JPH0689528B2 - Girder construction method and its equipment - Google Patents

Girder construction method and its equipment

Info

Publication number
JPH0689528B2
JPH0689528B2 JP15272990A JP15272990A JPH0689528B2 JP H0689528 B2 JPH0689528 B2 JP H0689528B2 JP 15272990 A JP15272990 A JP 15272990A JP 15272990 A JP15272990 A JP 15272990A JP H0689528 B2 JPH0689528 B2 JP H0689528B2
Authority
JP
Japan
Prior art keywords
girder
tower
suspension
rear tower
traveling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP15272990A
Other languages
Japanese (ja)
Other versions
JPH0447011A (en
Inventor
和男 浜本
聖司 谷口
Original Assignee
盟和工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 盟和工業株式会社 filed Critical 盟和工業株式会社
Priority to JP15272990A priority Critical patent/JPH0689528B2/en
Publication of JPH0447011A publication Critical patent/JPH0447011A/en
Publication of JPH0689528B2 publication Critical patent/JPH0689528B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、鉄橋又は高速道路若しくは陸橋等の建設工事
における、桁架設工法及びその装置に関するものであ
り、その目的とするところは、隣接する障害物の間にお
ける狭い場所での桁架設工事を安全確実に行えるように
したものである。
Description: TECHNICAL FIELD The present invention relates to a girder construction method and an apparatus therefor in a construction work such as an iron bridge, an expressway or an overpass, and the purpose thereof is adjacent to each other. The girder erection work in a narrow space between obstacles can be performed safely and reliably.

〔従来の技術〕[Conventional technology]

例えば、既設鉄道における高架レールの敷設替え工事を
行う場合、本出願人は先に特公昭57-32162号において、
桁架設装置の発明を提供した。
For example, in the case of performing the replacement work of the elevated rail on the existing railway, the applicant previously described in Japanese Patent Publication No. 57-32162
An invention of a girder erection device has been provided.

上記の発明は、間隔をおいた橋脚上に架設される手延機
の一端に前部タワーを一体に取付け、この前部タワーと
後方に間隔をおいて起設される後部タワーとに渉りガー
ダーを油圧装置でもって昇降自在に架設し、ガーダーに
は、それに沿って転動する走行機を設置するとともに走
行機には脚柱間に位置する橋桁を吊掛ける吊具をガーダ
ー下方に吊下げてなるものである。
In the above invention, the front tower is integrally attached to one end of the hand laying machine installed on the piers at intervals, and the front tower and the rear tower that is erected at a distance behind the tower are crossed. The girder is erected vertically using a hydraulic system, and the girder is equipped with a traveling machine that rolls along with it, and the traveling equipment is hung below the girder with hanging equipment that suspends the bridge girder located between the pillars. It will be.

これによって、前部タワーと後部タワーとに渉り架設さ
れたガーダーに沿う走行機及び吊具によって左右の脚柱
間の橋桁を順次前方へ引出すことができる。従って、橋
桁の引出し工程が円滑に行われると共に、橋桁を手延機
に固定する連結構造が不要となり、PC桁の引出しに特に
有効でその作業を簡便に行うことができる効果を有して
いる。
With this, the bridge girder between the left and right pedestals can be sequentially drawn out forward by the traveling machine and the suspension along the girder that is laid across the front tower and the rear tower. Therefore, the process of drawing out the bridge girder can be performed smoothly, and the connecting structure for fixing the bridge girder to the hand extender is not required, which is particularly effective for drawing out the PC girder and has the effect that the work can be performed easily. .

〔発明が解決しようとする課題〕[Problems to be Solved by the Invention]

前記の桁架設装置は、後部タワーの門型を成す左右両側
の脚柱の内側を桁が移動する構造であるから、設置場所
が比較的広い場合での使用には好適であるが、例えば既
設の鉄道において、レールの敷設替え工事を行う場合、
上り線と下り線の隣接するレール間の狭い場所におい
て、レールを敷設するには、前記桁架設装置は左右の脚
柱間の横幅が張出しすぎて走行する電車に接触して危険
であり、狭い場所での工事には使用できない場合があ
る。
Since the girder erection device has a structure in which the girder moves inside the pedestals on the left and right sides forming the gate type of the rear tower, it is suitable for use when the installation place is relatively wide. In the case of rail replacement work on
In order to lay a rail in a narrow space between adjacent rails on an up line and a down line, the girder erection device is dangerous because the lateral width between the left and right pedestals is too overhang and it may contact a train running. May not be used for construction at location.

〔課題を解決する手段〕[Means for solving the problem]

そこで、上記の従来技術の課題を解決し、且つ発明の目
的を達成するために、桁だけが移動設置できる程度の狭
い場所においても据付けて工事ができる桁架設工法及び
その装置を提供するものである。
Therefore, in order to solve the above-mentioned problems of the prior art and to achieve the object of the invention, there is provided a girder erection method and an apparatus thereof that can be installed and constructed even in a narrow place where only the girder can be moved and installed. is there.

本発明の第1は、桁架設工法において、桁の横幅より外
方に出っ張らない幅に設定した門構型前部タワーと後部
タワーの間に扛上及び扛下調節できる吊りガーダーを渡
して横架させ、その前部タワーに手延機を設け、且つ前
後部のタワーを橋脚上に配置し、その吊りガーダーの直
下において、台車に載置して前進移動させた桁が後部タ
ワーに接近したときに一旦停止し、後部タワーを桁高さ
よりやや上方に扛上させた後、その桁を後部タワーの脚
端と橋脚上に配置した走行ガーダーに形成した空間を移
動させ、桁が後部タワーを通過した後、当該後部タワー
を元の位置まで扛下させて接地し、次いで吊りガーダー
に長尺ねじ棒形の吊具で桁を吊下支持して走行ガーダー
から離反させてから、走行ガーダーを手延機を介して前
方に移動させた後、桁を吊りガーダーと共に扛下させて
橋脚上に設置し、吊具を除去してなるものである。
A first aspect of the present invention is, in a girder erection method, passing a hanging girder that can be lifted and lowered between a gate-structured front tower and a rear tower that is set to a width that does not project outside the lateral width of the girder. A girder was installed on the front tower, and a front and rear towers were installed, and the front and rear towers were placed on the pier, and the girder, which was placed on the trolley and moved forward just under the suspension girder, approached the rear tower. Sometimes after stopping once, the rear tower was lifted slightly above the girder height, and then the girder was moved through the space formed on the leg ends of the rear tower and the traveling girders placed on the bridge piers, and the girder moved up the rear tower. After passing, lower the rear tower to the original position and ground it, then suspend and support the girder with a long threaded rod-shaped suspender and separate it from the traveling girder, then move the traveling girder. After moving forward through the hand lathe By 扛下 with hanging digit girders placed on piers, it is made by removing the load block.

本発明の第2は、桁架設装置において、所定の間隔をお
いた橋脚上に架設される手延機の基端に門構型前部タワ
ーを一体に連結し、その前部タワーと所定の間隔を保持
して立設した門構型後部タワーとに扛上及び扛下調節が
できる吊りガーダーを横架し、前記の前後部タワーの横
幅を桁の横幅より外方に出っ張らないように設定し、そ
の吊りガーダーに桁を吊下支持するための長尺ねじ棒形
の吊具を設け、台車に載置して移動する桁が後部タワー
を通過するときに後部タワーの脚端を桁高さより多少上
方に扛上させるジャッキを後部タワーに内蔵し、桁の通
過後に元の位置に扛下して接地するように構成したもの
である。
A second aspect of the present invention is, in a girder erection device, a gate-structured front tower is integrally connected to a base end of a hand laying machine erected on bridge piers at predetermined intervals, and the front tower and a predetermined tower are connected to each other. A suspension girder that can be lifted and lowered can be installed horizontally across a gate-structured rear tower that is installed upright with a certain distance, and the width of the front and rear towers is set so that it does not project outside the width of the girder. The suspension girder is provided with a long-threaded rod-shaped suspension for suspending and supporting the girder, and when the girder that is placed on the trolley and moves past the rear tower, the leg ends of the rear tower are raised. The jack that lifts up a little higher than that is built into the rear tower, and it is configured to be lowered to the original position after passing the girder to be grounded.

〔作用〕[Action]

上記の手段に基づく作用は次のとおりである。まず、予
め桁を架設しようとする橋脚間及びその一基先の橋脚と
の間に走行ガーダーを移動して渡架される。
The operation based on the above means is as follows. First, the traveling girder is moved and bridged between the piers where the girders are to be erected in advance and between the piers ahead of the piers.

次いで、吊ガーダーを横架した前部タワーと後部タワー
が、手延機の前進移動に伴って桁を架けようとする橋脚
間まで前進移動して停止する。このとき吊ガーダーの後
部は台車によって支受されながら移動する。
Then, the front tower and the rear tower on which the hanging girder is placed horizontally move forward to the space between the piers on which the girder is going to be mounted and stop as the handrailer moves forward. At this time, the rear part of the hanging girder moves while being supported by the carriage.

続いて、吊ガーダーを扛上させておき、予め橋脚上に設
置してある既設の桁に沿って走行する台車に桁を乗せ、
これを前方に移動させて行き、後部タワーの接近したと
きにその桁を一旦停止させる。次に、桁上に乗せた仮受
台車に吊ガーダーの後部を支受させた後、後部タワー内
蔵のジャッキによって前記吊ガーダーを足場にして後部
タワーの脚端を台車上における桁最高部の高さより多少
上方まで打上させた後、ジャッキ支持部材と後部タワー
の脚柱とを軸で結合して位置決めしておき、この状態に
おいて、既設の桁ないし走行ガーダーと後部タワーの脚
端の間を台車上の桁がさらに前進して目的の橋脚間の位
置まで移動してから停止させる。
Then, lift the hanging girder, put the girder on the trolley that runs along the existing girder installed in advance on the pier,
Move it forward and stop the girder when the rear tower approaches. Next, after the rear part of the hanging girder is supported by the temporary carrier mounted on the girder, the lifting girder is used as a scaffold by the jack built into the rear tower, and the leg end of the rear tower is raised to the highest part of the girder on the bogie. After launching a little above, the jack support member and the pedestal of the rear tower are connected by a shaft and positioned, and in this state, the carriage between the existing girder or traveling girder and the leg end of the rear tower. The upper girder moves forward to the desired position between the piers, and then stops.

前記の桁が後部タワーを完全に通過した後、その後部タ
ワーを、その内蔵ジャッキで吊ガーダーを足場にして扛
下し、脚端を元の位置に接地して据付けを行う。
After the above-mentioned girder has completely passed through the rear tower, the rear tower is hung with its built-in jack using the hanging girder as a scaffold, and the leg ends are grounded to the original position for installation.

このとき、吊ガーダーを若干扛上して位置決めを行うこ
とによって仮受台車を撤去した後、長尺ねじ棒形の吊具
を吊ガーダーに掛止し、その下端部位を桁に取付けて吊
下支持し、且つ吊ガーダーを多少扛上させて前記桁を走
行ガーダーから離反させる。
At this time, after lifting the suspension girder a little and positioning it to remove the temporary carrier, suspend the long threaded rod-shaped suspension on the suspension girder and attach the lower end part to the girder to suspend it. The girder is supported and lifted up a little to separate the girder from the running girder.

次いで、走行ガーダーを手延機に沿い、且つローラー機
構を介してさらに前進移動しさせ、その先端部を前位の
橋脚に渡架させると、吊ガーダーに吊下支持された桁直
下に位置していた走行ガーダーが移動除去される。そこ
で、吊ガーダーを扛下すると、桁が隣合う橋脚上に設置
され、吊具を外すことによって1工程が終了する。
Then, the traveling girder was moved further forward along the handcuff and through the roller mechanism, and the tip of the traveling girder was placed on the front pier. The running girder that had been used is removed. Then, when the suspension girder is lowered, the girders are installed on the adjacent piers, and one step is completed by removing the suspension.

〔実施例〕〔Example〕

上記の手段に基づく実施例を図面を以て説明する。 An embodiment based on the above means will be described with reference to the drawings.

第1図は本発明に係る桁架設装置の概略正面図、第2図
は前部タワー省略して内部を示した第1図の1−1線に
沿う側面図、第3図は第1図の3−3線に沿う側面図、
第4図は後部タワーを上昇させ、PC桁をそのタワー下端
直下を通過させている状態を示す正面図、第5図は第4
図の5−5線に沿う側面図、第6図は第4図の6−6線
に沿う側面図、第7図は第4図の7−7線に沿う側面
図、第8図は第4図の8−8線に沿う側面図、第9図〜
第16図は桁架設工程を示す概略側面図、第17図は第13図
の17-17線に沿う側面図、第18図は第13図の18-18線に沿
う側面図、第19図は第13図の19-19線に沿う側面図であ
る。
FIG. 1 is a schematic front view of a girder erection device according to the present invention, FIG. 2 is a side view taken along the line 1-1 of FIG. 1 in which the front tower is omitted and the inside is shown, and FIG. 3 is FIG. Side view along line 3-3 of
Fig. 4 is a front view showing a state where the rear tower is raised and the PC girder is passed just below the lower end of the tower, and Fig. 5 is a front view.
5 is a side view taken along line 5-5 in FIG. 6, FIG. 6 is a side view taken along line 6-6 in FIG. 4, FIG. 7 is a side view taken along line 7-7 in FIG. 4, and FIG. 4 is a side view taken along line 8-8 of FIG. 4, FIG.
FIG. 16 is a schematic side view showing a girder erection process, FIG. 17 is a side view taken along line 17-17 of FIG. 13, FIG. 18 is a side view taken along line 18-18 of FIG. 13, and FIG. FIG. 19 is a side view taken along the line 19-19 in FIG.

図において、1は前部タワー、2は後部タワー、3は手
延機であって、その基端を前部タワー1に一体的に連結
してある。4は前部タワー1と後部タワー2とに渡して
横架した吊ガーダー、5は手延機3を介して橋脚上を前
進又は後退移動する走行ガーダー、6は走行ガーダーに
敷設したレール上を走行する台車、7は前後に適宜の間
隔をおいて配置した台車6の上に乗せて移動させる敷設
用のPC桁、8は前記のPC桁を吊ガーダー4の直下位置に
おいて吊下支持するための長尺ねじ棒形の吊具であっ
て、吊ガーダー4に垂下掛止してある。
In the figure, 1 is a front tower, 2 is a rear tower, and 3 is a hand laying machine, the base end of which is integrally connected to the front tower 1. 4 is a hanging girder that is horizontally extended across the front tower 1 and the rear tower 2, 5 is a traveling girder that moves forward or backward on the pier via a hand-drawing machine 3, and 6 is on a rail laid on the traveling girder. A traveling bogie, 7 is a laying PC girder that is moved by placing it on a dolly 6 arranged at appropriate intervals in the front and rear, and 8 is for suspending and supporting the PC girder at a position directly below the hanging girder 4. This is a long-threaded rod-shaped hanger, which is suspended from the hanging girder 4.

9はPC桁7の上を走行して吊ガーダー4を支受する仮受
台車、10は橋脚を示し、鉄道における隣合う上り電車T
と下り電車T′の比較的狭い間隔W″に起立構築されて
いる。11は手延機3に設けたローラー機構であり、走行
ガーダー5が前進してきたときに安定して支受し且つ案
内する役割を果たしている。12は前後のタワー1・2を
扛上又は扛下させるために、各タワーに内蔵したセンタ
ーホールジャッキを可とするジャッキであり、脚端11・2
1が台車6に乗せたPC桁の最高部の高さより多少上方に
達するまで扛上できるようになっている。
9 is a temporary trolley which runs on the PC girder 7 and supports the hanging girder 4, 10 is a bridge pier, and the adjacent up train T on the railway
And a standing train at a relatively narrow distance W ″ between the down train T ′. Reference numeral 11 denotes a roller mechanism provided on the hand stretcher 3, which stably supports and guides when the traveling girder 5 moves forward. 12 is a jack that allows a center hole jack built in each tower to lift or lower the front and rear towers 1 and 2, and leg end 1 1 and 2
1 is enabled to jack up until a little above the level of the highest portion of the PC digits placed on carriage 6.

13・14は左右の脚柱間に所定の間隔をおいて配置した横
梁部材であり、その左右端部を脚柱の腹板15・16に摺動
できるように沿わせ、上部の横梁部材13は脚柱に固定
し、下部の横梁部材14は脚柱にたいして上下摺動できる
ようにし、且つ下部の横梁部材14の左右端部に孔17をあ
けておき、また脚柱の側面にも孔18をあけておき、結合
軸19で下部の横梁部材14を脚柱に位置決めできるように
なっている。
Reference numerals 13 and 14 denote horizontal beam members arranged at a predetermined interval between the left and right pedestals. The left and right ends of the horizontal beam members are slidably aligned with the abdominal plates 15 and 16 of the pedestal, and the upper horizontal beam member 13 is provided. Is fixed to the pedestal, the lower cross beam member 14 is allowed to slide up and down with respect to the pedestal, holes 17 are formed in the left and right end portions of the lower cross beam member 14, and holes 18 are also formed in the side surfaces of the pedestal. The lower horizontal beam member 14 can be positioned on the pedestal with the connecting shaft 19 open.

前部タワー1及び後部タワー2は、その脚柱にH型鋼材
料を用いて門構型を成し、その横幅WがPC桁7の横幅W
より外方に出っ張らないように設定してある。
The front tower 1 and the rear tower 2 form a gate structure using an H-shaped steel material for the pedestal, and the width W is the width W of the PC girder 7.
It is set so that it does not stick out further.

この場合、前記の後部タワー2は、第4図及び第7・8
図示のようにPC桁7及びその上に位置させた仮受台車9
を介して支受される吊ガーダー4をジャッキ12の足場に
して扛上又は扛下するようになっている。
In this case, the rear tower 2 is shown in FIGS.
As shown in the figure, the PC girder 7 and the temporary carrier 9 positioned above it
The hanging girder 4 supported via the above is used as a scaffold for the jack 12 to lift or lower.

手延機3は、隣合う橋脚10・10の間隔Sに渡架できる長
さに骨組みした鉄骨枠形であって、前記橋脚の間隔Sに
応じた長さに設定され、且つ内部に走行ガーダー5を安
定に案内するためのローラー機構11が設けられている。
The hand stretcher 3 is a steel frame shape framed to a length that allows it to be bridged over the interval S between the adjacent piers 10, and is set to a length corresponding to the interval S between the piers and has a traveling girder inside. A roller mechanism 11 for stably guiding 5 is provided.

吊ガーダー4は、前後部の門構型タワー1・2の内側に
配置して横架され、且つ各タワーの高さ方向に対して上
下動調節ができるように設定されている。また、その吊
ガーダーの長さ方向の両端部位に吊具を垂下掛止する挿
通孔41・41が設けられている。
The hanging girders 4 are arranged inside the front and rear gate-structured towers 1 and 2 and are laterally suspended, and are set so that vertical movement can be adjusted in the height direction of each tower. In addition, insertion holes 41 are provided at both end portions in the length direction of the hanging girder so as to suspend and suspend the hanging tool.

走行ガーダー5は、全長Lが隣合う橋脚間隔Sの2倍の
長さに設定し、前記の手延機3のローラー機構11によっ
て円滑に前進又は後退できるような構造になっている。
The traveling girder 5 has a structure in which the total length L is set to be twice as long as the interval S between adjacent piers and can be smoothly moved forward or backward by the roller mechanism 11 of the hand-drawing machine 3.

台車6は、走行ガーダー5の長さ方向の平面に敷設した
レール上を走行するものであり、PC桁7の前後部位を支
受して目的の橋脚間まで移動させるもので役割をもって
いる。
The trolley 6 travels on a rail laid on a plane in the lengthwise direction of the traveling girder 5, and supports the front and rear parts of the PC girder 7 to move it between the desired piers.

PC桁7は、その長さ方向の両端部位に前記吊ガーダー4
の孔41・41に対峙する吊具用の孔71・71があけられてい
る。
The PC girder 7 has the hanging girder 4 at both end portions in its length direction.
There are holes 71, 71 for the hanging tool facing the holes 41, 41 of the.

吊具8は、ゲビンデスターブと称するものを用いもの
で、長尺ねじ棒の上端部位を吊ガーダー4に長さ調節機
構81を介して掛止させ、下端部位をPC桁の孔71に通して
適宜の止め具で吊下支持するようになっている。
The suspending tool 8 uses what is called a Gevin disturb, and the upper end part of the long screw rod is hooked on the hanging girder 4 via the length adjusting mechanism 81, and the lower end part is passed through the hole 71 of the PC girder. It is designed to be suspended and supported by an appropriate stopper.

仮受台車9は、前記の台車6と略同形同大のものを用
い、これをPC桁7の上に置き、その仮受台車に吊ガーダ
ー4を支受するようになっている。
The temporary carrier 9 is of substantially the same shape and size as the above-mentioned carrier 6, and is placed on the PC girder 7, and the hanging girder 4 is supported on the temporary carrier.

〔具体的な工程例〕[Specific process example]

次に上記の実施例に基づく桁の具体的な架設工程例は次
の通りである。
Next, a concrete example of the erection process of the girder based on the above embodiment is as follows.

まず、予めPC桁7を架設しようとする橋脚10・10の間隔
S及びその一橋脚前方の橋脚10′に走行ガーダー5を渡
架しておき、次いで、PC桁7の横幅Wより出っ張らない
ように設定されている門構型の前部タワー1及び後部タ
ワー2とに吊りガーダー4を渡して扛上・扛下できるよ
うに横架させ、且つその吊ガーダーの後部を台車6に支
受させてから、手延機3を走行ガーダー5に沿って前進
させると、前後部のタワー1・2及び吊ガーダー4も一
緒に前進移動する。
First, the traveling girder 5 is installed in advance on the space S between the piers 10 and 10 on which the PC girder 7 is to be erected and the pier 10 'in front of the pier, and then the width W of the PC girder 7 should not be overhanged. The suspension girder 4 is passed over the front tower 1 and the rear tower 2 of the gate structure set in the above so that the suspension girder can be raised and lowered horizontally, and the rear part of the suspension girder is supported by the carriage 6. After that, when the hand stretcher 3 is moved forward along the traveling girder 5, the front and rear towers 1 and 2 and the hanging girder 4 also move forward.

そして前後部のタワー1・2を目的の橋脚10・10間に位
置した所で停止させ、次いで吊ガーダー4を扛上させた
後、予め橋脚上に設置した既設のPC桁の平面に敷設した
レールに沿って走行する台車6に乗せたPC桁7を前方に
移動させて行き、後部タワー2に接近したときに、その
PC桁7を一旦停止させ、且つPC桁上に乗せた仮受台車9
に吊ガーダー4を支受させた後、後部タワー2のジャッ
キ12を扛上作動させる。これによって、後部タワー2に
対して摺動する下部の横梁部材14が、前記の吊ガーダー
4を足場にして後部タワー2を扛上させると、その脚端
21を台車上におけるPC桁7の最高部の高さより多少上方
まで扛上する。このとき、下部の横梁部材13と後部タワ
ーの脚柱にあけた孔17・18に結合軸19を通して位置止決
めしておくものとする。
Then, the front and rear towers 1 and 2 were stopped at a position located between the desired piers 10 and 10, and then the suspension girder 4 was lifted up, and then laid on the plane of the existing PC girder installed on the pier in advance. When the PC girder 7 on the carriage 6 traveling along the rail is moved forward and approaches the rear tower 2, the
Temporary trolley 9 with the PC girder 7 stopped and placed on the PC girder
After the suspension girder 4 is supported by the above, the jack 12 of the rear tower 2 is lifted. As a result, when the lower cross beam member 14 sliding on the rear tower 2 lifts the rear tower 2 using the hanging girder 4 as a scaffold, its leg ends
Raise 2 1 a little above the height of the PC girder 7 on the dolly. At this time, it is assumed that the lower cross beam member 13 and the holes 17 and 18 formed in the pedestal of the rear tower are passed through the connecting shaft 19 to be positioned.

この状態で台車上のPC桁7をさらに前進させて目的の橋
脚10・10間の位置で停止させる。
In this state, the PC girder 7 on the bogie is moved further forward and stopped at the desired position between the piers 10 and 10.

この状態で、後部タワー2を、その内蔵ジャッキ12で吊
ガーダー4を足場にして扛下して脚端21を元の位置に接
地させる。そして、吊ガーダー4を多少上昇させてから
仮受台車9を撤去した後、長尺ねじ棒形の吊具8を吊ガ
ーダー4の孔41に挿通して掛止し、その下端部位を桁の
孔71に通して適宜の止め具で取付け、適宜長さ調節機構
81で調節しながら吊下支持し、且つ吊ガーダー4を多少
扛上した後、固定して走行ガーダー5から離反させる。
In this state, the rear tower 2, to ground the foot end 2 1 and扛下to the girder 4 hanging by its internal jack 12 to the scaffold to the original position. Then, after lifting the hanging girder 4 a little and removing the temporary carrier 9, the long-threaded rod-shaped hanger 8 is inserted into the hole 41 of the hanger girder 4 and hooked, and the lower end part of the girder 4 is fixed. Through the hole 71, attach with an appropriate stopper, and adjust the length appropriately.
The suspension girder 4 is adjusted while being adjusted by 81, and the suspension girder 4 is lifted to some extent, then fixed and separated from the traveling girder 5.

次いで、走行ガーダー5を手延機3に沿い、そのローラ
ー機構11をを介して前進移動し、その先端部をさらに前
方の橋脚10″に渡架させると、吊ガーダー4で吊下支持
されたPC桁7の直下に位置していた走行ガーダー5の後
半部が移動除去され、橋脚10・10間に空間が形成され
る。そこで、吊ガーダー4を扛下してPC桁7を隣合う橋
脚10の上に、且つ既設の桁7′と隣接して設置され、吊
具8を取外すことによって1工程が終了する。
Next, the traveling girder 5 was moved forward along the handcuffing machine 3 through the roller mechanism 11 thereof, and the tip end thereof was further bridged to the front pier 10 ″, and was suspended and supported by the suspension girder 4. The rear half of the traveling girder 5 located directly below the PC girder 7 is moved and removed to form a space between the piers 10 and 10. Therefore, the suspension girder 4 is lowered to adjoin the PC girder 7 to the adjacent pier. It is installed on top of 10 and adjacent to the existing girder 7 ', and one step is completed by removing the hanger 8.

〔発明の効果〕〔The invention's effect〕

本発明は上記の構成であるから、特に鉄道における高架
レールの敷設替え工事において、ゆとりのない間隔で隣
接する上り電車と下り電車がすれ違う狭い場所で桁を架
設するのに、従来のように後部タワーの門構型の内側を
通過させる代わりに、後部タワーの左右両側脚柱部と略
同じ横幅であることにより、その脚端を扛上して空間を
形成し、その空間部位に桁を通過させることによって当
該タワーの横幅を大幅に縮小することができるから、相
当に狭い場所においても、門構型タワーを用いることが
できて、作業が能率的であり、且つ安全に行え、而も工
期の短縮化及びコストの低減を図ることができる。
INDUSTRIAL APPLICABILITY Since the present invention has the above-described configuration, particularly in the work of replacing an elevated rail in a railway, it is necessary to construct a girder in a narrow space where adjacent up trains and down trains pass each other at a space without a space, and a rear portion is provided as in the conventional case. Instead of passing inside the gate structure of the tower, it has a width that is approximately the same as the left and right pedestal parts of the rear tower, so that the leg ends are lifted to form a space and the girder passes through that space part. By doing so, the width of the tower can be greatly reduced, so that the gate-structured tower can be used even in a considerably narrow place, the work is efficient and safe, and Can be shortened and cost can be reduced.

【図面の簡単な説明】[Brief description of drawings]

図面は、本発明に係る桁架設装置の実施例を示すもの
で、第1図は本発明に係る桁架設装置の概略正面図、第
2図は前部タワー省略して内部を示した第1図の1−1
線に沿う側面図、第3図は第1図の3−3線に沿う側面
図、第4図は後部タワーを上昇させ、PC桁をそのタワー
下端直下を通過させている状態を示す正面図、第5図は
第4図の5−5線に沿う側面図、第6図は第4図の6−
6線に沿う側面図、第7図は第4図の7−7線に沿う側
面図、第8図は第4図の8−8線に沿う側面図、第9図
〜第16図は桁架設工程を示す概略側面図、第17図は第13
図の17-17線に沿う側面図、第18図は第13図の18-18線に
沿う側面図、第19図は第13図の19-19線に沿う側面図で
ある。 1……前部タワー 2……後部タワー 3……手延機 4……吊ガーダー 5……走行ガーダー 6……台車 7……PC桁 8……吊具 9……仮受台車 10……橋脚 11……手延機のローラー機構 12……ジャッキ
The drawings show an embodiment of the girder erection device according to the present invention. FIG. 1 is a schematic front view of the girder erection device according to the present invention, and FIG. 1-1 of the figure
Fig. 3 is a side view taken along the line, Fig. 3 is a side view taken along the line 3-3 in Fig. 1, and Fig. 4 is a front view showing a state in which the rear tower is raised and the PC girder is passed directly under the lower end of the tower. 5 is a side view taken along line 5-5 in FIG. 4, and FIG. 6 is 6- in FIG.
6 is a side view taken along line 6, FIG. 7 is a side view taken along line 7-7 of FIG. 4, FIG. 8 is a side view taken along line 8-8 of FIG. 4, and FIGS. Figure 17 is a schematic side view showing the installation process.
FIG. 17 is a side view taken along the line 17-17, FIG. 18 is a side view taken along the line 18-18 in FIG. 13, and FIG. 19 is a side view taken along the line 19-19 in FIG. 1 …… Front tower 2 …… Rear tower 3 …… Hand spreading machine 4 …… Suspending girder 5 …… Running girder 6 …… Bogie 7 …… PC girder 8 …… Suspension tool 9 …… Temporary receiving cart 10 …… Bridge pier 11 …… Roller mechanism of hand-rolling machine 12 …… Jack

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】桁の横幅より外方に出っ張らない幅に設定
した門構型前部タワーと後部タワー間に吊りガーダーを
渡して横架させ、その前部タワーに手延機を設け、且つ
前後部のタワーを橋脚上に配置し、その吊りガーダーの
直下において、台車に載置して前進移動させた桁が後部
タワーの位置まで接近したときに一旦停止し、後部タワ
ーを桁高さよりやや上方まで扛上させた後、その台車上
の桁を後部タワーの脚端と橋脚上に載置した走行ガーダ
ーの間を移動させ、後部タワー部位を通過した後、当該
後部タワーを元の位置まで扛下させ、次いで吊りガーダ
ーに掛止した長尺ねじ棒形の吊具で桁を吊下支持して走
行ガーダーから離反させてから、走行ガーダーを手延機
を介して前方に移動させた後、桁を吊りガーダーと共に
扛下させて橋脚上に設置し、吊具を除去したことを特徴
とする桁架設工法。
1. A suspension girder is passed between a gate-structured front tower and a rear tower, which is set to a width that does not extend beyond the lateral width of the girder, and is suspended horizontally, and a handcuffer is provided in the front tower. The front and rear towers are placed on the pier, and immediately below the suspension girder, the girder placed on the trolley and moved forward stops when the girder approaches the position of the rear tower, and the rear tower is slightly above the girder height. After raising it to the upper part, move the girder on the trolley between the leg end of the rear tower and the traveling girder placed on the bridge pier, and after passing the rear tower part, return the rear tower to its original position. After suspending the girder, and then suspending the girder by suspending it from the traveling girder with a long threaded rod-shaped suspension hung on the suspension girder, and then moving the traveling girder forward through the hand extender. , Hang the girder together with the hanging girder on the pier Digit erection construction method installed, characterized in that the removal of the load block.
【請求項2】所定の間隔をおいた橋脚上に架設される手
延機の基端に門構型前部タワーを一体に連結し、その前
部タワーと所定の間隔を保持して立設した門構型後部タ
ワーとに扛上及び扛下調節ができる吊りガーダーを横架
し、前記の前後部タワーの横幅を桁の横幅より外方に出
っ張らないように設定し、その吊りガーダーに桁を吊下
支持するための長尺ねじ棒形の吊具を設け、台車に載置
して移動する桁が後部タワーを通過するときに後部タワ
ーの脚端を桁高さより多少上方に扛上させるジャッキを
後部タワーに内蔵し、桁の通過後に元の位置に扛下して
接地するように構成したことを特徴とする桁架設装置。
2. A gate-structured front tower is integrally connected to a base end of a hand laying machine erected on a bridge pier at a predetermined distance, and is erected while maintaining a predetermined distance from the front tower. A hanging girder that can be lifted and lowered is horizontally installed on the gate type rear tower, and the width of the front and rear towers is set so that it does not project outside the width of the girder. A long threaded rod-shaped hanger for suspending and supporting the tower is provided, and when the girder that moves on the trolley passes through the rear tower, the leg ends of the rear tower are lifted slightly above the girder height. A girder erection device, characterized in that a jack is built in the rear tower, and the girder is constructed so that it is grounded after passing through the girder.
JP15272990A 1990-06-13 1990-06-13 Girder construction method and its equipment Expired - Lifetime JPH0689528B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15272990A JPH0689528B2 (en) 1990-06-13 1990-06-13 Girder construction method and its equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15272990A JPH0689528B2 (en) 1990-06-13 1990-06-13 Girder construction method and its equipment

Publications (2)

Publication Number Publication Date
JPH0447011A JPH0447011A (en) 1992-02-17
JPH0689528B2 true JPH0689528B2 (en) 1994-11-09

Family

ID=15546884

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15272990A Expired - Lifetime JPH0689528B2 (en) 1990-06-13 1990-06-13 Girder construction method and its equipment

Country Status (1)

Country Link
JP (1) JPH0689528B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008303657A (en) * 2007-06-08 2008-12-18 Meiwa Kogyo Kk Girder installation apparatus and girder installation carriage

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030070215A (en) * 2002-02-21 2003-08-29 박창희 apparatus for lifting using a construction or disjoint of bridge and a method of construction using the same
KR100721667B1 (en) * 2006-05-25 2007-05-23 삼성물산 주식회사 Construction method for girder in bridge and crane for pulling up girder, vehicle for carriage girder, girder used for the same
JP6144964B2 (en) * 2013-05-21 2017-06-07 鹿島建設株式会社 Temporary structure, fixing method, receiving girder for temporary structure, and laying girder for temporary structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008303657A (en) * 2007-06-08 2008-12-18 Meiwa Kogyo Kk Girder installation apparatus and girder installation carriage

Also Published As

Publication number Publication date
JPH0447011A (en) 1992-02-17

Similar Documents

Publication Publication Date Title
US3490605A (en) Traveling beam for the production of bridge sections
US3571835A (en) Apparatus for concreting multiple section structures, particularly bridge supports of reinforced or prestressed concrete
CZ280342B6 (en) Machine for preparing welding on a track
JPH0841828A (en) Bridge girder erection equipment
CN207567659U (en) Double-T shaped beam bridge changes beam construction system
CN104110002B (en) A kind of method for changing steel truss girder bridge floorings
JP3177904B2 (en) Mobile work vehicle for PC cable-stayed bridge
CN206784172U (en) Overpass anti-collision wall formwork hoisting conveyance
CN107604825B (en) The bridging method of T-type beam bridge
CN106800245B (en) A kind of floorings lifting hanger, hanging apparatus and hanging method
JPH0689528B2 (en) Girder construction method and its equipment
CN111705682A (en) Construction method and equipment for removing and rebuilding superstructure of widened bridge across electrified railway
JP2539150B2 (en) Bridge erection equipment
CN105239515A (en) Device and method for bracket installation of railway protective scaffolding in combined highway and railway bridge
CN113215978B (en) Construction method for laying pipeline along with bridge
CN209906230U (en) Railway ballastless track box girder bridge floor sound barrier hoisting device
JPH09256323A (en) Bridge girder installing apparatus
JP7083491B2 (en) Bridge sleeper replacement auxiliary device and bridge sleeper replacement method
CN210234958U (en) Carrying trolley for high-speed railway construction
CN210636823U (en) Rail type overhead connecting device for pier body steel bar overhead connecting construction
CN218365544U (en) Prestressed concrete precast beam tensioning trolley
CN206352299U (en) A kind of cage car device constructed for water seepage mechanism
JP6682332B2 (en) Bridge removal method
CN204959505U (en) Single line roof beam security platform
CN212477430U (en) Wave form steel web SCC worker method hangs basket with hoisting accessory

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 14

Free format text: PAYMENT UNTIL: 20081109

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081109

Year of fee payment: 14

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 15

Free format text: PAYMENT UNTIL: 20091109

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101109

Year of fee payment: 16

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 16

Free format text: PAYMENT UNTIL: 20101109