JPH0687793U - Duct hanging fittings - Google Patents

Duct hanging fittings

Info

Publication number
JPH0687793U
JPH0687793U JP3559693U JP3559693U JPH0687793U JP H0687793 U JPH0687793 U JP H0687793U JP 3559693 U JP3559693 U JP 3559693U JP 3559693 U JP3559693 U JP 3559693U JP H0687793 U JPH0687793 U JP H0687793U
Authority
JP
Japan
Prior art keywords
bolt
joining
mast
masts
duct
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP3559693U
Other languages
Japanese (ja)
Other versions
JPH0726626Y2 (en
Inventor
茂 西口
Original Assignee
三重ダクト工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三重ダクト工業株式会社 filed Critical 三重ダクト工業株式会社
Priority to JP3559693U priority Critical patent/JPH0726626Y2/en
Publication of JPH0687793U publication Critical patent/JPH0687793U/en
Application granted granted Critical
Publication of JPH0726626Y2 publication Critical patent/JPH0726626Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Supports For Pipes And Cables (AREA)
  • Duct Arrangements (AREA)

Abstract

(57)【要約】 【目的】建物の天井面へダクトを吊り下げ施工するに当
り、その作業能率と省力化に役立つ吊り金具を提供す
る。 【構成】ダクト(D)を抱持するクランプバンド(1
1)の切り離し両端部から、一対の接合マスト(12)
(13)を外向き一体的に垂立させ、その何れか一方の
接合マスト(12)から曲げ出した水平なフツク片(1
2b)を、天井面(C)から垂下する吊りボルト(1
0)と締結できるように定め、両接合マスト(12)
(13)の締結用となる水平貫通ボルト(18)の軸部
受け入れ用スライドガイド長孔(21)を、何れか一方
の接合マスト(12)に開口形成すると共に、その水平
貫通ボルト(18)の頭部又はナツト(19)を受け入
れる丸孔(20a)と同じくボルト(18)の軸部受け
入れ用長孔(20b)とが連通するキー孔(20)を、
他方の接合マスト(13)に対応形成した。
(57) [Summary] [Purpose] To provide a suspension fitting that helps work efficiency and labor saving when suspending a duct on the ceiling surface of a building. [Structure] Clamp band (1 that holds the duct (D)
1) A pair of joining masts (12) from both ends of separation.
The horizontal hook piece (1) in which the (13) is vertically erected outwardly and bent from one of the joining masts (12).
2b) hanging bolt (1) hanging from the ceiling surface (C)
0), so that both joint masts (12)
A slide guide elongated hole (21) for receiving a shaft portion of a horizontal through bolt (18) for fastening (13) is formed in one of the joining masts (12) and the horizontal through bolt (18) is formed. A key hole (20) through which a round hole (20a) for receiving the head or nut (19) of the bolt and a long hole (20b) for receiving the shaft portion of the bolt (18) communicate with each other,
It was formed corresponding to the other joining mast (13).

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

本考案は建物の空調や排煙などに使われるダクトの吊り金具に関する。 The present invention relates to a hanging metal fitting for a duct used for air conditioning and smoke exhaust of a building.

【0002】[0002]

【従来の技術】[Prior art]

従来、空調用や排煙用などの円形ダクトを、建物の天井面から吊り下げ状態に 施工する場合、図14、15のような吊り金具が使われている。 Conventionally, when a circular duct for air conditioning or smoke exhaust is installed in a suspended state from the ceiling surface of a building, suspension fittings as shown in FIGS. 14 and 15 have been used.

【0003】 この吊り金具は円形ダクト(D)を抱持するクランプバンド(1)と、その吊 りボルト(2)への締結用となるほぼ倒立U字型ハンガー枠(3)とから成り、 そのクランプバンド(1)から曲げ起された一対の接合片(1a)(1b)と、 これを挟むハンガー枠(3)の両脚片(3a)(3b)には、各々ボルト受け入 れ用丸孔(4)(5)が対応形成されているほか、上記ハンガー枠(3)のフラ ツトな頂面には、吊りボルト(2)との締結用ナツト(6)が溶接一体化されて もいる。This suspension metal fitting is composed of a clamp band (1) for holding a circular duct (D) and a substantially inverted U-shaped hanger frame (3) for fastening to the suspension bolt (2), The pair of joining pieces (1a) and (1b) bent and raised from the clamp band (1) and the leg pieces (3a) and (3b) of the hanger frame (3) sandwiching the joining pieces (1a) and (1b) are respectively provided with bolt receiving rounds. The holes (4) and (5) are formed correspondingly, and even if the nut (6) for fastening with the hanging bolt (2) is welded and integrated on the flat top surface of the hanger frame (3). There is.

【0004】 そして、上記ダクト(D)を吊り下げ施工するに当っては、これに捲き掛けた クランプバンド(1)の両接合片(1a)(1b)と、その両接合片(1a)( 1b)を挟むハンガー枠(3)の両脚片(3a)(3b)とを、水平貫通ボルト (7)並びにその固定ナツト(8)によって締結する一方、建物の天井面(C) から垂下する吊りボルト(2)に対して、上記ハンガー枠(3)の溶接ナツト( 6)を締結するようになっている。When suspending the duct (D), both joining pieces (1a) and (1b) of the clamp band (1) wound around the duct (D) and the joining pieces (1a) (1a) ( The leg pieces (3a) and (3b) of the hanger frame (3) sandwiching 1b) are fastened with the horizontal through bolt (7) and its fixing nut (8), while hanging from the ceiling surface (C) of the building. The welding nut (6) of the hanger frame (3) is fastened to the bolt (2).

【0005】[0005]

【考案が解決しようとする課題】[Problems to be solved by the device]

ところが、上記構成の吊り金具ではクランプバンド(1)と、そのハンガー枠 (3)とが言わばバラ部品として別個独立している。しかも、そのクランプバン ド(1)の両接合片(1a)(1b)に開口するボルト受け入れ用丸孔(4)と 、ハンガー枠(3)の両脚片(3a)(3b)に開口するボルト受け入れ用丸孔 (5)とを、正確に合致させなければ、上記水平ボルト(7)を貫通させること ができないため、それまでダクト(D)を所持している必要があり、そのボルト (7)とナツト(8)を両手で把持しなければならないこととも相俟って、上記 クランプバンド(1)とハンガー枠(3)との締結作業上、著しく煩雑であると 共に重労働となる。その作業は脚立などに立ち乗りしての所謂高所作業である関 係上、甚だ危険でもあり、到底1人で行なうことができない。 However, in the hanging metal fitting having the above-mentioned structure, the clamp band (1) and the hanger frame (3) thereof are, as it were, separated and independent. Moreover, the bolt receiving round hole (4) opening in both the joining pieces (1a) (1b) of the clamp band (1) and the bolts opening in both leg pieces (3a) (3b) of the hanger frame (3). The horizontal bolt (7) cannot be penetrated unless the receiving round hole (5) is correctly aligned. Therefore, it is necessary to have the duct (D) until then. ) And the nut (8) must be gripped with both hands, which is extremely troublesome in terms of the work of fastening the clamp band (1) and the hanger frame (3) together. Since the work is a so-called work at a high place by standing on a stepladder, it is extremely dangerous and cannot be performed by one person.

【0006】 又、ダクト(D)を天井面(C)からの吊り下げ状態に施工後、その設置高さ を正しく調整するような場合、上記水平貫通ボルト(7)をその受け入れ用丸孔 (4)(5)から一々完全に抜き出さなければならない。蓋し、上記吊りボルト (2)との締結用ナツト(6)が、ハンガー枠(3)の頂面に溶接一体化されて いるため、そのハンガー枠(3)とクランプバンド(1)を締結した状態のまま では、上記吊りボルト(2)に対して回動操作できないからである。その意味か らやり直しの作業となり、やはり頗る面倒である。When the duct (D) is hung from the ceiling surface (C) and then the installation height is properly adjusted, the horizontal through bolt (7) is attached to the receiving round hole ( 4) It must be completely extracted from (5). Since the nut (6) for fastening with the suspension bolt (2) is welded and integrated on the top surface of the hanger frame (3), the hanger frame (3) and the clamp band (1) are fastened. This is because the hanging bolt (2) cannot be pivotally operated in this state. From that point of view, it is a work to be redone, and it is still troublesome.

【0007】 更に、上記吊り金具のハンガー枠(3)はほぼ倒立U字型をなし、その一対の 脚片(3a)(3b)によってクランプバンド(1)の両接合片(1a)(1b )を挟んでいるため、上記ダクト(D)の高さ調整代(h)を大きく確保するこ とができず、その寸法は実際上約25〜30mmにとどまる。Further, the hanger frame (3) of the hanging metal fitting is substantially inverted U-shaped, and the pair of leg pieces (3a) and (3b) of the hanger frame (3) are used to connect both joining pieces (1a) (1b) of the clamp band (1). Since it is sandwiched between them, it is not possible to secure a large height adjustment allowance (h) for the duct (D), and the size is actually only about 25 to 30 mm.

【0008】 そのため、この寸法以上に高くダクト(D)を調整設置する必要が起った場合 には、上記吊りボルト(2)の下端部を切断加工して短かくするか、又は短かい 吊りボルト(2)と交換しなければならない。その現場での作業能率と省力性に 劣ることは、言うまでもない。Therefore, when it becomes necessary to adjust and install the duct (D) higher than this dimension, the lower end of the suspension bolt (2) is cut to make it shorter, or the suspension bolt (2) is suspended. Must be replaced with bolt (2). Needless to say, it is inferior in work efficiency and labor saving at the site.

【0009】[0009]

【課題を解決するための手段】[Means for Solving the Problems]

本考案はこのような課題の改良を企図しており、そのために役立つダクトの吊 り金具として、ダクトを抱持するクランプバンドの切り離し両端部から、一対の 接合マストを外向き一体的に垂立させて、その何れか一方の接合マストには、両 接合マストの締結用となる水平貫通ボルトの軸部を受け入れ得るスライドガイド 長孔を、上下方向への延在状態に開口形成し、残る他方の接合マストには、上記 スライドガイド長孔と対応位置するキー孔を、その上部が上記水平貫通ボルトの 径大な頭部か、又はこれに螺合されるナツトを受け入れ得る丸孔として、又下部 が上記水平貫通ボルトの軸部を受け入れ得る長孔として、その互いに連通する鍵 穴型に開口形成すると共に、その一方又は他方の接合マストから曲げ出した水平 なフツク片に、建物の天井面から垂下する吊りボルトの受け入れ用丸孔を開口形 成したことを特徴とするものである。 The present invention intends to improve such a problem, and as a duct hanging metal fitting useful for that purpose, a pair of joint masts are erected outwardly and integrally from the separated both ends of the clamp band that holds the duct. Then, a slide guide elongated hole capable of receiving the shaft portion of the horizontal through bolt for fastening the both joint masts is formed in one of the joint masts so as to extend in the vertical direction, and the other remains. The joint mast has a key hole corresponding to the long hole of the slide guide, a top part of the key hole is a large diameter head of the horizontal through bolt, or a round hole capable of receiving a nut screwed with the head part, and As a long hole whose lower part can receive the shaft portion of the horizontal through bolt, an opening is formed in a keyhole type communicating with each other, and a horizontal hook piece bent from one or the other of the joining masts is formed. It is characterized in that the receiving for round hole of the hanging bolts hanging from the ceiling surface of the object has form openings form.

【0010】 本考案の上記構成によれば、クランプバンドの切り離し両端部から一体的に垂 立する両接合マストの何れか一方には、その水平貫通ボルトの軸部受け入れ用ス ライドガイド長孔が開口形成されているため、これに水平貫通ボルトを貫通して 、ナツトを螺合締結することにより、その両者を仮り組みの締付け状態に保つこ とができる。According to the above-mentioned configuration of the present invention, the slide guide elongated hole for receiving the shaft portion of the horizontal through bolt is provided on either one of the two joint masts that stand upright from the separated both ends of the clamp band. Since the opening is formed, the nut can be screwed and fastened by penetrating the horizontal through bolt therethrough, and both of them can be maintained in the temporarily assembled tightened state.

【0011】 そして、他方の接合マストには上記スライドガイド長孔と対応位置する鍵穴型 のキー孔が開口形成されているので、その上部の丸孔に上記水平貫通ボルトの径 大な頭部又はナツトを受け入れる如く、その他方の接合マストを上記した一方の 接合マストに接合させることができるのであり、その両接合マストの締結状態で は上記水平貫通ボルトの軸部が、キー孔の下部をなす長孔と上記スライドガイド 長孔に沿って、下方へ滑り落ちるため、離脱するおそれも一切ない。Since a key hole type key hole corresponding to the slide guide elongated hole is formed in the other joining mast, a large head portion of the horizontal through bolt or a large hole of the horizontal through bolt is formed in the upper circular hole. The other joining mast can be joined to the one joining mast described above so as to receive the nut, and the shaft portion of the horizontal through bolt forms the lower part of the key hole when both joining masts are fastened. Sliding guide along the long hole and the slide guide, so there is no risk of separation.

【0012】 又、両接合マストの何れか一方からはフツク片が水平に曲げ出されており、こ れには建物の天井面から垂下する吊りボルトの受け入れ用丸孔が開口形成されて いるので、上記両接合マストを水平貫通ボルトとナツトによる締結状態のままで も、その吊りボルトに対して自由自在に昇降させて、ダクトの設置高さを調整で きるのであり、現場での施工作業性に著しく優れる。A hook piece is bent horizontally from either one of the two joint masts, and a circular hole for receiving a hanging bolt hanging from the ceiling surface of the building is formed in the hook piece. Even if the two joint masts are still fastened with the horizontal through bolts and nuts, the duct installation height can be adjusted by freely moving up and down with respect to the hanging bolts. Remarkably excellent in

【0013】[0013]

【実施例】 以下、図面に基いて本考案の詳細を説明すると、その吊り金具の基本実施例と これによる円形ダクトの吊り下げ施工状態を示した図1〜10において、(D) は一定長さの金属螺旋管やグラスウールなどから成る円形ダクト、(10)はそ のダクト(D)の吊りボルトであり、建物の天井面(C)から予じめ一体的に垂 下されている。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described in detail below with reference to the drawings. In FIGS. 1 to 10 showing a basic embodiment of the hanging metal fittings and a hanging construction state of a circular duct by the hanging metal fitting, (D) is a constant length. A circular duct made of a metal spiral tube or glass wool, (10) is a hanging bolt for the duct (D), which is preliminarily and integrally suspended from the ceiling surface (C) of the building.

【0014】 (11)は上記ダクト(D)を抱持する一定幅(W)のクランプバンドであっ て、亜鉛鉄板やステンレス鋼板などの金属板から、そのダクト(D)の太さより も若干小さな口径の円形に捲き曲げられている。(11) is a clamp band having a constant width (W) that holds the duct (D), and is made of a metal plate such as a zinc-iron plate or a stainless steel plate and slightly smaller than the thickness of the duct (D). It is bent into a circular shape.

【0015】 (12)(13)は上記クランプバンド(11)の切り離し両端部から直径方 向に沿って外方へ一体的に垂立された一対の接合マストであるが、その垂立高さ (H1)(H2)には高低変化が与えられており、その背高く垂立する一方の接 合マスト(12)は吊り下げ用として、そのマスト主体(12a)の上端部から 吊りボルト(10)と直交するフツク片(12b)が水平に曲げ出されている。 (14)はそのフツク片(12b)に開口形成された吊りボルト受け入れ用の丸 孔である。(12) and (13) are a pair of joint masts that are integrally erected outward from the both ends of the clamp band (11) that are separated from each other along the diametrical direction. The height changes are given to (H1) and (H2), and one of the joining masts (12) that stands upright is used for hanging, and the hanging bolt (10) is applied from the upper end of the mast main body (12a). ) And a hook piece (12b) orthogonal to the () are bent horizontally. (14) is a round hole for receiving the hanging bolt formed in the hook piece (12b).

【0016】 この点、図ではその背高く垂立する一方の吊り下げ用接合マスト(12)を、 クランプバンド(11)と同じ一定幅の金属板から正面視のコ字型に折り曲げる ことにより、そのマスト主体(12a)の下端部をクランプバンド(11)への 取付片(12c)として、上記クランプバンド(11)における切り離し一端部 の内面に接合し、且つスポツト溶接やリベツト(15)などによって固定一体化 している。In this regard, in the figure, by bending one of the suspending masts (12) that stands upright from a metal plate having the same constant width as the clamp band (11) into a U-shape when viewed from the front, The lower end of the mast body (12a) is used as an attachment piece (12c) to the clamp band (11) and is joined to the inner surface of one end of the clamp band (11), and by spot welding or riveting (15). It is fixed and integrated.

【0017】 そして、背低く垂立する他方の接合マスト(13)を、やはりクランプバンド (11)と同じ一定幅の金属板から正面視のL字型に折り曲げることにより、そ の一辺を接合片(13a)として、上記吊り下げ用接合マスト(12)のマスト 主体(12a)と背中合わせ状態に垂立させると共に、残る他辺をクランプバン ド(11)への取付片(13b)として、そのクランプバンド(11)における 切り離し他端部の内面に接合させた上、スポツト溶接やリベツト(16)などに より固定一体化している。Then, the other joining mast (13) which stands vertically low is bent from a metal plate having the same constant width as the clamp band (11) into an L-shape when viewed from the front so that one side of the joining mast is joined. As (13a), the hanging joint mast (12) is erected in a back-to-back state with the mast main body (12a), and the remaining other side is used as a mounting piece (13b) to the clamp band (11). The band (11) is separated and joined to the inner surface of the other end, and fixedly integrated by spot welding, a rivet (16) or the like.

【0018】 このように、両接合マスト(12)(13)の取付片(12c)(13b)を クランプバンド(11)の切り離し両端部へ、何れも内側から接合一体化するな らば、その段差(17)がクランプバンド(11)に対するダクト(D)の位置 ズレや空転の抵抗として働き、これを防止できる利点がある。In this way, if the attachment pieces (12c) (13b) of the two joining masts (12) (13) are separated and joined to both ends of the clamp band (11) from the inside, they are integrated. The step (17) serves as a resistance against the positional deviation of the duct (D) with respect to the clamp band (11) and a resistance against idling, and there is an advantage that this can be prevented.

【0019】 又、クランプバンド(11)とその両接合マスト(12)(13)とが、予じ め別個独立しているため、ダクト(D)の太さ変化に際会した場合、そのクラン プバンド(11)の口径や帯幅のみを対応変化させれば足り、上記接合マスト( 12)(13)を汎用できる利点もある。Further, since the clamp band (11) and the joint masts (12) and (13) thereof are separate and independent from each other in advance, when the thickness change of the duct (D) is encountered, the clan of the clamp band It is sufficient to change only the diameter and width of the band (11), and there is an advantage that the above-mentioned joining masts (12) (13) can be used in general.

【0020】 但し、クランプバンド(11)と別個な一対の接合マスト(12)(13)を 、そのクランプバンド(11)へ上記スポツト溶接やリベツト(15)(16) などによって固定一体化する構成に代えて、上記一対の接合マスト(12)(1 3)をクランプバンド(11)の切り離し両端部から連続一体に曲げ起し垂立さ せてもさしつかえない。However, the pair of joining masts (12) and (13) separate from the clamp band (11) are fixedly integrated with the clamp band (11) by the spot welding or the rivets (15) and (16). Instead of this, the pair of joining masts (12) (13) may be separated from the clamp band (11) and continuously bent and raised from both ends to stand up.

【0021】 上記クランプバンド(11)の切り離し両端部から一体的に垂立する一対の接 合マスト(12)(13)は、そのマスト主体(12a)と接合片(13a)と の接合状態において、1本の水平貫通ボルト(18)とナツト(19)により締 結されることになるが、その水平貫通ボルト(18)を受け入れるためのキー孔 (20)が上記背低い接合マスト(13)の接合片(13a)に開口形成されて いる。The pair of contact masts (12) and (13) which stand upright from the separated both ends of the clamp band (11) are connected to each other when the main mast body (12a) and the joint piece (13a) are joined together. It will be fastened with one horizontal through bolt (18) and nut (19), but the key hole (20) for receiving the horizontal through bolt (18) has the above-mentioned short joining mast (13). An opening is formed in the joining piece (13a).

【0022】 そのキー孔(20)は図7から明白なように、上部の径大な丸孔(20a)と 下部の径小な長孔(20b)との連通開口する鍵穴型を呈しており、その丸孔( 20a)によって上記水平貫通ボルト(18)の径大な頭部(18a)か、又は そのボルト(18)に螺合されるナツト(19)を受け入れることができるよう になっていると共に、残る上下方向に沿って細長く延在する径小な長孔(20b )により、上記ボルト(18)の軸部(18b)を受け入れることができるよう になっている。As is apparent from FIG. 7, the key hole (20) has a keyhole shape in which a large-diameter round hole (20a) in the upper portion and a small-diameter long hole (20b) in the lower portion communicate with each other. , The round hole (20a) of the horizontal through bolt (18) allows the large head portion (18a) or the nut (19) screwed to the bolt (18) to be received. At the same time, the shaft portion (18b) of the bolt (18) can be received by a small diameter elongated hole (20b) extending in a slender manner along the remaining vertical direction.

【0023】 他方、上記接合片(13a)と接合される背高い接合マスト(12)のマスト 主体(12a)には、そのキー孔(20)の開口全体と対応位置する径小なスラ イドガイド長孔(21)が、やはり上下方向に沿って細長く開口形成されており 、上記水平貫通ボルト(18)の軸部(18b)を受け入れ得るようになってい る。On the other hand, the mast body (12a) of the tall joining mast (12) joined to the joining piece (13a) has a small-sized slide guide length corresponding to the entire opening of the key hole (20). The hole (21) is also formed to be elongated in the vertical direction so that the shaft portion (18b) of the horizontal through bolt (18) can be received.

【0024】 そのため、図7から示唆される通り、先づ上記水平貫通ボルト(18)の軸部 (18b)を背高い接合マスト(12)側のスライドガイド長孔(21)へ貫通 させ、その軸部(18b)にナツト(19)を螺合した仮り組み状態のもとで、 そのナツト(19)に対して背低い接合マスト(13)側の径大な丸孔(20a )を挿入させることができ、その一対の接合マスト(12)(13)を接合状態 に保てるのであり、そうすれば上記水平貫通ボルト(18)の軸部(18b)は 背低い接合マスト(13)側の長孔(20b)と、背高い接合マスト(12)側 のスライドガイド長孔(21)に沿って、図1〜6のように自づとスライド落下 し、そのボルト(18)の離脱するおそれもない。Therefore, as suggested from FIG. 7, the shaft portion (18b) of the horizontal through bolt (18) is first passed through the slide guide elongated hole (21) on the side of the tall joining mast (12), and Under the provisionally assembled state in which the nut (19) is screwed into the shaft portion (18b), the large round hole (20a) on the side of the short joining mast (13) is inserted into the nut (19). The pair of joining masts (12) and (13) can be kept in a joined state, and then the shaft portion (18b) of the horizontal through bolt (18) has a length on the side of the short joining mast (13). There is also a risk that the bolt (18) may come off along the hole (20b) and the slide guide elongated hole (21) on the side of the tall joint mast (12) by itself, as shown in FIGS. Absent.

【0025】 つまり、上記水平貫通ボルト(18)とナツト(19)とを一々分解する必要 なく、その仮りの締付け状態に螺合したままでも、クランプバンド(11)の両 接合マスト(12)(13)を締結固定すべく、その両接合マスト(12)(1 3)の貫通状態にセツトできる結果となるわけである。その場合、両接合マスト (12)(13)の接合面にはダクト(D)の振動吸収用パツキング(図示省略 )が、予じめの貼り付け状態に介在されることもある。In other words, it is not necessary to disassemble the horizontal through bolt (18) and the nut (19) one by one, and even if they are screwed into the temporary tightened state, the both joint masts (12) ( As a result, both joint masts (12) and (13) can be set in a penetrating state in order to fasten and fix 13). In that case, a vibration absorbing packing (not shown) of the duct (D) may be interposed in a pre-attached state on the joint surfaces of the joint masts (12) and (13).

【0026】 図7では上記水平貫通ボルト(18)に螺合されたナツト(19)を、背低い 接合マスト(13)の径大な丸孔(20a)へ受け入れるようになっているが、 上記ボルト(18)を背高い接合マスト(12)のスライドガイド長孔(21) へ、逆向きに挿入させることによって、そのボルト(18)の頭部(18a)を 背低い接合マスト(13)の径大な丸孔(20a)へ受け入れさせることも可能 である。In FIG. 7, the nut (19) screwed into the horizontal through bolt (18) is received in the large round hole (20a) of the short joint mast (13). By inserting the bolt (18) into the slide guide slot (21) of the tall joint mast (12) in the reverse direction, the head (18a) of the bolt (18) is inserted into the short joint mast (13). It is also possible to let it be received in the large-diameter round hole (20a).

【0027】 何れにしても、水平貫通ボルト(18)の頭部(18a)又はナツト(19) は、これを上記フツク片(12b)と直交する吊りボルト(10)と干渉しない ように、退避させることが好ましい。蓋し、ダクト(D)の設置高さを調整する 際に、その背高い接合マスト(12)の垂立高さ(H1)を高さ調整代(H)と して、極力大きな寸法(実際上約100mm)のもとに活用できるからである。In any case, the head (18a) or nut (19) of the horizontal through bolt (18) is retracted so as not to interfere with the hanging bolt (10) orthogonal to the hook piece (12b). Preferably. When adjusting the installation height of the duct (D) with the lid, use the vertical height (H1) of the tall joint mast (12) as the height adjustment allowance (H), and make it as large as possible (actually). This is because it can be utilized under the condition of about 100 mm above.

【0028】 又、図では上記フツク片(12b)によって吊りボルト(10)へ、先に締結 される背高い接合マスト(12)を固定側として、その固定側接合マスト(12 )のマスト主体(12a)にスライドガイド長孔(21)を開口形成することに より、上記水平貫通ボルト(18)をそのナツト(19)との仮り組み状態とし て、そのガイド長孔(21)へ一層安定良く貫通保持できるように定めると共に 、その後固定側の接合マスト(12)へ閉止状態に接合される可動側の背低い接 合マスト(13)に、鍵穴型のキー孔(20)を対応形成している。Further, in the figure, the tall joint mast (12) that is fastened to the suspension bolt (10) by the hook piece (12b) is fixed side, and the main mast (of the fixed side joint mast (12) ( By forming the slide guide elongated hole (21) in 12a), the horizontal through bolt (18) is temporarily assembled with the nut (19), and the guide elongated hole (21) is more stable. A keyhole-type keyhole (20) is formed on the movable short mast (13) that is fixed to the fixed joint mast (12) and then joined to the fixed mast (12) in a closed state. There is.

【0029】 但し、そのキー孔(20)の径大な丸孔(20a)が径小な長孔(20b)の 直上位置に連通開口する限りでは、逆に背高い接合マスト(12)側のマスト主 体(12a)にキー孔(20)を、背低い接合マスト(13)側の接合片(13 a)にスライドガイド長孔(21)を各々対応形成しても良い。However, as long as the large-diameter round hole (20a) of the key hole (20) communicates with and opens directly above the small-diameter long hole (20b), on the contrary, on the side of the tall joint mast (12). A key hole (20) may be formed in the mast main body (12a), and a slide guide slot (21) may be formed in the joining piece (13a) on the side of the short joining mast (13).

【0030】 上記の構成において、ダクト(D)を建物の天井面(C)へ吊り下げ状態に施 工する当っては、図8、9から明白な通り、そのダクト(D)にクランプバンド (11)を捲き掛け抱持させた後、そのクランプバンド(11)から一体的に垂 立する背高い接合マスト(12)のフツク片(12b)を、天井面(C)から垂 下する吊りボルト(10)へ挿通させて、その吊りボルト(10)に上下一対の ナツト(22)(23)を締結することにより、脱落不能に吊り下げ固定する。In the above structure, when the duct (D) is suspended from the ceiling surface (C) of the building, as is apparent from FIGS. 8 and 9, the clamp band (D) is attached to the duct (D). 11) A hanging bolt for hanging a hook piece (12b) of a tall joint mast (12) which stands up integrally from the clamp band (11) after being wrapped around and held from the ceiling surface (C). It is inserted into (10) and a pair of upper and lower nuts (22) and (23) are fastened to the suspension bolt (10) to suspend and fix the suspension bolt (10) in a non-removable manner.

【0031】 その場合、上記フツク片(12b)に開口する吊りボルト受け入れ用丸孔(1 4)は、所謂バカ孔であり、又その吊りボルト(10)と螺合される上下一対の ナツト(22)(23)は、フツク片(12b)も含む接合マスト(12)と別 個独立しているため、これを回転操作することにより、そのダクト(D)の設置 高さを調整することができる。In that case, the hanging bolt receiving round hole (14) opening in the hook piece (12b) is a so-called stupid hole, and a pair of upper and lower nuts () screwed to the hanging bolt (10). Since 22) and (23) are independent of the joining mast (12) that also includes the hook piece (12b), the installation height of the duct (D) can be adjusted by rotating this. it can.

【0032】 そして、引き続き背高い接合マスト(12)側のスライドガイド長孔(21) へ水平貫通ボルト(18)を挿通させて、これにナツト(19)を仮りの締付け 状態として螺合させた後、そのボルト(18)をキー孔(20)へ受け入れる如 くに、他方の背低い接合マスト(13)を接合させるのである。Then, the horizontal penetrating bolt (18) was continuously inserted into the slide guide elongated hole (21) on the side of the tall joining mast (12), and the nut (19) was screwed into this as a temporary tightened state. Later, the other short mast (13) is joined so that the bolt (18) is received in the keyhole (20).

【0033】 そうすれば、上記水平貫通ボルト(18)は自づとスライド落下して、両接合 マスト(12)(13)からの離脱不能に保たれるので、そのボルト(18)に 対してナツト(19)を締め上げれば良い。そのボルト(18)とナツト(19 )とを予じめほぼ完全に締め上げておき、両接合マスト(12)(13)を貫通 する状態において、上方から叩打することにより、そのボルト(18)を下方へ 押し込み圧入させてもさしつかえない。クランプバンド(11)の口径はダクト (D)の太さよりも若干小さい寸法を有するため、その拡開付勢力を受けたボル ト(18)とナツト(19)が、弛緩するおそれはないからである。By doing so, the horizontal through bolt (18) slides down by itself and is kept incapable of being detached from the joint masts (12) and (13). Tighten the nut (19). The bolt (18) and nut (19) have been tightened almost completely in advance, and the bolt (18) is tapped from above while the joint masts (12) and (13) are penetrated. It doesn't matter if you press down and press fit. Since the diameter of the clamp band (11) is slightly smaller than the diameter of the duct (D), the bolt (18) and nut (19) that receive the expanding biasing force are not likely to loosen. is there.

【0034】 更に、上記吊り下げ施工後ダクト(D)の設置高さを調整する必要が起った場 合には、吊りボルト(10)と締結されている上下一対のナツト(22)(23 )を緩めて、図9と図10との対比から示唆されるように、その吊りボルト(1 0)に沿ってダクト(D)のクランプバンド(11)を昇降させれば足り、その クランプバンド(11)の両接合マスト(12)(13)を、上記水平貫通ボル ト(18)の抜き出し操作により分解する必要は一切ない。Further, when it becomes necessary to adjust the installation height of the duct (D) after the above-mentioned suspension construction, a pair of upper and lower nuts (22) (23) fastened to the suspension bolt (10). ) Is loosened and the clamp band (11) of the duct (D) is moved up and down along the suspension bolt (10) as suggested by the comparison between FIG. 9 and FIG. It is not necessary to disassemble both the joint masts (12) and (13) of (11) by extracting the horizontal through bolt (18).

【0035】 次に、図11は本考案の第1変形実施例を示しており、これではクランプバン ド(11)から背高く垂立する接合マスト(12)のフツク片(12b)を、吊 りボルト(10)との直交状態に締結するに当って、上記基本実施例に説示した 上下一対のナツト(22)(23)に代る1個のナツト(24)を、そのフツク 片(12b)の吊りボルト受け入れ用丸孔(14)へ遊転自在にかしめ付けてい る。Next, FIG. 11 shows a first modified embodiment of the present invention, in which the hook piece (12b) of the joining mast (12) which stands upright from the clamp band (11) is suspended. In fastening the bolt (10) in an orthogonal state, a nut (24), which replaces the pair of upper and lower nuts (22) and (23) described in the basic embodiment, is attached to the hook piece (12b). ) It is swaged freely in the round hole (14) for receiving the hanging bolt.

【0036】 これによれば、そのナツト(24)が上記フツク片(12b)に予じめ保持さ ており、しかもこれを自由自在に回転操作することができるため、そのナツト( 24)と吊りボルト(10)との締結作業や、ダクト(D)における設置高さの 調整作業を一層安楽に能率良く行なえる利点がある。According to this, since the nut (24) is preliminarily held by the hook piece (12b) and can be freely rotated, the nut (24) and the nut (24) can be suspended. There is an advantage that the fastening work with the bolt (10) and the adjustment work of the installation height in the duct (D) can be performed more easily and efficiently.

【0037】 又、図12は本考案の第2変形実施例を示しており、これでは接合マスト(1 2)(13)の一対をクランプバンド(11)の切り離し両端部から、ほぼ同等 の高さとして一体的に垂立させると共に、その一方の接合マスト(12)から水 平に折り曲げたフツク片(12b)を、他方の接合マスト(13)に対応形成し た窓(25)の貫通状態に張り出している。FIG. 12 shows a second modified embodiment of the present invention, in which a pair of the joining masts (12) and (13) are separated from both ends of the clamp band (11) by substantially the same height. As a result, a hook piece (12b), which is made upright integrally and is bent horizontally from one of the joining masts (12), is formed so as to penetrate the window (25) corresponding to the other joining mast (13). Overhangs.

【0038】 これによれば、そのフツク片(12b)が窓(25)を貫通しているため、ダ クト(D)の重量を受けるも、上向きに負け起き変形するおそれがなく、又両接 合マスト(12)(13)の振れ動くおそれもない結果、上記スライドガイド長 孔(21)とキー孔(20)とを自づと正しく対応合致させることができる。According to this, since the hook piece (12b) penetrates the window (25), even if the hook (12) receives the weight of the duct (D), there is no risk of losing and deforming upwards. As a result, there is no possibility that the combined masts (12) and (13) will swing, so that the slide guide elongated hole (21) and the key hole (20) can be properly matched with each other.

【0039】 更に、図13は本考案の第3変形実施例を示しており、これてはクランプバン ド(11)を正10角形やその他の正多角形に折り曲げることによって、その正 多角形のダクト(リニアダクト)(D)を抱持できるようになっている。このよ うな吊り金具としても、本考案を具体化できる趣旨である。Further, FIG. 13 shows a third modified embodiment of the present invention, in which the clamp band (11) is bent into a regular decagon or other regular polygons to form the regular polygon. The duct (linear duct) (D) can be held. The present invention can be embodied as a hanging metal fitting.

【0040】 尚、図11〜13の第1〜3変形実施例におけるその他の構成は、図1〜10 の上記基本実施例と実質的に同一であるため、その図11〜13に図1〜10と の対応符号を記入するにとどめて、その詳細な説明を省略する。Since the other configurations in the first to third modified embodiments of FIGS. 11 to 13 are substantially the same as those of the basic embodiment of FIGS. 1 to 10, FIGS. Only the corresponding symbols with 10 are entered, and the detailed description thereof is omitted.

【0041】[0041]

【考案の効果】[Effect of device]

以上のように、本考案の吊り金具ではその構成上、ダクト(D)を抱持するク ランプバンド(11)の切り離し両端部から、一対の接合マスト(12)(13 )を外向き一体的に垂立させて、その何れか一方の接合マスト(12)には、両 接合マスト(12)(13)の締結用となる水平貫通ボルト(18)の軸部(1 8b)を受け入れ得るスライドガイド長孔(21)を、上下方向への延在状態に 開口形成し、残る他方の接合マスト(13)には、上記スライドガイド長孔(2 1)と対応位置するキー孔(20)を、その上部が上記水平貫通ボルト(18) の径大な頭部(18a)か、又はこれに螺合されるナツト(19)を受け入れ得 る丸孔(20a)として、又下部が上記水平貫通ボルト(18)の軸部(18b )を受け入れ得る長孔(20b)として、その互いに連通する鍵穴型に開口形成 すると共に、その一方又は他方の接合マスト(12)から曲げ出した水平なフツ ク片(12b)に、建物の天井面(C)から垂下する吊りボルト(10)の受け 入れ用丸孔(14)を開口形成してあるため、冒頭に述べた従来技術の諸問題を 完全に改良することができる。 As described above, in the hanging metal fitting of the present invention, due to its structure, the pair of joining masts (12) and (13) are integrated outward from the separated both ends of the clamp band (11) that holds the duct (D). The slide which can stand upright and can receive the shaft portion (18b) of the horizontal through bolt (18) for fastening both joining masts (12) and (13) in one of the joining masts (12). The elongated guide hole (21) is formed so as to extend in the vertical direction, and the remaining joining mast (13) is provided with a key hole (20) corresponding to the slide guide elongated hole (21). , Its upper part is a large diameter head (18a) of the horizontal penetrating bolt (18) or a round hole (20a) capable of receiving a nut (19) screwed thereto, and the lower part is the horizontal penetrating part. Can accept shank (18b) of bolt (18) As long holes (20b), openings are formed in a keyhole shape that communicates with each other, and horizontal hook pieces (12b) bent from one or the other of the joining masts (12) are attached to the ceiling surface (C) of the building. Since the round hole (14) for receiving the hanging bolt (10) hanging from the opening is formed, the problems of the prior art described at the beginning can be completely improved.

【0042】 即ち、本考案の場合クランプバンド(11)の切り離し両端部から一体的に垂 立する両接合マスト(12)(13)の何れか一方には、その両接合マスト(1 2)(13)の締結用となる水平貫通ボルト(18)の軸部(18b)を受け入 れるスライドガイド長孔(21)が開口形成されているため、これに通し込んだ ボルト(18)にナツト(19)を螺合締結することにより、その両者を予じめ 仮り組みの締付け状態に保つことができる。That is, in the case of the present invention, one of the joint masts (12) and (13) that stand upright from the separated both ends of the clamp band (11) is connected to either of the joint masts (12) ( Since the slide guide elongated hole (21) for receiving the shaft portion (18b) of the horizontal through bolt (18) for fastening 13) is formed, the nut (18) is inserted into the nut ( By screwing 19) together, both of them can be preliminarily maintained in the temporarily assembled tightened state.

【0043】 そして、その後他方の接合マスト(13)を上記した一方の接合マスト(12 )と接合させれば良い。そうすれば、他方の接合マスト(13)に対応形成され ているキー孔(20)の丸孔(20a)が、上記水平貫通ボルト(18)の径大 な頭部(18a)又はナツト(19)を受け入れることとなり、そのボルト(1 8)の軸部(18b)は引き続きキー孔(20)の長孔(20b)と上記スライ ドガイド長孔(21)に沿って、下方へ落ち込むために、両接合マスト(12) (13)を自づと完全に締結固定できるわけであり、その現場での施工作業性に 著しく優れる。Then, after that, the other joining mast (13) may be joined to the above-mentioned one joining mast (12). Then, the round hole (20a) of the key hole (20) formed corresponding to the other joining mast (13) has a large head portion (18a) or nut (19) of the horizontal through bolt (18). ), The shaft portion (18b) of the bolt (18) continues to drop downwards along the slot (20b) of the key hole (20) and the slide guide slot (21). Since both joint masts (12) and (13) can be completely fastened and fixed by themselves, the workability at the site is remarkably excellent.

【0044】 その場合、特に請求項2の構成を採用するならば、吊りボルト(10)と締結 されるフツク片(12b)を備えた固定側の接合マスト(12)に、水平貫通ボ ルト(18)の軸部(18b)を受け入れるスライドガイド長孔(21)が開口 形成されているため、予じめ仮り組みの締付け状態として、その長孔(21)に 挿通されるボルト(18)とナツト(19)を、ますます安定に保つことができ る。In this case, particularly when the structure of claim 2 is adopted, the horizontal through bolt () is attached to the fixed-side joining mast (12) provided with the hook piece (12b) to be fastened to the hanging bolt (10). Since the slide guide elongated hole (21) for receiving the shaft portion (18b) of 18) is formed, the bolt (18) inserted into the elongated hole (21) is tightened in the preliminary provisional assembly. The nut (19) can be kept more and more stable.

【0045】 又、請求項4の構成を採用するならば、クランプバンド(11)とその両接合 マスト(12)(13)が別個独立しているため、クランプバンド(11)の口 径や帯幅を変えるだけで、ダクト(D)の太さ変化に対応することができ、両接 合マスト(12)(13)を汎用的に使える効果がある。Further, if the structure of claim 4 is adopted, since the clamp band (11) and both joint masts (12) (13) are independent, the diameter and band of the clamp band (11) are Only by changing the width, it is possible to deal with the change in the thickness of the duct (D), and there is an effect that the double-sided masts (12) and (13) can be used for general purposes.

【0046】 更に、両接合マスト(12)(13)の取付片(12c)(13b)をクラン プバンド(11)の切り離し両端部へ、その内側から接合固定しているため、そ の取付片(12c)(13b)とクランプバンド(11)の内面との相互間に生 ずる段差(17)によって、クランプバンド(11)に対するダクト(D)の位 置ズレや空転を防止できる効果もある。Further, since the attachment pieces (12c) and (13b) of the two joint masts (12) and (13) are separated and fixed to both ends of the clamp band (11) from the inside thereof, the attachment pieces ( The step (17) generated between the inner surfaces of the clamp bands (11c) and (12c) and (13b) also has an effect of preventing displacement of the duct (D) with respect to the clamp band (11) and idling.

【0047】 本考案では請求項1の構成から明白なように、上記両接合マスト(12)(1 3)の何れか一方から曲げ出された水平なフツク片(12b)が、建物の天井面 (C)から垂下する吊りボルト(10)と直交する関係にあり、そのフツク片( 12b)には吊りボルト(10)の受け入れ用丸孔(14)が開口形成されてい るため、上記水平貫通ボルト(18)とナツト(19)による両接合マスト(1 2)(13)の締結固定状態において、そのままでもクランプバンド(11)を 吊りボルト(10)に沿い自由自在に昇降させることができ、ダクト(D)の設 置高さを容易に調整し得る効果もある。According to the present invention, as is apparent from the structure of claim 1, the horizontal hook piece (12b) bent from either one of the both joint masts (12) (13) is the ceiling surface of the building. The hook bolt (10) hanging from (C) is orthogonal to the hook bolt (10), and the hook piece (12b) has a round hole (14) for receiving the hanging bolt (10). In the fastening and fixing state of both joint masts (12) and (13) by the bolt (18) and nut (19), the clamp band (11) can be freely moved up and down along the hanging bolt (10), There is also an effect that the installation height of the duct (D) can be easily adjusted.

【0048】 特に、請求項3の構成を採用するならば、背高く垂立する接合マスト(12) の上端部から上記フツク片(12b)が曲げ出されているため、上記ダクト(D )の高さ調整代(H)をますます大きく確保できることになる。In particular, if the structure of claim 3 is adopted, since the hook piece (12b) is bent out from the upper end of the joining mast (12) which stands upright, the duct (D) is The height adjustment allowance (H) can be secured more and more.

【0049】 又、請求項5の構成を採用するならば、上記接合マスト(12)のフツク片( 12b)と吊りボルト(10)とを締結するに当り、別個なナツト(22)(2 3)を把持する必要がなく、そのフツク片(12b)にかしめ付けられているナ ツト(24)を回転操作すれば足るため、上記ダクト(D)の高さ調整作業を一 層安楽に能率良く行なえる効果がある。Further, if the construction of claim 5 is adopted, when the hook piece (12b) of the joining mast (12) and the suspension bolt (10) are fastened, separate nuts (22) (23) are used. ) Is not required to be gripped, and only the nut (24) crimped to the hook piece (12b) is required to be rotated. Therefore, the height adjustment work of the duct (D) can be performed comfortably and efficiently. There is an effect that can be done.

【図面の簡単な説明】[Brief description of drawings]

【図1】本考案の吊り金具を示す斜面図である。FIG. 1 is a perspective view showing a suspension fitting of the present invention.

【図2】図1の反対方向から見た斜面図である。FIG. 2 is a perspective view seen from the opposite direction of FIG.

【図3】図1の正面図である。FIG. 3 is a front view of FIG.

【図4】図3の右側面図である。FIG. 4 is a right side view of FIG.

【図5】図3の左側面図である。FIG. 5 is a left side view of FIG.

【図6】図5の6−6線断面図である。6 is a sectional view taken along line 6-6 of FIG.

【図7】水平貫通ボルトとナツトによる両接合マストの
締結作用過程を示す斜面図である。
FIG. 7 is a perspective view showing a fastening operation process of both joining masts by a horizontal through bolt and a nut.

【図8】ダクトの吊り下げ施工状態を示す側面図であ
る。
FIG. 8 is a side view showing a suspended construction state of the duct.

【図9】図8の9−9線に沿う拡大断面図である。9 is an enlarged sectional view taken along line 9-9 of FIG.

【図10】図9に対応するダクトの高さ調整状態を示す
断面図である。
FIG. 10 is a sectional view showing a height adjustment state of the duct corresponding to FIG. 9;

【図11】本考案の第1変形実施例を示す部分拡大断面
図である。
FIG. 11 is a partially enlarged sectional view showing a first modified embodiment of the present invention.

【図12】同じく第2変形実施例を示す断面正面図であ
る。
FIG. 12 is a sectional front view showing a second modified example of the same.

【図13】更に第3変形実施例を示す断面正面図であ
る。
FIG. 13 is a sectional front view showing a third modified embodiment.

【図14】従来の吊り金具を示す分解斜面図である。FIG. 14 is an exploded perspective view showing a conventional hanging fitting.

【図15】その吊り金具による従来の吊り下げ施工状態
を示す正面図である。
FIG. 15 is a front view showing a conventional hanging construction state by the hanging metal fitting.

【符号の説明】[Explanation of symbols]

(10)・吊りボルト (11)・クランプバンド (12)・接合マスト (12a)・マスト主体 (12b)・フツク片 (12c)・取付片 (13)・接合マスト (13a)・接合片 (13b)・取付片 (14)・吊りボルト受け入れ用丸孔 (18)・水平貫通ボルト (18a)・頭部 (18b)・軸部 (19)・ナツト (20)・キー孔 (20a)・丸孔 (20b)・長孔 (21)・スライドガイド長孔 (C)・天井面 (D)・ダクト (10) -Suspension bolt (11) -Clamp band (12) -Joining mast (12a) -Mast main body (12b) -Hook piece (12c) -Mounting piece (13) -Joining mast (13a) -Joining piece (13b) ) ・ Mounting piece (14) ・ Round hole for receiving hanging bolt (18) ・ Horizontal through bolt (18a) ・ Head (18b) ・ Shaft (19) ・ Nut (20) ・ Key hole (20a) ・ Round hole (20b) -Long hole (21) -Slide guide long hole (C) -Ceiling surface (D) -Duct

Claims (5)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】ダクト(D)を抱持するクランプバンド
(11)の切り離し両端部から、一対の接合マスト(1
2)(13)を外向き一体的に垂立させて、 その何れか一方の接合マスト(12)には、両接合マス
ト(12)(13)の締結用となる水平貫通ボルト(1
8)の軸部(18b)を受け入れ得るスライドガイド長
孔(21)を、上下方向への延在状態に開口形成し、 残る他方の接合マスト(13)には、上記スライドガイ
ド長孔(21)と対応位置するキー孔(20)を、その
上部が上記水平貫通ボルト(18)の径大な頭部(18
a)か、又はこれに螺合されるナツト(19)を受け入
れ得る丸孔(20a)として、又下部が上記水平貫通ボ
ルト(18)の軸部(18b)を受け入れ得る長孔(2
0b)として、その互いに連通する鍵穴型に開口形成す
ると共に、 その一方又は他方の接合マスト(12)から曲げ出した
水平なフツク片(12b)に、建物の天井面(C)から
垂下する吊りボルト(10)の受け入れ用丸孔(14)
を開口形成したことを特徴とするダクトの吊り金具。
1. A pair of joining masts (1) from both ends of a clamp band (11) for holding a duct (D).
2) The (13) is vertically erected outward, and one of the joining masts (12) is connected to the horizontal through bolt (1) for fastening both joining masts (12) and (13).
The slide guide elongated hole (21) capable of receiving the shaft portion (18b) of 8) is formed so as to extend in the vertical direction, and the slide guide elongated hole (21) is formed in the remaining other joining mast (13). ) Corresponding to the key hole (20), the upper part of which has a large diameter head (18) of the horizontal through bolt (18).
a) or a round hole (20a) capable of receiving a nut (19) screwed thereto, and an elongated hole (2) whose lower portion can receive the shaft portion (18b) of the horizontal through bolt (18).
0b), the opening is formed in a keyhole shape that communicates with each other, and is hung from the ceiling surface (C) of the building on a horizontal hook piece (12b) bent from one or the other joining mast (12). Round hole (14) for receiving bolt (10)
A hanging metal fitting for a duct, characterized in that the opening is formed.
【請求項2】フツク片(12b)の曲げ出された接合マ
スト(12)を固定側として、その固定側の接合マスト
(12)にスライドガイド長孔(21)を開口形成する
一方、 上記固定側の接合マスト(12)と接合される可動側の
接合マスト(13)に、キー孔(20)を開口形成した
ことを特徴とする請求項1記載のダクトの吊り金具。
2. The slide guide elongated hole (21) is formed in the fixing mast (12) on the fixed side while the bent joint mast (12) of the hook piece (12b) is used as the fixed side. The suspension metal fitting for a duct according to claim 1, wherein a key hole (20) is formed in the movable joint mast (13) to be joined to the side joint mast (12).
【請求項3】両接合マスト(12)(13)の垂立高さ
(H1)(H2)を高低変化させ、その背高く垂立する
接合マスト(12)の上端部からフツク片(12b)を
曲げ出すことにより、その接合マスト(12)の垂立高
さ(H1)を高さ調整代(H)として、ダクト(D)の
設置高さを調整できるように定めたことを特徴とする請
求項1記載のダクトの吊り金具。
3. A hook piece (12b) from the upper end portion of the joining mast (12) which stands upright by changing the vertical height (H1) (H2) of both joining masts (12) (13). By bending out the joint mast (12), the standing height (H1) is set as the height adjustment allowance (H) so that the installation height of the duct (D) can be adjusted. The hanging metal fitting for the duct according to claim 1.
【請求項4】両接合マスト(12)(13)をクランプ
バンド(11)と別個独立させて、その下端部から各々
曲げ出した取付片(12c)(13b)を、上記クラン
プバンド(11)の切り離し両端部へ内側から接合し、
且つスポツト溶接やリベツト(15)(16)などによ
り固定一体化したことを特徴とする請求項1記載のダク
トの吊り金具。
4. The clamp band (11) is provided with the joining masts (12) and (13) separated from the clamp band (11) independently of each other, and the mounting pieces (12c) and (13b) respectively bent out from the lower ends thereof. Separate from both sides and join from both sides,
The hanging metal fitting for a duct according to claim 1, characterized in that it is fixedly integrated by spot welding, rivets (15), (16) or the like.
【請求項5】フツク片(12b)に開口形成された吊り
ボルト(10)の受け入れ用丸孔(14)に、その吊り
ボルト(10)と締結されるナツト(24)を遊転自在
にかしめ付けたことを特徴とする請求項1記載のダクト
の吊り金具。
5. A nut (24) fastened to the hanging bolt (10) is freely swaged in a round hole (14) for receiving the hanging bolt (10) formed in the hook piece (12b). The hanging metal fitting for the duct according to claim 1, which is attached.
JP3559693U 1993-06-03 1993-06-03 Duct hanging fittings Expired - Lifetime JPH0726626Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3559693U JPH0726626Y2 (en) 1993-06-03 1993-06-03 Duct hanging fittings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3559693U JPH0726626Y2 (en) 1993-06-03 1993-06-03 Duct hanging fittings

Publications (2)

Publication Number Publication Date
JPH0687793U true JPH0687793U (en) 1994-12-22
JPH0726626Y2 JPH0726626Y2 (en) 1995-06-14

Family

ID=12446194

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3559693U Expired - Lifetime JPH0726626Y2 (en) 1993-06-03 1993-06-03 Duct hanging fittings

Country Status (1)

Country Link
JP (1) JPH0726626Y2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10196632A (en) * 1997-01-17 1998-07-31 Nojimakakusei Seisakusho:Kk Bolt installation structure and piping supporting fitting
KR100913706B1 (en) * 2007-12-06 2009-08-24 (주)대양기연 Hanger with rocker of tube
JP2016075370A (en) * 2014-10-08 2016-05-12 株式会社ツバサ Pipe hanging band mechanism
CN112856786A (en) * 2021-01-19 2021-05-28 宗丽萍 Supply air duct mounting structure of new trend system

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000018436A (en) * 1998-06-30 2000-01-18 Nhk Spring Co Ltd Joining tool for piping support device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10196632A (en) * 1997-01-17 1998-07-31 Nojimakakusei Seisakusho:Kk Bolt installation structure and piping supporting fitting
KR100913706B1 (en) * 2007-12-06 2009-08-24 (주)대양기연 Hanger with rocker of tube
JP2016075370A (en) * 2014-10-08 2016-05-12 株式会社ツバサ Pipe hanging band mechanism
CN112856786A (en) * 2021-01-19 2021-05-28 宗丽萍 Supply air duct mounting structure of new trend system

Also Published As

Publication number Publication date
JPH0726626Y2 (en) 1995-06-14

Similar Documents

Publication Publication Date Title
US5297888A (en) Tubular framing system
US8100368B2 (en) Clamp and seismic sway brace
US7669806B2 (en) Sway brace fitting
US20070145222A1 (en) Hanger
JP2010529392A (en) Clamp and seismic sway reinforcement
JPH0687793U (en) Duct hanging fittings
CA2116555A1 (en) Guard rail fittings
JP4807832B2 (en) Scaffold plate support bracket
US7000362B1 (en) Screening device
JP2860533B2 (en) Surface lattice unit for windows
KR100486894B1 (en) Support for scaffold
JPH086896Y2 (en) Ceiling base muscle abuse hardware
JP3195276B2 (en) Piping support bracket
JPH10122434A (en) Hanging metal fitting for piping
CN218522319U (en) Seam type roof hanging point installation assembly and hanging device
JP2002121866A (en) Reroofing device for seam fastening-type folded roof
CN214062009U (en) Simple to operate's integral buckle structure and antidetonation gallows
JP4279770B2 (en) Air conditioner hanging mount
CN214786346U (en) Clamping installation part, sleeving installation part, hook installation part and assembling operating room
CN219865763U (en) Staple bolt structure for quick installation and connection of intubation tube
JP2000230315A (en) Pipe clamp and scaffold hanger making the same
JP6831979B2 (en) Suspended structure of ceiling beams
JPH10281348A (en) Suspension device for small bore pipe
JPH1194134A (en) Suspension band fitting for refrigerant piping of air conditioner
JPH0683047U (en) Sprinkler attachment