Gas water heater

Info

Publication number
JPH07122511B2
JPH07122511B2 JP60233664A JP23366485A JPH07122511B2 JP H07122511 B2 JPH07122511 B2 JP H07122511B2 JP 60233664 A JP60233664 A JP 60233664A JP 23366485 A JP23366485 A JP 23366485A JP H07122511 B2 JPH07122511 B2 JP H07122511B2
Authority
JP
Japan
Prior art keywords
pouring
water
temperature
bathtub
amount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP60233664A
Other languages
Japanese (ja)
Other versions
JPS6294759A (en
Inventor
弘 武智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Holdings Corp
Original Assignee
Matsushita Electric Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matsushita Electric Industrial Co Ltd filed Critical Matsushita Electric Industrial Co Ltd
Priority to JP60233664A priority Critical patent/JPH07122511B2/en
Publication of JPS6294759A publication Critical patent/JPS6294759A/en
Publication of JPH07122511B2 publication Critical patent/JPH07122511B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】 産業上の利用分野 本発明はガス給湯器に関するものである。TECHNICAL FIELD The present invention relates to a gas water heater.

従来の技術 第2図は従来の抑制への注湯を行なえるガス給湯器の一
例を示したもので、1はガス元弁、2はガス比例制御
弁、3はバーナ、4は熱交換器、5は水流スイッチ、6
は浴槽、7は浴槽6へ注湯する為の水バルブ、8は浴槽
6への注湯量を検知する水量センサ、9はこの給湯器を
制御する制御装置、10は出湯温度を検知する温度セン
サ、22は熱交換器4の出口配管から分岐し水バルブ7を
経由して浴槽6へ注湯する注湯配管、23は熱交換器4の
出口配管から分岐し他栓へ給湯する他栓配管である。こ
の給湯器により浴槽6に注湯しようとする場合には、制
御装置9により注湯量及び注湯温度を設定し、注湯開始
を指示すれば水バルブ7が開き温度センサ10,制御装置
9及びガス比例制御弁2により一定の温度に加熱された
湯が注湯配管22を経由して浴槽6に注湯される。この時
水量センサ8が浴槽6への注湯量を計算し、設定した注
湯量に達すれば水バルブ7を閉じて注湯を停止すること
により、浴槽への定温定量の注湯が可能となる。
2. Description of the Related Art FIG. 2 shows an example of a conventional gas water heater capable of pouring molten metal for suppression. 1 is a gas source valve, 2 is a gas proportional control valve, 3 is a burner, 4 is a heat exchanger. 5 is a water flow switch, 6
Is a bathtub, 7 is a water valve for pouring hot water into the bathtub, 8 is a water amount sensor that detects the amount of hot water poured into the bathtub 6, 9 is a control device that controls this water heater, and 10 is a temperature sensor that detects the hot water temperature. , 22 is a pouring pipe for branching from the outlet pipe of the heat exchanger 4 and pouring the molten metal into the bathtub 6 via the water valve 7, and 23 is a plug pipe for branching from the outlet pipe of the heat exchanger 4 and supplying hot water to another tap. Is. When pouring into the bathtub 6 with this water heater, the pouring amount and pouring temperature are set by the control device 9, and when the pouring start is instructed, the water valve 7 opens and the temperature sensor 10, the control device 9 and Hot water heated to a constant temperature by the gas proportional control valve 2 is poured into the bathtub 6 via the pouring pipe 22. At this time, the water amount sensor 8 calculates the pouring amount into the bath 6, and when the set pouring amount is reached, the water valve 7 is closed and pouring is stopped, so that constant temperature fixed amount pouring into the bath is possible.

発明が解決しようとする問題点 しかしながら、上記構成においては、注湯温度を一定に
する為には注湯中は設定された中湯温度で出湯させる必
要があり、他栓での任意な出湯温度の設定を禁止しなけ
ればならないという欠点があった。
DISCLOSURE OF THE INVENTION Problems to be Solved by the Invention However, in the above-mentioned configuration, in order to keep the pouring temperature constant, it is necessary to discharge the pouring water at the set pouring temperature during pouring. There was a drawback that you had to prohibit the setting of.

本発明はこのような従来の問題点を解決するもので浴槽
への注湯中においても他栓で任意の設定温度の湯を得る
ことができる給湯器を提供することを目的とするもので
ある。
The present invention solves such a conventional problem, and an object of the present invention is to provide a water heater that can obtain hot water at an arbitrary set temperature with another plug even during pouring into a bathtub. .

問題点を解決するための手段 上記問題点を解決する為に、本発明のガス給湯器は、水
量センサにより注湯量を、温度センサにより注湯温度を
それぞれ検知し、両者を演算することにより常に浴槽の
温度を把握し、他栓によって注湯温度が変化した時は、
他栓未使用時に注湯温度を変化させて注湯終了時には設
定した湯温を得ることができるようにしたものである。
Means for Solving the Problems In order to solve the above problems, the gas water heater of the present invention detects the pouring amount by the water amount sensor, detects the pouring temperature by the temperature sensor, respectively, and always calculates both. Grasp the temperature of the bathtub, and when the pouring temperature changes due to another tap,
The pouring temperature is changed when the other tap is not used so that the set pouring temperature can be obtained at the end of the pouring.

作用 本発明は上記した構成により、浴槽への注湯中に他栓で
同時給湯使用して浴槽への給湯条件が一時的に変化して
も、注湯終了時には設定湯温の浴槽湯温を得ることが可
能となるものである。
Effect of the InventionThe present invention has the above-described configuration, and even if the hot water supply condition for the bathtub is changed temporarily by using the other hot water while pouring the water into the bathtub, the bathtub temperature at the preset hot water temperature is maintained at the end of the pouring. It is possible to obtain it.

実施例 以下、本発明の一実施例を第1図にもとづいて説明す
る。この第1図において、11はガス元弁、12はガス比例
制御弁、13はバーナ、14は熱交換器、15は給湯量を検知
する水量センサ(1)、16は注湯量を検知する水量セン
サ(2)、17は浴槽、18は浴槽17へ注湯する為の水バル
ブ、19は給湯温度を検知する温度センサ、20は給湯器の
シーケンスを制御するシーケンス制御回路、21は浴槽17
への注湯量及び浴槽温度を演算する注湯回路、22は熱交
換器14の出口配管から分岐し水バルブ16を経由して浴槽
17へ注湯する注湯配管、23は熱交換器14の出口配管から
分岐し他栓へ給湯する他栓配管である。以上のように構
成されたガス給湯器について、以下その動作を説明す
る。他栓での給湯の場合、水栓を開けると熱交換器14お
よび他栓配管23を通って水が流れ、その水量を水量セン
サ(1)15が検知し点火水量以上の流量を判定すれば、
ガス元弁11及びガス比例制御弁12が開きバーナ13に点火
し熱交換器14に入ってきた水を加熱し給湯する。浴槽17
へ注湯する場合は、まず注湯回路21で注湯量及び注湯温
度を設定し、注湯開始を指示すると水バルブ18が開き注
湯配管22を経由して浴槽17に注湯する。この時水量セン
サ(2)18の水量と水量センサ(1)の水量が一致すれ
ば他栓は使用されていないと判断できるので、熱交換器
14からの出湯温度は前記設定した注湯温度に制御され
る。次に注湯と他栓同時使用の時は水量センサ(1)15
と水量センサ(2)16との流量が異なることにより判別
でき、この時他栓での設定温度が注湯設定温度と異なる
場合は他栓での設定温度を優先させ、他栓使用が終われ
ば浴槽17の温度が注湯設定温度になる様に設定温度を変
化させる様に注湯回路21が演算し動作する。具体的には
例えば、注湯設定温度が40℃で、他栓設定温度が50℃で
他栓使用中の注湯量が5であったとすると、他栓使用
終了後5を注湯するまでの間注湯温度を30℃にすれ
ば、結果的に10注湯した時には40℃の湯が浴槽に注湯
されたことになる。
Embodiment An embodiment of the present invention will be described below with reference to FIG. In FIG. 1, 11 is a gas source valve, 12 is a gas proportional control valve, 13 is a burner, 14 is a heat exchanger, 15 is a water amount sensor (1) for detecting the amount of hot water supply, and 16 is an amount of water for detecting the amount of pouring water. Sensors (2), 17 is a bathtub, 18 is a water valve for pouring hot water into the bathtub 17, 19 is a temperature sensor for detecting the hot water supply temperature, 20 is a sequence control circuit for controlling the sequence of the water heater, and 21 is the bathtub 17
A pouring circuit for calculating the pouring amount to the bath and the bath temperature, 22 is branched from the outlet pipe of the heat exchanger 14 and passes through the water valve 16 to the bath
A pouring pipe for pouring the molten metal into 17 and a plug pipe 23 for branching from the outlet pipe of the heat exchanger 14 to supply hot water to another plug. The operation of the gas water heater configured as above will be described below. In the case of hot water supply with the other tap, if the water tap is opened, water flows through the heat exchanger 14 and the other tap pipe 23, and the water amount sensor (1) 15 detects the amount of water and determines a flow rate equal to or higher than the ignition water amount. ,
The gas source valve 11 and the gas proportional control valve 12 open to ignite the burner 13 and heat the water that has entered the heat exchanger 14 to supply hot water. Bath 17
When pouring the molten metal into the bath, first, the pouring amount and the pouring temperature are set in the pouring circuit 21, and when the pouring start is instructed, the water valve 18 opens and the pouring is performed to the bath 17 through the pouring pipe 22. At this time, if the water amount of the water amount sensor (2) 18 and the water amount of the water amount sensor (1) match, it can be determined that the other plug is not used.
The tapping temperature from 14 is controlled to the set pouring temperature. Next, when pouring and using the other tap at the same time, water amount sensor (1) 15
And the water flow sensor (2) 16 have different flow rates. At this time, if the set temperature of the other tap is different from the pouring set temperature, the set temperature of the other tap is given priority, and if the use of the other tap is completed The pouring circuit 21 calculates and operates so as to change the set temperature so that the temperature of the bath 17 becomes the pouring set temperature. Specifically, for example, if the pouring set temperature is 40 ° C, the other tap setting temperature is 50 ° C, and the pouring amount is 5 while the other tap is being used, the time until pouring 5 is completed after the other tap is used. If the pouring temperature is set to 30 ° C, it means that 40 ° C of pouring water has been poured into the bathtub after 10 pourings.

第3図に本実施例における注油中のフローチャートを示
しその説明を以下に記す。注湯中には、他栓を使用して
いるか否かを2つの水量センサの流量差を監視すること
によって行い、他栓の使用がなければ補正注湯も行わず
に、浴槽17への注湯量が設定された注湯量に達した時点
で水バルブ18を閉じて注湯を終了する。他栓の使用があ
った場合は、熱交換器14からの出湯温度は他栓での設定
温度に制御し、他栓使用が終了するまでの他栓での出湯
温度と浴槽17へと注湯量の関係を記憶しておく。次に、
他栓の使用が終了すると補正注湯モードに入り、他栓で
設定された温度での注湯による浴槽の温度のズレを補正
する。
FIG. 3 shows a flow chart during the lubrication in this embodiment, and the explanation thereof will be described below. During pouring, whether or not another plug is being used is monitored by monitoring the flow rate difference between the two water amount sensors. If no other plug is used, correction pouring is not performed and pouring into the bathtub 17 is performed. When the amount of pouring water reaches the set pouring amount, the water valve 18 is closed and pouring is finished. When the other tap is used, the hot water outlet temperature from the heat exchanger 14 is controlled to the set temperature of the other tap, and the hot water outlet temperature of the other tap until the use of the other tap is completed and the pouring amount into the bathtub 17 Remember the relationship. next,
When the use of the other tap is completed, the correction pouring mode is entered, and the deviation of the bath temperature due to the pouring at the temperature set by the other tap is corrected.

上記補正注湯が終了すると、熱交換器14の出湯温度は注
湯設定温度に制御され、以下他栓使用がある毎に同様の
動作を繰り返す。そして浴槽17への注湯量が設定注湯量
に達した時点で、水バルブ18を閉じ浴槽への注湯を終了
する。
When the correction pouring is completed, the hot water outlet temperature of the heat exchanger 14 is controlled to the pouring set temperature, and the same operation is repeated every time another plug is used. Then, when the pouring amount into the bath 17 reaches the set pouring amount, the water valve 18 is closed and the pouring into the bath is completed.

以上の様に本実施例によれば、注湯中に他栓で使用時に
任意の設定温度を得ることが可能となる。
As described above, according to the present embodiment, it is possible to obtain an arbitrary set temperature when using another plug during pouring.

発明の効果 以上のように本発明によれば、浴槽へ設定温度と設定湯
量の湯張り注湯しているときに、浴槽栓以外の他栓で同
時給湯使用を可能にし、このために変化した同時給湯期
間の注湯熱量は、同時給湯終了時に注湯回路が熱量補正
演算して浴槽への給湯条件を補正し、設定湯量の注湯量
になったときには浴槽の平均湯温が設定温度に近似で
き、同時給湯中でも浴槽への給湯を行う熱量分は、同時
給湯中は浴槽給湯を中断する方式に比べ迅速に注湯でき
る。
EFFECTS OF THE INVENTION As described above, according to the present invention, it is possible to simultaneously use hot water with a plug other than the bathtub plug while pouring hot water at a set temperature and a set amount of hot water. Regarding the pouring heat amount during the simultaneous hot water supply period, the pouring circuit corrects the calorific value at the end of simultaneous hot water to correct the hot water supply condition to the bathtub, and when the pouring amount of the set hot water amount is reached, the average hot water temperature of the bathtub approximates the set temperature. Even if the hot water is supplied to the bathtub at the same time, the amount of heat to be supplied to the bathtub can be poured more quickly than the method of interrupting the hot water supply to the bathtub at the same time.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明の一実施例を示すガス給湯器の構成図、
第2図は従来例を示すガス給湯器の構成図、第3図は本
発明のガス給湯器の制御動作を示すフローチャートであ
る。 15……水量センサ(1)、16……水量センサ(2)、18
……水電磁弁、19……温度センサ、21……注湯回路。
FIG. 1 is a block diagram of a gas water heater showing an embodiment of the present invention,
FIG. 2 is a configuration diagram of a gas water heater showing a conventional example, and FIG. 3 is a flowchart showing a control operation of the gas water heater of the present invention. 15 …… Water volume sensor (1), 16 …… Water volume sensor (2), 18
…… Water solenoid valve, 19 …… Temperature sensor, 21 …… Pouring circuit.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】ガス比例制御弁と、出湯温度を検出する温
度センサと、前記ガス比例制御弁を前記温度センサで検
出した出湯温度に応じて制御するとともに駆動する比例
制御回路と、給湯器の一連のシーケンスを制御するシー
ケンス制御回路と、浴槽への給湯量を検知する水量セン
サと、浴槽への注湯を行なう為の水バルブと、熱交換器
の出口配管を分岐し、一方は前記水バルブを経由して浴
槽へ注湯する配管および他方は他栓へ給湯する配管と、
浴槽への注湯量および注湯温度を設定入力し、浴槽への
注湯と他栓との同時給油時は、他線での設定温度を優先
しつつ、浴槽への湯量が前記設定した注湯量になったと
き、浴槽内の湯温が前記設定した注湯温度になるよう
に、他栓未使用時に熱交換器の出湯温度を制御し、前記
設定した注湯量になったとき水バルブを閉じる注湯回路
とを備えたことを特徴とするガス給湯器。
1. A gas proportional control valve, a temperature sensor for detecting hot water temperature, a proportional control circuit for controlling and driving the gas proportional control valve according to the hot water temperature detected by the temperature sensor, and a water heater. A sequence control circuit that controls a series of sequences, a water amount sensor that detects the amount of hot water supplied to the bathtub, a water valve for pouring hot water into the bathtub, and a branch of the outlet pipe of the heat exchanger, one of which is the water A pipe for pouring hot water into the bathtub via the valve and a pipe for supplying hot water to the other tap,
When setting and inputting the pouring amount and pouring temperature into the bathtub, when pouring into the bathtub and refueling simultaneously with other plugs, the pouring amount of the pouring amount of the hot water into the bathtub is set while giving priority to the set temperature on the other line. When the water temperature in the bathtub reaches the set pouring temperature, the outlet temperature of the heat exchanger is controlled when the other plug is not used, and the water valve is closed when the set pouring amount is reached. A gas water heater having a pouring circuit.
JP60233664A 1985-10-18 1985-10-18 Gas water heater Expired - Fee Related JPH07122511B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP60233664A JPH07122511B2 (en) 1985-10-18 1985-10-18 Gas water heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP60233664A JPH07122511B2 (en) 1985-10-18 1985-10-18 Gas water heater

Publications (2)

Publication Number Publication Date
JPS6294759A JPS6294759A (en) 1987-05-01
JPH07122511B2 true JPH07122511B2 (en) 1995-12-25

Family

ID=16958591

Family Applications (1)

Application Number Title Priority Date Filing Date
JP60233664A Expired - Fee Related JPH07122511B2 (en) 1985-10-18 1985-10-18 Gas water heater

Country Status (1)

Country Link
JP (1) JPH07122511B2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2639003B2 (en) * 1988-10-17 1997-08-06 松下電器産業株式会社 Bath equipment with water heater
JPH02166344A (en) * 1988-12-16 1990-06-27 Matsushita Electric Ind Co Ltd Hot water supplying device
JPH0325240A (en) * 1989-06-23 1991-02-04 Harman Co Ltd Hot water feeding control device
JP2928728B2 (en) * 1994-09-05 1999-08-03 株式会社 ガスター Hot water filling amount control method in automatic bath apparatus with water heater and apparatus
JP4616162B2 (en) * 2005-12-09 2011-01-19 株式会社ヤマヒサ Circle for pet toilet
JP2008167658A (en) * 2006-12-11 2008-07-24 Yamahisa:Kk Support member
KR101811202B1 (en) 2009-08-12 2017-12-22 가부시키가이샤 엘에스아이 메디엔스 Urinary function measuring device for animal and urinary function measuring method for animal

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6060450A (en) * 1983-09-13 1985-04-08 Hitachi Chem Co Ltd Automatic bath heater

Also Published As

Publication number Publication date
JPS6294759A (en) 1987-05-01

Similar Documents

Publication Publication Date Title
AU2009202646B2 (en) Water heater
JPH07122511B2 (en) Gas water heater
JPS63259347A (en) Method of controlling hot water filling for automatic bath boiler having water heater
JPH07122510B2 (en) Gas water heater
JPH0424355Y2 (en)
JP3753161B2 (en) Water heater
JPS62172147A (en) Hot-water supplier
JP3892582B2 (en) Bath device with water heater
JPH07243700A (en) Method for controlling temperature of hot water feeding device
JPH0322690Y2 (en)
JP2722651B2 (en) Water heater
JP3331166B2 (en) Water heater
JPH0739879B2 (en) Automatic water filling device
JPH08193751A (en) Hot water feeder and method for controlling hot water filling and hot water feeding
JPH05126399A (en) Hot water supplying apparatus
JP3203630B2 (en) 1 can 2 circuit heating device
JPH02275249A (en) Control device of terminal electric hot water heater
JP3644088B2 (en) Hot water supply device with automatic bath water supply function
JPH0578738B2 (en)
JPH0756409B2 (en) Method of determining water mixture ratio and determining other plug usage in water heater with automatic bath drop function
JP2002168516A (en) Hot water supply bath apparatus
JPH03134434A (en) Automated bath furnace with hot water supplier
JPH02267453A (en) Hot water supplying device
JPH03251654A (en) Controlling method of alteration of temperature of hot water in automatic bath equipment
JPH05196294A (en) Hot water supplying device for bathtub

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees