JPH07127068A - Arrangement method for net material - Google Patents
Arrangement method for net materialInfo
- Publication number
- JPH07127068A JPH07127068A JP29753493A JP29753493A JPH07127068A JP H07127068 A JPH07127068 A JP H07127068A JP 29753493 A JP29753493 A JP 29753493A JP 29753493 A JP29753493 A JP 29753493A JP H07127068 A JPH07127068 A JP H07127068A
- Authority
- JP
- Japan
- Prior art keywords
- net
- reinforcements
- overlapped part
- overlapped
- until
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は斜面の安定化技術に関
し、より詳細には緑化基材吹付け用の補強網や落石防止
網(ロックネット)として用いられる網材の敷設方法に
関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a technique for stabilizing slopes, and more particularly to a method for laying a net material used as a reinforcing net or a rockfall net (rock net) for spraying greening base materials.
【0002】[0002]
【従来の技術】斜面の表層崩落の防止を図る工法として
は、アンカーピンを打設して固定しながら固定帯状の金
網を法面の上下方向に沿って敷き並べた後、金網が隠れ
るまで緑化基材(種子、肥料入り土砂等)を吹付けて全
面緑化を図る法面保護工法が知られている。2. Description of the Related Art As a construction method for preventing the surface layer of a slope from collapsing, fixed pin-shaped wire nets are laid along the up and down direction of the slope while anchoring and fixing anchor pins, and then greening is performed until the wire nets are hidden. A slope protection method is known in which a base material (seed, soil containing fertilizer, etc.) is sprayed to green the entire surface.
【0003】[0003]
【発明が解決しようとする問題点】前記した工法にあっ
ては敷設した金網が緑化基材の流下を阻止するように機
能する。しかしながら金網の継ぎ目箇所が組織的に分断
しているために、金網の継ぎ目箇所に土圧が集中すると
土圧に耐え切れずに金網が剥がれてしまい金網の継ぎ目
箇所で緑化基材の崩落現象を生じ易い。[Problems to be Solved by the Invention] In the above-mentioned construction method, the laid wire mesh functions to prevent the greening base material from flowing down. However, since the seam of the wire mesh is systematically divided, if the earth pressure is concentrated at the seam of the wire mesh, the wire mesh will not be able to withstand the earth pressure, and the wire mesh will peel off. It is easy to occur.
【0004】[0004]
【本発明の目的】本発明は以上の問題点を解決するため
になされたもので、その目的とするところは、簡単な施
工で以て効果的に網材の継ぎ目を強固に連結できる、網
材の敷方法を提供することにある。SUMMARY OF THE INVENTION The present invention has been made to solve the above problems, and an object thereof is to make it possible to effectively and firmly connect the joints of net materials with a simple construction. It is to provide a method of laying wood.
【0005】[0005]
【問題点を解決するための手段】本発明は、法面に帯状
の網材の両縁部を重合させて敷設する網材の敷設方法に
おいて、網材の重合部に沿って補強筋を配置し、つぎに
網材の重合部に補強筋が隠れるまで固結材を吹付けて連
続した縦枠を構築することを特徴とする、網材の敷設方
法である。The present invention is a method for laying a net material in which both edges of a belt-like net material are laid on a slope surface in a laying method, and reinforcing bars are arranged along the overlapped portion of the net material. Then, next, a solidifying material is sprayed until the reinforcing bars are hidden in the overlapping portion of the net material to construct a continuous vertical frame, which is a method for laying the net material.
【0006】以下図面を参照しながら本発明の実施例に
ついて説明する。An embodiment of the present invention will be described below with reference to the drawings.
【0007】<イ>金網の敷設工程 図1に法面の平面図を示し、図中上部が法面の上流側を
示し、図中上部が法面の下流側を示す。まず法面の縦方
向に沿って、帯状の金網1を順次敷設していく。この
際、図2に拡大して示すように、隣接する金網1,1の
両縁部を相互に重ね合わせて重合部2を形成する。尚、
金網1の敷設作業に当たり、従来と同様の各種のスぺー
サ部材を使用して金網1を法面から所定の距離だけ離隔
させて敷設することや、所定の間隔を隔ててアンカー類
を打設して金網1を固定することは従来と同様である。
尚、金網1は焼付塗装金網、樹脂被覆金網、可撓ネット
など公知の網材を含むものである。<A> Laying process of wire mesh FIG. 1 shows a plan view of the slope, the upper part of the drawing shows the upstream side of the slope, and the upper part of the drawing shows the downstream side of the slope. First, the strip-shaped wire mesh 1 is sequentially laid along the longitudinal direction of the slope. At this time, as shown in an enlarged view in FIG. 2, both edges of the adjacent wire nets 1 and 1 are overlapped with each other to form the overlapping portion 2. still,
When laying the wire net 1, using the same various spacer members as the conventional one, laying the wire net 1 at a predetermined distance from the slope or laying anchors at a predetermined interval Then, fixing the wire net 1 is the same as the conventional one.
The wire netting 1 includes a known net material such as a baking coating wire netting, a resin-coated wire netting, and a flexible netting.
【0008】<ロ>補強筋の配置 つぎに金網1,1の重合部2に鉄筋やワイヤーロープ等
の補強筋3を載置した後、アンカー4を打ち込んで金網
1及び補強筋3を仮固定する。補強筋3は後述する縦枠
の補強部材として機能する部材で、重合部2の全長に亘
り連続して配置することが望ましい。<B> Arrangement of Reinforcing Bars Next, after the reinforcing bars 3 such as reinforcing bars and wire ropes are placed on the overlapping portions 2 of the wire nets 1 and 1, the anchors 4 are driven in to temporarily fix the wire nets 1 and the reinforcing bars 3. To do. The reinforcing bar 3 is a member that functions as a reinforcing member for a vertical frame, which will be described later, and is preferably arranged continuously over the entire length of the overlapping portion 2.
【0009】<ハ>縦枠の構築 つぎに図3に示すように縦向きに形成された金網1の重
合部2に、補強筋3が隠れるまでモルタル等の固結材を
吹付ける。吹付けられた固結材が両金網1,1の重合部
2を透過し、図示するように断面山形の縦枠5が金網
1,1の重合部2に沿って連続して形成される。<C> Construction of Vertical Frame Next, as shown in FIG. 3, a solidifying material such as mortar is sprayed on the overlapping portion 2 of the wire mesh 1 formed in the vertical direction until the reinforcing bar 3 is hidden. The sprayed solidifying material permeates the overlapping portions 2 of the wire nets 1 and 1, and a vertical frame 5 having a chevron cross section is continuously formed along the overlapping portions 2 of the wire nets 1 and 1 as shown in the drawing.
【0010】<ニ>緑化基材の吹付け 縦枠5を構築したら、図4に示すように露出する金網1
が隠れるまで、公知の各種緑化基材6を所定の厚さに吹
付け、施工を完了する。尚、緑化基材6の吹付けに先行
して、公知の工法で縦枠5と直交する横枠(図示せず)
を構築する場合もある。<D> Spraying of greening base material Once the vertical frame 5 has been constructed, the wire mesh 1 exposed as shown in FIG.
Various publicly known greening base materials 6 are sprayed to a predetermined thickness until the surface is hidden, and the construction is completed. Incidentally, prior to the spraying of the greening base material 6, a horizontal frame (not shown) orthogonal to the vertical frame 5 by a known construction method.
May be built.
【0011】<ホ>金網の継目部の強度について 緑化基材6の自重は金網1全体に作用する。各金網1の
両縁部を除いた範囲は、金網1の強度によって支持して
表層崩落が拘束される。また、金網1,1の継目部に作
用する緑化基材6の自重は縦枠5により支持される。ま
た、縦枠5は金網1,1の継目部の剥離を防止するだけ
でなく、金網1,1の継目部に作用する緑化基材6の自
重を分散して効果的に自重を支持できる。また地山深部
からの崩落に対してはアンカー4に代わって鉄筋を挿入
して地山の補強を図ることで対処する。<E> Strength of the seam of the wire netting The weight of the greening base material 6 acts on the entire wire netting 1. The area excluding both edges of each wire net 1 is supported by the strength of the wire net 1 and the collapse of the surface layer is restrained. The vertical frame 5 supports the own weight of the greening base material 6 that acts on the joints of the wire nets 1, 1. Further, the vertical frame 5 not only prevents separation of the seam portions of the wire nets 1 and 1, but also disperses the self-weight of the greening base material 6 acting on the seam portions of the wire nets 1 and 1 and can effectively support the self-weight. Moreover, the collapse from the deep part of the natural ground is dealt with by reinforcing the natural ground by inserting a reinforcing bar instead of the anchor 4.
【0012】[0012]
【実施例2】前記実施例1は緑化工用の網材の重合部を
連結する場合について説明したが、ロックネット用の網
材の敷設に適用することも可能である。本実施例の場合
も、ロックネット用の網材の両縁を重合させ、その重合
部に縦枠を構築することは前記実施例1と同様である。[Embodiment 2] Although the first embodiment has been described with respect to the case where the overlapping portions of the net material for greening are connected, it can be applied to the laying of the net material for the lock net. Also in the case of this embodiment, it is the same as in the first embodiment that both edges of the net material for the lock net are polymerized and a vertical frame is constructed in the polymerized portion.
【0013】[0013]
【発明の効果】本発明は以上説明したようになるから次
のような効果を得ることができる。Since the present invention is as described above, the following effects can be obtained.
【0014】<イ> 網材の継ぎ目箇所を重合させ、こ
の重合部に固結材を吹付けて縦枠を構築したことによ
り、網材の継目箇所を強固に連結できる。したがって、
緑化工用の網材にあっては緑化基材を長期間に亘り安定
して支持でき、またロックネット用の網材にあっては落
石や表層崩落を長期間に亘り抑止できる。<B> By superposing the joint portions of the net material and spraying the solidifying material on the superposed portion to construct the vertical frame, the joint portions of the net material can be firmly connected. Therefore,
The net material for greening can stably support the greening base material for a long period of time, and the net material for rock net can prevent rock fall and surface layer collapse for a long period of time.
【0015】<ロ> 縦枠は隣接する網材を単に連結す
るだけでなく、網材に作用する荷重を効果的に分散で
き、荷重の集中を回避できる。<B> The vertical frame can not only simply connect the adjacent net materials, but also can effectively disperse the load acting on the net materials and avoid the concentration of the load.
【0016】<ハ> 網材の重合部に補強筋を配置した
後、固結材を吹付けるだけの作業であるから、網材の連
結作業を簡単に行える。 <ニ> 新規の法面を対象とするだけでなく、網材の継
ぎ目が剥がれた既存の法面を対象に施工することもでき
る。<C> Since the work is simply to spray the solidifying material after arranging the reinforcing bars in the overlapping portion of the mesh material, the mesh material can be easily connected. <D> Not only a new slope can be targeted, but also an existing slope where the seam of the mesh material is peeled off can be targeted.
【図面の簡単な説明】[Brief description of drawings]
【図1】 緑化基材を吹付けた法面の一部を省略した平
面図FIG. 1 is a plan view in which a part of the slope on which the greening base material is sprayed is omitted.
【図2】 図1におけるII−IIの断面図FIG. 2 is a sectional view of II-II in FIG.
【図3】 図1におけるIII −III の断面図FIG. 3 is a sectional view taken along line III-III in FIG.
【図4】 図1におけるIV−IVの断面図4 is a sectional view of IV-IV in FIG.
Claims (1)
て敷設する網材の敷設方法において、 網材の重合部に沿って補強筋を配置し、 つぎに網材の重合部に補強筋が隠れるまで固結材を吹付
けて連続した縦枠を構築することを特徴とする、 網材の敷設方法。1. A method for laying a net material in which both edges of a belt-like net material are laid on a slope, the reinforcing bar being arranged along the overlap portion of the net material, and then the overlap portion of the net material. A method of laying net material, characterized in that a continuous vertical frame is constructed by spraying a solid material until the reinforcing bars are hidden.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP29753493A JP3000075B2 (en) | 1993-11-02 | 1993-11-02 | Laying net material |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP29753493A JP3000075B2 (en) | 1993-11-02 | 1993-11-02 | Laying net material |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH07127068A true JPH07127068A (en) | 1995-05-16 |
JP3000075B2 JP3000075B2 (en) | 2000-01-17 |
Family
ID=17847786
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP29753493A Expired - Lifetime JP3000075B2 (en) | 1993-11-02 | 1993-11-02 | Laying net material |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3000075B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007035843A (en) * | 2005-07-26 | 2007-02-08 | Hitachi Ltd | Electronic circuit device |
-
1993
- 1993-11-02 JP JP29753493A patent/JP3000075B2/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007035843A (en) * | 2005-07-26 | 2007-02-08 | Hitachi Ltd | Electronic circuit device |
Also Published As
Publication number | Publication date |
---|---|
JP3000075B2 (en) | 2000-01-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH07127068A (en) | Arrangement method for net material | |
JPH0849237A (en) | Slope face covering structure and mat | |
JPH07119154A (en) | Method of stabilizing construction of cut face of slope | |
JP3096424B2 (en) | Vegetation infrastructure construction method | |
JP2000027150A (en) | Pebble-packed basket for engineering works | |
JPS6351527A (en) | Slope stabilization work | |
JPS58195629A (en) | Slope frame material | |
JPS60188534A (en) | Slope form and its construction | |
JPS59228531A (en) | Slope protection work | |
JPH0328420A (en) | Slope protection method | |
JP3492329B2 (en) | Widening road | |
JPS58199931A (en) | Slope frame structure member | |
JPS6145732B2 (en) | ||
JP2003213689A (en) | Wall surface greening panel and wall surface greening method using it | |
JP2002309584A (en) | Frame for forming slope protection frame and method for constructing slope protection frame using the same | |
JP3302633B2 (en) | Slope protection method | |
JP2676606B2 (en) | Construction method | |
JP2006063758A (en) | Retaining member for forming slope greening base, retaining structure for forming slope greening base thereby and slope greening method using retaining structure thereof | |
JPS58110721A (en) | Greens-planting work for slope | |
JPS63206520A (en) | In-situ slope framing work using simple trapezoidal formwork | |
JPS63217019A (en) | Slope protection work | |
JPH06128961A (en) | Executing method of filling | |
JPH1025741A (en) | Landslide guard fence | |
JPS6028973B2 (en) | Staircase construction method for stable planting on mountainside slopes | |
JPH09158191A (en) | Device for forming slope frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 9 Free format text: PAYMENT UNTIL: 20081112 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 9 Free format text: PAYMENT UNTIL: 20081112 |
|
S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313117 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081112 Year of fee payment: 9 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081112 Year of fee payment: 9 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20091112 Year of fee payment: 10 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 11 Free format text: PAYMENT UNTIL: 20101112 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 12 Free format text: PAYMENT UNTIL: 20111112 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111112 Year of fee payment: 12 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Year of fee payment: 13 Free format text: PAYMENT UNTIL: 20121112 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121112 Year of fee payment: 13 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131112 Year of fee payment: 14 |
|
EXPY | Cancellation because of completion of term |