JPH07191067A - Electronic watt-hour meter and its management system - Google Patents

Electronic watt-hour meter and its management system

Info

Publication number
JPH07191067A
JPH07191067A JP5346909A JP34690993A JPH07191067A JP H07191067 A JPH07191067 A JP H07191067A JP 5346909 A JP5346909 A JP 5346909A JP 34690993 A JP34690993 A JP 34690993A JP H07191067 A JPH07191067 A JP H07191067A
Authority
JP
Japan
Prior art keywords
data
expiration date
electronic watt
hour meter
meter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP5346909A
Other languages
Japanese (ja)
Other versions
JP3100276B2 (en
Inventor
Shinichi Igarashi
眞一 五十嵐
Tatsuji Naka
達次 中
Kazumasa Ibata
一雅 井端
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Osaki Electric Co Ltd
Azbil Corp
Original Assignee
Osaki Electric Co Ltd
Azbil Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Osaki Electric Co Ltd, Azbil Corp filed Critical Osaki Electric Co Ltd
Priority to JP05346909A priority Critical patent/JP3100276B2/en
Publication of JPH07191067A publication Critical patent/JPH07191067A/en
Application granted granted Critical
Publication of JP3100276B2 publication Critical patent/JP3100276B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PURPOSE:To easily and automatically manage the expiration date of the validity time of an electronic watt-hour meter which is a measuring instrument for a business agreement. CONSTITUTION:An electronic watt-hour meter provided with a powerfrequency converting section 4 which finds electric power from the product of the voltage and current of a load and outputs the electric power after converting the power into a frequency and a central processing section 5 which adds up the frequencies outputted from the converting section 4 and outputs the sum as electric energy is further provided with a nonvolatile memory 9 which stores the data about the expiration date of the validity time of the meter, input-output means 7 for exchanging the data with the outside, and writing/reading means 5 which writes and reads data in and from the memory 9 so that the data about the expiration date of the validity time can be stored in the meter itself in a state where the data can be read out from the memory 9.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、電力会社と電力需要家
との間における取引用計器、あるいは、ビルやマンショ
ンなどのオーナーと入居者との間において、使用電気料
金の配分の根拠として使用される取引証明用計器として
の電子式電力量計および同管理システムの改良に関する
ものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention is used as a basis for allocating electricity charges between transaction companies between electric power companies and electric power consumers, or between owners and residents of buildings and condominiums. The present invention relates to an improvement of an electronic watt hour meter as a transaction certifying instrument and its management system.

【0002】[0002]

【従来の技術】たとえばテナントビルにおいては、テナ
ントビルのオーナーが電力の使用に関して電力会社と一
括契約を行い、テナントビル全体として使用した電力料
金を支払う。一方、テナントビルのオーナーと各入居者
との間における電力料金の支払いに当たっては、各テナ
ント単位に取り付けられる取引証明用計器(電力量計)
の計量値を基に配分するようにして、使用電力料金の支
払いが行われる。
2. Description of the Related Art For example, in a tenant building, the owner of the tenant building makes a collective contract with an electric power company regarding the use of electric power, and pays the electricity charge used for the entire tenant building. On the other hand, when paying the electricity charges between the tenant building owner and each resident, a transaction proof meter (electric energy meter) attached to each tenant
The power usage fee is paid by allocating based on the measured value of.

【0003】これら料金取引の根拠として使用される計
器の設置および使用にあたっては、公的な検定機関にお
いて予め所定の検定が完了している計器を使用すること
が義務づけられている。
When installing and using the instruments used as the basis for these fee transactions, it is obligatory to use the instruments that have been subjected to predetermined certification in advance by a public certification body.

【0004】そこで、テナントビルのオーナーとして
は、各テナント単位に設置されている計器の検定有効期
間満了年月を管理する必要があるが、図6に示すよう
に、計器の検定有効期間は計器の種類により異なる。
Therefore, as the owner of the tenant building, it is necessary to manage the expiration date of the verification valid period of the meter installed in each tenant unit, but as shown in FIG. Depends on the type.

【0005】[0005]

【発明が解決しようとする課題】したがって、テナント
ビルのオーナーがこれらの計器を管理する上で、テナン
トによっては使用する電気機器の増加や種別変更などに
より計器の容量が変更される場合や、テナントの入れ替
わりにより計器を交換する必要を生ずる場合もあって、
各計器の検定有効期間を管理しようとする場合には、各
テナント毎の計器の検定ラベル、検定票、または、合番
号票を点検し、検定有効期間満了年月を定期的に調査す
る必要があり、これらの管理業務を常に正確に実施する
ことは、手間がかかると共に煩瑣な仕事である。 従
来、これら取引証明用計器の管理は、台帳により管理
する、パソコンなどにデータを入力することにより管
理する、または、外部のサービス機関に管理を委託す
る、などにより行われてきたが、いずれも忘れられるこ
とがあったり、また、それなりの費用を必要としてい
た。
Therefore, when the tenant building owner manages these instruments, depending on the tenant, the capacity of the instrument may change due to an increase or change in the type of electrical equipment used, In some cases, it may be necessary to replace the instrument due to the replacement of
If you want to manage the validity period of each instrument, it is necessary to check the instrument's certification label, certification sheet, or collation number for each tenant, and periodically check the expiration date of the validation period. Therefore, it is a time-consuming and laborious task to always perform these management tasks accurately. Conventionally, the management of these transaction certifying instruments has been performed by managing with a ledger, by entering data into a personal computer, or by outsourcing the management to an external service institution. It was sometimes forgotten, and required a certain amount of money.

【0006】本発明の目的は、上述の課題を解決し、取
引証明用計器である電子式電力量計の検定有効期間満了
年月を容易に、かつ、自動的に管理するための電子式電
力量計および同管理システムを提供することである。
An object of the present invention is to solve the above-mentioned problems, and to easily and automatically manage the expiration date of the verification valid period of an electronic watt-hour meter which is a transaction certifying instrument. It is to provide a meter and the management system.

【0007】[0007]

【課題を解決するための手段】請求項1記載の本発明
は、負荷の電圧と電流の積から電力を得、該電力を比例
する周波数に変換して出力する電力−周波数変換部と、
該電力−周波数変換部の出力周波数を積算し、電力量と
して出力する中央処理部とを備えた電子式電力量計にお
いて、検定有効期間満了年月のデータを記憶する不揮発
性メモリと、該データを外部と交換するための入出力手
段と、該データの不揮発性メモリへの書き込み、読み取
りを処理する書き込み・読み取り手段とを具備してい
る。
The present invention according to claim 1 obtains electric power from a product of voltage and current of a load, converts the electric power into a frequency proportional to the electric power, and outputs the electric power-frequency converter.
In an electronic watt-hour meter having a central processing unit that integrates the output frequencies of the power-frequency conversion unit and outputs as a power amount, a non-volatile memory that stores data of the expiration date of the verification valid period, and the data. And an external input / output unit for exchanging the data, and a writing / reading unit for writing and reading the data in the nonvolatile memory.

【0008】請求項2記載の本発明は、複数の請求項1
記載の電子式電力量計を通信手段を介して制御装置に接
続し、該制御装置に、複数の電子式電力量計の各々に検
定有効期間満了年月のデータを書き込み指令と共に送信
し、読み取り指令の送信に応じた複数の電子式電力量計
の各々からの検定有効期間満了年月のデータを受信する
送受信手段と、受信した検定有効期間満了年月のデータ
を処理する処理手段とを設けている。
The present invention according to claim 2 has a plurality of claims 1
The electronic watt-hour meter described is connected to a control device via a communication means, and the control device transmits to each of the plurality of electronic watt-hour meters data of the expiration date of the certification valid period together with a write command, and reads the data. Provided with a transmission / reception means for receiving the data of the expiration date of the certification valid period from each of the plurality of electronic watt-hour meters corresponding to the transmission of the command, and a processing means for processing the received data of the expiration date of the certification valid period. ing.

【0009】[0009]

【実施例】図1は、本発明の一実施例である、電子式電
力量計を示すブロック図である。電子式電力量計1は、
電圧変成器(PT)2と電流変成器(CT)3により、
それぞれ負荷電力線における電圧および電流値を計測
し、その値は電力−周波数変換部4に入力され、電力−
周波数変換部4は使用されている電力に比例した周波数
を中央処理部5に対して出力する。
1 is a block diagram showing an electronic watt-hour meter, which is an embodiment of the present invention. The electronic watt hour meter 1
By the voltage transformer (PT) 2 and the current transformer (CT) 3,
Each voltage and current value in the load power line is measured, and the value is input to the power-frequency conversion unit 4, and
The frequency converter 4 outputs a frequency proportional to the electric power used to the central processing unit 5.

【0010】中央処理部5は入力された周波数を基に電
力量を時々刻々積算し、それを表示部6に表示すると共
に、入出力部7から通信線8を介して、パソコンなどに
より構成される制御装置10(図3)に対して計量デー
タを出力する。
The central processing unit 5 momentarily integrates the amount of electric power based on the input frequency, displays it on the display unit 6, and is constituted by a personal computer or the like via the communication line 8 from the input / output unit 7. The metering data is output to the control device 10 (FIG. 3).

【0011】また、電子式電力量計1は、EEPRO
M、コアメモリ、電池によりバックアップされたRAM
などにより形成される不揮発性メモリ9を具備してお
り、不揮発性メモリ9は検定の有効期間満了年月のデー
タを記憶する。なお、不揮発性メモリ9は、中央処理部
5に外付けされるもの、内蔵されるもの、入出力部7に
内蔵されるもの、のいずれでもよい。
The electronic watt hour meter 1 is EEPRO.
RAM backed up by M, core memory, battery
A non-volatile memory 9 formed by, for example, is stored in the non-volatile memory 9. The non-volatile memory 9 stores data on the expiration date of the valid period of the test. The non-volatile memory 9 may be external to the central processing unit 5, built-in, or built in the input / output unit 7.

【0012】図2は、本発明の一実施例である電子式電
力量計1の、単独計器の場合の発注から設置に至る流れ
を示すブロック図である。
FIG. 2 is a block diagram showing a flow from the ordering to the installation of the electronic watt hour meter 1 which is an embodiment of the present invention in the case of a single meter.

【0013】所謂ビルオートメーション会社が、ステッ
プ1において計器製造メーカーに計器の発注を行い、ス
テップ2でこれに応えて計器製造メーカーが所定の仕様
を有する計器(図1の電子式電力量計1)を製造する。
ステップ3では製造された計器について検定機関に検定
を申請し、ステップ4で検定が実施されて合格すると、
当該計器に検定封印が施されると共に検定ラベルが貼り
付けられる。計器製造メーカーはステップ5で検定機関
より検定に合格した計器を引き取り、ビルオートメーシ
ョン会社に納入する。
A so-called building automation company orders an instrument from the instrument manufacturer in step 1, and responds to this in step 2 by the instrument manufacturer having a predetermined specification (electronic watt-hour meter 1 in FIG. 1). To manufacture.
In step 3, apply for the verification of the manufactured instrument to the verification agency, and if the verification is performed and passed in step 4,
The instrument is sealed with the certification seal and attached with the certification label. In step 5, the instrument manufacturer picks up the instruments that have passed the certification from the certification body and delivers them to the building automation company.

【0014】ビルオートメーション会社では計器の設置
工事を行い、ステップ6で計器の検定ラベルに記載され
ている「検定の有効期間満了年月」のデータを計器に対
して設定することにより、計器に内蔵される不揮発性メ
モリ9にこのデータが記憶される。
A building automation company installs a meter, and in step 6 sets the data of the "expiration date of the valid term" written on the meter's verification label for the meter to build it into the meter. This data is stored in the nonvolatile memory 9 to be stored.

【0015】ステップ6では、同時にビルオートメーシ
ョン・システムとしての調整が行われ、ステップ7でテ
ナントビルのオーナーにシステムが引き渡される。
In step 6, the building automation system is adjusted at the same time, and in step 7, the system is delivered to the tenant building owner.

【0016】図3は、図1に示される電子式電力量計の
検定有効期間満了年月を管理する電子式電力量計管理シ
ステムの構成を示すブロック図である。
FIG. 3 is a block diagram showing the configuration of an electronic watt hour meter management system for managing the expiration date of the verification valid period of the electronic watt hour meter shown in FIG.

【0017】テナントビルなどにおいて、各テナント毎
に設置される電子式電力量計1a,1b〜1nは、通信
線8によりテナントビルのオーナーの管理室などに設置
される制御装置10と接続される。制御装置10はパー
ソナルコンピュータなどにより構成され、ディスプレィ
11およびプリンタ12に接続される。なお、通信線8
の代わりに、無線、光、電力線搬送などの通信手段を用
いることもできる。
In a tenant building or the like, the electronic watt hour meters 1a, 1b to 1n installed for each tenant are connected by a communication line 8 to a control device 10 installed in the management room of the owner of the tenant building. . The control device 10 is composed of a personal computer or the like, and is connected to the display 11 and the printer 12. In addition, communication line 8
Instead of, the communication means such as wireless, optical and power line carrier can be used.

【0018】図4は、図3に示される電子式電力量計管
理システムにおける、制御装置10の「検定の有効期間
満了年月」のデータの書き込み・読み取り処理を示すフ
ローチャートである。
FIG. 4 is a flow chart showing the process of writing / reading the data of the “expiration date of the valid period” of the control device 10 in the electronic watt-hour meter management system shown in FIG.

【0019】制御装置10が、ステップ1で「検定の有
効期間満了年月」のデータの書き込みを行う場合は、ス
テップ2へ進み、「検定の有効期間満了年月」のデータ
を書き込もうとする計器のアドレスが指定され、「検定
の有効期間満了年月」のデータが当該電子式出力量計
(図3の1/1a,1b〜1n)に対して送信される。
ステップ3で指定された計器における「検定の有効期間
満了年月」のデータの書き込み完了を表す信号の受信が
確認されると、ステップ4で「検定の有効期間満了年
月」の読取日か否かを確認し、読取日でない場合はシス
テムとしての書き込み処理動作を終了する。
When the control device 10 writes the data of "expiration date of validity period" in step 1, the process proceeds to step 2, and the instrument tries to write the data of "expiration date of certification period". Is designated, and the data of "the expiration date of the valid period of the test" is transmitted to the electronic output meter (1 / 1a, 1b to 1n in FIG. 3).
When it is confirmed that the signal indicating the completion of the writing of the "expiration date of the certification" in the instrument specified in step 3 is received, it is determined in step 4 whether the reading date of the "expiration date of the certification validity period" is reached. If it is not the read date, the write processing operation of the system ends.

【0020】一方、制御装置10が「検定の有効期間満
了年月」のデータの読取日に読み取り動作を行う場合
は、ステップ1で「検定の有効期間満了年月」のデータ
の書き込み動作でないことを確認してステップ4へ進
み、ステップ4で「検定の有効期間満了年月」読取日で
あることを確認してステップ5へ進む。ステップ5では
最初に読み取る計器のアドレスを指定し、ステップ6で
「検定の有効期間満了年月」のデータの読み取り指令を
その計器に宛てて送信する。これに対して最初の計器は
自己の不揮発性メモリ9(図1)に記憶されている「検
定の有効期間満了年月」のデータを制御装置10に対し
て送りだす。制御装置10はこの「検定の有効期間満了
年月」のデータを正常に受信したかをステップ7で確認
し、データ正常受信でステップ8に進み、受信した最初
の計器の「検定の有効期間満了年月」のデータを自己の
メモリ(不図示)に格納する。
On the other hand, if the control device 10 performs the reading operation on the date of reading the data of "expiration date of validity of verification", it is not the writing operation of data of "expiration date of validity of verification" in step 1. Is confirmed and the process proceeds to step 4, and in step 4, it is confirmed that it is the “date of expiration of the valid period of the verification”, and the process proceeds to step 5. In step 5, the address of the instrument to be read first is specified, and in step 6, a command to read the data of "expiration date of the valid period" is sent to that instrument. On the other hand, the first instrument sends the data of "the expiration date of the valid period of the test" stored in its own non-volatile memory 9 (Fig. 1) to the control device 10. The control device 10 confirms in step 7 whether or not the data of "expiration date of validity of verification" has been normally received, and proceeds to step 8 when the data is normally received, and "expiration of validity period of the first instrument received" The “year / month” data is stored in its own memory (not shown).

【0021】次いで、制御装置10は、ステップ9で
「検定の有効期間満了年月」のデータを読み取るべき計
器のアドレスを一つ上げて、二番目の計器についてステ
ップ6〜ステップ8の読み取り動作を行う。さらに、制
御装置10は、ステップ9で「検定の有効期間満了年
月」のデータを読み取るべき計器のアドレスを一つ上げ
て、三番目の計器についてステップ6〜ステップ8の読
み取り動作を行う。
Next, the control device 10 increments the address of the instrument from which the data of "expiration date of the test is expired" is incremented by one in step 9, and the reading operation of steps 6 to 8 is performed for the second instrument. To do. Further, in step 9, the control device 10 increments the address of the meter from which the data of “expiration date of validity of the test” is read by one, and performs the reading operation of steps 6 to 8 for the third meter.

【0022】このようにして、制御装置10は管理すべ
きすべての計器1a,1b〜1nについて「検定の有効
期間満了年月」のデータの読み取りを行い、ステップ1
0で全計器についての読み取り終了を確認すると、ステ
ップ11で現在の年月から+6カ月の「検定の有効期間
満了年月」のデータを送ってきた計器があるかを判定す
る。もしこのような計器があれば、ステップ12で、計
器アドレス、需要家名、検定の有効期間満了年月をディ
スプレィ11およびプリンタ12に出力し、すべての読
み取り動作を終了する。
In this way, the control device 10 reads the data of "the expiration date of the valid period of the verification" for all the measuring instruments 1a, 1b to 1n to be managed, and step 1
When it is confirmed that the reading of all the meters is completed at 0, it is determined at step 11 whether or not there is an instrument that has sent the data of "expiration date of the valid period of +6 months" from the current year. If there is such an instrument, in step 12, the instrument address, the customer name, and the expiration date of the valid period of the certification are output to the display 11 and the printer 12, and all reading operations are completed.

【0023】図5は、図3に示される電子式電力量計に
おける、中央処理部5の「検定の有効期間満了年月」の
データの書き込み・読み取り処理を示すフローチャート
である。
FIG. 5 is a flow chart showing the data writing / reading process of the “validation period expiration date” of the central processing unit 5 in the electronic watt hour meter shown in FIG.

【0024】ステップ1で制御装置10からの「検定の
有効期間満了年月」のデータの書き込みまたは読み取り
の指令の到来を受信すると、ステップ2で同データの書
き込みか読み取りかを判断し、ステップ2で書き込み指
令と判断すると、ステップ3で電子式電力量計1の不揮
発性メモリ9に所定の「検定の有効期間満了年月」のデ
ータを書き込む。書き込み動作が終了すると、計器(電
子式電力量計1)はステップ4で制御装置10に対して
完了信号を送信する。
When an instruction to write or read data of "expiration date of validity of test" is received from the controller 10 in step 1, it is judged in step 2 whether the data is to be written or read, and step 2 If it is determined to be a write command in step 3, the predetermined "validation term expiration date" data is written in the non-volatile memory 9 of the electronic watt-hour meter 1 in step 3. When the writing operation is completed, the meter (electronic watt hour meter 1) sends a completion signal to the control device 10 in step 4.

【0025】また、ステップ2で制御装置10からの書
き込みの指令でないことを判断し、かつ、ステップ5で
制御装置10からの読み取りの指令を判断すると、ステ
ップ6で自己の不揮発性メモリ9に記憶されている「検
定の有効期間満了年月」のデータを読み出し、ステップ
7でそのデータを制御装置10に対して通信線8などを
介して送信して、読み取り動作を終了する。
If it is judged in step 2 that the command is not a write command from the control device 10, and if it is judged in step 5 that it is a read command from the control device 10, it is stored in its own non-volatile memory 9 in step 6. The data of "the expiration date of the valid period of the test" is read out, and in step 7, the data is transmitted to the control device 10 through the communication line 8 or the like, and the reading operation is ended.

【0026】以上のような電子式電力量計および同管理
システムにより、テナントビルのオーナーは、電子式電
力量計に記憶されている「検定の有効期間満了年月」の
データを読み出すことで、個々の計器の検定の有効期間
を毎月定期的に確認し、有効期間の残月数が6カ月乃至
1年となった計器のアドレス(番号)をハードコピーと
してプリント出力させることが可能となり、検定有効期
間満了の6カ月乃至1年前のデータにより予算に計器の
交換費用を予め計上可能となるなど、テナントビルなど
における取引証明用計器の管理を極めて容易かつ合理的
とすることができる。
With the electronic watt-hour meter and the management system as described above, the owner of the tenant building reads the data of "the expiration date of the verification period" stored in the electronic watt-hour meter, It is possible to check the validity period of each instrument's certification periodically every month and print out the address (number) of the instrument whose remaining valid period is 6 months to 1 year as a hard copy. The data for 6 months to 1 year before the expiry of the period allows the replacement cost of the instrument to be recorded in the budget in advance, which makes it extremely easy and rational to manage the transaction proof instrument in the tenant building.

【0027】[0027]

【発明の効果】以上説明したように、請求項1記載の本
発明によれば、検定有効期間満了年月のデータを記憶す
る不揮発性メモリと、該データを外部と交換するための
入出力手段と、該データの不揮発性メモリへの書き込
み、読み取りを処理する書き込み・読み取り手段とを具
備し、以て、電子式電力量計自体に検定有効期間満了年
月のデータを読み出し可能に記憶するようにしたから、
検定有効期間満了年月を容易に、かつ、自動的に管理す
ることを可能にする。
As described above, according to the present invention as set forth in claim 1, a non-volatile memory for storing the data of the expiration date of the test valid period, and an input / output means for exchanging the data with the outside. And a writing / reading means for processing writing and reading of the data into the non-volatile memory, so that the electronic watt-hour meter itself can readably store the data of the expiration date of the verification valid period. Because I chose
It is possible to easily and automatically manage the expiration date of the certification valid period.

【0028】また、請求項2記載の本発明によれば、複
数の請求項1記載の電子式電力量計を通信手段を介して
制御装置に接続し、該制御装置に、複数の電子式電力量
計の各々に検定有効期間満了年月のデータを書き込み指
令と共に送信し、読み取り指令の送信に応じた複数の電
子式電力量計の各々からの検定有効期間満了年月のデー
タを受信する送受信手段と、受信した検定有効期間満了
年月のデータを処理する処理手段とを設けたから、制御
装置により、検定有効期間満了年月を容易に、かつ、自
動的に管理することができる。
According to the present invention as set forth in claim 2, a plurality of electronic watt-hour meters according to claim 1 are connected to the control device via communication means, and the control device is provided with a plurality of electronic power meters. Sending and receiving the data of the expiration date of the valid test period to each of the meters along with the write command, and receiving the data of the expiry date of the valid test period from each of the multiple electronic watt-hour meters according to the transmission of the read command. Since the means and the processing means for processing the received data of the expiration date of the valid test period are provided, the expiration date of the valid test period can be easily and automatically managed by the control device.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例である、電子式電力量計のブ
ロック図である。
FIG. 1 is a block diagram of an electronic watt-hour meter, which is an embodiment of the present invention.

【図2】電子式電力量計の、単独計器の場合の発注から
設置に至る流れを示すフローチャートである。
FIG. 2 is a flowchart showing a flow from ordering to installation of an electronic watt hour meter in the case of a single meter.

【図3】本発明の一実施例である電子式電力量計管理シ
ステムの構成を示すブロック図である。
FIG. 3 is a block diagram showing a configuration of an electronic watt-hour meter management system that is an embodiment of the present invention.

【図4】同じく電子式電力量計管理システムにおける、
制御装置10の「検定の有効期間満了年月」のデータの
書き込み・読み取り処理を示すフローチャートである。
[FIG. 4] Similarly, in the electronic watt hour management system,
6 is a flowchart showing a process of writing / reading data of “expiration date of validity period” of the control device 10.

【図5】同じく電子式電力量計における、中央処理部5
の「検定の有効期間満了年月」のデータの書き込み・読
み取り処理を示すフローチャートである。
FIG. 5 is a central processing unit 5 of the electronic watt hour meter.
5 is a flowchart showing a process of writing / reading data of “the expiration date of the valid period of test”.

【図6】計器の種類に応じた検定有効期間を示す図であ
る。
FIG. 6 is a diagram showing a verification valid period according to the type of instrument.

【符号の説明】[Explanation of symbols]

1 電子式電力量計 1a 電子式電力量計 1b 電子式電力量計 1n 電子式電力量計 2 電圧変成器 3 電流変成器 4 電力−周波数変換部 5 中央処理部(書き込み・読み取り手段) 6 表示部 7 入出力部 8 通信線 9 不揮発性メモリ 10 制御装置 11 ディスプレィ 12 プリンタ 1 electronic watt-hour meter 1a electronic watt-hour meter 1b electronic watt-hour meter 1n electronic watt-hour meter 2 voltage transformer 3 current transformer 4 power-frequency converter 5 central processing unit (writing / reading means) 6 display Part 7 Input / output part 8 Communication line 9 Non-volatile memory 10 Control device 11 Display 12 Printer

─────────────────────────────────────────────────────
─────────────────────────────────────────────────── ───

【手続補正書】[Procedure amendment]

【提出日】平成6年8月18日[Submission date] August 18, 1994

【手続補正2】[Procedure Amendment 2]

【補正対象書類名】図面[Document name to be corrected] Drawing

【補正対象項目名】図1[Name of item to be corrected] Figure 1

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【図1】 [Figure 1]

【手続補正3】[Procedure 3]

【補正対象書類名】図面[Document name to be corrected] Drawing

【補正対象項目名】図2[Name of item to be corrected] Figure 2

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【図2】 [Fig. 2]

【手続補正4】[Procedure amendment 4]

【補正対象書類名】図面[Document name to be corrected] Drawing

【補正対象項目名】図3[Name of item to be corrected] Figure 3

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【図3】 [Figure 3]

【手続補正5】[Procedure Amendment 5]

【補正対象書類名】図面[Document name to be corrected] Drawing

【補正対象項目名】図4[Name of item to be corrected] Fig. 4

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【図4】 [Figure 4]

【手続補正6】[Procedure correction 6]

【補正対象書類名】図面[Document name to be corrected] Drawing

【補正対象項目名】図5[Name of item to be corrected] Figure 5

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【図5】 [Figure 5]

フロントページの続き (72)発明者 井端 一雅 神奈川県伊勢原市鈴川54番地 山武ハネウ エル株式会社伊勢原工場内Front page continuation (72) Inventor Kazumasa Ibata 54 Suzukawa, Isehara City, Kanagawa Yamatake Hanuel Co., Ltd. Isehara Factory

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 負荷の電圧と電流の積から電力を得、該
電力を比例する周波数に変換して出力する電力−周波数
変換部と、該電力−周波数変換部の出力周波数を積算
し、電力量として出力する中央処理部とを備えた電子式
電力量計において、検定有効期間満了年月のデータを記
憶する不揮発性メモリと、該データを外部と交換するた
めの入出力手段と、該データの前記不揮発性メモリへの
書き込み、読み取りを処理する書き込み・読み取り手段
とを具備したことを特徴とする電子式電力量計。
1. A power-frequency converter that obtains electric power from a product of a voltage and a current of a load, converts the electric power into a proportional frequency, and outputs the power, and integrates an output frequency of the power-frequency converter to obtain electric power. In an electronic watt-hour meter having a central processing unit for outputting as a quantity, a non-volatile memory for storing data of the expiration date of the certification valid period, an input / output unit for exchanging the data with the outside, and the data 2. An electronic watt-hour meter, comprising: a writing / reading unit that processes writing and reading in the nonvolatile memory.
【請求項2】 複数の請求項1記載の電子式電力量計を
通信手段を介して制御装置に接続し、該制御装置に、前
記複数の電子式電力量計の各々に検定有効期間満了年月
のデータを書き込み指令と共に送信し、読み取り指令の
送信に応じた前記複数の電子式電力量計の各々からの検
定有効期間満了年月のデータを受信する送受信手段と、
受信した検定有効期間満了年月のデータを処理する処理
手段とを設けたことを特徴とする電子式電力量計管理シ
ステム。
2. A plurality of electronic watt-hour meters according to claim 1 are connected to a control device via a communication means, and the control device is connected to each of the plurality of electronic watt-hour meters, and the expiration date of the valid verification period is reached. Transmitting and receiving the data of the month together with the write command, and a transmitting and receiving means for receiving the data of the expiration date of the verification valid period from each of the plurality of electronic watt hour meters according to the transmission of the read command,
An electronic watt-hour meter management system, comprising: a processing means for processing the received data of the expiration date of the verification valid period.
JP05346909A 1993-12-27 1993-12-27 Electronic watt-hour meter and its management system Expired - Fee Related JP3100276B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP05346909A JP3100276B2 (en) 1993-12-27 1993-12-27 Electronic watt-hour meter and its management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP05346909A JP3100276B2 (en) 1993-12-27 1993-12-27 Electronic watt-hour meter and its management system

Publications (2)

Publication Number Publication Date
JPH07191067A true JPH07191067A (en) 1995-07-28
JP3100276B2 JP3100276B2 (en) 2000-10-16

Family

ID=18386638

Family Applications (1)

Application Number Title Priority Date Filing Date
JP05346909A Expired - Fee Related JP3100276B2 (en) 1993-12-27 1993-12-27 Electronic watt-hour meter and its management system

Country Status (1)

Country Link
JP (1) JP3100276B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012061713A (en) * 2010-09-16 2012-03-29 Seiko Epson Corp Electric apparatus, method of controlling the electric apparatus, and program
JP2015064211A (en) * 2013-09-24 2015-04-09 東光東芝メーターシステムズ株式会社 Electronic watthour meter
JP2017187390A (en) * 2016-04-06 2017-10-12 富士電機株式会社 Smart meter managing examination valid period

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012061713A (en) * 2010-09-16 2012-03-29 Seiko Epson Corp Electric apparatus, method of controlling the electric apparatus, and program
JP2015064211A (en) * 2013-09-24 2015-04-09 東光東芝メーターシステムズ株式会社 Electronic watthour meter
JP2017187390A (en) * 2016-04-06 2017-10-12 富士電機株式会社 Smart meter managing examination valid period

Also Published As

Publication number Publication date
JP3100276B2 (en) 2000-10-16

Similar Documents

Publication Publication Date Title
CN1093940C (en) Automated communication of electricity meter data
GB2046924A (en) Portable programmerreader unit for programmable time registering electric energy meters
JP2004164583A (en) Remote meter reading system using grouped data structure
WO2001015099A1 (en) Prepayment energy metering system
JPH07191067A (en) Electronic watt-hour meter and its management system
KR102269887B1 (en) Power meter reading device and reading method thereof
CN109685993B (en) Accounting management method for power consumption of charging pile
KR20210004409A (en) Autonomous integrated remote meter reading and fare notification system
JP4896452B2 (en) Instrument
JP2007298411A (en) Weighing device
JP6884115B2 (en) Electricity rate management device for power generation system
JP2002142030A (en) Interphone system
JP4911969B2 (en) Substitute system for measuring instrument and alternative method for measuring instrument
JP3859632B2 (en) Water supply system and water charge calculation program
JP3110293B2 (en) Watt hour meter with communication function
KR20000058916A (en) Remote inspection of a meter method and device using watt hour meter therefor
JP4562559B2 (en) Discontinued power usage survey automatic distribution system and method
JPS63138269A (en) Electric charge liquidating device using recording card
JP2008269202A (en) Measurement data transmitter, meter reading system and simulation method
KR20230032711A (en) Smart measuring management system and method thereof
JPH0375568A (en) Adjusting system of rate using portable storage medium
KR20220097081A (en) Digital watt-hour meter and remote meter reading system supporting DLMS communication standard of non-standard communication watt-hour meter
JP2005106710A (en) Electric power charge calculation device, electric power charge calculation system, electric power charge calculation method, electric power charge calculation program, and recording medium recorded with program
JP2017167873A (en) Account money transfer business support device
JP2002269463A (en) Power receiving facility management device, power receiving facility management program, computer- readable recording medium with the program recorded thereon, and method therefor

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080818

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090818

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090818

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100818

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110818

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120818

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130818

Year of fee payment: 13

LAPS Cancellation because of no payment of annual fees