JPH06128961A - Executing method of filling - Google Patents

Executing method of filling

Info

Publication number
JPH06128961A
JPH06128961A JP14227691A JP14227691A JPH06128961A JP H06128961 A JPH06128961 A JP H06128961A JP 14227691 A JP14227691 A JP 14227691A JP 14227691 A JP14227691 A JP 14227691A JP H06128961 A JPH06128961 A JP H06128961A
Authority
JP
Japan
Prior art keywords
embankment
filling
slope
anchor material
shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP14227691A
Other languages
Japanese (ja)
Other versions
JPH0678625B2 (en
Inventor
Kiyoshi Yamamoto
山本  清
Susumu Kato
進 加藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OYO KIKAKU KK
Maeda Kosen Co Ltd
Oyo Kikaku KK
Original Assignee
OYO KIKAKU KK
Maeda Kosen Co Ltd
Oyo Kikaku KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OYO KIKAKU KK, Maeda Kosen Co Ltd, Oyo Kikaku KK filed Critical OYO KIKAKU KK
Priority to JP3142276A priority Critical patent/JPH0678625B2/en
Publication of JPH06128961A publication Critical patent/JPH06128961A/en
Publication of JPH0678625B2 publication Critical patent/JPH0678625B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

PURPOSE:To improve the efficiency of filling operation by a method wherein a surface-shaped anchor material is buried into a filling approximately horizontally, hat-shaped vertical girders installed in upright positions in the vertical direction along the face of a slope of the filling and an end section on the slope-face side of the anchor material are disposed in upright, weir boards are mounted to projecting sections upward projected from an existing filling surface in the extended sections of the vertical girders and filling construction on the existing filling surface is conducted. CONSTITUTION:An end side on the filling slope-face side of a surface-shaped anchor material 11 having large tensile strength is wound on a winding pipe 12, and installed by pins 13, etc. Hat-shaped vertical girders 24 are disposed in upright on the surface of the face of a slope of a filling at regular intervals. The winding pipes 12 are connected to the vertical girders 24 by using U-shaped bolts 28. The extended sections of the vertical girders 24 are projected to sections upper than a filling surface, and weir boards are set up to the projecting sections of the vertical girders 24. The filling of a base in specified height is completed, and the surface-shaped anchor material 11 is laid on the filling.

Description

【発明の詳細な説明】 〔産業上の利用分野〕この発明は盛土の施工方法に関す
るものである。 〔従来の技術〕盛土法面をできるだけ急な勾配に形成し
て安定させるために、最近は盛土内に複数層に引張強度
の大きいシート状のアンカー材を埋設し、盛土とアンカ
ー材との間に働く摩擦力によってアンカー材を盛土内に
固定し、その引張力で斜面の滑り破壊力に対抗して、斜
面の滑り破壊を防ぐ方法が用いられている。 〔発明が解決しようとする課題〕上記の従来技術には、
次ぎのような問題点が存在する。即ち、上記のように引
張強度の大きいアンカー材を埋設して盛土法面を安定さ
せる工法の場合には、勾配を従来の盛土よりも急にする
ことが可能となる。しかし、勾配を急にすると法面の際
が崩れ易いので、盛土端部に土嚢袋を土留として積み上
げ、その上をシート状のアンカー材で覆い、更に、上方
で盛土の中に巻き込んで土嚢袋を安定させてから、盛土
工事を行っている。このため、土嚢詰め・アンカー材の
巻き込み等の作業に人手が掛り、省力化が進まなず、思
うようにコスト引き下げができないことが問題となって
いる。 〔課題を解決するための手段〕本発明は、上記のような
問題点を解決するためになされたもので、急な勾配にお
いても盛土作業を容易にし、ひいてはコストを安くする
盛土の施工方法を提供することを目的としている。即
ち、本発明は、盛土内に引張強度の大きいアンカー材を
略水平に埋設し、盛土の法面に沿って上下方向に立設す
る縦梁と、前記アンカー材の法面側の端部とを連結する
とともに、この縦梁の延長部を既設盛土面より上方に突
出させ、この縦梁の突出部に堰板を取付けた後、既設盛
土面上の盛土工事を行うものである。 〔実施例〕以下、この発明の実施例を図面について詳し
く説明する。 (イ)アンカー材 アンカー材1は、盛土内に水平方向に埋設することによ
り、盛土の円弧滑りなどに対抗して盛土を安定させるた
めのものである。アンカー材1は盛土内に水平に埋設す
るものであり、面状、帯状、線状等の形状のものが用い
られる。 (1)面状アンカー材(図1) 面状アンカー材11としては、プラスチックネット、不
織布、透水マット、鋼板など、引張強度の大きいものな
ら特に材料を規定するものではない。この面状アンカー
材11の盛土法面側の端辺は、図1に示すように、巻付
管12に巻きつけて、ピン13等によって取り付ける。 (2)帯状アンカー材(図2) 帯状アンカー材14は、面状アンカー材11を帯状に複
数に分断したものである。これらの帯状アンカー材14
は、図2に示すように、所定間隔をおいて、巻付管12
に盛土法面側の端辺を巻きつけて、ピン13等によって
取り付ける。 (3)線状アンカー材(図3) 図3に示すように、線状アンカー材15は、異形鉄筋の
様に表面に凹凸を設けて摩擦抵抗を大きくした棒状体等
を用いる。線状アンカー材15には、周面に凹凸を設け
る代わりに、抵抗板等を取り付けた棒状体や鋼索等を用
いることができる。このように形成した線状アンカー材
15を多数用いて、盛土内に埋設することも考えられる
が、線状アンカー材15は比較的摩擦抵抗が小さいた
め、上記の面状アンカー材あるいは帯状アンカー材と併
用すると効果的である。また、面状アンカー材と帯状ア
ンカー材との併用も考えられる。 (ロ)縦梁 縦梁2は、アンカー材1に直接ないし間接的に取付けら
れて盛土の法面の表面に所定間隔で立設され、後述する
堰板を取付けるものである。縦梁2は、法面に沿って高
く立設し堰板を取付けるので、断面二次モーメントの大
きいことが要求される。その意味では長尺の鋼管パイ
プ、H形鋼、C形鋼などを用いるのが望ましいが、順次
継ぎ足して作業するには、簡単に連結可能なものが施工
性がよい。又、巻付管12などとクランプを用いて簡単
に連結できる短管状のもの、堰板が取付け易いハット状
のもの等が一般的である。 (1)短管状縦梁(図4) 短管状縦梁21としては、図4に示されるような、一般
に建築用足場パイプ等に使用される長さ1m程度のもの
を用いる。連結用挿入管22を用いて簡単に直列的に連
続でき、又、巻付管12や後述する直交管・筋交管等も
同じ太さの管を用いれば、連結する場合に一般に使用さ
れる足場組み立て用クランプ23を用いることができ好
都合である。 (2)ハット状縦梁(図5) ハット状縦梁24は、図5に示すように、断面形状がハ
ット型であり、ウェブ25と支持縁26に所定間隔で連
結孔27が付設されている。法面に立設する場合には、
図6に示すように、U字ボルト28を用いて巻付管12
と直交方向に連結するのがよい。ハット状縦梁24同志
を長手方向に接続するには、図に示すように、半筒状の
接続金具29等を用いる。 (ハ)堰板 堰板3は、アンカー材の上に盛土作業を行う前に、縦梁
に直接ないし間接的に取付けて、盛土法肩の形状保持を
容易にするためのもので、盛土作業の際盛土法肩の土を
堰止めて、土の落ちこぼれを防ぐ。堰板3は、既設盛土
面から突出する縦梁に取付けて用いるものであり、剛性
板状、ネット状等の形状のものが用いられる。 (1)剛性板状堰板(図7) 剛性板状堰板31としては、鋼板、セメント板、ベニヤ
板など土の保持ができる程度の剛性があれば特にその材
料を規定するものではない。又、その形状は平板でもよ
いし、リブ構造を持たせたものでもよい。図7に示すの
は、ガラス繊維補強セメント板で形成したリブ32付き
の板体からなる剛性板状堰板31であり、表面にはセラ
ミック粒33が吹付けてある。盛土法面の完成した後の
表面保護兼化粧材としての作用も期待したものである。
取付け方法の一例を図示すると、盛土法面に立設された
ハット状縦梁24の支持縁26の連結孔27の表面に剛
性板状堰板31を当て、ボルト・ナット等を用いて固定
する。 (2)ネット状堰板(図8) ネット状堰板34は、簡易に法肩を保護する目的であ
り、盛土の完成の後、法面を植生する場合などに適して
いる。金網、プラスチックネット、編網等が広く使用で
きるが、図8に示したのは比較的強度が大きく、目の粗
い亜鉛メッキ金網35の内面に、土の落ちこぼれを防ぐ
ため不織布等の透水性シート36を貼り合わせしたネッ
ト状堰板34である。 立設されたハット状縦梁24の
支持縁26の内面にネット状堰板34を当て、ボルト・
ナット等を用いて取付ける。 (ニ)盛土基盤の構築(図9) 盛土基盤は盛土施工のスタートであり、盛土の基礎を確
固にし、又、盛土法面の勾配を規定するためのものであ
る。図9に示すように、盛土体を形成する地盤をローラ
ー等を用いて充分に締め固めて平坦にし、盛土基盤40
を形成した後、アンカー材1をその上に水平に敷設す
る。敷設する際には、アンカー材1の端部には巻付管1
2を取付けたうえ、巻付管12を盛土の法尻計画線に沿
うように配置する。巻付管12には、所定の間隔をおい
て直交方向に直交管41を取付け、直交管41を盛土基
盤40の上に設置する。巻付管12および直交管41は
フックピン42を用いて盛土基盤40に固定する。巻付
管12の外側には、短管状縦梁21を所定の間隔をおい
て立設し、その下端を上述したようにクランプ23を用
いて巻付管12に連結する。縦梁には荷重が掛かるた
め、下端にコンクリート板等の簡単な基礎43を設けて
おくとよい。盛土基盤40から1m程度上の個所で、立
設された縦梁を横断的に連結するように巻付管12を取
付け、この巻付管12と直交管41との間には筋交管4
4を付設する。筋交管44の長さを調節して縦梁と盛土
基盤40のなす角度を盛土の計画勾配に合致させる。
長尺の縦梁を用いて、先端部を鋼索・ロープ等を用いて
地山に結び付けで安定させる等の方法をとってもよい。 (ホ)基盤盛土の施工(図10) 図10に示すように、このように立設された縦梁2の外
側に、上述したような方法で堰板3を取付ける。次い
で、盛土基盤40上に盛土4作業を行い、ローラー5等
を用いて確りと締め固める。筋交管44などが盛土作業
の邪魔になる場合には、部分的に土嚢袋を使用してもよ
い。 (ヘ)盛土の完成(図11) 図11に示すように、所定高の基盤の盛土4が出来上が
ったら、盛土4の上に面状アンカー材11を敷設し、そ
の法面側の端部は、縦梁に取付けてある巻付管12に巻
付ける。面状アンカー材11の敷設が完了したら、既設
盛土面上に縦梁突出していない場合には、縦梁2を延長
し、次ぎの盛土仕上げ予定高の個所に、縦梁2間を横断
的に連結するように、巻付管12を取付ける。堰板3を
縦梁2に取付けてから盛土4作業を行う。以下、このよ
うな作業を繰り返し、多層状のアンカー材で補強された
盛土体を完成する。盛土法面を緑化したい場合には、ネ
ット状堰板34を用いて盛土を行い、堰板の表面に植生
種子を吹きつけるなどの方法をとる。 〔本発明の作用〕盛土作業の際に土が堰板を内側から強
く押しつけることが考えられるが、本発明のように構成
すると、縦梁は盛土内に深く埋設された引張力第なアン
カー材と連結されているため、アンカー材と盛土との間
に働く摩擦力によって、縦梁は法面に確りと保持され、
堰板はこの縦梁に固定されているので、容易に外側に倒
れることはない。 〔本発明の効果〕本発明は次のような効果を得ることが
できる。 (イ)堰板を縦梁に取付けることによって、堰板が安定
でき、土嚢袋で盛土法面を形成しないでも盛土表面の土
の落ちこぼれを防ぎ、盛土作業を容易に行うことができ
る。 (ロ)土嚢積み作業・アンカー材の巻き込み作を省略す
ることにより、作業を早めるとともに、人員を削減しコ
スト低減を計ることができる。 (ハ)縦梁の勾配を計画勾配に設定し、この縦梁に堰板
を取付けて盛土作業を行えば、盛土の勾配が自然に規定
できるので作業が容易である。 (ニ)従来の垂直盛土工法では勾配が垂直に限定されて
いたが、本発明では、任意の勾配の盛土が可能である。 (ホ)通常、盛土法面を形成する場合は、勾配を2割な
いし1割8分とするが、本発明は引張強度の大きいアン
カー材で補強されているので、確実に盛土の崩壊を防ぐ
ので、この勾配を1割ないし3分程度にすることがで
き、有効利用できる土地を拡張できる上、運搬する土量
も少なく経済効果が大きい。 (ヘ)従来の垂直盛土工法のように、盛土表面に大規模
な基礎の上に立つ擁壁を必要とせず、簡便に施工ができ
るのでコストが安くできる。 (ト)従来の垂直盛土工法のように、表面壁が剛性板休
に限定されることなく、任意に選択できるほか、緑化も
可能となる。
DETAILED DESCRIPTION OF THE INVENTION [Industrial field of application] The present invention relates to a method for embankment construction. [Prior Art] In order to form and stabilize the embankment slope as steeply as possible, recently, a sheet-shaped anchor material with high tensile strength is embedded in multiple layers in the embankment, and between the embankment and the anchor material. A method is used in which the anchor material is fixed in the embankment by the frictional force that acts on the slope, and the tensile force of the anchor material counters the sliding failure force on the slope to prevent the sliding failure on the slope. [Problems to be Solved by the Invention]
There are the following problems. That is, in the case of the method of embedding the anchor material having high tensile strength to stabilize the embankment slope as described above, the slope can be made steeper than that of the conventional embankment. However, if the slope is steep, the slope tends to collapse, so sandbags are piled up at the end of the embankment as clods, covered with sheet-shaped anchor material, and then rolled up into the embankment to wrap up the sandbag. After stabilizing, the embankment work is underway. For this reason, there is a problem that labor such as packing sandbags and winding anchor material is required, labor saving does not proceed, and cost cannot be reduced as expected. [Means for Solving the Problems] The present invention has been made to solve the above-mentioned problems, and facilitates the embankment work even on a steep slope, and thus provides a method for embankment to reduce the cost. It is intended to be provided. That is, the present invention is to embed an anchor material having a large tensile strength substantially horizontally in the embankment, and to stand vertically in the vertical direction along the slope of the embankment, and the end of the anchor material on the slope side. In addition to connecting the above, the extension of this vertical beam is projected above the existing embankment surface, a dam plate is attached to the protruding portion of this vertical beam, and then the embankment work on the existing embankment surface is performed. Embodiments Embodiments of the present invention will be described in detail below with reference to the drawings. (A) Anchor material The anchor material 1 is embedded in the embankment in the horizontal direction to stabilize the embankment against the arc sliding of the embankment. The anchor material 1 is embedded horizontally in the embankment and has a planar shape, a strip shape, a linear shape, or the like. (1) Planar anchor material (FIG. 1) The planar anchor material 11 is not particularly limited as long as it has a large tensile strength, such as a plastic net, a non-woven fabric, a water permeable mat, and a steel plate. As shown in FIG. 1, the edge of the planar anchor material 11 on the embankment slope side is wound around a winding tube 12 and attached by a pin 13 or the like. (2) Band-shaped anchor material (FIG. 2) The band-shaped anchor material 14 is obtained by dividing the planar anchor material 11 into a plurality of bands. These strip anchor materials 14
As shown in FIG. 2, the winding tube 12 is provided at predetermined intervals.
Wind the edge on the slope side of the embankment and attach it with the pin 13 or the like. (3) Linear anchor material (FIG. 3) As shown in FIG. 3, the linear anchor material 15 uses a rod-shaped body or the like having irregularities on the surface such as deformed reinforcing bars to increase frictional resistance. As the linear anchor material 15, a rod-shaped body to which a resistance plate or the like is attached, a steel rope, or the like can be used instead of providing irregularities on the peripheral surface. It is conceivable that a large number of the linear anchor materials 15 formed in this way are used and embedded in the embankment. However, since the linear anchor material 15 has a relatively small friction resistance, the above-mentioned planar anchor material or strip anchor material is used. It is effective when used together with. It is also possible to use a planar anchor material and a strip anchor material together. (B) Longitudinal beam The longitudinal beam 2 is directly or indirectly attached to the anchor material 1 and is erected at a predetermined interval on the surface of the slope of the embankment to attach a weir plate described later. Since the vertical beam 2 is erected high along the slope and is attached with a dam plate, a large moment of inertia of area is required. In that sense, it is desirable to use long steel pipes, H-section steels, C-section steels, etc., but in order to add and work sequentially, those that can be easily connected have good workability. In addition, a short tubular member that can be easily connected to the winding pipe 12 or the like by using a clamp, a hat-shaped member that is easy to attach a dam plate, and the like are common. (1) Short tubular vertical beam (FIG. 4) As the short tubular vertical beam 21, one having a length of about 1 m which is generally used for scaffolding pipes for construction as shown in FIG. 4 is used. Scaffolds that are commonly used for connection can be easily made in series using the insertion tube 22 for connection, and the winding tube 12 and the orthogonal tube / brace tube etc. described later can also be used if they have the same thickness. The assembly clamp 23 can be conveniently used. (2) Hat-shaped vertical beam (FIG. 5) As shown in FIG. 5, the hat-shaped vertical beam 24 has a hat-shaped cross section, and has connecting holes 27 attached to the web 25 and the supporting edge 26 at predetermined intervals. There is. When standing on the slope,
As shown in FIG. 6, using the U-shaped bolt 28, the winding tube 12
It is better to connect in a direction orthogonal to. To connect the hat-shaped vertical beams 24 to each other in the longitudinal direction, a semi-cylindrical connection fitting 29 or the like is used as shown in the figure. (C) Weir plate The weir plate 3 is attached to the vertical beam directly or indirectly before the embankment work on the anchor material to facilitate the shape retention of the embankment shoulder. At the time of the embankment, the soil on the shoulder should be dammed to prevent the soil from falling off. The barrier plate 3 is used by being attached to a vertical beam that projects from the existing embankment surface, and has a rigid plate shape, a net shape, or the like. (1) Rigid plate-shaped dam plate (FIG. 7) The rigid plate-shaped dam plate 31 is not particularly specified as long as it is rigid enough to hold soil such as a steel plate, a cement plate or a veneer plate. The shape may be a flat plate or a rib structure. FIG. 7 shows a rigid plate-like dam plate 31 made of a plate body with ribs 32 formed of a glass fiber reinforced cement plate, on the surface of which ceramic particles 33 are sprayed. It is also expected to act as a surface protection and cosmetic material after the embankment slope is completed.
To illustrate an example of a mounting method, a rigid plate-like dam plate 31 is applied to the surface of the connecting hole 27 of the support edge 26 of the hat-shaped vertical beam 24 erected on the embankment slope, and fixed using bolts, nuts, etc. . (2) Net-shaped dam plate (Fig. 8) The net-shaped dam plate 34 is for the purpose of simply protecting the slope shoulder, and is suitable for vegetation on the slope after the completion of the embankment. Although wire nets, plastic nets, braided nets, etc. can be widely used, the one shown in FIG. 8 has a relatively large strength, and a water-permeable sheet such as a non-woven fabric is formed on the inner surface of the zinc-plated metal net 35 having a coarse mesh to prevent the falling of soil. It is a net-like dam plate 34 to which 36 is attached. The net-shaped dam plate 34 is applied to the inner surface of the support edge 26 of the vertically-arranged hat-shaped vertical beam 24, and bolts
Mount using nuts, etc. (D) Construction of embankment foundation (Fig. 9) The embankment foundation is the start of embankment construction, to solidify the foundation of the embankment and to regulate the slope of the embankment slope. As shown in FIG. 9, the ground forming the embankment is sufficiently compacted and flattened by using a roller or the like, and the embankment base 40
After forming the, the anchor material 1 is laid horizontally on it. At the time of laying, the end portion of the anchor material 1 has a winding tube 1
2 is attached, and the winding tube 12 is arranged so as to be along the plan line of the embankment of the embankment. An orthogonal tube 41 is attached to the winding tube 12 in a perpendicular direction at a predetermined interval, and the orthogonal tube 41 is installed on the embankment base 40. The winding tube 12 and the orthogonal tube 41 are fixed to the embankment base 40 using hook pins 42. Short tubular vertical beams 21 are erected at predetermined intervals on the outer side of the winding tube 12, and the lower end thereof is connected to the winding tube 12 using the clamp 23 as described above. Since a load is applied to the vertical beam, a simple foundation 43 such as a concrete plate may be provided at the lower end. The winding pipe 12 is attached at a position about 1 m above the embankment base 40 so as to connect the standing vertical beams transversely, and between the winding pipe 12 and the orthogonal pipe 41, the bracing pipe 4 is provided.
4 is attached. The length of the brace 44 is adjusted so that the angle between the vertical beam and the embankment base 40 matches the planned slope of the embankment.
A method may be adopted in which a long vertical beam is used and the tip end is tied to the natural ground with a steel rope, rope or the like to stabilize it. (E) Construction of foundation embankment (FIG. 10) As shown in FIG. 10, the weir plate 3 is attached to the outer side of the vertical beam 2 thus erected by the method described above. Next, the embankment 4 work is performed on the embankment base 40, and it is firmly compacted using the roller 5 and the like. A sandbag may be partially used when the brace 44 or the like interferes with the embankment work. (F) Completion of embankment (Fig. 11) As shown in Fig. 11, when the embankment 4 having a predetermined height is completed, the planar anchor material 11 is laid on the embankment 4, and the end on the slope side is , The winding pipe 12 attached to the vertical beam. After the laying of the planar anchor material 11 is completed, if the vertical beams do not project on the existing embankment surface, the vertical beams 2 are extended, and the vertical beams 2 are transversely crossed at the next planned embankment finish height. The winding tube 12 is attached so as to be connected. After mounting the dam plate 3 on the vertical beam 2, the embankment 4 work is performed. Hereinafter, such work is repeated to complete the embankment body reinforced by the multilayer anchor material. When it is desired to green the embankment slope, embankment is performed using the net-like dam plate 34, and vegetative seeds are sprayed on the surface of the dam plate. [Operation of the Present Invention] It is conceivable that the soil strongly presses the weir plate from the inside during the embankment work. However, with the configuration of the present invention, the vertical beam is the tensile force anchor material deeply embedded in the embankment. Since it is connected with, the vertical beam is firmly held on the slope by the frictional force acting between the anchor material and the embankment,
Since the barrier plate is fixed to this vertical beam, it cannot easily fall outside. [Effect of the present invention] The present invention can obtain the following effects. (A) By attaching the weir plate to the vertical beam, the weir plate can be stabilized, and even if the embankment slope is not formed with the sandbag, the falling of the soil on the embankment surface can be prevented and the embankment work can be easily performed. (B) By omitting the work of stacking sandbags and the work of winding the anchor material, the work can be speeded up, the number of personnel can be reduced, and the cost can be reduced. (C) If the slope of the vertical beam is set to the planned slope and a dam plate is attached to this vertical beam to perform the embankment work, the slope of the embankment can be specified naturally, so the work is easy. (D) In the conventional vertical embankment method, the gradient was limited to vertical, but in the present invention, embankment with an arbitrary gradient is possible. (E) Normally, when forming a fill slope, the gradient is set to 20 to 10 minutes, but since the present invention is reinforced with an anchor material having a high tensile strength, the collapse of the fill can be reliably prevented. Therefore, this gradient can be set to about 10% to 3 minutes, the land that can be effectively used can be expanded, and the amount of soil to be transported is small, which has a large economic effect. (F) Unlike the conventional vertical embankment method, it does not require a retaining wall standing on a large-scale foundation on the surface of the embankment, and construction can be performed easily, so costs can be reduced. (G) Unlike the conventional vertical embankment method, the surface wall is not limited to a rigid plate, and can be arbitrarily selected and greening is possible.

【図面の簡単な説明】 〔図1〕面状アンカー材の説明図 〔図2〕帯状アンカー材の説明図 〔図3〕線状アンカー材の説明図 〔図4〕短管状縦梁の説明図 〔図5〕ハット状縦梁の説明図 〔図6〕ハット状縦梁の連結方法と取付方法の説明図 〔図7〕剛性板状堰板とその取付方法の説明図 〔図8〕ネット状堰板とその取付方法の説明図 〔図9〕盛土基盤の施工方法を示す説明図 〔図10〕盛土基盤の盛土方法を示す説明図 〔図11〕補強盛土の施工方法を示す説明図[Brief description of drawings] [Fig. 1] Illustration of planar anchor material [Fig. 2] Illustration of band-shaped anchor material [FIG. 3] Illustration of linear anchor material [Fig. 4] Explanatory drawing of short tubular vertical beam [FIG. 5] Illustration of a hat-shaped vertical beam [Fig. 6] Illustration of connecting method and attaching method of hat-shaped vertical beams [FIG. 7] Illustration of a rigid plate-like dam plate and its mounting method [FIG. 8] Explanatory drawing of a net-like dam plate and its mounting method [Fig. 9] Explanatory diagram showing construction method of embankment base [Fig. 10] Explanatory diagram showing the embankment method of the embankment base [FIG. 11] Explanatory diagram showing a method of constructing a reinforced embankment

Claims (1)

【特許請求の範囲】 盛土内に引張強度の大きいアンカー材を略水平に埋設
し、 盛土の法面に沿って上下方向に立設する縦梁と、前記ア
ンカー材の法面側の端部とを連結するとともに、 この縦梁の延長部を既設盛土面より上方に突出させ、 この縦梁の延長部に堰板を取付けて、既設盛土面上の盛
土工事を行う、 盛土の施工方法。
[Claims] A vertical beam, in which an anchor material having a high tensile strength is embedded substantially horizontally in the embankment, and is vertically erected along the slope of the embankment, and an end portion of the anchor material on the slope side. This is a method of embankment construction in which the extension of this vertical beam is projected above the existing embankment surface, a weir plate is attached to the extension of this vertical beam, and embankment work is performed on the existing embankment surface.
JP3142276A 1991-04-01 1991-04-01 Embankment construction method Expired - Lifetime JPH0678625B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3142276A JPH0678625B2 (en) 1991-04-01 1991-04-01 Embankment construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3142276A JPH0678625B2 (en) 1991-04-01 1991-04-01 Embankment construction method

Publications (2)

Publication Number Publication Date
JPH06128961A true JPH06128961A (en) 1994-05-10
JPH0678625B2 JPH0678625B2 (en) 1994-10-05

Family

ID=15311597

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3142276A Expired - Lifetime JPH0678625B2 (en) 1991-04-01 1991-04-01 Embankment construction method

Country Status (1)

Country Link
JP (1) JPH0678625B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007239238A (en) * 2006-03-07 2007-09-20 Showa Kikai Shoji Kk Reinforced soil wall constructing implement and reinforced soil wall using this implement
JP2020084480A (en) * 2018-11-20 2020-06-04 ランデックス工業株式会社 Soil wall structure for anchor reinforcement

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5041311A (en) * 1973-05-31 1975-04-15
JPH02140327A (en) * 1987-11-23 1990-05-30 Henri Vidal Surface coating of banking body

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5041311A (en) * 1973-05-31 1975-04-15
JPH02140327A (en) * 1987-11-23 1990-05-30 Henri Vidal Surface coating of banking body

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007239238A (en) * 2006-03-07 2007-09-20 Showa Kikai Shoji Kk Reinforced soil wall constructing implement and reinforced soil wall using this implement
JP2020084480A (en) * 2018-11-20 2020-06-04 ランデックス工業株式会社 Soil wall structure for anchor reinforcement

Also Published As

Publication number Publication date
JPH0678625B2 (en) 1994-10-05

Similar Documents

Publication Publication Date Title
US3817006A (en) Apparatus for supporting masonry walls against wind damage during construction
RU2229561C2 (en) Wire netting for gravel structure enclosing and for soil surface layer protection and device for netting production
US5301918A (en) Form assembly for construction of concrete culverts
JP2836489B2 (en) Cut slope stabilization method
JPH06128961A (en) Executing method of filling
JP2650611B2 (en) Cut slope stability method
JPS6245801A (en) Construction of structure by foamed resin block
JP7131767B2 (en) Reinforcement embankment structure and construction method of reinforcement embankment
JP3499488B2 (en) Slope protection method
JPH10317381A (en) Structure for protecting face of slope by retaining wall and method for constructing the same
CN214942641U (en) Protection device of elevator shaft
JPH09328761A (en) Retaining wall structure
CN211646419U (en) Anchor rod protection structure for tunnel or culvert construction
CN107190757A (en) The construction method and support system of recyclable system of deep foundation pit support can be assembled
JPH0680249B2 (en) Reinforced embankment construction method
JP2001040671A (en) Slope reinforcing unit, and filling reinforcing structure and filling reinforcing construction method using the unit
JP2855263B2 (en) A frame for forming a legal frame and a legal frame method using the same
JPH07119153A (en) Method of forming face of slope and slope form
JPS6351527A (en) Slope stabilization work
JPH03144014A (en) Geotextile integral with fixing part and steep slope banking using thereof
JPH04254614A (en) Reinforcement for banking
JP2627879B2 (en) Cast-in-place method
JP2748259B2 (en) Frame for forming legal frame and legal method using the frame
JPS58164822A (en) Construction work of banking levee
JP3318570B2 (en) Method of forming vegetation base on steep slope