods 3 and 3, and the lower end portion projects from the lower end portion of the vertical rods 3 and 3 by an amount corresponding to the length.

両端縦杆材2の上端部には雄継手4が、下端部には雌継
手5がそれぞれ形成され、この雄継手4及び雌継手5を
介して両端の縦杆材2,2の上下両端部に、例えば地上に
立設された建地材6.6を差し込んで連結できる構成にな
っている。
A male joint 4 is formed on the upper end portion of the both-ends vertical rods 2, and a female joint 5 is formed on the lower end portion thereof. In addition, for example, a building material 6.6 standing on the ground can be inserted and connected.

なお、雄継手4及び雌継手5には連結後の建地材6のす
っぽ抜けを防止するためのロックねじ7を螺合するねじ
孔8が形成されている。
In addition, the male joint 4 and the female joint 5 are formed with a screw hole 8 into which a lock screw 7 for preventing the building material 6 after connection from slipping off is inserted.

また、両端縦杆材2の上端よりやや下がった部分には、
主に横地材を連結するための連結部9が三方に突設され
ている。
Also, in the part slightly lower than the upper end of the vertical rods 2 at both ends,
A connecting portion 9 for mainly connecting the horizontal members is provided so as to project in three directions.

連結部9は両端縦杆材2の側部に平面で見てコ字状に突
設され、かつ、その先端部に凹溝9aが形成されている。
そして、この連結部9に横地材20の端部がくさび21によ
って連結されている(第1図及び第3図参照)。
The connecting portion 9 is provided on both sides of the vertical rods 2 at both ends so as to project in a U shape when seen in a plan view, and a groove 9a is formed at a tip portion thereof.
The end of the horizontal material 20 is connected to the connecting portion 9 by a wedge 21 (see FIGS. 1 and 3).

この場合、横地材20の端部に側面で見てコ字状に形成さ
れ、かつ、上下フランジ部にくさびを挿入するためのく
さび孔(図省略)が形成された連結部22が突設され、こ
の連結部22のくさび孔と連結部9とにくさび21を挿入す
ることにより、横地材20と梁型枠支持フレーム1とを強
固に連結できるようになっている(第1図及び第3図参
照)。
In this case, a connecting portion 22 is formed at the end of the horizontal base material 20 so as to have a U-shape when viewed from the side and has a wedge hole (not shown) for inserting a wedge in the upper and lower flange portions. By inserting the wedge 21 into the wedge hole of the connecting portion 22 and the connecting portion 9, the horizontal base material 20 and the beam form supporting frame 1 can be firmly connected (see FIGS. 1 and 3). See figure).

このような構成において、梁型枠支持フレーム1は、構
築される梁型枠Aの高さに応じて、一方(上部横地材10
又は下部横地材11の一方)を上にして使用することがで
き、梁型枠Aの高さが大きく変わる場合には、上部横地
材10又は下部横地材11の一方を上にして設置し、また、
梁型枠Aの小さな高さ調整は梁型枠支持フレーム1の使
用時に、中間縦地材3,3(中央複数本)の上端部にジャ
ッキ(以下、「大引受ジャッキ」という)12を設置し、
この大引受ジャッキ12のハンドル付ナットを回転してお
こなう。
In such a structure, the beam form supporting frame 1 is provided on one side (upper horizontal base material 10) depending on the height of the beam form A to be constructed.
Or one of the lower horizontal base material 11) can be used upward, and when the height of the beam form A is largely changed, one of the upper horizontal base material 10 or the lower horizontal base material 11 is set up, Also,
A small height adjustment of the beam form A, when using the beam form support frame 1, installs a jack (hereinafter, referred to as "large overload jack") 12 at the upper end of the intermediate vertical materials 3, 3 (plurality in the center). Then
This is done by rotating the nut with handle of the large underwriting jack 12.

なお、大引受ジャッキ12の上端部には真上に溝状に開口
する大引き受け14が突設されている。
At the upper end of the large catch jack 12, there is provided a large catch 14 projecting directly above and opening in a groove shape.

また、梁型枠支持フレーム1は上下引っ繰り返し、中央
2本の中間縦杆材3の反対側端部に大引受ジャッキ12を
挿入し、この大引受ジャッキ12を先に述べた同様の方法
によって任意の高さにレベル調整できる構成にもなって
いる。
Further, the beam form supporting frame 1 is repeatedly pulled up and down, the large undertaking jacks 12 are inserted into the opposite ends of the two intermediate vertical rods 3 in the center, and the large undertaking jacks 12 are formed by the same method as described above. It also has a configuration that allows level adjustment to any height.

また、この場合、両端縦杆材2の下側に連結される建地
材6には、上端部に縦杆材2の雄継手4と係合可能な雌
継手を有するものを使用するものとし、仮に、このよう
な建地材が見当たらないときは、縦杆材2の雄継手4及
び建地材6の雄継手の双方に連結可能な連結金具(例え
ば、簡単な鋼製スリーブ)を使用するものとする。
Further, in this case, as the building material 6 connected to the lower side of the vertical rods 2 at both ends, one having a female joint engageable with the male joint 4 of the vertical rod 2 at its upper end is used. If such a building material is not found, use a connecting fitting (for example, a simple steel sleeve) that can be connected to both the male joint 4 of the vertical rod 2 and the male joint of the building material 6. It shall be.

梁型枠支持フレーム1がこのように構成されていること
により、梁型枠Aの梁成に応じて上部横地材10又は下部
横地材11の一方を上にして設置することにより、また、
設置後のレベル調整を大引受ジャッキ12によって行うこ
とにより調整作業を簡単に行うことができる。
Since the beam form supporting frame 1 is configured in this way, one of the upper horizontal base material 10 or the lower horizontal base material 11 is installed upward depending on the beam formation of the beam form A, and
By adjusting the level after installation by the large underwriting jack 12, the adjustment work can be easily performed.

なお、かかる場合、両端縦杆材2,2の連結部9は両端縦
杆材2の上下両端部に突設すると良い。
In such a case, the connecting portions 9 of the vertical rods 2, 2 at both ends may be projectingly provided at the upper and lower ends of the vertical rods 2 at both ends.

このように構成された梁型枠支持フレーム1は梁型枠A
の下側にこれと略直角に設置され、かつ、両端縦杆材2,
2の上下両端部に建地材6,6を連結することにより上下床
スラブ17,17間に固定されている。
The beam form supporting frame 1 configured as described above is used in the beam form A.
It is installed at a right angle to the lower side of this, and both ends of the vertical rods 2,
It is fixed between the upper and lower floor slabs 17, 17 by connecting the building materials 6, 6 to the upper and lower end portions of 2.

また、梁型枠支持フレーム1は梁型枠Aのスパン長に応
じてその長手方向に一定間隔おきに設置されている。
Further, the beam form supporting frame 1 is installed at regular intervals in the longitudinal direction according to the span length of the beam form A.

さらに、大引き受け14,14間に大引き18,18が梁型枠Aの
長手方向に沿って架設されている。
Further, the large pulls 18, 18 are installed between the large pullers 14, 14 along the longitudinal direction of the beam form A.

そして、大引き18,18が梁型枠Aの下側にうまくフイッ
トするように大引受けジャッキ12,12によってレベル調
整がなされる。
Then, the level is adjusted by the large pulling jacks 12 and 12 so that the large pulls 18 and 18 fit well to the lower side of the beam form A.

第2図は、この考案の他の実施例を示し、梁型枠支持フ
レーム1は先の実施例と同様に、上部横杆材10と下部縦
杆材11と両端縦杆材2,2と複数本の中間縦杆材3と複数
本の斜め杆材とからトラス梁状に構成されている。
FIG. 2 shows another embodiment of the present invention, in which the beam form supporting frame 1 has an upper horizontal rod member 10, a lower vertical rod member 11, both end vertical rod members 2, 2 as in the previous embodiment. A plurality of intermediate vertical rods 3 and a plurality of diagonal rods are formed in a truss beam shape.

また、両端縦杆材2,2は中央2本の中間縦杆材3より相
当長めに形成され、長い分だけ上端部が縦杆材3の上端
部より突出している。
Further, the vertical rods 2, 2 on both ends are formed to be considerably longer than the two intermediate vertical rods 3 at the center, and the upper ends thereof project from the upper ends of the vertical rods 3 by the longer length.

したがって、梁型枠支持フレーム1は梁型枠Aを支持し
易いように真上に開口する凹形状に構成されている。
Therefore, the beam form supporting frame 1 is formed in a concave shape that opens right above so as to easily support the beam form A.

両端縦杆材2,2の上端部にはトラス形状をしたブラケッ
ト19,19が水平に突設され、このブラケット19,19の先端
部に連結部15,15がそれぞれ形成されている。
Truss-shaped brackets 19 and 19 are horizontally projected from the upper ends of the vertical rods 2 and 2 at both ends, and connecting portions 15 and 15 are formed at the tips of the brackets 19 and 19, respectively.

また、下部横杆材11は上部横杆材10よりやや長めに形成
され、その先端部に連結部15,15がそれぞれ形成さてい
る。
Further, the lower horizontal rod 11 is formed to be slightly longer than the upper horizontal rod 10, and the connecting portions 15 and 15 are formed at the tip ends thereof.

中央2本の中間縦杆材3,3の上端部には支持杆13,13がね
じ式によって自由に昇降できるように挿入されている。
Support rods 13, 13 are inserted into the upper ends of the two middle vertical rods 3, 3 by a screw type so that they can be freely raised and lowered.

かかる梁型枠支持フレーム1も上下引っ繰り返し、中間
縦杆材3,3の反対側に支持杆13,13を挿入し、この支持杆
13,13を任意の高さに固定することができ、構築される
梁型枠Aのレベル調整を行うことができるようになって
いる。
The beam form supporting frame 1 is also repeatedly pulled up and down, and the supporting rods 13 and 13 are inserted on the opposite side of the intermediate vertical rods 3 and 3.
13, 13 can be fixed at any height, and the level of the beam form A to be constructed can be adjusted.

このように構成された梁型枠支持フレーム1は先の梁型
枠支持フレーム1と同様に梁型枠Aの下側に設置され、
かつ、上下床スラブ17,17間に建て付けられた左右パイ
プサボート6,6の連結部16,16にブラケット19及び下部横
杆材11の左右両端の連結部16を連結することより固定さ
れている。
The beam form supporting frame 1 configured in this way is installed below the beam form A, like the above-mentioned beam form supporting frame 1.
Also, it is fixed by connecting the bracket 19 and the connecting portions 16 at the left and right ends of the lower horizontal rod 11 to the connecting portions 16 and 16 of the left and right pipe support 6,6 built between the upper and lower floor slabs 17,17. There is.

〔考案の効果〕[Effect of device]

この考案に係る梁型枠支持フレームは以上説明した構成
からなり、構築される梁型枠の下側に、この梁型枠と直
交して設置される上部横杆材及び下部横杆材と、この上
部横杆材と下部横杆材との間に所定間隔おきに立設され
た複数本の中間縦杆材と、前記上部横杆材及び下部横杆
材の両端部に立設された両端縦杆材と、前記両端及び中
間の縦杆材間にそれぞれ設置された複数本の斜め杆材と
を備えてトラス梁状に構成されているので、構造的にき
わめて優れ、梁型枠を強固に支持できる効果がある。
The beam form supporting frame according to the present invention has the configuration described above, and on the lower side of the beam form to be constructed, an upper horizontal rod member and a lower horizontal rod member which are installed orthogonal to the beam form frame, A plurality of intermediate vertical rods which are erected at predetermined intervals between the upper horizontal rod and the lower horizontal rod, and both ends which are erected at both ends of the upper horizontal rod and the lower horizontal rod. Since it is constructed in the shape of a truss with a vertical rod and a plurality of diagonal rods installed between the both ends and the intermediate vertical rod, it is structurally excellent and the beam form is strong. Has the effect that can be supported.

また、両端縦杆材の一端が他端より長く突設され、か
つ、前記両端縦杆材の両端部に建地材と連結するための
継手部が、前記中間縦杆材の端部に前記梁型枠を支持す
るためのジャッキ又は支持杆材がそれぞれ着脱自在に取
り付けられて構成されているので、構築される梁型枠の
レベルに応じて上部横杆材又は下部横杆材の一方を上に
して設置し、かつ、ジャッキ又は支持杆材の高さを適宜
代えることができ、したがって、一つの梁型枠支持フレ
ームによって構築される梁型枠のレベルがきわめて大き
い場合及び微小に異なる場合でも自由に対応できる効果
がある。
In addition, one end of both ends of the vertical rod is projected longer than the other end, and a joint portion for connecting with a building material at both ends of the both ends of the vertical rod is provided at the end of the intermediate vertical rod. Since the jacks or supporting rods for supporting the beam formwork are detachably attached, one of the upper horizontal rod or the lower horizontal rod is used depending on the level of the beam formwork to be constructed. When installed on top and the height of jacks or supporting rods can be changed as appropriate, and therefore the level of the beam formwork constructed by one beam formwork support frame is extremely large and slightly different But there is an effect that you can respond freely.

【図面の簡単な説明】[Brief description of drawings]

第1図〜第4図は、この考案の一実施例を示すもので、
第1図及び第2図は梁型枠支持フレームのの正面図、第
3図及び第4図はその使用状態を示す側面図である。 1……梁型枠支持フレーム、2……両端縦杆材、3……
中間縦杆材、4……雄継手、5……雌継手、6……建地
材、7……ロックねじ、8……ねじ孔、9……連結部、
10……上部横杆材、11……下部横杆材、12……大引受け
ジャッキ、13……支持杆、14……大引き受け、15……連
結部、16……連結部、17……上下スラブ、18……大引
き、19……ブラケット、20……横地材、21……くさび、
22……連結部。
1 to 4 show an embodiment of the present invention,
FIGS. 1 and 2 are front views of the beam form supporting frame, and FIGS. 3 and 4 are side views showing the use state thereof. 1 ... Beam form supporting frame, 2 ... Vertical rods at both ends, 3 ...
Intermediate vertical rod, 4 ... Male joint, 5 ... Female joint, 6 ... Construction material, 7 ... Lock screw, 8 ... Screw hole, 9 ... Connecting portion,
10 …… Upper horizontal rod, 11 …… Lower horizontal rod, 12 …… Large receiving jack, 13 …… Supporting rod, 14 …… Large underwriting, 15 …… Coupling part, 16 …… Coupling part, 17 …… Upper and lower slabs, 18 …… large pull, 19 …… bracket, 20 …… horizontal ground material, 21 …… wedge,
22 …… Connecting part.

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】構築される梁型枠の下側に、この梁型枠と
直交して設置される上部横杆材及び下部横杆材と、この
上部横杆材と下部横杆材との間に所定間隔おきに立設さ
れた複数本の中間縦杆材と、前記上部横杆材及び下部横
杆材の両端部に立設された両端縦杆材と、前記両端及び
中間の縦杆材間にそれぞれ設置された複数本の斜め杆材
とを備えてトラス梁状に構成され、前記両端縦杆材の一
端が他端より長く突設され、かつ、前記両端縦杆材の両
端部に建て地材と連結するための継ぎ手部が、前記中間
縦杆材の端部に前記梁型枠を支持するためのジャッキ又
は支持杆材がそれぞれ着脱自在に取り付けられてなるこ
とを特徴とする梁型枠支持フレーム。
1. An upper horizontal rod and a lower horizontal rod, which are installed orthogonally to the beam form below the beam form to be constructed, and the upper horizontal rod and the lower horizontal rod. A plurality of intermediate vertical rods that are erected at predetermined intervals between them, double-sided vertical rods that are erected at both ends of the upper horizontal rod and the lower horizontal rod, and the vertical rods at both ends and the middle. A plurality of diagonal rods respectively installed between the members are configured in a truss beam shape, one end of the both end vertical rods is projected longer than the other end, and both end portions of the both end vertical rods are provided. The joint portion for connecting to the building material is detachably attached to a jack or a supporting rod for supporting the beam formwork at the end of the intermediate vertical rod. Beam formwork support frame.
JP1989131888U 1989-11-13 1989-11-13 Beam formwork support frame Expired - Fee Related JPH0738555Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1989131888U JPH0738555Y2 (en) 1989-11-13 1989-11-13 Beam formwork support frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1989131888U JPH0738555Y2 (en) 1989-11-13 1989-11-13 Beam formwork support frame

Publications (2)

Publication Number Publication Date
JPH0374747U JPH0374747U (en) 1991-07-26
JPH0738555Y2 true JPH0738555Y2 (en) 1995-09-06

Family

ID=31679371

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1989131888U Expired - Fee Related JPH0738555Y2 (en) 1989-11-13 1989-11-13 Beam formwork support frame

Country Status (1)

Country Link
JP (1) JPH0738555Y2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200475224Y1 (en) * 2014-04-15 2014-11-21 (주)금강시스템즈스케폴딩 Concrete mold assembly

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3514887B2 (en) * 1995-09-06 2004-03-31 株式会社有弘メンテナンス Shoring system
JP5172796B2 (en) * 2009-08-17 2013-03-27 株式会社タイセン工業 Horizontal member and gantry using the horizontal member

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS635145B2 (en) * 1980-06-26 1988-02-02 Nippon Steel Corp

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0352380Y2 (en) * 1986-04-30 1991-11-13
JPH0536042Y2 (en) * 1986-06-30 1993-09-13

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS635145B2 (en) * 1980-06-26 1988-02-02 Nippon Steel Corp

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200475224Y1 (en) * 2014-04-15 2014-11-21 (주)금강시스템즈스케폴딩 Concrete mold assembly

Also Published As

Publication number Publication date
JPH0374747U (en) 1991-07-26

Similar Documents

Publication Publication Date Title
US4083156A (en) Apparatus for bracing a tilt-up wall panel
US7435038B2 (en) Method and apparatus for lifting and stabilizing subsided slabs, flatwork and foundations of buildings
US6550213B1 (en) Slab foundation construction fixture, particularly as adapts standard girts for pre-use as foundation forms
US20080031686A1 (en) Concrete slab form system
US20020027043A1 (en) Wall jack
JPS6348753Y2 (en)
JPH0738555Y2 (en) Beam formwork support frame
CN211873836U (en) Support base of support pole setting
US5660006A (en) Wall support device
JPS61290164A (en) Method and apparatus for supporting beam and slab
CN214462389U (en) Scaffold for building engineering
JP2537584Y2 (en) Temporary beam for slab formwork
CN218176590U (en) Scaffold erecting structure under irregular complex facade modeling
JPH07102788A (en) Temporary safety handrail
KR102661918B1 (en) Complex type system support with adjustable structure
JPH0650456Y2 (en) Horizontal pillar prefabricated rebar erection device
JPS6354858B2 (en)
JPH0213643Y2 (en)
JPH0334546B2 (en)
JPH0748872Y2 (en) H type adjustable building frame
JPH0618976Y2 (en) Temporary scaffolding bridge
JP2943083B2 (en) Architectural foundation block structure
KR200349956Y1 (en) mold supporter for concrete wall
JPH0623651Y2 (en) Sash assembly device for curtain wall
JPH0211549Y2 (en)

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees