JPH0726626Y2 - Duct hanging fittings - Google Patents

Duct hanging fittings

Info

Publication number
JPH0726626Y2
JPH0726626Y2 JP3559693U JP3559693U JPH0726626Y2 JP H0726626 Y2 JPH0726626 Y2 JP H0726626Y2 JP 3559693 U JP3559693 U JP 3559693U JP 3559693 U JP3559693 U JP 3559693U JP H0726626 Y2 JPH0726626 Y2 JP H0726626Y2
Authority
JP
Japan
Prior art keywords
joining
bolt
mast
duct
masts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP3559693U
Other languages
Japanese (ja)
Other versions
JPH0687793U (en
Inventor
茂 西口
Original Assignee
三重ダクト工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三重ダクト工業株式会社 filed Critical 三重ダクト工業株式会社
Priority to JP3559693U priority Critical patent/JPH0726626Y2/en
Publication of JPH0687793U publication Critical patent/JPH0687793U/en
Application granted granted Critical
Publication of JPH0726626Y2 publication Critical patent/JPH0726626Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Supports For Pipes And Cables (AREA)
  • Duct Arrangements (AREA)

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】本考案は建物の空調や排煙などに
使われるダクトの吊り金具に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a hanging metal fitting for a duct used for air conditioning and smoke exhaust of a building.

【0002】[0002]

【従来の技術】従来、空調用や排煙用などの円形ダクト
を、建物の天井面から吊り下げ状態に施工する場合、図
14、15のような吊り金具が使われている。
2. Description of the Related Art Conventionally, when a circular duct for air conditioning or smoke exhaust is hung from the ceiling surface of a building, a hanging metal fitting as shown in FIGS. 14 and 15 is used.

【0003】この吊り金具は円形ダクト(D)を抱持す
るクランプバンド(1)と、その吊りボルト(2)への
締結用となるほぼ倒立U字型ハンガー枠(3)とから成
り、そのクランプバンド(1)から曲げ起された一対の
接合片(1a)(1b)と、これを挟むハンガー枠
(3)の両脚片(3a)(3b)には、各々ボルト受け
入れ用丸孔(4)(5)が対応形成されているほか、上
記ハンガー枠(3)のフラツトな頂面には、吊りボルト
(2)との締結用ナツト(6)が溶接一体化されてもい
る。
This hanging fitting comprises a clamp band (1) for holding a circular duct (D) and a substantially inverted U-shaped hanger frame (3) for fastening to the hanging bolt (2). The pair of joining pieces (1a) (1b) bent and raised from the clamp band (1) and the leg pieces (3a) (3b) of the hanger frame (3) sandwiching the joining pieces (1a) and (1b) respectively have round holes (4) for receiving bolts. ) (5) is formed correspondingly, and a nut (6) for fastening with the hanging bolt (2) is welded and integrated on the flat top surface of the hanger frame (3).

【0004】そして、上記ダクト(D)を吊り下げ施工
するに当っては、これに捲き掛けたクランプバンド
(1)の両接合片(1a)(1b)と、その両接合片
(1a)(1b)を挟むハンガー枠(3)の両脚片(3
a)(3b)とを、水平貫通ボルト(7)並びにその固
定ナツト(8)によって締結する一方、建物の天井面
(C)から垂下する吊りボルト(2)に対して、上記ハ
ンガー枠(3)の溶接ナツト(6)を締結するようにな
っている。
When suspending the duct (D), both joining pieces (1a) and (1b) of the clamp band (1) wound around the duct (D) and the joining pieces (1a) (1a) ( Both legs (3) of the hanger frame (3) sandwiching 1b)
While the a) and (3b) are fastened with the horizontal through bolts (7) and their fixing nuts (8), the hanger frame (3) is attached to the hanging bolts (2) hanging from the ceiling surface (C) of the building. ) The welding nut (6) is fastened.

【0005】[0005]

【考案が解決しようとする課題】ところが、上記構成の
吊り金具ではクランプバンド(1)と、そのハンガー枠
(3)とが言わばバラ部品として別個独立している。し
かも、そのクランプバンド(1)の両接合片(1a)
(1b)に開口するボルト受け入れ用丸孔(4)と、ハ
ンガー枠(3)の両脚片(3a)(3b)に開口するボ
ルト受け入れ用丸孔(5)とを、正確に合致させなけれ
ば、上記水平ボルト(7)を貫通させることができない
ため、それまでダクト(D)を所持している必要があ
り、そのボルト(7)とナツト(8)を両手で把持しな
ければならないこととも相俟って、上記クランプバンド
(1)とハンガー枠(3)との締結作業上、著しく煩雑
であると共に重労働となる。その作業は脚立などに立ち
乗りしての所謂高所作業である関係上、甚だ危険でもあ
り、到底1人で行なうことができない。
However, in the hanging metal fitting having the above structure, the clamp band (1) and the hanger frame (3) thereof are, as it were, independent parts. Moreover, both joint pieces (1a) of the clamp band (1)
The bolt receiving round hole (4) opening in (1b) and the bolt receiving round hole (5) opening in both leg pieces (3a) (3b) of the hanger frame (3) must be exactly aligned. Since the horizontal bolt (7) cannot be penetrated, it is necessary to have the duct (D) until then, and the bolt (7) and nut (8) must be held by both hands. Together with this, the work of fastening the clamp band (1) and the hanger frame (3) is extremely complicated and requires heavy labor. Since the work is so-called work at a high place by standing on a stepladder, it is extremely dangerous and cannot be performed by one person.

【0006】又、ダクト(D)を天井面(C)からの吊
り下げ状態に施工後、その設置高さを正しく調整するよ
うな場合、上記水平貫通ボルト(7)をその受け入れ用
丸孔(4)(5)から一々完全に抜き出さなければなら
ない。蓋し、上記吊りボルト(2)との締結用ナツト
(6)が、ハンガー枠(3)の頂面に溶接一体化されて
いるため、そのハンガー枠(3)とクランプバンド
(1)を締結した状態のままでは、上記吊りボルト
(2)に対して回動操作できないからである。その意味
からやり直しの作業となり、やはり頗る面倒である。
When the duct (D) is hung from the ceiling surface (C) and the installation height of the duct (D) is adjusted correctly, the horizontal through bolt (7) is attached to the receiving round hole ( 4) It must be completely extracted from (5). Since the nut (6) for fastening with the hanging bolt (2) is integrally welded to the top surface of the hanger frame (3), the hanger frame (3) and the clamp band (1) are fastened. This is because the hanging operation cannot be performed with respect to the hanging bolt (2) in this state. From that meaning, it is a work of re-doing, and it is still troublesome.

【0007】更に、上記吊り金具のハンガー枠(3)は
ほぼ倒立U字型をなし、その一対の脚片(3a)(3
b)によってクランプバンド(1)の両接合片(1a)
(1b)を挟んでいるため、上記ダクト(D)の高さ調
整代(h)を大きく確保することができず、その寸法は
実際上約25〜30mmにとどまる。
Further, the hanger frame (3) of the above-mentioned hanging fitting is substantially inverted U-shaped, and its pair of leg pieces (3a) (3).
Both joint pieces (1a) of the clamp band (1) according to b)
Since (1b) is sandwiched, it is not possible to secure a large height adjustment allowance (h) for the duct (D), and the dimension is practically limited to about 25 to 30 mm.

【0008】そのため、この寸法以上に高くダクト
(D)を調整設置する必要が起った場合には、上記吊り
ボルト(2)の下端部を切断加工して短かくするか、又
は短かい吊りボルト(2)と交換しなければならない。
その現場での作業能率と省力性に劣ることは、言うまで
もない。
Therefore, when it becomes necessary to adjust and install the duct (D) higher than this size, the lower end of the hanging bolt (2) is cut to make it shorter, or the hanging bolt is shorter. Must be replaced with bolt (2).
Needless to say, it is inferior in work efficiency and labor saving at the site.

【0009】[0009]

【課題を解決するための手段】本考案はこのような課題
の改良を企図しており、そのために役立つダクトの吊り
金具として、ダクトを抱持するクランプバンドの切り離
し両端部から、一対の接合マストを外向き一体的に垂立
させて、その何れか一方の接合マストには、両接合マス
トの締結用となる水平貫通ボルトの軸部を受け入れ得る
スライドガイド長孔を、上下方向への延在状態に開口形
成し、残る他方の接合マストには、上記スライドガイド
長孔と対応位置するキー孔を、その上部が上記水平貫通
ボルトの径大な頭部か、又はこれに螺合されるナツトを
受け入れ得る丸孔として、又下部が上記水平貫通ボルト
の軸部を受け入れ得る長孔として、その互いに連通する
鍵穴型に開口形成すると共に、その一方又は他方の接合
マストから曲げ出した水平なフツク片に、建物の天井面
から垂下する吊りボルトの受け入れ用丸孔を開口形成し
たことを特徴とするものである。
DISCLOSURE OF THE INVENTION The present invention intends to improve such a problem, and as a duct hanging metal fitting useful for this purpose, a pair of joint masts are provided from both ends of a clamp band for holding the duct. Of the connecting guide mast, and one of the connecting masts has a slide guide elongated hole that can receive the shaft portion of the horizontal through bolt for fastening both connecting masts and extends vertically. In the other joining mast which is formed in the state of being left in the state, a key hole corresponding to the slide guide long hole is formed in the remaining joint mast, and the upper part thereof is the large-diameter head portion of the horizontal through bolt, or a nut screwed to this. As a round hole for receiving the shaft portion of the horizontal through bolt, and as a long hole for receiving the shaft portion of the horizontal through bolt, the opening is formed in a keyhole shape communicating with each other and is bent from one or the other of the joining masts. And a horizontal hook strip, is characterized in that the receiving for round hole of the hanging bolts hanging from a ceiling surface of a building an opening formed.

【0010】本考案の上記構成によれば、クランプバン
ドの切り離し両端部から一体的に垂立する両接合マスト
の何れか一方には、その水平貫通ボルトの軸部受け入れ
用スライドガイド長孔が開口形成されているため、これ
に水平貫通ボルトを貫通して、ナツトを螺合締結するこ
とにより、その両者を仮り組みの締付け状態に保つこと
ができる。
According to the above construction of the present invention, the slide guide elongated hole for receiving the shaft portion of the horizontal through bolt is opened in either one of the two joint masts which stand upright from the separated both ends of the clamp band. Since they are formed, they can be maintained in the provisionally assembled tightened state by penetrating the horizontal through bolts and screwing and fastening the nuts.

【0011】そして、他方の接合マストには上記スライ
ドガイド長孔と対応位置する鍵穴型のキー孔が開口形成
されているので、その上部の丸孔に上記水平貫通ボルト
の径大な頭部又はナツトを受け入れる如く、その他方の
接合マストを上記した一方の接合マストに接合させるこ
とができるのであり、その両接合マストの締結状態では
上記水平貫通ボルトの軸部が、キー孔の下部をなす長孔
と上記スライドガイド長孔に沿って、下方へ滑り落ちる
ため、離脱するおそれも一切ない。
Since a keyhole-shaped keyhole corresponding to the slide guide elongated hole is formed in the other joining mast, a large-diameter head portion of the horizontal through bolt or a large hole is formed in the upper circular hole. It is possible to join the other joining mast to the one joining mast described above so as to receive the nut, and the shaft portion of the horizontal through bolt forms the lower part of the key hole in the fastening state of both joining masts. Since it slides down along the hole and the slide guide elongated hole, there is no risk of separation.

【0012】又、両接合マストの何れか一方からはフツ
ク片が水平に曲げ出されており、これには建物の天井面
から垂下する吊りボルトの受け入れ用丸孔が開口形成さ
れているので、上記両接合マストを水平貫通ボルトとナ
ツトによる締結状態のままでも、その吊りボルトに対し
て自由自在に昇降させて、ダクトの設置高さを調整でき
るのであり、現場での施工作業性に著しく優れる。
Further, a hook piece is bent horizontally from either one of the two joint masts, and a round hole for receiving a hanging bolt hanging down from the ceiling surface of the building is formed in the hook piece. Even if the two joint masts are still fastened with the horizontal through bolts and nuts, they can be freely moved up and down with respect to the hanging bolts to adjust the installation height of the ducts, which is remarkably excellent in workability on site. .

【0013】[0013]

【実施例】以下、図面に基いて本考案の詳細を説明する
と、その吊り金具の基本実施例とこれによる円形ダクト
の吊り下げ施工状態を示した図1〜10において、
(D)は一定長さの金属螺旋管やグラスウールなどから
成る円形ダクト、(10)はそのダクト(D)の吊りボ
ルトであり、建物の天井面(C)から予じめ一体的に垂
下されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described in detail below with reference to the drawings. Referring to FIGS.
(D) is a circular duct made of a certain length of metal spiral tube or glass wool, and (10) is a suspension bolt for the duct (D), which is hung integrally from the ceiling surface (C) of the building in advance. ing.

【0014】(11)は上記ダクト(D)を抱持する一
定幅(W)のクランプバンドであって、亜鉛鉄板やステ
ンレス鋼板などの金属板から、そのダクト(D)の太さ
よりも若干小さな口径の円形に捲き曲げられている。
Reference numeral (11) is a clamp band having a constant width (W) for holding the duct (D), which is made of a metal plate such as a zinc iron plate or a stainless steel plate and is slightly smaller than the thickness of the duct (D). It is bent into a circular shape.

【0015】(12)(13)は上記クランプバンド
(11)の切り離し両端部から直径方向に沿って外方へ
一体的に垂立された一対の接合マストであるが、その垂
立高さ(H1)(H2)には高低変化が与えられてお
り、その背高く垂立する一方の接合マスト(12)は吊
り下げ用として、そのマスト主体(12a)の上端部か
ら吊りボルト(10)と直交するフツク片(12b)が
水平に曲げ出されている。(14)はそのフツク片(1
2b)に開口形成された吊りボルト受け入れ用の丸孔で
ある。
Reference numerals (12) and (13) denote a pair of joining masts which are integrally erected outward from the both ends of the clamp band (11) separated from each other along the diametrical direction. The height changes are given to H1) and (H2), and one of the joining masts (12) which stands upright is used for hanging, and the hanging bolt (10) is connected to the upper end of the mast main body (12a). The hook pieces (12b) orthogonal to each other are bent horizontally. (14) is the hook piece (1
2b) is a round hole for receiving a hanging bolt formed in the opening.

【0016】この点、図ではその背高く垂立する一方の
吊り下げ用接合マスト(12)を、クランプバンド(1
1)と同じ一定幅の金属板から正面視のコ字型に折り曲
げることにより、そのマスト主体(12a)の下端部を
クランプバンド(11)への取付片(12c)として、
上記クランプバンド(11)における切り離し一端部の
内面に接合し、且つスポツト溶接やリベツト(15)な
どによって固定一体化している。
At this point, in the figure, one of the suspending masts (12) which stands upright is attached to the clamp band (1).
By bending a metal plate having the same constant width as 1) into a U-shape when viewed from the front, the lower end of the mast body (12a) is used as a mounting piece (12c) to the clamp band (11).
It is joined to the inner surface of one end of the clamp band (11) which is cut off, and is fixed and integrated by spot welding, rivets (15) or the like.

【0017】そして、背低く垂立する他方の接合マスト
(13)を、やはりクランプバンド(11)と同じ一定
幅の金属板から正面視のL字型に折り曲げることによ
り、その一辺を接合片(13a)として、上記吊り下げ
用接合マスト(12)のマスト主体(12a)と背中合
わせ状態に垂立させると共に、残る他辺をクランプバン
ド(11)への取付片(13b)として、そのクランプ
バンド(11)における切り離し他端部の内面に接合さ
せた上、スポツト溶接やリベツト(16)などにより固
定一体化している。
Then, the other joining mast (13) which stands upright low is bent from a metal plate having the same constant width as the clamp band (11) into an L-shape when viewed from the front so that one side of the joining mast ( 13a), the standing mast body (12a) of the suspension joining mast (12) is erected in a back-to-back state, and the remaining other side is used as an attachment piece (13b) to the clamp band (11). 11) Separated and joined to the inner surface of the other end, fixed and integrated by spot welding, rivets (16) and the like.

【0018】このように、両接合マスト(12)(1
3)の取付片(12c)(13b)をクランプバンド
(11)の切り離し両端部へ、何れも内側から接合一体
化するならば、その段差(17)がクランプバンド(1
1)に対するダクト(D)の位置ズレや空転の抵抗とし
て働き、これを防止できる利点がある。
In this way, the two joint masts (12) (1
If the mounting pieces (12c) and (13b) of 3) are separated and integrated into both ends of the clamp band (11) from the inside, the step (17) is the step (17).
There is an advantage that it works as a resistance against the positional deviation of the duct (D) with respect to 1) and a resistance against idling, and can prevent this.

【0019】又、クランプバンド(11)とその両接合
マスト(12)(13)とが、予じめ別個独立している
ため、ダクト(D)の太さ変化に際会した場合、そのク
ランプバンド(11)の口径や帯幅のみを対応変化させ
れば足り、上記接合マスト(12)(13)を汎用でき
る利点もある。
Further, since the clamp band (11) and the joint masts (12) and (13) of the clamp band are independent of each other in advance, when the change in the thickness of the duct (D) is encountered, the clamp band (11) is clamped. It is sufficient to change only the diameter and the width of the band (11), and there is an advantage that the joining masts (12) and (13) can be used in general.

【0020】但し、クランプバンド(11)と別個な一
対の接合マスト(12)(13)を、そのクランプバン
ド(11)へ上記スポツト溶接やリベツト(15)(1
6)などによって固定一体化する構成に代えて、上記一
対の接合マスト(12)(13)をクランプバンド(1
1)の切り離し両端部から連続一体に曲げ起し垂立させ
てもさしつかえない。
However, a pair of joining masts (12) and (13) separate from the clamp band (11) are connected to the clamp band (11) by the spot welding or the riveting (15) (1).
6) and the like, the clamp band (1) is replaced with the pair of the joining masts (12) and (13).
1) Separation It is acceptable to bend and raise from both ends continuously and vertically.

【0021】上記クランプバンド(11)の切り離し両
端部から一体的に垂立する一対の接合マスト(12)
(13)は、そのマスト主体(12a)と接合片(13
a)との接合状態において、1本の水平貫通ボルト(1
8)とナツト(19)により締結されることになるが、
その水平貫通ボルト(18)を受け入れるためのキー孔
(20)が上記背低い接合マスト(13)の接合片(1
3a)に開口形成されている。
A pair of joining masts (12) which stand up integrally from both ends of the clamp band (11) which is separated.
(13) is the mast main body (12a) and the joining piece (13).
In the joined state with a), one horizontal through bolt (1
8) and the nut (19),
A key hole (20) for receiving the horizontal through bolt (18) has a joining piece (1) of the short joining mast (13).
An opening is formed in 3a).

【0022】そのキー孔(20)は図7から明白なよう
に、上部の径大な丸孔(20a)と下部の径小な長孔
(20b)との連通開口する鍵穴型を呈しており、その
丸孔(20a)によって上記水平貫通ボルト(18)の
径大な頭部(18a)か、又はそのボルト(18)に螺
合されるナツト(19)を受け入れることができるよう
になっていると共に、残る上下方向に沿って細長く延在
する径小な長孔(20b)により、上記ボルト(18)
の軸部(18b)を受け入れることができるようになっ
ている。
As is apparent from FIG. 7, the key hole (20) has a keyhole shape in which a large-diameter round hole (20a) in the upper portion and a small-diameter long hole (20b) in the lower portion communicate with each other. The round hole (20a) allows the large-diameter head (18a) of the horizontal through bolt (18) or a nut (19) screwed to the bolt (18) to be received. In addition, the bolt (18) has a small diameter elongated hole (20b) extending along the remaining vertical direction.
The shank (18b) can be received.

【0023】他方、上記接合片(13a)と接合される
背高い接合マスト(12)のマスト主体(12a)に
は、そのキー孔(20)の開口全体と対応位置する径小
なスライドガイド長孔(21)が、やはり上下方向に沿
って細長く開口形成されており、上記水平貫通ボルト
(18)の軸部(18b)を受け入れ得るようになって
いる。
On the other hand, the mast body (12a) of the tall joining mast (12) joined to the joining piece (13a) has a small diameter slide guide length corresponding to the entire opening of the key hole (20). The hole (21) is also formed to be elongated in the vertical direction so that the shaft portion (18b) of the horizontal through bolt (18) can be received.

【0024】そのため、図7から示唆される通り、先づ
上記水平貫通ボルト(18)の軸部(18b)を背高い
接合マスト(12)側のスライドガイド長孔(21)へ
貫通させ、その軸部(18b)にナツト(19)を螺合
した仮り組み状態のもとで、そのナツト(19)に対し
て背低い接合マスト(13)側の径大な丸孔(20a)
を挿入させることができ、その一対の接合マスト(1
2)(13)を接合状態に保てるのであり、そうすれば
上記水平貫通ボルト(18)の軸部(18b)は背低い
接合マスト(13)側の長孔(20b)と、背高い接合
マスト(12)側のスライドガイド長孔(21)に沿っ
て、図1〜6のように自づとスライド落下し、そのボル
ト(18)の離脱するおそれもない。
Therefore, as suggested from FIG. 7, the shaft portion (18b) of the horizontal through bolt (18) is first passed through the slide guide elongated hole (21) on the tall joint mast (12) side, and Under the provisionally assembled state in which the nut (19) is screwed into the shaft portion (18b), a large diameter circular hole (20a) on the side of the joint mast (13) that is short with respect to the nut (19).
Can be inserted, and the pair of joining masts (1
2) It is possible to keep the (13) in a joined state, so that the shaft portion (18b) of the horizontal through bolt (18) has a long hole (20b) on the side of the short joining mast (13) and a tall joining mast. There is no risk that the bolt (18) will fall off along the slide guide elongated hole (21) on the (12) side as shown in FIGS.

【0025】つまり、上記水平貫通ボルト(18)とナ
ツト(19)とを一々分解する必要なく、その仮りの締
付け状態に螺合したままでも、クランプバンド(11)
の両接合マスト(12)(13)を締結固定すべく、そ
の両接合マスト(12)(13)の貫通状態にセツトで
きる結果となるわけである。その場合、両接合マスト
(12)(13)の接合面にはダクト(D)の振動吸収
用パツキング(図示省略)が、予じめの貼り付け状態に
介在されることもある。
That is, it is not necessary to disassemble the horizontal through bolts (18) and nuts (19) one by one, and the clamp band (11) can be screwed in the temporary tightened state.
In order to fasten and fix both the joint masts (12) and (13), the result is that the both joint masts (12) and (13) can be set in the penetrating state. In that case, the vibration absorbing packing (not shown) of the duct (D) may be interposed in a pre-attached state on the joint surfaces of the two joint masts (12) and (13).

【0026】図7では上記水平貫通ボルト(18)に螺
合されたナツト(19)を、背低い接合マスト(13)
の径大な丸孔(20a)へ受け入れるようになっている
が、上記ボルト(18)を背高い接合マスト(12)の
スライドガイド長孔(21)へ、逆向きに挿入させるこ
とによって、そのボルト(18)の頭部(18a)を背
低い接合マスト(13)の径大な丸孔(20a)へ受け
入れさせることも可能である。
In FIG. 7, a nut (19) screwed to the horizontal through bolt (18) is attached to a short joint mast (13).
It is designed to be received in the large circular hole (20a) of the above, but by inserting the bolt (18) into the slide guide elongated hole (21) of the tall joint mast (12) in the opposite direction, It is also possible for the head (18a) of the bolt (18) to be received in the large round hole (20a) of the short joining mast (13).

【0027】何れにしても、水平貫通ボルト(18)の
頭部(18a)又はナツト(19)は、これを上記フツ
ク片(12b)と直交する吊りボルト(10)と干渉し
ないように、退避させることが好ましい。蓋し、ダクト
(D)の設置高さを調整する際に、その背高い接合マス
ト(12)の垂立高さ(H1)を高さ調整代(H)とし
て、極力大きな寸法(実際上約100mm)のもとに活
用できるからである。
In any case, the head (18a) or nut (19) of the horizontal through bolt (18) is retracted so as not to interfere with the hanging bolt (10) orthogonal to the hook piece (12b). Preferably. When adjusting the installation height of the duct (D) with the lid, the vertical height (H1) of the tall joint mast (12) is used as the height adjustment allowance (H), and the size is as large as possible (actually, approximately). This is because it can be utilized under 100 mm).

【0028】又、図では上記フツク片(12b)によっ
て吊りボルト(10)へ、先に締結される背高い接合マ
スト(12)を固定側として、その固定側接合マスト
(12)のマスト主体(12a)にスライドガイド長孔
(21)を開口形成することにより、上記水平貫通ボル
ト(18)をそのナツト(19)との仮り組み状態とし
て、そのガイド長孔(21)へ一層安定良く貫通保持で
きるように定めると共に、その後固定側の接合マスト
(12)へ閉止状態に接合される可動側の背低い接合マ
スト(13)に、鍵穴型のキー孔(20)を対応形成し
ている。
Further, in the figure, the tall joint mast (12) to be fastened to the suspension bolt (10) by the hook piece (12b) as a fixed side is the mast main body (of the fixed side joint mast (12)). By forming the slide guide elongated hole (21) in 12a), the horizontal penetrating bolt (18) is tentatively assembled with the nut (19) so that it is more stably penetrated and held in the guide elongated hole (21). A keyhole-shaped keyhole (20) is formed correspondingly to the movable short mast (13) which is fixed so as to be fixed to the fixed mast (12).

【0029】但し、そのキー孔(20)の径大な丸孔
(20a)が径小な長孔(20b)の直上位置に連通開
口する限りでは、逆に背高い接合マスト(12)側のマ
スト主体(12a)にキー孔(20)を、背低い接合マ
スト(13)側の接合片(13a)にスライドガイド長
孔(21)を各々対応形成しても良い。
However, as long as the large round hole (20a) of the key hole (20) communicates with and opens directly above the small long hole (20b), on the contrary, on the side of the tall joint mast (12). A key hole (20) may be formed in the mast main body (12a), and a slide guide slot (21) may be formed in the joining piece (13a) on the side of the short joining mast (13).

【0030】上記の構成において、ダクト(D)を建物
の天井面(C)へ吊り下げ状態に施工する当っては、図
8、9から明白な通り、そのダクト(D)にクランプバ
ンド(11)を捲き掛け抱持させた後、そのクランプバ
ンド(11)から一体的に垂立する背高い接合マスト
(12)のフツク片(12b)を、天井面(C)から垂
下する吊りボルト(10)へ挿通させて、その吊りボル
ト(10)に上下一対のナツト(22)(23)を締結
することにより、脱落不能に吊り下げ固定する。
In the above construction, when the duct (D) is hung from the ceiling surface (C) of the building, the clamp band (11) is attached to the duct (D) as apparent from FIGS. ) Is hung up and held, and then the hook piece (12b) of the tall joint mast (12) which stands upright from the clamp band (11) is hung from the ceiling surface (C). ), And a pair of upper and lower nuts (22) and (23) are fastened to the suspension bolt (10) so that the suspension bolt (10) is suspended and fixed so as not to fall off.

【0031】その場合、上記フツク片(12b)に開口
する吊りボルト受け入れ用丸孔(14)は、所謂バカ孔
であり、又その吊りボルト(10)と螺合される上下一
対のナツト(22)(23)は、フツク片(12b)も
含む接合マスト(12)と別個独立しているため、これ
を回転操作することにより、そのダクト(D)の設置高
さを調整することができる。
In this case, the hanging bolt receiving round hole (14) opening in the hook piece (12b) is a so-called stupid hole, and a pair of upper and lower nuts (22) screwed with the hanging bolt (10). (23) is independent of the joining mast (12) that also includes the hook piece (12b), so that the installation height of the duct (D) can be adjusted by rotating this.

【0032】そして、引き続き背高い接合マスト(1
2)側のスライドガイド長孔(21)へ水平貫通ボルト
(18)を挿通させて、これにナツト(19)を仮りの
締付け状態として螺合させた後、そのボルト(18)を
キー孔(20)へ受け入れる如くに、他方の背低い接合
マスト(13)を接合させるのである。
Then, the tall joint mast (1
After inserting the horizontal penetrating bolt (18) into the slide guide elongated hole (21) on the 2) side and screwing the nut (19) into the provisionally tightened state, the bolt (18) is inserted into the key hole (21). The other short joining mast (13) is joined as it is received in 20).

【0033】そうすれば、上記水平貫通ボルト(18)
は自づとスライド落下して、両接合マスト(12)(1
3)からの離脱不能に保たれるので、そのボルト(1
8)に対してナツト(19)を締め上げれば良い。その
ボルト(18)とナツト(19)とを予じめほぼ完全に
締め上げておき、両接合マスト(12)(13)を貫通
する状態において、上方から叩打することにより、その
ボルト(18)を下方へ押し込み圧入させてもさしつか
えない。クランプバンド(11)の口径はダクト(D)
の太さよりも若干小さい寸法を有するため、その拡開付
勢力を受けたボルト(18)とナツト(19)が、弛緩
するおそれはないからである。
Then, the horizontal through bolt (18)
Slides and falls by itself, and both joint masts (12) (1
3) The bolt (1
It is sufficient to tighten the nut (19) against 8). The bolt (18) and nut (19) are tightened almost completely in advance, and the bolt (18) is tapped from above while the joint masts (12) and (13) are penetrated. It doesn't matter if you press down and press fit. The diameter of the clamp band (11) is the duct (D)
This is because the bolts (18) and nuts (19) that receive the expansion urging force are not likely to loosen because they have a size slightly smaller than the thickness of the.

【0034】更に、上記吊り下げ施工後ダクト(D)の
設置高さを調整する必要が起った場合には、吊りボルト
(10)と締結されている上下一対のナツト(22)
(23)を緩めて、図9と図10との対比から示唆され
るように、その吊りボルト(10)に沿ってダクト
(D)のクランプバンド(11)を昇降させれば足り、
そのクランプバンド(11)の両接合マスト(12)
(13)を、上記水平貫通ボルト(18)の抜き出し操
作により分解する必要は一切ない。
Further, when it is necessary to adjust the installation height of the duct (D) after the suspension construction, a pair of upper and lower nuts (22) fastened to the suspension bolts (10).
It suffices to loosen (23) and raise and lower the clamp band (11) of the duct (D) along the hanging bolt (10) as suggested by the comparison between FIG. 9 and FIG.
Both joint masts (12) of the clamp band (11)
It is not necessary to disassemble (13) by the operation of extracting the horizontal through bolt (18).

【0035】次に、図11は本考案の第1変形実施例を
示しており、これではクランプバンド(11)から背高
く垂立する接合マスト(12)のフツク片(12b)
を、吊りボルト(10)との直交状態に締結するに当っ
て、上記基本実施例に説示した上下一対のナツト(2
2)(23)に代る1個のナツト(24)を、そのフツ
ク片(12b)の吊りボルト受け入れ用丸孔(14)へ
遊転自在にかしめ付けている。
Next, FIG. 11 shows a first modified embodiment of the present invention, in which the hook piece (12b) of the joining mast (12) standing upright from the clamp band (11).
When fastening the bolts in a state orthogonal to the suspension bolts (10), a pair of upper and lower nuts (2) described in the basic embodiment are used.
2) One nut (24) instead of (23) is swageably swaged to the hanging bolt receiving round hole (14) of the hook piece (12b).

【0036】これによれば、そのナツト(24)が上記
フツク片(12b)に予じめ保持さており、しかもこれ
を自由自在に回転操作することができるため、そのナツ
ト(24)と吊りボルト(10)との締結作業や、ダク
ト(D)における設置高さの調整作業を一層安楽に能率
良く行なえる利点がある。
According to this, since the nut (24) is preliminarily held by the hook piece (12b) and can be freely rotated, the nut (24) and the hanging bolt can be freely rotated. There is an advantage that the fastening work with (10) and the adjustment work of the installation height in the duct (D) can be performed more easily and efficiently.

【0037】又、図12は本考案の第2変形実施例を示
しており、これでは接合マスト(12)(13)の一対
をクランプバンド(11)の切り離し両端部から、ほぼ
同等の高さとして一体的に垂立させると共に、その一方
の接合マスト(12)から水平に折り曲げたフツク片
(12b)を、他方の接合マスト(13)に対応形成し
た窓(25)の貫通状態に張り出している。
FIG. 12 shows a second modified embodiment of the present invention, in which a pair of the joining masts (12) and (13) are separated from the clamp band (11) at substantially the same height from both ends. And the hook piece (12b) bent horizontally from one of the joining masts (12) is projected to the penetrating state of the window (25) corresponding to the other joining mast (13). There is.

【0038】これによれば、そのフツク片(12b)が
窓(25)を貫通しているため、ダクト(D)の重量を
受けるも、上向きに負け起き変形するおそれがなく、又
両接合マスト(12)(13)の振れ動くおそれもない
結果、上記スライドガイド長孔(21)とキー孔(2
0)とを自づと正しく対応合致させることができる。
According to this, since the hook piece (12b) penetrates the window (25), even if the weight of the duct (D) is received, there is no danger of losing and deforming upwards, and the both joint masts. (12) As a result that there is no possibility of wobbling of (13), the slide guide elongated hole (21) and the key hole (2
0) can be correctly matched and matched with itself.

【0039】更に、図13は本考案の第3変形実施例を
示しており、これてはクランプバンド(11)を正10
角形やその他の正多角形に折り曲げることによって、そ
の正多角形のダクト(リニアダクト)(D)を抱持でき
るようになっている。このような吊り金具としても、本
考案を具体化できる趣旨である。
Further, FIG. 13 shows a third modified embodiment of the present invention, in which the clamp band (11) is fixed to the right side.
By bending into a square or other regular polygon, the regular polygonal duct (linear duct) (D) can be held. The present invention can be embodied also as such a hanging metal fitting.

【0040】尚、図11〜13の第1〜3変形実施例に
おけるその他の構成は、図1〜10の上記基本実施例と
実質的に同一であるため、その図11〜13に図1〜1
0との対応符号を記入するにとどめて、その詳細な説明
を省略する。
Since the other constructions of the first to third modified embodiments of FIGS. 11 to 13 are substantially the same as those of the basic embodiment of FIGS. 1 to 10, FIGS. 1
Only the corresponding code with 0 is entered, and the detailed description thereof is omitted.

【0041】[0041]

【考案の効果】以上のように、本考案の吊り金具ではそ
の構成上、ダクト(D)を抱持するクランプバンド(1
1)の切り離し両端部から、一対の接合マスト(12)
(13)を外向き一体的に垂立させて、その何れか一方
の接合マスト(12)には、両接合マスト(12)(1
3)の締結用となる水平貫通ボルト(18)の軸部(1
8b)を受け入れ得るスライドガイド長孔(21)を、
上下方向への延在状態に開口形成し、残る他方の接合マ
スト(13)には、上記スライドガイド長孔(21)と
対応位置するキー孔(20)を、その上部が上記水平貫
通ボルト(18)の径大な頭部(18a)か、又はこれ
に螺合されるナツト(19)を受け入れ得る丸孔(20
a)として、又下部が上記水平貫通ボルト(18)の軸
部(18b)を受け入れ得る長孔(20b)として、そ
の互いに連通する鍵穴型に開口形成すると共に、その一
方又は他方の接合マスト(12)から曲げ出した水平な
フツク片(12b)に、建物の天井面(C)から垂下す
る吊りボルト(10)の受け入れ用丸孔(14)を開口
形成してあるため、冒頭に述べた従来技術の諸問題を完
全に改良することができる。
As described above, in the hanging fitting of the present invention, due to its structure, the clamp band (1) for holding the duct (D) is provided.
1) A pair of joining masts (12) from both ends of separation.
(13) is made to stand upright integrally, and the joining mast (12) (1) is attached to one of the joining masts (12).
The shaft portion (1) of the horizontal through bolt (18) for fastening 3)
8b) can receive a slide guide slot (21),
A key hole (20) corresponding to the slide guide elongated hole (21) is formed in the other joining mast (13) that is opened in a state of extending in the vertical direction, and the upper portion thereof has the horizontal through bolt ( A round hole (20) capable of receiving the large-diameter head (18a) of 18) or a nut (19) screwed to this head.
a) and as a long hole (20b) whose lower portion can receive the shaft portion (18b) of the horizontal through bolt (18), the opening is formed in a keyhole shape communicating with each other, and one or the other of the joining masts ( Since the horizontal hook piece (12b) bent out from 12) is formed with the round hole (14) for receiving the hanging bolt (10) hanging from the ceiling surface (C) of the building, it was described at the beginning. The problems of the prior art can be completely improved.

【0042】即ち、本考案の場合クランプバンド(1
1)の切り離し両端部から一体的に垂立する両接合マス
ト(12)(13)の何れか一方には、その両接合マス
ト(12)(13)の締結用となる水平貫通ボルト(1
8)の軸部(18b)を受け入れるスライドガイド長孔
(21)が開口形成されているため、これに通し込んだ
ボルト(18)にナツト(19)を螺合締結することに
より、その両者を予じめ仮り組みの締付け状態に保つこ
とができる。
That is, in the case of the present invention, the clamp band (1
One of the joint masts (12) and (13) integrally standing upright from the separated both ends of 1) is provided with a horizontal through bolt (1) for fastening the joint masts (12) and (13).
Since the slide guide elongated hole (21) for receiving the shaft portion (18b) of 8) is formed, the nut (19) is screwed and fastened to the bolt (18) which is inserted into the slide guide elongated hole (21), so as to connect both of them. It is possible to keep the tightening condition of the preliminary assembly.

【0043】そして、その後他方の接合マスト(13)
を上記した一方の接合マスト(12)と接合させれば良
い。そうすれば、他方の接合マスト(13)に対応形成
されているキー孔(20)の丸孔(20a)が、上記水
平貫通ボルト(18)の径大な頭部(18a)又はナツ
ト(19)を受け入れることとなり、そのボルト(1
8)の軸部(18b)は引き続きキー孔(20)の長孔
(20b)と上記スライドガイド長孔(21)に沿っ
て、下方へ落ち込むために、両接合マスト(12)(1
3)を自づと完全に締結固定できるわけであり、その現
場での施工作業性に著しく優れる。
And then, the other joining mast (13)
May be joined to the one joining mast (12) described above. Then, the round hole (20a) of the key hole (20) formed corresponding to the other joining mast (13) has a large head (18a) or nut (19) of the horizontal through bolt (18). ) Will be accepted, and the bolt (1
Since the shaft portion (18b) of 8) continues to fall downward along the long hole (20b) of the key hole (20) and the slide guide long hole (21), both joint masts (12) (1)
Since 3) can be completely fastened and fixed by itself, the construction workability at the site is remarkably excellent.

【0044】その場合、特に請求項2の構成を採用する
ならば、吊りボルト(10)と締結されるフツク片(1
2b)を備えた固定側の接合マスト(12)に、水平貫
通ボルト(18)の軸部(18b)を受け入れるスライ
ドガイド長孔(21)が開口形成されているため、予じ
め仮り組みの締付け状態として、その長孔(21)に挿
通されるボルト(18)とナツト(19)を、ますます
安定に保つことができる。
In this case, particularly when the structure of claim 2 is adopted, the hook piece (1) to be fastened with the suspension bolt (10).
Since the fixed joint mast (12) provided with 2b) is formed with the slide guide elongated hole (21) for receiving the shaft portion (18b) of the horizontal through bolt (18), the preliminary temporary assembly is performed. In the tightened state, the bolts (18) and nuts (19) inserted through the elongated holes (21) can be kept more and more stable.

【0045】又、請求項4の構成を採用するならば、ク
ランプバンド(11)とその両接合マスト(12)(1
3)が別個独立しているため、クランプバンド(11)
の口径や帯幅を変えるだけで、ダクト(D)の太さ変化
に対応することができ、両接合マスト(12)(13)
を汎用的に使える効果がある。
Further, if the construction of claim 4 is adopted, the clamp band (11) and both joint masts (12) (1)
Clamp band (11) because 3) is independent
It is possible to cope with the change in the thickness of the duct (D) simply by changing the diameter and the band width of the two joint masts (12) (13).
Has the effect of being able to be used universally.

【0046】更に、両接合マスト(12)(13)の取
付片(12c)(13b)をクランプバンド(11)の
切り離し両端部へ、その内側から接合固定しているた
め、その取付片(12c)(13b)とクランプバンド
(11)の内面との相互間に生ずる段差(17)によっ
て、クランプバンド(11)に対するダクト(D)の位
置ズレや空転を防止できる効果もある。
Further, since the mounting pieces (12c) and (13b) of both joint masts (12) and (13) are separated and fixed to the both ends of the clamp band (11) from the inside, the mounting pieces (12c) are fixed. ) (13b) and the inner surface of the clamp band (11), the step (17) generated between the clamp band (11) and the clamp band (11) is effective in preventing displacement of the duct (D) and idling.

【0047】本考案では請求項1の構成から明白なよう
に、上記両接合マスト(12)(13)の何れか一方か
ら曲げ出された水平なフツク片(12b)が、建物の天
井面(C)から垂下する吊りボルト(10)と直交する
関係にあり、そのフツク片(12b)には吊りボルト
(10)の受け入れ用丸孔(14)が開口形成されてい
るため、上記水平貫通ボルト(18)とナツト(19)
による両接合マスト(12)(13)の締結固定状態に
おいて、そのままでもクランプバンド(11)を吊りボ
ルト(10)に沿い自由自在に昇降させることができ、
ダクト(D)の設置高さを容易に調整し得る効果もあ
る。
According to the present invention, as is apparent from the structure of claim 1, the horizontal hook piece (12b) bent out from either one of the two joining masts (12) and (13) is the ceiling surface of the building ( C) is perpendicular to the hanging bolt (10) and the hook piece (12b) has a round hole (14) for receiving the hanging bolt (10). (18) and Natto (19)
In the fastening and fixing state of both joining masts (12) and (13), the clamp band (11) can be freely moved up and down along the hanging bolt (10),
There is also an effect that the installation height of the duct (D) can be easily adjusted.

【0048】特に、請求項3の構成を採用するならば、
背高く垂立する接合マスト(12)の上端部から上記フ
ツク片(12b)が曲げ出されているため、上記ダクト
(D)の高さ調整代(H)をますます大きく確保できる
ことになる。
In particular, if the structure of claim 3 is adopted,
Since the hook piece (12b) is bent out from the upper end of the joining mast (12) which stands upright, the height adjustment allowance (H) of the duct (D) can be increased more and more.

【0049】又、請求項5の構成を採用するならば、上
記接合マスト(12)のフツク片(12b)と吊りボル
ト(10)とを締結するに当り、別個なナツト(22)
(23)を把持する必要がなく、そのフツク片(12
b)にかしめ付けられているナツト(24)を回転操作
すれば足るため、上記ダクト(D)の高さ調整作業を一
層安楽に能率良く行なえる効果がある。
Further, if the construction of claim 5 is adopted, a separate nut (22) is used for fastening the hook piece (12b) of the joining mast (12) and the suspension bolt (10).
It is not necessary to grip (23), and the hook piece (12
Since it is sufficient to rotate the nut (24) crimped to b), there is an effect that the height adjustment work of the duct (D) can be performed more easily and efficiently.

【図面の簡単な説明】[Brief description of drawings]

【図1】本考案の吊り金具を示す斜面図である。FIG. 1 is a perspective view showing a suspension fitting of the present invention.

【図2】図1の反対方向から見た斜面図である。FIG. 2 is a perspective view seen from the opposite direction of FIG.

【図3】図1の正面図である。FIG. 3 is a front view of FIG.

【図4】図3の右側面図である。FIG. 4 is a right side view of FIG.

【図5】図3の左側面図である。FIG. 5 is a left side view of FIG.

【図6】図5の6−6線断面図である。6 is a sectional view taken along line 6-6 of FIG.

【図7】水平貫通ボルトとナツトによる両接合マストの
締結作用過程を示す斜面図である。
FIG. 7 is a perspective view showing a fastening operation process of both joining masts by a horizontal through bolt and a nut.

【図8】ダクトの吊り下げ施工状態を示す側面図であ
る。
FIG. 8 is a side view showing a suspended construction state of the duct.

【図9】図8の9−9線に沿う拡大断面図である。9 is an enlarged sectional view taken along line 9-9 of FIG.

【図10】図9に対応するダクトの高さ調整状態を示す
断面図である。
FIG. 10 is a sectional view showing a height adjustment state of the duct corresponding to FIG. 9;

【図11】本考案の第1変形実施例を示す部分拡大断面
図である。
FIG. 11 is a partially enlarged sectional view showing a first modified embodiment of the present invention.

【図12】同じく第2変形実施例を示す断面正面図であ
る。
FIG. 12 is a sectional front view showing a second modified example of the same.

【図13】更に第3変形実施例を示す断面正面図であ
る。
FIG. 13 is a sectional front view showing a third modified embodiment.

【図14】従来の吊り金具を示す分解斜面図である。FIG. 14 is an exploded perspective view showing a conventional hanging fitting.

【図15】その吊り金具による従来の吊り下げ施工状態
を示す正面図である。
FIG. 15 is a front view showing a conventional hanging construction state by the hanging metal fitting.

【符号の説明】[Explanation of symbols]

(10)・吊りボルト (11)・クランプバンド (12)・接合マスト (12a)・マスト主体 (12b)・フツク片 (12c)・取付片 (13)・接合マスト (13a)・接合片 (13b)・取付片 (14)・吊りボルト受け入れ用丸孔 (18)・水平貫通ボルト (18a)・頭部 (18b)・軸部 (19)・ナツト (20)・キー孔 (20a)・丸孔 (20b)・長孔 (21)・スライドガイド長孔 (C)・天井面 (D)・ダクト (10) -Suspension bolt (11) -Clamp band (12) -Joining mast (12a) -Mast main body (12b) -Hook piece (12c) -Mounting piece (13) -Joining mast (13a) -Joining piece (13b) ) ・ Mounting piece (14) ・ Holding bolt receiving round hole (18) ・ Horizontal through bolt (18a) ・ Head (18b) ・ Shaft (19) ・ Nut (20) ・ Key hole (20a) ・ Round hole (20b) -Long hole (21) -Slide guide long hole (C) -Ceiling surface (D) -Duct

Claims (5)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】ダクト(D)を抱持するクランプバンド
(11)の切り離し両端部から、一対の接合マスト(1
2)(13)を外向き一体的に垂立させて、 その何れか一方の接合マスト(12)には、両接合マス
ト(12)(13)の締結用となる水平貫通ボルト(1
8)の軸部(18b)を受け入れ得るスライドガイド長
孔(21)を、上下方向への延在状態に開口形成し、 残る他方の接合マスト(13)には、上記スライドガイ
ド長孔(21)と対応位置するキー孔(20)を、その
上部が上記水平貫通ボルト(18)の径大な頭部(18
a)か、又はこれに螺合されるナツト(19)を受け入
れ得る丸孔(20a)として、又下部が上記水平貫通ボ
ルト(18)の軸部(18b)を受け入れ得る長孔(2
0b)として、その互いに連通する鍵穴型に開口形成す
ると共に、 その一方又は他方の接合マスト(12)から曲げ出した
水平なフツク片(12b)に、建物の天井面(C)から
垂下する吊りボルト(10)の受け入れ用丸孔(14)
を開口形成したことを特徴とするダクトの吊り金具。
1. A pair of joining masts (1) from both ends of a clamp band (11) for holding a duct (D).
2) The (13) is vertically erected outward, and one of the joining masts (12) is connected to the horizontal through bolt (1) for fastening both joining masts (12) and (13).
The slide guide elongated hole (21) capable of receiving the shaft portion (18b) of 8) is formed so as to extend in the vertical direction, and the slide guide elongated hole (21) is formed in the remaining other joining mast (13). ) Corresponding to the key hole (20), the upper part of which has a large diameter head (18) of the horizontal through bolt (18).
a) or a round hole (20a) capable of receiving a nut (19) screwed thereto, and an elongated hole (2) whose lower portion can receive the shaft portion (18b) of the horizontal through bolt (18).
0b), the opening is formed in a keyhole shape that communicates with each other, and the horizontal hook piece (12b) bent from one or the other joining mast (12) is hung from the ceiling surface (C) of the building. Round hole (14) for receiving bolt (10)
A hanging metal fitting for a duct, characterized in that the opening is formed.
【請求項2】フツク片(12b)の曲げ出された接合マ
スト(12)を固定側として、その固定側の接合マスト
(12)にスライドガイド長孔(21)を開口形成する
一方、 上記固定側の接合マスト(12)と接合される可動側の
接合マスト(13)に、キー孔(20)を開口形成した
ことを特徴とする請求項1記載のダクトの吊り金具。
2. The slide guide elongated hole (21) is formed in the fixing mast (12) on the fixed side while the bent joint mast (12) of the hook piece (12b) is used as the fixed side. The suspension metal fitting for a duct according to claim 1, wherein a key hole (20) is formed in the movable joint mast (13) to be joined to the side joint mast (12).
【請求項3】両接合マスト(12)(13)の垂立高さ
(H1)(H2)を高低変化させ、その背高く垂立する
接合マスト(12)の上端部からフツク片(12b)を
曲げ出すことにより、その接合マスト(12)の垂立高
さ(H1)を高さ調整代(H)として、ダクト(D)の
設置高さを調整できるように定めたことを特徴とする請
求項1記載のダクトの吊り金具。
3. A hook piece (12b) from the upper end portion of the joining mast (12) which stands upright by changing the vertical height (H1) (H2) of both joining masts (12) (13). By bending out the joint mast (12), the standing height (H1) is set as the height adjustment allowance (H) so that the installation height of the duct (D) can be adjusted. The hanging metal fitting for the duct according to claim 1.
【請求項4】両接合マスト(12)(13)をクランプ
バンド(11)と別個独立させて、その下端部から各々
曲げ出した取付片(12c)(13b)を、上記クラン
プバンド(11)の切り離し両端部へ内側から接合し、
且つスポツト溶接やリベツト(15)(16)などによ
り固定一体化したことを特徴とする請求項1記載のダク
トの吊り金具。
4. The clamp band (11) is provided with the joining masts (12) and (13) separated from the clamp band (11) independently of each other, and the mounting pieces (12c) and (13b) respectively bent out from the lower ends thereof. Separate from both sides and join from both sides,
The hanging metal fitting for a duct according to claim 1, characterized in that it is fixed and integrated by spot welding, rivets (15) (16) or the like.
【請求項5】フツク片(12b)に開口形成された吊り
ボルト(10)の受け入れ用丸孔(14)に、その吊り
ボルト(10)と締結されるナツト(24)を遊転自在
にかしめ付けたことを特徴とする請求項1記載のダクト
の吊り金具。
5. A nut (24) fastened to the hanging bolt (10) is freely swaged in a round hole (14) for receiving the hanging bolt (10) formed in the hook piece (12b). The hanging metal fitting for the duct according to claim 1, which is attached.
JP3559693U 1993-06-03 1993-06-03 Duct hanging fittings Expired - Lifetime JPH0726626Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3559693U JPH0726626Y2 (en) 1993-06-03 1993-06-03 Duct hanging fittings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3559693U JPH0726626Y2 (en) 1993-06-03 1993-06-03 Duct hanging fittings

Publications (2)

Publication Number Publication Date
JPH0687793U JPH0687793U (en) 1994-12-22
JPH0726626Y2 true JPH0726626Y2 (en) 1995-06-14

Family

ID=12446194

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3559693U Expired - Lifetime JPH0726626Y2 (en) 1993-06-03 1993-06-03 Duct hanging fittings

Country Status (1)

Country Link
JP (1) JPH0726626Y2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000018436A (en) * 1998-06-30 2000-01-18 Nhk Spring Co Ltd Joining tool for piping support device

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10196632A (en) * 1997-01-17 1998-07-31 Nojimakakusei Seisakusho:Kk Bolt installation structure and piping supporting fitting
KR100913706B1 (en) * 2007-12-06 2009-08-24 (주)대양기연 Hanger with rocker of tube
JP6388206B2 (en) * 2014-10-08 2018-09-12 株式会社エコル Pipe suspension band mechanism
CN112856786B (en) * 2021-01-19 2022-09-30 深圳市甲骨文智慧实验室建设有限公司 Supply air duct mounting structure of new trend system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000018436A (en) * 1998-06-30 2000-01-18 Nhk Spring Co Ltd Joining tool for piping support device

Also Published As

Publication number Publication date
JPH0687793U (en) 1994-12-22

Similar Documents

Publication Publication Date Title
EP0640197B1 (en) Tubular framing system
US5873556A (en) Adjustable drop ceiling fixture support
US20070181330A1 (en) Far-side support for brackets
KR20000077172A (en) Bar Hanger and Mounting Clip Assembly
US7410141B2 (en) Industrial hanger for metal framing
JPH0726626Y2 (en) Duct hanging fittings
CA2116555A1 (en) Guard rail fittings
US6145334A (en) Separate type air conditioner
US7000362B1 (en) Screening device
KR100763606B1 (en) Hanger for fixing ceiling member
JPH086896Y2 (en) Ceiling base muscle abuse hardware
JP2000248700A (en) Gutter attaching device
JP2860533B2 (en) Surface lattice unit for windows
JP2560508Y2 (en) Structure of fixing brackets and fixing parts for ceiling mounting members
JPH0725386U (en) Pipe support
JP4279770B2 (en) Air conditioner hanging mount
JP3103947B2 (en) Ceiling structure
JPH10122434A (en) Hanging metal fitting for piping
JPH0683047U (en) Sprinkler attachment
CN214786346U (en) Clamping installation part, sleeving installation part, hook installation part and assembling operating room
KR20230157131A (en) Bracket
JPH0141773Y2 (en)
AU751694B2 (en) Safety rail
JPH1019309A (en) Assembled multi-purpose frame
JPH0752267Y2 (en) Tight frame