JPH0716735Y2 - Seawall block - Google Patents
Seawall blockInfo
- Publication number
- JPH0716735Y2 JPH0716735Y2 JP1990040970U JP4097090U JPH0716735Y2 JP H0716735 Y2 JPH0716735 Y2 JP H0716735Y2 JP 1990040970 U JP1990040970 U JP 1990040970U JP 4097090 U JP4097090 U JP 4097090U JP H0716735 Y2 JPH0716735 Y2 JP H0716735Y2
- Authority
- JP
- Japan
- Prior art keywords
- concrete
- block
- water
- lining
- mouth
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Revetment (AREA)
Description
【考案の詳細な説明】 《産業上の利用分野》 この考案は、護岸の法留めを形成するコンクリートブロ
ックに関する。[Detailed Description of the Invention] << Industrial Application Field >> The present invention relates to a concrete block forming a bank stop for a seawall.
《従来の技術》 従来、護岸の法留めは、遮水矢板を挟んで木製の型枠を
組み、それにコンクリートを打設して作られていた。<Prior art> Conventionally, the seawalls have been constructed by placing a wooden formwork with water-permeable sheet piles sandwiched between them and placing concrete on it.
《考案が解決しようとする課題》 この方法は、型枠を作るのにたいへん手間がかかるだけ
でなく、湧き水のため型枠が浮き上がったりして、工事
が容易でなかった。<Problems to be solved by the device> This method is not only very time-consuming to make the form, but also the form is raised due to the spring water, which makes the construction difficult.
この考案は、このような問題を解消するための護岸の法
留めブロックを提供することを目的とする。This invention aims at providing the bank retaining block of the seawall for solving such a problem.
《課題を解決するための手段》 この考案の護岸の法留めブロックは、地中に打ち込まれ
た一連の遮水矢板を跨いでその上に並べられる、断面が
ほぼ台形のコンクリートブロックであって、底部に向っ
て開放する内部空洞を有している。空洞に中詰めコンク
リートを打設するための口が天端にあいている。背面側
上部には、法覆工を受けるための段部が形成されてい
る。<Means for Solving the Problem> The bank retaining block of the revetment of the present invention is a concrete block having a substantially trapezoidal cross section, which is arranged over a series of water-proof sheet piles driven into the ground. It has an internal cavity that opens towards the bottom. There is an opening at the top for pouring concrete in the cavity. A step portion is formed in the upper portion on the back side for receiving the lining.
《作用》 使用するには、遮水矢板を跨ぐようにしてこのブロック
を並べ、隣のブロック同士をボルト等で結合する。次い
で、天端の口から中詰めコンクリートを内部空洞に打設
する。<Operation> To use, this block is arranged so as to straddle the water-proof sheet pile, and adjacent blocks are connected with bolts or the like. Next, the filling concrete is poured into the internal cavity from the mouth of the top end.
こうして、コンクリートが硬化すれば法留めのでき上が
りである。In this way, once the concrete is hardened, the legal closure is completed.
《実施例》 このブロック1は第1図に示すように、断面がほぼ台形
のコンクリートブロックであって、底部に向って開放す
る内部空洞を有している。内部空洞に通ずる口2が天端
にあいている。背面側上部には、法覆工を受けるための
段部13が形成されている。<Example> As shown in Fig. 1, this block 1 is a concrete block having a substantially trapezoidal cross section, and has an internal cavity that opens toward the bottom. The mouth 2 leading to the internal cavity is open at the top. A step portion 13 for receiving a lining is formed on the upper portion of the back side.
図中、符号3,4はボルト孔、符号5はエア抜き孔であ
る。In the figure, reference numerals 3 and 4 are bolt holes, and reference numeral 5 is an air vent hole.
第2図は使用状態を示したものであり、符号6は河底、
符号7は遮水のために打ち込まれた一連の鋼矢板(シー
トパイル)である。これらシートパイル7を跨ぐ格好で
ブロック1をその上に並べる。隣のブロック同士は、ボ
ルト孔3に通した連結ボルト8で締めつける。FIG. 2 shows the use condition, and the reference numeral 6 indicates the riverbed,
Reference numeral 7 is a series of steel sheet piles (sheet piles) that have been hammered in to block water. The blocks 1 are arranged on the sheet pile 7 in such a manner as to straddle them. Adjacent blocks are fastened together with connecting bolts 8 passed through the bolt holes 3.
次いで、あらかじめボルト孔4に通しておいた固定ボル
ト9の上に長尺の鉄筋10を置いて、結束する。Next, the long rebar 10 is placed on the fixing bolt 9 that has been passed through the bolt hole 4 in advance, and is bound.
こうして、口2から中詰めコンクリート11を打設し、バ
イブレータを使ってエア抜き孔5からセメントペースが
出るくらいに締め固める。In this way, the filling concrete 11 is poured from the mouth 2 and is compacted using the vibrator so that the cement pace comes out from the air vent hole 5.
こうして、養生し、コンクリート11が固まれば、法留め
が完成する。In this way, when the concrete is cured and the concrete 11 is solidified, the mooring is completed.
その後、法面をコンクリートで覆って法覆工12を形成す
る。法覆工12の下端はブロックの段部13で受けるように
する。Then, the slope is covered with concrete to form a slope lining 12. The lower end of the slope lining 12 is received by the stepped portion 13 of the block.
《考案の効果》 この考案のブロックは、底部に向って開放する内部空洞
を有するので、地中に打ち込まれた一連の遮水矢板を跨
ぐ格好でその上に並べることができる。並べた後、天端
の口からコンクリートを打設することにより、遮水矢板
と一体になった強固な護岸の法留めを簡単に構築するこ
とができる。もちろん、ブロックはコンクリート製なの
で、構築中に湧き水で浮き上がることもない。また、断
面が台形であり、すそ広がりで座りがよいので据付けが
きわめて容易である。さらに、背面側上部に段部を形成
したので、この段部で法覆工の下端を支持することがで
き、法覆工の施工が容易になるという効果もある。<< Effect of Device >> Since the block of this device has an internal cavity that opens toward the bottom, it can be arranged on a block of a series of water-impermeable sheet piles driven into the ground. After placing them side by side, by pouring concrete from the mouth of the top, it is possible to easily construct a strong seawall retaining wall that is integrated with the water blocking sheet pile. Of course, the blocks are made of concrete so they won't float up in spring water during construction. In addition, the trapezoidal cross section and wide skirt make it easy to install, which makes installation extremely easy. Further, since the step portion is formed on the upper portion on the back side, the lower end of the lining can be supported by this step portion, and there is an effect that the construction of the lining can be facilitated.
第1図は法留めブロックの斜視図、第2図は使用状態断
面図、である。 2……口 7……矢板 11……中詰めコンクリートFIG. 1 is a perspective view of the dead-end block, and FIG. 2 …… Mouth 7 …… Shipboard 11 …… Filled concrete
Claims (1)
いでその上に並べられる、断面がほぼ台形のコンクリー
トブロックであって、底部に向って開放する内部空洞を
有し、該空洞に中詰めコンクリート11を打設するための
口2が天端にあいており、背面側上部に法覆工12を受け
るための段部13を形成した護岸の法留めブロック。1. A concrete block having a substantially trapezoidal cross section, which is arranged over a series of water-impermeable sheet piles 7 driven into the ground, and has an internal cavity which opens toward the bottom. The bank 2 has a mouth 2 for pouring the filling concrete 11 in the cavity at the top, and a step 13 for receiving the lining 12 on the rear upper side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1990040970U JPH0716735Y2 (en) | 1990-04-17 | 1990-04-17 | Seawall block |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1990040970U JPH0716735Y2 (en) | 1990-04-17 | 1990-04-17 | Seawall block |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH041225U JPH041225U (en) | 1992-01-08 |
JPH0716735Y2 true JPH0716735Y2 (en) | 1995-04-19 |
Family
ID=31551233
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP1990040970U Expired - Lifetime JPH0716735Y2 (en) | 1990-04-17 | 1990-04-17 | Seawall block |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0716735Y2 (en) |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS52154227A (en) * | 1976-06-18 | 1977-12-21 | Shinkouzou Gijiyutsu Kk | Method of building breast wall |
-
1990
- 1990-04-17 JP JP1990040970U patent/JPH0716735Y2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPH041225U (en) | 1992-01-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3599431B2 (en) | Construction method of temporary deadline | |
JPH0716735Y2 (en) | Seawall block | |
JP2001040630A (en) | Caisson marine structure | |
JP3848917B2 (en) | Hybrid structure box construction method | |
JP2571742B2 (en) | Construction method of underwater concrete using concrete block | |
JPH0144852B2 (en) | ||
JP2581815Y2 (en) | Fixed structure of handrails on balconies | |
CN216157147U (en) | Construction structure convenient for demoulding of ground beam and floor | |
JPH0219252B2 (en) | ||
GB2382086A (en) | Improvements relating to foundation rafts | |
JP3295768B2 (en) | Precast concrete road gutter | |
JP2979118B2 (en) | Retaining wall structure | |
JP2703200B2 (en) | Coastal protection or river revetment construction method using stair-type blocks | |
CN211816455U (en) | Pre-closed advanced water stop post-pouring belt for basement outer wall | |
JPH0262652B2 (en) | ||
JPH0258631A (en) | Execution of caisson | |
JP2723789B2 (en) | Concrete block and its laying method | |
JP3301967B2 (en) | Shade concrete block | |
JP3328084B2 (en) | Mat member mounting structure | |
JP2003020634A (en) | Water channel construction method | |
CN106223483A (en) | A kind of precast reinforced concrete structure method of attachment | |
JP2538649Y2 (en) | Precast concrete block for anchoring | |
JP3013207U (en) | Concrete Kasagi block | |
JPH07119125A (en) | Construction method of breakwater | |
JP3211228B2 (en) | Shaft concrete block for steel sheet pile wall |