JPH0714486Y2 - panel - Google Patents

panel

Info

Publication number
JPH0714486Y2
JPH0714486Y2 JP1990117789U JP11778990U JPH0714486Y2 JP H0714486 Y2 JPH0714486 Y2 JP H0714486Y2 JP 1990117789 U JP1990117789 U JP 1990117789U JP 11778990 U JP11778990 U JP 11778990U JP H0714486 Y2 JPH0714486 Y2 JP H0714486Y2
Authority
JP
Japan
Prior art keywords
nut
panel
wall
core material
frame member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1990117789U
Other languages
Japanese (ja)
Other versions
JPH0475005U (en
Inventor
正秀 林
龍平 畠山
Original Assignee
昭和アルミニウム株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 昭和アルミニウム株式会社 filed Critical 昭和アルミニウム株式会社
Priority to JP1990117789U priority Critical patent/JPH0714486Y2/en
Publication of JPH0475005U publication Critical patent/JPH0475005U/ja
Application granted granted Critical
Publication of JPH0714486Y2 publication Critical patent/JPH0714486Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Panels For Use In Building Construction (AREA)
  • Air Filters, Heat-Exchange Apparatuses, And Housings Of Air-Conditioning Units (AREA)
  • Load-Bearing And Curtain Walls (AREA)
  • Joining Of Building Structures In Genera (AREA)

Description

【考案の詳細な説明】 産業上の利用分野 この考案は、複数のパネルにより組立てられる組立式冷
蔵庫、組立式冷凍庫、組立式保温庫、組立式クリーンル
ーム等の組立式建造物における天井や、壁を構成するの
に用いられるパネルに関する。
[Detailed Description of the Invention] Industrial field of use [Technical Field] The present invention is designed to remove ceilings and walls of prefabricated structures such as prefabricated refrigerators, prefabricated freezers, prefabricated warmers, and prefabricated clean rooms that are assembled by a plurality of panels. Relates to panels used to make up.

従来の技術 たとえば組立式建造物の天井を構成する天井パネルとし
て、従来、板状芯材と、芯材の周囲に配置された枠と、
芯材の両面を覆う皮材とよりなり、枠が、外側方に開口
した横断面略コ字形の枠部材で形成されたものが用いら
れていた。そして、組立式建造物の天井は、複数の天井
パネルからなる天井構成体を並列状に並べることにより
構成されており、天井パネルは、隣接する天井構成体の
天井パネルにまたがる板状部を有する天井保持梁に、天
井パネルの上面に固定された取付金具を介して取付けら
れている。取付金具は、取付金具を貫通したボルトを、
天井パネルに取付けられた埋め込みナットにねじ嵌める
ことにより天井パネルに固定されるようになっている。
埋め込みナットは、天井パネル上面の皮材を切除すると
ともに芯材に凹所を形成し、この凹所にナットを嵌入す
ることにより天井パネルに取付けられている。
2. Description of the Related Art Conventionally, for example, as a ceiling panel that constitutes the ceiling of a prefabricated building, a plate-shaped core material, and a frame arranged around the core material,
The frame is made of a skin material that covers both surfaces of the core material, and the frame is formed of a frame member having an approximately U-shaped cross section open to the outside. The ceiling of the prefabricated building is configured by arranging a plurality of ceiling panels in parallel, and the ceiling panel has a plate-shaped portion that extends over the ceiling panels of the adjacent ceiling panels. It is attached to the ceiling holding beam via a mounting bracket fixed to the upper surface of the ceiling panel. The mounting bracket is a bolt that penetrates the mounting bracket.
It is designed to be fixed to the ceiling panel by screwing it into an embedded nut attached to the ceiling panel.
The embedded nut is attached to the ceiling panel by cutting the skin material on the upper surface of the ceiling panel, forming a recess in the core material, and fitting the nut into the recess.

考案が解決しようとする課題 しかしながら、従来の天井パネルでは、これを天井パネ
ル保持梁に固定するのに用いるナットを、その上面の皮
材を切除するとともに芯材に凹所を形成し、この凹所に
ナットを嵌入することにより取付けなければならず、そ
の作業が面倒であるという問題があった。
However, in the conventional ceiling panel, in the conventional ceiling panel, the nut used to fix this to the ceiling panel holding beam is formed by cutting the skin material on the upper surface and forming a recess in the core material. There was a problem in that the work had to be troublesome because the nut had to be fitted into the place to install it.

この考案は上記実情に鑑みてなされたものであって、た
とえば天井パネルに適用した場合、上述したような面倒
な作業を行なうことなく、天井パネルを天井パネル保持
梁に取付けうるパネルを提供することにある。
The present invention has been made in view of the above circumstances, and when applied to, for example, a ceiling panel, to provide a panel capable of attaching the ceiling panel to the ceiling panel holding beam without performing the above-mentioned troublesome work. It is in.

課題を解決するための手段 この考案によるパネルは、板状芯材と、芯材の周囲に配
置された枠と、芯材の両面を覆う皮材とよりなるパネル
において、枠がアルミニウム押出形材製枠部材で形成さ
れ、枠部材が、芯材の周面を覆う帯状被覆壁部と、被覆
壁部の一側縁部に一体に設けられ、かつ芯材とは反対側
に突出する突出壁部と、被覆壁部の芯材側と反対の面
に、突出壁部と所定間隔をおいてこれと平行になるよう
に一体に設けられ、かつ突出壁部とともにナット嵌入溝
を形成するナット嵌入溝形成用壁部とよりなり、ナット
嵌入溝内にナットが嵌合め入れられるとともに突出壁部
にボルト挿通孔が形成され、ナットのねじ孔がボルト挿
通孔と一致するようにナットの位置が決められているも
のである。
Means for Solving the Problems A panel according to the present invention comprises a plate-shaped core material, a frame arranged around the core material, and a skin material covering both surfaces of the core material. A band-shaped covering wall portion that is formed of a frame-making member, and the band-like covering wall portion that covers the peripheral surface of the core material, and a projecting wall that is integrally provided at one side edge portion of the covering wall portion and that projects toward the opposite side of the core material. Portion and a surface of the covering wall portion opposite to the core material side are integrally provided so as to be parallel to the protruding wall portion at a predetermined interval, and form a nut fitting groove with the protruding wall portion. It consists of the groove forming wall, the nut is fitted in the nut fitting groove, the bolt insertion hole is formed in the protruding wall, and the nut position is adjusted so that the screw hole of the nut matches the bolt insertion hole. It has been decided.

この考案によるパネルは、組立式建造物の天井パネルだ
けではなく、壁パネルにも適用することができる。
The panel according to the present invention can be applied not only to the ceiling panel of the prefabricated building but also to the wall panel.

作用 このパネルは、枠がアルミニウム押出形材製枠部材で形
成され、枠部材が、芯材の周面を覆う帯状被覆壁部と、
被覆壁部の一側縁部に一体に設けられ、かつ芯材とは反
対側に突出する突出壁部と、被覆壁部の芯材側と反対の
面に、突出壁部と所定間隔をおいてこれと平行になるよ
うに一体に設けられ、かつ突出壁部とともにナット嵌入
溝を形成するナット嵌入溝形成用壁部とよりなり、ナッ
ト嵌入溝内にナットが嵌め入れられるとともに突出壁部
にボルト挿通孔が形成され、ナットのねじ孔がボルト挿
通孔と一致するようにナットの位置が決められているの
で、たとえば天井パネルに適用した場合、天井パネル保
持梁に固定するのに上記ナットを利用して行なうことが
できる。しかも、ナットの位置は、枠部材の長さ方向に
任意に変更することができるので、ボルト挿通孔の位置
を変えれば固定位置を変更できる。また、このパネルの
枠部材は、アルミニウム押出形材製であるので、その製
造が容易である。
Action In this panel, the frame is formed of a frame member made of aluminum extruded profile, and the frame member has a strip-shaped covering wall portion that covers the peripheral surface of the core material
A protruding wall portion that is integrally provided at one side edge portion of the covering wall portion and that protrudes to the side opposite to the core material, and a predetermined distance from the protruding wall portion on the surface of the covering wall portion opposite to the core material side And a nut fitting groove forming wall part that is integrally provided so as to be parallel to this and forms a nut fitting groove together with the projecting wall part, and the nut is fitted in the nut fitting groove and the projecting wall part is formed. Since the bolt insertion hole is formed and the position of the nut is determined so that the screw hole of the nut matches the bolt insertion hole, when applied to a ceiling panel, for example, the above nut is used to fix it to the ceiling panel holding beam. You can use it. Moreover, since the position of the nut can be arbitrarily changed in the length direction of the frame member, the fixing position can be changed by changing the position of the bolt insertion hole. Further, since the frame member of this panel is made of aluminum extruded profile, its manufacture is easy.

実施例 以下、この考案の実施例を、図面を参照して説明する。
この実施例は、この考案によるパネルを組立式クリーン
ルーム用天井パネルに適用したものである。なお、以下
の説明において、左右は第1図および第2図の左右をい
うものとする。
Embodiment An embodiment of the present invention will be described below with reference to the drawings.
In this embodiment, the panel according to the present invention is applied to an assembling type clean room ceiling panel. In the following description, the left and right means the left and right in FIGS. 1 and 2.

図面は組立式クリーンルームの天井における隣接する左
右1対の天井パネルを示す。天井パネル(1)は、芯材
(2)と、芯材(2)の周囲に配置された額縁状枠
(3)と、芯材(2)の両面に接着剤(図示略)によっ
て接着された金属、たとえばアルミニウム(アルミニウ
ム合金も含む)製皮材(4)とよりなる。枠(3)は4
本のアルミニウム押出形材製枠部材(5)によって形成
されている。枠部材(5)は、第4図に示すように、横
断面略コ字形で上下1対のフランジ部(5a)(突出壁
部)と両フランジ部(5a)を一体に連結するウェブ部
(5b)(帯状被覆壁部)とよりなり、その開口を外方に
向けて配置されている。両フランジ部(5a)の先端に
は、それぞれ他のフランジ部(5a)側に突出した突縁
(5c)が全長にわたって一体に設けられている。ウェブ
部(5b)の外面には、それぞれ両フランジ部(5a)との
間に所定間隔をおいてこれらと平行な1対のナット嵌入
溝形成用壁部(5d)が一体に設けられ、両ナット嵌入溝
形成用壁部(5d)と両フランジ部(5a)との間にそれぞ
れナット嵌入溝(6)が形成されている。ナット嵌入溝
形成用壁部(5d)のフランジ部(5a)を向いた面には、
それぞれその幅方向に所定間隔をおいて1対のナット支
持部(5e)が全長にわたって一体に設けられている。そ
して、上側のナット嵌入溝(6)内にナット(7)が嵌
め入れられている。ナット(7)は、枠部材(5)の長
さ方向の両端部から、またはフランジ部(5a)とナット
嵌入溝形成用壁部(5d)との間からナット嵌入溝(6)
内に嵌め入れられている。ナット(7)は、ウェブ部
(5b)および突縁(5c)により枠部材(5)の幅方向の
位置決めがされるとともに、枠部材(5)の長さ方向の
両側においてフランジ部(5a)に一体に形成された切り
曲げ突起(8)によって枠部材(5)の長さ方向の位置
決めがなされている。なお、ナット(7)は、枠部材
(5)の幅および長さの両方向に1〜2mm程度移動しう
るようになっている。また、ナット(7)の枠部材
(5)の長さ方向の位置決めは、切り曲げ突起(8)に
代えて、別個に形成した部材を枠部材(5)に固定する
ことによって設けた突出部により行なってもよい。上側
の皮材(4)および上側のフランジ部(5a)におけるナ
ット(7)のねじ孔(7a)と対応する位置には、それぞ
れボルト挿通孔(11)(12)が形成されている。また、
枠部材(5)のウェブ部(5b)における芯材(2)と反
対側の面の幅の中央部には、両ナット嵌入溝形成用壁部
(5d)によってやといざね嵌入溝(9)が全長にわたっ
て形成されている。そして、左右の天井パネル(1)の
やといざね嵌入溝(9)内にまたがってアルミニウム押
出形材製偏平管状やといざね(10)が嵌め入れられてい
る。皮材(4)の周縁部には、内方屈曲部(4a)が設け
られている。下側の皮材(4)の互いに平行な1対の縁
部の内方屈曲部(4a)における両端寄りの部分に、内方
屈曲部(4a)の全高にわたるスリット(図示略)がそれ
ぞれ形成されている。スリットよりも長さ方向の外側部
分において、内方屈曲部(4a)が折り返されて内方折り
返し部(4b)が設けられており、内方折り返し部(4b)
が枠部材(5)の下側フランジ部(5a)の突縁(5c)に
係合させられている。
The drawing shows a pair of adjacent left and right ceiling panels in the ceiling of a prefabricated clean room. The ceiling panel (1) is adhered to both surfaces of the core material (2), the frame-like frame (3) arranged around the core material (2), and the core material (2) with an adhesive (not shown). And a metal (eg, aluminum (including aluminum alloy)) skin material (4). Frame (3) is 4
It is formed by the frame extruded aluminum frame forming member (5). As shown in FIG. 4, the frame member (5) has a substantially U-shaped cross section and a pair of upper and lower flange portions (5a) (protruding wall portions) and a web portion (which integrally connects both flange portions (5a)). 5b) (belt-shaped covering wall), and is arranged with its opening facing outward. A projecting edge (5c) protruding toward the other flange portion (5a) is integrally provided at the tip of each flange portion (5a) over the entire length. On the outer surface of the web portion (5b), a pair of nut fitting groove forming wall portions (5d) parallel to the flange portions (5a) are provided integrally with the flange portions (5a) at predetermined intervals. A nut fitting groove (6) is formed between the nut fitting groove forming wall portion (5d) and both flange portions (5a). On the surface of the nut fitting groove forming wall (5d) facing the flange (5a),
A pair of nut support portions (5e) are integrally provided over the entire length at predetermined intervals in the width direction. Then, the nut (7) is fitted in the upper nut fitting groove (6). The nut (7) is fitted into the nut fitting groove (6) from both ends of the frame member (5) in the longitudinal direction or from between the flange portion (5a) and the nut fitting groove forming wall portion (5d).
It is fitted inside. The nut (7) is positioned in the width direction of the frame member (5) by the web portion (5b) and the projecting edge (5c), and the flange portion (5a) is provided on both sides in the length direction of the frame member (5). The frame member (5) is positioned in the longitudinal direction by the cutting and bending protrusions (8) integrally formed with the frame member (5). The nut (7) can move about 1 to 2 mm in both the width and length directions of the frame member (5). The positioning of the nut (7) in the longitudinal direction of the frame member (5) is performed by fixing a separately formed member to the frame member (5) instead of the cutting and bending protrusion (8). May be performed by. Bolt insertion holes (11) (12) are formed in the upper skin material (4) and the upper flange portion (5a) at positions corresponding to the screw holes (7a) of the nut (7). Also,
At the center of the width of the surface of the web portion (5b) of the frame member (5) opposite to the core material (2), the nut fitting groove forming wall portion (5d) allows the fitting fitting groove (9). ) Is formed over the entire length. Then, the flat tubular shape and the flat panel (10) made of aluminum extruded shape are fitted in the flat panel fitting grooves (9) of the left and right ceiling panels (1). An inward bent portion (4a) is provided on the peripheral portion of the skin material (4). Slits (not shown) are formed over the entire height of the inward bent portion (4a) at portions near both ends of the inward bent portion (4a) of a pair of parallel edges of the lower skin material (4). Has been done. The inner bent portion (4a) is folded back to provide an inner folded portion (4b) at the outer side portion in the length direction of the slit, and the inner folded portion (4b) is provided.
Is engaged with the projecting edge (5c) of the lower flange portion (5a) of the frame member (5).

隣接する左右の天井パネル(1)は、パネル吊り金具
(13)を介して、その上方に配置されたリップH形状天
井パネル保持梁(14)に取付けられている。パネル吊り
金具(13)は略L字形で、左右の天井パネル(1)にま
たがりかつその上面に接する水平壁(13a)および水平
壁(13a)に連なって上方にのびる垂直壁(13b)を備え
ている。垂直壁(13b)の上端部には、天井パネル保持
梁(14)の下側水平壁(14a)のリップ(14b)に係合す
る略逆U字形係合部(13c)が一体に設けられている。
図示は省略したが、天井パネル保持梁(14)を挟んで対
称位置にも、吊り金具(13)が配置されている。パネル
吊り金具(13)は、水平壁(13a)を上方から貫通した
ボルト(15)を、上側の皮材(4)および枠部材(5)
の上側のフランジ部(5a)に形成されたボルト挿通孔
(11)(12)に通し、さらに天井パネル(1)に取付け
られたナット(7)にねじ嵌めることによって取付けら
れている。
Adjacent left and right ceiling panels (1) are attached to a lip H-shaped ceiling panel holding beam (14) arranged above the ceiling panels (1) via panel hanging metal fittings (13). The panel hanging bracket (13) is substantially L-shaped, and is provided with a horizontal wall (13a) that extends over the left and right ceiling panels (1) and is in contact with the upper surface of the ceiling panel, and a vertical wall (13b) that extends upward from the horizontal wall (13a). ing. A substantially inverted U-shaped engaging portion (13c) that engages with a lip (14b) of the lower horizontal wall (14a) of the ceiling panel holding beam (14) is integrally provided at the upper end of the vertical wall (13b). ing.
Although not shown, the hanging metal fittings (13) are also arranged at symmetrical positions with the ceiling panel holding beam (14) interposed therebetween. In the panel hanging metal fitting (13), the bolt (15) penetrating the horizontal wall (13a) from above is attached to the upper skin material (4) and the frame member (5).
It is attached by passing it through the bolt insertion holes (11) (12) formed in the flange portion (5a) on the upper side of, and further by screwing it into the nut (7) attached to the ceiling panel (1).

上記において、ナット(7)は、枠部材(5)をパネル
(1)に組み込む前に枠部材(5)に取付けておいても
よいし、あるいはパネル(1)に組み込んだ後、たとえ
ばクリーンルーム等の組立現場で取付けてもよい。
In the above, the nut (7) may be attached to the frame member (5) before the frame member (5) is incorporated into the panel (1), or after being incorporated into the panel (1), for example, in a clean room or the like. It may be attached at the assembly site.

上記においては、この考案によるパネルを天井パネルに
適用した場合について説明されているが、この考案によ
るパネルは、組立式構造物の壁を構成し、かつ壁パネル
保持柱に固定される壁パネルにも用いることができる。
The above describes the case where the panel according to the present invention is applied to a ceiling panel. However, the panel according to the present invention constitutes a wall of a prefabricated structure and is a wall panel fixed to a wall panel holding column. Can also be used.

考案の効果 この考案のパネルによれば、上述のように、これを適用
した天井パネルを天井パネル保持梁に固定する場合や、
壁パネルを壁パネル保持柱に固定する場合に、ナット嵌
入溝内に嵌め入れられたナットを利用して行なうことが
できる。したがって、従来のように、天井パネル上面の
皮材を切除するとともに芯材に凹所を形成し、この凹所
にナットを嵌入するという面倒な作業を必要としない。
しかも、ナットの位置は、枠部材の長さ方向に任意に変
更することができるので、突出壁部に形成するボルト挿
通孔の位置を変えれば、天井保持梁や壁保持柱への固定
位置を変更できる。また、このパネルの枠部材は、アル
ミニウム押出形材製であるので、その製造が容易であ
る。
Effect of the Invention According to the panel of the present invention, as described above, when the ceiling panel to which the panel is applied is fixed to the ceiling panel holding beam,
When fixing the wall panel to the wall panel holding column, it is possible to use a nut fitted in the nut fitting groove. Therefore, unlike the prior art, the cumbersome work of cutting the skin material on the upper surface of the ceiling panel, forming a recess in the core, and fitting the nut into the recess is not required.
Moreover, the position of the nut can be arbitrarily changed in the length direction of the frame member. Therefore, if the position of the bolt insertion hole formed in the protruding wall portion is changed, the fixing position to the ceiling holding beam or the wall holding column can be changed. Can be changed. Further, since the frame member of this panel is made of aluminum extruded profile, its manufacture is easy.

【図面の簡単な説明】[Brief description of drawings]

図面はこの考案によるパネルを組立式クリーンルームの
天井パネルに適用した場合の実施例を示し、第1図は組
立式クリーンルームの天井における隣接する左右1対の
天井パネルを示す部分分解斜視図、第2図は同じく左右
1対の天井パネルを部分拡大断面図、第3図は第2図の
III−III線拡大断面図、第4図は枠部材の横断面図であ
る。 (1)……天井パネル、(2)……芯材、(3)……
枠、(4)……皮材、(5)……枠部材、(5a)……フ
ランジ部(突出壁部)、(5b)……ウェブ部(被覆壁
部)、(5d)……ナット嵌入溝形成用壁部、(6)……
ナット嵌入溝、(7)……ナット、(7a)……ねじ孔、
(12)……ボルト挿通孔。
The drawings show an embodiment in which the panel according to the present invention is applied to a ceiling panel of an assembled clean room, and FIG. 1 is a partially exploded perspective view showing a pair of left and right adjacent ceiling panels in the ceiling of the assembled clean room. The figure also shows a partially enlarged sectional view of a pair of left and right ceiling panels.
III-III line expanded sectional view, FIG. 4 is a transverse sectional view of a frame member. (1) …… Ceiling panel, (2) …… Core material, (3) ……
Frame, (4) …… Leather material, (5) …… Frame member, (5a) …… Flange part (protruding wall part), (5b) …… Web part (covering wall part), (5d) …… Nut Wall part for forming fitting groove, (6)
Nut fitting groove, (7) …… nut, (7a) …… screw hole,
(12) …… Bolt insertion hole.

フロントページの続き (51)Int.Cl.6 識別記号 庁内整理番号 FI 技術表示箇所 F24F 1/00 401 A Continuation of the front page (51) Int.Cl. 6 Identification number Office reference number FI technical display location F24F 1/00 401 A

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】板状芯材と、芯材の周囲に配置された枠
と、芯材の両面を覆う皮材とよりなるパネルにおいて、
枠がアルミニウム押出形材製枠部材で形成され、枠部材
が、芯材の周面を覆う帯状被覆壁部と、被覆壁部の一側
縁部に一体に設けられ、かつ芯材とは反対側に突出する
突出壁部と、被覆壁部の芯材側と反対の面に、突出壁部
と所定間隔をおいてこれと平行になるように一体に設け
られ、かつ突出壁部とともにナット嵌入溝を形成するナ
ット嵌入溝形成用壁部とよりなり、ナット嵌入溝内にナ
ットが嵌め入れられるとともに突出壁部にボルト挿通孔
が形成され、ナットのねじ孔がボルト挿通孔と一致する
ようにナットの位置が決められているパネル。
1. A panel comprising a plate-shaped core material, a frame arranged around the core material, and a skin material covering both surfaces of the core material,
The frame is formed of a frame member made of extruded aluminum material, and the frame member is integrally provided on a strip-shaped coating wall portion that covers the peripheral surface of the core material and one side edge portion of the coating wall portion, and is opposite to the core material. Side wall and the surface of the covering wall opposite to the core side are integrally provided at a predetermined interval in parallel with the wall, and the nut is fitted together with the wall. A nut insertion groove forming wall portion that forms a groove, a nut is inserted into the nut insertion groove, and a bolt insertion hole is formed in the protruding wall portion so that the screw hole of the nut matches the bolt insertion hole. A panel in which the positions of nuts are determined.
JP1990117789U 1990-11-09 1990-11-09 panel Expired - Lifetime JPH0714486Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1990117789U JPH0714486Y2 (en) 1990-11-09 1990-11-09 panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1990117789U JPH0714486Y2 (en) 1990-11-09 1990-11-09 panel

Publications (2)

Publication Number Publication Date
JPH0475005U JPH0475005U (en) 1992-06-30
JPH0714486Y2 true JPH0714486Y2 (en) 1995-04-10

Family

ID=31865696

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1990117789U Expired - Lifetime JPH0714486Y2 (en) 1990-11-09 1990-11-09 panel

Country Status (1)

Country Link
JP (1) JPH0714486Y2 (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2188658B (en) * 1986-04-02 1989-12-06 Hunter Douglas Ind Bv Sandwich panel

Also Published As

Publication number Publication date
JPH0475005U (en) 1992-06-30

Similar Documents

Publication Publication Date Title
US4744188A (en) Suspended island ceiling system
US20040172907A1 (en) Suspension system and structure for securing border ceiling panels
JPH0714486Y2 (en) panel
JPH0544403Y2 (en)
JP4220437B2 (en) Partition panel
JP3514232B2 (en) Partition panel system
JPS636350Y2 (en)
JPH0122821Y2 (en)
JPS642927Y2 (en)
JPH09250224A (en) Handrail member
JPH057855U (en) Built-in frame that doubles as a wall panel in the sanitary facility room
JPH0428978Y2 (en)
JPH0810607Y2 (en) Connection structure between columns and wall panels
JPH0241211Y2 (en)
JPH069156Y2 (en) Panel wall mounting edge
JPH0735978Y2 (en) Eaves unit for industrialized houses
JP2975547B2 (en) Attached structure and extension structure
JP2774406B2 (en) Wall mounting fixture and wall mounting structure
JPS6037939Y2 (en) ceiling
JPS6328271Y2 (en)
JPH09203188A (en) Attaching structure for exterior wall panel
JPS5823865Y2 (en) External wall structure
JP3034666B2 (en) Joint structure of horizontal members for ceiling frames
JP2004124480A (en) Built-up type partition device
JPH072878Y2 (en) Structure of pillars such as terraces

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term