JPH0687435U - Underground beam main support stand - Google Patents

Underground beam main support stand

Info

Publication number
JPH0687435U
JPH0687435U JP3375093U JP3375093U JPH0687435U JP H0687435 U JPH0687435 U JP H0687435U JP 3375093 U JP3375093 U JP 3375093U JP 3375093 U JP3375093 U JP 3375093U JP H0687435 U JPH0687435 U JP H0687435U
Authority
JP
Japan
Prior art keywords
pipe
attached
shaped members
height adjusting
underground beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP3375093U
Other languages
Japanese (ja)
Other versions
JP2590136Y2 (en
Inventor
芳彦 橋本
Original Assignee
ニッセイ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ニッセイ株式会社 filed Critical ニッセイ株式会社
Priority to JP1993033750U priority Critical patent/JP2590136Y2/en
Publication of JPH0687435U publication Critical patent/JPH0687435U/en
Application granted granted Critical
Publication of JP2590136Y2 publication Critical patent/JP2590136Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

(57)【要約】 【目的】 内側に生コンクリートが十分に廻り込んで固
化することにより梁の断面欠損を防止して強度を向上さ
せると共に、内側の高さ調整パイプを確実に固定して鉄
筋の重量による沈みを防止して配筋精度を向上させた地
中梁主筋受スタンドを提供するものである。 【構成】 ベース板2の上部に、2本のL形材21、21を
四角形状に配置して、隣接するL形材21、21の端部の間
に間隙部22、22を設けたガイド筒23を立設し、この内側
に高さ調整パイプ4を上下動自在に挿着し、このパイプ
4の上端に鉄筋6を挿通する角パイプ7を横方向にT形
に接合すると共に、前記高さ調整パイプ4の下端側に、
前記ガイド筒23の対向する間隙部22、22を貫通するスト
ッパーボルト29を取付け、このボルト29の両端側に両L
形材21、21の外面と当接するL形の押え金具30、30を取
付けたことを特徴とするものである。
(57) [Summary] [Purpose] Along with the fact that ready-mixed concrete wraps around inside and solidifies, preventing cross-section loss of the beam and improving strength, and securely fixing the inner height adjustment pipe to rebar. The present invention provides an underground beam main bar receiving stand that prevents the sinking due to the weight of the ground and improves the bar arrangement accuracy. [Construction] A guide in which two L-shaped members 21 and 21 are arranged in a square shape on the upper portion of a base plate 2 and gaps 22 and 22 are provided between the ends of the adjacent L-shaped members 21 and 21. A tube 23 is erected, a height adjusting pipe 4 is vertically movably inserted inside the tube 23, and a rectangular pipe 7 through which a reinforcing bar 6 is inserted is joined to the upper end of the pipe 4 in a T-shape in the lateral direction. On the lower end side of the height adjustment pipe 4,
A stopper bolt 29, which penetrates the gaps 22, 22 facing each other of the guide cylinder 23, is attached, and both ends L of the bolt 29
It is characterized in that L-shaped pressing fittings 30, 30 which are in contact with the outer surfaces of the shape members 21, 21 are attached.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

本考案は鉄筋基礎工事において地中梁主筋を支持する受スタンドの改良に関す るものである。 The present invention relates to the improvement of the receiving stand that supports the main reinforcement of the underground beam in the reinforcing bar foundation work.

【0002】[0002]

【従来の技術】[Prior art]

一般に地中梁を施工する場合には、先ず基礎鉄筋を組立てるが、従来は図6に 示すような組立用足場を必要としない地中梁主筋受スタンド1を用いて基礎鉄筋 の組立作業を行なっていた。この構造は、ベース板2の上に角パイプで形成した ガイドパイプ3を立設し、この内側に同様に角パイプで形成した高さ調整パイプ 4を上下動自在に挿着して、外側のガイドパイプ3の側面に取付けたボルト5で 内側の高さ調整パイプ4の側面を固定して任意の高さに調整できるようになって いる。また内側の高さ調整パイプ4の上端には、梁幅に合わせた鉄筋6を貫通す る角パイプ7が横方向にT形に接合され、この角パイプ7の底面に前記鉄筋6を 固定するボルト8が取付けられている。 Generally, when constructing an underground beam, first the basic rebar is assembled, but conventionally, the basic rebar assembly work is performed using the underground beam main bar receiving stand 1 which does not require a scaffold for assembly as shown in FIG. Was there. In this structure, a guide pipe 3 formed of a square pipe is erected on a base plate 2, and a height adjusting pipe 4 also formed of a square pipe is inserted inside the guide pipe 3 so as to be vertically movable, and the outer pipe The height of the inner height adjusting pipe 4 is fixed by a bolt 5 attached to the side surface of the guide pipe 3 so that the height can be adjusted to any height. At the upper end of the inner height adjusting pipe 4, a square pipe 7 penetrating a reinforcing bar 6 according to the beam width is laterally joined in a T shape, and the reinforcing bar 6 is fixed to the bottom surface of the rectangular pipe 7. The bolt 8 is attached.

【0003】 上記構造の地中梁主筋受スタンド1は、図7に示すように地中に掘った溝10の 底部に、栗石11を敷いた後、捨てコンクリート12を打設してベースアンカー13を 埋設する。次いで捨てコンクリート12の上に溝10の長手方向に沿って所定の間隔 で地中梁主筋受スタンド1…を配置して、ベースアンカー13をベース板2にナッ ト14で固定する。この後、水平な角パイプ7に貫通した鉄筋6の上に地中梁上主 筋15…を横方向に間隔をおいて載せ、この上に四角形状のフープ筋16を載せ、更 にフープ筋16の下部に地中梁下主筋17…を載せて針金で結束して鉄筋を組立てる 。この後、型枠を組んでから生コンクリートを流し込んで地中梁を施工していた 。As shown in FIG. 7, the underground beam main bar receiving stand 1 having the above structure has a base anchor 13 by placing a crushed stone 11 at the bottom of a groove 10 dug in the ground and then placing a discarded concrete 12 therein. To bury. Then, the underground beam main bar receiving stands 1 ... Are arranged at a predetermined interval along the longitudinal direction of the groove 10 on the discarded concrete 12, and the base anchor 13 is fixed to the base plate 2 with the nut 14. After this, on the reinforcing bar 6 that penetrates the horizontal square pipe 7, the main reinforcements 15 above the underground beam are placed at intervals in the lateral direction, and the square hoop reinforcement 16 is mounted on this, and the hoop reinforcement is further placed. Place the bottom girder main reinforcement 17 on the lower part of 16 and tie it with wire to assemble the reinforcing bar. After that, the formwork was assembled, and then ready-mixed concrete was poured to construct the underground beam.

【0004】 しかしながら従来の地中梁主筋受スタンド1は、共に角パイプで形成された外 側のガイドパイプ3の内側に高さ調整パイプ4が上下動自在に挿着されて、鉄筋 の支持高さを調整するようになっているため、このガイドパイプ3と高さ調整パ イプ4の内側に形成される中空部は密閉状態となっている。このため中空部の内 側に生コンクリートが流れ込まず、この部分が断面欠損して梁の強度が低下する 問題があった。また内側の高さ調整パイプ4はボルト5により側面から締めつけ て固定する構造であるので接触面積が少なく、支持する鉄筋の重量が重くなった りこの上に作業者が乗ると、高さ調整パイプ4が重みで下がって鉄筋が沈み、配 筋精度が悪くなる問題もあった。However, in the conventional underground beam main bar receiving stand 1, a height adjusting pipe 4 is vertically movably inserted inside an outer guide pipe 3 which is formed of a square pipe, so that the supporting height of the reinforcing bar is increased. Since the height is adjusted, the hollow portion formed inside the guide pipe 3 and the height adjusting pipe 4 is in a sealed state. For this reason, there was a problem that the ready-mixed concrete did not flow into the inside of the hollow part, and the cross-section was lost at this part, reducing the strength of the beam. Also, since the inner height adjusting pipe 4 is fixed by tightening it from the side with bolts 5, the contact area is small, and the weight of the reinforcing bar to be supported becomes heavy. There was also a problem that 4 was lowered due to weight and the rebar sank, resulting in poor rebar accuracy.

【0005】[0005]

【考案が解決しようとする課題】[Problems to be solved by the device]

本考案は上記欠点を除去し、内側に生コンクリートが十分に廻り込んで固化す ることにより梁の断面欠損を防止して強度を向上させると共に、内側の高さ調整 パイプを確実に固定して鉄筋の重量による沈みを防止して配筋精度を向上させた 地中梁主筋受スタンドを提供するものである。 The present invention eliminates the above-mentioned defects and prevents the beam cross section from being broken by improving the strength of the concrete by sneaking into the inside of the ready-mixed concrete and solidly fixing the inner height adjustment pipe. The purpose of the present invention is to provide an underground beam main bar support stand that prevents sinking due to the weight of the reinforcing bar and improves the bar arrangement accuracy.

【0006】[0006]

【課題を解決するための手段】[Means for Solving the Problems]

本考案は、ベース板の上部に、2本のL形材を四角形状に配置して、隣接する L形材の端部の間に間隙部を設けたガイド筒を立設し、この内側に高さ調整パイ プを上下動自在に挿着し、このパイプの上端に鉄筋を挿通する筒状体を横方向に T形に接合すると共に、前記高さ調整パイプの下端側に、前記ガイド筒の対向す る間隙部を貫通するストッパーボルトを取付け、このボルトの両端側に両L形材 の外面と当接するL形の押え金具を取付けたことを特徴とするものである。 According to the present invention, two L-shaped members are arranged in a rectangular shape on the upper part of the base plate, and a guide tube having a gap between the ends of the adjacent L-shaped members is erected on the inside thereof. A height adjustment pipe is vertically movably inserted, a tubular body for inserting a reinforcing bar is joined to the upper end of this pipe in a T shape in the lateral direction, and the guide tube is attached to the lower end side of the height adjustment pipe. It is characterized in that stopper bolts that penetrate through the gaps facing each other are attached, and L-shaped pressing fittings that abut the outer surfaces of both L-shaped members are attached to both ends of the bolts.

【0007】[0007]

【作用】[Action]

本考案の地中梁主筋受スタンドは、ストッパーボルトをガイド筒の間隙部に沿 って上下にスライドさせて高さ調整パイプの位置を調整してから、ナットを締付 けてL形の押え金具によりガイド筒を構成する2本のL形材の外面を締付けて固 定する。次いでこの地中梁主筋受スタンドを、地中に掘った溝の底部の捨てコン クリートの上に所定の間隔で配置して、ベースアンカーをベース板に固定する。 この後、水平な角パイプに貫通した鉄筋の上に地中梁上主筋を横方向に間隔をお いて載せ、この上に四角形状のフープ筋を載せ、更にフープ筋の下部側に地中梁 下主筋を載せて針金で結束して鉄筋を組立てる。この後、型枠を組んでから生コ ンクリートを流し込むと、ガイド筒のコーナーに砕石が通過できる十分な幅に形 成されている間隙部から生コンクリートが内側に流入する。 The underground beam main bar receiving stand of the present invention adjusts the position of the height adjusting pipe by sliding the stopper bolt up and down along the gap of the guide tube, and then tightening the nut to fix the L-shaped presser foot. Tighten the outer surfaces of the two L-shaped members that make up the guide tube with the metal fittings to fix them. Next, the underground beam main bar receiving stand is arranged at a predetermined interval on the discard concrete at the bottom of the groove dug in the ground, and the base anchor is fixed to the base plate. After this, the main reinforcements of the underground girders are placed on the rebars that penetrate the horizontal square pipes with a space in the lateral direction, the square hoop reinforcements are placed on this, and the underground girders are placed on the lower side of the hoop reinforcements. Place the lower main bar and tie it with wire to assemble the reinforcing bar. After this, when the formwork is assembled and the fresh concrete is poured in, the fresh concrete flows into the inside of the guide tube through the gap formed with a width that allows crushed stone to pass.

【0008】 また高さ調整パイプは間隙部を利用してここにストッパーボルトを上下動自在 に貫通させているので、任意の位置で固定することができる。また鉄筋の重量が 加わっても、ストッパーボルトに取付けたL形の押え金具がナットにより締付け られて、押え金具の内側が2本のL形材の外面と当接して間隙部の広がりを防止 すると共に、広い接触面積により大きな摩擦力が作用して、座屈や高さ調整パイ プの位置ずれを防止することができる。Further, since the stopper bolt is vertically pierced through the height adjusting pipe by utilizing the gap portion, the height adjusting pipe can be fixed at any position. Also, even if the weight of the reinforcing bar is added, the L-shaped press fitting attached to the stopper bolt is tightened by the nut, and the inside of the press fitting contacts the outer surfaces of the two L-shaped members to prevent the gap from expanding. At the same time, a large frictional force acts on the wide contact area to prevent buckling and displacement of the height adjustment pipe.

【0009】[0009]

【実施例】【Example】

以下本考案の一実施例を図1ないし図4を参照して詳細に説明する。この地中 梁主筋受スタンド20はベース板2の上部に、2本のL形材21、21を四角形状に配 置して、隣接するL形材21、21の端部の間に間隙部22、22を設けたガイド筒23が 立設されている。このガイド筒23の上端部と下端部の側面には対向する間隙部22 、22を塞ぐようにL形の連結金具24、24が溶接されている。この間隙部22の広さ は図4に示すように生コンクリート25中に混合している砕石26が通過できる20〜 25mm程度に形成されている。 Hereinafter, an embodiment of the present invention will be described in detail with reference to FIGS. This underground beam main bar receiving stand 20 has two L-shaped members 21 and 21 arranged in a square shape on the upper part of the base plate 2 and has a gap between the ends of the adjacent L-shaped members 21 and 21. A guide cylinder 23 having 22 and 22 is provided upright. L-shaped connecting fittings 24, 24 are welded to the side surfaces of the upper end portion and the lower end portion of the guide cylinder 23 so as to close the facing gap portions 22, 22. As shown in FIG. 4, the gap 22 is formed to have a width of about 20 to 25 mm through which the crushed stone 26 mixed in the green concrete 25 can pass.

【0010】 またガイド筒23の内側に挿着した高さ調整パイプ4の上端には図1に示すよう に、梁幅に合わせた鉄筋6を貫通する角パイプ7が横方向にT形に接合され、こ の角パイプ7の中間に鉄筋6を固定するボルト8が取付けられている。更に高さ 調整パイプ4の下端側の対向するコーナーには図2に示すようにボルト挿通孔28 、28が開孔され、ここにストッパーボルト29が貫通し、このストッパーボルト29 の両端は図3に示すようにガイド筒23の間隙部22、22から外側に突設している。Further, as shown in FIG. 1, a square pipe 7 penetrating a reinforcing bar 6 matching the beam width is joined in a T shape in the lateral direction at the upper end of the height adjusting pipe 4 inserted inside the guide cylinder 23. A bolt 8 for fixing the reinforcing bar 6 is attached in the middle of the square pipe 7. Further, as shown in FIG. 2, bolt insertion holes 28, 28 are formed at opposite corners on the lower end side of the height adjusting pipe 4, and stopper bolts 29 penetrate therethrough, and both ends of the stopper bolts 29 are shown in FIG. As shown in FIG. 3, the guide cylinder 23 is provided so as to project outward from the gap portions 22, 22.

【0011】 この外側に突設したストッパーボルト29の端部には、夫々L形の押え金具30が 取付けられている。このL形の押え金具30、30はストッパーボルト29に取付けた ナット14を締め付けることにより、押え金具30、30の内側がガイド筒23を構成す る2本のL形材21、21の外面と当接して高さ調整パイプ4の位置を固定するよう になっている。L-shaped pressing fittings 30 are attached to the ends of the stopper bolts 29 protruding from the outside. By tightening the nut 14 attached to the stopper bolt 29, the insides of the holding metal fittings 30 and 30 form the outer surfaces of the two L-shaped members 21 and 21 forming the guide tube 23. The position of the height adjusting pipe 4 is fixed by abutting on it.

【0012】 上記構成の地中梁主筋受スタンド20は、ストッパーボルト29を間隙部22、22に 沿って上下にスライドさせて高さ調整パイプ4の位置を調整してから、ナット14 を締付けることにより、L形の押え金具30、30がガイド筒23を構成する2本のL 形材21、21の外面と当接して固定される。この後、図7と同様に、地中に掘った 溝10の底部の捨てコンクリート12の上に、溝10の長手方向に沿って地中梁主筋受 スタンド20…を所定の間隔で配置して、ベースアンカー13をベース板2に固定す る。この後、水平な角パイプ7に貫通した梁幅に合わせた鉄筋6の上に地中梁上 主筋15…を横方向に間隔をおいて載せ、この上に四角形状のフープ筋16を載せ、 更にフープ筋16の下部側に地中梁下主筋17…を載せて針金で結束して鉄筋を組立 てる。In the underground beam main reinforcement receiving stand 20 having the above-described structure, the stopper bolt 29 is slid up and down along the gaps 22, 22 to adjust the position of the height adjusting pipe 4, and then the nut 14 is tightened. As a result, the L-shaped pressing fittings 30, 30 are fixed by abutting on the outer surfaces of the two L-shaped members 21, 21 constituting the guide cylinder 23. After this, similarly to Fig. 7, the underground beam main bar receiving stands 20 ... are arranged at predetermined intervals along the longitudinal direction of the groove 10 on the waste concrete 12 at the bottom of the groove 10 dug in the ground. , The base anchor 13 is fixed to the base plate 2. After this, on the reinforcing bars 6 that match the beam width that penetrates the horizontal square pipes 7, the underground beam upper main bars 15 are placed laterally at intervals, and the square hoop bars 16 are placed on this. Furthermore, the lower main beam 17 of the underground beam is placed on the lower side of the hoop reinforcement 16, and the reinforcement is assembled by binding with wire.

【0013】 この後、型枠を組んでから生コンクリート25を流し込むと、図4に示すように ガイド筒23のコーナーに形成した間隙部22、22から生コンクリート25が内側に流 入する。間隙部22の広さは生コンクリート25中に混合している砕石26が通過でき る十分な幅に形成されているので、砕石26が分離することなく内部まで侵入して 固化し、強度の高いコンクリートが全体に形成されるため断面欠損を防止するこ とができる。After that, when the formwork is assembled and then the fresh concrete 25 is poured, the fresh concrete 25 is poured inward from the gap portions 22, 22 formed at the corners of the guide cylinder 23 as shown in FIG. Since the size of the gap 22 is wide enough to allow the crushed stones 26 mixed in the ready-mixed concrete 25 to pass through, the crushed stones 26 penetrate into the inside without solidifying and solidify, and thus the strength is high. Since concrete is formed on the entire surface, it is possible to prevent cross-section loss.

【0014】 また高さ調整パイプ4の固定構造は、図1に示すように前記間隙部22、22を利 用してここにストッパーボルト29を上下動自在に貫通させているので、任意の位 置で固定することができる。また図3に示すようにガイド筒23を構成するL形材 21、21の間の間隙部22は、鉄筋の重量が加わった時に座屈して広がろうとするが 、ストッパーボルト29に取付けたL形の押え金具30、30がナット14により締付け られて、押え金具30、30の内側が2本のL形材21、21の外面と当接して間隙部22 の広がりを防止すると共に、広い接触面積により大きな摩擦力が作用して、大き な加重が加わっても座屈や高さ調整パイプ4の位置ずれを防止することができる 。Further, in the fixing structure of the height adjusting pipe 4, as shown in FIG. 1, since the stopper bolt 29 is vertically pierced through the gap portions 22 and 22, it can be moved to any position. It can be fixed in place. Further, as shown in FIG. 3, the gap 22 between the L-shaped members 21 and 21 forming the guide cylinder 23 tends to buckle and widen when the weight of the reinforcing bar is applied, but it is attached to the stopper bolt 29. Shaped retainers 30, 30 are tightened by nuts 14, and the insides of retainers 30, 30 come into contact with the outer surfaces of the two L-shaped members 21, 21 to prevent the gap 22 from widening and to make a wide contact. Even if a large weight is applied due to a large frictional force acting on the area, it is possible to prevent buckling and displacement of the height adjusting pipe 4.

【0015】 図5は本考案の他の実施例を示すもので、高さ調整パイプ4を丸パイプで形成 したもので、この高さ調整パイプ4の下部側に開口したボルト挿通孔28、28にス トッパーボルト29を貫通させ、更にその両端をL形材21、21の間の間隙部22、22 を貫通させて、ここにL形の押え金具30、30を取付けて、L形材21、21を両側か ら締付けて高さ調整パイプ4の固定と、ガイド筒23の変形を防止するようにした ものである。FIG. 5 shows another embodiment of the present invention, in which the height adjusting pipe 4 is formed by a round pipe, and the bolt inserting holes 28, 28 opened at the lower side of the height adjusting pipe 4 are shown. The stopper bolt 29 is passed through the both ends, and both ends are passed through the gaps 22, 22 between the L-shaped members 21, 21, and the L-shaped press fittings 30, 30 are attached to the L-shaped member 21. , 21 are fastened from both sides to fix the height adjusting pipe 4 and prevent the guide tube 23 from being deformed.

【0016】 なお上記実施例では高さ調整パイプ4の下部側にボルト挿通孔28を開孔して、 ここにストッパーボルト29を貫通させた構造について示したが、高さ調整パイプ 4の下端にリングを溶接して、ここにストッパーボルト29を貫通させる構造でも 良い。In the above-described embodiment, the bolt insertion hole 28 is formed on the lower side of the height adjusting pipe 4, and the stopper bolt 29 is penetrated here. However, at the lower end of the height adjusting pipe 4, The ring may be welded and the stopper bolt 29 may be penetrated here.

【0017】[0017]

【考案の効果】[Effect of device]

以上説明した如く本考案に係る地中梁主筋受スタンドによれば、高さ調整パイ プを上下に案内するガイド筒が、2個のL形材を間隙部を設けて構成されている ので、この間隙部から内側に砕石の混合した生コンクリートが十分に廻り込んで 固化して、梁の断面欠損を防止して強度を向上させると共に、高さ調整パイプに 接続したストッパーボルトの両端に設けたL形の押え金具が、間隙部を挟んで隣 接するL形材を両側から締付けて高さ調整パイプを確実に固定できるので鉄筋の 重量による沈みを防止して配筋精度を向上させることができる。 As described above, according to the underground beam main reinforcement receiving stand according to the present invention, the guide tube for vertically guiding the height adjusting pipe is configured by providing two L-shaped members with a gap. The raw concrete mixed with crushed stones fully intrudes into the inside from this gap and solidifies to prevent the cross-section loss of the beam to improve the strength, and at the both ends of the stopper bolt connected to the height adjustment pipe. The L-shaped presser fitting can securely fix the height adjustment pipe by tightening the L-shaped members that are adjacent to each other across the gap from both sides, so it is possible to prevent sinking due to the weight of the reinforcing bar and improve the bar arrangement accuracy. .

【図面の簡単な説明】[Brief description of drawings]

【図1】本考案の一実施例による地中梁主筋受スタンド
を示す斜視図である。
FIG. 1 is a perspective view showing an underground beam main bar receiving stand according to an embodiment of the present invention.

【図2】図1のガイド筒と高さ調整パイプの接続部を示
す断面図である。
FIG. 2 is a cross-sectional view showing a connecting portion between the guide cylinder and the height adjusting pipe of FIG.

【図3】図1のAーA線断面図である。3 is a cross-sectional view taken along the line AA of FIG.

【図4】生コンクリートを流し込んだ状態の図1のBー
B線断面図である。
FIG. 4 is a sectional view taken along line BB in FIG. 1 in a state where fresh concrete is poured.

【図5】本考案の他の実施例による高さ調整パイプを丸
パイプで形成した地中梁主筋受スタンドの断面図であ
る。
FIG. 5 is a sectional view of an underground beam main bar receiving stand in which a height adjusting pipe is a round pipe according to another embodiment of the present invention.

【図6】従来の地中梁主筋受スタンドを示す斜視図であ
る。
FIG. 6 is a perspective view showing a conventional underground beam main bar receiving stand.

【図7】図6に示す従来の地中梁主筋受スタンドにより
鉄筋を組立てた状態を示す正面図である。
7 is a front view showing a state where rebars are assembled by the conventional underground beam main bar receiving stand shown in FIG.

【符合の説明】[Explanation of sign]

1 地中梁主筋受スタンド 2 ベース板 3 ガイドパイプ 4 高さ調整パイプ 5 ボルト 6 鉄筋 7 角パイプ 8 ボルト 12 捨てコンクリート 13 ベースアンカー 15 地中梁上主筋 16 フープ筋 17 地中梁下主筋 20 地中梁主筋受スタンド 21 L形材 22 間隙部 23 ガイド筒 24 L形の連結金具 25 生コンクリート 26 砕石 28 ボルト挿通孔 29 ストッパーボルト 30 押え金具 1 Underground beam main bar receiving stand 2 Base plate 3 Guide pipe 4 Height adjustment pipe 5 Bolt 6 Reinforcing bar 7 Square pipe 8 Bolt 12 Discarded concrete 13 Base anchor 15 Underground beam upper main bar 16 Hoop bar 17 Underground beam lower main bar 20 Ground Middle beam main bar receiving stand 21 L-shaped member 22 Gap 23 Guide tube 24 L-shaped connecting metal fitting 25 Fresh concrete 26 Crushed stone 28 Bolt insertion hole 29 Stopper bolt 30 Holding metal fitting

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 ベース板の上部に、2本のL形材を四角
形状に配置して、隣接するL形材の端部の間に間隙部を
設けたガイド筒を立設し、この内側に高さ調整パイプを
上下動自在に挿着し、このパイプの上端に鉄筋を挿通す
る筒状体を横方向にT形に接合すると共に、前記高さ調
整パイプの下端側に、前記ガイド筒の対向する間隙部を
貫通するストッパーボルトを取付け、このボルトの両端
側に両L形材の外面と当接するL形の押え金具を取付け
たことを特徴とする地中梁主筋受スタンド。
1. A guide tube having two L-shaped members arranged in a quadrangular shape on the upper portion of a base plate and having a gap between the ends of adjacent L-shaped members is erected upright. A height adjusting pipe is vertically movably attached to the upper end of the pipe, and a tubular body through which a reinforcing bar is inserted is joined to the upper end of the pipe in a T shape in the lateral direction, and the guide pipe is attached to the lower end side of the height adjusting pipe. Underground beam main bar receiving stand, characterized in that stopper bolts penetrating the facing gaps are attached, and L-shaped pressing metal fittings that abut the outer surfaces of both L-shaped members are attached to both end sides of the bolts.
JP1993033750U 1993-05-28 1993-05-28 Underground beam main reinforcement stand Expired - Lifetime JP2590136Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1993033750U JP2590136Y2 (en) 1993-05-28 1993-05-28 Underground beam main reinforcement stand

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1993033750U JP2590136Y2 (en) 1993-05-28 1993-05-28 Underground beam main reinforcement stand

Publications (2)

Publication Number Publication Date
JPH0687435U true JPH0687435U (en) 1994-12-22
JP2590136Y2 JP2590136Y2 (en) 1999-02-10

Family

ID=12395105

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1993033750U Expired - Lifetime JP2590136Y2 (en) 1993-05-28 1993-05-28 Underground beam main reinforcement stand

Country Status (1)

Country Link
JP (1) JP2590136Y2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020094443A (en) * 2018-12-14 2020-06-18 正利 高田 Method for constructing foundation of building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020094443A (en) * 2018-12-14 2020-06-18 正利 高田 Method for constructing foundation of building

Also Published As

Publication number Publication date
JP2590136Y2 (en) 1999-02-10

Similar Documents

Publication Publication Date Title
KR101498720B1 (en) Design method for steel frame girder having reinforcing member at end lower part thereof
US3842558A (en) Wall attachment system
CN210216483U (en) Foundation and foundation bearing platform thereof
CN218204941U (en) Connecting structure of shear wall and floor slab
KR101906322B1 (en) Rahmen bridge allowing longitudinal displacement and construction method therefor
JP2928942B2 (en) Column beam connection and construction method
JPH0687435U (en) Underground beam main support stand
JP3098560U (en) Precast culvert block
JP2737099B2 (en) Construction method of underground beam reinforcing bars and underground beams
JP2860491B2 (en) Solid foundation using steel frame
JP2000001865A (en) Side face body for construction and execution method of structure using the same
KR102634379B1 (en) Prefabricated bracket assembly integrated with prefabricated column assembly for connecting PC beams
KR102330481B1 (en) Semiconductor factory structure using grill beam structure
JPH05195539A (en) Steel-framed column base
CN217679836U (en) Bottom-reinforced high-strength concrete combined shear wall
JPH0673203U (en) Beam-column joint structure
CN211369261U (en) Simple and easy independent foundation upright post construction is synthesized reinforcing bar frame
KR102585526B1 (en) Composite frame with end-buried girder joint
JP2560598B2 (en) RC reverse construction method
JP2952366B2 (en) Composite beam and its manufacturing method
JP3465025B2 (en) Foundation structure
JPH0132345B2 (en)
JP3232487B2 (en) Construction method of column base and column base structure
JP3863322B2 (en) Steel reinforced concrete column base structure
JPH0823176B2 (en) Steel plate concrete structure joining method