JPH07197517A - Underground sewerage maintenance device and working bench used therefor - Google Patents

Underground sewerage maintenance device and working bench used therefor

Info

Publication number
JPH07197517A
JPH07197517A JP33855993A JP33855993A JPH07197517A JP H07197517 A JPH07197517 A JP H07197517A JP 33855993 A JP33855993 A JP 33855993A JP 33855993 A JP33855993 A JP 33855993A JP H07197517 A JPH07197517 A JP H07197517A
Authority
JP
Japan
Prior art keywords
workbench
leader
winch drum
main body
underground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP33855993A
Other languages
Japanese (ja)
Other versions
JP3372095B2 (en
Inventor
Nobuaki Kaida
展彰 買田
Masanori Hasuike
優憲 蓮池
Souhei Katori
聡兵 香取
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kato Heavy Industries Construction Machinery Co Ltd
Original Assignee
Ishikawajima Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ishikawajima Construction Machinery Co Ltd filed Critical Ishikawajima Construction Machinery Co Ltd
Priority to JP33855993A priority Critical patent/JP3372095B2/en
Publication of JPH07197517A publication Critical patent/JPH07197517A/en
Application granted granted Critical
Publication of JP3372095B2 publication Critical patent/JP3372095B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PURPOSE:To improve the cleaning work efficiency for an underground sewerage. CONSTITUTION:Two units of maintenance device body 26 which is equipped with a winch drum 27 installed on a working bench 6, driving device 28 for the winch drum 27, rising/lowering leader 30 which is supported on the working bench 6 so as to project downward, lower part guide sheave 33 which is pivotally supported at the lower part of the rising/lowering leader 30 are provided. The driving side end part of a rope 27a wound on the winch drum 27 of one maintenance device body 26 is connected with the end part in the excavation direction side of a bucket 34 which is formed so as to be installed inside an underground water passage. Further, the driving out side end part of the rope 27a wound on the winch drum 27 of the other maintenance device body 26 is connected to the end part on the counter-excavation direction side of the bucket 34.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、地下下水道保全装置及
び該地下下水道保全装置に用いる作業台に関するもので
ある。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an underground sewer maintenance system and a workbench used in the underground sewer conservation system.

【0002】[0002]

【従来の技術】一般に地下下水道は、図5に示すように
地中に極めて緩い勾配を有するように横方向へ掘削され
た地下水路1と、地表から前記の地下水路1へ連通する
ように下方へ向かって掘削された作業通路2と、該作業
通路2の底部に設けたピット3とから構成されている。
2. Description of the Related Art Generally, an underground sewer is a laterally excavated underground waterway 1 having an extremely gentle slope in the ground as shown in FIG. It is composed of a work passage 2 excavated toward and a pit 3 provided at the bottom of the work passage 2.

【0003】上記の作業通路2は、所定の間隔を隔てて
多数設けられており、また、各作業通路2の地表開口部
2aは、通常はカバー4によって被覆されている。
A large number of the work passages 2 are provided at a predetermined interval, and the ground opening 2a of each work passage 2 is usually covered with a cover 4.

【0004】このような地下下水道では、土砂、ゴミな
どによる閉塞を防止するために定期的に清掃作業を実施
している。
In such an underground sewer, cleaning work is carried out regularly in order to prevent blockage due to earth and sand and dust.

【0005】従来、地下下水道を清掃する際には、カバ
ー4を取り外した地表開口部2aから作業通路2を経て
地下水路1へ入り、地下水路1に堆積した土砂5等を人
力によって一旦ピット3に集め、このピット3に集めら
れた土砂5等を地表に設けたウインチなどの巻上装置
(図示せず)から吊り下げたバケットに投入し、このバ
ケットを巻き上げることによって地下下水道の内部の土
砂5等を除去するようにしている。
Conventionally, when cleaning the underground sewer, the ground opening 2a from which the cover 4 has been removed enters the underground waterway 1 through the work passage 2, and the earth and sand 5 accumulated in the underground waterway 1 is temporarily pitted by human power. The soil and sand 5 collected in the pit 3 is put into a bucket suspended from a hoisting device (not shown) such as a winch provided on the surface of the earth, and the bucket is rolled up to collect the sediment inside the underground sewer. 5 etc. are removed.

【0006】[0006]

【発明が解決しようとする課題】しかしながら、地下水
路は狭隘であるため、多数の作業者が同一の作業通路2
間に位置する地下水路1に一度に入って作業することが
できず、地下下水道の清掃作業を短時間で効率よく行な
うことができないという問題があった。
However, since the underground waterway is narrow, many workers have the same work passage 2
There is a problem that it is impossible to enter the underground waterway 1 located between them once to perform the work, and it is impossible to efficiently perform the cleaning work of the underground sewer in a short time.

【0007】本発明は、前述の実情に鑑み、地下下水道
の清掃作業を効率よく行ない得る地下下水道保全装置及
び該地下下水道保全装置に用いる作業台を提供すること
を目的としてなしたものである。
The present invention has been made in view of the above-mentioned circumstances, and an object thereof is to provide an underground sewerage maintenance system and a workbench used for the underground sewerage maintenance system, which can efficiently perform the cleaning work of the underground sewerage system.

