JPH0710471A - Assembling method and equipment for boom of tower type crane - Google Patents

Assembling method and equipment for boom of tower type crane

Info

Publication number
JPH0710471A
JPH0710471A JP6137476A JP13747694A JPH0710471A JP H0710471 A JPH0710471 A JP H0710471A JP 6137476 A JP6137476 A JP 6137476A JP 13747694 A JP13747694 A JP 13747694A JP H0710471 A JPH0710471 A JP H0710471A
Authority
JP
Japan
Prior art keywords
boom
brace
opposite
assembly
tower crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP6137476A
Other languages
Japanese (ja)
Other versions
JP3554583B2 (en
Inventor
Michel Lissandre
ミシエル・リザンドル
Yves Millet
イベ・ミーエー
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Manitowoc Crane Group France SAS
Original Assignee
Potain SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Potain SA filed Critical Potain SA
Publication of JPH0710471A publication Critical patent/JPH0710471A/en
Application granted granted Critical
Publication of JP3554583B2 publication Critical patent/JP3554583B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/26Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

PURPOSE: To assemble a boom of a tower crane by improving safety and shortening stationing using time of an assembly auxiliary device. CONSTITUTION: Boom elements 15, 16, 17, 18 are aligned and assembled with a brace 13 on the ground, and the brace 13 of a boom and occasionally a brace 111 of a boom 8 on the opposite side are lifted up and aligned by using an assembly auxiliary device 69 in assembling a distribution boom 7 of a tower crane and the assembled boom 8 on the opposite side to be used at a site of building construction and civil work. Thereafter, the braces 13, 111 lifted and aligned and the boom 7 or the boom 8 on the opposite side are lifted by using the same assembly auxiliary device 69, the boom is put on a surface of a mast head part 6, and consequently, free end parts 56, 122 of the braces 13, 111 are correctly temporarily fixed on a top part of the mast head part 6 so as to be directly fixed by a connecting shaft 14, etc.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、塔式クレーンのブーム
の組立て方法、及びこの方法を実施する装置に関する。
本発明は特に、建物建築及び土木工事の現場で使用され
る塔式クレーンの、分配ブーム、及び釣合い錘の支えを
構成する組合わされる反対側ブームの組立てにその利用
が見出だされる。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of assembling a boom of a tower crane and an apparatus for carrying out the method.
The invention finds particular use in the assembly of tower booms used in the field of building construction and civil engineering, the distribution booms and the associated opposite booms which make up the support of the counterweight.

【0002】[0002]

【従来の技術】このようなクレーンの分配ブームは、一
般に対称三角形の横断面を有し、三角形の上部頂点は上
側フレームに対応し、一方二つの下部頂点は、現場上で
荷物を分配する台車の走行軌道を形成する下側フレーム
に対応する。この分配ブームは主として、上側フレーム
及び下側フレームの端部に配置された仮留軸によって、
互いに整列させられて組立てられたブーム要素、ブーム
の中央平面に直角に取付けられた仮留軸によって、端部
と端部を合わせて互いに組立てられた複数の部分で形成
された固定筋交いで構成され、筋交いの前端部は、ブー
ムの中央平面に同様に直角に取付けられた仮留軸によっ
て、ブーム要素の上側フレームの高さで連接される。
The distribution boom of such a crane generally has a symmetrical triangular cross section, the upper vertices of the triangles corresponding to the upper frame, while the two lower vertices are the trolleys for distributing loads on site. It corresponds to the lower frame that forms the running track of. This distribution boom is mainly composed of temporary retaining shafts arranged at the ends of the upper frame and the lower frame.
A boom element assembled and aligned with each other, composed of fixed braces formed of multiple parts assembled end-to-end by a temporary anchoring shaft mounted at right angles to the mid-plane of the boom , The front end of the brace is articulated at the height of the upper frame of the boom element by a temporary anchoring shaft, which is also mounted at a right angle to the midplane of the boom.

【0003】このようなブームの組立ては、一般に次の
ように行われる。分配ブームは、ブームの根元の要素の
方向に上側フレーム上に静置した筋交いと、地上で整列
させられて組立てられ、次いで移動クレーンのような組
立て補助装置を用いて、持上げ用に吊り縄を装備され
る。持上げの最後に、ブームの根元の連接部は、マスト
頭部の前面又は回転軸に当てがわれ、仮留めされる。
Assembly of such a boom is generally performed as follows. The distribution boom is assembled with the braces resting on the upper frame in the direction of the element at the base of the boom, aligned on the ground and then assembled with the aid of assembly aids such as mobile cranes. Equipped. At the end of lifting, the articulation at the base of the boom is applied to the front of the mast head or the axis of rotation and temporarily fastened.

【0004】作業の第1のやり方によれば、ブームは、
組立て補助装置による位置に保持され、筋交いの自由端
部とマスト頭部の頂部のその固定点の間に複滑車が設け
られる。ウインチ又は引上げケーブルを用いて、マスト
頭部の頂部に筋交いの仮留部を作ることができるまで、
複滑車の自由ロープに近づけられる。複滑車の作業は高
所で行われ、困難な作業条件、特に風又は他の悪天候の
場合には、一人又は数人の作業員を必要とし、一方、組
立て補助装置はこの全時間の間駐留させられ、この装置
は一般に高い費用で賃貸しされる。
According to the first method of operation, the boom is
Held in position by the assembly aid, a compound pulley is provided between the free end of the brace and its fixed point on the top of the mast head. Using a winch or pull-up cable, until you can make a bracing temporary stop on the top of the mast head,
You can approach the free rope of the compound pulley. The work of compound pulleys is carried out at high altitudes and requires one or several workers in difficult working conditions, especially in wind or other bad weather, while the assembly aids are stationed during this whole time. This equipment is generally rented at high cost.

【0005】さらに一層微妙な作業の他のやり方によれ
ば、組立て組立て補助装置が、ブーム及びその筋交いを
ブームの根元の連接部の周りに持上げるのに用いられ、
この持上げは、ブームの根元の要素上で待機する筋交い
の自由端部と、マスト頭部の頂部で待機する十分に長い
吊り具の端部の間で仮留めが行えるまで上げられる。仮
留めが行われると、組立て補助装置を用いて、筋交いが
整列させられ緊張するまでブームが下げられる。反対側
ブームの組立ては、分配ブームの組立てと同様なやり方
で行われ、したがって同一の不都合を示す。
According to yet another more subtle method of construction, an assembly aid is used to lift the boom and its braces around the articulation at the base of the boom,
The lift is raised until a temporary tack can be made between the free end of the brace waiting on the root element of the boom and the end of a sufficiently long sling waiting on the top of the mast head. Once tacked, the assembly aid is used to lower the boom until the braces are aligned and taut. Assembly of the opposite boom is done in a similar manner to assembly of the distribution boom and thus presents the same disadvantages.

【0006】[0006]

【発明が解決しようとする課題】本発明は、安全性を改
良し、組立て補助装置の駐留時間を短縮する、塔式クレ
ーンのブームの組立て方法、及びその方法を実施する装
置を提供することによって、上に述べられた不都合な点
を修正することを目的としている。
SUMMARY OF THE INVENTION The present invention provides a method for assembling a tower crane boom, and an apparatus for carrying out the method, which improves safety and reduces the parking time of the assembly aids. , Is intended to correct the inconveniences mentioned above.

【0007】[0007]

【課題を解決するための手段】そのため本発明による塔
式クレーンのブームの組立て方法は、一方の端部がブー
ムの要素又は反対側ブームと連接され、最初は自由端部
である他方の端部が、クレーンのマスト頭部の頂部に仮
留めによって接続されるようになっている固定筋交いを
備えた、分配ブーム、及び場合によっては反対側ブーム
も組立てるために、 −ブームの要素をその筋交いとともに地上で整列させて
組立てること、 −まだ地上にあるブームの筋交い、及び場合によっては
反対側ブームの筋交いを持上げて整列させ、その結果、
筋交いの自由端部が、マスト頭部の頂部に直接仮留めの
ために正しく扱われるように、前記自由端部が、ブーム
又は反対側ブームの上方高くに配置されて保持されるこ
と、 −持上げられ整列させられて保持された筋交いとブーム
又は反対側ブームの組立て体を持上げること、 −持上げの最後に、ブーム又は反対側ブームをマスト頭
部の面に当てがうこと、 −ブーム又は反対側ブームを、マスト頭部の下部に取付
けること、並びに −ブーム又は反対側ブームの筋交いの自由端部を、マス
ト頭部の頂部に直接仮留めすることに存する。
SUMMARY OF THE INVENTION Therefore, a method of assembling a boom for a tower crane according to the present invention comprises a first end which is articulated at one end with a boom element or the opposite boom, the other end being initially the free end. To assemble a distribution boom, and optionally an opposite boom, with a fixed brace adapted to be connected by tack to the top of the mast head of the crane, in order to assemble the elements of the boom with that brace. Aligning and assembling on the ground,-Raising the boom brace still on the ground, and possibly the opposite boom brace, so that
The free end of the brace is held high above the boom or on the opposite boom so that the free end of the brace is correctly handled for temporary tacking directly on the top of the mast head, Lifting and holding the bracing and boom or opposite boom assembly, aligned and held, -at the end of lifting, applying the boom or opposite boom to the face of the mast head, -the boom or opposite It consists in attaching the side booms to the lower part of the mast head, and-temporarily fastening the free ends of the braces of the boom or the opposite boom directly to the top of the mast head.

【0008】容易に理解されるように、筋交いを最初に
分配ブーム又は反対側ブーム上の適当な高さに上げるこ
とは、この筋交いの自由端部を直接組合わせることがで
き、したがって現在の複滑車装置を不要にする形状で、
マスト頭部の前にブーム又は反対側ブームを当てがうこ
とを可能にする。組立ては一層迅速で一層容易に、した
がって従業員については一層安全な条件で、かつ組立て
補助装置を短縮された時間しか駐留させないことによっ
て行うことができる。
As will be readily appreciated, raising the brace first to a suitable height on the distribution boom or the opposite boom allows the free ends of this brace to be directly combined and therefore the current compound. With a shape that does not require a pulley device,
Allows the boom or opposite boom to be applied in front of the mast head. Assembly can be done quicker and easier, and therefore in safer conditions for the employee, and by having the assembly aids stationed for a reduced amount of time.

【0009】油圧式移動式クレーンのようなこの組立て
補助装置は、まだ地上にある筋交い、ブーム又は反対側
ブームを持上げて整列させ、次いで持上げられ整列させ
られて保持されたその筋交いとブーム又は反対側ブーム
の組立て体の持上げを行い、マスト頭部の前面に当てが
うのにも使用されるのが有利である。
This assembly aid, such as a hydraulic mobile crane, involves lifting and aligning braces, booms or opposite booms that are still on the ground, and then the braces and booms or opposites that are lifted and aligned and retained. Advantageously, it is also used to lift the side boom assembly and apply it to the front of the mast head.

【0010】上に定義された方法を実施するための本発
明による装置は、一方では、分配ブームの場合にはブー
ムの根元の要素の固定点を、又は反対側ブームの固定点
を筋交いの固定点に接続し、組立て補助装置のフックに
直接又は間接的に吊下げられるに適した、少なくとも一
つの吊り縄又は吊り縄セットを有し、他方では、持上げ
られ整列させられて保持された筋交いと分配ブーム又は
反対側ブームの組立て体を持上げられる、釣合い装置の
ような吊下げ手段を有する。したがってブーム又は反対
側ブームの組立て体が持上げられる前の、分配ブーム又
は反対側ブームがまだ地上に静置されているときに、筋
交いを持上げ位置にもたらすために、まず筋交いに牽引
力がかけられる。
The device according to the invention for carrying out the method defined above comprises, on the one hand, a bracing fixation of the fixing point of the root element of the boom in the case of a distribution boom or of the opposite boom. Having at least one sling or sling set suitable for connecting to a point and being hung directly or indirectly on the hooks of the assembly aid, on the other hand, with the braces being lifted, aligned and held. It has suspending means, such as a balancing device, for lifting the distribution boom or the opposite boom assembly. Thus, traction is first applied to the braces to bring the braces to the raised position before the distribution boom or the opposite boom assembly is lifted and the distribution boom or the opposite boom is still resting on the ground.

【0011】塔式クレーンの分配ブーム組立て方法の好
ましい一実施態様によれば、前記装置は、ブームの根元
の要素の固定点を筋交いの固定点に接続する少なくとも
1本の吊り縄以外に、第1の端部が筋交いの固定点に連
接され、一方第2の端部が、ブームの根元の要素の上側
フレームに沿って移動するための支持・案内手段をもっ
た持上げ束を有し、手段が、束を立ち上げられた位置に
停止され、その位置で前記フレームへの仮留めを保証す
るためにさらに設けられている。
According to a preferred embodiment of the method for assembling the distribution boom of a tower crane, said device comprises, in addition to at least one sling that connects the fixing point of the root element of the boom to the fixing point of the braces. One end is articulated to a fixed point of the brace, while the second end has a lifting bundle with supporting and guiding means for moving along the upper frame of the root element of the boom, Are further provided to stop the stack in the raised position and ensure temporary fastening to the frame in that position.

【0012】持上げ束の第2の端部は、ブームの根元の
要素の上側フレームに沿って移動し、束が立ち上げられ
た位置に達したときは、前記フレームによって支えられ
る車止めと接触するようになる走行車輪を支持すること
ができる。この束はブームの筋交いと同時に持上げら
れ、その剛性によって、分配ブーム組立て体の持上げと
それをマスト頭部の前に当てがう間、持上げられて整列
させられた位置に筋交いを確実に保持する。
The second end of the lifting bundle moves along the upper frame of the element at the base of the boom so that when the bundle reaches the raised position it comes into contact with the bollard supported by said frame. Can support the running wheels. This bundle is lifted at the same time as the boom braces, and its rigidity ensures that the braces are held in a lifted and aligned position during the lifting of the distribution boom assembly and its application in front of the mast head. .

【0013】分配ブームの筋交いは順次複数の部分で作
られ、該部分それぞれの長さが、運搬時には筋交いの各
部分が上に取付けられ、組立て時には結合連接棒によっ
て互いに結合されるブームの要素の長さとほぼ対応する
のが有利である。
The distribution boom brace is made up of a plurality of parts in sequence, the length of each of which is such that during transport the parts of the brace are mounted on top of it and during assembly they are connected to each other by connecting connecting rods of the boom. Advantageously, it corresponds approximately to the length.

【0014】塔式クレーンの分配ブームに利用された本
発明による装置に関する他の特徴によれば、この装置
は、分配ブームの上側フレームへの二つの固定金具をも
ったブーム持上げ釣合い装置をさらに有し、この固定金
具の一方が固定長連接棒を支持し、他方が、分配ブーム
の傾斜を修正するために長さ調整吊り具を支持する。
According to another characteristic of the device according to the invention used in the distribution boom of a tower crane, the device further comprises a boom lifting balance device with two fastenings to the upper frame of the distribution boom. Then, one of the fixing brackets supports the fixed-length connecting rod, and the other supports the length adjusting sling for correcting the inclination of the distribution boom.

【0015】本発明の補足的一特徴によれば、固定長連
接棒及び長さ調整吊り具は、分配ブームの横勾配を修正
するために、連接棒及び吊り具のそれぞれ固定金具への
仮留軸の両側に配置された、厚みのあるワッシャによっ
て横方向に位置決めされている。
According to a supplementary feature of the invention, a fixed length connecting rod and a length adjusting sling temporarily suspend the connecting rod and sling respectively on a fixing bracket in order to correct the lateral slope of the distribution boom. It is laterally positioned by thick washers located on either side of the shaft.

【0016】組立て補助装置を用いて筋交い及び束の持
上げを行った後に、釣合い装置はブーム組立て体を持上
げ、それをマスト頭部の前に当てがうために、同一組立
て補助装置とともに使用される。この釣合い装置は、装
置の重心区域において、分配ブーム上に常に固定して静
置される。
After performing the bracing and lifting of the bundle with the assembly aid, the balancer is used with the same assembly aid to lift the boom assembly and place it in front of the mast head. . This balancing device is always fixedly rested on the distribution boom in the area of the center of gravity of the device.

【0017】塔式クレーンの反対側ブームの組立てに特
に一層適した本発明による装置の他の実施態様によれ
ば、装置は、塔式クレーンの反対側ブームを組立てるた
めに、中点が組立て補助装置のフックへの吊下げに役立
つ釣合い装置、及び釣合い装置の両端部に固定され、反
対側ブームの両側に取付けられた2組の吊り縄を有し、
この吊り縄は、釣合い装置を反対側ブームのフレームの
固定点に接続する後方吊り縄、及び二つの部分からなる
前方吊り縄をそれぞれ有し、前方吊り縄の一方が、釣合
い装置を筋交いの持上げ用に筋交いに接続し、他方が、
持上げられた筋交いと反対側ブームの組立て体の持上げ
用に、筋交いを反対側ブームのフレームの固定点に接続
している。
According to another embodiment of the device according to the invention, which is particularly well suited for the assembly of the opposite boom of a tower crane, the device is a midpoint assembly aid for assembling the opposite boom of a tower crane. A balancing device useful for hanging the device on a hook, and two sets of hanging ropes fixed to both ends of the balancing device and attached to opposite sides of the boom,
This sling has a rear sling that connects the balancing device to a fixed point on the frame of the opposite boom and a front sling consisting of two parts, one of the front sling lifting the balancing device in braces. Connect to the brace for
A brace is connected to a fixed point on the frame of the opposite boom for lifting the raised brace and opposite boom assembly.

【0018】したがって、吊り縄と釣合い装置で構成さ
れた単一セットは、ここでは反対側ブームの筋交いの持
上げ、及び持上げられた筋交いと反対側ブームの組立て
体の持上げに役立ち、二つの作業は、組立て補助装置の
フックへの吊下げ点を修正することなしに、一方に続い
て他方が直接に行われる。本発明による他の態様によれ
ば、筋交い自由端部のマスト頭部の頂部への仮留めは、
好ましくは分配ブームの側の筋交い自由端部に、及び反
対側ブームの側の接続連接棒に設けられた孔の存在によ
って容易に行われる。
Therefore, a single set consisting of a sling and a balancing device is here useful for lifting the opposite boom brace, and for lifting the raised brace and opposite boom assembly, the two tasks , One after the other directly without modifying the suspension points on the hooks of the assembly aids. According to another aspect of the present invention, the provisional fastening of the brace free end to the top of the mast head comprises:
This is preferably facilitated by the presence of holes at the brace free end on the side of the distribution boom and on the connecting connecting rod on the side of the opposite boom.

【0019】いずれにせよ本発明は、限定されない例と
して、塔式クレーンのブームの組立て方法を実施するや
り方を説明し、その方法を実施する装置のいくつかの実
施態様を示した添付の図面を参照しながら、以下になさ
れる記載から一層理解されるであろう。
In any case, the present invention illustrates, by way of non-limiting example, a method for carrying out a method of assembling a boom of a tower crane and the accompanying drawings showing some embodiments of apparatus for carrying out the method. With reference, it will be further understood from the following description.

【0020】[0020]

【実施例】図1に示されたクレーンは公知のやり方で、
固定又は回転式基礎台枠1、方向転換装置4を介してそ
れ自身マスト頭部6を載せた回転軸5を支える固定軸3
を載せた、高さを調節できるマスト2を有する。このク
レーンは、本発明による組立て用に装置の両側に設けら
れた、分配ブーム7及び釣合い錘をもった反対側ブーム
8を備えている。
DETAILED DESCRIPTION OF THE INVENTION The crane shown in FIG.
A fixed or rotary base frame 1 and a fixed shaft 3 for supporting a rotary shaft 5 on which a mast head 6 itself is mounted via a direction changing device 4.
It has a mast 2 on which the height can be adjusted. The crane comprises a distribution boom 7 and an opposite boom 8 with a counterweight, which is provided on each side of the device for assembly according to the invention.

【0021】分配ブーム7は、台車9及び台車9の走行
機構10、並びに作業場上で荷物扱いするための荷揚ウ
インチ11を備えており、分配ブームは、マスト頭部6
又は回転軸5で水平軸周りに連接して取付けられ、前記
マスト頭部の頂部に14で接続された筋交い13を介し
て、ほぼ水平の位置に維持される。長さを調節できるこ
の分配ブーム7は、根元の要素15、一つ又は複数の中
間要素16、いわゆる筋交い取付け要素17、及び筋交
い取付け要素の先に位置する一つ又は複数の普通の要素
18を有する。
The distribution boom 7 is provided with a trolley 9, a traveling mechanism 10 for the trolley 9, and an unloading winch 11 for handling luggage on the work site.
Alternatively, the rotary shaft 5 is attached to be connected around a horizontal axis, and is maintained in a substantially horizontal position via a brace 13 connected at 14 to the top of the mast head. This adjustable distribution boom 7 comprises a root element 15, one or more intermediate elements 16, a so-called brace attachment element 17 and one or more ordinary elements 18 located ahead of the brace attachment element. Have.

【0022】分配ブーム7の筋交い13は、前記分配ブ
ームの要素、さらに詳しくは根元の要素15、中間要素
16、及び筋交いの下に位置する部分に限定された筋交
い取付け要素17の長さとほぼ対応する、それぞれの長
さをもった複数部分19、20、21で順次形成され
る。図2、3及び4に示されたように、筋交い13の異
なる部分19、20、21は、輸送のために、対応する
分配ブーム要素の上に配置される。
The braces 13 of the distribution boom 7 correspond substantially with the lengths of the elements of said distribution boom, more specifically the root element 15, the intermediate element 16 and the brace attachment elements 17 limited to the parts located below the braces. The plurality of portions 19, 20, and 21 having respective lengths are sequentially formed. As shown in FIGS. 2, 3 and 4, the different parts 19, 20, 21 of the brace 13 are arranged on the corresponding distribution boom element for transport.

【0023】図3を参照すると、筋交い13の中間部分
20は、後部はキャップ23によって両端部を終わる円
形断面の長い要素22で構成され、前部は筋交い13の
線及び分配ブーム7の中央平面と直角に取付けられた軸
26によって、互いに組合わされてほぞを形成する、握
り部25を備えた連接棒24で構成される。運搬位置で
は、長い要素22は、張索軸29を備えた前方支持部2
8、及び仮留軸29を備えた後方支持部30によって、
対応するブームの中間要素16の上側フレーム27の上
に静置され、仮留軸上には長い要素が位置決めされるよ
うになり、一方、連接棒24は、前記上側フレーム27
の前端部に下ろされる。
Referring to FIG. 3, the middle portion 20 of the brace 13 is constituted by a long element 22 of circular cross section, the rear end of which is terminated by caps 23, the front of which is the line of the brace 13 and the central plane of the distribution boom 7. And a connecting rod 24 with a grip 25 which are joined together by a shaft 26 mounted at a right angle to form a tenon. In the transport position, the elongate element 22 comprises the front support 2 with the cords 29.
8 and the rear support 30 including the temporary retaining shaft 29,
It rests on the upper frame 27 of the intermediate element 16 of the corresponding boom, so that the long element is positioned on the temporary anchoring shaft, while the connecting rod 24 makes the upper frame 27
Is lowered to the front end of the.

【0024】図4に示されたように、筋交い13の前方
部分21は、後部は、ほぞ33によって前端部を、キャ
ップ34によって後端部を終わる円形断面の長い要素3
2で構成され、前部は軸36によって互いに組合わされ
てキャップを形成する二重吊具35で終わる。二重吊具
35はさらに、軸39によってほぞを形成するガセット
プレート38の高さで、ブームの筋交い取付け要素17
の上側フレーム37上に組立てられる。軸36及び39
は、いずれも筋交い13の線及び分配ブーム7の中央平
面と直角に取付けられる。運搬位置では、長い要素32
は、張索軸41を備えた後方支持部40によって、分配
ブーム7の筋交い取付け要素17の上側フレーム37の
上に静置される。
As shown in FIG. 4, the front portion 21 of the brace 13 has a long element 3 of circular cross section, the rear portion of which is terminated by the tenon 33 at the front end and the cap 34 at the rear end.
2 and the front ends in a double hanger 35 which is joined together by a shaft 36 to form a cap. The double hoist 35 is further at the height of the gusset plate 38 forming a tenon by the shaft 39, at the boom brace attachment element 17.
Is assembled on the upper frame 37 of the. Axes 36 and 39
Are mounted at right angles to the lines of the brace 13 and the central plane of the distribution boom 7. In the transport position, the long element 32
Is rested on the upper frame 37 of the brace attachment element 17 of the distribution boom 7 by means of a rear support 40 with a tensioning shaft 41.

【0025】図2に示されたように、筋交い13の後方
部分19は、支持部44を通って両側の延長上に取付け
られた円形断面の2本の長い要素42、43を有し、支
持部44の上部は、分配ブーム7の筋交い13の持上げ
用に役立つ吊り縄46の係止用軸45を受入れ、一方、
その下部は、筋交い13の線及び分配ブーム7の中央平
面と直角に取付けられ、前記長い要素4、43の組立て
と、前記筋交い13の持上げにも役立つ束48の連接に
同時に役立っている軸47を受入れる。
As shown in FIG. 2, the rear portion 19 of the brace 13 has two elongate elements 42, 43 of circular cross section mounted on extensions on either side through the support 44, The upper part of the part 44 receives a locking shaft 45 of a hanging rope 46 which serves for lifting the brace 13 of the distribution boom 7, while
Its lower part is mounted at a right angle to the line of the brace 13 and the central plane of the distribution boom 7 and serves at the same time for the assembly of the long elements 4, 43 and for the connection of the bundle 48 which also serves to lift the brace 13. Accept.

【0026】長い要素42、43の軸47で組立てられ
た両端部は、それぞれほぞ49及びキャップ50を形成
し、前記両端部が平角以下の角度を形成するときは、支
え板51を介して互いに当接するようになる。さらに筋
交い13の後方部分19は、筋交い13の線及び分配ブ
ーム7の中央平面と直角に取付けられた軸54によって
組立て用のほぞを形成する、握り部53を備えた連接棒
52を前方に有し、2本の長い要素42、43の組立て
体の前端部はキャップ55を形成する。2本の長い要素
42、43の組立て体の後端部は、筋交い13をマスト
6の頭部の頂部に14で容易に接続するために、楕円形
孔57を備えたほぞ56を形成する。
The two ends of the long element 42, 43 assembled on the shaft 47 form a tenon 49 and a cap 50, respectively, and when said two ends form an angle less than a flat angle, they are separated from each other by a support plate 51. Come into contact. Furthermore, the rear part 19 of the brace 13 has in front a connecting rod 52 with a grip 53, which forms an assembly tenon by means of a shaft 54 mounted at right angles to the lines of the brace 13 and the central plane of the distribution boom 7. The front end of the assembly of the two long elements 42, 43 then forms a cap 55. The rear end of the assembly of the two long elements 42, 43 forms a tenon 56 with an oval hole 57 for easily connecting 14 the brace 13 to the top of the head of the mast 6.

【0027】図11に詳細に示されたように、一方の端
部を筋交い13に軸47で連接される束48は、他方の
端部にブームの根元の要素15の円形断面の上側フレー
ム59上を回転することができる、空中ゴマの形状をし
た車輪58を備えている(図2も参照)。運搬位置で
は、束48は筋交い13の後方部分19の下方の前方に
下ろされ、2本の長い要素42、43の組立て体は、張
索軸又は仮留軸61を備えた前方支持部60、及び仮留
軸63を備えた後方支持部62によってブームの根元の
要素15の上側フレーム上に静置され、軸上には束が位
置決めされるようになり、一方、連接棒52は前記フレ
ーム59の前端部に下ろされる。
As shown in detail in FIG. 11, a bundle 48, which is connected at one end to the brace 13 by means of a shaft 47, has at the other end an upper frame 59 of circular section of the element 15 at the base of the boom. It is equipped with wheels 58 in the shape of an aerial sesame that can rotate above (see also FIG. 2). In the transport position, the bundle 48 is lowered anteriorly below the posterior portion 19 of the brace 13 and the assembly of the two elongate elements 42, 43 comprises a front support 60 with a tensioning or anchoring shaft 61, And the rear support 62 with the temporary retaining shaft 63 allows it to rest on the upper frame of the element 15 at the base of the boom, so that the bundle is positioned on the shaft, while the connecting rod 52 is connected to the frame 59. Is lowered to the front end of the.

【0028】図5、6及び7に図示された分配ブーム7
の筋交い13の持上げ及び整列は、次のように行われ
る。完全に装備されたブーム7の要素15、16、1
7、18は、地上に並べられて互いに組立てられる。そ
のとき筋交い13の部分19、20、21は、連接棒5
2、24をそれぞれキャップ23、34に接続すること
によって、筋交いの線及び分配ブーム7の中央平と直角
に取付けられた軸64、65によって組立てられる。
Distributing boom 7 illustrated in FIGS. 5, 6 and 7.
The lifting and alignment of the brace 13 are performed as follows. Elements 15, 16 and 1 of fully equipped boom 7
7, 18 are lined up on the ground and assembled together. At that time, the portions 19, 20, 21 of the brace 13 are connected to the connecting rod 5
2 and 24 are respectively connected to the caps 23 and 34 for assembly by the braces and the shafts 64 and 65 mounted at right angles to the center plane of the distribution boom 7.

【0029】こうして装備された分配ブーム7は、装備
された台車9の通過に十分な高さがある少なくとも二つ
の架台66、67上に上げられる。架台66はブームの
根元の要素15の後部に配置され、一方架台67は、前
記筋交い13の持上げ時にブーム7の傾きを避けるため
に、筋交い13の組立て軸を越えてブーム7の前部に配
置される。ブーム7の後ろ側のブーム軸に配置された組
立て補助装置69のフック68を用いて、筋交い13の
後方部分19の支持部44の軸45に吊り下げられた持
上げ吊り縄46の自由端部が捕捉される。フック68へ
の吊り縄46の捕捉は、地面の高さで行われる。次いで
図5に示されたように、組立て補助装置69のフック6
8は、吊り縄46が緊張するまで再び上げられる。
The distribution boom 7 thus equipped is raised on at least two pedestals 66, 67 which are sufficiently high for the trolleys 9 equipped to pass through. The cradle 66 is arranged in the rear part of the element 15 at the base of the boom, while the pedestal 67 is arranged in the front part of the boom 7 beyond the assembly axis of the brace 13 in order to avoid tilting of the boom 7 when lifting said brace 13. To be done. Using the hook 68 of the assembly assisting device 69 arranged on the boom shaft on the rear side of the boom 7, the free end portion of the lifting rope 46 suspended on the shaft 45 of the support portion 44 of the rear portion 19 of the brace 13 is moved. To be captured. The catching of the hanging rope 46 on the hook 68 is performed at the height of the ground. Then, as shown in FIG. 5, the hook 6 of the assembly assisting device 69.
8 is raised again until the sling 46 is tense.

【0030】フック68の上昇を継続することによっ
て、筋交い13の部分は徐々に次々と持上げられ、一
方、その自重の作用で前記筋交い13に軸47で吊下げ
られた持上げ束48は、ブームの根元の要素15の上側
フレーム59上を、車輪58を介して回転することによ
って立上がる(図6参照)。
By continuing to raise the hook 68, the portions of the brace 13 are gradually lifted up one after another, while the lifting bundle 48 suspended by the shaft 47 on the brace 13 by the action of its own weight causes the lifting bunch 48 to rise. It rises by rotating on the upper frame 59 of the root element 15 via wheels 58 (see FIG. 6).

【0031】この作業中、ブームの根元の要素15の後
端部に位置する二重固定点71を、持上げ束48の頂部
に位置する軸72に接続する二重固定吊り縄70は、徐
々に緊張する。作業の終りには、二重固定吊り縄70は
緊張され、筋交い13は持上げ位置でほぼ真直ぐにさ
れ、一方、持上げ束48の下端部は、上側フレーム59
の、ブームの根元の要素15の長さのほぼ中央に固定さ
れた支持部74と一体の軸73に当接するようになる
(図2及び7参照)。この位置で、持上げ束48の下端
部は、軸75によって手動又は自動で支持部74に施錠
される。
During this operation, the double-fixed sling line 70, which connects the double-fixed point 71 located at the rear end of the boom root element 15 to the shaft 72 located at the top of the lifting bundle 48, is gradually increased. get nervous. At the end of the work, the double fixed lanyard 70 is tensioned and the brace 13 is made almost straight in the lifting position, while the lower end of the lifting bundle 48 has an upper frame 59.
The abutment of a shaft 73 integral with a support 74 fixed approximately in the center of the length of the boom root element 15 (see FIGS. 2 and 7). In this position, the lower end of the lifting bundle 48 is manually or automatically locked to the support 74 by the shaft 75.

【0032】完全に装備されたブーム7及び筋交い13
で構成された組立て体を持上げ位置に引上げるには、図
12に示されたような釣合い装置76が使用される。釣
合い装置76は、ブーム7の上側フレーム79への二つ
の固定金具77、78を有する。各金具77、78は、
ブーム7の構造体の結合部81、82に配置された上部
鐙部80、及び結合部81、82の両側に配置されたそ
れぞれ二つの下部鐙部83、84で形成される。下部鐙
部83及び84の上部鐙部80への取付けは、ねじ8
7、88によって行われる。
Fully equipped boom 7 and brace 13
In order to pull up the assembly constituted by (1) to the raised position, a balancing device 76 as shown in FIG. 12 is used. The balance device 76 has two fixing brackets 77, 78 to the upper frame 79 of the boom 7. Each metal fitting 77, 78
It is formed by an upper stirrup 80 arranged on the joints 81, 82 of the structure of the boom 7 and two lower stirrups 83, 84 arranged on both sides of the joints 81, 82, respectively. To attach the lower stirrups 83 and 84 to the upper stirrup 80, screw 8
7, 88.

【0033】ブーム7の上側フレーム79周りの回転、
固定金具77、78の固定化は、下部鐙部83、84を
通るブーム7の変形防止設備86に係合された軸85に
よって保証される。各上部鐙部80は、ブーム7の中央
平面と直角に取付けられた握り部付きの軸89、90を
高い部分に支持している。固定金具77は、第1の持上
げ吊り縄92によって延長された固定長連接棒91を、
その軸によって再捕捉する。異なる厚さのワッシャ93
は、支持部間の軸の両側からの要求で、前記固定金具7
7及び連接棒91に分配される。
Rotation of the boom 7 around the upper frame 79,
The fixing of the fixing brackets 77, 78 is ensured by the shaft 85 engaged with the deformation preventing equipment 86 of the boom 7 passing through the lower stirrups 83, 84. Each upper stirrup 80 supports a shaft 89, 90 with a grip mounted at a right angle to the central plane of the boom 7 at a high portion. The fixing metal fitting 77 includes a fixed-length connecting rod 91 extended by the first lifting hanging rope 92,
Recapture by that axis. Washers of different thickness 93
Is a request from both sides of the shaft between the supporting parts,
7 and connecting rod 91.

【0034】他の側では、固定金具78は、第2の持上
げ吊り縄95によって延長された長さ調整吊り具94を
その軸90によって再捕捉する。異なる厚さのワッシャ
96も、軸90の両側からの要求で分配される。長さ調
整吊り具94は、軸90に一方の端部で連接される調整
連接棒97を有し、その本体は、複数の仮留孔98、調
整連接棒97の仮留孔98を一方の端部で軸としている
部品99、及びその必要があれば、部品99の他方の端
部に101で接続される追加連接棒100を有する。
On the other side, the fixture 78 recaptures the length adjustment sling 94 extended by the second lifting sling 95 by its shaft 90. Washers 96 of different thickness are also dispensed on demand from both sides of shaft 90. The length adjusting hanger 94 has an adjusting connecting rod 97 that is connected to the shaft 90 at one end, and its main body has a plurality of temporary retaining holes 98 and one temporary retaining hole 98 of the adjusting connecting rod 97. It has a part 99 which is axial at the end and, if necessary, an additional connecting rod 100 which is connected 101 at the other end of the part 99.

【0035】ブーム7の傾斜は、吊り具94の長さを調
整することによって正しくされ、一方、その横勾配は、
軸89及び90の両側のワッシャ93の分配によって修
正される。原則として調整は、与えられた長さのブーム
のすべてについて一度行われる。完全に装備されたブー
ム7及び筋交い13で構成された組立て体を、持上げ位
置に調整して持上げる釣合い装置76は、組立て補助装
置69によってマスト頭部6の高さまで持上げられる。
この作業は図8に示されている。
The tilt of the boom 7 is made correct by adjusting the length of the hanger 94, while its lateral slope is
It is modified by the distribution of washers 93 on either side of shafts 89 and 90. As a rule, adjustments are made once for all booms of a given length. A balancing device 76, which adjusts and lifts the fully-equipped boom 7 and brace 13 to the lifting position, is lifted up to the height of the mast head 6 by the assembly assisting device 69.
This task is shown in FIG.

【0036】図9及び10に示されたように、こうして
持上げられたブーム7は、マスト頭部6の前面にブーム
の根元の要素15を結合するように図示される。結合
は、ブームの根元の要素15の下側フレーム104を後
方に延長するキャップ103に、回転軸5のほぞを形成
する二つのガセットプレート102を接続する2本の軸
12によって行われる。ガセットプレート102の内側
では、アングル型の案内装置105が、キャップ103
をガセットプレート102にあらかじめ中心決めするの
を保証し、軸12に容易に正しい位置を取らせる。
As shown in FIGS. 9 and 10, the boom 7 thus lifted is illustrated as connecting the boom root element 15 to the front of the mast head 6. The connection is made by two shafts 12 connecting two gusset plates 102 forming the tenon of the rotary shaft 5 to a cap 103 extending rearwardly of a lower frame 104 of the boom root element 15. Inside the gusset plate 102, the angle-type guide device 105 is attached to the cap 103.
Ensures that the gusset plate 102 is pre-centered and the shaft 12 is easily positioned correctly.

【0037】ブームの根元要素15のマスト頭部6への
結合が行われ、ほぞ56を形成する筋交い13の自由後
方端部は、マスト頭部6の頂部106付近に現れる。頂
部106から二重吊り具107が、ほぞ56と組合わさ
れるために設けられたキャップを形成する(図14も参
照)。梯子108及び作業台109は、組立工によって
連結軸14を正しい位置にするために設けられる。マス
ト頭部6の頂部106に筋交い13の組立てを行うこと
は、筋交い13の横方向の柔軟性、及びほぞ56の楕円
形孔57によって容易にされる。
Once the boom root element 15 is connected to the mast head 6, the free rear end of the brace 13 forming the tenon 56 appears near the top 106 of the mast head 6. A double sling 107 from the top 106 forms a cap provided for being associated with the tenon 56 (see also FIG. 14). The ladder 108 and the workbench 109 are provided by an assembler so that the connecting shaft 14 is placed in the correct position. Assembly of the brace 13 to the top 106 of the mast head 6 is facilitated by the lateral flexibility of the brace 13 and the elliptical hole 57 in the tenon 56.

【0038】そちらの側からは、図13に詳細に示され
た反対側ブーム8が、分配ブーム7と同じ高さで、マス
ト頭部6又は回転軸5の後面に、110で連接して取付
けられ、前記マスト頭部6の頂部106に138で連接
された筋交い111を介して、ほぼ水平の位置に保持さ
れる。筋交い111は、反対側ブーム8の両側に対称的
に取付けられ、その両端部がキャップ113、114に
よって終わる、円形断面の2本の同一の長い要素112
で構成される。
From that side, the opposite boom 8, which is shown in detail in FIG. 13, is mounted at the same height as the distribution boom 7 on the mast head 6 or on the rear face of the rotary shaft 5 in an articulated manner at 110. And is held in a substantially horizontal position via the brace 111 connected to the top portion 106 of the mast head 6 at 138. Brace 111 is mounted symmetrically on both sides of opposite boom 8 and has two identical long elements 112 of circular cross section, the ends of which are terminated by caps 113, 114.
Composed of.

【0039】後方キャップ113は、軸117によって
ほぞを形成するガセットプレート116の高さで、フレ
ーム115上に組立てられる。前方キャップ114は、
ほぞを形成する基部121及び頂部122で折畳まれ、
スペーサ123、124によって接続される2枚の平鉄
板120で構成された連結要素119に軸118によっ
て組立てられる。連結要素119は、キャップ114と
ほぞ121の間の支え板125を介して、長い要素11
2の延長上に保持される。
The rear cap 113 is assembled on the frame 115 at the height of the gusset plate 116 forming a tenon by the shaft 117. The front cap 114 is
Folded at the base 121 and the top 122 forming a tenon,
It is assembled by a shaft 118 to a connecting element 119 composed of two flat iron plates 120 connected by spacers 123 and 124. The connecting element 119 is connected to the long element 11 via the support plate 125 between the cap 114 and the tenon 121.
Hold on extension of 2.

【0040】反対側ブーム8の組立て方法を実施するた
めの装置は、中点127が組立て補助装置69のフック
68の係止に役立つ釣合い装置126を有し、釣合い装
置126の両端部128に接続され、反対側ブーム8の
両側に取付けられた2本の吊り縄は、それぞれ釣合い装
置126の端部128を反対側ブーム8の対応するフレ
ーム115の後部に配置された固定点130に直接接続
する後方吊り縄129、及び二つの部分131、132
で作られ、その第1部分131は釣合い装置126の端
部128を筋交い111の固定点133に接続し、その
第2部分132は、筋交い111の固定点134を反対
側ブーム8の対応するフレーム115の前部に配置され
た固定点135に接続する前方吊り縄を有する。
The device for carrying out the method of assembling the opposite boom 8 has a balance device 126 whose midpoint 127 serves to lock the hook 68 of the assembly aid device 69 and which is connected to both ends 128 of the balance device 126. The two slings attached to both sides of the opposite boom 8 directly connect the ends 128 of the balancing device 126 to fixed points 130 located at the rear of the corresponding frame 115 of the opposite boom 8. Rear hanging rope 129 and two parts 131, 132
The first part 131 connects the end 128 of the balancer 126 to the fixed point 133 of the brace 111, and the second part 132 thereof connects the fixed point 134 of the brace 111 to the corresponding frame of the opposite boom 8. It has a front sling that connects to a fixed point 135 located at the front of 115.

【0041】筋交い111の持ち上げ及び反対側ブーム
8の組立ては、次のようにして行われる。反対側ブーム
8は、フレーム115上に下ろされた筋交い111と地
上で組立てられる。組立て補助装置69のフック68を
用いて、釣合い装置126の中点127が地面の高さで
吊され、次いでフック68が徐々に上げられる。
The lifting of the brace 111 and the assembling of the opposite side boom 8 are performed as follows. The opposite boom 8 is assembled on the ground with the brace 111 lowered onto the frame 115. Using the hook 68 of the assembly aid 69, the midpoint 127 of the balancing device 126 is hung at ground level and then the hook 68 is gradually raised.

【0042】最初の時点で後方吊り縄129及び前方吊
り縄131が張られ、筋交い111が、今度は前方吊り
縄132が張れるまで持上げられる。次の時点で、持上
げられた位置で筋交い111をもった反対側ブーム8
が、組立て補助装置69によってマスト頭部6の高さに
持上げられる。次いで分配ブーム7におけるように、反
対側ブーム8は当てがわれ、マスト頭部6又は回転軸5
の後面に110で取付けられ、筋交い111は、軸13
8の組立てを容易にするように、楕円形孔137を備え
た連接棒136によって前記マスト頭部6の頂部106
に取付けられる(図1及び14参照)。
At the first time, the rear hanging rope 129 and the front hanging rope 131 are stretched, and the brace 111 is lifted this time until the front hanging rope 132 is stretched. At the next point in time, the opposite boom 8 with the brace 111 in the lifted position
Is lifted to the height of the mast head 6 by the assembly assisting device 69. The opposite boom 8 is then applied, as in the dispensing boom 7, to the mast head 6 or the rotary shaft 5.
It is attached to the rear surface at 110 and the brace 111 is attached to the shaft 13
8 to facilitate the assembly of the mast head 6 by means of a connecting rod 136 with an oval hole 137.
(See FIGS. 1 and 14).

【0043】本発明が、同一の塔式クレーンの分配ブー
ム7及び反対側ブーム8に同時に適用されるならば、原
則として反対側ブーム8の組立てを行い、それから場合
によっては反対側ブーム8に部分釣合い錘を配置し、次
いで分配ブーム7の取付けを行う。
If the present invention applies simultaneously to the distribution boom 7 and the opposite boom 8 of the same tower crane, the assembly of the opposite boom 8 is in principle carried out, and then the opposite boom 8 can be partly fitted. The counterweight is placed and then the distribution boom 7 is attached.

【0044】言うまでもないように、本発明は、例とし
て上に述べられた本発明の方法を実施する唯一の態様、
及び塔式クレーンのブームを組立てる装置の実施態様に
限定されるものではなく、もしろ同一原理に基いた実施
及び応用のあらゆる変形を含んでいる。したがって、例
えば筋交い13及び111の細部を支える建設的修正
や、ブームの根元の要素15の上側フレーム59を滑動
する車輪58をシューに取替えるような、あらゆる同等
技術の取入れによって、本発明の範囲から遠ざかるもの
ではない。方法に関する同じ考え方の順で、ある作業の
順番は、本発明の精神から離れることなしに修正するこ
とができる。
Needless to say, the present invention is the only way to carry out the method of the invention described above by way of example,
And the embodiment of the device for assembling the boom of a tower crane is not limited to it, but includes any variations of implementation and application based on the same principle. Thus, from the scope of the present invention, any constructive modifications, such as supporting the details of the braces 13 and 111, or the incorporation of any equivalent technique, such as replacing the wheels 58 sliding the upper frame 59 of the root element 15 of the boom with shoes. It does not move away. In the order of the same idea of methods, the order of certain operations can be modified without departing from the spirit of the invention.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明による方法を適用した塔式クレーンの組
立て状態の全体図。
FIG. 1 is an overall view of a tower crane in an assembled state to which a method according to the present invention is applied.

【図2】分配ブームの場合について、本発明による方法
を実施するために、固定筋交いを持上げて整列させるの
に役立つ装置を支えるブームの根元の要素の斜視図。
FIG. 2 is a perspective view of the root element of the boom that carries the device useful for lifting and aligning the fixed braces for carrying out the method according to the invention, in the case of a distribution boom.

【図3】運搬位置に対応する筋交いの一部の配置を示す
ブーム中間要素の斜視図。
FIG. 3 is a perspective view of a boom intermediate element showing an arrangement of a portion of a brace corresponding to a carrying position.

【図4】分配ブームの筋交い取付け要素の斜視図。FIG. 4 is a perspective view of a brace attachment element of a distribution boom.

【図5】ブームの筋交いの持上げ及び整列の第1状態を
示す図。
FIG. 5 is a view showing a first state of lifting and aligning a brace of a boom.

【図6】同じく第2状態を示す図。FIG. 6 is a diagram showing a second state of the same.

【図7】同じく第3状態を示す図。FIG. 7 is a diagram showing a third state of the same.

【図8】持上げた筋交いをもった分配ブーム組立て体の
持上げ作業を示す図。
FIG. 8 is a view showing a lifting operation of a distribution boom assembly having a raised brace.

【図9】マスト頭部に取付けるブームの配置の詳細を示
す図。
FIG. 9 is a diagram showing details of the arrangement of a boom attached to the mast head.

【図10】同じく斜視図。FIG. 10 is a perspective view of the same.

【図11】分配ブームの筋交いの持上げ及び整列に役立
つ束の詳細斜視図。
FIG. 11 is a detailed perspective view of a bundle useful for lifting and aligning the braces of a distribution boom.

【図12】分配ブーム組立て体の持上げに役立つ釣合い
装置の全体斜視図。
FIG. 12 is an overall perspective view of a balancing device useful for lifting a distribution boom assembly.

【図13】反対側ブームの場合について、本発明による
方法を実施するための装置の全体斜視図。
FIG. 13 is a general perspective view of an apparatus for carrying out the method according to the invention for the case of an opposite boom.

【図14】クレーンのマスト頭部の高い部分の詳細斜視
図。
FIG. 14 is a detailed perspective view of a high portion of the mast head of the crane.

【符号の説明】[Explanation of symbols]

2 マスト 3 固定軸 5 回転軸 6 マスト頭部 7 分配ブーム 8 反対側ブーム 9 台車 10 台車走行機構 11 荷揚ウインチ 13、111 筋交い 15 分配ブーム7の根元の要素 16 同中間要素 17 同筋交い取付け要素 18 同普通の要素 19 筋交い13の後方部分 20 同中間部分 21 同前方部分 22、32、42、43、112 長い要素 23、34、50、55、103、113、114 キ
ャップ 24、52、91、97、100、136 連接棒 25、53 握り部 26、36、39、45、47、54、64、65、7
2、73、75、85、117、118、138 軸 27、37、59、79 上側フレーム 28、60 前方支持部 29、41、61 張索軸 30、40、62 後方支持部 31、63 仮留軸 33、49、56 ほぞ 35、107 二重吊り具 38、102、106 ガセットプレート 44、74 支持部 46 吊り縄 48 束(持上げ束) 51、125 支え板 57、137 楕円形孔 58 車輪 66、67 架台 68 フック 69 組立て補助装置 70 二重固定吊り縄 71 二重固定点 76、126 釣合い装置 77、78 固定金具 80 上部鐙部 81、82 結合部 83、84 下部鐙部 86 変形防止設備 87、88 ねじ 89、90 握り部付きの軸 92、95 持上げ吊り縄 93、95 ワッシャ 94 長さ調整吊り具 104 下側フレーム 105 案内装置 106 マスト頭部6の頂部 108 梯子 109 作業台 115 フレーム 119 連結要素 120 平鉄板 123、124 スペーサ 127 釣合い装置126の中点 128 同端部 129 後方吊り縄 130、133、134、135 固定点 131、132 前方吊り縄
2 Mast 3 Fixed shaft 5 Rotating shaft 6 Mast head 7 Distributing boom 8 Opposite boom 9 Truck 10 Truck traveling mechanism 11 Lifting winch 13, 111 Bracing 15 Element at the base of distributing boom 7 16 Same intermediate element 17 Same bracing mounting element 18 Same element 19 Rear part of brace 13 Same middle part 21 Same middle part 21 Same front part 22, 32, 42, 43, 112 Long element 23, 34, 50, 55, 103, 113, 114 Cap 24, 52, 91, 97 , 100, 136 connecting rod 25, 53 grip portion 26, 36, 39, 45, 47, 54, 64, 65, 7
2, 73, 75, 85, 117, 118, 138 Shaft 27, 37, 59, 79 Upper frame 28, 60 Front support part 29, 41, 61 Tension shaft 30, 40, 62 Rear support part 31, 63 Temporary retention Shaft 33, 49, 56 Mortise 35, 107 Double lifting device 38, 102, 106 Gusset plate 44, 74 Support portion 46 Hanging rope 48 Bundle (lifting bundle) 51, 125 Support plate 57, 137 Oval hole 58 Wheel 66, 67 Stand 68 Hook 69 Assembly auxiliary device 70 Double fixed hanging rope 71 Double fixed point 76, 126 Balance device 77, 78 Fixing metal fitting 80 Upper stirrup 81, 82 Coupling 83, 84 Lower stirrup 86 Deformation prevention equipment 87, 88 screw 89, 90 shaft with grip 92, 95 lifting hoisting rope 93, 95 washer 94 length adjusting hanger 104 lower frame 1 05 Guide device 106 Top of mast head 6 108 Ladder 109 Workbench 115 Frame 119 Connecting element 120 Flat iron plate 123, 124 Spacer 127 Middle point 128 of counterbalance device 126 Same end 129 Rear suspension rope 130, 133, 134, 135 Fixed Points 131, 132 Front noose

Claims (13)

【特許請求の範囲】[Claims] 【請求項1】 一方の端部がブームの一要素(17)又
は反対側ブーム(8)に(39、117で)連接され、
最初は自由である他方の端部が、塔のマスト頭部(6)
の頂部(106)に(14、138で)仮留めによって
接続されるように設けられている固定筋交い(13、1
11)を備えた、分配ブーム(7)及び場合によっては
反対側ブーム(8)の組立てを可能にする塔式クレーン
のブームの組立て方法において、 −ブームの要素(15、16、17、18)をその筋交
い(13)とともに地上で整列させて組立てること、 −まだ地上にあるブーム(7)の筋交い(13)、及び
場合によっては反対側ブーム(8)の筋交い(111)
を持上げて整列させ、その結果、筋交い(13、11
1)の自由端部(56、122)が、マスト頭部(6)
の頂部(106)に直接仮留めのために正しく扱われる
ように、前記自由端部が、ブーム(7)又は反対側ブー
ム(8)の上方高くに配置されて保持されること、 −持上げられ整列させられて保持された筋交い(13、
111)とブーム(7)又は反対側ブーム(8)の組立
て体を持上げること、 −持上げの最後に、ブーム(7)又は反対側ブーム
(8)をマスト頭部(6)の面に当てがうこと、 −ブーム(7)又は反対側ブーム(8)を、マスト頭部
(6)の下部(5)に(12、110で)取付けるこ
と、並びに −ブーム(7)又は反対側ブーム(8)の筋交い(1
3、111)の自由端部(56、122)を、マスト頭
部(6)の頂部(106)に(14、138で)直接仮
留めすることに存することを特徴とする塔式クレーンの
ブームの組立て方法。
1. One end is connected (at 39, 117) to one element (17) of the boom or to the opposite boom (8),
The other end, which is initially free, is the mast head of the tower (6)
Fixed braces (13, 1) provided to be connected by temporary fastening (at 14, 138) to the top (106) of the
In a method for assembling a boom of a tower crane, which comprises assembling a distribution boom (7) and optionally an opposite boom (8) with 11):-elements of the boom (15,16,17,18) Assembling with the braces (13) aligned on the ground, -the braces (13) of the boom (7) still on the ground, and optionally the braces (111) of the opposite boom (8).
Lift and align, resulting in braces (13, 11
The free end (56, 122) of 1) is the mast head (6)
The free end being positioned and held high above the boom (7) or the opposite boom (8) so that it can be handled correctly for temporary tacking directly on the top (106) of the. Brace (13,
111) and lifting the boom (7) or opposite boom (8) assembly, -at the end of lifting, bring the boom (7) or opposite boom (8) against the face of the mast head (6). Rigging, -attaching the boom (7) or the opposite boom (8) to the lower part (5) of the mast head (6) (at 12,110), and-the boom (7) or the opposite boom (8). 8) Brace (1
Boom of a tower crane, characterized in that the free ends (56, 122) of (3, 111) are temporarily tacked (at 14, 138) directly to the top (106) of the mast head (6). How to assemble.
【請求項2】 移動式クレーンのような組立て補助装置
(69)を使用し、前記組立て補助装置(69)が、ま
だ地上にある筋交い(13、111)、ブーム(7)又
は反対側ブーム(8)を持上げて整列させるのにも、次
いで持上げられ整列させられて保持された筋交い(1
3、111)とブーム(7)又は反対側ブーム(8)の
組立て体の持上げを行い、マスト頭部(6)の前面に当
てがうのにも使用されることを特徴とする請求項1記載
の塔式クレーンのブームの組立て方法。
2. An assembly aid (69), such as a mobile crane, is used, which assembly aid (69) is still on the ground brace (13, 111), boom (7) or opposite boom (7). 8) Lifting and aligning, then lifting and aligning and holding the braces (1
3. 111) and boom (7) or opposite boom (8) assembly for lifting and also for applying to the front of the mast head (6). The method for assembling the boom of the tower crane described.
【請求項3】 前記方法が、同一の塔式クレーンの分配
ブーム(7)及び反対側ブーム(8)に利用されるこ
と、まず反対側ブーム(8)の組立てが行われ、次いで
分配ブーム(7)の組立てが行われることを特徴とする
請求項1又は2記載の塔式クレーンのブームの組立て方
法。
3. The method is applied to the distribution boom (7) and the opposite boom (8) of the same tower crane, the opposite boom (8) is first assembled and then the distribution boom (8). 7. The method of assembling a boom of a tower crane according to claim 1, wherein the assembly of 7) is performed.
【請求項4】 請求項1から3のいずれか1項に記載の
方法を実施する塔式クレーンのブームの組立て装置にお
いて、該装置が、一方では、分配ブーム(7)の場合に
はブームの根元の要素(15)の固定点(71)を、又
は反対側ブーム(8)の固定点(130、135)を筋
交い(13、111)の固定点(47、133、13
4)に接続し、組立て補助装置(69)のフック(6
8)に直接又は間接的に吊下げられるに適した、少なく
とも一つの吊り縄(46、70)又は吊り縄セット(1
29、131、132)を有し、他方では、持上げられ
整列させられて保持された筋交い(13、111)と分
配ブーム(7)又は反対側ブーム(8)の組立て体を持
上げられる、釣合い装置(76、126)のような吊下
げ手段を有することを特徴とする塔式クレーンのブーム
の組立て装置。
4. An apparatus for assembling a boom of a tower crane, which implements the method as claimed in claim 1, wherein the apparatus comprises, on the one hand, a boom in the case of a distribution boom (7). The fixed point (71) of the root element (15) or the fixed point (130, 135) of the opposite boom (8) is connected to the fixed point (47, 133, 13) of the brace (13, 111).
4) and hooks (6) of the auxiliary assembly device (69)
8) at least one sling (46, 70) or sling set (1) adapted to be suspended directly or indirectly
29, 131, 132) and, on the other hand, an assembly of lifted, aligned and retained brace (13, 111) and distribution boom (7) or opposite boom (8), which is lifted An apparatus for assembling a boom of a tower crane, characterized in that it has a hanging means such as (76, 126).
【請求項5】 塔式クレーンの分配ブーム(7)の組立
てのために、前記装置が、ブームの根元の要素(15)
の固定点(71)を筋交い(13)の固定点(47)に
接続する少なくとも1本の吊り縄(70)以外に、第1
の端部が筋交い(13)の固定点(47)に連接され、
一方第2の端部が、ブームの根元の要素(15)の上側
フレーム(59)に沿って移動するための支持・案内手
段をもった持上げ束(48)を有し、手段(73、7
4、75)が、束(48)を立ち上げられた位置に停止
され、該位置で前記フレーム(59)への仮留めを保証
するためにさらに設けられていることを特徴とする請求
項4記載の塔式クレーンのブームの組立て装置。
5. The device for assembling a distribution boom (7) of a tower crane comprises a boom root element (15).
Other than at least one hanging rope (70) connecting the fixed point (71) of the to the fixed point (47) of the brace (13),
Is connected to the fixed point (47) of the brace (13),
On the other hand, the second end has a lifting bundle (48) with supporting and guiding means for moving along the upper frame (59) of the element (15) at the base of the boom, the means (73, 7).
4, 75) are further provided to stop the bundle (48) in the raised position, in order to ensure a temporary fastening to the frame (59) in that position. Boom assembly device for the tower crane described.
【請求項6】 持上げ束(48)の第2の端部が、ブー
ムの根元の要素(15)の上側フレーム(59)に沿っ
て移動し、束(48)が立ち上げられた位置に達したと
きは、前記フレーム(59)によって支えられる車止め
(73、74)と接触するようになる走行車輪(58)
を支持することを特徴とする請求項5記載の塔式クレー
ンのブームの組立て装置。
6. The second end of the lifting bundle (48) moves along the upper frame (59) of the boom root element (15) to reach the position where the bundle (48) is raised. When this happens, the traveling wheels (58) come into contact with the bollards (73, 74) supported by the frame (59).
6. The boom assembly apparatus for a tower crane according to claim 5, wherein the boom assembly apparatus supports the boom.
【請求項7】 分配ブーム(7)の筋交い(13)が順
次複数の部分(19、20、21)で作られ、該部分そ
れぞれの長さが、運搬時には筋交い(13)の各部分
(19、20、21)が上に取付けられ、組立て時には
結合連接棒(24、52)によって互いに結合されるブ
ームの要素(15、16、17)の長さとほぼ対応する
ことを特徴とする請求項5又は6記載の塔式クレーンの
ブームの組立て装置。
7. The brace (13) of the distribution boom (7) is made up of a plurality of parts (19, 20, 21) in sequence, the length of each part being each part (19) of the brace (13) during transport. , 20, 21) mounted above and corresponding approximately to the length of the elements (15, 16, 17) of the boom which, when assembled, are connected to each other by a connecting connecting rod (24, 52). Or a tower crane boom assembling apparatus.
【請求項8】 前記装置が、分配ブーム(7)の上側フ
レーム(79)への二つの固定金具(77、78)をも
ったブーム持上げ釣合い装置(76)をさらに有し、前
記固定金具の一方(77)が固定長連接棒(91)を支
持し、他方(78)が、分配ブーム(7)の傾斜を修正
するために長さ調整吊り具(94)を支持することを特
徴とする請求項5から7のいずれか1項に記載の塔式ク
レーンのブームの組立て装置。
8. The device further comprises a boom lifting balancer (76) having two fastenings (77, 78) to the upper frame (79) of the distribution boom (7), the fastening of the fastenings One (77) carries a fixed length connecting rod (91) and the other (78) carries a length adjusting sling (94) to correct the tilt of the distribution boom (7). A boom assembly device for a tower crane according to any one of claims 5 to 7.
【請求項9】 固定長連接棒(91)及び長さ調整吊り
具(94)が、分配ブーム(7)の横勾配を修正するた
めに、連接棒(91)及び吊り具(94)のそれぞれ固
定金具(77、78)への仮留軸(89、90)の両側
に配置された、厚みのあるワッシャ(93、96)によ
って横方向に位置決めされることを特徴とする請求項8
記載の塔式クレーンのブームの組立て装置。
9. A fixed length connecting rod (91) and a length adjusting sling (94) are provided for each of the connecting rod (91) and sling (94) to correct the lateral slope of the distribution boom (7). 9. Thick washer (93, 96) arranged on both sides of the temporary retaining shaft (89, 90) to the fixing fitting (77, 78) for lateral positioning.
Boom assembly device for the tower crane described.
【請求項10】 長さ調整吊り具(94)が、固定金具
(78)への吊り具(94)の仮留軸(90)に一端部
で連接され、吊り具本体が、複数の仮留孔(98)、調
整連接棒(97)の仮留孔(98)を一端部で軸として
いる部品(99)、及び必要ならば部品(99)の他端
部に(101で)仮留めされる追加連接棒(100)を
有することを特徴とする請求項8又は9記載の塔式クレ
ーンのブームの組立て装置。
10. A length adjusting sling (94) is connected at one end to a temporary retaining shaft (90) of the sling (94) to a fixture (78), and the sling body has a plurality of temporary retaining hooks. A hole (98), a part (99) having the temporary retaining hole (98) of the adjusting connecting rod (97) as an axis at one end, and if necessary, temporarily fixed (at 101) to the other end of the part (99). Boom assembling device for tower cranes according to claim 8 or 9, characterized in that it has an additional connecting rod (100).
【請求項11】 固定金具(77、78)が、上部鐙部
(80)及び上部鐙部にねじ(87、88)によって取
付けられる二つの下部鐙部(83、84)でそれぞれ形
成され、前記ブーム(7)構造体の結合部(81、8
2)の両側に配置された、下部鐙部(83、84)を横
切るブーム(7)の変形防止設備(86)に係合された
軸(85)によって回転を固定されることを特徴とする
請求項8から10のいずれか1項に記載の塔式クレーン
のブームの組立て装置。
11. Fixing fittings (77, 78) are respectively formed of an upper stirrup (80) and two lower stirrup (83, 84) attached to the upper stirrup by screws (87, 88), respectively. Boom (7) Structure connection (81, 8)
Characterized in that the rotation is fixed by shafts (85) which are arranged on both sides of 2) and which are engaged with the deformation preventing equipment (86) of the boom (7) traversing the lower stirrups (83, 84). A boom crane assembling apparatus for a tower crane according to any one of claims 8 to 10.
【請求項12】 前記装置が、塔式クレーンの反対側ブ
ーム(8)を組立てるために、中点(127)が組立て
補助装置(69)のフック(68)への吊下げに役立つ
釣合い装置(126)、及び釣合い装置(126)の両
端部(128)に固定され、反対側ブーム(8)の両側
に取付けられた2組の吊り縄(129、131、13
2)を有し、前記吊り縄が、釣合い装置(126)を反
対側ブーム(8)のフレーム(115)の固定点(13
0)に接続する後方吊り縄(129)、及び二つの部分
(131、132)からなる前方吊り縄をそれぞれ有
し、前方吊り縄の一方(131)が、釣合い装置(12
6)を筋交い(111)の持上げ用に筋交い(111)
に接続し、他方(132)が、持上げられた筋交い(1
11)と反対側ブーム(8)の組立て体の持上げ用に、
筋交い(111)を反対側ブーム(8)のフレーム(1
15)の固定点(135)に接続することを特徴とする
請求項4記載の塔式クレーンのブームの組立て装置。
12. Balancing device (22), in which the midpoint (127) serves to suspend an assembly aid (69) on a hook (68) for assembling an opposite boom (8) of a tower crane. 126) and two sets of hanging ropes (129, 131, 13) fixed to both ends (128) of the balancer (126) and mounted on opposite sides of the opposite boom (8).
2), wherein the sling attaches the balancing device (126) to the fixed point (13) of the frame (115) of the opposite boom (8).
0) and a front sling rope (129) connected to each other and a front sling rope composed of two parts (131, 132), and one of the front sling ropes (131) has a balancing device (12).
Brace (111) for lifting 6) Brace (111)
The other (132) to the raised brace (1
11) For lifting the assembly of the boom (8) on the opposite side,
Connect the brace (111) to the frame (1) of the opposite boom (8).
Boom assembly device for tower cranes according to claim 4, characterized in that it is connected to a fixed point (135) of 15).
【請求項13】 孔(57、137)が、筋交い(1
3、111)の自由端部(56、122)をマスト頭部
(6)の頂部(106)に仮留めするのために設けら
れ、前記孔(57、137)が、好ましくは分配ブーム
(7)側の筋交い(13)の自由端部(56)、及び反
対側ブーム(8)側の結合連接棒(136)に設けられ
ることを特徴とする請求項4から12のいずれか1項に
記載の塔式クレーンのブームの組立て装置。
13. The holes (57, 137) have a brace (1
3, 111) are provided to temporarily fasten the free ends (56, 122) of the mast head (6) to the top (106) of the mast head (6), said holes (57, 137) preferably being on the distribution boom (7). ) Side brace (13) free end (56) and opposite boom (8) side connecting connecting rod (136). Tower crane boom assembly equipment.
JP13747694A 1993-06-22 1994-06-20 Method and apparatus for assembling a boom of a tower crane Expired - Fee Related JP3554583B2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR9307814 1993-06-22
FR9307814A FR2706882B1 (en) 1993-06-22 1993-06-22

Publications (2)

Publication Number Publication Date
JPH0710471A true JPH0710471A (en) 1995-01-13
JP3554583B2 JP3554583B2 (en) 2004-08-18

Family

ID=9448602

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13747694A Expired - Fee Related JP3554583B2 (en) 1993-06-22 1994-06-20 Method and apparatus for assembling a boom of a tower crane

Country Status (10)

Country Link
EP (1) EP0635450B1 (en)
JP (1) JP3554583B2 (en)
CN (1) CN1033634C (en)
AT (1) ATE160760T1 (en)
CZ (1) CZ153194A3 (en)
DE (1) DE69407106T2 (en)
DK (1) DK0635450T3 (en)
ES (1) ES2110723T3 (en)
FR (1) FR2706882B1 (en)
RU (1) RU2145934C1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6367153B1 (en) 1999-11-10 2002-04-09 Mitsubishi Denki Kabushiki Kaisha Method of manufacturing fuel injection valve

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2756551B1 (en) * 1996-12-03 1999-01-15 Potain Sa METHOD AND DEVICE FOR MOUNTING THE TIE RODS OF TOWER CRANE BOOMS
FR2788758B1 (en) 1999-01-27 2001-02-23 Potain Sa METHOD AND DEVICE FOR MOUNTING THE MASTER HEAD OF TOWER CRANES
CN101712439B (en) * 2009-11-27 2012-07-04 三一汽车制造有限公司 Crane transition auxiliary device, transport trailer and method for dismantling crane
CN102267671B (en) * 2010-06-04 2015-09-16 周杨 Crane arm
CN101979308B (en) * 2010-10-14 2012-02-01 长沙中联重工科技发展股份有限公司 Tower crane, pull rod structure for balance arm thereof and mounting method for structure
CN102489981B (en) * 2011-12-05 2014-03-19 中联重科股份有限公司 Aided device for installing or dismantling parts
CN103303818B (en) * 2012-03-06 2016-09-21 上海庞源机械租赁股份有限公司 A kind of form of construction work of derrick crane aerial spreading crane arm
CN102616680A (en) * 2012-04-05 2012-08-01 中联重科股份有限公司 Tower crane connecting plate and tower crane with same
CN103420283A (en) * 2012-05-18 2013-12-04 李宜君 Swing arm structure of tower crane
JP5862530B2 (en) * 2012-09-26 2016-02-16 コベルコクレーン株式会社 Guide bracket for hoisting member, method for connecting hoisting member, and method for connecting jib
US9206021B2 (en) * 2012-09-26 2015-12-08 Kobelco Cranes Co., Ltd. Crane and crane assembling method
CN103086283B (en) * 2013-01-24 2015-05-13 中联重科股份有限公司 Cargo boom and tower crane with same
CN103539023B (en) * 2013-10-29 2015-10-28 中联重科股份有限公司 The mounting structure of equilibrium arm and pull bar and tower head, installation method and tower crane
CN104030175A (en) * 2014-05-12 2014-09-10 江苏大通重工有限公司 Connection apparatus for rear-oblique pull rod of miniature tower-type hoisting machinery
DE102014016607A1 (en) * 2014-11-10 2016-05-12 Liebherr-Werk Biberach Gmbh Method for displacing a tower crane
CN104609320B (en) * 2015-01-09 2017-02-22 广州文冲船厂有限责任公司 Method for replacing hinge support bearing of crane boom
US10190268B2 (en) 2016-09-19 2019-01-29 Somero Enterprises, Inc. Concrete screeding system with boom mounted screed head
DE202017107301U1 (en) 2017-09-01 2018-12-07 Liebherr-Werk Biberach Gmbh Tower Crane
FR3114581B1 (en) * 2020-09-25 2022-12-09 Manitowoc Crane Group France Crane element forming a pivot for a component-mounted crane
CN113998604A (en) * 2021-09-22 2022-02-01 徐工集团工程机械股份有限公司建设机械分公司 Truss arm capable of being combined and enhanced and triangular truss arm unit body thereof

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1296149A (en) * 1961-06-09 1962-06-15 Foeneter S A Installation for transporting materials, possibly people, on a construction site
FR1389480A (en) * 1963-11-07 1965-02-19 Method for lifting the jib of distribution cranes and devices allowing its implementation
DK115280B (en) * 1966-05-25 1969-09-22 Edilmac Spa Tower swivel crane with a crane tower swiveling vertically.
FI44039C (en) * 1968-09-18 1971-08-10 Betonikone Ab Oy Method and apparatus for installing a self-erecting crane boom
DE8709267U1 (en) * 1987-07-04 1987-08-20 Man Ghh Logistics Gmbh, 74076 Heilbronn Tower tip of a rotating construction crane designed as a transport and assembly unit

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6367153B1 (en) 1999-11-10 2002-04-09 Mitsubishi Denki Kabushiki Kaisha Method of manufacturing fuel injection valve

Also Published As

Publication number Publication date
DE69407106D1 (en) 1998-01-15
EP0635450B1 (en) 1997-12-03
FR2706882B1 (en) 1995-08-11
FR2706882A1 (en) 1994-12-30
CZ153194A3 (en) 1995-01-18
RU2145934C1 (en) 2000-02-27
ATE160760T1 (en) 1997-12-15
RU94021633A (en) 1996-09-10
JP3554583B2 (en) 2004-08-18
DE69407106T2 (en) 1998-03-26
CN1033634C (en) 1996-12-25
CN1103378A (en) 1995-06-07
DK0635450T3 (en) 1998-08-10
ES2110723T3 (en) 1998-02-16
EP0635450A1 (en) 1995-01-25

Similar Documents

Publication Publication Date Title
JPH0710471A (en) Assembling method and equipment for boom of tower type crane
RU2587746C2 (en) Method for connection of sections of crane suspension assembly and gate unit used therein
US5622237A (en) Portable hoist system
US3433459A (en) Load handling apparatus
BRPI1001533A2 (en) MAIN FOLDING BOOM ANCHOR AND TRANSPORTABLE GORNID ANCHOR COVERS
CN104695752B (en) Rapid rush-repair Tower System and its erection method
US6663065B1 (en) Portable boom
US5704755A (en) Panel lifting hoists
RU2200699C2 (en) Method and device for mounting tension guys of tower crane load-lifting boom
US5083636A (en) Climbing safety net
JP4349604B2 (en) Derrick device for top work of transmission tower
JPH08311817A (en) Bridge erection device
JP2002507530A (en) Ring lift crane
JP3973215B2 (en) Steel tower-mounted base bar device and its assembly method
CN216807878U (en) Jacket ceiling hoisting device
CN105883645B (en) The method for dismounting of tower crane attachment device
JPH02182695A (en) Jib connecting device to extension boom top end
JPH0722452Y2 (en) Stand type column tool
JPH0328066Y2 (en)
JPH09227069A (en) Hung-moving method and device therefor
JPH0111670Y2 (en)
JP3008431U (en) Hanging jig for wall joint material
JP3779510B2 (en) Heavy lifting
WO2023206967A1 (en) Trolley and tower crane
JP3889521B2 (en) Pile driver and its work floor mounting method

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040413

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040510

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees