JPH07122313B2 - Wastewater treatment structure in the outer corridor - Google Patents

Wastewater treatment structure in the outer corridor

Info

Publication number
JPH07122313B2
JPH07122313B2 JP15898492A JP15898492A JPH07122313B2 JP H07122313 B2 JPH07122313 B2 JP H07122313B2 JP 15898492 A JP15898492 A JP 15898492A JP 15898492 A JP15898492 A JP 15898492A JP H07122313 B2 JPH07122313 B2 JP H07122313B2
Authority
JP
Japan
Prior art keywords
gutter
pillar
eaves
outer corridor
attached
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP15898492A
Other languages
Japanese (ja)
Other versions
JPH0626157A (en
Inventor
宗且 園田
Original Assignee
株式会社園田製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社園田製作所 filed Critical 株式会社園田製作所
Priority to JP15898492A priority Critical patent/JPH07122313B2/en
Publication of JPH0626157A publication Critical patent/JPH0626157A/en
Publication of JPH07122313B2 publication Critical patent/JPH07122313B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、アパートなどの建築物
の外廊下における排水処理構造に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a wastewater treatment structure in an outer corridor of a building such as an apartment.

【0002】[0002]

【従来の技術】アパートなどの外廊下における従来の排
水処理は、廊下に敷設する床板自体に排水溝を形成して
おき、この排水溝に設けたドレンに呼び樋の上端をそれ
ぞれ接続し、各呼び樋の下端を柱に取り付けてある竪樋
に接続していた。したがって、各柱には呼び樋からの排
水を流下する竪樋が取り付けてあった。また、竪樋を柱
に取り付けるには、柱にドリルで下孔を穿設し、この下
孔にタッピンブビスをねじ込むことにより樋ホルダを取
り付け、該樋ホルダにより竪樋を支持する構造を採用し
ていた。
2. Description of the Related Art In conventional wastewater treatment in an outer corridor such as an apartment, a drainage groove is formed in the floor plate itself laid in the corridor, and the drains provided in the drainage groove are connected to the upper ends of the gutters, respectively. The lower end of the gutter was connected to a vertical gutter attached to a pillar. Therefore, each pillar was equipped with a downpipe that drained the drainage water from the gutter. In addition, in order to attach the vertical gutter to the column, a hole is drilled in the column, and a tap holder screw is screwed into the hole to attach the gutter holder, and the gutter holder is used to support the gutter. It was

【0003】[0003]

【発明が解決しようとする課題】しかしながら、従来の
外廊下は、モルタルなどからなる床板を廊下の長手方向
に沿って多数接続した状態で敷設するので、各床板に形
成した排水溝を隙間なく連結させる手間が煩雑であり、
また、床板同士の接続部分に充填したコーキング材やパ
ッキンが経年変化で劣化するなどして水漏れを起こした
り、或は接続部分に水が溜るなどのトラブルが発生す
る。また、柱ごとに竪樋を取り付けるために各柱に多数
の下孔を穿設し、この下孔にタッピングビスをねじ込ん
で樋ホルダをそれぞれ固定しなくてはならないので、竪
樋の取り付け作業にも長時間と多くの労力を必要として
いた。更に、防錆処理した柱に下孔を穿設してタッピン
グビスをねじ込むと、柱に傷がついて防錆処理が破損さ
れるので、この下孔の部分から錆びるという不都合が発
生する。
However, since the conventional outer corridor is laid with a large number of floor boards made of mortar or the like connected along the longitudinal direction of the corridor, the drainage grooves formed in each floor board are connected without gaps. It is complicated to do,
In addition, the caulking material or packing filled in the connection portion between the floor plates deteriorates over time, causing water leakage, or troubles such as water pooling in the connection portion. Also, in order to attach a gutter to each pillar, it is necessary to drill a large number of pilot holes in each pillar and screw tapping screws into these pilot holes to fix the gutter holders respectively. It took a long time and a lot of work. Furthermore, if a pilot hole is bored in a rust-proof pillar and a tapping screw is screwed into it, the pillar is damaged and the rust-proof coating is damaged. Therefore, the inconvenience of rusting from the pilot hole occurs.

【0004】[0004]

【課題を解決するための手段】本発明は上記に鑑み提案
されたもので、建物から所定間隔だけ離隔した位置に複
数本の柱を建物の壁面に沿って所定のスパンで立設し、
隣合う柱間に前桁を架設し、該前桁と建物壁面に固定し
た後桁との間に床板を敷設した外廊下において、床板の
軒先側端縁に臨ませて軒樋を上記柱間に設け、柱には1
本おきに竪樋を樋保持具によって取り付け、この竪樋を
取り付けた柱の両側に位置する軒樋に呼び樋の上端をそ
れぞれ接続し、両呼び樋の下端を当該竪樋の上端に設け
た集水器に接続したものである。
The present invention has been proposed in view of the above, and a plurality of pillars are erected at a predetermined span along a wall surface of a building at a position separated from the building by a predetermined distance.
In an outer corridor in which a front girder is installed between adjacent pillars and a floor board is laid between the front girder and the rear girder fixed to the building wall, the eaves gutter is exposed by facing the edge of the floor board on the eaves side. Installed on the pillar, 1 on the pillar
A gutter was attached to each book by means of a gutter holder, and the upper ends of the sluices were connected to the eaves gutters located on both sides of the column to which the gutter was attached, and the lower ends of both sluices were provided at the upper end of the gutter. It is connected to a water collector.

【0005】[0005]

【作用】床板上の水はすべて軒樋に流れ込み、各軒樋内
の水は呼び樋を通って集水器に集合し、ここから竪樋を
流れ落ちて下水等に排水される。
[Function] All the water on the floorboard flows into the eaves gutter, and the water in each eaves gutter passes through the slamming gutter to gather in the water collector, from which it flows down the downpipe and is drained to sewage.

【0006】[0006]

【実施例】以下、本発明の実施例を図面にもとづいて説
明する。図1に示す外廊下1の実施例は、二階建てアパ
ート2の外廊下1であり、アパート2から所定間隔だけ
離隔した位置に金属角パイプ製の柱3…をアパート2の
棟方向(壁面)に沿って所定のスパンで複数本立設し、
各柱3,3間には断面コ字状の前桁4をボルト止めして
架設し、この前桁4とアパート2の壁面側に固定した後
桁5との間に金属製の枠体6…を設け、この枠体6上に
長方形の床板7,7を2枚宛止着してある。なお、枠体
6を柱3側に僅かに下り傾斜した状態で設置するので、
各枠体6上に止着した床板7,7も柱3側に僅かに下り
傾斜した状態で敷設されることとなる。
Embodiments of the present invention will be described below with reference to the drawings. The embodiment of the outer corridor 1 shown in FIG. 1 is the outer corridor 1 of a two-story apartment 2, in which the pillars 3 made of metal square pipes are separated from the apartment 2 by a predetermined distance, and the pillars 3 made of metal square pipes are directed toward the ridge (wall surface) of the apartment 2. A plurality of pieces are erected at a predetermined span along
A front girder 4 having a U-shaped cross section is erected between the columns 3 and 3 by bolts, and a metal frame 6 is provided between the front girder 4 and a rear girder 5 fixed to the wall surface of the apartment 2. .. are provided, and two rectangular floor plates 7, 7 are fixedly attached to the frame body 6. Since the frame body 6 is installed on the pillar 3 side with a slight downward inclination,
The floor boards 7, 7 fixed to each frame 6 are also laid in a state of being slightly inclined downward to the pillar 3 side.

【0007】枠体6は、図2および図3に示すように、
鋼材を溶接によって矩形に接続した枠であり、本実施例
では十字の補強材8を設け、上面には床板止着具を嵌合
するための受け孔9…を開設してある。
The frame 6 is, as shown in FIGS. 2 and 3,
This is a frame in which steel materials are connected in a rectangular shape by welding. In this embodiment, a cross-shaped reinforcing member 8 is provided, and receiving holes 9 for fitting a floor plate fastening tool are formed on the upper surface.

【0008】床板7は、図4および図5に示すように、
制振鋼板や一般鋼板などの金属板を芯材10として使用
し、その上面、下面、および四周をすべて合成ゴム11
で覆うことにより長方形の板体に成型したもので、対向
する側縁である長辺部分に第1段部12と第2段部13
を形成し、隣合う床板7の第1段部12と第2段部13
とを重ね合わせた場合に両床板7,7を隙間なく接続で
きるように両段部12,13を上下逆の形状に形成して
あり、また、床板7の上面にはスリップ止めの模様14
…を刻設してある。
The floor plate 7, as shown in FIGS. 4 and 5,
A metal plate such as a vibration-damping steel plate or a general steel plate is used as the core material 10, and the upper surface, the lower surface, and the four circumferences are all made of synthetic rubber 11
It is molded into a rectangular plate body by being covered with, and the first step portion 12 and the second step portion 13 are provided on the long side portions which are the side edges facing each other.
And the first step portion 12 and the second step portion 13 of the floor boards 7 adjacent to each other are formed.
The two step parts 12, 13 are formed in the upside-down shape so that the two floor plates 7, 7 can be connected with each other without any gap when they are overlapped with each other. Moreover, the slip prevention pattern 14 is formed on the upper surface of the floor plate 7.
... is engraved.

【0009】なお、床板7の長辺は廊下の幅方向の長
さ、即ち枠体6の柱3側から建物の壁面側の長さに等し
く設定し、床板7の短辺は枠体6の廊下方向の長さに等
しく設定して、一つの枠体6上に丁度床板7,7を2枚
止着できるよう各辺の長さを設定してある。また、ゴム
11は、芯材10の上部側の厚さを芯材10の下部側の
厚さよりも厚く設定することにより、芯材10を薄くす
ることなく歩行の際のクッション性を高めてある。
The long side of the floor plate 7 is set equal to the length in the width direction of the corridor, that is, the length from the side of the pillar 3 of the frame 6 to the side of the wall of the building, and the short side of the floor plate 7 is of the frame 6. The length is set equal to the length in the corridor direction, and the length of each side is set so that exactly two floor plates 7 and 7 can be fixed to one frame body 6. Further, the rubber 11 is configured to have a cushioning property when walking without increasing the thickness of the core material 10 by making the thickness of the core material 10 on the upper side larger than the thickness of the core material 10 on the lower side. .

【0010】したがって、1つの枠体6上に長辺が廊下
の幅方向に向く状態で2枚の床板7,7を並べて各床板
7に開設してある止着孔15…内に挿入した止着具(図
示せず)の下端を枠体6の受け孔9…内に係止すると、
床板7の接合面がゴム11の弾性により隙間を生じるこ
となく殆ど密着し、隣合う床板7,7の上面同士が面一
になるとともに、下面同士も面一になる。この様に、枠
体6…上に床板7…を第1段部12と第2段部13とを
重合した状態で順次敷設すると、隣合う床板7,7間が
密着した状態で廊下の床面を構成することができる。
Therefore, two floor boards 7, 7 are arranged side by side on one frame 6 with their long sides facing in the width direction of the corridor, and are inserted into the fastening holes 15 ... Opened in each floor board 7. When the lower end of the garment (not shown) is locked in the receiving holes 9 ... of the frame body 6,
Due to the elasticity of the rubber 11, the joint surface of the floor plate 7 is in close contact with each other without forming a gap, and the upper surfaces of the adjacent floor plates 7 and 7 are flush with each other and the lower surfaces are flush with each other. In this way, if the floor plates 7 are sequentially laid on the frame body 6 in a state where the first step portion 12 and the second step portion 13 are superposed, the floors of the corridor are closely attached to each other. A surface can be constructed.

【0011】したがって、廊下の床面が雨水等により濡
れても、隣合う床板7,7の接合面間に水が浸入して階
下に漏れ落ちることを有効に防止することができる。そ
して、万一接合面間に水が浸入したとしても、接合面間
の軒先側への下り傾斜によって廊下の外側(軒先側)に
流れてしまい、階下には漏れることがない。このため、
何等かのトラブルによって床板7,7の接合面間に隙間
が生じたとしても、廊下1の床面上の水が階下に漏れ落
ちることはない。
Therefore, even if the floor surface of the corridor gets wet with rainwater or the like, it is possible to effectively prevent water from entering between the joining surfaces of the adjacent floor plates 7 and leaking downstairs. Even if water enters between the joint surfaces, it will flow to the outside of the corridor (eave side) due to the downward inclination of the joint surfaces toward the eaves side and will not leak downstairs. For this reason,
Even if a gap occurs between the joint surfaces of the floor plates 7 and 7 due to some trouble, the water on the floor surface of the corridor 1 does not leak downstairs.

【0012】また、前記した柱3には1本おきに竪樋1
6を樋保持具17によって柱3の建物側側面に沿わせて
取り付ける。竪樋16は、塩化ビニールパイプなど一般
的なパイプで構成し、上端には2本の呼び樋18,18
を接続可能な漏斗状の集水器19を設けてある。
In addition, every other one of the pillars 3 has a vertical gutter 1
6 is attached along the side of the pillar 3 on the side of the building by the gutter holder 17. The vertical gutter 16 is composed of a general pipe such as a vinyl chloride pipe, and has two sluices 18 and 18 at the upper end.
There is provided a funnel-shaped water collector 19 to which can be connected.

【0013】そして、この竪樋16を柱3に取り付ける
樋保持具17は、図7に示すように、柱3の周囲に巻き
付ける柱側バンド部材20と、この柱側バンド部材20
の一側面に設けられて竪樋16を保持する樋ホルダ21
とからなる。柱側バンド部材20は、ステンレススプリ
ング鋼の帯板を略四角形に屈曲し、該帯板の一端を外側
に屈曲して係止受部22を形成し、他端にバックル23
を軸24により軸着して該バックル23により係脱可能
に構成してある。
As shown in FIG. 7, a gutter holder 17 for attaching the vertical gutter 16 to the pillar 3 has a pillar side band member 20 wound around the pillar 3 and the pillar side band member 20.
Gutter holder 21 provided on one side surface for holding the vertical gutter 16
Consists of. The column-side band member 20 is formed by bending a stainless spring steel strip plate into a substantially rectangular shape, bending one end of the strip plate outward to form a lock receiving portion 22, and a buckle 23 at the other end.
Is attached by a shaft 24 and can be engaged and disengaged by the buckle 23.

【0014】このバックル23は、両側に上記した軸2
4を支承する起立片25を形成した操作部材26と、該
操作部材26の長さの途中に一端を軸26′により回動
自在に軸着して他端には係止部27を形成した連結部材
28とからなり、連結部材28の係止部27を帯板の係
止受部22に係止可能に成形してある。したがって、連
結部材28の係止部27を帯板の係止受部22から外す
と、図7に示すように、帯板の弾性によって帯板の係止
受部22とバックル23とが離隔し、この間隔を手で拡
大すると、柱側バンド部材20を柱3に巻き付けること
ができる。
The buckle 23 has the shaft 2 on both sides.
4, an operating member 26 having a standing piece 25 for supporting 4, an end of the operating member 26 is rotatably attached by a shaft 26 'in the middle of its length, and a locking portion 27 is formed at the other end. The connecting member 28 is formed so that the engaging portion 27 of the connecting member 28 can be engaged with the engaging portion 22 of the strip. Therefore, when the locking portion 27 of the connecting member 28 is disengaged from the locking receiving portion 22 of the band plate, the locking receiving portion 22 of the band plate and the buckle 23 are separated by the elasticity of the band plate, as shown in FIG. The column-side band member 20 can be wound around the column 3 by manually expanding this interval.

【0015】この状態で操作部材26の自由端を帯板の
係止受部22側に回動すると、連結部材28の軸26′
が操作部材26の軸24よりも係止受部22側に移動す
るので連結部材28の係止部27が帯板の係止受部22
に近付くことが可能となり、図9に示すように、係止部
27を係止受部22に係合することができる。そして、
操作部材26の自由端を係止受部22から離隔する方向
(図9中矢印方向)に回動すると、操作部材26の軸2
4が次第に係止受部22側に引き寄せられ、これにより
帯板が次第に柱3を締め付け始める。引き続き操作部材
26の自由端を更に回動すると、連結部材28の軸2
6′が操作部材26の軸24を越え、操作部材26を十
分に回動すると連結部材28の軸26′が操作部材26
の軸24よりも帯板に近付く。したがって、帯板の一端
の係止受部22と反対側との間隔が狭くなり、これによ
り帯板の四辺が柱3に強い力で締め付けられる。
In this state, when the free end of the operating member 26 is rotated toward the lock receiving portion 22 of the strip, the shaft 26 'of the connecting member 28 is rotated.
Moves toward the lock receiving portion 22 side with respect to the shaft 24 of the operating member 26, so that the lock portion 27 of the connecting member 28 moves the lock receiving portion 22 of the strip plate.
And the locking portion 27 can be engaged with the locking receiving portion 22, as shown in FIG. And
When the free end of the operating member 26 is rotated in the direction away from the lock receiving portion 22 (the direction of the arrow in FIG. 9), the shaft 2 of the operating member 26 is rotated.
4 is gradually pulled toward the lock receiving portion 22 side, whereby the strip plate gradually starts to tighten the column 3. When the free end of the operating member 26 is further rotated further, the shaft 2 of the connecting member 28 is rotated.
When the 6'exceeds the shaft 24 of the operating member 26 and the operating member 26 is sufficiently rotated, the shaft 26 'of the connecting member 28 is moved by the operating member 26.
Closer to the strip than the axis 24 of. Therefore, the distance between the one end of the strip and the opposite side of the lock receiving portion 22 is narrowed, whereby the four sides of the strip are fastened to the column 3 with a strong force.

【0016】そして、帯板の弾性力によりバックル23
が係止受部22から離隔する方向に移動しようとしても
操作部材26は戻り回動することがなく、連結部材28
の係止部27が帯板の係止受部22に係止した状態、即
ち柱3の側面に強固に締め付けた状態を維持する。
The elastic force of the strip causes the buckle 23
The operating member 26 does not return and rotate even if an attempt is made to move in a direction away from the lock receiving portion 22, and the connecting member 28
The state in which the locking portion 27 of the above is locked to the locking receiving portion 22 of the strip, that is, the state in which the locking portion 27 is firmly fastened to the side surface of the column 3 is maintained.

【0017】なお、本実施例では操作部材26の自由端
の形状を楔形に成形することにより、操作部材26の自
由端と帯板との間に簡単に指を入れられないようにし
て、不用意に外されることを防止している。
In this embodiment, the free end of the operating member 26 is formed in a wedge shape so that a finger cannot be easily inserted between the free end of the operating member 26 and the strip plate. It prevents it from being removed easily.

【0018】また、樋ホルダ21は、図面の実施例で
は、柱側バンド部材20の一側面にビス等により固定し
た半円弧状プラスチック製固定部29と、該固定部29
の一端に枢着した半円弧状のプラスチック製回動部30
とからなり、回動部30の自由端に形成したフック状係
止部31を固定部29の他端に形成してある突起状の係
合部32にワンタッチで係止できるように構成してあ
る。
In the illustrated embodiment, the gutter holder 21 has a semi-arcuate plastic fixing portion 29 fixed to one side surface of the column-side band member 20 with screws or the like, and the fixing portion 29.
Semi-arc shaped plastic rotating part 30 pivotally attached to one end of the
The hook-shaped engaging portion 31 formed at the free end of the rotating portion 30 can be engaged with the protruding engaging portion 32 formed at the other end of the fixed portion 29 with one touch. is there.

【0019】この樋保持具17により竪樋16を柱3に
取り付けるには、バックル23を外した状態で柱側バン
ド部材20を柱3の所定高さに巻き付け、バックル23
を掛けることにより樋保持具17自体を柱3に取り付
け、その後に樋ホルダ21を開いて内部に竪樋16を通
し、回動部30を戻し回動して係止部31を係合部32
に係止する。この様にして竪樋16を取り付けると、タ
ッピングビス等を使用しなくても、竪樋16を柱3に簡
単に取り付けることができるし、高さ調整も自由であ
る。また、柱3に孔を穿設する必要もないので、柱3の
表面に施した防錆処理や塗装を損傷することがない。し
たがって、長年雨水に濡れても防錆効果を維持すること
ができ、美観を損ねることがない。そして、上記のよう
にして取り付けた竪樋16の集水器19に各軒樋33か
らの呼び樋18,18を接続する。
To attach the vertical gutter 16 to the pillar 3 with the gutter holder 17, the pillar-side band member 20 is wound around the pillar 3 at a predetermined height with the buckle 23 removed.
The gutter holder 17 itself is attached to the pillar 3 by hanging, and then the gutter holder 21 is opened, the vertical gutter 16 is passed through the inside, and the rotating portion 30 is returned and rotated to engage the engaging portion 31 with the engaging portion 32.
Lock on. When the vertical gutter 16 is attached in this manner, the vertical gutter 16 can be easily attached to the pillar 3 without using a tapping screw or the like, and the height can be freely adjusted. Further, since it is not necessary to form a hole in the pillar 3, the anticorrosive treatment applied to the surface of the pillar 3 and the coating are not damaged. Therefore, even if it gets wet with rainwater for many years, the rust preventive effect can be maintained and the appearance is not spoiled. Then, the sluices 18 and 18 from the eaves gutters 33 are connected to the water collector 19 of the vertical gutter 16 attached as described above.

【0020】軒樋33は、上面が開放して両端が閉塞し
た断面倒コ字状の長尺な部材であり、それぞれの柱3,
3間に、両端を柱3側面のブラケット(図示せず)にボ
ルト止めすることにより架設されている。この場合、こ
の軒樋33は、図6に示すように、敷設した床板7…の
傾斜下端が上面開口部上に臨む位置に設置し、また、図
7に示すように、底面の一端に開設した排水孔34が竪
樋16側に向く方向に配置する。なお、軒樋33はほぼ
水平に架設してもよいが、竪樋16側に僅かに下り傾斜
させた状態で取り付けてもよい。そして、図7に示すよ
うに、竪樋16を取り付けた柱3の両側に位置する軒樋
33,33の排水孔34,34に呼び樋18として機能
するフレキシブルパイプの上端をそれぞれ接続し、各フ
レキシブルパイプの下端を前記した集水器19に接続す
る。
The eaves gutter 33 is a long member having an inverted U-shaped cross section with an open upper surface and closed both ends.
It is erected by bolting both ends to a bracket (not shown) on the side surface of the pillar 3 between the three. In this case, the eaves gutter 33 is installed at a position where the sloping lower end of the laid floorboards 7 faces the upper opening as shown in FIG. 6, and is also installed at one end of the bottom surface as shown in FIG. The drainage holes 34 are arranged in the direction toward the vertical gutter 16 side. Although the eaves gutter 33 may be installed substantially horizontally, it may be attached in a state in which it is slightly inclined downward to the vertical gutter 16 side. Then, as shown in FIG. 7, the upper ends of the flexible pipes functioning as the call gutters 18 are respectively connected to the drainage holes 34, 34 of the eaves gutters 33, 33 located on both sides of the pillar 3 to which the vertical gutter 16 is attached. The lower end of the flexible pipe is connected to the water collector 19 described above.

【0021】したがって、上記した構成からなる外廊下
1においては、床板7…が雨水等により濡れた場合、こ
の水は、床板7…上面の下り傾斜により廊下の軒先側に
流れ、床板7…の傾斜下端から軒樋33…内に流下す
る。そして、各軒樋33内に流下した水は、フレキシブ
ルパイプ18内を通って集水器19に集合し、この集水
器19から竪樋16を流れ落ちて下水等に排水処理され
る。
Therefore, in the outer corridor 1 having the above-mentioned structure, when the floorboards 7 ... Are wet by rainwater or the like, this water flows toward the eaves side of the corridor due to the downward inclination of the floorboards 7 ... Run down into the eaves gutter 33 ... from the bottom of the slope. Then, the water that has flowed down into each eaves gutter 33 passes through the flexible pipe 18 and gathers in the water collector 19, and then flows down the downflow gutter 16 from this water collector 19 to be drained into sewage or the like.

【0022】なお、上記した実施例はアパート2の外廊
下1における排水処理であるが、本発明は、これに限定
されるものではなく、他の建築物の外廊下1の排水処理
にも使用することができる。
Although the above-described embodiment is the wastewater treatment in the outer corridor 1 of the apartment 2, the present invention is not limited to this, and is also used in the wastewater treatment of the outer corridor 1 of other buildings. can do.

【発明の効果】以上説明したように本発明によれば、外
廊下の床板上の水は、床板の傾斜によって軒先側の軒樋
内に流れ込み、各軒樋内の水は呼び樋を通って集水器に
集められ、ここから竪樋を流れ落ちて排水処理される。
したがって、床板上の水を確実に排水処理することがで
きる。そして、本発明に係る排水処理構造は、柱の1本
おきに竪樋を設ければ、その柱の両側の軒樋内の水を処
理することができるので、柱ごとに竪樋を取り付ける必
要がなく、外廊下の組立作業を従来よりも簡略化するこ
とができるし、竪樋の半減により美観が向上する。ま
た、請求項2に記載の樋保持具を使用して竪樋を取り付
けると、竪樋の取付作業を短時間で効率良く終らせるこ
とができるし、柱にねじ孔などを穿設する必要がないの
で、柱の防錆処理を破壊する虞れもなく、錆の心配もな
い。
As described above, according to the present invention, the water on the floorboard of the outer corridor flows into the eaves trough on the eaves side by the inclination of the floorboard, and the water in each eaves trough passes through the trough. It is collected in a water collector, from which it flows down a vertical gutter for wastewater treatment.
Therefore, the water on the floor plate can be reliably discharged. Further, in the wastewater treatment structure according to the present invention, if a gutter is provided every other column, water in the eaves gutters on both sides of the column can be treated, so it is necessary to attach a gutter to each column. As a result, the work of assembling the outer corridor can be simplified as compared with the conventional method, and the appearance is improved by halving the vertical gutter. Further, when the down gutter is attached using the gutter holder according to claim 2, the installation work of the down gutter can be efficiently completed in a short time, and it is necessary to form a screw hole or the like in the pillar. Since there is no such thing, there is no risk of destroying the rust prevention treatment of the pillar, and there is no worry of rust.

【図面の簡単な説明】[Brief description of drawings]

【図1】アパートの外廊下の平面図である。FIG. 1 is a plan view of an outer corridor of an apartment.

【図2】枠体の平面図である。FIG. 2 is a plan view of a frame body.

【図3】枠体の側面図である。FIG. 3 is a side view of a frame body.

【図4】床板の平面図である。FIG. 4 is a plan view of a floor board.

【図5】床板の一部欠截断面図である。FIG. 5 is a partially cutaway sectional view of a floor plate.

【図6】外廊下の一部欠截断面図である。FIG. 6 is a partially cutaway sectional view of an outer corridor.

【図7】アパート側から見た柱の側面図である。FIG. 7 is a side view of the pillar viewed from the apartment side.

【図8】樋保持具の斜視図である。FIG. 8 is a perspective view of a gutter holder.

【図9】連結部材の係止部を柱側バンド部材の係止受部
に係合した状態におけるバックルの側面図である。
FIG. 9 is a side view of the buckle in a state where the locking portion of the connecting member is engaged with the locking receiving portion of the column-side band member.

【図10】樋保持具を柱に取り付けた状態におけるバッ
クルの側面図である。
FIG. 10 is a side view of the buckle with the gutter holder attached to the pillar.

【符号の説明】[Explanation of symbols]

1 外廊下 2 建物としてのアパート 3 柱 4 前桁 5 後桁 6 枠体 7 床板 12 第1段部 13 第2段部 16 竪樋 17 樋保持具 18 呼び樋 19 集水器 20 柱側バンド部材 21 樋ホルダ 23 バックル 33 軒樋 1 Outer corridor 2 Apartment as a building 3 Pillar 4 Front girder 5 Rear girder 6 Frame 7 Floor board 12 First step 13 Second step 16 Vertical gutter 17 Gutter retainer 18 Entry gutter 19 Water collector 20 Column side band member 21 gutter holder 23 buckle 33 eaves gutter

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 建物から所定間隔だけ離隔した位置に複
数本の柱を建物の壁面に沿って所定のスパンで立設し、
隣合う柱間に前桁を架設し、該前桁と建物壁面に固定し
た後桁との間に床板を敷設した外廊下において、 床板の軒先側端縁に臨ませて軒樋を上記柱間に設け、柱
には1本おきに竪樋を樋保持具によって取り付け、この
竪樋を取り付けた柱の両側に位置する軒樋に呼び樋の上
端をそれぞれ接続し、両呼び樋の下端を当該竪樋の上端
に設けた集水器に接続したことを特徴とする外廊下にお
ける排水処理構造。
1. A plurality of pillars are erected at a predetermined span along a wall surface of the building at a position separated from the building by a predetermined distance,
In an outer corridor in which a front girder is installed between adjacent pillars and a floor board is laid between the front girder and the rear girder fixed to the building wall, the eaves gutter is exposed by facing the edge of the floor board on the eaves side. Every other gutter is attached to the pillar by means of a gutter holder, and the upper ends of the sluices are connected to the eaves gutters located on both sides of the pillar to which this gutter is attached. A wastewater treatment structure in an outer corridor, which is connected to a water collector installed at the upper end of a vertical gutter.
【請求項2】 樋保持具は帯板を略四角形に屈曲して端
部に設けたバックルの係脱操作によって柱の周囲に巻き
付け可能な柱側バンド部材と、該柱側バンド部材に設け
られ内部に竪樋を保持する樋ホルダとからなる請求項1
に記載の外廊下における排水処理構造。
2. The gutter holder is provided on a pillar-side band member which can be wound around a pillar by engaging and disengaging a buckle provided at an end by bending a belt plate into a substantially square shape, and the pillar-side band member. A gutter holder for holding a vertical gutter therein.
Wastewater treatment structure in the outer corridor described in.
JP15898492A 1992-05-27 1992-05-27 Wastewater treatment structure in the outer corridor Expired - Lifetime JPH07122313B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15898492A JPH07122313B2 (en) 1992-05-27 1992-05-27 Wastewater treatment structure in the outer corridor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15898492A JPH07122313B2 (en) 1992-05-27 1992-05-27 Wastewater treatment structure in the outer corridor

Publications (2)

Publication Number Publication Date
JPH0626157A JPH0626157A (en) 1994-02-01
JPH07122313B2 true JPH07122313B2 (en) 1995-12-25

Family

ID=15683677

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15898492A Expired - Lifetime JPH07122313B2 (en) 1992-05-27 1992-05-27 Wastewater treatment structure in the outer corridor

Country Status (1)

Country Link
JP (1) JPH07122313B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4438556A1 (en) * 1994-10-28 1996-05-02 Mann & Hummel Filter Filters, in particular for filtering the intake air of an internal combustion engine
JP4886943B2 (en) * 2001-08-20 2012-02-29 株式会社オーティス Drainage coupler
CN109440921A (en) * 2018-12-14 2019-03-08 重庆迈高电梯有限公司 A kind of elevator shelter bridge

Also Published As

Publication number Publication date
JPH0626157A (en) 1994-02-01

Similar Documents

Publication Publication Date Title
US6164019A (en) Dry deck rain trays
USRE38950E1 (en) Waterproof decking method and apparatus
US6467995B2 (en) Self-flushing pipe
US4550535A (en) Coping system
JPH07122313B2 (en) Wastewater treatment structure in the outer corridor
JPH0712510Y2 (en) Connected roof plate
US20040223807A1 (en) Self-flushing gutter pipe
JP4087969B2 (en) Roof material and roof structure for inclined roof
JP2572587Y2 (en) Floor material
JPH0518065A (en) Drainage structure
JP2697947B2 (en) Balcony drainage structure
JPH0526181Y2 (en)
JPH07116747B2 (en) Wastewater treatment structure for floorboards of outdoor facilities
JPS6348737Y2 (en)
JP2003003421A (en) Horizontally-drawing drainage system and cover device for bridge
JPH08144445A (en) Interior and exterior facing repair structure
JP2900779B2 (en) Roof shingle and shingle roof structure using the shingle
JPH0636136Y2 (en) Balcony drainage structure
JPS6328727Y2 (en)
JPH0712509Y2 (en) Connected roof plate
JPS6310031Y2 (en)
JPH1136537A (en) Roof construction
JPH08189152A (en) Drainage structure of balcony
JP2826278B2 (en) Floor structure of attached structure
JP2004011258A (en) Rain gutter device for balcony floor