【0008】[0008]

【課題を解決するための手段】第1の発明は、作業台に
設置したウインチドラムと、該ウインチドラムを駆動す
る駆動装置と、作業台に下方へ突出するように支持され
た昇降リーダと、該昇降リーダの下部に枢支された下部
ガイドシーブとをそれぞれ備えた2基の保全装置本体を
有し、一方の保全装置本体のウインチドラムに巻き付け
られたロープの繰り出し側端部を地下水路の内部に設置
可能に形成されたバケットの掘削方向側端部に連結し得
るように、且つ他方の保全装置本体のウインチドラムに
巻き付けられたロープの繰り出し側端部を地下水路の内
部に設置可能に形成されたバケットの反掘削方向側端部
に連結し得るように構成した地下下水道保全装置として
いる。
SUMMARY OF THE INVENTION A first invention is a winch drum installed on a workbench, a drive device for driving the winch drum, and a lift leader supported on the workbench so as to project downward. It has two maintenance device main bodies each having a lower guide sheave pivotally supported at the bottom of the lifting leader, and one end of the rope wound around the winch drum of one maintenance device main body is connected to the end of the underground waterway. It is possible to install the end of the rope wound around the winch drum of the other maintenance device main body so that it can be connected to the end on the excavation side of the bucket that can be installed inside, and inside the underground waterway. The underground sewer conservation device is configured so that it can be connected to the end of the formed bucket on the side opposite to the excavation direction.

【0009】第2の発明は、第1の発明の地下下水道保
全装置において、作業台に立設した中空構造のガイドリ
ーダと、該ガイドリーダの内部に昇降し得るように配設
された昇降リーダと、該昇降リーダをガイドリーダに対
して昇降させる昇降装置と、前記の昇降リーダの下部に
枢支された下部ガイドシーブとをそれぞれ備えた2基の
保全装置本体を有する構成としている。
A second invention is, in the underground sewer maintenance system of the first invention, a guide leader having a hollow structure which is erected on a workbench, and an ascending / descending leader arranged so as to be able to ascend and descend inside the guide leader. And two lowering sheaves, each of which includes a lifting device for lifting the lifting leader with respect to the guide leader, and a lower guide sheave pivotally supported on the lower part of the lifting leader.

【0010】第3の発明は、第1の発明、或いは第2の
発明の地下下水道保全装置のウインチドラムの駆動装置
を油圧モータとした構成としている。
In a third aspect of the invention, the drive device for the winch drum of the underground sewer maintenance system of the first or second aspect is a hydraulic motor.

【0011】第4の発明は、第1の発明、或いは第2の
発明の地下下水道保全装置のウインチドラムの駆動装置
を電動モータとした構成としている。
In a fourth aspect of the invention, the drive device for the winch drum of the underground sewer maintenance system of the first or second aspect is an electric motor.

【0012】第5の発明は、第2の発明から第4の発明
の地下下水道保全装置の昇降リーダが中空に形成され且
つ該昇降リーダの昇降装置が昇降リーダの内部に配設さ
れた構成としている。
A fifth aspect of the invention is a construction in which the raising / lowering leader of the underground sewer maintenance apparatus of the second to fourth aspects is formed hollow and the raising / lowering apparatus of the raising / lowering leader is disposed inside the raising / lowering leader. There is.

【0013】第6の発明は、第2の発明から第5の発明
の地下下水道保全装置の各保全装置本体のガイドリーダ
に上部ガイドシーブを枢支した構成としている。
In a sixth aspect of the invention, an upper guide sheave is pivotally supported on a guide leader of each maintenance device body of the underground sewer maintenance device of the second to fifth aspects.

【0014】第7の発明は、第1の発明から第6の発明
の地下下水道保全装置に用いられる作業台であって、保
全装置本体を載置できる上面を有し、保全装置本体の下
部ガイドシーブのロープ溝に平行する方向へ水平に延び
且つ幅方向へ間隔を隔てて相対する一対の側面に、該各
側面に沿って所定の等間隔を置いて穿設された複数のピ
ン孔を有する作業台本体と、該作業台本体下面の長手方
向の一側に偏し且つ幅方向に所定の間隔を隔てた対称位
置に作業台本体の一側方向へ向けて取付けられ且つ先端
部に設けた押圧部材を前進後退させ得るねじ装置を有す
る作業台位置決め装置と、前記の作業台本体両側面の適
宜の位置に前記のピン孔に挿通し得るピンを介して作業
台本体の他側方向へ向けて着脱でき且つロッド先端部に
設けた押圧部材を前進後退させ得るシリンダを有する作
業台固定装置とを備えた構成としている。
A seventh aspect of the present invention is a workbench used in the underground sewer maintenance system according to any one of the first to sixth aspects, having a top surface on which the maintenance device body can be placed, and a lower guide of the maintenance device body. A plurality of pin holes that extend horizontally in a direction parallel to the rope groove of the sheave and that face each other at intervals in the width direction are provided at predetermined equal intervals along the respective side faces. The workbench main body and the lower surface of the workbench main body are attached to the one end of the workbench main body in a symmetrical position deviated to one side in the longitudinal direction and at a predetermined distance in the width direction, and are provided at the tip portion. A workbench positioning device having a screw device capable of advancing and retracting the pressing member, and a workbench main body directed toward the other side of the workbench main body through pins that can be inserted into the pin holes at appropriate positions on both side surfaces of the workbench main body. Can be attached and detached and the pressing member provided at the tip of the rod It has a configuration that includes a work platform fixing device having the advance may be retracted cylinder.

【0015】[0015]

【作用】従って、本発明では、作業台の側面に設けた複
数のピン孔のうちの適宜の位置のピン孔を選んで作業台
固定装置を装着することによって該作業台固定装置の押
圧部材と作業台位置決め装置の押圧部材との間隔を下水
道の地表開口部の幅に対応させ得る。
Therefore, according to the present invention, a pin hole at a proper position is selected from a plurality of pin holes provided on the side surface of the workbench, and the workbench fixing device is mounted on the workbench fixing device so that the workbing fixing device is pressed. The space between the workbench positioning device and the pressing member can correspond to the width of the surface opening of the sewer.

【0016】また、各保全装置本体及び作業台をそれぞ
れの目的の下水道の地表開口部に上架したときに、作業
台位置決め装置のねじ装置を作動し押圧部材を前後進さ
せて作業台の地表開口部に対する位置を決定し、作業台
固定装置のシリンダを伸張方向へ作動し押圧部材を前進
させて地表開口部の縁側面に押し当てることによって作
業台を地表開口部の所定の位置に固定できる。
When the main body of each maintenance device and the workbench are mounted on the surface opening of the sewer for their respective purposes, the screw device of the workbench positioning device is operated to move the pressing member forward and backward to open the workbench surface. The workbench can be fixed at a predetermined position of the ground surface opening by determining the position with respect to the part, operating the cylinder of the workbench fixing device in the extension direction, and advancing the pressing member to press it against the edge side surface of the ground surface opening.

【0017】さらに、一方の保全装置本体のウインチド
ラムに巻き付けられたロープの繰り出し側端部を地下水
路の内部に設置したバケットの掘削方向側端部に連結
し、且つ他方の保全装置本体のウインチドラムに巻き付
けられたロープの繰り出し側端部を前記のバケットの反
掘削方向側端部に連結し、各保全装置本体の駆動装置を
作動させて、一方の保全装置本体のウインチドラムをロ
ープを巻き取る方向へ、同時に、他方の保全装置本体の
ウインチドラムをロープを繰り出す方向へ駆動すれば、
地下水路内部のバケットを掘削方向へ前進させることが
できる。また逆に、一方の保全装置本体のウインチドラ
ムをロープを繰り出す方向へ、同時に、他方の保全装置
本体のウインチドラムをロープを巻き取る方向へ駆動す
れば、地下水路内部のバケットは反掘削方向へ後退させ
ることができる。
Further, the payout side end of the rope wound around the winch drum of one maintenance device main body is connected to the excavation direction side end of the bucket installed inside the underground waterway, and the winch of the other maintenance device main body. The end of the rope wound around the drum on the payout side is connected to the end of the bucket on the opposite side of the excavation direction, and the drive device of each maintenance device body is operated to wind the rope around the winch drum of one maintenance device body. If you drive the winch drum of the other maintenance device body in the direction to pull out the rope,
The bucket inside the underground waterway can be moved forward in the excavation direction. On the contrary, if the winch drum of one maintenance device body is driven in the direction in which the rope is unwound and at the same time the winch drum of the other maintenance device body is driven in the direction in which the rope is wound up, the bucket inside the underground waterway moves in the anti-excavation direction. Can be retracted.

【0018】[0018]

【実施例】以下、本発明の実施例を図面を参照しつつ説
明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0019】図1ないし図4は、本発明の地下下水道保
全装置及び該地下下水道保全装置に用いる作業台の一例
の概略を表す側面図である。図中、図5と同じものには
同じ符号を付すことによって説明を省略する。
1 to 4 are side views showing an outline of an example of an underground sewer maintenance system and a workbench used in the underground sewer conservation system of the present invention. In the figure, the same parts as those in FIG.

【0020】6は作業台であり、該作業台6は地下下水
道の作業通路2の地表開口部2aに架け渡すことができ
る充分の長さを有し、上面に後述の保全装置本体26を
載置し得るよう形成され、幅方向の両側面に、該各側面
に沿って所定の等間隔を置いて穿設された複数のピン孔
7を有し、長さ方向の両端部に幅方向へ間隔を隔てて配
設され、且つ幅方向へ転動し得るように枢支されたスラ
イド用車輪8を備えた作業台本体9を有し、該作業台本
体9の下面の中心より長手方向の一側へ少し偏り、且つ
幅方向へ所定の間隔を隔てた対称位置に作業台位置決め
装置10を備えている。
Reference numeral 6 denotes a workbench, which has a sufficient length to bridge the surface opening 2a of the work passage 2 of the underground sewer, and has a maintenance device main body 26 described later mounted on the upper surface thereof. Has a plurality of pin holes 7 formed so that it can be placed on both side surfaces in the width direction at regular intervals along the respective side surfaces, and both ends in the length direction in the width direction. A workbench main body 9 having slide wheels 8 pivotally supported so as to be able to roll in the width direction, which are arranged at intervals, is provided. The workbench positioning device 10 is provided at symmetrical positions that are slightly biased to one side and are spaced apart by a predetermined distance in the width direction.

【0021】作業台本体9の下面に取り付けられる前記
の作業台位置決め装置10は、図3に示すように、作業
台本体の一方の端部が閉塞された中空のガイド部11を
備えたフレーム12を有し、該フレーム12の前記のガ
イド部11に摺動自在に内嵌されたジャッキ本体13
と、該ジャッキ本体13の後端部に螺合され、且つ前記
ガイド部11の閉塞側を貫通して延びる端部にハンドル
14を有するスクリューロッド15とからなるねじ装置
16を有し、前記のジャッキ本体13の先端部に設けた
押圧部材17を作業台本体9の長手方向の外側へ向けて
取り付けられている。
The workbench positioning device 10 mounted on the lower surface of the workbench body 9 has a frame 12 having a hollow guide portion 11 with one end of the workbench body closed as shown in FIG. And a jack main body 13 slidably fitted in the guide portion 11 of the frame 12.
And a screw rod 15 having a handle 14 at an end portion that extends through the closed side of the guide portion 11 and is screwed to the rear end portion of the jack body 13, and the screw device 16 is provided. The pressing member 17 provided at the tip of the jack body 13 is attached to the work table body 9 in the longitudinal direction.

【0022】そして、ねじ装置16のハンドル14を人
力によって操作しスクリューロッド15を回転させる
と、ジャッキ本体13が作業台本体9の長手方向に前進
又は後退して先端に設けた押圧部材17が所要の位置を
占めるように構成されている。
When the handle 14 of the screw device 16 is manually operated to rotate the screw rod 15, the jack body 13 moves forward or backward in the longitudinal direction of the worktable body 9 to require the pressing member 17 provided at the tip. Is configured to occupy the position of.

【0023】また、前記の作業台6は、前記の作業台本
体9の両側側面に設けたピン孔7にピン18を介して着
脱できる作業台固定装置19を備えている。
The workbench 6 is also provided with a workbench fixing device 19 which can be attached to and detached from the pin holes 7 provided on both side surfaces of the workbench body 9 via pins 18.

