JPH0738327Y2 - Lifting prevention support device for bridge girder - Google Patents
Lifting prevention support device for bridge girderInfo
- Publication number
- JPH0738327Y2 JPH0738327Y2 JP416792U JP416792U JPH0738327Y2 JP H0738327 Y2 JPH0738327 Y2 JP H0738327Y2 JP 416792 U JP416792 U JP 416792U JP 416792 U JP416792 U JP 416792U JP H0738327 Y2 JPH0738327 Y2 JP H0738327Y2
- Authority
- JP
- Japan
- Prior art keywords
- lifting prevention
- bridge girder
- prevention member
- anchor bar
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Description
【0001】[0001]
【産業上の利用分野】本考案は、コンクリート製橋桁を
地震発生時等において上揚しないように支承する装置に
関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a device for supporting a concrete bridge girder so that it will not be lifted when an earthquake occurs.
【0002】[0002]
【従来の技術】従来、橋桁の支承装置としては、実公平
3−20327号公報により公表されているように、鋼
製アンカー棒の下部を支持台に埋込固定し、そのアンカ
ー棒の上部を被覆するアンカーキャップとアンカー棒と
の間にゴム製中心保持用パッキングを介在させ、前記ア
ンカーキャップをコンクリート製橋桁に埋込固定した構
造の支承装置が知られている。2. Description of the Related Art Conventionally, as a supporting device for a bridge girder, as disclosed in Japanese Utility Model Publication No. 3-20327, the lower part of a steel anchor rod is embedded and fixed in a support base, and the upper part of the anchor rod is fixed. There is known a bearing device having a structure in which a rubber center-holding packing is interposed between a covering anchor cap and an anchor rod, and the anchor cap is embedded and fixed in a concrete bridge girder.
【0003】[0003]
【考案が解決しようとする課題】前記従来の橋桁の支承
装置の場合は、地震等が発生して橋桁に上揚力が作用し
たとき、橋桁が上方に移動する恐れがある。In the case of the conventional support device for a bridge girder, there is a possibility that the bridge girder may move upward when an uplift force acts on the bridge girder due to an earthquake or the like.
【0004】[0004]
【課題を解決するための手段】前述の問題を有利に解決
するために、本考案の橋桁の上揚防止支承装置において
は、中間部にストッパー1を備えているアンカーバー2
の下部を、下部構造物3の上部に埋込固定し、橋桁4に
固定される上揚防止部材5を、前記ストッパー1の下部
においてアンカーバー2に嵌設し、前記ストッパー1と
上揚防止部材5との間に弾性パッキング6を介在させ、
前記アンカーバー2の上部を被覆するカバー筒体7の下
端部を、前記上揚防止部材5に接合し、前記アンカーバ
ー2の上部とカバー筒体7との間に弾性筒体8を介在さ
せ、前記上揚防止部材5とカバー筒体7とを橋桁4に埋
込固定した橋桁の上揚防止支承装置。In order to advantageously solve the above-mentioned problems, an anchor bar 2 having a stopper 1 at an intermediate portion is provided in a lifting prevention support device of a bridge girder of the present invention.
The lower part of the above is embedded and fixed in the upper part of the lower structure 3, and the lifting prevention member 5 fixed to the bridge girder 4 is fitted to the anchor bar 2 below the stopper 1, and the stopper 1 and the lifting prevention member 5 are attached. The elastic packing 6 is interposed between
The lower end of the cover cylinder 7 covering the upper part of the anchor bar 2 is joined to the lifting prevention member 5, and the elastic cylinder 8 is interposed between the upper part of the anchor bar 2 and the cover cylinder 7. A lifting support device for a bridge girder in which the lifting prevention member 5 and the cover cylinder 7 are embedded and fixed in the bridge girder 4.
【0005】[0005]
【実施例】図5および図6は本考案の第1実施例におい
て用いられる上揚防止部材5を示すものであって、鋼板
9に橋桁4の長手方向に延長する長孔10が設けられ、
前記鋼板9の上面に、長孔10と同方向に延長する扁平
な鋼製筒体11の下端部が溶接により固着され、かつ前
記鋼板9の上部には、鋼製筒体11の外側において多数
の鋼製アンカー部材12が溶接により固着されている。5 and 6 show a lifting prevention member 5 used in the first embodiment of the present invention, in which a steel plate 9 is provided with an elongated hole 10 extending in the longitudinal direction of a bridge girder 4,
The lower end of a flat steel cylinder 11 extending in the same direction as the long hole 10 is fixed to the upper surface of the steel plate 9 by welding, and a large number of steel plates 9 are formed on the upper surface of the steel plate 9 outside the steel cylinder 11. The steel anchor member 12 is fixed by welding.
【0006】図7および図8は本考案の第1実施例にお
いて用いられるカバー筒体7を示すものであって、扁平
断面の合成樹脂製筒体13の下端部の外周にフランジ1
4が設けられ、かつ両側の扁平外面の上部および下部
に、挿込孔15を有する突出部16が一体に設けられて
いる。FIGS. 7 and 8 show a cover cylinder 7 used in the first embodiment of the present invention, in which a flange 1 is formed on the outer periphery of the lower end of a synthetic resin cylinder 13 having a flat cross section.
4 is provided, and projecting portions 16 having insertion holes 15 are integrally provided on the upper and lower portions of the flat outer surfaces on both sides.
【0007】図1ないし図4は本考案の第1実施例に係
る橋桁の上揚防止支承装置を示すものであって、円形断
面の鋼製アンカーバー2の中間部に、円環状板体からな
る鋼製ストッパー1が嵌合されて溶接により固着され、
そのストッパー1の下部において、前記アンカーバー2
にゴムリングからなる弾性パッキング6と上揚防止部材
5の長孔10とが順次嵌設され、橋台または橋脚からな
る下部構造物3の上部に、アンカーバー2を挿入するた
めの挿入孔17が設けられ、その挿入孔17に挿入され
たアンカーバー2の下部と挿入孔17との間に、セメン
トモルタル等の常温硬化性充填材18が充填され、かつ
前記下部構造物3の上面と上揚防止部材5における鋼板
9の下面との間に、分割型のゴム板からなる弾性支承板
19が挿入される。FIGS. 1 to 4 show a lifting prevention support device for a bridge girder according to a first embodiment of the present invention, in which an intermediate portion of a steel anchor bar 2 having a circular cross section is composed of an annular plate member. The steel stopper 1 is fitted and fixed by welding,
At the bottom of the stopper 1, the anchor bar 2
The elastic packing 6 made of a rubber ring and the elongated hole 10 of the lifting prevention member 5 are sequentially fitted to the above, and an insertion hole 17 for inserting the anchor bar 2 is provided at the upper part of the lower structure 3 made of abutment or pier. The room temperature curable filler 18 such as cement mortar is filled between the lower part of the anchor bar 2 inserted into the insertion hole 17 and the insertion hole 17, and the upper surface of the lower structure 3 and the lifting prevention member. An elastic support plate 19 made of a split rubber plate is inserted between the lower surface of the steel plate 9 and the lower surface of the steel plate 9.
【0008】扁平断面のカバー筒体7内に、係止突起2
0の下部においてゴム製弾性筒体8が嵌入され、その弾
性筒体8はアンカーバー嵌合用中央凹面21とアンカー
バー移動許容用側部空間22とを備えている。前記弾性
筒体8の各中央凹面21はアンカーバー2の上部に嵌合
され、かつカバー筒体7の下端のフランジ14は上揚防
止部材5における鋼製筒体11に嵌入され、前記カバー
筒体7の下部と上揚防止部材5における鋼製筒体11と
の間にシール材23が充填されている。A locking projection 2 is provided in the cover cylinder 7 having a flat cross section.
At the lower part of 0, a rubber elastic cylinder 8 is fitted, and the elastic cylinder 8 is provided with an anchor bar fitting central concave surface 21 and an anchor bar movement permitting side space 22. Each central concave surface 21 of the elastic tubular body 8 is fitted to the upper part of the anchor bar 2, and the flange 14 at the lower end of the cover tubular body 7 is fitted to the steel tubular body 11 of the lifting prevention member 5 to provide the cover tubular body. A seal material 23 is filled between the lower part of the coil 7 and the steel tubular body 11 of the lifting prevention member 5.
【0009】カバー筒体7を囲む補強用スパイラル鉄筋
24の上部および下部に屈折連設された挿込杆25は、
カバー筒体7の上部および下部に設けられた挿込孔15
に嵌挿され、次に橋桁4を構成するコンクリートが打設
される。The insertion rods 25, which are bent and connected to the upper and lower portions of the reinforcing spiral reinforcing bar 24 surrounding the cover cylinder 7,
Insertion holes 15 provided in the upper and lower parts of the cover cylinder 7
Then, the concrete forming the bridge girder 4 is placed.
【0010】前記アンカーバー2から橋軸直角方向に離
れた位置において、下部構造物3と橋桁4との間に可動
支承体(図示を省略した)が介在され、橋桁4は下部構
造物3に対し橋軸方向に移動することができる。At a position away from the anchor bar 2 in the direction perpendicular to the bridge axis, a movable support (not shown) is interposed between the lower structure 3 and the bridge girder 4, and the bridge girder 4 is attached to the lower structure 3. On the other hand, it can move in the direction of the bridge axis.
【0011】図11および図12は本考案の第2実施例
において用いられる上揚防止部材5を示すものであっ
て、鋼板9に円形の透孔26が設けられると共に、鋼板
9の上面に円形の鋼製筒体11の下端部が固着されてい
るが、その他の構成は第1実施例における上揚防止部材
5の場合と同様である。11 and 12 show a lifting prevention member 5 used in the second embodiment of the present invention, in which a steel plate 9 is provided with a circular through hole 26, and the steel plate 9 has a circular top hole. Although the lower end portion of the steel tubular body 11 is fixed, other configurations are the same as those of the lifting prevention member 5 in the first embodiment.
【0012】図9および図10は本考案の第2実施例に
係る橋桁の上揚防止支承装置を示すものであって、カバ
ー筒体7および弾性筒体8として円形断面のものが用い
られ、その弾性筒体8の外面に多数の溝27が設けられ
ているが、その他の構成は第1実施例の場合と同様であ
る。第2実施例の場合は、アンカーバー2から橋軸直角
方向に離れた位置において、下部構造物3と橋桁4との
間に固定支承体(図示を省略した)が介在され、橋桁4
は下部構造物3に対し水平方向に移動しないように支承
される。9 and 10 show a lifting prevention support device for a bridge girder according to a second embodiment of the present invention, in which the cover cylinder 7 and the elastic cylinder 8 have a circular cross section. Although a large number of grooves 27 are provided on the outer surface of the elastic tubular body 8, the other configurations are the same as those in the first embodiment. In the case of the second embodiment, at a position apart from the anchor bar 2 in the direction perpendicular to the bridge axis, a fixed support (not shown) is interposed between the lower structure 3 and the bridge girder 4, and the bridge girder 4
Is supported so as not to move horizontally with respect to the substructure 3.
【0013】各実施例の橋桁の上揚防止支承装置におい
て、橋桁4の撓み変形は弾性パッキング6および弾性支
承板19の圧縮変形により許容され、かつ地震発生等に
より橋桁4の支承部に上向き移動力すなわち上揚力が作
用した場合は、橋桁4に固定された上揚防止部材5が弾
性パッキング6を介してストッパー1に係合するので、
橋桁4の上揚移動が阻止される。In the lifting prevention support device of each bridge girder, the bending deformation of the bridge girder 4 is allowed by the compressive deformation of the elastic packing 6 and the elastic support plate 19, and an upward moving force is applied to the bearing part of the bridge girder 4 due to an earthquake or the like. That is, when a lifting force is applied, the lifting prevention member 5 fixed to the bridge girder 4 engages with the stopper 1 via the elastic packing 6,
Lifting movement of bridge girder 4 is prevented.
【0014】[0014]
【考案の効果】本考案によれば、中間部にストッパー1
を備えているアンカーバー2の下部を、下部構造物3の
上部に埋込固定し、橋桁4に固定される上揚防止部材5
を、前記ストッパー1の下部においてアンカーバー2に
嵌設し、前記ストッパー1と上揚防止部材5との間に弾
性パッキング6を介在させ、前記アンカーバー2の上部
を被覆するカバー筒体7の下端部を、前記上揚防止部材
5に接合し、前記アンカーバー2の上部とカバー筒体7
との間に弾性筒体8を介在させ、前記上揚防止部材5と
カバー筒体7とを橋桁4に埋込固定したので、地震力等
によって橋桁4が上向きに移動するのを簡単な手段によ
って防止することができ、かつストッパー1の下面と上
揚防止部材5との間に弾性パッキング6が介在されてい
るので、橋桁4の撓みを許容することができる。According to the present invention, the stopper 1 is provided at the middle portion.
The lower part of the anchor bar 2 provided with is embedded and fixed in the upper part of the lower structure 3, and is fixed to the bridge girder 4.
Is fitted to the anchor bar 2 at the lower part of the stopper 1, and the elastic packing 6 is interposed between the stopper 1 and the lifting prevention member 5, and the lower end of the cover cylinder body 7 covering the upper part of the anchor bar 2. Part is joined to the lifting prevention member 5, and the upper portion of the anchor bar 2 and the cover cylinder 7 are joined together.
Since the elastic tubular body 8 is interposed between and, the lifting prevention member 5 and the cover tubular body 7 are embedded and fixed in the bridge girder 4, it is possible to easily move the bridge girder 4 upward by seismic force or the like. Since the elastic packing 6 is interposed between the lower surface of the stopper 1 and the lifting prevention member 5, the flexure of the bridge girder 4 can be allowed.
【図1】本考案の第1実施例に係る橋桁の上揚防止支承
装置を示す一部切欠縦断正面図である。FIG. 1 is a partially cutaway vertical front view showing a lifting support bearing device for a bridge girder according to a first embodiment of the present invention.
【図2】図1の一部を拡大して示す縦断正面図である。FIG. 2 is a vertical sectional front view showing a part of FIG. 1 in an enlarged manner.
【図3】図2の一部を拡大して示す縦断正面図である。FIG. 3 is a vertical sectional front view showing a part of FIG. 2 in an enlarged manner.
【図4】図2のA−A線拡大断面図である。FIG. 4 is an enlarged cross-sectional view taken along the line AA of FIG.
【図5】本考案の第1実施例において用いられる上揚防
止部材を示す平面図である。FIG. 5 is a plan view showing a lifting prevention member used in the first embodiment of the present invention.
【図6】図5に示す上揚防止部材の一部縦断側面図であ
る。FIG. 6 is a partially longitudinal side view of the lifting prevention member shown in FIG.
【図7】本考案の第1実施例において用いられるカバー
筒体を示す一部切欠縦断正面図である。FIG. 7 is a partially cutaway vertical front view showing a cover cylinder used in the first embodiment of the present invention.
【図8】図7のB−B線拡大断面図である。FIG. 8 is an enlarged cross-sectional view taken along the line BB of FIG.
【図9】本考案の第2実施例に係る橋桁の上揚防止支承
装置の一部を示す縦断正面図である。FIG. 9 is a vertical sectional front view showing a part of the lifting prevention supporting device of the bridge girder according to the second embodiment of the present invention.
【図10】図9のC−C線断面図である。10 is a cross-sectional view taken along the line CC of FIG.
【図11】本考案の第2実施例において用いられる上揚
防止部材を示す平面図である。FIG. 11 is a plan view showing a lifting prevention member used in the second embodiment of the present invention.
【図12】図11に示す上揚防止部材の縦断側面図であ
る。12 is a vertical cross-sectional side view of the lifting prevention member shown in FIG.
1 ストッパー 2 アンカーバー 3 下部構造物 4 橋桁 5 上揚防止部材 6 弾性パッキング 7 カバー筒体 8 弾性筒体 9 鋼板 10 長孔 11 鋼製筒体 12 アンカー部材 13 合成樹脂製筒体 15 挿込孔 16 突出部 17 挿入孔 18 常温硬化性充填材 19 弾性支承板 20 係止突起 21 中央凹面 22 側部空間 23 シール材 24 スパイラル鉄筋 25 挿込杆 26 透孔 DESCRIPTION OF SYMBOLS 1 Stopper 2 Anchor bar 3 Lower structure 4 Bridge girder 5 Lifting prevention member 6 Elastic packing 7 Cover cylinder 8 Elastic cylinder 9 Steel plate 10 Long hole 11 Steel cylinder 12 Anchor member 13 Synthetic resin cylinder 15 Insertion hole 16 Protrusion 17 Insertion hole 18 Room temperature hardening filler 19 Elastic support plate 20 Locking protrusion 21 Central concave surface 22 Side space 23 Sealing material 24 Spiral rebar 25 Inserting rod 26 Through hole
Claims (1)
カーバー2の下部を、下部構造物3の上部に埋込固定
し、橋桁4に固定される上揚防止部材5を、前記ストッ
パー1の下部においてアンカーバー2に嵌設し、前記ス
トッパー1と上揚防止部材5との間に弾性パッキング6
を介在させ、前記アンカーバー2の上部を被覆するカバ
ー筒体7の下端部を、前記上揚防止部材5に接合し、前
記アンカーバー2の上部とカバー筒体7との間に弾性筒
体8を介在させ、前記上揚防止部材5とカバー筒体7と
を橋桁4に埋込固定した橋桁の上揚防止支承装置。1. A lower portion of an anchor bar 2 having a stopper 1 at an intermediate portion thereof is embedded and fixed in an upper portion of a lower structure 3, and a lifting prevention member 5 fixed to a bridge girder 4 is attached to a lower portion of the stopper 1. At the anchor bar 2, the elastic packing 6 is provided between the stopper 1 and the lifting prevention member 5.
The lower end portion of the cover tubular body 7 covering the upper portion of the anchor bar 2 is joined to the lifting prevention member 5, and the elastic tubular body 8 is provided between the upper portion of the anchor bar 2 and the cover tubular body 7. A support device for lifting prevention of bridge girders in which the lifting prevention member 5 and the cover cylinder 7 are embedded and fixed in the bridge girder 4 with the interposition of.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP416792U JPH0738327Y2 (en) | 1992-01-10 | 1992-01-10 | Lifting prevention support device for bridge girder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP416792U JPH0738327Y2 (en) | 1992-01-10 | 1992-01-10 | Lifting prevention support device for bridge girder |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0557006U JPH0557006U (en) | 1993-07-30 |
JPH0738327Y2 true JPH0738327Y2 (en) | 1995-08-30 |
Family
ID=11577187
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP416792U Expired - Fee Related JPH0738327Y2 (en) | 1992-01-10 | 1992-01-10 | Lifting prevention support device for bridge girder |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0738327Y2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4731434B2 (en) * | 2006-09-14 | 2011-07-27 | 前田建設工業株式会社 | Construction method of viaduct bearing and viaduct bearing |
-
1992
- 1992-01-10 JP JP416792U patent/JPH0738327Y2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH0557006U (en) | 1993-07-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101892073B1 (en) | Composite Structure Rahmen using Steel Pipe and Constructing Method thereof | |
JPH0738327Y2 (en) | Lifting prevention support device for bridge girder | |
JP4439436B2 (en) | Sealed rubber support plate support | |
JPH08239808A (en) | Travel limiting device of structure | |
CN114753254A (en) | Caulking structure that prefabricated pier stud and cushion cap socket joint formula are connected | |
JP3581691B2 (en) | Mounting method and mounting structure of horizontal force damper for structure | |
JP2001115419A (en) | Anchor bar | |
JPH0246491Y2 (en) | ||
JPH0246488Y2 (en) | ||
JPH0320327Y2 (en) | ||
JP3881671B2 (en) | Stopper device for bridge | |
JPH0718130B2 (en) | Compound pier | |
KR101848888B1 (en) | A fixed structure fastened to the pier post | |
JPH0442363Y2 (en) | ||
JPH02194204A (en) | Rubber support device with middle stage shear stopper for structure | |
JPS6011132Y2 (en) | bearing device | |
JP4441660B2 (en) | Function separation type bridge support device | |
JPH0246490Y2 (en) | ||
JP2019203331A (en) | Reinforcement joint structure of reinforced concrete beam | |
JP3851162B2 (en) | Stopper for bridge | |
JPH11264190A (en) | Joint construction for concrete-filled steel pipe column | |
JPH0315613Y2 (en) | ||
JP3639368B2 (en) | Foundation structure of steel column base | |
JPH0246489Y2 (en) | ||
KR20230144936A (en) | Expansion joint for connecting slabs using stud anchor and tooth anchor hybrid type and Bridge bearing apparatus using anchor for enhancing shear force and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
LAPS | Cancellation because of no payment of annual fees |