JPH07224465A - Constructing method for concrete house, etc. - Google Patents

Constructing method for concrete house, etc.

Info

Publication number
JPH07224465A
JPH07224465A JP3921494A JP3921494A JPH07224465A JP H07224465 A JPH07224465 A JP H07224465A JP 3921494 A JP3921494 A JP 3921494A JP 3921494 A JP3921494 A JP 3921494A JP H07224465 A JPH07224465 A JP H07224465A
Authority
JP
Japan
Prior art keywords
concrete
floor
wall
walls
concrete wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP3921494A
Other languages
Japanese (ja)
Inventor
Akira Muroboshi
晃 室星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP3921494A priority Critical patent/JPH07224465A/en
Publication of JPH07224465A publication Critical patent/JPH07224465A/en
Pending legal-status Critical Current

Links

Abstract

PURPOSE:To permit constructing a concrete floor and a concrete wall at a construction site, reduce the labor of workmen in operations to erect the concrete wall and other works, accomplish the coupling structure of floor, wall, etc., by means of dovetail coupling, and make laying of electric wirings. telephone lines, gas pipes, and service water piping at the same time as construction of the concrete wall. CONSTITUTION:Rails 21 are laid parallel with bases on both sides of a foundation 11, and an assembly type date-shaped truss 24 is installed on these rails in such a way as capable of traveling freely. A chain block 31 is furnished capable of traveling along a transverse rail which is installed between beams of the truss, and a separating member is laid on the concrete floor, and a provisional frame is circumferentially installed on the oversurface of this separating member., and a concrete wall 2 equipped with reinforcing bars or steel skeleton is built in the aside tumbled condition. A necessary amount of concrete walls are built one after another by the same method, and the walls are raised one by one by traction of the chain block and installed in place fast on the concrete floor.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、建築現場において、鉄
筋又は鉄骨を配設したコンクリート床及びコンクリート
壁を造成して互いに結合することより、家屋又は店舗等
を構築するようにしたコンクリート住宅等の建築工法に
関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a concrete house or the like for constructing a house or a store by constructing a concrete floor and a concrete wall on which reinforcing bars or steel frames are arranged and connecting them at a construction site. Related to the construction method of.

【0002】[0002]

【従来の技術】従来、鉄筋又は鉄骨等を配設したコンク
リート建築物を構築する場合、鉄筋等を組んだ後、仮枠
を付設してその間にコンクリートを流し込み、コンクリ
ートの硬化後に仮枠を外して建物の床部や壁部を構築す
るようにしていたが、特に壁部を構築する場合、壁部の
鉄筋等を挟んで両側に仮枠を設ける必要があるため、狭
隘な建築現場ではこの仮枠の付設が困難であり、仮枠材
料の使用量が多くなると同時に、多大な作業時間を要
し、生産コストが高騰するものであった。
2. Description of the Related Art Conventionally, when constructing a concrete building in which reinforcing bars or steel frames are arranged, after assembling the reinforcing bars, a temporary frame is attached and concrete is poured between them, and the temporary frame is removed after hardening of the concrete. The floors and walls of the building were constructed by using this method.However, especially when constructing walls, temporary frames must be provided on both sides of the reinforcing bars of the walls, so this is not possible on narrow construction sites. It was difficult to attach the temporary frame, the amount of the temporary frame material used was large, and at the same time, a large amount of working time was required, resulting in a high production cost.

【0003】加えて壁部を構築する場合、足場を組んで
の高所作業がほとんどであるため、作業の危険率が高く
なり、作業性が極めて悪いものであった。
In addition, in the case of constructing the wall portion, since most of the work is done at a high place with scaffolding, the work risk is high and the workability is extremely poor.

【0004】[0004]

【発明が解決しようとする課題】このような問題点を解
消するために、本出願人は、鉄筋又は鉄骨を配設したコ
ンクリート床及びコンクリート壁をすべて建築現場で造
成して結合し得る建築工法を案出した(特開平3−54
52号公報)。
In order to solve such a problem, the present applicant has constructed a construction method capable of constructing and joining all concrete floors and concrete walls on which reinforcing bars or steel frames are arranged at a construction site. Was devised (JP-A-3-54)
No. 52).

【0005】この工法は、特開平3−5452号公報の
第1欄第3行乃至第16行に記載されているように、コ
ンクリート床又はコンクリート壁の内部に配設した鉄筋
又は鉄骨を端面から外部に露出しておいて、コンクリー
ト床とコンクリート壁及びコンクリート壁同士を結合す
る際に、露出した鉄筋又は鉄骨を互いに接合するように
したものである。
According to this construction method, as described in JP-A-3-5452, column 1, line 3 to line 16, a reinforcing bar or a steel frame disposed inside a concrete floor or a concrete wall can be removed from the end surface. When exposed to the outside, when the concrete floor and the concrete wall and the concrete walls are joined together, the exposed reinforcing bars or steel frames are joined together.

【0006】ところがこの工法においては、コンクリー
ト床上で造成したコンクリート壁の起立方法が確立され
てなく、作業員の力作業でそれらの起立作業を行うのは
不可能であり、クレーン等を用いる場合は、クレーンの
設置地盤を必要とするものであった。
However, in this construction method, the method of standing up the concrete wall constructed on the concrete floor is not established, and it is impossible to perform the standing up work by the manual work of the worker. When using a crane or the like, , The crane ground was required.

【0007】また、コンクリート床とコンクリート壁及
びコンクリート壁同士を結合する際、端面から露出した
鉄筋又は鉄骨に、互いにずれが生じた場合、それらの接
合が困難になるという問題点があった。
Further, when the concrete floor and the concrete wall and the concrete walls are joined together, if the reinforcing bars or the steel frames exposed from the end faces are displaced from each other, it is difficult to join them.

【0008】さらに、コンクリート床やコンクリート壁
に配設する電気配線、電話線、水道管、ガス管等を、コ
ンクリート床やコンクリート壁の造成後に取り付けるよ
うにすると、これらが床面や壁面に露呈して外観を損な
うばかりか、取り付け工事に面倒な手間を要するもので
あった。
Furthermore, when electrical wiring, telephone lines, water pipes, gas pipes, etc., arranged on a concrete floor or a concrete wall are attached after the construction of the concrete floor or the concrete wall, these are exposed on the floor surface or the wall surface and the external appearance. In addition to damaging the installation, installation work was troublesome.

【0009】本発明はこのような問題点を解消するため
に為されたもので、驅体構造として必要なコンクリート
床とコンクリート壁を建築現場で造成すると共に、コン
クリート壁の起立作業を動力で行うことにより、作業員
の労力を軽減して、作業効率を向上するようにしたコン
クリート住宅等の建築工法を提供することを目的とす
る。
The present invention has been made in order to solve such a problem, and a concrete floor and a concrete wall required as a rod structure are constructed at a construction site, and a standing operation of the concrete wall is performed by power. Accordingly, it is an object of the present invention to provide a construction method for a concrete house or the like that reduces the labor of a worker and improves the work efficiency.

【0010】また、コンクリート床又はコンクリート壁
の内部に配設した鉄筋又は鉄骨の納まりを配慮する必要
がなく、結合作業も簡単な方法で行え、且つ堅固な結合
強度を得られるようにしたコンクリート住宅等の建築工
法を提供することを目的とする。
Further, it is not necessary to consider the accommodation of the reinforcing bars or steel frames arranged inside the concrete floor or the concrete wall, the joining work can be performed by a simple method, and a firm joining strength can be obtained. The purpose is to provide a construction method such as.

【0011】さらに、コンクリート床やコンクリート壁
の造成後に、電気配線、電話線、ガス管、水道管配等を
付設する手間を省き、外観上の見映えも良くしたコンク
リート住宅等の建築工法を提供することを目的とする。
Further, there is provided a construction method for a concrete house or the like, which does not have to be provided with electric wiring, telephone lines, gas pipes, water pipes, etc. after the concrete floor or concrete wall is constructed, and which has a good appearance. The purpose is to

【0012】[0012]

【課題を解決するための手段】上記の目的を達成するた
めに、本発明のコンクリート住宅等の建築工法は、地盤
に造成した土台の上に鉄筋又は鉄骨を配設したコンクリ
ート床を構築すると共に、前記土台の両側の基盤に平行
なレールを敷設し、これらのレールに前記土台を跨いだ
状態で所要高さの組立式門形トラスを走行可能に搭載
し、該門形トラスの梁間に付設した横行レールに沿って
走行自在にチェーンブロックを設ける一方、前記コンク
リート床の面上に介離材を敷設し、該介離材の上面に仮
枠を周設して鉄筋又は鉄骨を配設したコンクリート壁を
横転状態で造成し、さらにこのコンクリート壁の面上に
介離材及び仮枠を設けて他の所定量のコンクリート壁を
順次同方法で造成した後、前記コンクリート壁の夫々を
前記チェーンブロックの牽引によって順次起立して前記
コンクリート床の所定箇所に結合するようにしたのであ
る。
In order to achieve the above object, the construction method for concrete houses and the like of the present invention is to construct a concrete floor in which reinforcing bars or steel frames are arranged on a foundation built in the ground. , Laying parallel rails on the bases on both sides of the base, and movably mounting the prefabricated gate truss of the required height on the rails while straddling the base, and attaching between the beams of the gate truss While the chain block is provided so as to be able to travel along the traversing rail, the interposing material is laid on the surface of the concrete floor, and the temporary frame is provided around the upper surface of the interposing material to dispose the reinforcing bar or the steel frame. After constructing the concrete wall in the overturned state, further providing an interposer and a temporary frame on the surface of the concrete wall to sequentially construct another predetermined amount of the concrete wall by the same method, and then forming each of the concrete walls by the chain. Block It is sequentially standing had to be coupled to a predetermined portion of the concrete floor by pulling the.

【0013】また、前記コンクリート床と前記コンクリ
ート壁の造成時に、前記コンクリート床と前記コンクリ
ート壁及び前記コンクリート壁同士の隣接せる所要箇所
に一対の蟻溝を形成し、前記コンクリート壁の夫々を起
立したときに合致する一対の蟻溝内に補強筋を挿入する
と共にコンクリートを流し込んで硬化させることによ
り、前記コンクリート床と前記コンクリート壁及び前記
コンクリート壁同士を結合するようにするのが好まし
い。
Further, when the concrete floor and the concrete wall are constructed, a pair of dovetail grooves are formed at required positions where the concrete floor and the concrete wall and the concrete walls are adjacent to each other, and each of the concrete walls is erected. It is preferable that the concrete floor, the concrete wall, and the concrete walls are connected to each other by inserting a reinforcing bar into a pair of dovetail grooves that sometimes coincide with each other and pouring concrete to cure the concrete.

【0014】また、前記コンクリート床と前記コンクリ
ート壁の造成時に、それらの内部に電気配線を挿通した
管、水道管又はガス管等の配管を収納しておくようにす
るのが好ましい。
Further, when the concrete floor and the concrete wall are constructed, it is preferable that a pipe such as a pipe through which electric wiring is inserted, a water pipe or a gas pipe is housed therein.

【0015】[0015]

【作用】本発明において、門形トラスはレールにより桁
行方向に走行可能であり、またチェーンブロックは門形
トラスの梁間方向に走行可能であるから、チェーンブロ
ックは桁行方向と梁間方向ともに移動可能であって、自
由な位置で造成後のコンクリート壁を牽引して起立させ
ることができる。また、このチェーンブロックにより他
の材料等を引上げることができる。
In the present invention, since the gate truss can be moved in the girder direction by the rail and the chain block can be moved in the girder direction of the girder truss, the chain block can be moved in the girder direction and the girder direction. Therefore, it is possible to pull up the concrete wall after construction and to stand it up at any position. Also, other materials and the like can be pulled up by this chain block.

【0016】門形トラスは、土台の両側のレールに搭載
され、コンクリート床及びコンクリート壁の造成はすべ
て土台上で行われるから、建築作業に必要な地盤は土台
の両側にレールを付設する地盤を確保するだけでよい。
従って、レールを付設する必要のない側の土台の対向二
辺については、コンクリート床の外方に作業空間を必要
とせず、従って隣接建築物との間隔を非常に狭い幅でと
ることができる。
The gate truss is mounted on rails on both sides of the foundation, and the concrete floor and the concrete wall are all constructed on the foundation. Therefore, the ground required for construction work is the foundation with rails on both sides of the foundation. All you have to do is secure.
Therefore, no working space is required outside the concrete floor for the two opposite sides of the base on the side where it is not necessary to attach the rails, and therefore the space between adjacent buildings can be made very narrow.

【0017】また、本発明においては、土台上でコンク
リート床を構築し、このコンクリート床の平坦性を利用
してコンクリート壁を造成すると共に、さらにこの横転
状態にしたコンクリート壁の平坦性を利用して順次他の
コンクリート壁を造成することができるため、驅体構造
に必要なコンクリート床及びコンクリート壁をすべて建
築現場で造成することができるのである。
Further, in the present invention, a concrete floor is constructed on the foundation, a concrete wall is constructed by utilizing the flatness of the concrete floor, and further, the flatness of the rolled concrete wall is utilized. Since other concrete walls can be sequentially constructed, it is possible to construct all the concrete floors and concrete walls required for the rod structure at the construction site.

【0018】なお、この方法によると、一階のコンクリ
ート壁を結合した後、その上に二階のコンクリート床を
造成することにより、この二階のコンクリート床の平坦
面を利用して二階のコンクリート壁を順次造成すること
ができる。
According to this method, after the concrete walls on the first floor are joined together, a concrete floor on the second floor is formed on the concrete walls, so that the concrete wall on the second floor can be used by utilizing the flat surface of the concrete floor on the second floor. It can be created sequentially.

【0019】従って、本発明は、一層のコンクリート建
築物ばかりでなく、二層以上のコンクリート建築物をも
構築することが可能である。
Therefore, the present invention can construct not only a single-layer concrete building but also a two- or more-layer concrete building.

【0020】コンクリート床とコンクリート壁及びコン
クリート壁同士を結合するために、コンクリート床と夫
々のコンクリート壁の造成の際に形成した蟻溝同士を合
致させ、その内部に補強筋を配してコンクリートで結合
させる方法を用いたため、従来のように鉄筋又は鉄骨の
合わせ作業及び接合を不要とし、結合強度の増強を図
り、作業を簡易化することができる。
In order to connect the concrete floor to the concrete wall and to each other, the dovetail grooves formed during the construction of the concrete floor and the respective concrete walls are matched with each other, and reinforcing bars are arranged inside the dovetail groove to make concrete. Since the joining method is used, it is not necessary to join and join the reinforcing bars or steel frames as in the conventional case, and the joining strength can be increased and the work can be simplified.

【0021】コンクリート床又はコンクリート壁を造成
する際に、電気配線を挿通した管、水道管又はガス管等
の必要な配管をすべて配設して予め埋め込んでおけば、
驅体完成と同時に各配管の施行も完了する。
When constructing a concrete floor or a concrete wall, if all necessary pipes such as pipes through which electric wiring is inserted, water pipes or gas pipes are arranged and embedded in advance,
At the same time as the completion of the body, the implementation of each pipe is also completed.

【0022】[0022]

【実施例】以下、本発明の実施例を図面を参照しながら
説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0023】図1は本発明の建築工法における土台とレ
ールと門形トラスの平面図である。図2乃至図4は本発
明の建築工法を工程順に示す断面図であり、図2は最底
部のコンクリート床の工程を示し、図3はコンクリート
壁の工程を示し、図4は他のコンクリート壁の工程を示
す。図5は図1のA−A線矢示方向に相当する立面図で
あり、図2乃至図4に示した工程によって造成したコン
クリート壁を起立するための門形トラスとチェーンブロ
ックを示す図である。図6はコンクリート床の上にコン
クリート壁を起立して結合した状態を示す部分断面図で
ある。図7は四方のコンクリート壁を起立結合した状態
を示す横断面図である。図8(a) 乃至(c) は蟻溝による
コンクリート壁同士の結合工程を示す斜視図である。図
9(a) 乃至(c) はコンクリート床とコンクリート壁の蟻
溝による結合工程を示す斜視図である。
FIG. 1 is a plan view of a base, rails, and gate trusses in the construction method of the present invention. 2 to 4 are cross-sectional views showing the construction method of the present invention in the order of steps, FIG. 2 shows a step of the bottom concrete floor, FIG. 3 shows a step of concrete wall, and FIG. 4 shows another concrete wall. The process of is shown. FIG. 5 is an elevational view corresponding to the direction of arrow AA in FIG. 1, showing a gate truss and a chain block for erecting a concrete wall constructed by the steps shown in FIGS. 2 to 4. Is. FIG. 6 is a partial cross-sectional view showing a state in which a concrete wall is erected and joined on a concrete floor. FIG. 7 is a cross-sectional view showing a state in which four-sided concrete walls are vertically joined. 8 (a) to 8 (c) are perspective views showing a process of joining concrete walls with a dovetail groove. 9 (a) to 9 (c) are perspective views showing the joining process of the concrete floor and the concrete wall by the dovetail groove.

【0024】図1において、地盤10上に構築した土台
11の両側に沿って、桁行方向に互いに平行にレール用
土台22を付設し、夫々のレール用土台22上にレール
21を二本ずつ平行に固設する。
In FIG. 1, rail bases 22 are provided along the both sides of the base 11 constructed on the ground 10 so as to be parallel to each other in the girder direction, and two rails 21 are parallel to each rail base 22. Fixed to.

【0025】これらのレール21上に門形トラス24を
搭載した状態を示すと、図5のようになる。
FIG. 5 shows a state in which the portal truss 24 is mounted on the rails 21.

【0026】各レール用土台22上にレール21を二本
ずつ固設したのは、その上に搭載する門形トラス24の
支持強度或は起立状態の安定性を図るためである。門形
トラス24を現場で組み立てるには、まず片側ずつのト
ラス柱25を組み立て、各トラス柱25の下端に支持プ
レート25aを固定して、少なくとも4個の車輪26を
四方に配置し、これらの車輪26を介して各トラス柱2
5を片側二本ずつのレール21上に搭載する。この状態
で両側のトラス柱25、25は夫々自立した状態とな
る。
Two rails 21 are fixedly mounted on each rail base 22 for the purpose of supporting strength of the gate-shaped truss 24 mounted thereon or stability of the standing state. In order to assemble the portal truss 24 on site, first assemble the truss pillars 25 on one side, fix the support plate 25a to the lower end of each truss pillar 25, and arrange at least four wheels 26 in four directions. Each truss pillar 2 via wheels 26
5 are mounted on two rails 21 on each side. In this state, the truss posts 25, 25 on both sides are in a self-supporting state.

【0027】次いで両側のトラス柱25、25にトラス
梁27を架設して成る門形トラス24の水平荷重に対抗
してトラス柱25とトラス梁27の各隅部に筋交い28
を固設する。トラス柱25とトラス梁27は鉄骨材のト
ラス構造とし、現場で組み立てて分解できる構造とす
る。
Next, the truss columns 25 and 25 are braced to the corners of the truss column 25 and the truss beam 27 against the horizontal load of the portal truss 24, which is constructed by arranging the truss beams 27 on the truss columns 25.
To be fixed. The truss pillars 25 and the truss beams 27 have a truss structure made of steel aggregate and can be assembled and disassembled on site.

【0028】トラス梁27の下面に沿って梁間方向に横
行レール29を付設してある。この横行レール29に沿
って走行自在にチェーンブロック31が設けてある。チ
ェーンブロック31は電動モータで自走する一般構造を
有し、不図示の押釦コードにより遠隔操作することがで
きる。
A traverse rail 29 is attached along the lower surface of the truss beam 27 in the beam-to-beam direction. A chain block 31 is provided so as to run freely along the traverse rail 29. The chain block 31 has a general structure that is self-propelled by an electric motor, and can be remotely operated by a push button cord (not shown).

【0029】チェーンブロック31にはロードチェーン
32が動力により牽引可能に垂下してあり、ロードチェ
ーン32の下端に設けたフック33を後述するコンクリ
ート壁2(図5においては、起立途中のコンクリート壁
2’として示してある)を縛りつけたロープ34等に引
っ掛け、この状態でチェーンブロック31の横行走行と
門形トラス24の縦行走行により該チェーンブロック3
1を自由な位置に移動することができる。
A load chain 32 hangs down on the chain block 31 so that it can be pulled by power, and a hook 33 provided at the lower end of the load chain 32 is used for the concrete wall 2 (in FIG. 5, the concrete wall 2 in the process of standing up). (Indicated as') is hooked on the rope 34 etc. which is tied up, and in this state, the chain block 3 is traversed and the gate truss 24 is traversed longitudinally.
1 can be moved to any position.

【0030】ここで、土台11上に構築する驅体構築の
工法を、図2乃至図4を用いて説明する。
Here, a method of constructing the rod body constructed on the base 11 will be described with reference to FIGS. 2 to 4.

【0031】まず、図2に示すように、土台11の隙間
を埋めるように床用仮枠12aを固設し、土台11と床
用仮枠12aとの成す上面を平坦にし、土台11の側面
に沿って端面用仮枠12bを付設し、床用仮枠12a上
に鉄筋6又は鉄骨を組んだ後、生コンクリート20を所
定厚さだけ流し込んでコンクリート床1の板材を造成す
る。このコンクリート床1の床面には必要により孔部1
3や段差部14を空けておく。
First, as shown in FIG. 2, the floor temporary frame 12a is fixedly installed so as to fill the gap of the base 11, the upper surface of the base 11 and the floor temporary frame 12a is made flat, and the side surface of the base 11 is fixed. The end face temporary frame 12b is attached along the above, the reinforcing bars 6 or steel frames are assembled on the floor temporary frame 12a, and then the fresh concrete 20 is poured into the concrete frame 1 by a predetermined thickness to form a plate material of the concrete floor 1. The floor surface of this concrete floor 1 may have holes 1 if necessary.
3 and step 14 are left open.

【0032】また、生コンクリート20を流し込む前
に、電気配線を挿通した管、水道管又はガス管等の必要
な配管7をすべて配設して予め埋め込んでおく。この配
管7として、蛇腹式の屈曲性に富むプラスチック管を使
用すれば、内部の鉄筋6等を避けて配置することができ
る。
Before pouring the ready-mixed concrete 20, all necessary pipes 7 such as pipes through which electric wiring is inserted, water pipes, gas pipes, etc. are arranged and embedded in advance. If a flexible bellows type plastic tube is used as the pipe 7, it can be arranged avoiding the internal reinforcing bars 6 and the like.

【0033】さらに、コンクリート床1を造成する際
に、図9に示すように、後述するコンクリート壁2との
接合面の必要箇所に蟻溝3を形成しておく。この蟻溝3
の形成方法は、蟻溝形の板材を形成箇所に配置してお
き、コンクリート硬化後にこれを抜き取る方法によれば
よい。
Further, when constructing the concrete floor 1, as shown in FIG. 9, a dovetail groove 3 is formed in a necessary portion of a joint surface with a concrete wall 2 which will be described later. This dovetail 3
The dope groove may be formed by arranging a dovetail-shaped plate material at the formation site and removing it after hardening the concrete.

【0034】次に、図3において、孔部13上面を板材
で塞ぐか、発泡スチロール樹脂板で閉塞し、段差部14
は仮枠を設ける等してコンクリート床1の床面を略平坦
にした後、コンクリート床1の上面にビニールシート等
の介離材4を敷設する。このビニールシートはコンクリ
ートとの剥離性に優れ、可撓性にも富み、安価であるの
で剥離材として好適するものである。
Next, referring to FIG. 3, the upper surface of the hole 13 is closed with a plate material or a styrene foam plate, and the step portion 14 is formed.
After the floor surface of the concrete floor 1 is made substantially flat by providing a temporary frame or the like, the interposing material 4 such as a vinyl sheet is laid on the upper surface of the concrete floor 1. This vinyl sheet is suitable as a release material because it has excellent releasability from concrete, is highly flexible, and is inexpensive.

【0035】そして、介離材4上にコンクリート壁2の
周囲を形成するための壁用仮枠5を設け、出入口孔及び
窓孔等の開口部15に壁2の厚さと等しい肉厚の発泡ス
チロール樹脂板16を付設した後、鉄骨又は鉄筋6を組
み、生コンクリート20を流し込んでコンクリート壁2
を造成する。
Then, a temporary wall frame 5 for forming the periphery of the concrete wall 2 is provided on the spacer 4, and a foamed polystyrene having a wall thickness equal to the thickness of the wall 2 is provided in the openings 15 such as entrance and exit holes and window holes. After attaching the resin plate 16, the steel frame or the reinforcing bar 6 is assembled, and the fresh concrete 20 is poured into the concrete wall 2
To create.

【0036】なお、図3には、コンクリート床1上の剥
離材4の上面で、二枚のコンクリート壁2、2を同時に
造成するようにしてある。これは、コンクリート床1の
面で二枚のコンクリート壁2、2が造成できることを示
すものである。この場合、必要に応じて二枚分の壁用仮
枠5を設ける。このように、狭い二枚のコンクリート壁
2、2を並設すれば、その上面を次ぎの他の広いコンク
リート壁2の造成用として利用するのに必要な面積を確
保することができるのである。
In FIG. 3, two concrete walls 2 and 2 are simultaneously formed on the upper surface of the peeling material 4 on the concrete floor 1. This shows that two concrete walls 2 and 2 can be formed on the surface of the concrete floor 1. In this case, two wall temporary frames 5 are provided as needed. In this way, by arranging two narrow concrete walls 2 in parallel, it is possible to secure an area required for using the upper surface of the concrete wall 2 for the construction of another wide concrete wall 2.

【0037】このとき、蟻溝3を、コンクリート壁2に
も、図9のコンクリート床1の蟻溝3との対向位置と、
図8のコンクリート壁2同士の角部にも設ける。こうし
て、図3に示すように、介離材4上に二枚のコンクリー
ト壁2、2を横転した状態で造成する。
At this time, the dovetail groove 3 is also provided on the concrete wall 2 at a position facing the dovetail groove 3 of the concrete floor 1 of FIG.
It is also provided at the corners between the concrete walls 2 in FIG. Thus, as shown in FIG. 3, two concrete walls 2 and 2 are formed on the spacer 4 in a state of being laterally rolled.

【0038】次に、図4において、コンクリート壁2、
2が硬化した後、その上面に介離材4を付設し、この上
にさらに残りの壁2を上記と同方法で造成する。この場
合にも、両コンクリート壁2の開口部15等に発泡スチ
ロール樹脂板16を詰め込み、上面をできるだけ平坦に
する。
Next, referring to FIG. 4, the concrete wall 2,
After the 2 is hardened, the spacer 4 is attached to the upper surface thereof, and the remaining wall 2 is further formed thereon by the same method as described above. Also in this case, the foamed polystyrene resin plate 16 is packed in the openings 15 and the like of both concrete walls 2 to make the upper surfaces as flat as possible.

【0039】なお、図4のコンクリート壁2は広い側の
壁を造成する場合を示すが、コンクリート床1の面積が
狭い場合は、コンクリート壁2を分割して造成してお
き、後で結合すればよい。このとき、コンクリート壁2
同士の継ぎ手部にも一対の蟻溝3、3を対向位置に形成
しておく。
The concrete wall 2 in FIG. 4 shows a case where the wide side wall is constructed. When the concrete floor 1 has a small area, the concrete wall 2 is divided and constructed, and the concrete wall 2 is joined later. Good. At this time, concrete wall 2
A pair of dovetail grooves 3 and 3 are also formed in the joint portion of each other at opposing positions.

【0040】また、各コンクリート壁2の造成の際、コ
ンクリート床1の場合と同様に、生コンクリート20を
流し込む前に、電気配線を挿通した管、水道管又はガス
管等の必要な配管7をすべて配設して予め埋め込んでお
く。
When each concrete wall 2 is constructed, as in the case of the concrete floor 1, before pouring the ready-mixed concrete 20, a necessary pipe 7 such as a pipe through which electric wiring is inserted, a water pipe or a gas pipe is installed. All are installed and embedded in advance.

【0041】そして、最上段のコンクリート壁2が硬化
した後、上記のチェーンブロック31を用いて各コンク
リート壁2、2、…の起立作業を行う。
After the top concrete wall 2 is hardened, the concrete blocks 2, 2, ... Are erected using the chain block 31.

【0042】この作業は、図5に示すように、チェーン
ブロック31の横行走行と門形トラス24の縦行走行に
よりチェーンブロック31を所定位置に移動し、チェー
ンブロック31からロードチェーン32を引き出して下
端のフック33をコンクリート壁2に縛りつけたロープ
34等に引っ掛け、さらにチェーンブロック31と門形
トラス24の移動により、コンクリート壁2を牽引して
起立させる。
In this work, as shown in FIG. 5, the chain block 31 is moved to a predetermined position by the traverse running of the chain block 31 and the traverse running of the gate truss 24, and the load chain 32 is pulled out from the chain block 31. The lower end hook 33 is hooked on the rope 34 or the like bound to the concrete wall 2, and the concrete block 2 is pulled up by the movement of the chain block 31 and the gate truss 24.

【0043】図5には、起立途中のコンクリート壁2’
(一点鎖線)と起立を終了した状態のコンクリート壁
2”(二点鎖線)が図示してある。
FIG. 5 shows a concrete wall 2'in the process of standing up.
(One-dot chain line) and the concrete wall 2 ″ (two-dot chain line) in the state where the standing is completed are illustrated.

【0044】こうして、コンクリート壁2、2…を所定
位置に起立すると共に、図8(a) 乃至(c) 及び図9(a)
乃至(c) の工程に従ってコンクリート床1とコンクリー
ト壁2又はコンクリート壁2、2同士の結合を行う。
In this way, the concrete walls 2, 2 ... Are erected at predetermined positions, and at the same time as shown in FIGS. 8 (a) to 8 (c) and 9 (a).
According to the steps (c) to (c), the concrete floor 1 and the concrete wall 2 or the concrete walls 2 and 2 are connected to each other.

【0045】この結合方法は、コンクリート床1とコン
クリート壁2又はコンクリート壁2、2同士の端面を合
致したときに形成される一対の蟻溝3、3の成す空所に
縦筋9aを複数の横筋9bで連結した補強筋8を挿入
し、生コンクリート20を流し込んで硬化させればよ
い。
In this joining method, a plurality of vertical streaks 9a are provided in the void formed by the pair of dovetail grooves 3 and 3 formed when the concrete floor 1 and the concrete wall 2 or the end faces of the concrete walls 2 and 2 are matched with each other. The reinforcing bar 8 connected by the horizontal bar 9b may be inserted, and the fresh concrete 20 may be poured and cured.

【0046】なお、コンクリート床1とコンクリート壁
2又はコンクリート壁2、2同士の接合面を接着剤或は
シーリング剤等を介して接合すれば、互いの接合面の結
合力が増強するうえ、水分の浸透を防止することができ
る。
If the concrete floor 1 and the concrete wall 2 or the joint surfaces of the concrete walls 2 and 2 are joined together by an adhesive or a sealing agent, the bonding force between the joint surfaces is increased and the moisture content is increased. Can be prevented.

【0047】上記工程によって建築驅体が完了するもの
であり、同時にコンクリート内に予め埋め込んでおいた
各種配管7はその施行をすべて完了しているのであるか
ら、直ちに配電設備、水道の蛇口、ガス器具接続口等の
取り付けを行うことができるのである。
The construction steps are completed by the above steps, and at the same time, the various pipes 7 which have been previously embedded in the concrete have all been completed. Therefore, immediately the power distribution equipment, the tap of the water supply, and the gas. It is possible to attach a device connection port or the like.

【0048】また、コンクリート壁2、2…の上端に屋
根を葺く。この際にも門形トラス24とチェーンブロッ
ク31を利用することができる。
Further, a roof is roofed on the upper ends of the concrete walls 2, 2. Also in this case, the gate truss 24 and the chain block 31 can be used.

【0049】またコンクリート壁2、2…上に階上を造
成する場合、従来の工法に従って二階部分の床を構築す
るか、図6に示すように、コンクリート壁2、2…の上
端に予め蟻溝3、3…を形成しておき、二階部分の床を
上記の最下部のコンクリート床1として、その上に上記
と同様の方法で二階部分を建造する。
Further, when the upper floor is to be constructed on the concrete walls 2, 2, ..., the floor of the second floor is constructed according to the conventional construction method, or as shown in FIG. The grooves 3, 3 ... Are formed, and the floor of the second floor is used as the bottom concrete floor 1 described above, and the second floor is constructed on it by the same method as described above.

【0050】なお、本発明において、門形トラス24と
チェーンブロック31とは、コンクリート壁2の起立用
として説明してあるが、各コンクリート壁2を起立して
結合後に、門形トラス24の移動性を利用して壁の装飾
施行、屋根の葺き作業等に適宜使用できる。また、この
チェーンブロックにより他の材料等を引上げることがで
きる。
In the present invention, the portal truss 24 and the chain block 31 have been described as being used to erect the concrete wall 2. However, after the concrete walls 2 are erected and joined, the portal truss 24 is moved. It can be used for wall decoration and roofing work, etc. Also, other materials and the like can be pulled up by this chain block.

【0051】[0051]

【発明の効果】以上説明したように、本発明のコンクリ
ート住宅等の建築工法によれば、横転状態に造成したコ
ンクリート床とコンクリート壁の上面の平坦性をそのま
ま利用して他のコンクリート床及びコンクリート壁を順
次横転状態に造成していくことができるから、従来の工
法における壁用の仮枠を用いずに各コンクリート板材を
建築物の内方ですべて建造することができ、従来の仮枠
を付設する余裕のない狭隘な敷地においても本発明によ
る建築物の構築が可能となるのである。
As described above, according to the method for constructing a concrete house or the like of the present invention, the concrete floor constructed in a rollover state and the flatness of the upper surface of the concrete wall are used as they are for other concrete floors and concrete. Since it is possible to construct the walls in the overturned state one by one, it is possible to construct each concrete plate material entirely inside the building without using the temporary frame for walls in the conventional construction method. It is possible to construct a building according to the present invention even in a narrow site where there is no room to attach.

【0052】また、上記の方法を順次繰り返して階上へ
と築造することにより多層のコンクリート住宅にも適用
可能である。
Further, it is applicable to a multi-layer concrete house by repeating the above-mentioned method and building it upstairs.

【0053】また、造成したコンクリート壁を起立させ
る作業に関して、桁行方向に移動可能な門形トラスと梁
間方向に移動可能なチェーンブロックを用いて、硬化後
のコンクリート壁を起立することができるため、作業員
の力作業を軽減し、又はクレーン使用の際の必要地盤を
不要とするのである。
Further, regarding the work of standing up the constructed concrete wall, the hardened concrete wall can be standing up by using the gate truss movable in the girder direction and the chain block movable in the beam direction. It reduces the manual labor of workers or eliminates the need for the ground when using cranes.

【0054】さらに、各コンクリート部材の結合手段と
して採用した蟻溝による結合方法は、接合すべき部材間
の一体的性に優れ、高強度のジョイント構造を実現する
ことができ、しかも対向する蟻溝内には塑性体であるコ
ンクリートを充填するのであるから、互いの蟻溝の合致
状態にずれが生じても、接合すべきコンクリート部材の
納まりを優先して連結することが可能となる。
Further, the dovetail-joining method adopted as the joining means for the respective concrete members is excellent in the integrity of the members to be joined and can realize a high-strength joint structure. Since concrete, which is a plastic body, is filled inside, it is possible to connect the concrete members to be joined with priority, even if there is a deviation in the matching state of the dovetail grooves.

【0055】また、コンクリート床又はコンクリート壁
を造成する際に、予め、電気配線を挿通した管、水道管
又はガス管等の必要な配管をすべて埋め込んでおくよう
にしたから、驅体完成後の配管施行の手間が省け、床又
は壁内配管の施行をもコンクリート床及びコンクリート
壁の造成時に一括して行うことができる。
Further, when the concrete floor or the concrete wall is constructed, all the necessary pipes such as pipes through which electric wiring is inserted, water pipes or gas pipes are embedded in advance. The time and effort for implementing the piping can be saved, and the piping in the floor or wall can be implemented collectively when the concrete floor and the concrete wall are constructed.

【図面の簡単な説明】[Brief description of drawings]

【図1】図1は本発明の建築工法における土台とレール
と門形トラスの平面図である。
FIG. 1 is a plan view of a base, a rail, and a gate truss in the construction method of the present invention.

【図2】図2は本発明の建築工法における最底部のコン
クリート床の工程を示す縦断面図である。
FIG. 2 is a vertical cross-sectional view showing a process of the concrete floor at the bottom in the building method of the present invention.

【図3】図3は本発明の建築工法におけるコンクリート
壁の工程を示す縦断面図である。
FIG. 3 is a vertical cross-sectional view showing a process of a concrete wall in the construction method of the present invention.

【図4】図4は本発明の建築工法における他のコンクリ
ート壁の工程を示す縦断面図である。
FIG. 4 is a vertical sectional view showing another concrete wall process in the building method of the present invention.

【図5】図5は図1のA−A線矢示方向に相当する立面
図であり、図2乃至図4に示した工程によって造成した
コンクリート壁を起立するための門形トラスとチェーン
ブロックを示す図である。
5 is an elevational view corresponding to the direction of arrow AA in FIG. 1, and is a gate truss and chain for standing up the concrete wall constructed by the steps shown in FIGS. 2 to 4. It is a figure which shows a block.

【図6】図6は本発明の建築工法におけるコンクリート
床の上にコンクリート壁を起立して結合した状態を示す
部分断面図である。
FIG. 6 is a partial cross-sectional view showing a state in which a concrete wall is erected and joined on a concrete floor in the construction method of the present invention.

【図7】図7は本発明の建築工法における四方のコンク
リート壁を起立結合した状態を示す横断面図である。
FIG. 7 is a transverse cross-sectional view showing a state in which concrete walls on four sides are erected and joined in the construction method of the present invention.

【図8】図8(a) 乃至(c) は本発明の建築工法における
蟻溝によるコンクリート壁同士の結合工程を示す斜視図
である。
8 (a) to 8 (c) are perspective views showing a step of joining concrete walls with a dovetail groove in the construction method of the present invention.

【図9】図9(a) 乃至(c) は本発明の建築工法における
コンクリート床とコンクリート壁の蟻溝による結合工程
を示す斜視図である。
9 (a) to 9 (c) are perspective views showing a step of joining a concrete floor and a concrete wall by means of a dovetail groove in the construction method of the present invention.

【符合の説明】[Explanation of sign]

1…コンクリート床、2…コンクリート壁、3…蟻溝、
4…介離材、5…壁用仮枠、6…壁、7…配管、8…空
所、9…補強筋、10…地盤、11…土台、12a…床
用仮枠、12b…端面用仮枠、20…生コンクリート、
21…レール、24…門形トラス、25…トラス柱、2
7…トラス梁、31…チェーンブロック、32…ロード
チェーン。
1 ... Concrete floor, 2 ... Concrete wall, 3 ... Dovetail,
4 ... Spacer, 5 ... Wall temporary frame, 6 ... Wall, 7 ... Piping, 8 ... Vacancy, 9 ... Reinforcing bar, 10 ... Ground, 11 ... Base, 12a ... Floor temporary frame, 12b ... End face Temporary frame, 20 ... Ready-mixed concrete,
21 ... Rail, 24 ... Gate truss, 25 ... Truss pillar, 2
7 ... Truss beam, 31 ... Chain block, 32 ... Road chain.

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】地盤に造成した土台の上に鉄筋又は鉄骨を
配設したコンクリート床を構築すると共に、前記土台の
両側の基盤に平行なレールを敷設し、これらのレールに
前記土台を跨いだ状態で所要高さの組立式門形トラスを
走行可能に搭載し、該門形トラスの梁間に付設した横行
レールに沿って走行自在にチェーンブロックを設ける一
方、前記コンクリート床の面上に介離材を敷設し、該介
離材の上面に仮枠を周設して鉄筋又は鉄骨を配設したコ
ンクリート壁を横転状態で造成し、さらにこのコンクリ
ート壁の面上に介離材及び仮枠を設けて他の所定量のコ
ンクリート壁を順次同方法で造成した後、前記コンクリ
ート壁の夫々を前記チェーンブロックの牽引によって順
次起立して前記コンクリート床の所定箇所に結合するよ
うにしたことを特徴とするコンクリート住宅等の建築工
法。
1. A concrete floor in which reinforcing bars or steel frames are arranged on a foundation built on the ground, parallel rails are laid on the foundations on both sides of the foundation, and the foundation is straddled by these rails. In this state, a prefabricated gate truss of a required height is mounted so that it can travel, and a chain block is provided so that it can travel freely along the traverse rail attached between the beams of the gate truss, while it is separated on the surface of the concrete floor. Material is laid, and a temporary frame is provided around the upper surface of the spacer to create a concrete wall in which the reinforcing bars or steel frames are arranged in a horizontal state, and the spacer and temporary frame are further formed on the surface of the concrete wall. It is characterized in that after the other concrete walls are provided and another predetermined amount of concrete walls are sequentially constructed by the same method, each of the concrete walls is sequentially erected by the pulling of the chain block and is connected to a predetermined portion of the concrete floor. Construction methods of concrete housing, etc. to.
【請求項2】前記コンクリート床と前記コンクリート壁
の造成時に、前記コンクリート床と前記コンクリート壁
及び前記コンクリート壁同士の隣接せる所要箇所に一対
の蟻溝を形成し、前記コンクリート壁の夫々を起立した
ときに合致する一対の蟻溝内に補強筋を挿入すると共に
コンクリートを流し込んで硬化させることにより、前記
コンクリート床と前記コンクリート壁及び前記コンクリ
ート壁同士を結合するようにしたことを特徴とする請求
項1記載のコンクリート住宅等の建築工法。
2. When forming the concrete floor and the concrete wall, a pair of dovetail grooves are formed at required positions where the concrete floor and the concrete wall and the concrete walls are adjacent to each other, and each of the concrete walls is erected. The concrete floor, the concrete wall, and the concrete walls are connected to each other by inserting a reinforcing bar into a pair of dovetail grooves that sometimes match and pouring concrete to cure the concrete floor. 1. Construction method for concrete houses, etc.
【請求項3】前記コンクリート床と前記コンクリート壁
の造成時に、それらの内部に電気配線等を挿通した管、
水道管又はガス管等の配管を収納しておくようにしたこ
とを特徴とする請求項1記載のコンクリート住宅等の建
築工法。
3. A pipe having electric wires inserted therein when the concrete floor and the concrete wall are constructed,
The method for constructing a concrete house or the like according to claim 1, wherein a pipe such as a water pipe or a gas pipe is stored.
JP3921494A 1994-02-14 1994-02-14 Constructing method for concrete house, etc. Pending JPH07224465A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3921494A JPH07224465A (en) 1994-02-14 1994-02-14 Constructing method for concrete house, etc.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3921494A JPH07224465A (en) 1994-02-14 1994-02-14 Constructing method for concrete house, etc.

Publications (1)

Publication Number Publication Date
JPH07224465A true JPH07224465A (en) 1995-08-22

Family

ID=12546893

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3921494A Pending JPH07224465A (en) 1994-02-14 1994-02-14 Constructing method for concrete house, etc.

Country Status (1)

Country Link
JP (1) JPH07224465A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017098749A1 (en) * 2015-12-08 2017-06-15 三菱重工コンプレッサ株式会社 Rotor tool

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017098749A1 (en) * 2015-12-08 2017-06-15 三菱重工コンプレッサ株式会社 Rotor tool

Similar Documents

Publication Publication Date Title
US4372906A (en) Method and apparatus for pre-casting steel reinforced concrete box-like modules
US4211043A (en) Precast concrete building module form
US4495131A (en) Method for pre-casting steel reinforced concrete box-like modules
CN111218983A (en) Lattice formula structure concrete frame house
US4378664A (en) System for constructing a building
KR100296723B1 (en) Construction method such as concrete house
JPH07224465A (en) Constructing method for concrete house, etc.
KR20130022656A (en) Hybrid building construction method combining dry type and wet type
JP3582027B2 (en) Construction method for concrete houses, etc.
JP5166055B2 (en) Construction method of multistory parking lot
JPH05311617A (en) Construction method for elevated structure
JPH0718734A (en) Constructing method for reinforced concrete building structure
KR102289243B1 (en) Underground Parking Lot Construction Method Using Pre-assembled bar column, U-shaped beam, Corrugated deck
JPH08165662A (en) Construction method of underground structure
TWI723407B (en) Transport method for construction materials
JPH10317661A (en) Erection scaffolding used for outer peripheral part reinforcing of existing building
CN212926452U (en) Joint connecting device for assembly type building frame
JP2832278B2 (en) Building method
JP2972956B2 (en) Column and beam joining method and its structure
JPS6363849A (en) Structural member for pillar
WO2020222630A1 (en) Hollow core slab manufactured by vibration casting without formwork
JPH07207763A (en) Building construction method for concrete house or the like
RU2087650C1 (en) House-building combine
JPH0899795A (en) Crane device for construction and construction method
EA040697B1 (en) MULTI-HOLLOW-HOUSE PLATE FOR THE SBC SYSTEM OF A PREFABRICATED GAMBER-LESS FRAME