【0024】該作業台固定装置19は、図4に示すよう
に、前記作業台本体9のピン孔7のピッチの略倍ピッチ
に穿設された2個のピン孔を有するブラケット20と、
該ブラケット20に固設され、且つ一方の端部が閉塞さ
れた角型中空断面を有するガイド部21とからなるフレ
ーム22を有し、該フレーム22の前記ガイド部21の
中空内部の閉塞端側に基部を枢支され、且つガイド部2
1の開放端側に延びるロッドの先端部に押圧部材23を
有するシリンダ24を備え、前記ガイド部21の中空内
部に摺動自在に挿入され、且つ前記シリンダ24のロッ
ドの先端部付近を支持するように形成された中空の被ガ
イド部材25を有する。
As shown in FIG. 4, the workbench fixing device 19 includes a bracket 20 having two pin holes formed at a pitch substantially double the pitch of the pin holes 7 of the workbench body 9,
A frame 22 is provided which is fixed to the bracket 20 and has a rectangular hollow cross section whose one end is closed, and a frame 22. The frame 22 has a hollow inside closed end side of the guide 21. The base portion is pivotally supported by the guide portion 2
1 is provided with a cylinder 24 having a pressing member 23 at the tip of a rod extending toward the open end side, is slidably inserted into the hollow inside of the guide portion 21, and supports the vicinity of the tip of the rod of the cylinder 24. It has a hollow guided member 25 formed as described above.

【0025】上記の作業台固定装置19は、押圧部材2
3を作業台本体9の長手方向の外側へ向け、作業台本体
9の側面に設けた複数のピン孔7のいづれにもピン18
を介して着脱することが可能であり、前記の作業台位置
決め装置10との間隔を適宜に選定して装着することが
できる。
The workbench fixing device 19 has the pressing member 2
3 toward the outer side in the longitudinal direction of the workbench main body 9, and the pins 18 are provided in each of the plurality of pin holes 7 provided on the side surface of the workbench main body 9.
It is possible to attach and detach via the work table, and it is possible to install the work table positioning device 10 by appropriately selecting an interval from the work table positioning device 10.

【0026】そして、シリンダ24をロッドが伸張する
方向へ作動させることによってロッド先端の押圧部材2
3を作業台本体9の長手方向へ押し出せるように構成さ
れている。
By operating the cylinder 24 in the direction in which the rod extends, the pressing member 2 at the tip of the rod is moved.
3 can be pushed out in the longitudinal direction of the workbench body 9.

【0027】さらに、前記の作業台本体9の上面に保全
装置本体26を載置する。
Further, the maintenance device body 26 is placed on the upper surface of the workbench body 9.

【0028】該保全装置本体26は、前記作業台本体9
の上面の長手方向の前記作業台固定装置19取付け側の
端部近くの幅方向中央部分に、軸が作業台本体9の幅方
向へ水平に延びるように配置したウインチドラム27
と、該ウインチドラム27を駆動する油圧モータ28と
を有し、作業台本体9の中心より前記の作業台位置決め
装置10取付け側へ偏った幅方向中央部分に立設され、
且つ垂直方向へ延びる中空のガイドリーダ29と、該ガ
イドリーダ29の内部に昇降し得るように且つ作業台本
体9の下方へ突出し得るように配設した昇降リーダ30
と、前記のガイドリーダ29の中空内部の上部と昇降リ
ーダ30の中位部とを連結して昇降リーダ30をガイド
リーダ29に対して昇降させ得る昇降装置31とを有
し、さらに、前記のガイドリーダ29の上部にロープ溝
を前記のウインチドラム27方向へ向けて回転自在に枢
支された上部ガイドシーブ32と、前記の昇降リーダ3
0の下部の前記の上部ガイドシーブ32と同一の平面内
に、回転自在に枢支された下部ガイドシーブ33とを備
えている。
The maintenance device body 26 is the workbench body 9
A winch drum 27 in which a shaft extends horizontally in the width direction of the workbench main body 9 in the central portion in the width direction near the end on the workbench fixing device 19 attachment side of the upper surface of the workbench fixing device 19.
And a hydraulic motor 28 for driving the winch drum 27, which is erected at a central portion in the width direction that is deviated from the center of the workbench main body 9 to the workbench positioning device 10 mounting side,
In addition, a hollow guide leader 29 extending in the vertical direction and an elevating leader 30 arranged so as to be able to ascend and descend inside the guide leader 29 and to project below the workbench body 9.
And an elevating device 31 for connecting the upper part of the hollow inside of the guide leader 29 and the middle part of the elevating leader 30 to elevate the elevating leader 30 with respect to the guide leader 29. An upper guide sheave 32 rotatably supported by a rope groove in the upper part of the guide leader 29 toward the winch drum 27, and the elevating leader 3 described above.
A lower guide sheave 33 rotatably supported is provided in the same plane as the upper guide sheave 32 at the lower part of 0.

【0029】またさらに、地下水路1の内部へ投入でき
地下水路1内を自由に往復し得られ、且つ一側に掘削用
の開口部34aを有し、該開口部34a側と反開口部3
4a側とにロープの端部を接続し得るように形成したバ
ケット34を設ける。
Furthermore, it can be put into the underground waterway 1 and can freely reciprocate in the underground waterway 1, and it has an opening 34a for excavation on one side, and the opening 34a side and the anti-opening 3
A bucket 34 formed so that the end of the rope can be connected to the 4a side is provided.

【0030】そして、前記の保全装置本体26のウイン
チドラム27から繰り出されるロープ27aを上部ガイ
ドシーブ32に巻き掛け、さらに下部ガイドシーブ33
に巻き掛けたのち、バケット34に接続し得るように形
成する。
Then, the rope 27a fed from the winch drum 27 of the maintenance device body 26 is wound around the upper guide sheave 32, and further the lower guide sheave 33.
It is formed so that it can be connected to the bucket 34 after being wrapped around.

【0031】次に作動について説明する。前述の作業台
6と該作業台6上に載置した保全装置本体26とにより
構成した2基の地下下水道保全装置を清掃対象の地下下
水道へ連通する2箇所の作業通路2の地表開口部2a
に、それぞれの作業台位置決め装置10が清掃対象の地
下水路1側に位置するように据え付ける。
Next, the operation will be described. The surface opening 2a of the work passage 2 at two places communicating with the underground sewer system to be cleaned by the two underground sewer system maintenance devices composed of the work table 6 and the maintenance device main body 26 placed on the work table 6.
In addition, each workbench positioning device 10 is installed so as to be located on the side of the groundwater channel 1 to be cleaned.

【0032】この際、予め、作業台位置決め装置10の
押圧部材17を基準とし、目的の地下下水道の地表開口
部2aの地下水路1延設方向の開口幅よりも少し狭い間
隔位置に作業台固定装置19の押圧部材23が位置する
ように、作業台本体9の側面に設けたピン孔7のうちの
適宜の位置のピン孔7を選び、ピン18を介して作業台
固定装置19を固定して置く。
At this time, using the pressing member 17 of the workbench positioning device 10 as a reference, the workbench is fixed at a position slightly narrower than the opening width of the ground surface opening 2a of the intended underground sewer in the direction in which the underground waterway 1 is extended. A pin hole 7 at an appropriate position is selected from the pin holes 7 provided on the side surface of the workbench body 9 so that the pressing member 23 of the device 19 is positioned, and the workbench fixing device 19 is fixed via the pin 18. Put.

【0033】而して、作業台位置決め装置10のねじ装
置16のハンドル14を人力により操作してスクリュー
ロッド15を回転させジャッキ本体13を前進させるこ
とにより、ジャッキ本体13先端の押圧部材17を地表
開口部2aの清掃対象地下水路1側の周縁側面に当接し
て作業台6の地表開口部2aに対する位置を決定し、作
業台固定装置19のシリンダ24を作動しロッドを伸張
させることにより、該ロッド先端の押圧部材23を地表
開口部2aの他方側の周縁側面に押し当てることにより
作業台本体9を地表開口部2aの所定の位置に固定す
る。
Then, the handle 14 of the screw device 16 of the workbench positioning device 10 is manually operated to rotate the screw rod 15 to move the jack body 13 forward so that the pressing member 17 at the tip of the jack body 13 is brought to the surface. The position of the workbench 6 with respect to the surface opening 2a is determined by abutting the opening 2a on the peripheral side surface on the side of the groundwater channel 1 to be cleaned, and the cylinder 24 of the workbench fixing device 19 is operated to extend the rod. The workbench main body 9 is fixed to a predetermined position of the ground surface opening 2a by pressing the pressing member 23 at the tip of the rod against the peripheral side surface on the other side of the ground surface opening 2a.

【0034】さらに、一方(図1に示すA側)の保全装
置本体26のウインチドラム27に巻き付けられたロー
プ27aの繰り出し側端部を地下水路1の内部に投入し
たバケット34の掘削用の開口部34a側に連結し、他
方(図1に示すB側)の保全装置本体26のウインチド
ラム27に巻き付けられたロープ27aの繰り出し側端
部を前記のバケット34の反開口部34a側に連結す
る。
Further, an opening for excavating the bucket 34 in which the end of the rope 27a wound around the winch drum 27 of the main body 26 of the maintenance device on one side (A side shown in FIG. 1) is fed into the underground waterway 1. The end portion of the rope 27a wound around the winch drum 27 of the other maintenance device main body 26 (the side B shown in FIG. 1) is connected to the side of the portion 34a, and is connected to the side opposite to the opening 34a of the bucket 34. .

【0035】そして、各保全装置本体26,26の昇降
装置31を作動して昇降リーダ30を昇降させ、該昇降
リーダ30の下端部に設けた下部ガイドシーブ33の高
さ位置を調整することによって、バケット34の地下水
路1内における往復動通過位置を地下水路1の高さに適
合させる。
Then, the elevating device 31 of each maintenance device body 26, 26 is operated to elevate the elevating leader 30, and the height position of the lower guide sheave 33 provided at the lower end of the elevating leader 30 is adjusted. The reciprocating passage position of the bucket 34 in the groundwater channel 1 is adapted to the height of the groundwater channel 1.

【0036】その後、各保全装置本体26,26のウイ
ンチドラム27の油圧モータ28を作動させ、一方(図
1のA側)の保全装置本体26のウインチドラム27を
ロープ27aを巻き取る方向へ駆動し、同時に、他方
(図1のB側)の保全装置本体26のウインチドラム2
7をロープ27aを繰り出す方向へ駆動すれば、地下水
路1内部のバケット34は掘削方向へ前進し、地下水路
1内に堆積している土砂5等を一方(図1のA側)の作
業通路2下のピット3へ搬送する。
After that, the hydraulic motor 28 of the winch drum 27 of each of the maintenance device bodies 26, 26 is actuated to drive the winch drum 27 of one of the maintenance device bodies 26 (A side in FIG. 1) in the direction of winding the rope 27a. At the same time, the winch drum 2 of the other maintenance device main body 26 (B side in FIG. 1).
When 7 is driven in the direction of unwinding the rope 27a, the bucket 34 inside the groundwater channel 1 advances in the excavation direction, and the earth and sand 5 and the like accumulated in the groundwater channel 1 are used as one working passage (A side in FIG. 1). 2 Transport to lower pit 3.

【0037】また逆に、一方(図1のA側)の保全装置
本体26のウインチドラム27をロープ27aを繰り出
す方向へ駆動し、同時に、他方(図1のB側)の保全装
置本体26のウインチドラム27をロープ27aを巻き
取る方向へ駆動すれば、地下水路1内部のバケット34
は反掘削方向へ後退する。
On the contrary, the winch drum 27 of the maintenance device main body 26 on one side (A side in FIG. 1) is driven in the direction in which the rope 27a is extended, and at the same time, the winch drum 27 of the other maintenance device main body 26 (on the B side in FIG. 1). If the winch drum 27 is driven in the direction in which the rope 27a is wound up, the bucket 34 inside the underground waterway 1
Retreats in the anti-excavation direction.

【0038】かくして、地下水路1内のバケット34を
往復動させることによって、地下水路1内に堆積してい
る土砂5等をバケット34の掘削方向側(図1のA側)
の作業通路2下のピット3へ集積することができる。
In this way, by reciprocating the bucket 34 in the groundwater channel 1, the earth and sand 5 accumulated in the groundwater channel 1 is excavated in the bucket 34 (A side in FIG. 1).
Can be accumulated in the pit 3 below the work passage 2 of.

【0039】前記によれば、作業台6に対する作業台固
定装置19の装着位置を自在に選定し得るように形成し
たので、色々な大きさの地表開口部2aに作業台6及び
保全装置本体26を据え付けることができる。また、油
圧モータ28によって駆動されるウインチドラム27に
巻き取られ、且つ昇降可能な昇降リーダ30の先端部に
設けた下部ガイドシーブ33によりガイドされるロープ
27aによって地下水路1内に投入したバケット34を
往復動させ得るように形成したので、昇降リーダ30を
昇降させることによってバケット34の往復動位置の高
さを選択することが可能となり、色々な深さの地下水路
1に対応することができるとともに、機械力を駆使する
ことによって、少数の作業者により短時間内に効率のよ
い下水道清掃作業が可能となる。
According to the above, since the mounting position of the workbench fixing device 19 with respect to the workbench 6 can be freely selected, the workbench 6 and the maintenance device main body 26 are formed in the ground surface opening 2a of various sizes. Can be installed. Further, the bucket 34, which is wound into the winch drum 27 driven by the hydraulic motor 28 and is guided into the groundwater channel 1 by the rope 27a guided by the lower guide sheave 33 provided at the tip of the elevating leader 30 capable of ascending and descending. Since it is formed so as to be able to reciprocate, the height of the reciprocating position of the bucket 34 can be selected by raising and lowering the raising / lowering leader 30, and it is possible to correspond to the groundwater channel 1 of various depths. At the same time, by making full use of mechanical power, it becomes possible for a small number of workers to perform efficient sewer cleaning work in a short time.

【0040】なお、前述の実施例では、保全装置本体2
6のウインチドラム27を駆動する装置として油圧モー
タ28を設けた場合について説明したが、該油圧モータ
28に代えて電動モータとしてもよいことなど、その
他、本発明の要旨を逸脱しない範囲内において種々変更
を加え得ることは勿論である。
In the above embodiment, the maintenance device main body 2
Although the case where the hydraulic motor 28 is provided as a device for driving the winch drum 27 of No. 6 has been described, various other modifications may be made within the scope not departing from the gist of the present invention, such as an electric motor instead of the hydraulic motor 28. Of course, changes can be made.

【0041】[0041]

【発明の効果】本発明の地下下水道保全装置及び該地下
下水道保全装置に用いる作業台によれば、下記のごとき
種々の優れた効果を奏し得る。
EFFECTS OF THE INVENTION According to the underground sewerage conservation system and the workbench used in the underground sewerage conservation system of the present invention, various excellent effects as described below can be obtained.

【0042】I)作業台に対する作業台固定装置の装着
位置を自在に選定し得るように形成したので、色々な大
きさの地表開口部に対応して作業台及び保全装置本体を
据え付けることができる。
I) Since the mounting position of the workbench fixing device with respect to the workbench can be freely selected, the workbench and the maintenance device main body can be installed corresponding to the ground surface openings of various sizes. .

【0043】II)昇降リーダの昇降位置によってバケ
ットの往復動位置の高さを選択し得るので、色々な深さ
の地下水路に対応できる。
II) Since the height of the reciprocating position of the bucket can be selected depending on the raising / lowering position of the raising / lowering leader, it is possible to cope with underground waterways of various depths.

【0044】III)地下水路の内部に投入したバケッ
トを機械力によって往復動し得るように形成したので、
少数の作業者により短時間内に効率のよい下水道清掃作
業を実施することができる。
III) Since the bucket put into the underground waterway is formed so as to be able to reciprocate by mechanical force,
Efficient sewer cleaning work can be performed within a short time by a small number of workers.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の地下下水道保全装置及び該地下下水道
保全装置に用いる作業台の概略を表す側面図である。
FIG. 1 is a side view showing an outline of an underground sewer conservation system of the present invention and a workbench used in the underground sewer conservation system.

【図2】図1のII−II矢視図である。FIG. 2 is a view taken along the line II-II of FIG.

【図3】図1に関連する作業台位置決め装置の概略を表
す側面図である。
FIG. 3 is a side view schematically showing a workbench positioning device related to FIG. 1.

【図4】図1に関連する作業台固定装置の概略を表す側
面図である。
FIG. 4 is a side view schematically showing a workbench fixing device related to FIG. 1.

【図5】地下下水道の一例の概略を表す断面図である。FIG. 5 is a cross-sectional view schematically showing an example of underground sewer.

【符号の説明】[Explanation of symbols]

1 地下水路 6 作業台 7 ピン孔 9 作業台本体 10 作業台位置決め装置 16 ねじ装置 17 押圧部材 18 ピン 19 作業台固定装置 23 押圧部材 24 シリンダ 26 保全装置本体 27 ウインチドラム 28 油圧モータ(駆動装置) 29 ガイドリーダ 30 昇降リーダ 31 昇降装置 32 上部ガイドシーブ 33 下部ガイドシーブ 34 バケット 1 Groundwater Channel 6 Worktable 7 Pinhole 9 Worktable Main Body 10 Worktable Positioning Device 16 Screw Device 17 Pushing Member 18 Pin 19 Worktable Fixing Device 23 Pushing Member 24 Cylinder 26 Maintenance Device Main Body 27 Winch Drum 28 Hydraulic Motor (Drive Device) 29 Guide Reader 30 Lifting Leader 31 Lifting Device 32 Upper Guide Sheave 33 Lower Guide Sheave 34 Bucket

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】 作業台に設置したウインチドラムと、該
ウインチドラムを駆動する駆動装置と、作業台に下方へ
突出するように支持された昇降リーダと、該昇降リーダ
の下部に枢支された下部ガイドシーブとをそれぞれ備え
た2基の保全装置本体を有し、一方の保全装置本体のウ
インチドラムに巻き付けられたロープの繰り出し側端部
を地下水路の内部に設置可能に形成されたバケットの掘
削方向側端部に連結し得るように、且つ他方の保全装置
本体のウインチドラムに巻き付けられたロープの繰り出
し側端部を地下水路の内部に設置可能に形成されたバケ
ットの反掘削方向側端部に連結し得るように構成したこ
とを特徴とする地下下水道保全装置。
1. A winch drum installed on a workbench, a drive device for driving the winch drum, an elevating leader supported on the workbench so as to project downward, and a pivotal support under the elevating leader. It has two maintenance device main bodies each provided with a lower guide sheave, and one end of the rope wound around the winch drum of one of the maintenance device main body is provided on the inside of the ground water channel. A side end of the bucket which is formed so that it can be connected to the end on the side of the excavation direction and the end of the other side of the rope wound around the winch drum of the main body of the maintenance device can be installed inside the underground waterway. An underground sewer conservation system characterized by being configured so that it can be connected to a section.
【請求項2】 作業台に設置したウインチドラムと、該
ウインチドラムを駆動する駆動装置と、作業台に立設し
た中空構造のガイドリーダと、該ガイドリーダの内部に
昇降し得るように配設された昇降リーダと、該昇降リー
ダをガイドリーダに対して昇降させる昇降装置と、前記
の昇降リーダの下部に枢支された下部ガイドシーブとを
それぞれ備えた2基の保全装置本体を有し、一方の保全
装置本体のウインチドラムに巻き付けられたロープの繰
り出し側端部を地下水路の内部に設置可能に形成された
バケットの掘削方向側端部に連結し得るように、且つ他
方の保全装置本体のウインチドラムに巻き付けられたロ
ープの繰り出し側端部を地下水路の内部に設置可能に形
成されたバケットの反掘削方向側端部に連結し得るよう
に構成したことを特徴とする地下下水道保全装置。
2. A winch drum installed on a workbench, a drive device for driving the winch drum, a guide leader having a hollow structure installed upright on the workbench, and arranged so as to be able to move up and down inside the guide leader. A lifting / lowering leader, a lifting / lowering device for lifting / lowering the lifting / lowering leader with respect to the guide reader, and a lower guide sheave pivotally supported on a lower portion of the lifting / lowering leader. One end of the main body of the maintenance device is connected so that the end of the rope wound around the winch drum can be connected to the end of the bucket formed in the underground waterway in the excavating direction. The end of the rope wound around the winch drum on the other side is connected to the end on the side opposite to the excavation direction of the bucket that can be installed inside the underground waterway. Underground sewer conservation equipment to collect.
【請求項3】 ウインチドラムの駆動装置が油圧モータ
であることを特徴とする請求項1、或いは請求項2に記
載の地下下水道保全装置。
3. The underground sewer maintenance system according to claim 1, wherein the drive device for the winch drum is a hydraulic motor.
【請求項4】 ウインチドラムの駆動装置が電動モータ
であることを特徴とする請求項1、或いは請求項2に記
載の地下下水道保全装置。
4. The underground sewer maintenance system according to claim 1, wherein the drive device for the winch drum is an electric motor.
【請求項5】 昇降リーダが中空に形成され且つ該昇降
リーダの昇降装置が昇降リーダの内部に配設されたこと
を特徴とする請求項2から請求項4に記載の地下下水道
保全装置。
5. The underground sewer maintenance system according to claim 2, wherein the elevating leader is formed hollow, and the elevating device for the elevating leader is disposed inside the elevating leader.
【請求項6】 各保全装置本体のガイドリーダに上部ガ
イドシーブを枢支したことを特徴とする請求項2から請
求項5に記載の地下下水道保全装置。
6. The underground sewer maintenance system according to claim 2, wherein an upper guide sheave is pivotally supported by a guide leader of each maintenance system body.
【請求項7】 保全装置本体を載置できる上面を有し、
保全装置本体の下部ガイドシーブのロープ溝に平行する
方向へ水平に延び且つ幅方向へ間隔を隔てて相対する一
対の側面に、該各側面に沿って所定の等間隔を置いて穿
設された複数のピン孔を有する作業台本体と、該作業台
本体下面の長手方向の一側に偏し且つ幅方向に所定の間
隔を隔てた対称位置に作業台本体の一側方向へ向けて取
付けられ且つ先端部に設けた押圧部材を前進後退させ得
るねじ装置を有する作業台位置決め装置と、前記の作業
台本体両側面の適宜の位置に前記のピン孔に挿通し得る
ピンを介して作業台本体の他側方向へ向けて着脱でき且
つロッド先端部に設けた押圧部材を前進後退させ得るシ
リンダを有する作業台固定装置とを備えたことを特徴と
する請求項1から請求項6に記載の地下下水道保全装置
に用いる作業台。
7. An upper surface on which the maintenance device main body can be placed,
A pair of side faces that extend horizontally in a direction parallel to the rope groove of the lower guide sheave of the maintenance device body and face each other at intervals in the width direction are provided at predetermined equal intervals along the respective side faces. A workbench main body having a plurality of pin holes and attached to one side of the workbench main body at symmetrical positions on the lower surface of the workbench main body that are biased to one side in the longitudinal direction and are spaced apart by a predetermined distance in the width direction. And a workbench positioning device having a screw device capable of advancing and retracting a pressing member provided at the tip end, and a workbench main body via pins that can be inserted into the pin holes at appropriate positions on both side surfaces of the workbench main body. 7. A workbench fixing device having a cylinder that can be attached and detached toward the other side of the rod and that can move forward and backward a pressing member provided at the tip of the rod. A workbench used for sewer maintenance equipment.
JP33855993A 1993-12-28 1993-12-28 Underground sewer maintenance device and workbench used for the underground sewer maintenance device Expired - Fee Related JP3372095B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP33855993A JP3372095B2 (en) 1993-12-28 1993-12-28 Underground sewer maintenance device and workbench used for the underground sewer maintenance device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP33855993A JP3372095B2 (en) 1993-12-28 1993-12-28 Underground sewer maintenance device and workbench used for the underground sewer maintenance device

Publications (2)

Publication Number Publication Date
JPH07197517A true JPH07197517A (en) 1995-08-01
JP3372095B2 JP3372095B2 (en) 2003-01-27

Family

ID=18319321

Family Applications (1)

Application Number Title Priority Date Filing Date
JP33855993A Expired - Fee Related JP3372095B2 (en) 1993-12-28 1993-12-28 Underground sewer maintenance device and workbench used for the underground sewer maintenance device

Country Status (1)

Country Link
JP (1) JP3372095B2 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100454159B1 (en) * 2002-12-11 2004-10-26 주식회사 한국지중정보 Internal photographing method and device in path of drainage
KR100913412B1 (en) * 2009-04-24 2009-09-16 (주)성지토목기술공사 Drainage canal
KR100963307B1 (en) * 2009-11-30 2010-06-15 성림산업(주) Traction device for repairing water supply and drainage conduit
KR100967184B1 (en) * 2009-11-30 2010-07-05 성림산업(주) Repariring process of water supply and drainage conduit
JP2011026830A (en) * 2009-07-24 2011-02-10 Ksk:Kk Cable guiding device
CN103498508A (en) * 2013-09-04 2014-01-08 沈阳市政集团有限公司 Drainage pipeline trash remover
JP2015031026A (en) * 2013-08-01 2015-02-16 東京都下水道サービス株式会社 Wiring method to crossing pipe in fluid pipeline, and wiring method of communication line for work with work body attached to portion thereof, as well as device for use in the method

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102650145A (en) * 2012-05-14 2012-08-29 中国十七冶集团有限公司 Method for dredging drainage pipeline by winches
CN107447851A (en) * 2017-09-16 2017-12-08 张怀志 Tractor portable type underground pipeline dredging machine

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100454159B1 (en) * 2002-12-11 2004-10-26 주식회사 한국지중정보 Internal photographing method and device in path of drainage
KR100913412B1 (en) * 2009-04-24 2009-09-16 (주)성지토목기술공사 Drainage canal
JP2011026830A (en) * 2009-07-24 2011-02-10 Ksk:Kk Cable guiding device
KR100963307B1 (en) * 2009-11-30 2010-06-15 성림산업(주) Traction device for repairing water supply and drainage conduit
KR100967184B1 (en) * 2009-11-30 2010-07-05 성림산업(주) Repariring process of water supply and drainage conduit
JP2015031026A (en) * 2013-08-01 2015-02-16 東京都下水道サービス株式会社 Wiring method to crossing pipe in fluid pipeline, and wiring method of communication line for work with work body attached to portion thereof, as well as device for use in the method
CN103498508A (en) * 2013-09-04 2014-01-08 沈阳市政集团有限公司 Drainage pipeline trash remover
CN103498508B (en) * 2013-09-04 2015-06-17 沈阳市政集团有限公司 Drainage pipeline trash remover

Also Published As

Publication number Publication date
JP3372095B2 (en) 2003-01-27

Similar Documents

Publication Publication Date Title
KR100703620B1 (en) Cutter and method for working the soil
CN103669351B (en) Full-stroke hole-leading hydraulic static pile driver
JP3372095B2 (en) Underground sewer maintenance device and workbench used for the underground sewer maintenance device
JP4448481B2 (en) Soil work method and soil work machine
CN208234420U (en) Construction site Miniature hanging device
KR100820136B1 (en) Gate removal device of gate structure
CN215443968U (en) Pipe taking device and full-casing full-slewing drilling machine system
JP3847969B2 (en) Deep manhole dredge device
CN210264513U (en) Movable engineering drilling machine
KR100500133B1 (en) Lift using vehicle maintenance dock
CN111332830A (en) Cement warehouse cleaning device and method
JP5851774B2 (en) Low head drilling rig with variable feed stroke
CN211110767U (en) Hoisting equipment for mounting gate of hydropower station
CN213387587U (en) Vertical column type heavy equipment hoisting device for underground coal mine
CN211971104U (en) Cement warehouse cleaning device
CN212776633U (en) Colliery is headwork face water pump elevating gear in pit
KR100661007B1 (en) A aid-dredgers for intercepting sewer and sewer conduit and it's dredger mehhod
CN215331634U (en) Device for protecting hole opening of dug pile during lifting
JP3373318B2 (en) Transfer device
CN214940079U (en) High-pressure jet grouting pile machine capable of being used for water stopping of deep foundation pit
CN214570569U (en) Municipal administration is applicable to well lid hoisting accessory
CN219343350U (en) Telescopic pressurizing grab bucket
CN217079762U (en) A frame that slides for assembled steel construction building construction
JP2568482Y2 (en) Underground excavator
JP5485025B2 (en) Underground pile insertion and removal equipment

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees