JPH07113269B2 - Frame unit for scaffolding board - Google Patents

Frame unit for scaffolding board

Info

Publication number
JPH07113269B2
JPH07113269B2 JP4752792A JP4752792A JPH07113269B2 JP H07113269 B2 JPH07113269 B2 JP H07113269B2 JP 4752792 A JP4752792 A JP 4752792A JP 4752792 A JP4752792 A JP 4752792A JP H07113269 B2 JPH07113269 B2 JP H07113269B2
Authority
JP
Japan
Prior art keywords
pipe
fixed column
unit
frame unit
scaffolding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP4752792A
Other languages
Japanese (ja)
Other versions
JPH05214806A (en
Inventor
好宏 与那原
Original Assignee
好宏 与那原
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 好宏 与那原 filed Critical 好宏 与那原
Priority to JP4752792A priority Critical patent/JPH07113269B2/en
Publication of JPH05214806A publication Critical patent/JPH05214806A/en
Publication of JPH07113269B2 publication Critical patent/JPH07113269B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、建築中の建造物の柱の
周囲に足場を設ける際に組み付ける足場板用枠を構成す
る足場板用枠ユニットに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a scaffold plate frame unit which constitutes a scaffold plate frame to be assembled when a scaffold is provided around a pillar of a building under construction.

【0002】[0002]

【従来の技術】種々の建造物を建築するに当たっては、
まず鉄骨の組み立てが行われ、その後これらの鉄骨の回
りに適宜足場を仮設して各種の作業が進められる。
2. Description of the Related Art In constructing various structures,
First, the steel frames are assembled, and then various works are carried out by appropriately providing temporary scaffolds around these steel frames.

【0003】そして、前記足場は、各種のクランプを用
いて多数の直線状のパイプを縦横に連結することによっ
て構築されていた。
The scaffold has been constructed by connecting a large number of straight pipes vertically and horizontally using various clamps.

【0004】[0004]

【発明が解決しようとする課題】しかし、前記従来技術
によれば極めて多くのパイプ及びクランプが必要である
ほか、その取り付け作業が煩瑣であり、作業に多大な労
力を要するという問題があった。
However, according to the above-mentioned prior art, there is a problem that an extremely large number of pipes and clamps are required, and that the mounting work is complicated and the work requires a great deal of labor.

【0005】本発明は前記事情に鑑みてなされたもの
で、容易に足場板用の枠を形成することのできるユニッ
トを提供せんとするものである。
The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a unit capable of easily forming a frame for a scaffolding plate.

【0006】[0006]

【課題を解決するための手段】前記課題を解決するた
め、本発明は、立設された固定柱の周りを取り巻くよう
に隣合わせて複数体配設される足場板用枠ユニットであ
って、隣接する双方のユニット方向に向き相互に適合す
る連結部を有するとともに、該連結部同士を連結せしめ
て前記固定柱の回りに取り付けられた状態において水平
方向に張り出す足場板支持部を有してなる構成としたも
のである。
In order to solve the above problems, the present invention relates to a scaffolding plate frame unit in which a plurality of adjacent scaffolding plate frame units are arranged side by side so as to surround a standing fixed column. And a scaffolding plate support portion that extends in the horizontal direction in a state in which the connection portions are connected to each other and are attached around the fixed column. It is configured.

【0007】[0007]

【作用】本発明の足場板用枠ユニットは立設された固定
柱(例えばH形鋼等)の回りを取り巻くように隣合わせ
て複数体配設される。例えば、固定柱がH形鋼の場合に
は、4体のユニットがH形鋼の四隅部にそれぞれ配設さ
れて隣接するユニット同士がそれぞれ適合する連結部同
士で連結され、前記H形鋼に対して適宜の取付手段、例
えばキャッチクランプ等を用いて取り付け固定される。
A plurality of scaffolding board frame units of the present invention are arranged next to each other so as to surround a fixed column (for example, H-shaped steel) standing upright. For example, when the fixed column is H-section steel, four units are arranged at the four corners of the H-section steel, and adjacent units are connected to each other by compatible connecting portions. On the other hand, it is attached and fixed using an appropriate attachment means, for example, a catch clamp or the like.

【0008】このとき、前記固定柱の回りには、水平方
向に張り出す足場板支持部が張り出しこれにより足場板
支持枠が形成されるので、ここに足場板を載置して固定
する。
At this time, since the scaffolding plate supporting portion projecting in the horizontal direction projects around the fixed column to form a scaffolding plate supporting frame, the scaffolding plate is placed and fixed there.

【0009】前記の如く、本発明の足場板用枠ユニット
によれば、直線状のパイプを組み合わせて各種クランプ
で連結する従来技術に比べて簡易かつ確実に足場板用枠
を形成することができる。
As described above, according to the scaffolding board frame unit of the present invention, the scaffolding board frame can be formed more easily and more reliably than in the prior art in which linear pipes are combined and connected by various clamps. .

【0010】[0010]

【実施例】以下、本発明の一実施例を図面に基づいて説
明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings.

【0011】図1は本発明の一実施例に係る足場板用枠
ユニットを示す平面図、図2は同斜視図を示している。
FIG. 1 is a plan view showing a scaffolding plate frame unit according to an embodiment of the present invention, and FIG. 2 is a perspective view thereof.

【0012】本実施例の足場板用枠ユニット1は棒体、
具体的には金属パイプを直交状態に固着することにより
構成される。金属パイプを用いるのは、ユニット1の頑
丈さとユニット1の軽量化、取り扱いの便宜等の種々の
要請を考慮したものである。
The scaffolding board frame unit 1 of this embodiment is a rod body,
Specifically, it is configured by fixing metal pipes in an orthogonal state. The metal pipe is used in consideration of various requirements such as toughness of the unit 1, weight reduction of the unit 1, convenience of handling, and the like.

【0013】図面実施例においては、まず、一端側が後
述する連結突部2と適合する連結受部3とされる第一の
パイプ4が準備される。そして、該第一のパイプ4の筒
身の中央部より前記連結受部3側に寄った位置には、該
第一のパイプ4を直交状態で挟み込むように第二及び第
三のパイプ5、6が一直線状に固着される。すなわち、
前記第二及び第三のパイプ5、6の一端5a、6aには
前記第一のパイプ4の周面形状に適合する円弧状凹部が
それぞれ形成されており、この円弧状凹部を前記第一の
パイプ4の筒身の周面に密着させて溶接等の適宜の手段
により強固に固着されるものである。
In the embodiment shown in the drawings, first, a first pipe 4 is prepared whose one end side is a connection receiving portion 3 which is compatible with a connection projection 2 which will be described later. Then, at a position closer to the connection receiving portion 3 side than the central portion of the tubular body of the first pipe 4, the second and third pipes 5 are sandwiched so as to sandwich the first pipe 4 in an orthogonal state, 6 are fixed in a straight line. That is,
Arc-shaped recesses conforming to the peripheral surface shape of the first pipe 4 are formed at the ends 5a, 6a of the second and third pipes 5, 6, respectively. The pipe 4 is tightly adhered to the peripheral surface of the tubular body and is firmly fixed by an appropriate means such as welding.

【0014】前記第二のパイプ5の開放端部5bには該
第二のパイプ5の内径と適合する径の連結パイプ7が一
部挿入され溶接等により固着されて連結突部2が構成さ
れている。前記連結パイプ7は前記第一のパイプ4とも
適合するものであり、あるユニットの連結突部2を隣接
するユニットの連結受部3に嵌め込むことにより複数の
ユニットが隣合わせに連結される。
A connecting projection 2 is formed by partially inserting a connecting pipe 7 having a diameter compatible with the inner diameter of the second pipe 5 into the open end 5b of the second pipe 5 and fixing it by welding or the like. ing. The connection pipe 7 is also compatible with the first pipe 4, and a plurality of units are connected side by side by fitting the connection protrusion 2 of a unit into the connection receiving portion 3 of an adjacent unit.

【0015】図中8は連結受部3に設けられたピン孔、
9は連結突部7の筒身上に軸方向に並べて穿設されたピ
ン孔、10は固定ピンを示し、連結突部2を連結受部3
に嵌め込んだ後に前記ピン孔8、9同士を一致させて前
記固定ピン10を挿入することにより連結突部2が連結
受部3から抜け出ることが防止されるとともに、連結突
部2の連結受部3への挿入量を変更することにより種々
の大きさの固定柱11に対応することが可能となる。も
っとも、前記連結受部3にピン孔8の代わりに雌ねじを
設け、前記固定ピン10の代わりに前記雌ねじに適合す
るボルトを用いて両者を固定することとしてもよい。
In the figure, 8 is a pin hole provided in the connection receiving portion 3,
Reference numeral 9 denotes a pin hole formed on the cylindrical body of the connecting projection 7 so as to be aligned in the axial direction, and 10 denotes a fixing pin.
By inserting the fixing pin 10 by aligning the pin holes 8 and 9 with each other after the connection projection 2 is fitted in the connection projection 2, the connection projection 2 is prevented from coming out of the connection receiving portion 3, and the connection reception of the connection projection 2 is prevented. By changing the amount of insertion into the portion 3, it becomes possible to accommodate fixed columns 11 of various sizes. However, a female screw may be provided in the connection receiving portion 3 instead of the pin hole 8, and a bolt adapted to the female screw may be used instead of the fixing pin 10 to fix the both.

【0016】なお、前記第一のパイプ4の全長と、前記
連結パイプ7の先端から前記第三のパイプの外端部6b
までの長さは略同一とされる。
It should be noted that the entire length of the first pipe 4 and the end of the connecting pipe 7 from the outer end portion 6b of the third pipe.
Up to the same length.

【0017】前記構成よりなる足場板用枠ユニット1
は、図3〜図6の如くして例えばH形鋼等の予め立設さ
れている固定柱11の回りを取り囲むように隣合わせて
連結され、前記固定柱11に対して取り付けられる。
A scaffolding board frame unit 1 having the above structure
3 to 6, they are connected side by side so as to surround the circumference of a fixed column 11 such as an H-shaped steel that is erected in advance, and are attached to the fixed column 11.

【0018】すなわち、前記ユニット1は固定柱11の
四隅に前記連結突部2と連結受部3とが互いに隣り合わ
せになるようにそれぞれ配設され、これらの連結突部2
を連結受部3に嵌め込んで前記固定ピン10等によって
固定される。そして、前記固定柱11に対して図5及び
図6に示すようにキャッチクランプ12等の適宜の取り
付け手段を用いて取り付け固定される。
That is, the unit 1 is arranged at the four corners of the fixed column 11 so that the connecting projection 2 and the connecting receiving portion 3 are adjacent to each other.
Is fitted into the connection receiving portion 3 and fixed by the fixing pin 10 or the like. Then, as shown in FIGS. 5 and 6, it is attached and fixed to the fixed column 11 by using an appropriate attaching means such as a catch clamp 12.

【0019】その結果、前記固定柱11の周囲には、各
ユニット1を構成する前記第一のパイプ4と第三のパイ
プ6とが水平方向に張り出すこととなり、これらの張り
出しパイプによって足場板13を支える足場板支持枠が
形成される。従って、図7に示すように前記張り出しパ
イプの上に足場板13を架設して固定すれば前記固定柱
11の回りに容易かつ確実に足場を構築することができ
る。さらに図面実施例によれば、前記連結受部3に対す
る連結突部2の挿入量を自在に調節して固定できるの
で、さまざまな大きさの固定柱に対応することができる
利点がある。
As a result, the first pipe 4 and the third pipe 6 constituting each unit 1 are horizontally projected around the fixed column 11, and the scaffolding plate is formed by these overhanging pipes. A scaffolding board support frame that supports 13 is formed. Therefore, as shown in FIG. 7, if the scaffold plate 13 is installed and fixed on the projecting pipe, the scaffold can be easily and surely built around the fixed column 11. Further, according to the embodiment shown in the drawings, since the insertion amount of the connecting projection 2 with respect to the connecting receiving portion 3 can be freely adjusted and fixed, there is an advantage that it can be applied to fixed columns of various sizes.

【0020】なお、図中14は前記各ユニット1におい
て前記第一のパイプ4と第三のパイプ6とを連結し前記
第一及び第三のパイプ4、6と同様に足場板支持枠を構
成する渡しパイプであり、同時に前記各ユニット1を補
強する筋交いとしても作用する。なお、前記渡しパイプ
14は図示した直線状のものである必要はなく、第一の
パイプ4の端部から第三のパイプの端部に渡って湾曲し
て形成されたもの等であってもよい。
In the figure, reference numeral 14 connects the first pipe 4 and the third pipe 6 in each unit 1 and constitutes a scaffolding plate support frame like the first and third pipes 4 and 6. It also serves as a transfer pipe, and at the same time acts as a brace that reinforces each unit 1. The transfer pipe 14 does not have to be the linear one shown in the drawing, and may be formed in a curved shape from the end of the first pipe 4 to the end of the third pipe. Good.

【0021】また、前記各ユニット1において、前記第
一及び第三のパイプ4、6の外端部4b、6bには手摺
柱支持パイプ15が上下方向をなしてそれぞれ溶接等に
より固着されている。この手摺柱支持パイプ15には手
摺柱16が高さ調節自在に挿入される。
In each unit 1, a handrail pillar support pipe 15 is vertically fixed to the outer ends 4b and 6b of the first and third pipes 4 and 6 by welding or the like. . A handrail post 16 is inserted into the handrail post support pipe 15 so that its height can be adjusted.

【0022】すなわち、前記手摺柱16には相互間に適
宜の間隔を開けて上下方向をなしてピン孔17が並設さ
れ、一方、前記手摺柱支持パイプ15の上端には紛失防
止用のチェーン18を介して固定ピン19が設けられて
いる。
That is, the handrail pillars 16 are provided with pin holes 17 arranged in parallel in the vertical direction at appropriate intervals, while the handrail pillar support pipe 15 has a chain for preventing loss at the upper end thereof. A fixing pin 19 is provided via 18.

【0023】そして、前記手摺柱支持パイプ15への前
記手摺柱16の挿入量を調節して、適宜のピン孔17に
前記固定ピン18を挿通すれば、前記手摺柱16が所望
の高さに設定される。
Then, by adjusting the insertion amount of the handrail post 16 into the handrail post support pipe 15 and inserting the fixing pin 18 into an appropriate pin hole 17, the handrail post 16 is brought to a desired height. Is set.

【0024】前記手摺柱16の上端には手摺棒20を挿
通する手摺棒保持部21が設けられており、ここに手摺
棒20を通して手摺棒20同士をコーナージョイント2
2で連結すれば、前記足場板13の回りに所望の高さの
手摺が形成される。
A handrail rod holding portion 21 for inserting the handrail rod 20 is provided at the upper end of the handrail pillar 16, and the handrail rod 20 is passed through here to connect the handrail rods 20 to the corner joint 2.
If the two are connected, a handrail with a desired height is formed around the scaffolding plate 13.

【0025】[0025]

【発明の効果】本発明によれば、固定柱の回りに極めて
容易に且つ確実に足場板用枠を構築することが可能であ
るほか、同一構成のユニットを組み合わせて使用するも
のであるため製造コストの低減も図れる等の効果があ
る。
According to the present invention, it is possible to construct a frame for a scaffolding plate around a fixed column very easily and surely, and since units having the same structure are used in combination, it is manufactured. There are effects such as cost reduction.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の一実施例に係る足場板用枠ユニットを
示す平面図である。
FIG. 1 is a plan view showing a scaffolding board frame unit according to an embodiment of the present invention.

【図2】図1に示すユニットの斜視図である。FIG. 2 is a perspective view of the unit shown in FIG.

【図3】図2に示すユニットの連結の仕方を示す斜視図
である。
FIG. 3 is a perspective view showing how to connect the units shown in FIG.

【図4】固定柱の回りに図1に示すユニットを取り付け
た状態を示す平面図である。
FIG. 4 is a plan view showing a state in which the unit shown in FIG. 1 is attached around a fixed column.

【図5】固定柱に対するユニットの取り付け構造の一例
を示す斜視図である。
FIG. 5 is a perspective view showing an example of a mounting structure of a unit to a fixed column.

【図6】図4の一部拡大平面図である。6 is a partially enlarged plan view of FIG.

【図7】足場板、手摺等を取り付けた状態を示す斜視図
である。
FIG. 7 is a perspective view showing a state in which a scaffold plate, a handrail and the like are attached.

【符号の説明】[Explanation of symbols]

2、3 連結部 4、6 足場板支持部 11 固定柱 2, 3 Connection part 4, 6 Scaffolding plate support part 11 Fixed column

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 立設された固定柱(11)の周りを取り
巻くように隣合わせて複数体配設される足場板用枠ユニ
ットであって、隣接する双方のユニット方向に向き相互
に適合する連結部(2、3)を有するとともに、該連結
部(2、3)同士を連結せしめて前記固定柱(11)の
回りに取り付けられた状態において水平方向に張り出す
足場板支持部(4、6)を有してなることを特徴とする
足場板用枠ユニット。
1. A scaffolding plate frame unit, which is provided in a plurality of adjacently arranged so as to surround a vertically-arranged fixed column (11), and is connected to both adjacent unit directions so as to be compatible with each other. A scaffolding plate support part (4, 6) having parts (2, 3) and horizontally protruding in a state where the connection parts (2, 3) are connected to each other and attached around the fixed column (11). ). A frame unit for scaffolding board.
JP4752792A 1992-02-03 1992-02-03 Frame unit for scaffolding board Expired - Fee Related JPH07113269B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4752792A JPH07113269B2 (en) 1992-02-03 1992-02-03 Frame unit for scaffolding board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4752792A JPH07113269B2 (en) 1992-02-03 1992-02-03 Frame unit for scaffolding board

Publications (2)

Publication Number Publication Date
JPH05214806A JPH05214806A (en) 1993-08-24
JPH07113269B2 true JPH07113269B2 (en) 1995-12-06

Family

ID=12777596

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4752792A Expired - Fee Related JPH07113269B2 (en) 1992-02-03 1992-02-03 Frame unit for scaffolding board

Country Status (1)

Country Link
JP (1) JPH07113269B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2768885B2 (en) * 1993-03-12 1998-06-25 好宏 与那原 Scaffolding equipment
JP2842509B2 (en) * 1994-06-01 1999-01-06 鹿島建設株式会社 Construction scaffolding for columnar structures with cross-sectional changes
CN101967880B (en) * 2010-10-29 2012-05-09 中建三局第三建设工程有限责任公司 Standardized lattice column for low jack-up formwork system

Also Published As

Publication number Publication date
JPH05214806A (en) 1993-08-24

Similar Documents

Publication Publication Date Title
JPH07113269B2 (en) Frame unit for scaffolding board
JP2999956B2 (en) Projection stand device for temporary scaffolding
JPH0419151Y2 (en)
JPS5910267Y2 (en) temporary scaffolding structure
JPH08113982A (en) Device for joining column and beam of steel framed building
JP2990383B2 (en) Temporary support method using stacked temporary support frame
JP3028030B2 (en) Bellows support
JPH0536907Y2 (en)
JPH0447300Y2 (en)
JP2598154Y2 (en) Temporary support
JPH11182026A (en) Temporary scaffold construction field assembling block
JPH0119683Y2 (en)
JPH0246595Y2 (en)
JP3018921U (en) Scaffolding board support member, frame scaffolding assembly and scaffolding structure
JPH0438039Y2 (en)
JP2587379B2 (en) Temporary support
JPH0618976Y2 (en) Temporary scaffolding bridge
JP2990384B2 (en) Beam form support method and beam form support
JPH0327166Y2 (en)
JPH0735026Y2 (en) Prop standing device
JPH0354265Y2 (en)
JPH0213643Y2 (en)
JPH0211549Y2 (en)
JPS63201270A (en) Auxiliary pillar
JP2001311303A (en) Standard base of prefabricated scaffolding and joint pin

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees