CN212926452U - Joint connecting device for assembly type building frame - Google Patents

Joint connecting device for assembly type building frame Download PDF

Info

Publication number
CN212926452U
CN212926452U CN202021007583.8U CN202021007583U CN212926452U CN 212926452 U CN212926452 U CN 212926452U CN 202021007583 U CN202021007583 U CN 202021007583U CN 212926452 U CN212926452 U CN 212926452U
Authority
CN
China
Prior art keywords
prefabricated
node
steel bars
shaped steel
longitudinal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021007583.8U
Other languages
Chinese (zh)
Inventor
孙峻岭
成志勇
何永平
杨林
陈清华
雷文斌
芮斯瑜
凌致远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hanyang International Engineering Consulting Co Ltd
Original Assignee
Hanyang International Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hanyang International Engineering Consulting Co Ltd filed Critical Hanyang International Engineering Consulting Co Ltd
Priority to CN202021007583.8U priority Critical patent/CN212926452U/en
Application granted granted Critical
Publication of CN212926452U publication Critical patent/CN212926452U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to the technical field of assembly type buildings, in particular to a node connecting device for an assembly type building frame, the assembly type building frame is provided with a longitudinal beam, a cross beam and a stand column, the node connecting device comprises a connecting node, and the longitudinal beam and the cross beam are intersected through the connecting node; the connecting nodes comprise beam-beam connecting nodes positioned in the longitudinal beams or the transverse beams; the beam-beam connecting joint comprises a plurality of vertical steel bars and a plurality of U-shaped steel bars; each U-shaped steel bar comprises a U-shaped tail end and an open end, part of the U-shaped steel bars extend into the longitudinal beam from the inside of the cross beam, and the other part of the U-shaped steel bars extend into the cross beam from the inside of the longitudinal beam; a plurality of through holes are formed between the U-shaped tail ends of the U-shaped steel bars; the vertical steel bars are arranged in the longitudinal beams or the cross beams and penetrate through the through holes. The utility model discloses avoided the poor problem of wholeness between current each prefabricated component, the application of prestressing force can increase the column network interval simultaneously, reduces post quantity, improves space utilization.

Description

Joint connecting device for assembly type building frame
Technical Field
The utility model relates to an assembly type structure technical field, in particular to nodal connection device for assembly type structure frame.
Background
At present, most buildings in China still mainly adopt cast-in-place. The construction mode not only needs to employ a large amount of labor, but also has long construction period, high cost, disordered field management, low prefabrication rate, assembly rate and industrialization degree, and has a certain gap from green buildings which are vigorously advocated and developed by the nation and industrialized construction modes which are preferentially adopted. With the continuous increase of sustainable development and environmental protection and energy conservation requirements and the improvement of labor cost, the industrialization of buildings represented by fabricated buildings is more and more emphasized, and the prefabricated building has wide application prospects.
There are many problems with current industry fabricated building structures: the column spacing is small, and the spatial arrangement is limited; the prefabrication and assembly rate is low, and the on-site formwork supporting quantity is large; the connection integrity between the components is poor, the construction operation efficiency is low, and the like. The market urgent need can effectively increase the column network interval, increase the span of building, and the wholeness can be equated with cast-in-place structure to safe, reliable, high-efficient, simple and convenient novel assembled prefabricated construction.
Disclosure of Invention
For solving the problem that prior art exists, the utility model provides a nodal connection device for assembly type structure frame for the connected node of connecting prefabricated component passes through joint, connecting reinforcement and connects into whole with corresponding prefabricated component, has reduced assembly type structure frame's the construction degree of difficulty, and the efficiency of construction has obtained further improvement.
The utility model discloses a following technical scheme realizes: the node connecting device is used for an assembly type building frame, the assembly type building frame is provided with a longitudinal beam, a cross beam and a stand column, the node connecting device comprises a connecting node, and the longitudinal beam and the cross beam are intersected through the connecting node; the connecting nodes comprise beam-beam connecting nodes positioned in the longitudinal beams or the transverse beams;
the beam-beam connecting joint comprises a plurality of vertical steel bars and a plurality of U-shaped steel bars; each U-shaped steel bar comprises a U-shaped tail end and an open end, part of the U-shaped steel bars extend into the longitudinal beam from the inside of the cross beam, and the other part of the U-shaped steel bars extend into the connecting joint from the inside of the longitudinal/cross beam; a plurality of through holes are formed between the U-shaped tail ends of the U-shaped steel bars; the vertical reinforcing steel bars are embedded in the longitudinal beam brackets and penetrate through the through holes.
In a preferred embodiment, the upper structure of the beam-beam connecting node is penetrated by a U-shaped steel bar, the opening end of the U-shaped steel bar is embedded in the end part of the cross beam, and the tail end of the U-shaped steel bar is positioned in the longitudinal beam;
in the substructure of beam-girder connected node, partly U shaped steel muscle is pre-buried in longeron both sides and extends to the crossbeam tip, and another part U shaped steel muscle is pre-buried in the crossbeam tip and extends to the longeron both sides, and the terminal overlap of the U type of these two parts U shaped steel muscle sets up and forms a plurality of through-holes, and the through-hole has been alternated to pre-buried vertical reinforcing bar in the longeron.
Compared with the prior art, the utility model has the advantages of it is following:
1. the utility model discloses well prefabricated crossbeam of prestressing force, many prefabricated components such as longeron and beam column connected node pass through the joint, the connecting reinforcement becomes whole, the prestressing steel bundle no longer runs through building frame's whole prefabricated crossbeam, the longeron, and only set up in the prefabricated crossbeam/longeron between two adjacent stands, therefore the construction degree of difficulty of assembly type building frame has been reduced, the poor problem of wholeness between each prefabricated component among the prior art has been avoided, simultaneously prestressing force's application can increase the column network interval, reduce post quantity, provide space utilization, be particularly useful for large-span prestressed concrete assembly type building.
2. The utility model discloses a longeron, crossbeam and beam column connected node all can prefabricate in the mill among the building structure to adopt joint seam and tie bar to carry out erection joint, not only the preparation precision is high, efficient, and the wholeness is good moreover, safe and reliable, provides guiding scheme to design, the construction of assembly type structure.
3. The utility model discloses in connect into whole through the prefabricated crossbeam of a plurality of prestressing force and the prefabricated longeron of a plurality of prestressing force, can replace traditional cast-in-place roof beam, the board of on the ground or secret building.
4. The utility model discloses an in the work progress, at the prefabricated component of mill, on-the-spot assembly has reduced the formwork volume on scene, and the construction is controlled controllably, has improved prefabricated assembly rate simultaneously again, accords with national development strategy. Because the prefabricated longitudinal beam and the prefabricated transverse beam are prefabricated in a factory and are installed and connected on site by adopting prestress, and the prefabricated components are hoisted and accurately positioned, the prefabricated longitudinal beam and the prefabricated transverse beam are high in manufacturing efficiency and precision, good in integrity, safe and reliable, and provide an instructive method for the design and construction of the fabricated building.
Drawings
Fig. 1 is a schematic view of the overall structure of a building frame system according to an embodiment of the present invention;
fig. 2 is a schematic connection diagram of a column-beam connection node according to an embodiment of the present invention;
fig. 3 is a schematic connection diagram of a beam-column connection node and a prefabricated longitudinal beam according to an embodiment of the present invention;
fig. 4 is a schematic view of an arrangement of external prestressing strands of a prefabricated longitudinal beam according to an embodiment of the present invention;
fig. 5 is a schematic view of placing a precast beam according to an embodiment of the present invention;
fig. 6 is a schematic view of a prefabricated longitudinal beam according to an embodiment of the present invention after installation;
fig. 7 is one of the sectional views of the joint of the prefabricated longitudinal beam and the prefabricated transverse beam according to the embodiment of the present invention;
fig. 8 is a schematic structural view of an upper portion of a prefabricated longitudinal and transverse beam joint (i.e., a beam-beam connection joint), according to an embodiment of the present invention, wherein (a) is a sectional view along a horizontal direction, and (b) is a perspective view;
fig. 9 is a schematic structural view of a lower portion (containing vertical reinforcing bars) of a beam-beam connection node according to an embodiment of the present invention, in which (a) is a sectional view along a horizontal direction and (b) is a perspective view;
fig. 10 is one of cross-sectional views of a connection of a cast-in-place beam-column connection node according to an embodiment of the present invention;
fig. 11 is a cross-sectional view of a cast-in-place beam-column connection node according to an embodiment of the present invention in the horizontal direction;
fig. 12 is one of cross-sectional views of a joint of a precast beam-column connection node according to an embodiment of the present invention;
fig. 13 is a schematic view of a single-story prefabricated building structure according to an embodiment of the present invention;
fig. 14 is a schematic view illustrating connection between a first type of U-shaped steel bar and a vertical steel bar according to an embodiment of the present invention;
fig. 15 is a schematic view illustrating connection between a second type of U-shaped reinforcing bars and a mouth-shaped reinforcing bar according to an embodiment of the present invention;
fig. 16 is a schematic view of a construction state of the mounting hanger according to the embodiment of the present invention;
fig. 17 is a schematic side view of an integrated mounting hanger for prefabricating longitudinal and transverse beam construction according to an embodiment of the present invention;
fig. 18 is according to the utility model discloses prefabricated vertical, crossbeam buried bolt hole schematic diagram in advance.
Wherein: 1-prefabricating/casting upright posts in situ; 2-prefabricating/casting beam-column connection nodes in situ; 3, prefabricating the longitudinal beam; 4-prefabricating a longitudinal beam bracket; 5, prefabricating a cross beam; 6-connecting seams; 7-prestressed steel strands; 8-monolithic layer concrete; 9-prefabricating/casting beam column connecting node brackets; 10-comprehensive mounting of a hanger; 11-high strength bolts; 12-temporary jack; 13-pre-embedded members on the upright post; 14-comprehensive mounting of hanger legs; 15-pre-burying bolt holes; 16-a first type of U-shaped steel bar; 17-vertical reinforcement; 18-connecting the reinforcing steel bars; 19-stirrup; 20-a cannula; 21-a second type of U-shaped steel bar; 22-square steel bar.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention clearer, the technical solutions of the present invention will be described in detail below with reference to the accompanying drawings and embodiments. It is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of them. Based on the embodiments of the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
Examples
In the prior art, the top plate or the bottom plate of a single-layer or multi-layer building is generally cast in situ, which can cause a large number of branch modules on site, disordered site management and small column net spacing. The utility model provides an among the system architecture, a plurality of prefabricated longerons, prefabricated crossbeam connect into whole roof beam, the board that is used for replacing among the prior art, through using joint, the poor problem of seam reinforcing bar solution assembled component wholeness, the setting of prestressing force steel beam can improve the column network interval simultaneously, has improved space utilization.
The design idea of the utility model is that the whole is broken into parts, the beams and the plates in the building are replaced by the structures of the prestressed prefabricated longitudinal beams and the prefabricated transverse beams, and the single prestressed prefabricated longitudinal beams and the single prefabricated transverse beams have relatively small volume and are convenient to transport; the prestressed steel beams are applied to the interior of the prefabricated longitudinal beams and the interior of the transverse beams, so that the span can be maximized, the upright columns have large optimized space, the number of prefabricated components can be reduced, meanwhile, the overall rigidity of the building structure is increased, the deformation is relatively small, the integrity is better, and the seismic performance is stronger.
As shown in fig. 1, the utility model discloses can be applied to the above-ground or underground multi-storey building, building structure's vertical, horizontal can be many strides ally many and ally oneself with, including a plurality of stands, a plurality of beam column connected node, a plurality of prefabricated longerons and a plurality of prefabricated crossbeam; the prefabricated longitudinal beams are arranged in the intervals of the adjacent upright columns, the prefabricated transverse beams are arranged between the two prefabricated longitudinal beams which are parallel to each other, the prefabricated longitudinal beams and the upright columns are connected into a whole through connecting seams and joint reinforcing steel bars, and the prefabricated transverse beams in the same row are connected into a whole through the connecting seams and the joint reinforcing steel bars; concrete can be poured on the prefabricated cross beams, the prefabricated longitudinal beams and the beam-column connecting nodes to achieve the effect of an integrated layer, and the effect is shown in fig. 13. The prefabricated longitudinal beam and the prefabricated beam structure can be prefabricated in a whole hole or prefabricated in sectional blocks, the whole hole can be prefabricated to reduce the hoisting and transportation times, and the prefabricated sectional blocks can reduce the hoisting and transportation weight.
It should be noted that the precast cross beams and the precast longitudinal beams are only used for distinguishing the erection directions of the two beams, and the arrangement of the longitudinal cross beams can be switched when necessary. Because of the different follow-up influences that produce of length and breadth roof beam setting direction, like the increase and decrease of relevant post interval, the condition such as change of prefabricated component cross-section belongs to the utility model discloses relevant technical characteristics's equivalent replacement is in this patent protection within range.
In the utility model, the assembly type building frame system is provided with two types of connecting nodes with different structures, the first type of connecting node is a beam-column connecting node at the top of the upright post 1, and the connection between the prefabricated longitudinal beam, the prefabricated transverse beam and the upright post is realized, as shown in fig. 10-12; the second type of connecting node is a beam-beam connecting node arranged in the prefabricated longitudinal beam to realize the connection between the prefabricated longitudinal beam and the prefabricated transverse beam, and a stand column is not arranged below the beam-beam connecting node, is positioned at the intersection of the prefabricated transverse beam and the prefabricated longitudinal beam, is arranged in the prefabricated longitudinal beam body and is prefabricated together with the prefabricated longitudinal beam, as shown in fig. 7-9.
As shown in fig. 2, the top of the upright post 1 is connected with a beam-column connecting node 2; the beam column connecting nodes are connected with the prefabricated longitudinal beams and the prefabricated transverse beams, so that the prefabricated longitudinal beams are arranged between the two adjacent beam column connecting nodes, and/or the prefabricated transverse beams are arranged on the beam column connecting nodes and then used for bearing the prefabricated transverse beams, and the prefabricated transverse beams are erected between the two adjacent beam column connecting nodes. As shown in fig. 3 and 4, a connecting seam 6 is reserved between the prefabricated longitudinal beam 3 and the beam-column connecting node 2; prestressed steel bundles 7 are arranged inside the prefabricated longitudinal beam and anchored at two ends of a beam span of the prefabricated longitudinal beam; the prefabricated longitudinal beam is connected with the beam column connecting node into a whole through the connecting seam and the joint reinforcing steel bar. As shown in fig. 5, the precast cross beam 5 firstly reaches a state of a simply supported beam by being placed on the longitudinal beam corbel 4 of the precast longitudinal beam; and beam column connecting node brackets 9 are arranged on two sides of the beam column connecting node 2 and are used for bearing the prestress prefabricated beam. As shown in fig. 6 and 7, prestressed steel bundles 7 are arranged inside the precast transverse beam 5 and anchored on two sides of the prestressed precast longitudinal beam. The prefabricated beam is connected with the prestressed prefabricated longitudinal beam into a whole through the connecting seam and the joint reinforcing steel bar, and finally, the prefabricated longitudinal beam and the prefabricated transverse beam are integrated into a continuous system. As shown in fig. 13, a plurality of columns and a plurality of prestressed precast longitudinal beams and transverse beams are connected into a whole, and then, concrete 8 for a monolithic layer is poured to achieve the monolithic layer. The upright post and the beam-column connecting node can be cast in place and can also be prefabricated or prefabricated in sections; that is to say, beam column connected node can be prefabricated in the mill, also can prefabricate or cast in situ with the stand jointly. The prefabricated longitudinal beams and the prefabricated transverse beams can also be prefabricated in sections.
As shown in fig. 7, solid sections reserved at two ends of the prefabricated beam are in temporary simply-supported lap joint with the longitudinal beam, the web is provided with prestressed steel bundles, and after construction is performed on the connecting joints, tensioning and anchoring are completed at two ends of the prefabricated beam to form a continuous structure. And a web plate of the prefabricated beam is provided with a prestressed steel beam, and tensioning, grouting and anchor sealing are completed when prefabrication is performed in a factory. According to the span requirement of the structure, the sectional form of the prefabricated longitudinal beam can be selected from a box shape, and the sectional form of the prefabricated transverse beam can be selected from conventional forms such as a box shape, a T shape, an I shape, a double T shape and the like.
Therefore, the utility model has the advantages that the whole continuous structure formed by the prefabricated longitudinal beams and the transverse beams has reasonable internal force distribution and is provided with prestressed steel beams; in addition, the section efficiency is high, compared with a common reinforced concrete frame structure, the large span can be increased, and the upright column has a large optimization space; meanwhile, the prestressed longitudinal beam and transverse beam simply-supported system has better integrity and seismic performance.
The precast beam may also be hollow in section to reduce weight. The hollow parts of the prefabricated longitudinal beams and the prefabricated transverse beams can be used for space utilization, and cables, drainage pipelines and other equipment can be placed in the beams. When the prefabricated longitudinal beam and the prefabricated transverse beam are connected by adopting the connecting seam and the joint reinforcing steel bar, the collision between the transverse beam prestressed steel beam pipeline and the longitudinal beam prestressed steel beam pipeline is avoided.
The connection of the beam column connection node and the upright column can adopt a reserved steel bar sleeve or other effective connection modes. A posture adjusting steel gasket or other effective adjusting measures are arranged on the bracket of the cross beam and used for adjusting the posture of the prefabricated longitudinal beam; and constructing a connecting joint after the posture of the prefabricated longitudinal beam on the bracket is adjusted.
The bracket on the side surface of the beam-column connecting node can be arranged according to the section form of the longitudinal beam or the cross beam, can be a U-shaped bracket or a trapezoidal bracket, and is prefabricated together with the beam-column connecting node in a factory. As shown in fig. 2, in one structure of the beam-column connection node, a pair of beam-column connection node U-shaped brackets 9 is arranged on one opposite surface of the beam-column connection node 2, the two U-shaped brackets are used for connecting two prefabricated beams, and the cross section of the prefabricated beam can be a T-shaped or I-shaped cross section; the other opposite surface is connected with a prefabricated longitudinal beam, the section of the prefabricated longitudinal beam can be a box section, and the prefabricated longitudinal beam and the beam column connecting node are connected into a whole through connecting seams and joint reinforcing steel bars.
The connecting joint between the prefabricated longitudinal beam and the prefabricated transverse beam, namely the beam-beam connecting joint, can adopt the structures shown in fig. 7-9. Beam-girder connected node includes the joint line 6 of reserving between prefabricated longeron and prefabricated crossbeam, and 6 departments of joint line have arranged a plurality of vertical reinforcing bars 17 and a plurality of first type U shaped steel muscle 16, and every first type U shaped steel muscle includes that U type is terminal and open end. Each first type U-shaped steel bar is partially arranged in the prefabricated transverse beam (such as a U-shaped tail end) and partially arranged in the prefabricated longitudinal beam (such as an opening end); the vertical reinforcing steel bars are arranged in the brackets of the prefabricated longitudinal beams. The width of a reserved connecting seam between the prefabricated longitudinal beam and the prefabricated transverse beam is about 350mm, and the lap joint thickness of the prefabricated transverse beam and the corbels on the two sides of the prefabricated longitudinal beam is at least 200 mm.
The upper and lower portions of the beam-to-beam connection node are differently configured. The upper part of the beam-beam connecting joint is penetrated by a first type of U-shaped steel bar, the opening end of the first type of U-shaped steel bar is embedded in the end part of the prefabricated beam, and the tail end of the U-shaped steel bar is positioned in the prefabricated longitudinal beam; because the prefabricated top surface elevation of the prefabricated longitudinal beam is slightly smaller than that of the prefabricated transverse beam, the first U-shaped steel bars positioned at the upper part of the beam-beam connecting node can be directly placed above the prefabricated longitudinal beam, as shown in (a) and (b) of fig. 8. The beam-girder connecting node substructure comprises first U-shaped steel bars and vertical steel bars, one part of the first U-shaped steel bars are pre-embedded on two sides of the prefabricated longitudinal beam and extend to the end part of the prefabricated longitudinal beam, the other part of the first U-shaped steel bars are pre-embedded on the end part of the prefabricated transverse beam and extend to two sides of the prefabricated longitudinal beam, the U-shaped ends of the two parts of the first U-shaped steel bars are overlapped to form a through hole, and the vertical steel bars 17 pre-embedded in the bracket of the prefabricated longitudinal beam penetrate through the through hole as shown in (a) and (b) in fig. 14 and fig. 9. And finally, pouring concrete to cover the tops of the prefabricated longitudinal beams and the connecting seams to form a whole. A plurality of stirrups 19 are arranged inside the beam-beam connecting joint to increase the strength of the connecting part, and the stirrups are perpendicular to the axial direction of the prefabricated longitudinal beam and fasten the plurality of first type U-shaped steel bars together.
The utility model discloses in, the work progress that the roof beam connecting node corresponds includes:
(1) positioning the steel bars of the prefabricated cross beam and the prefabricated longitudinal beam through a steel bar pedestal in a prefabricated yard, and fixing the positioned steel bars through a steel bar binding process; hoisting the fixed steel bar net rack into the corresponding prefabricated template by using a crane; and pouring concrete, and forming prefabricated components such as prefabricated beams, prefabricated longitudinal beams and the like after the concrete reaches a corresponding strength grade.
(2) And (4) transporting the prefabricated components to an erection site, firstly erecting the prefabricated longitudinal beam on the bracket of the beam-column connecting node, and then erecting the prefabricated transverse beam on the bracket of the prefabricated longitudinal beam.
(3) The first type of U-shaped steel bar positioned at the lower part of the prefabricated beam and the first type of U-shaped steel bar positioned at the prefabricated longitudinal beam are sleeved on the vertical steel bar pre-embedded in the bracket of the prefabricated longitudinal beam, and the first type of U-shaped steel bar positioned at the upper part of the prefabricated beam is overlapped at the upper part of the top plate of the prefabricated longitudinal beam; and pouring concrete to cover the top of the prefabricated longitudinal beam and the connecting joints among the prefabricated longitudinal beam and the prefabricated transverse beam, and forming the prefabricated beam connecting joint after the concrete reaches the designed strength grade.
The beam column connecting node between the prefabricated longitudinal beam, the prefabricated cross beam and the upright column can be prefabricated and can also be formed in a cast-in-place mode. The cast-in-place beam-column connection node can adopt the structures shown in fig. 10 and fig. 11; the precast beam column connection node may adopt a structure shown in fig. 12.
Cast-in-place beam column connected node includes connecting reinforcement 18, and connecting reinforcement passes through sleeve pipe 20 pre-buried at prefabricated crossbeam or prefabricated longeron tip to inside extending beam column connected node. A plurality of stirrups 19 are arranged inside the beam-column connecting node to fasten the connecting steel bars so as to enhance the strength of the connecting part, and connecting seams are reserved among the prefabricated longitudinal beam, the prefabricated transverse beam and the cast-in-place beam-column connecting node; and finally, pouring concrete from the connecting joints to form the whole beam-column connecting joint. The lap joint thickness of the prefabricated longitudinal beam and the brackets at two sides of the prefabricated transverse beam is at least 200 mm.
The construction process corresponding to the cast-in-place beam column connecting node is as follows: after the upright posts are installed, the prefabricated longitudinal beams and the prefabricated cross beams are erected through the top corbels of the upright posts, and connecting steel bars are pre-embedded at beam ends of the prefabricated cross beams. And fixing a net rack connected with the steel bars at the beam-column connection nodes by a method of manual measurement and steel bar binding. And pouring concrete after the reinforcing steel bars are in place, and forming the cast-in-place beam-column connecting node after the concrete reaches the designed strength grade.
As shown in fig. 12 and 15, the prefabricated beam-column connection node comprises a plurality of second type U-shaped steel bars 21, a plurality of mouth-shaped steel bars 22 and a plurality of stirrups 19; the second type U-shaped steel bars are pre-embedded at the joints of the two ends of the prefabricated longitudinal beam or the prefabricated transverse beam and the beam column connecting node, specifically, one part of the second type U-shaped steel bars are arranged in the prefabricated transverse beam or the prefabricated longitudinal beam, and the other part of the second type U-shaped steel bars are arranged in the prefabricated beam column connecting node or the prefabricated beam column connecting node bracket; the two parts of the second U-shaped steel bars are connected through the mouth-shaped steel bars. The width of a reserved connecting joint between the prefabricated longitudinal beam, the prefabricated cross beam and the prefabricated beam column connecting node is about 350mm, the lap joint thickness of the prefabricated longitudinal beam and the brackets on the two sides of the prefabricated cross beam is at least 200mm, and a plurality of stirrups are arranged in the connecting joint. And after the second U-shaped steel bars 21, the mouth-shaped steel bars 22, the stirrups 19 and other joint steel bars are installed, pouring concrete into the connecting joints, and after the concrete reaches the design strength, connecting the prefabricated longitudinal beams or the prefabricated transverse beams with the beam column connecting nodes into a whole. In this embodiment, the structure of the second type of U-shaped steel bar is the same as the structure of the first type of U-shaped steel bar.
The construction process corresponding to the precast beam column connecting node is as follows: the reinforcing steel bars of the prefabricated longitudinal beams or the prefabricated cross beams and the beam column connecting nodes are positioned in the prefabricated yard through corresponding reinforcing steel bar pedestals, and the reinforcing steel bars are fixed through reinforcement. And hoisting the fixed reinforcement cage to the inside of the corresponding prefabricated formwork by using a crane. And pouring concrete, and forming a prefabricated longitudinal beam or a prefabricated transverse beam and a prefabricated beam column connecting node after the concrete reaches a corresponding strength grade. And (4) transporting the prefabricated part to an erection site, firstly erecting the prefabricated beam-column connecting node on the stand column, and then erecting the prefabricated longitudinal beam or the prefabricated transverse beam on the bracket of the prefabricated beam-column connecting node. And connecting the second U-shaped steel bars pre-embedded at the end parts of the prefabricated cross beams and the end parts of the prefabricated longitudinal beams or the bracket of the prefabricated longitudinal beams by using the mouth-shaped steel bars and the plurality of stirrups. And pouring joints between the prefabricated longitudinal beams or the prefabricated transverse beams and the prefabricated beam column connecting nodes, and forming the prefabricated beam column connecting nodes after the poured concrete reaches the designed strength grade.
In the utility model, the connecting seam can be a wet seam, a dry seam and other effective seam structures; connecting nodes include, but are not limited to, structures that take the form of: a. connecting the nodes in a pure reinforced concrete form; b. connecting the nodes in the forms of steel bars, steel plates, high-strength bolts and concrete; c. the node plate, the high-strength bolt and the concrete form a connecting node.
The utility model discloses in the work progress, the user transports prefabricated component such as prefabricated longeron of prestressing force, the prefabricated crossbeam of prestressing force to the construction site, through the prefabricated/cast-in-place post of erection equipment at first installation, then the prefabricated/cast-in-place connected node of installation is fixed. The prestressed prefabricated longitudinal beam is hoisted and positioned through erecting equipment, the posture of a component is accurately adjusted to form a simply supported state, then connecting reinforcing steel bars at the connecting positions of two ends of the prestressed prefabricated longitudinal beam and the prefabricated/cast-in-place connecting nodes are installed, and connecting seams at two ends are poured to connect the prestressed prefabricated longitudinal beam and the prefabricated/cast-in-place column into a whole. The prestressed prefabricated beam is hoisted on the longitudinal beam bracket or the prefabricated/cast-in-place connecting node bracket through erecting equipment, the posture of a component is accurately adjusted, then connecting reinforcing steel bars at the connecting part of the prefabricated beam and the prefabricated longitudinal beam or the prefabricated/cast-in-place connecting node are installed, and connecting seams at two ends are poured to connect the prefabricated longitudinal beam, the prefabricated beam and the prefabricated/cast-in-place connecting node into a whole. And finally, pouring concrete on the cross beam, the longitudinal beam and the prefabricated/cast-in-place connecting node to form an integrated layer. As shown in fig. 16-18, particularly, the construction process of the present invention is as follows:
step one, mounting prefabricated/cast-in-place upright posts and prefabricated/cast-in-place connecting nodes.
The prefabricated vertical columns are prefabricated and formed by concrete in a factory, and the prefabricated columns (namely, the vertical columns) which are transported to the site are hoisted to a design position and fixed. The prefabricated beam column connecting node is formed by prefabricating concrete in a factory, and after the upright post is installed, the prefabricated/cast-in-place beam column connecting node is installed at the top of the upright post. The prefabricated column can be changed into cast-in-place according to the requirement.
And step two, placing a prefabricated longitudinal beam between two adjacent prefabricated/cast-in-place upright columns, and pouring connecting seams at two sides of the prefabricated longitudinal beam to complete the construction of the beam-column connecting node.
The precast longitudinal beam is formed by prefabricating concrete in a factory, a prestressed pipeline is arranged in the precast longitudinal beam, and the longitudinal beam prestressed steel beam is arranged in the prestressed pipeline.
Hoisting and positioning the prestressed prefabricated longitudinal beam which is transported to the site through the comprehensive mounting hanger 10, then accurately adjusting the posture of the prefabricated component to form a simple support state, and paying attention to the fact that the center of the prestressed prefabricated longitudinal beam is aligned with the center of the prefabricated/cast-in-place beam-column connecting node during accurate posture adjustment. After the prefabricated longitudinal beam is placed, connecting steel bars such as U-shaped steel bars, vertical steel bars and stirrups are installed at the connecting joints on the two sides of the prefabricated longitudinal beam, and then the connecting joints on the two sides of the prefabricated longitudinal beam are poured.
And step three, tensioning the prestressed steel bundles in the prefabricated longitudinal beam.
And after the connecting joints on the two sides of the prefabricated longitudinal beam reach the strength, tensioning the prestressed steel beams, so that the multi-span longitudinal beams in the actual building engineering are connected into a whole by the connecting joints and the connecting steel bars. The principle is similar to that of a bridge engineering construction method in which a prefabricated longitudinal beam is placed firstly after simply supporting and then continuously, the step can be regarded as a simply supporting system, and then the multi-span prefabricated longitudinal beam is integrated through connecting seams and connecting reinforcing steel bars, so that the system is converted into a continuous system.
And fourthly, placing a prefabricated beam between two parallel prefabricated longitudinal beams or two prefabricated/cast-in-place beam column connecting nodes, and pouring a connecting joint between the end part of the prefabricated beam and the prefabricated longitudinal beam to complete the construction of the beam connecting node.
That is, the construction method of the prestressed precast beam is divided into two types: one method is that a bracket is arranged on a prefabricated/cast-in-place beam column connecting node, the bracket of the prefabricated/cast-in-place beam column connecting node is used as a beam falling supporting point of a prefabricated beam, the posture of a component is accurately adjusted on the bracket of the prefabricated/cast-in-place beam column connecting node, connecting reinforcing steel bars at connecting seams between two sides of the prefabricated beam and the prefabricated/cast-in-place beam column connecting node are installed, and then connecting seams are poured to connect the prefabricated beam and the beam column connecting node into a whole; and the other method is that brackets are arranged on two sides of the prefabricated longitudinal beam, the brackets on the two sides of the prefabricated longitudinal beam are used as beam falling supporting points of the prefabricated transverse beam, the posture of the component is accurately adjusted on the brackets of the longitudinal beam, then connecting steel bars at the connecting joints are installed, and the connecting joints are poured so as to connect the prestressed prefabricated transverse beam and the prefabricated longitudinal beam into a whole.
After the prefabricated longitudinal beam is installed, the prefabricated transverse beam is placed on the longitudinal beam bracket or the beam column connecting node bracket through erecting equipment, then the posture of the prefabricated longitudinal beam is accurately adjusted, and the prestressed pipeline is prevented from being not corresponding. And after the prefabricated beam is placed, mounting connecting steel bars at the connecting joints, and then pouring the connecting joints.
For the safety of construction, the construction method may choose to erect the whole frame system first and then erect the small box girders (i.e. the prefabricated cross girders in this embodiment) therebetween, or may choose to erect the prefabricated cross girders step by step along a certain sequence after erecting the prefabricated longitudinal girders.
And fifthly, tensioning the beam prestress steel bundles in the prefabricated beam.
The precast beam is formed by prefabricating concrete in a factory, beam prestressed steel bundles are fixed in a prestressed pipeline of the precast beam, and the prestressed steel bundles are tensioned at two ends of the precast beam after the plurality of precast beams are hoisted. Connecting seams are reserved between the prefabricated cross beam and the prefabricated longitudinal beam and between the prefabricated longitudinal beam and the prefabricated connecting nodes; and after the prefabricated longitudinal beam is hoisted and the prestressed steel beam is tensioned, connecting steel bars are installed, corresponding connecting joints are poured, and after the prefabricated transverse beam is hoisted and the prestressed steel beam is tensioned, corresponding connecting joints are poured.
In actual engineering, a plurality of spans of one row of prefabricated beams can be simultaneously tensioned and connected with connecting steel bars into a whole through connecting seams. The principle of the construction conversion system is equal to the installation of the prefabricated longitudinal beam, and the description is omitted here.
The prestressed steel beams are arranged in the prefabricated longitudinal beams and the prefabricated transverse beams, the prestressed steel beams in the prefabricated longitudinal beams and the prestressed steel beams in the prefabricated transverse beams are separately arranged in staggered layers, and tensioning is carried out after the connecting joints are poured. The thickness of the connecting seam is about 350mm, and concrete is poured after the connecting steel bars are installed. The lap joint thickness of the prefabricated longitudinal beam and the brackets at two sides of the prefabricated transverse beam is at least 200 mm.
And step six, pouring concrete on the prefabricated cross beams, the prefabricated longitudinal beams and the prefabricated/cast-in-place beam column connecting nodes to form the building structure integrated layer connected by the multiple prefabricated components.
And after the plurality of prestressed prefabricated cross beams and the plurality of prestressed prefabricated longitudinal beams are installed, pouring integrated layer concrete to achieve the effect of an integrated layer.
Step seven, constructing a multi-layer assembly type building structure
The utility model discloses can be applied to individual layer or multilayer and construct on the ground or underground. Repeating the first step to the sixth step, and constructing a two-layer structure or more-layer structures on the basis of the one-layer structure to complete the construction of the multi-layer assembly type building structure, wherein the construction result is shown in figure 1.
In addition, the erection equipment adopted in the construction process mainly comprises a comprehensive installation hanger 10 and a plurality of temporary jacks 12, a floor stand does not need to be erected, a large amount of stand materials and erection time are saved, and the construction efficiency is high. The high-strength bolts 11 are arranged on the supporting legs 14 of the comprehensive installation hanging frame, and the comprehensive installation hanging frame is connected with the pre-buried bolt holes 15 arranged on the prefabricated cross beam through the high-strength bolts so as to be fixed on the prefabricated cross beam, ensure that the comprehensive installation hanging frame and the prestressed prefabricated longitudinal beam are relatively fixed, and have a good supporting effect. The temporary jack is fixedly installed on the prefabricated/cast-in-place beam column connecting node through the embedded member 13 on the stand column, so that the relative fixation of the temporary jack and the prefabricated beam column connecting node is ensured, and the temporary jack has a better supporting and adjusting effect. And finally, connecting the comprehensive installation hanging bracket with a temporary jack, and adjusting the horizontal and longitudinal positions of the prefabricated beam according to the requirements.
The pre-buried bolt hole on the prefabricated longeron can be pre-buried respectively in the top and both sides of prefabricated longeron, and the pre-buried bolt hole needs prefabricate simultaneously in the mill with prefabricated longeron. The high-strength bolts arranged on the supporting legs of the comprehensive installation hanging bracket and the number of the pre-buried bolt holes in the prefabricated longitudinal beam are arranged according to the weight and the hoisting condition of the prestressed prefabricated longitudinal beam.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the description in the above embodiments and the description is only preferred examples of the present invention, and is not intended to limit the present invention, and that the present invention can have various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications all fall into the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (8)

1. The node connecting device is used for an assembly type building frame, and the assembly type building frame is provided with a longitudinal beam, a cross beam and a stand column; the connecting nodes comprise beam-beam connecting nodes positioned in the longitudinal beams or the transverse beams;
the beam-beam connecting joint comprises a plurality of vertical steel bars and a plurality of U-shaped steel bars; each U-shaped steel bar comprises a U-shaped tail end and an open end, part of the U-shaped steel bars extend into the longitudinal beam from the inside of the cross beam, and the other part of the U-shaped steel bars extend into the connecting joint from the inside of the longitudinal/cross beam; a plurality of through holes are formed between the U-shaped tail ends of the U-shaped steel bars; the vertical reinforcing steel bars are embedded in the longitudinal beam brackets and penetrate through the through holes.
2. The node connecting device according to claim 1, wherein the upper structure of the beam-beam connecting node is penetrated by a U-shaped steel bar, the open end of the U-shaped steel bar is embedded in the end part of the cross beam, and the tail end of the U-shaped steel bar is positioned in the longitudinal beam;
in the substructure of beam-girder connected node, partly U shaped steel muscle is pre-buried in longeron both sides and extends to the crossbeam tip, and another part U shaped steel muscle is pre-buried in the crossbeam tip and extends to the longeron both sides, and the terminal overlap of the U type of these two parts U shaped steel muscle sets up and forms a plurality of through-holes, and the through-hole has been alternated to pre-buried vertical reinforcing bar in the longeron.
3. The nodal connection apparatus of claim 2, wherein the beam-to-beam connection node further includes a plurality of stirrups that secure the plurality of U-shaped steel bars together.
4. The nodal connection device of claim 1, wherein said connection node further comprises a beam-column connection node at the top of a column.
5. The node connecting device according to claim 4, wherein the beam-column connecting node is a cast-in-place beam-column connecting node, and comprises connecting steel bars, and the connecting steel bars are embedded at the end parts of the cross beams or the longitudinal beams through sleeves and extend into the beam-column connecting node.
6. The node connecting device according to claim 5, wherein the beam-column connecting node further comprises a plurality of stirrups for fastening the connecting reinforcing bars.
7. The node connecting device according to claim 4, wherein the beam-column connecting node is a prefabricated beam-column connecting node and comprises a plurality of U-shaped steel bars and a plurality of square steel bars, one part of the U-shaped steel bars are arranged in the cross beam or the longitudinal beam, the other part of the U-shaped steel bars are arranged in the beam-column connecting node, and the two parts of the U-shaped steel bars are connected through the square steel bars.
8. The node connecting device according to claim 4, wherein beam-column connecting node brackets are provided on both sides of the beam-column connecting node for receiving a beam.
CN202021007583.8U 2020-06-04 2020-06-04 Joint connecting device for assembly type building frame Active CN212926452U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021007583.8U CN212926452U (en) 2020-06-04 2020-06-04 Joint connecting device for assembly type building frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021007583.8U CN212926452U (en) 2020-06-04 2020-06-04 Joint connecting device for assembly type building frame

Publications (1)

Publication Number Publication Date
CN212926452U true CN212926452U (en) 2021-04-09

Family

ID=75319563

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021007583.8U Active CN212926452U (en) 2020-06-04 2020-06-04 Joint connecting device for assembly type building frame

Country Status (1)

Country Link
CN (1) CN212926452U (en)

Similar Documents

Publication Publication Date Title
CN107090925B (en) Reinforced precast reinforced concrete shear wall, structural system and construction method thereof
CN106836479B (en) Assembled prestressed concrete frame structure
CN108060746B (en) Assembled prestressed concrete large-span frame system and construction method thereof
CN107938835B (en) Prefabricated assembled frame adopting steel reinforced concrete column and steel beam combination
CN111648468B (en) Ultrahigh space utilization rate fabricated building system and efficient construction method thereof
CN108005304B (en) Assembled prestressed concrete frame system and construction method thereof
CN110670722A (en) Implementation method of beam-column connecting node of fabricated building
CN109424072B (en) Connecting joint for supporting reinforced concrete columns on steel beams and construction method
CN110670723A (en) Large-span prestressed concrete assembled building frame system
CN103031926A (en) Double T-shaped composite beam provided with prestressed steel tube concrete core rods and fabrication method of double T-shaped composite beam
CN111411721A (en) Assembly type prefabricated floor slab secondary beam combined component
CN101285329B (en) Suspendome concrete integrated floor structure and construction method thereof
CN203639804U (en) Continuous rigid frame bridge based on steel truss and concrete slab composite beam
CN112854438A (en) Assembly type concrete frame system with exposed flat net rack floor and exposed truss girder
CN109680833B (en) Self-supporting prefabricated steel reinforced concrete wall plate component, wall, structural system and manufacturing method
CN110670721A (en) Implementation method of large-span prestressed concrete assembly type building frame structure
CN114592440B (en) Upper structure of assembled steel-concrete combined bridge and construction process thereof
CN212926452U (en) Joint connecting device for assembly type building frame
CN216042835U (en) Layer adding device with light wall board for raising frame structure
CN114215179B (en) Wet construction method for center pillar joint of steel beam floor system and steel frame wallboard system
CN216920677U (en) First-layer supporting structure of large rockery outer package
WO2023123321A1 (en) Large-span prefabricated structure
CN202990244U (en) Dual-T shaped composite beam with prestress concrete filled steel tube core bar
CN115434425A (en) Lattice type steel reinforced concrete prefabricated beam column joint and method
CN112727157A (en) Assembled double-column overhead station

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant