JPH0735013Y2 - Remodelable stair frame scaffolding - Google Patents
Remodelable stair frame scaffoldingInfo
- Publication number
- JPH0735013Y2 JPH0735013Y2 JP12134289U JP12134289U JPH0735013Y2 JP H0735013 Y2 JPH0735013 Y2 JP H0735013Y2 JP 12134289 U JP12134289 U JP 12134289U JP 12134289 U JP12134289 U JP 12134289U JP H0735013 Y2 JPH0735013 Y2 JP H0735013Y2
- Authority
- JP
- Japan
- Prior art keywords
- leg pipe
- horizontal rod
- jack
- remodelable
- tread
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Movable Scaffolding (AREA)
Description
【考案の詳細な説明】 〔産業上の利用分野〕 この考案は、階段の仕上げ作業の際に使用する盛替可能
な階段用枠組足場に関するものである。[Detailed Description of the Invention] [Industrial field of application] The present invention relates to a remodelable staircase frame scaffold used for finishing work of stairs.
従来、階段の仕上げ作業は階段の踏面上に建枠と交差筋
かいと布枠で枠組足場を組み、踏面およびけ込み部の仕
上の場合には枠組を補強したうえ、脚管の下端のベース
ジャッキを調節してベール板を上方へ引上げるようにし
ていた。Conventionally, stairs finishing work involves building a frame scaffolding on the tread of the stairs with a building frame and cross braces and a cloth frame.When finishing the tread and the foot, the frame is reinforced and the base of the lower end of the leg pipe is used. The jack was adjusted so that the bale plate could be pulled up.
前記のように、従来の階段の仕上げ作業における枠組足
場の盛替に当っては、踏面上に置かれた建枠の脚管下端
のベース板を踏面から上方へ引上げる場合、その脚管下
端の支持力が失われるのを防ぐため、予めその脚管の前
後の脚管に水平材を掛け渡して強固に緊結し枠組を補強
する必要があったが、その作業に手間がかかり面倒であ
るとともに、その作業中はその近辺の通行が妨げられる
欠点があった。As mentioned above, when replacing the framework scaffolding in the conventional stair finishing work, when the base plate at the lower end of the leg pipe of the building frame placed on the tread is pulled upward from the tread, the lower end of the leg pipe is In order to prevent the loss of the supporting force of the leg tube, it was necessary to previously hang horizontal members on the leg tubes before and after the leg tube to firmly bond them to reinforce the framework, but that work is troublesome and troublesome. At the same time, there was a drawback that the traffic in the vicinity was obstructed during the work.
この考案は、このような欠点を解消して枠組足場の盛替
が簡単かつ容易に行えるようにすることを課題とするも
のである。It is an object of the present invention to eliminate such a drawback and to make it possible to easily and easily re-arrange the framework scaffold.
この考案は前記の課題を解決するため、それぞれベース
ジャッキを有する短脚管および長脚管を水平棒の両端に
直交させて連結し、水平棒の任意の位置に中間ジャッキ
を取付けられるようにした盛替可能な階段用枠組足場の
手段を講じるものである。In order to solve the above problems, this invention connects a short leg pipe and a long leg pipe each having a base jack so that they are orthogonal to both ends of a horizontal rod, and an intermediate jack can be attached to any position of the horizontal rod. It is a means of remodeling staircase framework scaffolding.
この考案の作用について実施例を参照して説明する。 The operation of this invention will be described with reference to an embodiment.
階段14の踏面15またはけ込み部16の仕上げを行うには第
2図に示すように、上段の場合は中間ジャッキ10を水平
棒3の短脚管1に近いボルト嵌入孔8にUボルト11を嵌
入しその脚12をナット13で締付けた後、回転把手6を回
転させて水平棒3と踏面15との間を押圧するようにして
水平棒3を回転把手6の上面で確実に支持し、つぎに短
脚管1のベースジャッキ7を引上げてベース板4と踏面
15aまたはけ込み部16aとの間に間隔を明けて短脚管1と
長脚管2とによる枠組足場の支持を中間ジャッキ10と長
脚管2による支持に盛替えることにより踏面15aまたは
け込み部16aの仕上げ作業を行うことができるようにす
るものである。また下段の場合は水平棒3の長脚管2に
近いボルト嵌入孔8にUボルト11を挿入しナット13によ
って中間ジャッキ10を水平棒3の長脚管2の近くに取付
けて上段と同様に踏面15bまたはけ込み部16bの仕上げ作
業を行うものである。In order to finish the tread 15 or the barbed portion 16 of the stairs 14, as shown in FIG. 2, in the case of the upper stage, the intermediate jack 10 is inserted into the bolt insertion hole 8 near the short leg pipe 1 of the horizontal rod 3 in the U bolt 11. After tightening the leg 12 and tightening the leg 12 with the nut 13, the rotary handle 6 is rotated to press the space between the horizontal rod 3 and the tread 15 so that the horizontal rod 3 is securely supported on the upper surface of the rotary handle 6. Next, pull up the base jack 7 of the short leg tube 1 to pull up the base plate 4 and the tread surface.
15a or the tread 15a or the tuck-in by changing the support of the frame scaffold by the short leg pipe 1 and the long leg pipe 2 to the support by the intermediate jack 10 and the long leg pipe 2 with a space between the tread 15a or the long leg pipe 2 The finishing work of the portion 16a can be performed. Further, in the case of the lower stage, the U bolt 11 is inserted into the bolt insertion hole 8 of the horizontal rod 3 near the long leg pipe 2 and the intermediate jack 10 is attached by the nut 13 near the long leg pipe 2 of the horizontal rod 3 as in the upper stage. This is for finishing the tread surface 15b or the indented portion 16b.
この考案の実施例について図面を参照して説明する。 An embodiment of the present invention will be described with reference to the drawings.
第1図において、左右の短脚管1と長脚管2とを溶接等
により水平棒3に連結し、短脚管1および長脚管2中に
は、それぞれベース板4上にねじ棒5を回転自在に取付
け、ねじ棒5に回転把手6をねじ込んで構成されたベー
スジャッキ7が嵌入され、また水平棒3には多数のボル
ト嵌入孔8が設けられ、長脚管2と水平棒3との間には
補強のための筋かい9が取付けられている。短脚管1と
長脚管2との間の水平棒3には、ベース板4上にねじ棒
5を回転自在に取付け、ねじ棒5には回転把手6がねじ
込まれたベースジャッキ7と同様な中間ジャッキ10が水
平棒3にそのボルト嵌入孔8にUボルト11の両脚12を嵌
入しナット13で締付けて取付けられるようになってい
る。In FIG. 1, left and right short leg pipes 1 and long leg pipes 2 are connected to a horizontal rod 3 by welding or the like, and in each of the short leg pipe 1 and the long leg pipe 2, a screw rod 5 is provided on a base plate 4. Is rotatably attached, and a base jack 7 configured by screwing a rotary handle 6 into a screw rod 5 is fitted thereinto. Further, a large number of bolt fitting holes 8 are provided in the horizontal rod 3, and the long leg pipe 2 and the horizontal rod 3 are provided. A brace 9 for reinforcement is attached between and. A horizontal rod 3 between the short leg pipe 1 and the long leg pipe 2 is rotatably mounted with a screw rod 5 on a base plate 4, and the screw rod 5 has a rotary handle 6 screwed into it, similar to a base jack 7. The intermediate jack 10 is attached to the horizontal rod 3 by inserting both legs 12 of the U bolt 11 into the bolt insertion hole 8 and tightening the nut 13.
この考案は、枠組足場を盛替える場合に予め盛替部分に
手間のかかる補強を施す必要がなく、単に中間ジャッキ
を操作するだけでよいので、その作業が簡単かつ誰でも
容易に行うことができ、またその作業に長尺の単管類を
使用しないので作業場所の近辺の交通を妨げることがな
く工事に渋滞を来たすことがない。According to this invention, when the frame scaffolding is relocated, it is not necessary to provide a complicated reinforcement in advance to the repositioning part, and only the intermediate jack is required to be operated, so that the work can be performed easily and easily by anyone. Moreover, since long single pipes are not used for the work, there is no obstruction to traffic around the work place, and there is no congestion in the work.
図面はこの考案の1実施例を示すもので、第1図は正面
図、第2図は斜視図である。 1……短脚管、2……長脚管、3……水平棒、7……ベ
ースジャッキ、10……中間ジャッキ。The drawings show one embodiment of the present invention. FIG. 1 is a front view and FIG. 2 is a perspective view. 1 ... Short leg pipe, 2 ... Long leg pipe, 3 ... Horizontal rod, 7 ... Base jack, 10 ... Intermediate jack.
Claims (1)
脚管(1)および長脚管(2)を水平棒(3)の両端に
直交させて連結し、水平棒(3)の任意の位置に中間ジ
ャッキ(10)を取付けけられるようにした盛替可能な階
段用枠組足場。1. A short leg pipe (1) and a long leg pipe (2) each having a base jack (7) are connected orthogonally to both ends of a horizontal rod (3), and the horizontal rod (3) is located at any position. A framed scaffolding for stairs that can be relocated so that an intermediate jack (10) can be attached to it.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP12134289U JPH0735013Y2 (en) | 1989-10-16 | 1989-10-16 | Remodelable stair frame scaffolding |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP12134289U JPH0735013Y2 (en) | 1989-10-16 | 1989-10-16 | Remodelable stair frame scaffolding |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0361051U JPH0361051U (en) | 1991-06-14 |
JPH0735013Y2 true JPH0735013Y2 (en) | 1995-08-09 |
Family
ID=31669378
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP12134289U Expired - Lifetime JPH0735013Y2 (en) | 1989-10-16 | 1989-10-16 | Remodelable stair frame scaffolding |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0735013Y2 (en) |
-
1989
- 1989-10-16 JP JP12134289U patent/JPH0735013Y2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPH0361051U (en) | 1991-06-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7284746B2 (en) | Clamping apparatus and apparatus for use in erecting temporary guard rails | |
JPH0735013Y2 (en) | Remodelable stair frame scaffolding | |
US5622354A (en) | Post plumbing device | |
KR20130142929A (en) | The system supporter | |
EP0338145B1 (en) | Foldable scaffolding unit | |
JPH1150653A (en) | Supporting frame of scaffold plate and fitting and removing method therefor and construction for reinforced concrete wall by use thereof | |
JPH0450352Y2 (en) | ||
JP2519196B2 (en) | One-sided scaffold | |
JP3081653U (en) | Baseboard panel fixture | |
EP1765533B1 (en) | Clamping apparatus and apparatus for use in erecting temporary guard rails | |
JPH02274962A (en) | Temporary hand rail device for stairs | |
JP2000073561A (en) | Setting method for external strut | |
JPH03206265A (en) | Temporary handrail device for stair | |
CN221095796U (en) | Assembled auxiliary standing tool | |
JP4038086B2 (en) | Bracing unit mounting structure | |
JPS6128837Y2 (en) | ||
JP3016046B2 (en) | Folding stair unit | |
JPH0552108U (en) | Balcony formwork support device | |
JP2939183B2 (en) | Fixture for temporary stairs | |
JPH0717711Y2 (en) | Scaffolding board frame for H steel upholstery | |
EP2019177A2 (en) | Removable horizontal member for supporting platforms of scaffolding for the building sector | |
JPH0732090U (en) | Wall tie clamp device for temporary scaffolding | |
JP2542039Y2 (en) | Construction work scaffold plate support rod | |
JP2982858B2 (en) | Scaffolding bracket | |
JPS5910269Y2 (en) | Handrail support for scaffolding frame |